"THE INTEGRATION AND OPERATION OF WIND POWER PLANTS INTO POWER SYSTEMS" TRAINING COURSE

Curricula for

MODULE 2 CRITERIA/REQUIREMENTS/CERTIFICATES FOR WIND POWER PLANTS CONNECTION AND OPERATION TO/AS PART OF THE NATIONAL POWER SYSTEM (NPS). THE DIMENSIONING AND SAFETY IN OPERATION OF THE ELECTRICAL POWER NETWORKS/NPS, IN CASE OF WIND POWER PLANTS CONNECTION AT NPS ELECTRICAL POWER NETWORKS. Ph. D. Vatră Fănică - LPQI/LPQIVES National Coordinator Ph. D. Poida Ana - LPQI/LPQIVES National Manager

LPQIVES is co-finaced by:

LPQIVES is a programme of:

LPQI is part of:

www.lpqi.org PARTNER NAME S.I.E.R.  internet address - www.sier.ro e-mail address: [email protected]  Address: Bdul Lacul Tei no.1, sector 2, Bucureşti phone number + 0722.361.954  Copyright ©SIER. fax number: + 021.610.52.83

1

Module 2 CRITERIA/REQUIREMENTS/CERTIFICATES FOR WIND POWER PLANTS CONNECTION AND OPERATION TO/AS PART OF THE NATIONAL POWER SYSTEM (NPS). THE DIMENSIONING AND SAFETY IN OPERATION OF THE ELECTRICAL POWER NETWORKS/NPS, IN CASE OF WIND POWER PLANTS CONNECTION AT NPS ELECTRICAL POWER NETWORKS. 1 INTRODUCTION The utilisation of the wind installations represents a serious option for electrical energy generation, but the connecting conditions of the power plants at the power system and the injection of electrical energy/power into the electrical power system is not so easy at it looks. The cost of the produced wind energy also is depending on the nodes to which the respective wind power plants (WPP) are connected on. The wind power plants can be connected at different points of medium and high voltage, having -as a consequence - different operation costs, which are depending on the local electrical networks configuration, the costs of electrical lines needed for the connection of the wind power plants at power system and the costs of the needed electrical networks modifications. The proposed connecting solutions have to assure the optimal and absolutely safety operation of the wind groups, as well the fulfilment of the electrical networks operators and system operators specific requirements, for do not affect the optimal and absolutely safety operation of the electrical networks, respectively of the entire power system. 1.1 General aims This module’s general aim is to provide the attendants the basic knowledge about the connection and operation of the wind groups and power plants at/into the electrical networks of the NPS and about the dimensioning and safety in operation of the electrical power networks, respectively of the NPS, in case of wind power plants connection at NPS electrical power networks. The aim is achieved through 6 didactic sections, presented at point 2.2 from curricula. 1.2 Target groups This module’s target groups are: investors, consultants, designers, electrical installations building up or installation work contractor, managers and specialists from the electricity generation companies based on renewable power resources, respectively from the electricity companies, responsible with the initiation, financing, designing, implementation/performing, operating and maintenance of wind installations, from equipment sellers and services, as well, who intend to increase their knowledge in this field. 2 SPECIFIC AIMS AND TOPICS The pathway of module consists of a 2 days seminar, subdivided in sections (with different duration), with these contents and related aims. 1st day Contents Aims

Contents

Aims

The connection of the wind power plants at the NPS electrical networks. Electrical generators used into wind power plants. The wind power groups control. The operation of the wind groups and power plants into the electrical networks of the NPS. The first day aim is to provide the attendants the basic knowledge about the main components and parameters/characteristics of the wind installations, as well reffering to the connection and the operation of the wind groups and power plants into the electrical networks of the NPS. 2nd day The influence of the electrical power networks/NPS on wind power plants operation. The electrical power networks/NPS operation in case of wind power plants connecting to the electrical networks of the NPS. The wind power plants control. The integration into the operative/dispatching control of NPS. During the second day are provided the basic knowledge about the influence of the electrical power networks on wind power plants operation, the electrical power networks/NPS operation in wind power plants presence. Also, there are presented several basic information as regards the wind power plants control and their integration into operative/dispatching control of NPS.

Below there’s an overview of the module contents. www.lpqi.org PARTNER NAME S.I.E.R.  internet address - www.sier.ro e-mail address: [email protected]  Address: Bdul Lacul Tei no.1, sector 2, Bucureşti phone number + 0722.361.954  Copyright ©SIER. fax number: + 021.610.52.83

2

2.1 Pathway of course / module Time progression (hours)

Section

Knowledge level

Course opening

Course opening. Information.

1

Connection of WPP at NPS electrical networks

2

El. generators used into wind power plants.

3

Wind power groups control.

4

The WPP operation into el. networks. The influence on WPP.

5

El. power networks/ NPS operation in WPP presence

900

6

WPP integration into NPS dispatching control

930

The end of seminar/ module

Lesson

015

215

315

430

630

730

3

Lesson and discussions

Final discussions. Questioner filling. Confirmation of attendance.

