RECONSTRUCCION DE ACUEDUCTO TOMA FENCAL,DEL CASERIO MIRAFLORES,DISTRITO DE BELLAVISTA DE LA UNION,PROVINCIA DE SECHURA PI LLACLLA, DISTRITO DE ABELARDO PARDO LEZAMETA -BOLOGNESI - ANCASH

PROYECTO:

1

Subpresupuesto: Cliente: Lugar:

MUNICIPALIDAD DISTRITAL DE BELLAVISTA DE LA UNION BELLAVISTA DE LA UNION PROVINCIA DE SECHURA -PIURA CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Item 01 01.01

Descripción

Und

Metrado

P. Unit. S/.

Parcial S/.

Mes 1 Parcial

CANAL TOMA EL FENCAL OBRAS PRELIMINARES

1.00

1,483.00

42,483.00

42,483.00

40.00

800.00

1,483.00

1,483.00

01.01.01

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m

u

01.01.02

CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO (P/RESERVORIO)

m2

1.00

5,000.00

32,000.00

32,000.00

01.01.03

MOVILIZACION Y DESMOVILIZACION DE EQUIPO

glb

2.00

500.00

5,000.00

5,000.00

01.01.04

DEPOSITO PARA ALMACENAR AGUA

u

1.00

3,000.00

1,000.00

1,000.00

01.01.05

MEDIDAS DE MITIGACION AMBIENTAL

u

3,000.00

3,000.00

01.02

OBRAS PROVISIONALES

0.77

1,548.35

11,770.75

11,770.75

01.02.01

TRAZO Y REPLANTEO EN CANALES

km

3,087.72

1.45

1,192.23

1,192.23

01.02.02

LIMPIEZA, DESBROCE Y QUEMA DE VEGETACION

m2

14.00

72.59

4,477.19

4,477.19

01.02.03

ELIMINACION DE ARBOLES C/MOTOSIERRA

u

14.35

354.36

1,016.26

1,016.26

01.02.04

DEMOLICION DE ESTRUCTURAS DE LADRILLOS Y CONCRETO

m3

5,085.07

5,085.07

01.03

REVESTIMIENTO DE CANAL (TOMA FENCAL L=771.93 M.),

60.00

364.56

314,811.71

248,584.95

01.03.01

CONTROL TOPOGRAFICO DURANTE DURANTE LA EJECUCIÓN

d

780.26

6.66

21,873.60

11,301.36

01.03.02

LIMPIEZA DE CAPA ORGANICA CON MAQUINARIA (E=0.25M)

m3

605.01

12.17

5,196.53

5,196.53

01.03.03

EXCAVACION DE MATERIAL EN SECCION DEL CANAL /MAQUINARIA

m3

2,601.13

41.06

7,362.97

7,362.97

01.03.04

RELLENO CAJA CANAL C/MAT. TRANP. COMPACTADO CON MAQUINARIA (D=5 KM.)

m3

18.65

12.52

106,802.40

106,802.40

01.03.05

ELIMINACION DE MATERIAL EXCEDENTE D=2.5KM

m3

605.01

12.17

233.50

233.50

01.03.06

EXCAVACION DE CAJA DE CANAL CON MAQUINARIA

m3

1,713.68

6.53

7,362.97

4,908.65

01.03.07

PERFILADO Y REFINE DE SECCION DE CAJA DE CANAL

m2

77.19

58.83

11,190.33

7,460.22

PROYECTO:

RECONSTRUCCION RECONSTRUCCION DE ACUEDUCTODE TOMA ACUEDUCTO FENCAL,DEL TOMA CASERIO FENCAL,DEL MIRAFLORES,DISTRITO CASERIO MIRAFLORES,DISTRITO DE BELLAVISTA DE DE BELLAVISTA LA UNION,PROVINCIA DE LA UNION,PROVINCIA DE SECHURA PIURA DE SECHURA PI LLACLLA, DISTRITO LLACLLA, DE ABELARDO DISTRITO PARDO DE ABELARDO LEZAMETA PARDO -BOLOGNESI LEZAMETA - ANCASH -BOLOGNESI - ANCASH 1

Subpresupuesto: Cliente: Lugar:

MUNICIPALIDAD DISTRITAL DE BELLAVISTA DE LA UNION BELLAVISTA DE LA UNION PROVINCIA DE SECHURA -PIURA CRONOGRAMA VALORIZADO CRONOGRAMA DEVALORIZADO AVANCE DE OBRA DE AVANCE DE OBRA

Item 01 01.01

Descripción

Und

Metrado

P. Unit. S/.

Parcial S/.

Mes 1

CANAL TOMA EL FENCAL OBRAS PRELIMINARES

1.00

1,483.00

42,483.00

40.00

800.00

1,483.00

01.01.01

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m

u

01.01.02

CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO (P/RESERVORIO)

m2

1.00

5,000.00

32,000.00

01.01.03

MOVILIZACION Y DESMOVILIZACION DE EQUIPO

glb

2.00

500.00

5,000.00

01.01.04

DEPOSITO PARA ALMACENAR AGUA

u

1.00

3,000.00

1,000.00

01.01.05

MEDIDAS DE MITIGACION AMBIENTAL

u

01.02

OBRAS PROVISIONALES

0.77

1,548.35

11,770.75

TRAZO Y REPLANTEO EN CANALES

km

3,087.72

1.45

1,192.23

01.02.02

LIMPIEZA, DESBROCE Y QUEMA DE VEGETACION

m2

14.00

72.59

4,477.19

01.02.03

ELIMINACION DE ARBOLES C/MOTOSIERRA

u

14.35

354.36

1,016.26

01.02.04

DEMOLICION DE ESTRUCTURAS DE LADRILLOS Y CONCRETO

m3

REVESTIMIENTO DE CANAL (TOMA FENCAL L=771.93 M.),

100.0%

3,000.00

01.02.01

01.03

%

5,085.07 60.00

364.56

314,811.71

01.03.01

CONTROL TOPOGRAFICO DURANTE DURANTE LA EJECUCIÓN

d

780.26

6.66

21,873.60

01.03.02

LIMPIEZA DE CAPA ORGANICA CON MAQUINARIA (E=0.25M)

m3

605.01

12.17

5,196.53

01.03.03

EXCAVACION DE MATERIAL EN SECCION DEL CANAL /MAQUINARIA

m3

2,601.13

41.06

7,362.97

01.03.04

RELLENO CAJA CANAL C/MAT. TRANP. COMPACTADO CON MAQUINARIA (D=5 KM.)

