Time Schedule-tugas Metode Pelaksanaan Konstruksi

  • Uploaded by: MAWAR99
  • 0
  • 0
  • April 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Time Schedule-tugas Metode Pelaksanaan Konstruksi as PDF for free.

More details

  • Words: 921
  • Pages: 7
Volume

Harga Satuan (Rp)

Jumlah

B obot (%)

Durasi (Hari)

1.

Tebas Tebang

200

10

2000

18.18

59

2.

Potong Tumbang

200

20

4000

36.36

99

3.

Kumpul

200

15

3000

27.27

49

4.

Bakar

200

10

2000

18.18

57

Total 11000 Kumulatif Waktu (Hari) Bobot Pekerjaan/Ha Kumulatif Pekerjaan/Ha

100.00

264

No.

Uraian Pekerjaan

1

2

3

4

Waktu (Bulan) 5

6

7

8

9

30 30 9.24 9.24

30 60 9.30 18.55

30 90 11.02 29.57

30 120 11.02 40.59

30 150 11.02 51.61

30 180 15.18 66.79

30 210 15.98 82.78

30 240 9.57 92.34

24 264 7.66 100.00

No.

Uraian Pekerjaan

Volume

Harga Satuan (Rp)

Jumlah

Bobot (%)

Durasi (Hari)

1.

Tebas Tebang

200

10

2000

18.18

59

2.

Potong Tumbang

200

20

4000

36.36

99

3.

Kumpul

200

15

3000

27.27

49

4.

Bakar

200

10

2000

18.18

57

Total 11000 Kumulatif Waktu (Hari) Bobot Pekerjaan/Ha Kumulatif Pekerjaan/Ha

100.00

265

1 30

2 29 1

3

4

Waktu (Bulan) 5

30

30

30

6

7

22

27

30 60 9.30 18.55

30 90 11.02 29.57

30 120 11.02 40.59

30 150 11.02 51.61

9

30

24

30 240 9.57 92.34

24 264 7.66 100.00

8

3

30 30 9.24 9.24

8

30 180 15.18 66.79

30 210 15.98 82.78

No.

Uraian Pekerjaan

Volume

Harga Satuan (Rp)

Jumlah

Bobot (%)

Durasi (Hari)

1.

Tebas Tebang

200

10

2000

18.18

59

2.

Potong Tumbang

200

20

4000

36.36

99

3.

Kumpul

200

15

3000

27.27

49

4.

Bakar

200

10

2000

18.18

57

Total 11000 Kumulatif Waktu Bobot Pekerjaan Kumulatif Pekerjaan

100.00

265 (Hari) (%) (%)

1 30

2 29

3

1

30

Waktu (Bulan) 4 5

30

30

6

7

22

27

8

8

7

30

20

30 210 24.60 93.62

20 230 6.38 100.00

'15 30 30 9.24 9.24

30 60 9.30 18.55

30 90 11.02 29.57

30 120 11.02 40.59

30 150 11.02 51.61

30 180 17.42 69.02

Jika tidak ada batas waktu dan hanya tersedia 1 unit traktor untuk mengerjakan seluruh pekerjaan: No.

Uraian Pekerjaan

Volume

Harga Satuan (Rp)

Jumlah

Bobot (%)

Durasi (Hari)

110 100 90 80 70 60 50 40

1 30

1.

Tebas Tebang

200

10

2,000

18.18

59

2.

Potong Tumbang

200

20

4,000

36.36

99

3.

Kumpul

200

15

3,000

27.27

49

4.

Bakar

200

10

2,000

18.18

57

Total 11,000 Kumulatif Waktu (Hari) Bobot Pekerjaan (%) Kumulatif Pekerjaan (%)

100.00

265

30 30 9.24 9.24

0 0

1 9.24

2 29

Waktu (Bulan) 4 5

3

6

7

8 100%

1

30

30

30

8 22

30 20 10 0

27 7

50%

30

20

'15 0

0.5

1

30 60 9.30 18.55 2 18.55

1.5

2

30 90 11.02 29.57 3 29.57

2.5

3

30 120 11.02 40.59 4 40.59

3.5

4

30 150 11.02 51.61 5 51.61

4.5

5

30 180 17.42 69.02 6 69.02

5.5

30 210 24.60 93.62 7 93.62

6

6.5

20 230 6.38 100.00 8 100.00

7

0%

7.5

8

No.

