ESTIMATION

Messrs.:

Sankyu - Thai Co.,Ltd. Wellgrow Industrial Estate Ph III 90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,A.Bangpakong Chachoengsao 24180 . Tel 038-522280 - 7 Fax. 038-522287

Attn.

: Mr. Surathep Lertsara Manager

CC.

: คุณ วิชาญ เดียรดาษ

Project : New Injection Machine Installation Location : Wellgrow Industial Estate Title of works :

Addition Works For New Toshiba Injection Install

Job No. : SKT 080925 Revision :

0

บริษัท อีไออาร์ เอ็นจิเนียร่ิง จำากัด

EIR ENGINEERING CO.,LTD. 228/94 หมู่ 5 ถ.ศรีนครินทร์ ต.บางเมือง อ.เมือง จ.สมุทรปราการ 10270 228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270 Tel : 0-27031367 ~ 9

Fax: 0-23882687 E-Mail : eirengineering @ gmail .com

Revision Date:10/05/2008

Revision Date:10/05/2008

d.,T.Bang-muang , A.Muang , Samutprakarn 10270

Revision Date:10/05/2008

Revision Date:10/05/2008

บริษัท อีไออาร์ เอ็นจิเนียร่ิง จำากัด

EIR ENGINEERING CO.,LTD. 228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270 Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .com

QUOTATION Quotation :No.SKT 080925 Messrs.

:

Sankyu - Thai Co.,Ltd.

:

Wellgrow Industrial Estate Ph III

:

Preparing 90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,

:

Date

:

Validity of Quotation

:

.A.Bangpakong Chachoengsao 24180

Tel.

: Tel 038-522280 - 7 Fax. 038-522288

Attn.

: Mr. Surathep Lertsara

Period

:

Delivery Revised

:

P/O No.

###

:

0

:

: Manager

1) Price

(

Baht )38,640.00 :

Excluded Vat 7%

2) Project

New :Injection Machine Installation

3) Title of work

Addition : Works For New Toshiba Injection Install

4) Term of Payment

Within : 30 days

Item

Description

Quantity Unit

Amount

1

DIRECT COST

1

LOT

31,600.00

2

INDIRECT COST

1

LOT

2,000.00

3

EXPENSE & PROFIT

1

LOT

5,040.00

38,640.00 2,704.80 41,344.80

TOTAL VAT 7% FINAL AMOUNT

We hope that our confirmation will meet with your requirement and look forward to receiving your valuable or

Your Faithfully,

Page 5 of 16

EIR Engineering Co.,Ltd.

Sukhon Thewaran Manager

Page 6 of 16

EIR Engineering Co.,Ltd.

rn 10270 ail .com

your valuable order in due course

Page 7 of 16

EIR Engineering Co.,Ltd.

Page 8 of 16

EIR Engineering Co.,Ltd.

บริษัท อีไออาร์ เอ็นจิเนียร่ิง จำากัด

EIR ENGINEERING CO.,LTD.

228/94 Moo 5,Srinakarin rd.,T.Bang-muang , A.Muang , Samutprakarn 10270 Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .

SUMMARY OF QUOTATION Bidder : EIR ENGINEERING CO.,LTD. Quotation No. : SKT 080925 Client : Sankyu - Thai Co.,Ltd. Date : ### Project : New Injection Machine Installation Revision No. : 0 Title of work : Addition Works For New Toshiba Injection Install Item Description

Q'ty UnitUnit Cost Total Amount

1

Direct Cost

A

Addition Works For New Toshiba Injection Install 1

Subtotal 2

lot 31,600.00

31,600.00

31,600.00

1

Indirect Cost 2.1 Site Staff and Supervisor

1 lot

2.2 Transportation

1 lot

2.3 Tool and consumption

1 lot

2.4 Site Expense

1 lot

2,000.00

1 Temporary Facilities 2 Small Construction Supplies 3 Utility Supply Costs Subtotal 2

3

2,000.00

5,040.00

Expense & Profit GRAND TOTAL

38,640.00

mutprakarn 10270 eering @ gmail .com

COST

Different

Estimation Sheet Client : Date : 24 September 2008 Sankyu - Thai Co.,Ltd. Project New :Injection Machine Installation Job Number : SKT 080925 Location Wellgrow : Industial Estate Revision : 0 Title Of Work Addition : Works For New Toshiba Injection Install

No. 1

Description

Q'ty UnitUnit Price Total Cost

Remark

DIRECT COST

A Addition Works For New Toshiba Injection Install A1

INJECTION 11 M/C TAKEOFF AND RE-INSTALL WORK - PM11 MDB PANEL

1 SET

Existing

- NEW INJECTION MACHINE 700 A.

1 SET

Existing

- CHILLER MACHINE 100 A.