m3

18.65

12.52

106,802.40

01.03.05

ELIMINACION DE MATERIAL EXCEDENTE D=2.5KM

m3

605.01

12.17

233.50

01.03.06

EXCAVACION DE CAJA DE CANAL CON MAQUINARIA

m3

1,713.68

6.53

7,362.97

01.03.07

PERFILADO Y REFINE DE SECCION DE CAJA DE CANAL

m2

77.19

58.83

11,190.33

100.0%

RECONSTRUCCION DE ACUEDUCTO RECONSTRUCCION TOMA FENCAL,DEL DE ACUEDUCTO CASERIO MIRAFLORES,DISTRITO TOMA FENCAL,DEL CASERIO DE BELLAVISTA MIRAFLORES,DISTRITO DE LA UNION,PROVINCIA DE BELLAVISTA DE SECHURA DE LA UNION,PROVINCIA PIURA DE SECHURA PI PROYECTO: LLACLLA, DISTRITO DE ABELARDO LLACLLA, PARDO DISTRITO LEZAMETADE-BOLOGNESI ABELARDO -PARDO ANCASH LEZAMETA -BOLOGNESI - ANCASH 1

Subpresupuesto: Cliente: Lugar:

MUNICIPALIDAD DISTRITAL DE BELLAVISTA DE LA UNION BELLAVISTA DE LA UNION PROVINCIA DE SECHURA -PIURA CRONOGRAMA VALORIZADO DE CRONOGRAMA AVANCE DE OBRA VALORIZADO DE AVANCE DE OBRA

Item 01 01.01

Descripción

Und

Metrado

P. Unit. S/.

Parcial S/.

OBRAS PRELIMINARES

1.00

1,483.00

42,483.00

40.00

800.00

1,483.00

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m

u

01.01.02

CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO (P/RESERVORIO)

m2

1.00

5,000.00

32,000.00

01.01.03

MOVILIZACION Y DESMOVILIZACION DE EQUIPO

glb

2.00

500.00

5,000.00

01.01.04

DEPOSITO PARA ALMACENAR AGUA

u

1.00

3,000.00

1,000.00

01.01.05

MEDIDAS DE MITIGACION AMBIENTAL

u

OBRAS PROVISIONALES

3,000.00 0.77

1,548.35

11,770.75

01.02.01

TRAZO Y REPLANTEO EN CANALES

km

3,087.72

1.45

1,192.23

01.02.02

LIMPIEZA, DESBROCE Y QUEMA DE VEGETACION

m2

14.00

72.59

4,477.19

01.02.03

ELIMINACION DE ARBOLES C/MOTOSIERRA

u

14.35

354.36

1,016.26

01.02.04

DEMOLICION DE ESTRUCTURAS DE LADRILLOS Y CONCRETO

m3

01.03

Parcial

CANAL TOMA EL FENCAL

01.01.01

01.02

Mes 2

REVESTIMIENTO DE CANAL (TOMA FENCAL L=771.93 M.),

5,085.07 60.00

364.56

314,811.71

66,226.76 10,572.24

01.03.01

CONTROL TOPOGRAFICO DURANTE DURANTE LA EJECUCIÓN

d

780.26

6.66

21,873.60

01.03.02

LIMPIEZA DE CAPA ORGANICA CON MAQUINARIA (E=0.25M)

m3

605.01

12.17

5,196.53

01.03.03

EXCAVACION DE MATERIAL EN SECCION DEL CANAL /MAQUINARIA

m3

2,601.13

41.06

7,362.97

01.03.04

RELLENO CAJA CANAL C/MAT. TRANP. COMPACTADO CON MAQUINARIA (D=5 KM.)

m3

18.65

12.52

106,802.40

01.03.05

ELIMINACION DE MATERIAL EXCEDENTE D=2.5KM

m3

605.01

12.17

233.50

01.03.06

EXCAVACION DE CAJA DE CANAL CON MAQUINARIA

m3

1,713.68

6.53

7,362.97

2,454.32

01.03.07

PERFILADO Y REFINE DE SECCION DE CAJA DE CANAL

m2

77.19

58.83

11,190.33

3,730.11

RECONSTRUCCION DE ACUEDUCTO TOMA FENCAL,DEL RECONSTRUCCION CASERIO MIRAFLORES,DISTRITO DE ACUEDUCTO TOMA FENCAL,DEL DE BELLAVISTA CASERIO DE LA UNION,PROVINCIA MIRAFLORES,DISTRITO DE SECHURA DE BELLAVISTA PIURA DE LA UNION,PROVINCIA DE SECHURA PI PROYECTO: LLACLLA, DISTRITO DE ABELARDO PARDO LEZAMETA LLACLLA, -BOLOGNESI DISTRITO DE - ANCASH ABELARDO PARDO LEZAMETA -BOLOGNESI - ANCASH 1

Subpresupuesto: Cliente: Lugar:

MUNICIPALIDAD DISTRITAL DE BELLAVISTA DE LA UNION BELLAVISTA DE LA UNION PROVINCIA DE SECHURA -PIURA CRONOGRAMA VALORIZADO DE AVANCE DE OBRA CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Item 01 01.01

Descripción

Und

Metrado

Parcial Mes 2 S/.