Uraian Pekerjaan

Volume

Harga Satuan (Rp)

Jumlah

Bobot (%)

Durasi (Hari)

1.

Tebas Tebang

200

10

2000

18.18

30

2.

Potong Tumbang

200

20

4000

36.36

50

3.

Kumpul

200

15

3000

27.27

25

4.

Bakar

200

10

2000

18.18

57

Total 11000 Kumulatif Waktu (Hari) Bobot Pekerjaan/Ha Kumulatif Pekerjaan/Ha

100.00

192

1 30 '15

Waktu (Bulan) 2 3

30

4

5

'15 15 '15

30 30 29.09 29.09

30 60 38.18 67.27

10 30

27

30 90 24.11 91.39

27 117 8.61 100.00

Jika waktu dibatasi 4 bulan dan disediakan 2 unit traktor untuk menyelesaikan masing-masing kegiatan/pekerjaan: No.

Uraian Pekerjaan

Volume

Harga Satuan (Rp)

Jumlah

Bobot (%)

120

Durasi (Hari) 100

1.

Tebas Tebang

200

10

2,000

18.18

30

80

2.

Potong Tumbang

200

20

4,000

36.36

50

60

3.

Kumpul

200

15

3,000

27.27

25

4.

Bakar

200

10

2,000

18.18

57

Total 11,000 Kumulatif Waktu (Hari) Bobot Pekerjaan (%) Kumulatif Pekerjaan (%)

100.00

192

1 30 '15

Waktu (Bulan) 2 3

100% 30

5

'15 15 '15

40 20

0 0

4

10

50% 30

27

0 0

30 0.5 301 30 60 29.09 38.18 29.09 67.27 1 29.09

2 67.27

1.5

30 2 90 24.11 91.39

2.5 27 117 8.61 100.00

3 91.39

4 100.00

3

0%

3.5

4

Jika waktu dibatasi 4 bulan dan hanya tersedia 2 unit traktor untuk menyelesaikan seluruh pekerjaan: Tebas Tebang: 2 traktor: (15/30)*2000 Ha = 1000 Ha. 1 traktor: ((2000 Ha-1000 Ha)/2000 Ha)*59 hari = 30 hari. Potong Tumbang: 1 traktor: (79/99)*2000 = 1595,96 Ha. 2 traktor: ((2000 Ha-1595,96 Ha)/2000 Ha)*50 hari = 10 hari. Kumpul: 1 traktor: 49 hari. Bakar: Diperkirakan sekitar 57 hari. No.

Uraian Pekerjaan

Volume

Harga Satuan (Rp)

Jumlah

Bobot (%)

Durasi (Hari)

1.

Tebas Tebang

200

10

2,000

18.18

45

2.

Potong Tumbang

200

20

4,000

36.36

86

3.

Kumpul

200

15

3,000

27.27

49

110 100 90 15 80

Waktu (Bulan) 2 3 15 '15

1 '15

1 70 2 15 '15 60 '15 50

Bakar

200

10

2,000

18.18

Total 11,000 100.00 Kumulatif Waktu (Hari) Bobot Pekerjaan (%) Kumulatif Pekerjaan (%) Pembulatan Bobot Pekerjaan (%) Pembulatan Kumulatif Pekerjaan (%)

57 267

0 0

30 1

15 '15

40

4.

30

30

30 20 10 0

1

0 30

0.5

30 19.22 19.22 19 19

1 30 60 23.99 43.21 24 43

1 19.22

2 43.21

1.5

30

4 100% '10 2 4

50% 27

30 2 90 37.29 80.50 37 80

2.527

117 19.58 100.08 20 100

3 80.50

4 100

3

0%

3.5

4