ESTIMATION

Messrs.:

Sankyu - Thai Co.,Ltd. Wellgrow Industrial Estate Ph III 90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,A.Bangpakong Chachoengsao 24180 . Tel 038-522280 - 7 Fax. 038-522287

Attn.

: Mr. Surathep Lertsara Manager

CC.

: คุณ วิชาญ เดียรดาษ

Project : Toshiba Injection Machine Installation Location : Wellgrow Industrial Estate Title of works :

P-M10 PANEL MODIFICATION

Job No. : SKT 080929 Revision :

0

บริษัท อีไออาร์ เอ็นจิเนียร่ิง จำากัด

EIR ENGINEERING CO.,LTD. 228/94 หมู่ 5 ถ.ศรีนครินทร์ ต.บางเมือง อ.เมือง จ.สมุทรปราการ 10270 228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270 Tel : 0-27031367 ~ 9

Fax: 0-23882687 E-Mail : eirengineering @ gmail .com

d.,T.Bang-muang , A.Muang , Samutprakarn 10270

บริษัท อีไออาร์ เอ็นจิเนียร่ิง จำากัด

EIR ENGINEERING CO.,LTD. 228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270 Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .com

QUOTATION Quotation :No.SKT 080929 Messrs.

:

Sankyu - Thai Co.,Ltd.

:

Wellgrow Industrial Estate Ph III

:

Preparing 90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,

:

Date

:

Validity of Quotation

:

.A.Bangpakong Chachoengsao 24180

Tel.

: Tel 038-522280 - 7 Fax. 038-522288

Attn.

: Mr. Surathep Lertsara

Period

:

Delivery Revised

: :

P/O No.

10 October 2008

0

:

: Manager

1) Price

(

Baht )58,075.00 :

Excluded Vat 7%

2) Project

Toshiba : Injection Machine Installation

3) Title of work

P-M10 : PANEL MODIFICATION

4) Term of Payment

Within : 30 days

Item

Description

Quantity Unit

1

DIRECT COST

1

LOT

2

INDIRECT COST

1

LOT

3

EXPENSE & PROFIT

1

LOT

Amount

50,500.00

7,575.00

58,075.00 4,065.25 62,140.25

TOTAL VAT 7% FINAL AMOUNT

We hope that our confirmation will meet with your requirement and look forward to receiving your valuable or

Your Faithfully,

Page 5 of 10

EIR Engineering Co.,Ltd.

Sukhon Thewaran Manager

Page 6 of 10

EIR Engineering Co.,Ltd.

rn 10270 ail .com

your valuable order in due course

Page 7 of 10

EIR Engineering Co.,Ltd.

Page 8 of 10

EIR Engineering Co.,Ltd.

Estimation Sheet Client : Sankyu - Thai Co.,Ltd. Project Toshiba : Injection Machine Installation Location Wellgrow : Industrial Estate Title Of Work P-M10 : PANEL MODIFICATION

No.

Description

Date : 10 October 2008 Job Number : SKT 080929 Revision : 0

Q'ty Unit Unit Price

1

DIRECT COST

A

P-M10 PANEL MODIFICATION WORK

Total Cost

MDB P-M10 TAKEOFF 630AT MCCB AND INSTALL 800AT MCCB - Circuit Breaker

ABB T6N 800AT 3P MCCB

1 SET

25,000.00

- Circuit Breaker

ABB T3N 630AT 3P MCCB

1 SET

Existing

- Copper Bus Bar

1 LOT

12,500.00

- Panel Door

1 SET

Existing

- Inner Plate

1 SET

Existing

- Miscellaneous

1

Lot

2,000.00

2,000.00

- Transportation

1

Lot

1,500.00

1,500.00

- Labor Charge (Shut Down Work)

1

Lot

9,500.00

9,500.00

Over Head And Profit

1

Lot

7,575.00

7,575.00 58,075.00

GRAND TOTAL

8453258.xlsBOQ

12,500.00

50,500.00

TOTAL A

B

25,000.00

Page 9 of10

EIR Engineering Co.,Ltd.

8453258.xlsBOQ

Page 10 of10

EIR Engineering Co.,Ltd.