Den So 080924 New Inj12 Install

  • Uploaded by: eir
  • 0
  • 0
  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Den So 080924 New Inj12 Install as PDF for free.

More details

  • Words: 1,091
  • Pages: 16
ESTIMATION

Messrs.:

Sankyu - Thai Co.,Ltd. Wellgrow Industrial Estate Ph III 90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,A.Bangpakong Chachoengsao 24180 . Tel 038-522280 - 7 Fax. 038-522287

Attn.

: Mr. Surathep Lertsara Manager

CC.

: คุณ วิชาญ เดียรดาษ

Project : New Injection Machine Installation Location : Wellgrow Industial Estate Title of works :

New Injection12 Machine Install

Job No. : SKT 080924 Revision :

0

บริษัท อีไออาร์ เอ็นจิเนียร่ิง จำากัด

EIR ENGINEERING CO.,LTD. 228/94 หมู่ 5 ถ.ศรีนครินทร์ ต.บางเมือง อ.เมือง จ.สมุทรปราการ 10270 228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270 Tel : 0-27031367 ~ 9

Fax: 0-23882687 E-Mail : eirengineering @ gmail .com

Revision Date:10/05/2008

Revision Date:10/05/2008

d.,T.Bang-muang , A.Muang , Samutprakarn 10270

Revision Date:10/05/2008

Revision Date:10/05/2008

บริษัท อีไออาร์ เอ็นจิเนียร่ิง จำากัด

EIR ENGINEERING CO.,LTD. 228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270 Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .com

QUOTATION Quotation :No.SKT 080924 Messrs.

:

Sankyu - Thai Co.,Ltd.

:

Wellgrow Industrial Estate Ph III

:

Preparing 90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,

:

Date

:

Validity of Quotation

:

.A.Bangpakong Chachoengsao 24180

Tel.

: Tel 038-522280 - 7 Fax. 038-522288

Attn.

: Mr. Surathep Lertsara

Period

:

Delivery Revised

:

P/O No.

:

25 August 2008

0

:

: Manager

1) Price

(

Baht )

:###

Excluded Vat 7%

2) Project

New :Injection Machine Installation

3) Title of work

New:Injection12 Machine Install

4) Term of Payment

Within : 30 days

Item

Description

Quantity Unit

Amount

1

DIRECT COST

1

LOT

208,315.00

2

INDIRECT COST

1

LOT

7,500.00

3

EXPENSE & PROFIT

1

LOT

32,372.25

248,187.25 17,373.11 265,560.36

TOTAL VAT 7% FINAL AMOUNT

We hope that our confirmation will meet with your requirement and look forward to receiving your valuable or

Your Faithfully,

Page 5 of 16

EIR Engineering Co.,Ltd.

Sukhon Thewaran Manager

Page 6 of 16

EIR Engineering Co.,Ltd.

rn 10270 ail .com

your valuable order in due course

Page 7 of 16

EIR Engineering Co.,Ltd.

Page 8 of 16

EIR Engineering Co.,Ltd.

บริษัท อีไออาร์ เอ็นจิเนียร่ิง จำากัด

EIR ENGINEERING CO.,LTD.

228/94 Moo 5,Srinakarin rd.,T.Bang-muang , A.Muang , Samutprakarn 10270 Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .

SUMMARY OF QUOTATION Bidder : EIR ENGINEERING CO.,LTD. Quotation No. : SKT 080924 Client : Sankyu - Thai Co.,Ltd. Date : ### Project : New Injection Machine Installation Revision No. : 0 Title of work : New Injection12 Machine Install Item Description

Q'ty UnitUnit Cost Total Amount

1

Direct Cost

A

NEW INJECTION M/C NO.12 INSTALL WORK

Subtotal 2

1 lot

###

208,315.00

###

1

Indirect Cost 2.1 Site Staff and Supervisor

1 lot

2.2 Transportation

1 lot

5,000.00

2.3 Tool and consumption

1 lot

2,500.00

2.4 Site Expense

1 lot

1 Temporary Facilities 2 Small Construction Supplies 3 Utility Supply Costs Subtotal 2

3

7,500.00

32,372.25

Expense & Profit GRAND TOTAL

###

mutprakarn 10270 eering @ gmail .com

COST

Different

Estimation Sheet Client : Sankyu - Thai Co.,Ltd. Project New :Injection Machine Installation Location Wellgrow : Industial Estate Title Of Work New :Injection12 Machine Install

No. 1

Description

Date : ### Job Number : SKT 080924 Revision : 0

Q'ty UnitUnit PriceTotal Cost

Remark

DIRECT COST

A NEW INJECTION M/C NO.12 INSTALL WORK A1

NEW INJECTION M/C INSTALL WORK - PM11 MDB PANEL

1 SET

Existing

- Sub-Panel 250 A.

1 SET

Existing

- NEW INJECTION MACHINE 700 A.

