Production Systems Planning, Control & Networking E-business and E-work Applications Functional decomposition Maintain work specification list
< < us es > >
Shipowner Sign contract
S hipow ner S ubm it enquiry
Receive enquiry
Submit Enquiry
Shipowner
Repair worklist to purchasing department
E stim ate produc tion Examine Enquiry Request work specification list
< < us es > > Rec eive tender
Shipyard
Shipyard Plan the work
P lan p rodu c tion Submit work specification Shipowner list
S ubm it tender
Shipowner, Shipyard
Ship inspection
Shipyard, subcontractors Shipyard, shipowner
Shipyard Prepare estimate
Update repair worklist
S ubm it shiprepair contract < < u ses > >
S hipy ard
S ubm it reques t for quotation
< < us es > >
S tart shiprepair work Receive quotation < < us es> >
S ub mit quot ation
Rec eive reques t for qu otation
Receive work specification list Estimate manhours Estimate materials, RFQs Estimate subcontracts, RFQs Estimate time Produce tender
Plan the work
Keep manhours record
Shipyard, shipowner, subcontractors
Shipyard Materials requisition, Shipyard (Production), RFQs (Production) Subcontractors Shipyard
Follow up Shipyard subcontractors work
Combine Material Requirements
Shipyard (Purchasing)
Orders to suppliers
Shipyard (Purchasing)
Materials delivery
Trac k s hiprepair work
Suppliers
Shipyard
Submit tender
Produce shiprepair invoice Shipyard
Update produc tion plan
Update plan
Negotiations
S ubco ntra c tor
P lan produc tion
E s tim ate produc tion
Accepted ?
Submit invoice
No
Yes
Payment of the invoice
Shipyard
Shipowner
Makris, S., D. Mourtzis, N. Papakostas, G. Chryssolouris and I. Gaviotis, "An e-Collaboration Software Framework for the Ship Repair Supply Chain", Proceedings of the 12th International Conference on Computer Applications in Shipbuilding-ICCAS, Busan, -Korea, (August 2005) pp. 717-727.
Production Systems Planning, Control & Networking E-business and E-work Applications Internet based Collaboration
Makris, S., D. Mourtzis, N. Papakostas, G. Chryssolouris and I. Gaviotis, "An e-Collaboration Software Framework for the Ship Repair Supply Chain", Proceedings of the 12th International Conference on Computer Applications in Shipbuilding-ICCAS, Busan, -Korea, (August 2005) pp. 717-727.
Production Systems Planning, Control & Networking E-business and E-work Applications Standards Based Data Modeling
Ship Product Model Exchange Requirements TC 184/SC 4 Part Libraries ISO 13584 ISO TC 184/SC 4/WG 2 Ship Core Structure Ship Arrangements ISO AP 215 WG 3/T 23 Ship Hull Forms ISO AP 216 WG 3/T 23 Ship Structures ISO AP 218 WG 3/T 23
Ship_operational_log
Ship Structures (Common Model) ISO 10303, Part 102 (Withdrawn) ISO TC 184/SC 4/WG 3/T 23
Distribution Systems
Mission Subsystems/Equipm.
Electrical ISO AP 212 JWG 9
Ship Mechanical Systems ISO AP 226 WG 3/T 23
Piping ISO AP 227 and AP 217 WG 3/T 20 and T 23 HVAC ISO AP 227 WG 3/T 20
Miscellaneous Operational Logs, Records & Messages ISO AP 234 JWG with TC 8
Outfit and Furnishings
ARM AP2
Application Protocols
Tender_due_date
ISO UoF 2
UoF 3
Calendar_date
Ship_inf ormation
Weapons
Enquiry
UoF 1
Calendar_date
Ship_arrival_date_to Electronics
Hydraulics/Pneumatics
ARM AP1
Calendar_date
Ship_arrival_date_f rom
Ship_characteristics
Job_Inf ormation L[1:?]
Shipyard_job
Units of Functionality General_notes
Building Blocks
Text
Text Terms_and_conditions_of _the_repair
Chryssolouris, G., Makris, S., Xanthakis, V., Konstantinis, V., An XML based implementation of the Value Added Chain in Manufacturing: A Ship repair Case Study, CIRP Journal of Manufacturing Systems, (Vol.32, No.6, 2003)