P. Unit. S/.

CANAL TOMA EL FENCAL OBRAS PRELIMINARES

1.00

1,483.00

42,483.00

40.00

800.00

1,483.00

01.01.01

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m

u

01.01.02

CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO (P/RESERVORIO)

m2

1.00

5,000.00

32,000.00

01.01.03

MOVILIZACION Y DESMOVILIZACION DE EQUIPO

glb

2.00

500.00

5,000.00

01.01.04

DEPOSITO PARA ALMACENAR AGUA

u

1.00

3,000.00

1,000.00

01.01.05

MEDIDAS DE MITIGACION AMBIENTAL

u

01.02

OBRAS PROVISIONALES

3,000.00 0.77

1,548.35

11,770.75

01.02.01

TRAZO Y REPLANTEO EN CANALES

km

3,087.72

1.45

1,192.23

01.02.02

LIMPIEZA, DESBROCE Y QUEMA DE VEGETACION

m2

14.00

72.59

4,477.19

01.02.03

ELIMINACION DE ARBOLES C/MOTOSIERRA

u

14.35

354.36

1,016.26

01.02.04

DEMOLICION DE ESTRUCTURAS DE LADRILLOS Y CONCRETO

m3

01.03

%

REVESTIMIENTO DE CANAL (TOMA FENCAL L=771.93 M.),

5,085.07 60.00

364.56

314,811.71

01.03.01

CONTROL TOPOGRAFICO DURANTE DURANTE LA EJECUCIÓN

d

780.26

6.66

21,873.60

01.03.02

LIMPIEZA DE CAPA ORGANICA CON MAQUINARIA (E=0.25M)

m3

605.01

12.17

5,196.53

01.03.03

EXCAVACION DE MATERIAL EN SECCION DEL CANAL /MAQUINARIA

m3

2,601.13

41.06

7,362.97

01.03.04

RELLENO CAJA CANAL C/MAT. TRANP. COMPACTADO CON MAQUINARIA (D=5 KM.)

m3

18.65

12.52

106,802.40

01.03.05

ELIMINACION DE MATERIAL EXCEDENTE D=2.5KM

m3

605.01

12.17

233.50

01.03.06

EXCAVACION DE CAJA DE CANAL CON MAQUINARIA

m3

1,713.68

6.53

7,362.97

01.03.07

PERFILADO Y REFINE DE SECCION DE CAJA DE CANAL

m2

77.19

58.83

11,190.33

21.0%

RECONSTRUCCION DE ACUEDUCTO TOMA FENCAL,DEL CASERIO MIRAFLORES,DISTRITO DE BELLAVISTA DE LA UNION,PROVINCIA DE SECHURA PI LLACLLA, DISTRITO DE ABELARDO PARDO LEZAMETA -BOLOGNESI - ANCASH

PROYECTO:

1

Subpresupuesto: Cliente: Lugar:

MUNICIPALIDAD DISTRITAL DE BELLAVISTA DE LA UNION BELLAVISTA DE LA UNION PROVINCIA DE SECHURA -PIURA CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Item

Descripción

Und

01.03.08

RELLENO, ESPARCIDO Y COMPACTACION DE CAPA DE AFIRMADO BERMAS (E=.10

01.03.09

Metrado

P. Unit. S/.

Parcial S/.

Mes 1 Parcial

m3

1,713.68

59.54

4,541.09

3,027.39

CONCRETO F'c = 175 Kg/cm2, ESPESOR DE LOSA E=0.075 M.

m2

257.31

20.14

102,032.51

68,021.67

01.03.10

ENCOFRADO Y DESENCOFRADO DE CERCHAS (15 USOS)

u

964.91

12.08

5,182.22

5,182.22

01.03.11

JUNTA DE DILATACION CON MATERIAL ELASTOMERICO 1/2"

m

1,713.68

18.31

11,656.11

11,656.11

01.03.12

CURADO DE LOSA CON ANTISOL

m2

31,377.48

17,431.93

01.04

TOMAS LATERALES IZQUIERDA TIPO II (05UND):

33.00

1.66

28,882.55

m2

38.50

43.46

54.78

EXCAVACION MANUAL PARA OBRAS DE ARTE CANAL

m3

5.50

36.11

1,673.21

01.04.03

RELLENO COMPACTADO MANUAL MATERIAL PROPIO

m3

9.90

63.47

198.61

01.04.04

CAPA DE OVER E=0.30 M.

m3

33.00

33.68

628.35

01.04.05

SOLADOS CONCRETO f'c=100 kg/cm2 E=10cm

m2

20.09

550.56

1,111.44

01.04.06

CONCRETO f'c=210 kg/cm2

m3

1,274.92

4.42

11,060.75

01.04.07

ACERO fy=4200 kg/cm2 GRADO 60

kg

41.70

43.47

5,635.15

01.04.08

ENCOFRADO Y DESENCOFRADO MUROS CARA VISTA

m2

5.00

1,288.36

1,812.70

01.04.09

COMPUERTA DE FIERRO DE E=1/4" Y MARCO DOBLE E=2"X2"X1/4" DE 1.00X0.80 H

22.00

12.08

6,441.80

01.04.10

JUNTA DE DILATACION CON MATERIAL ELASTOMERICO

01.04.01

TRAZO, NIVEL Y REPLANTEO

01.04.02

01.05

u m

ACUEDUCTO SOBRE DREN (01 UND),

265.76 33.00

1.66

38,436.16

01.05.01

TRAZO, NIVEL Y REPLANTEO

m2

44.00

2.95

54.78

01.05.02

LIMPIEZA MANUAL DE TERRENO CANAL

m3

19.08

43.46

129.80

m3

12.60

5.53

829.22

01.05.03

EXCAVACIÓN MANUAL DE CIMENTACION DE MUROS

PROYECTO:

RECONSTRUCCION RECONSTRUCCION DE ACUEDUCTODE TOMA ACUEDUCTO FENCAL,DEL TOMA CASERIO FENCAL,DEL MIRAFLORES,DISTRITO CASERIO MIRAFLORES,DISTRITO DE BELLAVISTA DE DE BELLAVISTA LA UNION,PROVINCIA DE LA UNION,PROVINCIA DE SECHURA PIURA DE SECHURA PI LLACLLA, DISTRITO LLACLLA, DE ABELARDO DISTRITO PARDO DE ABELARDO LEZAMETA PARDO -BOLOGNESI LEZAMETA - ANCASH -BOLOGNESI - ANCASH 1

Subpresupuesto: Cliente: Lugar:

MUNICIPALIDAD DISTRITAL DE BELLAVISTA DE LA UNION BELLAVISTA DE LA UNION PROVINCIA DE SECHURA -PIURA CRONOGRAMA VALORIZADO CRONOGRAMA DEVALORIZADO AVANCE DE OBRA DE AVANCE DE OBRA

Item

Descripción

Und

01.03.08

RELLENO, ESPARCIDO Y COMPACTACION DE CAPA DE AFIRMADO BERMAS (E=.10

01.03.09

Metrado

P. Unit. S/.

Parcial S/.

Mes 1

m3

1,713.68

59.54

4,541.09

CONCRETO F'c = 175 Kg/cm2, ESPESOR DE LOSA E=0.075 M.

m2

257.31

20.14

102,032.51

01.03.10

ENCOFRADO Y DESENCOFRADO DE CERCHAS (15 USOS)

u

964.91

12.08

5,182.22

01.03.11

JUNTA DE DILATACION CON MATERIAL ELASTOMERICO 1/2"

m

1,713.68

18.31

11,656.11

01.03.12

CURADO DE LOSA CON ANTISOL

m2

01.04

TOMAS LATERALES IZQUIERDA TIPO II (05UND):

31,377.48 33.00

1.66

28,882.55

m2

38.50

43.46

54.78

EXCAVACION MANUAL PARA OBRAS DE ARTE CANAL

m3

5.50

36.11

1,673.21

01.04.03

RELLENO COMPACTADO MANUAL MATERIAL PROPIO

m3

9.90

63.47

198.61

01.04.04

CAPA DE OVER E=0.30 M.

m3

33.00

33.68

628.35

01.04.05

SOLADOS CONCRETO f'c=100 kg/cm2 E=10cm

m2

20.09

550.56

1,111.44

01.04.06

CONCRETO f'c=210 kg/cm2

m3

1,274.92

4.42

11,060.75

01.04.07

ACERO fy=4200 kg/cm2 GRADO 60

kg

41.70

43.47

5,635.15

01.04.08

ENCOFRADO Y DESENCOFRADO MUROS CARA VISTA

m2

5.00

1,288.36

1,812.70

01.04.09

COMPUERTA DE FIERRO DE E=1/4" Y MARCO DOBLE E=2"X2"X1/4" DE 1.00X0.80 H

22.00

12.08

6,441.80

01.04.10

JUNTA DE DILATACION CON MATERIAL ELASTOMERICO

01.04.01

TRAZO, NIVEL Y REPLANTEO

01.04.02

01.05

u m

ACUEDUCTO SOBRE DREN (01 UND),

265.76 33.00

1.66

38,436.16

01.05.01

TRAZO, NIVEL Y REPLANTEO

m2

44.00

2.95

54.78

01.05.02

LIMPIEZA MANUAL DE TERRENO CANAL

m3

19.08

43.46

129.80

m3

12.60

5.53

829.22

01.05.03

EXCAVACIÓN MANUAL DE CIMENTACION DE MUROS

%

RECONSTRUCCION DE ACUEDUCTO RECONSTRUCCION TOMA FENCAL,DEL DE ACUEDUCTO CASERIO MIRAFLORES,DISTRITO TOMA FENCAL,DEL CASERIO DE BELLAVISTA MIRAFLORES,DISTRITO DE LA UNION,PROVINCIA DE BELLAVISTA DE SECHURA DE LA UNION,PROVINCIA PIURA DE SECHURA PI PROYECTO: LLACLLA, DISTRITO DE ABELARDO LLACLLA, PARDO DISTRITO LEZAMETADE-BOLOGNESI ABELARDO -PARDO ANCASH LEZAMETA -BOLOGNESI - ANCASH 1

Subpresupuesto: Cliente: Lugar:

MUNICIPALIDAD DISTRITAL DE BELLAVISTA DE LA UNION BELLAVISTA DE LA UNION PROVINCIA DE SECHURA -PIURA CRONOGRAMA VALORIZADO DE CRONOGRAMA AVANCE DE OBRA VALORIZADO DE AVANCE DE OBRA

Item

Descripción

Und

01.03.08

RELLENO, ESPARCIDO Y COMPACTACION DE CAPA DE AFIRMADO BERMAS (E=.10

01.03.09

Metrado

P. Unit. S/.

Parcial S/.

