ESTIMATION

Messrs.:

Sankyu - Thai Co.,Ltd. Wellgrow Industrial Estate Ph III 90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,A.Bangpakong Chachoengsao 24180 . Tel 038-522280 - 7 Fax. 038-522287

Attn.

: Mr. Surathep Lertsara Manager

CC.

: คุณ วิชาญ เดียรดาษ

Project : Toshiba Injection Machine Installation Location : Wellgrow Industial Estate Title of works :

Sub Panel For New Injection 1

Job No. : SKT 080927 Revision :

0

บริษัท อีไออาร์ เอ็นจิเนียร่ิง จำากัด

EIR ENGINEERING CO.,LTD. 228/94 หมู่ 5 ถ.ศรีนครินทร์ ต.บางเมือง อ.เมือง จ.สมุทรปราการ 10270 228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270 Tel : 0-27031367 ~ 9

Fax: 0-23882687 E-Mail : eirengineering @ gmail .com

Revision Date:10/05/2008

Revision Date:10/05/2008

d.,T.Bang-muang , A.Muang , Samutprakarn 10270

Revision Date:10/05/2008

Revision Date:10/05/2008

บริษัท อีไออาร์ เอ็นจิเนียร่ิง จำากัด

EIR ENGINEERING CO.,LTD. 228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270 Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .com

QUOTATION Quotation :No.SKT 080927 Messrs.

:

Sankyu - Thai Co.,Ltd.

:

Wellgrow Industrial Estate Ph III

:

Preparing 90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,

:

Date

:

Validity of Quotation

:

.A.Bangpakong Chachoengsao 24180

Tel.

: Tel 038-522280 - 7 Fax. 038-522288

Attn.

: Mr. Surathep Lertsara

Period

:

Delivery Revised

: :

P/O No.

10 October 2008

0

:

: Manager

1) Price

(

Baht )

:###

Excluded Vat 7%

2) Project

Toshiba : Injection Machine Installation

3) Title of work

Sub :Panel For New Injection 1

4) Term of Payment

Within : 30 days

Item

Description

Quantity Unit

Amount

1

DIRECT COST

1

LOT

89,910.00

2

INDIRECT COST

1

LOT

2,200.00

3

EXPENSE & PROFIT

1

LOT

13,816.50

105,926.50 7,414.86 113,341.36

TOTAL VAT 7% FINAL AMOUNT

We hope that our confirmation will meet with your requirement and look forward to receiving your valuable or

Your Faithfully,

Page 5 of 16

EIR Engineering Co.,Ltd.

Sukhon Thewaran Manager

Page 6 of 16

EIR Engineering Co.,Ltd.

rn 10270 ail .com

your valuable order in due course

Page 7 of 16

EIR Engineering Co.,Ltd.

Page 8 of 16

EIR Engineering Co.,Ltd.

บริษัท อีไออาร์ เอ็นจิเนียร่ิง จำากัด

EIR ENGINEERING CO.,LTD.

228/94 Moo 5,Srinakarin rd.,T.Bang-muang , A.Muang , Samutprakarn 10270 Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .

SUMMARY OF QUOTATION Bidder : EIR ENGINEERING CO.,LTD. Quotation No. : SKT 080927 Client : Sankyu - Thai Co.,Ltd. Date : ### Project : Toshiba Injection Machine Installation Revision No. : 0 Title of work : Sub Panel For New Injection 1 Item Description

Q'ty UnitUnit Cost Total Amount

1

Direct Cost

A

Sub-Panel For New Injection Machine No.1

1 lot 58,000.00

58,000.00

B

Wire And Cable For Sub-MDB Panel No.1

1 lot 31,910.00

31,910.00

Subtotal 2

89,910.00

1

Indirect Cost 2.1 Site Staff and Supervisor

1 lot

2.2 Transportation

1 lot

1,200.00

2.3 Tool and consumption

1 lot

1,000.00

2.4 Site Expense

1 lot

1 Temporary Facilities 2 Small Construction Supplies 3 Utility Supply Costs Subtotal 2

3

2,200.00

13,816.50

Expense & Profit GRAND TOTAL

###

mutprakarn 10270 eering @ gmail .com

COST

Different

Estimation Sheet Client : Sankyu - Thai Co.,Ltd. Project Toshiba : Injection Machine Installation Location Wellgrow : Industial Estate Title Of Work Sub Panel : For New Injection 1

