Lampiran A 2.docx

  • Uploaded by: Novi Herlinda
  • 0
  • 0
  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Lampiran A 2.docx as PDF for free.

More details

  • Words: 345
  • Pages: 4
LAMPIRAN A DATA IKLIM TAHUN 2019

Bulan

Jumlah curah hujan (mm)

Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember (Sumber BMKG Cirebon 2019)

Suhu udara (0°) Rata²

Rata-rata Penyinaran Matahari (%)

Kelembapan Udara (%) Rata²

Tekanan Udara ( mb)

LAMPIRAN B JAM KERJA ALAT CRUSHING PLANT 09 Tanggal

Start

Stop

Jam kerja

Start

Stop

pagi (j:m)

Jam kerja

Total jam

Total jam

siang (j:m)

kerja (j:m)

kerja (jam)

04/03/19

08:50

11:43

2:93

12:55

14:40

1:85

4:78

05/03/19

08:00

11:45

3:45

12:45

14:40

1:95

5:40

06/03/19

07:20

12:00

4:80

12:45

14:45

2:00

6:80

08/03/19

07:55

12:00

4:45

13:00

14:40

1:40

5:85

09/03/19

07:00

0

0

0

0

0

0

11/03/19

07:18

09:25

0

0

0

12/03/19

07:35

10:08

12:50

14:40

0

13/03/19

07:25

11:45

12:50

14:45

1:95

4:20

6:15

Keterangan Pengecekan dan pembersihan unit crusher, tunggu Reclaimer Pindah ke Pile 2,terjadinya o verload pada Chute B1-06. Persiapan dan pengecekan alat-alat crusher, Limit error,Tripper LS Over run dan AF stop,Elektrik repair Limit.

0

Crusher LS P9 tidak operasi,PM B1-10.1 repair impact plate outlet chute, B1-10 Ganti bend pulley, B1-10 repair belt conveyor, B1-07.1 replace skirt plate timur barat, B1-09 reverse hammer secondary crusher, B1-01 tambah skirt rubber untuk apron, B1-12 repair outlet chute tripper dan Repair support rail tripper AF Stop.kabel reel tripper tidak bisa menggulung. Cek unit Crusher dan bersihkan chute Tripper,

Persiapan dan pengecekan alat crusher, telatnya bahan baku dan terjadi Clooging di jaws Crusher

14/03/19

07:55

11:35

3:80

13:00

14:40

1:40

5:20

15/03/19

07:30

11:30

4:00

12:30

14:45

2:15

6:15

16/03/19

07:30

12:00

4:70

12:40

14:40

2

6:70

18/03/19

07:30

12:00

4:70

12:30

14:40

2:10

6:80

19/03/19

07:00

0

0

0

0

0

0

20/03/19 21/03/19 22/03/19 23/03/19 25/03/19 26/03/19 2703/19 28/03/19 29/03/19 30/03/19 01/04/19 02/04/19 03/04/19 04/04/19 05/04/19

Persiapan dan pengecekan alat crusher dan tes kabel tripper Persiapan crusher dan pengecekan

0

Persiapan crusher dan pembersihan chute tripper PCC Persiapan dan pembersiahan chute tripper PCC dan telatnya bahan baku Tidak beroperasi, terjadinya penambalan/tambahan belt conveyor

06/04/19 07/04/19 Total jam kerja per bulan

Jam/bulan

Rata-rata jam kerja per hari

Jam/hari

Related Documents

Lampiran A
May 2020 14
Lampiran A
December 2019 23
1108 Lampiran A
June 2020 2

More Documents from ""