Mes 2 Parcial

m3

1,713.68

59.54

4,541.09

1,513.70

CONCRETO F'c = 175 Kg/cm2, ESPESOR DE LOSA E=0.075 M.

m2

257.31

20.14

102,032.51

34,010.84

01.03.10

ENCOFRADO Y DESENCOFRADO DE CERCHAS (15 USOS)

u

964.91

12.08

5,182.22

01.03.11

JUNTA DE DILATACION CON MATERIAL ELASTOMERICO 1/2"

m

1,713.68

18.31

11,656.11

01.03.12

CURADO DE LOSA CON ANTISOL

m2

01.04

TOMAS LATERALES IZQUIERDA TIPO II (05UND):

31,377.48

13,945.55

33.00

1.66

28,882.55

28,882.55

m2

38.50

43.46

54.78

54.78

EXCAVACION MANUAL PARA OBRAS DE ARTE CANAL

m3

5.50

36.11

1,673.21

1,673.21

01.04.03

RELLENO COMPACTADO MANUAL MATERIAL PROPIO

m3

9.90

63.47

198.61

198.61

01.04.04

CAPA DE OVER E=0.30 M.

m3

33.00

33.68

628.35

628.35

01.04.05

SOLADOS CONCRETO f'c=100 kg/cm2 E=10cm

m2

20.09

550.56

1,111.44

1,111.44

01.04.06

CONCRETO f'c=210 kg/cm2

m3

1,274.92

4.42

11,060.75

11,060.75

01.04.07

ACERO fy=4200 kg/cm2 GRADO 60

kg

41.70

43.47

5,635.15

5,635.15

01.04.08

ENCOFRADO Y DESENCOFRADO MUROS CARA VISTA

m2

5.00

1,288.36

1,812.70

1,812.70

01.04.09

COMPUERTA DE FIERRO DE E=1/4" Y MARCO DOBLE E=2"X2"X1/4" DE 1.00X0.80 H

22.00

12.08

6,441.80

6,441.80

01.04.10

JUNTA DE DILATACION CON MATERIAL ELASTOMERICO

265.76

265.76

01.04.01

TRAZO, NIVEL Y REPLANTEO

01.04.02

01.05

u m

ACUEDUCTO SOBRE DREN (01 UND),

33.00

1.66

38,436.16

38,436.16

01.05.01

TRAZO, NIVEL Y REPLANTEO

m2

44.00

2.95

54.78

54.78

01.05.02

LIMPIEZA MANUAL DE TERRENO CANAL

m3

19.08

43.46

129.80

129.80

m3

12.60

5.53

829.22

829.22

01.05.03

EXCAVACIÓN MANUAL DE CIMENTACION DE MUROS

RECONSTRUCCION DE ACUEDUCTO TOMA FENCAL,DEL RECONSTRUCCION CASERIO MIRAFLORES,DISTRITO DE ACUEDUCTO TOMA FENCAL,DEL DE BELLAVISTA CASERIO DE LA UNION,PROVINCIA MIRAFLORES,DISTRITO DE SECHURA DE BELLAVISTA PIURA DE LA UNION,PROVINCIA DE SECHURA PI PROYECTO: LLACLLA, DISTRITO DE ABELARDO PARDO LEZAMETA LLACLLA, -BOLOGNESI DISTRITO DE - ANCASH ABELARDO PARDO LEZAMETA -BOLOGNESI - ANCASH 1

Subpresupuesto: Cliente: Lugar:

MUNICIPALIDAD DISTRITAL DE BELLAVISTA DE LA UNION BELLAVISTA DE LA UNION PROVINCIA DE SECHURA -PIURA CRONOGRAMA VALORIZADO DE AVANCE DE OBRA CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Item

Descripción

Und

01.03.08

RELLENO, ESPARCIDO Y COMPACTACION DE CAPA DE AFIRMADO BERMAS (E=.10

01.03.09

Metrado

Parcial Mes 2 S/.

P. Unit. S/.

m3

1,713.68

59.54

4,541.09

CONCRETO F'c = 175 Kg/cm2, ESPESOR DE LOSA E=0.075 M.

m2

257.31

20.14

102,032.51

01.03.10

ENCOFRADO Y DESENCOFRADO DE CERCHAS (15 USOS)

u

964.91

12.08

5,182.22

01.03.11

JUNTA DE DILATACION CON MATERIAL ELASTOMERICO 1/2"

m

1,713.68

18.31

11,656.11

01.03.12

CURADO DE LOSA CON ANTISOL

m2

01.04

TOMAS LATERALES IZQUIERDA TIPO II (05UND):

31,377.48 33.00

1.66

28,882.55

01.04.01

TRAZO, NIVEL Y REPLANTEO

m2

38.50

43.46

54.78

01.04.02

EXCAVACION MANUAL PARA OBRAS DE ARTE CANAL

m3

5.50

36.11

1,673.21

01.04.03

RELLENO COMPACTADO MANUAL MATERIAL PROPIO

m3

9.90

63.47

198.61

01.04.04

CAPA DE OVER E=0.30 M.

m3

33.00

33.68

628.35

01.04.05

SOLADOS CONCRETO f'c=100 kg/cm2 E=10cm

m2

20.09

550.56

1,111.44

01.04.06

CONCRETO f'c=210 kg/cm2

m3

1,274.92

4.42

11,060.75

01.04.07

ACERO fy=4200 kg/cm2 GRADO 60

kg

41.70

43.47

5,635.15

01.04.08

ENCOFRADO Y DESENCOFRADO MUROS CARA VISTA

m2

5.00

1,288.36

1,812.70

01.04.09

COMPUERTA DE FIERRO DE E=1/4" Y MARCO DOBLE E=2"X2"X1/4" DE 1.00X0.80 H

22.00

12.08

6,441.80

01.04.10

JUNTA DE DILATACION CON MATERIAL ELASTOMERICO

01.05

u m

ACUEDUCTO SOBRE DREN (01 UND),

33.00

1.66

38,436.16

TRAZO, NIVEL Y REPLANTEO

m2

44.00

2.95

54.78

01.05.02

LIMPIEZA MANUAL DE TERRENO CANAL

m3

19.08

43.46

129.80

m3

12.60

5.53

829.22

01.05.03

100.0%

265.76

01.05.01

EXCAVACIÓN MANUAL DE CIMENTACION DE MUROS

%

100.0%

RECONSTRUCCION DE ACUEDUCTO TOMA FENCAL,DEL CASERIO MIRAFLORES,DISTRITO DE BELLAVISTA DE LA UNION,PROVINCIA DE SECHURA PI LLACLLA, DISTRITO DE ABELARDO PARDO LEZAMETA -BOLOGNESI - ANCASH

