ESTIMATION

Messrs.:

Sankyu - Thai Co.,Ltd. Wellgrow Industrial Estate Ph III 90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,A.Bangpakong Chachoengsao 24180 . Tel 038-522280 - 7 Fax. 038-522287

Attn.

: Mr. Surathep Lertsara Manager

CC.

: คุณ วิชาญ เดียรดาษ

Project : Toshiba Injection Machine Installation Location : Wellgrow Industial Estate Title of works :

New Toshiba Injection1 Machine Install

Job No. : SKT 080926 Revision :

0

บริษัท อีไออาร์ เอ็นจิเนียร่ิง จำากัด

EIR ENGINEERING CO.,LTD. 228/94 หมู่ 5 ถ.ศรีนครินทร์ ต.บางเมือง อ.เมือง จ.สมุทรปราการ 10270 228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270 Tel : 0-27031367 ~ 9

Fax: 0-23882687 E-Mail : eirengineering @ gmail .com

Revision Date:10/05/2008

Revision Date:10/05/2008

d.,T.Bang-muang , A.Muang , Samutprakarn 10270

Revision Date:10/05/2008

Revision Date:10/05/2008

บริษัท อีไออาร์ เอ็นจิเนียร่ิง จำากัด

EIR ENGINEERING CO.,LTD. 228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270 Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .com

QUOTATION Quotation :No.SKT 080926 Messrs.

:

Sankyu - Thai Co.,Ltd.

:

Wellgrow Industrial Estate Ph III

:

Preparing 90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,

:

Date

:

Validity of Quotation

:

.A.Bangpakong Chachoengsao 24180

Tel.

: Tel 038-522280 - 7 Fax. 038-522288

Attn.

: Mr. Surathep Lertsara

Period

:

Delivery Revised

: :

P/O No.

10 October 2008

0

:

: Manager

1) Price

(

Baht )

:###

Excluded Vat 7%

2) Project

Toshiba : Injection Machine Installation

3) Title of work

New:Toshiba Injection1 Machine Install

4) Term of Payment

Within : 30 days

Item

Description

Quantity Unit

Amount

1

DIRECT COST

1

LOT

204,650.00

2

INDIRECT COST

1

LOT

7,500.00

3

EXPENSE & PROFIT

1

LOT

31,822.50

243,972.50 17,078.08 261,050.58

TOTAL VAT 7% FINAL AMOUNT

We hope that our confirmation will meet with your requirement and look forward to receiving your valuable or

Your Faithfully,

Page 5 of 16

EIR Engineering Co.,Ltd.

Sukhon Thewaran Manager

Page 6 of 16

EIR Engineering Co.,Ltd.

rn 10270 ail .com

your valuable order in due course

Page 7 of 16

EIR Engineering Co.,Ltd.

Page 8 of 16

EIR Engineering Co.,Ltd.

บริษัท อีไออาร์ เอ็นจิเนียร่ิง จำากัด

EIR ENGINEERING CO.,LTD.

228/94 Moo 5,Srinakarin rd.,T.Bang-muang , A.Muang , Samutprakarn 10270 Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .

SUMMARY OF QUOTATION Bidder : EIR ENGINEERING CO.,LTD. Quotation No. : SKT 080926 Client : Sankyu - Thai Co.,Ltd. Date : ### Project : Toshiba Injection Machine Installation Revision No. : 0 Title of work : New Toshiba Injection1 Machine Install Item Description

Q'ty UnitUnit Cost Total Amount

1

Direct Cost

A

New Toshiba Injection1 Machine Install

Subtotal 2

1 lot

###

204,650.00

###

1

Indirect Cost 2.1 Site Staff and Supervisor

1 lot

2.2 Transportation

1 lot

5,000.00

2.3 Tool and consumption

1 lot

2,500.00

2.4 Site Expense

1 lot

1 Temporary Facilities 2 Small Construction Supplies 3 Utility Supply Costs Subtotal 2

3

7,500.00

31,822.50

Expense & Profit GRAND TOTAL

###

mutprakarn 10270 eering @ gmail .com

COST

Different

Estimation Sheet Client : Sankyu - Thai Co.,Ltd. Project Toshiba : Injection Machine Installation Location Wellgrow : Industial Estate Title Of Work New :Toshiba Injection1 Machine Install

No. 1

Description

Date : ### Job Number : SKT 080926 Revision : 0

Q'ty UnitUnit PriceTotal Cost

Remark

DIRECT COST

A New Toshiba Injection1 Machine Install A1

NEW INJECTION M/C INSTALL WORK - PM10 MDB PANEL

1 SET

Existing

- ABB BREAKER T6N 800AT 3P MCCB

1 SET

Existing

- Sub-Panel 250 A.