1 SET

Existing

- MOLD TEMP MACHINE

1 SET

Existing

- HOPPER DRYER MACHINE

1 SET

Existing

- JET LOADER

1 SET

Existing

- CRUSHER

1 SET

Existing

- TAKEOFF AND RE-WIRING CABLE CV 1 C - 185x3 (x2) sq.1 LOT

Existing

Inj. M/C No.11

- TAKEOFF AND RE-INSTALL CABLE THW 1C - 50 sq. G

1 LOT

Existing

Inj. M/C No.11

- TAKEOFF AND RE-WIRING CABLE CV 1 C - 95x3 sq.

1 LOT

Existing

Sub-Panel11

- TAKEOFF AND RE-WIRING CABLE THW 1C - 16 sq. G

1 LOT

Existing

Sub-Panel11

- TAKEOFF AND RE-WIRING CABLE CV 4 C - 2.5 sq.

1 LOT

Existing

Crusher

- TAKEOFF AND RE-WIRING CABLE CV 4 C - 2.5 sq.

1 LOT

Existing

Lighting

- TAKEOFF CABLE RACK W:300 L:3000

1 LOT

Existing

- TAKEOFF CABLE RACK W:200 L:3000

1 LOT

Existing

- TAKEOFF CABLE RACK ACCESSORIES

1 LOT

Existing

- TAKEOFF WIREWAY W:300 FOR P-M11 AND P-M12

1 LOT Existing

- TAKEOFF STEEL SUPPORT C:75 800X660X400

1 LOT Existing

- STEEL SUPPORT C:75 1500X300X1500

1 LOT Existing

- INSTALL CABLE RACK W:300 L3000 WITH COVER

1 LOT

Existing

- INSTALL CABLE RACK W:200 L3000 WITH COVER

1 LOT

Existing

- HORIZONTAL RACK W:200

1 SET

###

1,200.00

- SPECIAL TEE RACK W:200/300

1 SET

###

1,650.00

- COVER HORIZONTAL RACK W:200

1 SET

8453276.xlsBOQ

Page 11 of16

700.00

700.00

EIR Engineering Co.,Ltd.

- COVER SPECIAL TEE RACK W:200/300

1 SET

###

- STEEL SUPPORT C:100 L:400

8 SET

- WIRING CONNECT ACCESSORIES

1 LOT

###

2,000.00

- MISCELENEOUS

1 LOT

###

1,000.00

- PAINTING WORK

1 LOT

- LABOR CHARGE

1 LOT

250.00

800.00 ###

TOTAL A1

A2

1,250.00 2,000.00

800.00 15,000.00 25,600.00

SUB-PANEL INJECTION 11,12 MODIFIED - SUB-PANEL 11 W550X H1000 XL200

1 SET

Existing

- SUB-PANEL 12 W550X H1000 XL201

1 SET

Existing

- WIRE AND CABLE CV 1C-95 x3 ( R,S,T)

1 SET

Existing

- WIRE AND CABLE THW 1C-16 ( G )

1 SET

Existing

- MAIN BUSBAR (R,S,T)

2 SET

Existing

- GROUND BUSBAR (G)

2 SET

Existing

- FLANGE SOCKET SLOPING 32A 3P+E IP67

2 SET

Existing

- POWER PLUGS 32A 3P+E IP67

2 SET

Existing

- ABB BREAKER T1N 32AT 3P MCCB (TAKEOFF)

2 SET

Existing

CRUSHER

- ABB BREAKER T1N 32AT 3P MCCB

2 SET

Existing

FOR MOLDCHANGE C/P

- ABB BREAKER T1N 160AT 3P MCCB (NEW INSTALL)

2 SET

- LABOR CHARGE

1 LOT TOTAL A2

800.00

5,200.00 FOR HOT RUN C/P 800.00 6,000.00

TOTAL A

8453276.xlsBOQ

###

31,600.00

Page 12 of16

EIR Engineering Co.,Ltd.

MD Ratio Materials install Material Cost

Q'ty Unit Unit Price

8453276.xlsBOQ

Total Cost

Page 13 of16

Cost ฿/mdOffer ฿/md 1.10

1.000

350.00

400.00

Labour Cost Unit M/DTotal M/D Unit Price

labour cost

EIR Engineering Co.,Ltd.

1 LOT

###

2,000.00

1 LOT

###

2,500.00

1 LOT

###

1,000.00

1 LOT

###

9,000.00

1 LOT

###

9,000.00

#REF!

8453276.xlsBOQ

Page 14 of16

EIR Engineering Co.,Ltd.

8453276.xlsBOQ

Amount

Different

Total Cost

Cost

Page 15 of16

EIR Engineering Co.,Ltd.

8453276.xlsBOQ

Page 16 of16