You are about to undergo
Safety Induction Training Please enjoy your seat and pay attention carefully
Potential Hazards at Hazard is anything that can Workplace cause harm
Potential Hazards at Workplace a. Fall from trap into deep height,
deep hole
hole
Potential Hazards at Workplace a. Fall from trap into deep height,
hole,
fall into sea
Potential Hazards at Workplace b. stabbeand lacerated by sharp Cut,
d,
objects/tools
Potential Hazards at Workplace c. electric shock and Fire ,
explosion
Potential Hazards at Workplace crushed by heavy d. Falling object,
object,
Potential Hazards at Workplace crushed by heavy d. Falling entangled by rotating object, object, hit machines/parts, by moving vehicles
Potential Hazards at Workplace e. Exposure of harsh weather as storm, heavy rain, sun heat Rain
Oh.. Its so hot today.. I need more drink water, otherwise I will get dehydration
Guys, its rain now. Stop the activity and go sheltering
Potential Hazards at Workplace a. Bitten by noxious animals or insects as snake, scorpion, and bee/wasp Be careful of my stings too …
My bite is even more noxious then yours…
My tail and tweezers, they are so noxious ..
Potential Hazards at Workplace g. Exposure to noise, radiation, and poisonous materials Exposure to excessive noise for long period may lead to injury of hearing system
Drt!!! Drt!!! Drt!!! Drt!!! drt!!!!
Controlling Hazards Hazards are controllable
Controlling Hazards a. Engineering control Installation of proper scaffolding (proper flat-form, handrails, ladder, bracing, jack-plate, etc.)
Controlling Hazards a. Engineering control Use of safe ladder. Never use defect ladder or drum while working
Controlling Hazards a. Engineering control Furthermore, when personnel must use long I ladder make sure there is another person to hold the ladder or make sure the ladder secured to fix structure
Assign one person to hold the ladder
Secure to fix structure
Controlling Hazards a. Engineering control Cover of hole/opening. Every hole/opening with hazard of people fall into it must be covered properly. I must cover this hole / opening properly, otherwise people will fall into it
Controlling Hazards a. Engineering control Installation of safety barrier means to isolate the hazard and to keep people away from the hazard.
Ups.. Sorry
Hey, you have to stay outside the barrier
Controlling Hazards b. Arrangement of Equipments and Materials on the Safe Place and Safe Manner
Example: Acetylene tanks must be place on upright position and be secured to fix structure as rack.
Controlling Hazards b. Arrangement of Equipments and Materials on the Safe Place and Safe Manner Example: Bend all protruding nails on waste of woods to prevent foot punctured by nails. For our own safety, we must bend all this protruding nails
Ouch… I forgot to bend that nail. Now, my foot punctured by nail
Are you OK? Let me help you
Controlling Hazards b. Arrangement of Equipments and Materials on the Safe Place and Safe Manner Materials laid down in unsafe place may endanger employees in the vicinity
Controlling Hazards b. Arrangement of Equipments and Materials on the Safe Place and Safe Live cable must be with proper insulation, proper Manner connection, grounding, and to be arrange in such way to Whentrailing necessary, post warning signs in the vicinity. avoid cable.
Controlling Hazards b. Arrangement of Equipments and Materials on the Safe Place and Safe Flammable materials must be stored in separate room that Manner free from spark of fire or excessive heat and with sufficient Storage must be posted with warning sign “flammable ventilation. materials”, prohibition sign “no smoking”, and Material Safety Data Sheet (MSDS).
Controlling Hazards b. Arrangement of Equipments and Materials on the Safe Place and Safe Harmful substances to be stored in separate room with Manner restricted access and completed with warning sign and MSDS Only competent and authorized person may deal with harmful substances.
Controlling Hazards c. Provision of safety signs in the strategic area of the Workplace Prohibition sign: white background, circular red border with diagonal cross bar, black symbol. Prohibition sign means that particular action is prohibited in the area.