1 SET

Existing

- NEW INJECTION MACHINE 700 A.

1 SET

Existing

- CHILLER MACHINE 100 A.

1 SET

Existing

- MOLD TEMP MACHINE

1 SET

Existing

- HOPPER DRYER MACHINE

1 SET

Existing

- JET LOADER

1 SET

Existing

- CRUSHER

1 SET

Existing

- WIRE AND CABLE CV 1 C - 185x3 (x2) sq. R,S,T

180

M

750.00

135,000.00

Inj. M/C

- WIRE AND CABLE THW 1C - 50 sq. G

30

M

207.00

6,210.00

Inj. M/C

- WIRE AND CABLE CV 4 C - 25 sq.

10

M

Supply By Owner

Chiller

- WIRE AND CABLE CV 4 C - 16 sq.

15

M

Supply By Owner

Mold Temp

- WIRE AND CABLE CV 4 C - 10 sq.

15

M

- WIRE AND CABLE CV 4 C - 6 sq.

15

M

Supply By Owner

Jet Loader

- WIRE AND CABLE CV 4 C - 2.5 sq.

20

M

Supply By Owner

Crusher

- WIRING CONNECT ACCESSORIES

1 LOT

- FLEXIBLE CONDUIT3 "

3

- FLEXIBLE CONDUIT1 1/2 "

190.00

2,850.00

2,000.00

2,000.00

M

400.00

1,200.00

3

M

170.00

510.00

- FLEXIBLE CONDUIT1 1/4 "

3

M

140.00

420.00

- FLEXIBLE CONDUIT1 "

3

M

90.00

270.00

- FLEXIBLE CONDUIT3/4 "

3

M

65.00

195.00

- FLEXIBLE CONDUIT1/2 "

3

M

45.00

135.00

- FLEX CONDUIT ACCESSORIES

1 LOT

2,000.00

2,000.00

- CABLE RACK W:300 L:3000

1 LOT Supply By Owner

- CABLE RACK W:200 L:3000

6 SET

1,230.00

7,380.00

- SPECIAL TEE RACK W:200/300

1 SET

1,650.00

1,650.00

- CABLE RACK COVER W:300

1 LOT Supply By Owner

- CABLE RACK COVER W:200

6 SET

8453261.xlsBOQ

Page 11 of16

930.00

Dryer

5,580.00

EIR Engineering Co.,Ltd.

- COVER SPECIAL TEE RACK W:200/300

1 SET

1,250.00

1,250.00

- CABLE RACK ACCESSORIES

1 LOT

2,000.00

2,000.00

10 SET

150.00

1,500.00

- MISCELENEOUS

1 LOT

3,000.00

3,000.00

- PAINTING WORK

1 LOT

1,500.00

1,500.00

- LABOR CHARGE

1 LOT

- STEEL SUPPORT W:300

TOTAL A1

30,000.00 ###

TOTAL A

8453261.xlsBOQ

###

Page 12 of16

###

EIR Engineering Co.,Ltd.

MD Ratio Materials install

1.000

Material Cost

Q'ty Unit Unit Price

8453261.xlsBOQ

Total Cost

M

609.00

109,620.00

30

M

159.00

4,770.00

-

M

450.00

-

-

M

280.00

-

-

M

190.00

-

-

M

130.00

-

20

M

73.00 ###

350.00

400.00

Labour Cost

180

1 LOT

Cost ฿/mdOffer ฿/md 1.10

Unit M/DTotal M/D Unit Price

labour cost

1,460.00 2,000.00

3

M

400.00

1,200.00

3

M

170.00

510.00

3

M

140.00

420.00

3

M

90.00

270.00

3

M

65.00

195.00

3

M

45.00

135.00

1 LOT

###

1,000.00

4 SET

###

4,884.00

4 SET

###

4,884.00

1 SET

440.00

440.00

4 SET

756.00

3,024.00

4 SET

756.00

3,024.00

Page 13 of16

EIR Engineering Co.,Ltd.

1 SET 1 LOT 10 SET

300.00 ### 100.00

300.00 2,000.00 1,000.00

1 LOT

###

2,500.00

1 LOT

###

1,000.00

1 LOT

###

9,000.00 153,636.00

###

8453261.xlsBOQ

Page 14 of16

EIR Engineering Co.,Ltd.

8453261.xlsBOQ

Amount

Different

Total Cost

Cost

Page 15 of16

EIR Engineering Co.,Ltd.

8453261.xlsBOQ

Page 16 of16

EIR Engineering Co.,Ltd.