No. 1

Description

Date : ### Job Number : SKT 080927 Revision : 0

Q'ty UnitUnit PriceTotal Cost

Remark

DIRECT COST

A Sub-Panel For New Injection Machine No.1 A1

Sub-MDB Panel For New Machine No. 1

1

Set

### 58,000.00

- METAL PANEL 550X 1100 X200

1 set

- MAIN BUSBAR (R,S,T)

1 set

- GROUND BUSBAR (G)

1 set

- ACRYLIC BUSBAR COVER

1 set

- ABB BREAKER T3N 250AT 3P MCCB

1 set

Main Breaker

- ABB BREAKER T1N 125AT 3P MCCB

1 set

Chiller M/C

- ABB BREAKER T1N 80AT 3P MCCB

1 set

Dryer M/C

- ABB BREAKER T1N 63AT 3P MCCB

1 set

Mold Temp M/C

- ABB BREAKER T1N 32AT 3P MCCB

1 set

Crusher M/C

- ABB BREAKER T1N 32AT 3P MCCB

1 set

Jet Loader M/C

- FLANGE SOCKET SLOPING 125A 3P+E IP67 1 set

Chiller M/C

- FLANGE SOCKET SLOPING 125A 3P+E IP67 1 set

Dryer M/C

- FLANGE SOCKET SLOPING 63A 3P+E IP671 set

Mold Temp M/C

- FLANGE SOCKET SLOPING 32A 3P+E IP671 set

Crusher M/C

- FLANGE SOCKET SLOPING 32A 3P+E IP671 set

Jet Loader M/C

- POWER PLUGS 125A 3P+E IP67

1 set

Chiller M/C

- POWER PLUGS 125A 3P+E IP67

1 set

Dryer M/C

- POWER PLUGS 63A 3P+E IP67

1 set

Mold Temp M/C

- POWER PLUGS 32A 3P+E IP67

1 set

Crusher M/C

- POWER PLUGS 32A 3P+E IP67

1 set

Jet Loader M/C

- WIRING ACCESSORIES

1 lot

- NAMEPLATE

1 lot

- STANCHION SUPPORT H:400

1 set

TOTAL A1

58,000.00

TOTAL A

58,000.00

B Wire And Cable For Sub-MDB Panel No.1 - PM10 MDB PANEL

1

Set

Existing

- ABB BREAKER T3N 250AT 3P MCCB

1

Set

Existing

8453262.xlsBOQ

Page 11 of16

EIR Engineering Co.,Ltd.

- WIRE AND CABLE CV 1C-95 x3 ( R,S,T)

40

M

408.00

16,320.00

- WIRE AND CABLE THW 1C-16 ( G )

15

M

66.00

990.00

2,500.00

2,500.00

350.00

2,100.00

500.00

1,000.00

- WIRING CONNECT ACCESSORIES

1 LOT

- FLEXIBLE CONDUIT2 1/2 "

6

- FLEXIBLE CONNECTOR 2 1/2"

2 SET

- CABLE RACK W:300 L:3000

1 LOT

Existing

- CABLE RACK W:200 L:3000

1 LOT

Existing

- MISCELENEOUS

1 LOT

3,000.00

3,000.00

- LABOR CHARGE

1 LOT

6,000.00

6,000.00

TOTAL B

8453262.xlsBOQ

M

31,910.00

Page 12 of16

EIR Engineering Co.,Ltd.

MD Ratio Materials install

Cost ฿/mdOffer ฿/md 1.10

1.000

350.00

Material Cost

Q'ty Unit Unit Price

Total Cost

31,600.00

400.00

Labour Cost Unit M/D Total M/D Unit Price

###

labour cost

-

###

3,290.00

###

365.56

###

2,115.00

###

235.00

###

1,786.00

###

198.44

###

1,786.00

###

198.44

###

1,786.00

###

198.44

###

1,786.00

###

198.44

###

2,077.00

###

230.78

###

2,077.00

###

230.78

880.00

670.00

744.444

74.44

492.00

341.70

379.667

37.97

492.00

341.70

379.667

37.97

###

2,010.00

###

223.33

###

2,010.00

###

223.33

776.00

636.50

707.222

70.72

408.00

294.80

327.556

32.76

408.00

294.80

327.556

32.76

-

-

200.00

200.00

222.222

22.22

600.00

300.00

333.333

33.33

###

2,644.72

Trans ###

8453262.xlsBOQ

55,402.50

Page 13 of16

EIR Engineering Co.,Ltd.

8453262.xlsBOQ

Page 14 of16

EIR Engineering Co.,Ltd.

8453262.xlsBOQ

Amount

Different

Total Cost

Cost

Page 15 of16

EIR Engineering Co.,Ltd.

8453262.xlsBOQ

Page 16 of16