1 SET

Existing

- CHILLER MACHINE 100 A.

1 SET

Existing

- MOLD TEMP MACHINE

1 SET

Existing

- HOPPER DRYER MACHINE

1 SET

Existing

- JET LOADER

1 SET

Existing

- CRUSHER

1 SET

Existing

- WIRE AND CABLE CV 1 C - 185x3 (x2) sq. R,S,T

200

M

750.00

150,000.00

Inj. M/C No.11

- WIRE AND CABLE THW 1C - 50 sq. G

35

M

207.00

7,245.00

Inj. M/C No.11

- WIRE AND CABLE CV 4 C - 25 sq.

10

M

Supply By Owner

Chiller

- WIRE AND CABLE CV 4 C - 16 sq.

15

M

Supply By Owner

Mold Temp

- WIRE AND CABLE CV 4 C - 10 sq.

15

M

Supply By Owner

Dryer

- WIRE AND CABLE CV 4 C - 6 sq.

15

M

Supply By Owner

Jet Loader

- WIRE AND CABLE CV 4 C - 2.5 sq.

20

M

Supply By Owner

Crusher

- WIRING CONNECT ACCESSORIES

1 LOT

2,000.00

2,000.00

- FLEXIBLE CONDUIT3 "

3

M

400.00

1,200.00

- FLEXIBLE CONDUIT1 1/2 "

3

M

170.00

510.00

- FLEXIBLE CONDUIT1 1/4 "

3

M

140.00

420.00

- FLEXIBLE CONDUIT1 "

3

M

90.00

270.00

- FLEXIBLE CONDUIT3/4 "

3

M

65.00

195.00

- FLEXIBLE CONDUIT1/2 "

3

M

45.00

135.00

- FLEX CONDUIT ACCESSORIES

1 LOT

2,000.00

2,000.00

- CABLE RACK W:200 L:3000

6 SET

1,230.00

7,380.00

- CABLE RACK VER-IN W:200

1 SET

500.00

500.00

- CABLE RACK VER-OUT W:200

1 SET

500.00

500.00

- CABLE RACK COVER W:200

6 SET

930.00

5,580.00

- CABLE RACK COVER VER-IN W:200

1 SET

350.00

350.00

- CABLE RACK COVER VER-OUT W:200

1 SET

350.00

350.00

8453283.xlsBOQ

Page 11 of16

EIR Engineering Co.,Ltd.

- CABLE RACK ACCESSORIES

1 LOT

2,000.00

2,000.00

- WIREWAY W:300

2 SET

1,670.00

3,340.00

- WIREWAY VER-OUT W:300

2 SET

670.00

1,340.00

- STEEL SUPPORT C:75 1500X300X1500

1 SET

2,000.00

2,000.00

10 SET

150.00

1,500.00

- MISCELENEOUS

1 LOT

3,000.00

3,000.00

- PAINTING WORK

1 LOT

1,500.00

1,500.00

- LABOR CHARGE

1 LOT

- STEEL SUPPORT W:300

TOTAL A1

15,000.00 ###

TOTAL A

8453283.xlsBOQ

###

Page 12 of16

###

EIR Engineering Co.,Ltd.

MD Ratio Materials install

1.000

Material Cost

Q'ty Unit Unit Price

8453283.xlsBOQ

Total Cost

M

609.00

121,800.00

35

M

159.00

5,565.00

-

M

450.00

-

-

M

280.00

-

-

M

190.00

-

-

M

130.00

-

20

M

73.00 ###

350.00

400.00

Labour Cost

200

1 LOT

Cost ฿/mdOffer ฿/md 1.10

Unit M/DTotal M/D Unit Price

labour cost

1,460.00 2,000.00

3

M

400.00

1,200.00

3

M

170.00

510.00

3

M

140.00

420.00

3

M

90.00

270.00

3

M

65.00

195.00

3

M

45.00

135.00

1 LOT

###

1,000.00

4 SET

###

4,884.00

1 SET

440.00

440.00

1 SET

440.00

440.00

4 SET

756.00

3,024.00

1 SET

300.00

300.00

1 SET

300.00

300.00

Page 13 of16

EIR Engineering Co.,Ltd.

1 LOT

###

2,000.00

2 SET

###

2,806.00

2 SET 1 SET 10 SET

616.00 ### 100.00

1,232.00 1,500.00 1,000.00

1 LOT

###

2,500.00

1 LOT

###

1,000.00

1 LOT

###

9,000.00 164,981.00

###

8453283.xlsBOQ

Page 14 of16

EIR Engineering Co.,Ltd.

8453283.xlsBOQ

Amount

Different

Total Cost

Cost

Page 15 of16

EIR Engineering Co.,Ltd.

8453283.xlsBOQ

Page 16 of16

EIR Engineering Co.,Ltd.

Related Documents


More Documents from "eir"