No Smoking
Controlling Hazards c. Provision of safety signs in the strategic area of the Workplace Warning sign: triangle shape, yellow background, black border, and black symbol. Warning sign means to warn attendance about potential hazard that may happen in the vicinity
Controlling Hazards c. Provision of safety signs in the strategic area of the Workplace Mandatory sign: round shape, blue background, and white symbol Mandatory sign means that action must be done as mandated by the sign.
Controlling Hazards d. Use of proper Personal Protective Equipment (PPE). Safety Helmet, means to protect head from impact caused by falling object, moving object, and etc. Safety helmet must be worn properly at all time while personnel present on the premises Helmet is very Important
Controlling Hazards d. Use of proper Personal Protective Equipment (PPE). Safety Shoes is steel toe shoes means to protect feet from falling object, sharp object, impact, insect, chemical, and etc. Safety shoes must be properly worn at all time while on the premises.
Safety Shoes
Controlling Hazards d. Use of proper Personal Protective Equipment (PPE). Safety belt / body harness is a mean of falling protection. In case personnel fall from height, safety belt / body harness will catch the person. Personnel working at a place 2 meters high or more and with hazard of falling person, must use safety belt / body harness. Safety belt / body harness
2m
Controlling Hazards d. Use of proper Personal Protective Equipment (PPE). Another example of safe use of safety belt / body harness. Anchor safety belt to fix structure, do not anchor it to unfix structure.
Correct Method
Incorrect Method
Controlling Hazards d. Use of proper Personal Protective Equipment (PPE). Working at height without safety belt / body harness is very dangerous.
Unsafe action (no safety belt)
>2m
Controlling Hazards d. Use of proper Personal Protective Equipment (PPE). Use of face shield for cutting and grinding work. Face shield means to protect face from spark of fire or flying-broken cutting / grinding disk. So, remember to use face shield while grinding or cutting
I didn’t wear face shield while grinding. Suddenly the disk broken and hit my face. Look at my face, it so badly injured.
Controlling Hazards d. Use of proper Personal Protective Equipment (PPE). Welding work requires welder to use welding mask, welding gloves, welding apron, and smoke maskmask (if necessary). Welding No welding mask No apron
Welding clothes Apron No welding gloves
Welding gloves
Controlling Hazards d. Use of proper Personal Protective Equipment (PPE). When exposed to excessive noise, personnel must use ear plug / ear muff to reduce the noise to acceptable level.
Ear plug
Controlling Hazards d. Use of proper Personal Protective Equipment (PPE). When exposed to excessive noise, personnel must use ear plug / ear muff to reduce the noise to acceptable level.
Ear muff
Controlling Hazards d. Use of proper Personal Protective Equipment (PPE). Use of proper hand gloves to protect hands from injury.
When hand gloves get defected, change it with the new one
OK Sir
Controlling Hazards d. Use of proper Personal Protective Equipment (PPE). When working on or over water, wear life jacket
Its easier for your buddy to help you if you use life jacket Life jacket will keep you floating when you fall in to water
Controlling Hazards d. Use of proper Personal Protective Equipment (PPE).
When driving, fasten your seat belt. To see why seat belt is important to you, take a look at this…. So.. Remember to use seat belt while driving!!!
Controlling Hazards e. Periodic Safety Training and Safety Campaign is held for new personnel prior to Safety work on site. Personnel undergone induction to be induction informed about hazards on site, hazards control, site safety regulation, emergency response, and etc.
Indoor Safety Induction
Outdoor Safety Induction
Controlling Hazards e. Periodic Safety Training and Safety Toolbox is held daily to maintained Campaign meeting awareness of personnel, conducted by supervisor or safety officer attended by a group of workers.