MODULE DETAILED PROGRAM

First day: 60 min. 15 min. 120 min.

Participants registration Course opening. Information. Section 1: The connection of the wind power plants at the NPS electrical networks. - The main components and parameters/characteristics of a wind installation/ group. - The electrical schema of a wind group. - Operating regimes / states of a wind group. - The voltage levels at which the wind groups/power plants can be connected.

www.lpqi.org PARTNER NAME S.I.E.R.  internet address - www.sier.ro e-mail address: [email protected]  Address: Bdul Lacul Tei no.1, sector 2, Bucureşti phone number + 0722.361.954  Copyright ©SIER. fax number: + 021.610.52.83

3 - The internal electrical network of wind power plants. - Wind groups/power plants connecting solutions to the electrical power systems. - Technical aspects of the wind power plants connecting to the electrical power system. Services that can be performed by the wind groups/power plants. - International standards relating to the wind power plants and connecting of distributed sources to power systems Modality: Lesson and discussions. 30 min.

Coffee break

60 min.

Section 2: Electrical generators used into wind power plants. - The asynchronous machine. - The asynchronous generator with short-circuited rotor. - The asynchronous generator with phase-wound rotor. - The synchronous generator. - The reactive power control when wind groups are used. Modality: Lesson and discussions.

75 min.

Section 3: Wind power plants control. - General idea of wind power groups/units control. - Monitoring and control system of the wind power group/unit. - The control system of turbine. - The control system of generator Modality: Lesson and discussions.

Second day: 120 min.

Section 4: The operation of the wind power plants into the electrical networks. The influence of the electrical power networks on wind power plants operation. - The network voltage variation/fluctuation. - The short circuit currents. - The active power losses. Modality: Lesson and discussions.

30 min.

Coffee break

60 min

Section 5: The electrical power networks/NPS operation in wind power plants presence. - The losses into the electrical power distribution networks. - The safety operation of the electrical power system. - The contribution of wind power systems at the system services performing. Modality: Lesson and discussions.

90 min.

Section 6: The integration into the operative/ dispatching control of NPS. - The wind power plants monitoring. - The operative/dispatching control of NPS. - The integration of wind power plants into the operative/dispatching control of NPS - The operational/operative control extended to big wind power plants. Modality: Lesson and discussions.

30 min.

Final discussions. End of the module/course. User Satisfaction Questioners filling by the attendants. Confirmation of attendance at module/course.

www.lpqi.org PARTNER NAME S.I.E.R.  internet address - www.sier.ro e-mail address: [email protected]  Address: Bdul Lacul Tei no.1, sector 2, Bucureşti phone number + 0722.361.954  Copyright ©SIER. fax number: + 021.610.52.83

4

GENERAL NOTES: - each day there will be coffee breaks, in the purpose of dividing the teaching periods in sections not exceeding 2.5 hours; - at the beginning of the module the lecturer will explain the module aims; - at the end of the module/lessons, a user satisfaction survey will help the lecturer in monitoring the module quality. 4

TEACHING METHODS

Teaching methods are summarized in three main moments: − knowledge transfer (Lesson): topics exposure by the lecturer with the help of slides and eventually other electronic tools (animations, data sheets, didactic movies); − deepening/learning verification (Discussion): general discussion stimulated by the lecturer (also during the lesson) to verify knowledge transfer and to eventually deepen particular topics. During all the sections, the lecturer will always attend, with teaching and/or activity coordination duty. 5

DIDACTIC MATERIAL AND TOOLS

The didactic tools which will be used by the lecturers will be: − Blackboard; − Video-projector; − Pointer; − Notebook. The lecture room will be suitable to allow the use of all the above listed didactic tools. Each user will receive, during the registration, a folder containing: − course program; − lecture notes containing all or part of the lecture slides. At the end of each lesson/section the lectures will perform a Test referring to the taught knowledge. Some additional materials are available, as electronic form, at: http://www.leonardo-energy.org The folder will also include a user satisfaction questionnaire (which will be filled by attendants at the end of the course).. 6 EXISTING KNOWLEDGE REQUIREMENTS Topic General energetics. Renewable resources Electrical circuits Electrical networks and systems Electrical power plants The operative control of NPS.

7

Basic

Level Medium • • • •

High



ACQUIRED KNOWLEDGE

The knowledge acquired during the seminar/module should be sufficient for retention of basic aspects referable to: - The connection of the wind power plants at the NPS electrical networks. - Electrical generators used into wind power plants. - The wind power plants control. - The operation of the wind power plants into the electrical networks. - The influence of the electrical power networks on wind power plants operation. - The electrical power networks/NPS operation in wind power plants presence. - The wind power plants integration into the operative/ dispatching control of NPS. www.lpqi.org PARTNER NAME S.I.E.R.  internet address - www.sier.ro e-mail address: [email protected]  Address: Bdul Lacul Tei no.1, sector 2, Bucureşti phone number + 0722.361.954  Copyright ©SIER. fax number: + 021.610.52.83