PROYECTO:

1

Subpresupuesto: Cliente: Lugar:

MUNICIPALIDAD DISTRITAL DE BELLAVISTA DE LA UNION BELLAVISTA DE LA UNION PROVINCIA DE SECHURA -PIURA CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Item

Descripción

01.05.04

NIVELACION DE RASANTE DE ACCESOS A ACUEDUCTO

01.05.05

Und

P. Unit. S/.

Parcial S/.

5.00

687.83

69.68

ELIMINACION DE AGUA PARA EXCAVACION Y COLOCAR CIMENTACION/MOTOBOMB

d

2.30

89.52

3,439.15

01.05.06

CAPA DE PIEDRA GRANDE EN CIMIENTOS E=0.40 M.

m3

2.59

84.91

205.90

01.05.07

CAPA DE HORMIGON GRUESO E=0.15 M.

m3

20.40

33.68

219.92

01.05.08

SOLADOS CONCRETO f'c=100 kg/cm2 E=10cm

m2

21.03

506.99

687.07

01.05.09

CONCRETO F´C=175 KG/CM2+30% P.G

m3

14.14

550.56

10,662.00

01.05.10

CONCRETO f'c=210 kg/cm2

m3

3.35

521.99

7,784.92

01.05.11

CONCRETO f'c=175 kg/cm2

m3

1,265.94

4.42

1,748.67

01.05.12

ACERO fy=4200 kg/cm2 GRADO 60

kg

118.00

43.47

5,595.45

01.05.13

ENCOFRADO Y DESENCOFRADO MUROS CARA VISTA

m2

2.40

43.32

5,129.46

01.05.14

CARTON EMBREADO

m2

7.00

29.31

103.97

01.05.15

JUNTA WATER STOP DE 6"

m

85.80

18.31

205.17

01.05.16

CURADO DE LOSA CON ANTISOL

m2

01.06

m2

Metrado

PASE PEATONAL (03 UND)

1,571.00 40.00

1.66

15,286.11

01.06.01

TRAZO, NIVEL Y REPLANTEO

m2

10.00

43.46

66.40

01.06.02

EXCAVACION MANUAL PARA OBRAS DE ARTE CANAL

m3

10.80

521.99

434.60

01.06.03

CONCRETO f'c=175 kg/cm2

m3

6.72

550.56

5,637.49

01.06.04

CONCRETO f'c=210 kg/cm2

m3

575.01

4.42

3,699.76

01.06.05

ACERO fy=4200 kg/cm2 GRADO 60

kg

52.20

43.47

2,541.54

01.06.06

ENCOFRADO Y DESENCOFRADO MUROS CARA VISTA

m2

34.80

18.31

2,269.13

Mes 1 Parcial

PROYECTO:

RECONSTRUCCION RECONSTRUCCION DE ACUEDUCTODE TOMA ACUEDUCTO FENCAL,DEL TOMA CASERIO FENCAL,DEL MIRAFLORES,DISTRITO CASERIO MIRAFLORES,DISTRITO DE BELLAVISTA DE DE BELLAVISTA LA UNION,PROVINCIA DE LA UNION,PROVINCIA DE SECHURA PIURA DE SECHURA PI LLACLLA, DISTRITO LLACLLA, DE ABELARDO DISTRITO PARDO DE ABELARDO LEZAMETA PARDO -BOLOGNESI LEZAMETA - ANCASH -BOLOGNESI - ANCASH 1

Subpresupuesto: Cliente: Lugar:

MUNICIPALIDAD DISTRITAL DE BELLAVISTA DE LA UNION BELLAVISTA DE LA UNION PROVINCIA DE SECHURA -PIURA CRONOGRAMA VALORIZADO CRONOGRAMA DEVALORIZADO AVANCE DE OBRA DE AVANCE DE OBRA

Item

Descripción

01.05.04

NIVELACION DE RASANTE DE ACCESOS A ACUEDUCTO

01.05.05

Und

P. Unit. S/.

Parcial S/.

Mes 1

5.00

687.83

69.68

ELIMINACION DE AGUA PARA EXCAVACION Y COLOCAR CIMENTACION/MOTOBOMB

d

2.30

89.52

3,439.15

01.05.06

CAPA DE PIEDRA GRANDE EN CIMIENTOS E=0.40 M.

m3

2.59

84.91

205.90

01.05.07

CAPA DE HORMIGON GRUESO E=0.15 M.

m3

20.40

33.68

219.92

01.05.08

SOLADOS CONCRETO f'c=100 kg/cm2 E=10cm

m2

21.03

506.99

687.07

01.05.09

CONCRETO F´C=175 KG/CM2+30% P.G

m3

14.14

550.56

10,662.00

01.05.10

CONCRETO f'c=210 kg/cm2

m3

3.35

521.99

7,784.92

01.05.11

CONCRETO f'c=175 kg/cm2

m3

1,265.94

4.42

1,748.67

01.05.12

ACERO fy=4200 kg/cm2 GRADO 60

kg

118.00

43.47

5,595.45

01.05.13

ENCOFRADO Y DESENCOFRADO MUROS CARA VISTA

m2

2.40

43.32

5,129.46

01.05.14

CARTON EMBREADO

m2

7.00

29.31

103.97

01.05.15

JUNTA WATER STOP DE 6"

m

85.80

18.31

205.17

01.05.16

CURADO DE LOSA CON ANTISOL

m2

01.06

m2

Metrado

PASE PEATONAL (03 UND)