Controlling Hazards e. Periodic Safety Training and Safety Safety Mass Meeting is a monthly meeting Campaign conducted by MES and attended by all subcontractors personnel. Management shall give general safety talk on the meeting. Our objective is zero accident
Remember to work safely at all time
Controlling Hazards e. Periodic Safety Training and Safety Fire Fighting Training Campaign
Controlling Hazards e. Periodic Safety Training and Safety First Aid Training Campaign
Controlling Hazards e. Periodic Safety Training and Safety The Best Safety Performance - Subcontractor is Campaign
subcontractor that performed the best safety implementation on site.given to the subcontractor by Safety Committee Reward Thank you Pak Patrick Congratulation! Pak Sujadi
The Best Safety Performance – Subcontractor (Period of January 2009)
The Best Safety Performance – Subcontractor (Period of February 2009)
Site Safety Regulation Regulation for better performance
Site Safety Regulation a. Every personnel must commence work in safe manner, never try to work in unsafe manner that may endanger him self, other people, equipments and materials. My friend, don’t ascend the ladder with one hand!!. U should not bring any material while ascending
Oh…help!! I am falling !!
Site Safety Regulation b. Every personnel must obey Health and Safety Regulation at Workplace and make sure to pay attention to safety signs in the area before commencing task. Guys, remember to follow work method and site safety regulation. We have to remind each other to work safely. I don’t want anyone of us get accident. We come here safe, we go home safe.
Site Safety Regulation c. Every personnel is prohibited to fight, gamble, steal, consume liquor and illegal drug. Breaching this regulation shall impact to immediate dismissal from site project.
Site Safety Regulation d. Every personnel is prohibited to carry any gun or weapon to work place. And also not allowed to bring any such weapon like this
We, workers, are not allowed to carry gun to work area
Site Safety Regulation e. It is prohibited to any body to operate any equipments / heavy equipments without authorization from his employer. Only competent person will be authorized to operate equipments / heavy equipments. Hmm..
Sorry Sir, you are not allowed to operate the heavy equipment
I want to operate this heavy equipment but I don’t have any license
Site Safety Regulation f.
Every personnel is obligated to report unsafe condition, near-miss, and incident/accident to supervisor or Investigation will be carried out based on your report to take necessary safety officer. prevention of the same occurrence in the future. Sir, this sling is defect, really unsafe OK lets change it with the good one
Site Safety Regulation g. Every personnel is obligated to keep work area clean and tidy. Wasting garbage elsewhere is prohibited.
I will make this area clean at all time. Garbage brings hazards to our health.
Site Safety Regulation h. Every personnel is prohibited to smoking in workplace. Smoking is only allowed in designated smoking area.
Site Safety Regulation When you need to go smoking, please go to designated smoking area
Site Safety Regulation i.
Every personnel should drive or ride any vehicle in project area with maximum speed 25 km/h.
Violation and Disciplinary Violation is indicator of lack awareness Action
Violation and Disciplinary action MES Management committed to encourage all personnel on the premises to comply with site safety violation. Necessary efforts such safety trainings, safety campaigns, safety awards, and safety inspections have been taken and will be kept continue. Next necessary step to be taken by MES Management is to take disciplinary action against those who violate site safety regulation. Every body from top management to the workers should take it seriously. Safety is every body responsibility.
Violation and Disciplinary action First Violation
Disciplinary Action
Reprimand
Disciplinary Action
1st Warning Letter and 2 days suspension
Third Violation
Disciplinary Action
2nd Warning Letter and 5 days suspension
Fourth Violation
Disciplinary Action
Dismissal form project
Second Violation
End of Induction Training Should you need more information, please contact safety team. We will be please to assist you.
Safety Contact
I Gede Sumantra, MES, (081379454399) R Bagus Teguh KW, MES, (0813 90565309) Dodi Achmad, SSP, (0812 20707786) Dodi Fahrodi, SSP, (0812 25592702) Lukman, SSP (0815 73565567) Ali Efendi, SWI, (0813 25373846) Muklish, SWI, (0852 31149115) Siswoyo, GEOTEC, (0815 53103042) Hendra Permana, CEM, (0856 93610638) Sony Setiawan, ACSET, (0813 90758455) Krismantomo, INDOMIX, (0813 90484651) Gilang Grishnanda, SKS, (0856 1948468) Adi Wijaya, KYUEI, (0813 57952420)
Emergency Contact
Hospital Bangsri (0291 771097) Hospital Kartini (0291 591175) Police Station Bangsri (0291771110) Police Station Jepara (0291 591110) Military Quarters Bangsri (0291 771003)