Kelompok 2 Transmisi.docx

  • Uploaded by: muhammad sawal
  • 0
  • 0
  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Kelompok 2 Transmisi.docx as PDF for free.

More details

  • Words: 180
  • Pages: 2
Kelompok 2 Job 3 Sistem Distribusi Tiga fasa Alat dan bahan yang ada : Kode DL 10016a DL 7901 TT LB 731 42 LB 733 10 LB 732 42 LB 727 31 LB 727 38 LB 727 12

Nama Alat/Bahan Power Supply 3 Phase Overhead Line Model Switch Three Pole Resistive Load 1.0 Inductive Load 01 Moving Iron Meter 2.5 A Moving Irong Meter 600 V Power Faktor Meter

Alat dan bahan yang tidak ada : Kode CA 405 LB 7272 12

Nama Alat/bahan Wattmeter Cos Phi Meter

Kelompok 2 Job 4 perbaikan Faktor daya. Alat dan bahan yang ada : Kode DL 10016a DL 7901 TT LB 731 42 LB 733 10 LB 732 42 LB 727 31 LB 727 38 LB 727 12 LB 733 11

Nama Alat/Bahan Power Supply 3 Phase Overhead Line Model Switch Three Pole Resistive Load 1.0 Inductive Load 01 Moving Iron Meter 2.5 A Moving Irong Meter 600 V Power Faktor Meter Capasitive Load

Alat dan bahan yang tidak ada : Kode CA 405 LB 7272 12

Nama Alat/bahan Wattmeter Cos Phi Meter

Related Documents

Kelompok 2
May 2020 42
Kelompok 2
May 2020 44
Kelompok 2
May 2020 39
Kelompok: 2
May 2020 45
Ti-2-kelompok-2
May 2020 32
Ti-2-kelompok-2
May 2020 31

More Documents from "Armin"