1,571.00 40.00

1.66

15,286.11

01.06.01

TRAZO, NIVEL Y REPLANTEO

m2

10.00

43.46

66.40

01.06.02

EXCAVACION MANUAL PARA OBRAS DE ARTE CANAL

m3

10.80

521.99

434.60

01.06.03

CONCRETO f'c=175 kg/cm2

m3

6.72

550.56

5,637.49

01.06.04

CONCRETO f'c=210 kg/cm2

m3

575.01

4.42

3,699.76

01.06.05

ACERO fy=4200 kg/cm2 GRADO 60

kg

52.20

43.47

2,541.54

01.06.06

ENCOFRADO Y DESENCOFRADO MUROS CARA VISTA

m2

34.80

18.31

2,269.13

%

RECONSTRUCCION DE ACUEDUCTO RECONSTRUCCION TOMA FENCAL,DEL DE ACUEDUCTO CASERIO MIRAFLORES,DISTRITO TOMA FENCAL,DEL CASERIO DE BELLAVISTA MIRAFLORES,DISTRITO DE LA UNION,PROVINCIA DE BELLAVISTA DE SECHURA DE LA UNION,PROVINCIA PIURA DE SECHURA PI PROYECTO: LLACLLA, DISTRITO DE ABELARDO LLACLLA, PARDO DISTRITO LEZAMETADE-BOLOGNESI ABELARDO -PARDO ANCASH LEZAMETA -BOLOGNESI - ANCASH 1

Subpresupuesto: Cliente: Lugar:

MUNICIPALIDAD DISTRITAL DE BELLAVISTA DE LA UNION BELLAVISTA DE LA UNION PROVINCIA DE SECHURA -PIURA CRONOGRAMA VALORIZADO DE CRONOGRAMA AVANCE DE OBRA VALORIZADO DE AVANCE DE OBRA

Item

Descripción

Und

Metrado

P. Unit. S/.

Parcial S/.

Mes 2 Parcial

5.00

687.83

69.68

69.68

ELIMINACION DE AGUA PARA EXCAVACION Y COLOCAR CIMENTACION/MOTOBOMB

d

2.30

89.52

3,439.15

3,439.15

01.05.06

CAPA DE PIEDRA GRANDE EN CIMIENTOS E=0.40 M.

m3

2.59

84.91

205.90

205.90

01.05.07

CAPA DE HORMIGON GRUESO E=0.15 M.

m3

20.40

33.68

219.92

219.92

01.05.08

SOLADOS CONCRETO f'c=100 kg/cm2 E=10cm

m2

21.03

506.99

687.07

687.07

01.05.09

CONCRETO F´C=175 KG/CM2+30% P.G

m3

14.14

550.56

10,662.00

10,662.00

01.05.10

CONCRETO f'c=210 kg/cm2

m3

3.35

521.99

7,784.92

7,784.92

01.05.11

CONCRETO f'c=175 kg/cm2

m3

1,265.94

4.42

1,748.67

1,748.67

01.05.12

ACERO fy=4200 kg/cm2 GRADO 60

kg

118.00

43.47

5,595.45

5,595.45

01.05.13

ENCOFRADO Y DESENCOFRADO MUROS CARA VISTA

m2

2.40

43.32

5,129.46

5,129.46

01.05.14

CARTON EMBREADO

m2

7.00

29.31

103.97

103.97

01.05.15

JUNTA WATER STOP DE 6"

m

85.80

18.31

205.17

205.17

01.05.16

CURADO DE LOSA CON ANTISOL

m2

1,571.00

1,571.00

01.05.04

NIVELACION DE RASANTE DE ACCESOS A ACUEDUCTO

01.05.05

01.06

m2

PASE PEATONAL (03 UND)

40.00

1.66

15,286.11

15,286.11

01.06.01

TRAZO, NIVEL Y REPLANTEO

m2

10.00

43.46

66.40

66.40

01.06.02

EXCAVACION MANUAL PARA OBRAS DE ARTE CANAL

m3

10.80

521.99

434.60

434.60

01.06.03

CONCRETO f'c=175 kg/cm2

m3

6.72

550.56

5,637.49

5,637.49

01.06.04

CONCRETO f'c=210 kg/cm2

m3

575.01

4.42

3,699.76

3,699.76

01.06.05

ACERO fy=4200 kg/cm2 GRADO 60

kg

52.20

43.47

2,541.54

2,541.54

01.06.06

ENCOFRADO Y DESENCOFRADO MUROS CARA VISTA

m2

34.80

18.31

2,269.13

2,269.13

RECONSTRUCCION DE ACUEDUCTO TOMA FENCAL,DEL RECONSTRUCCION CASERIO MIRAFLORES,DISTRITO DE ACUEDUCTO TOMA FENCAL,DEL DE BELLAVISTA CASERIO DE LA UNION,PROVINCIA MIRAFLORES,DISTRITO DE SECHURA DE BELLAVISTA PIURA DE LA UNION,PROVINCIA DE SECHURA PI PROYECTO: LLACLLA, DISTRITO DE ABELARDO PARDO LEZAMETA LLACLLA, -BOLOGNESI DISTRITO DE - ANCASH ABELARDO PARDO LEZAMETA -BOLOGNESI - ANCASH 1

Subpresupuesto: Cliente: Lugar:

MUNICIPALIDAD DISTRITAL DE BELLAVISTA DE LA UNION BELLAVISTA DE LA UNION PROVINCIA DE SECHURA -PIURA CRONOGRAMA VALORIZADO DE AVANCE DE OBRA CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Item

Descripción

01.05.04

NIVELACION DE RASANTE DE ACCESOS A ACUEDUCTO

01.05.05

Und

Parcial Mes 2 S/.

P. Unit. S/.

5.00

687.83

69.68

ELIMINACION DE AGUA PARA EXCAVACION Y COLOCAR CIMENTACION/MOTOBOMB

d

2.30

89.52

3,439.15

01.05.06

CAPA DE PIEDRA GRANDE EN CIMIENTOS E=0.40 M.

m3

2.59

84.91

205.90

01.05.07

CAPA DE HORMIGON GRUESO E=0.15 M.

m3

20.40

33.68

219.92

01.05.08

SOLADOS CONCRETO f'c=100 kg/cm2 E=10cm

m2

21.03

506.99

687.07

01.05.09

CONCRETO F´C=175 KG/CM2+30% P.G

m3

14.14

550.56

10,662.00

01.05.10

CONCRETO f'c=210 kg/cm2

m3

3.35

521.99

7,784.92

01.05.11

CONCRETO f'c=175 kg/cm2

m3

1,265.94

4.42

1,748.67

01.05.12

ACERO fy=4200 kg/cm2 GRADO 60

kg

118.00

43.47

5,595.45

01.05.13

ENCOFRADO Y DESENCOFRADO MUROS CARA VISTA

m2

2.40

43.32

5,129.46

01.05.14

CARTON EMBREADO

m2

7.00

29.31

103.97

01.05.15

JUNTA WATER STOP DE 6"

m

85.80

18.31

205.17

01.05.16

CURADO DE LOSA CON ANTISOL

m2

01.06

m2

Metrado

PASE PEATONAL (03 UND)

%

1,571.00 40.00

1.66

15,286.11

01.06.01

TRAZO, NIVEL Y REPLANTEO

m2

10.00

43.46

66.40

01.06.02

EXCAVACION MANUAL PARA OBRAS DE ARTE CANAL

m3

10.80

521.99

434.60

01.06.03

CONCRETO f'c=175 kg/cm2

m3

6.72

550.56

5,637.49

01.06.04

CONCRETO f'c=210 kg/cm2

m3

575.01

4.42

3,699.76

01.06.05

ACERO fy=4200 kg/cm2 GRADO 60

kg

52.20

43.47

2,541.54

01.06.06

ENCOFRADO Y DESENCOFRADO MUROS CARA VISTA

m2

34.80

18.31

2,269.13

100.0%

RECONSTRUCCION DE ACUEDUCTO TOMA FENCAL,DEL CASERIO MIRAFLORES,DISTRITO DE BELLAVISTA DE LA UNION,PROVINCIA DE SECHURA PI LLACLLA, DISTRITO DE ABELARDO PARDO LEZAMETA -BOLOGNESI - ANCASH

PROYECTO:

1

Subpresupuesto: Cliente: Lugar:

MUNICIPALIDAD DISTRITAL DE BELLAVISTA DE LA UNION BELLAVISTA DE LA UNION PROVINCIA DE SECHURA -PIURA CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Item 01.06.07 01.07 01.07.01

Descripción CURADO DE LOSA CON ANTISOL

Und

Utilidad

1.00

Total Final

Mes 1 Parcial

6,000.00

6,000.00

6,000.00

6,000.00

6,000.00

S/.

457,670.28

308,838.70

9.77%

S/.

44,700.20

30,163.97

10.00%

S/.

45,767.03

30,883.87

S/.

548,137.51

369,886.54

S/.

98,664.75

66,579.58

S/.

646,802.26

436,466.11

glb

Sub-Total Impuesto General a las Ventas

Parcial S/. 637.19

Costo Directo Gastos Generales

P. Unit. S/.

m2

FLETE FLETE TERRESTRE GENERAL

Metrado

18.00%

PROYECTO:

RECONSTRUCCION RECONSTRUCCION DE ACUEDUCTODE TOMA ACUEDUCTO FENCAL,DEL TOMA CASERIO FENCAL,DEL MIRAFLORES,DISTRITO CASERIO MIRAFLORES,DISTRITO DE BELLAVISTA DE DE BELLAVISTA LA UNION,PROVINCIA DE LA UNION,PROVINCIA DE SECHURA PIURA DE SECHURA PI LLACLLA, DISTRITO LLACLLA, DE ABELARDO DISTRITO PARDO DE ABELARDO LEZAMETA PARDO -BOLOGNESI LEZAMETA - ANCASH -BOLOGNESI - ANCASH 1

Subpresupuesto: Cliente: Lugar:

MUNICIPALIDAD DISTRITAL DE BELLAVISTA DE LA UNION BELLAVISTA DE LA UNION PROVINCIA DE SECHURA -PIURA CRONOGRAMA VALORIZADO CRONOGRAMA DEVALORIZADO AVANCE DE OBRA DE AVANCE DE OBRA

Item 01.06.07 01.07 01.07.01

Descripción CURADO DE LOSA CON ANTISOL

Und

Utilidad

1.00

Total Final

6,000.00

glb

Mes 1 %

6,000.00

100.0%

6,000.00 S/.

457,670.28

9.77%

S/.

44,700.20

10.00%

S/.

45,767.03

S/.

548,137.51

S/.

98,664.75

S/.

646,802.26

Sub-Total Impuesto General a las Ventas

Parcial S/.

637.19

Costo Directo Gastos Generales

P. Unit. S/.

m2

FLETE FLETE TERRESTRE GENERAL

Metrado

18.00%

67.5%

RECONSTRUCCION DE ACUEDUCTO RECONSTRUCCION TOMA FENCAL,DEL DE ACUEDUCTO CASERIO MIRAFLORES,DISTRITO TOMA FENCAL,DEL CASERIO DE BELLAVISTA MIRAFLORES,DISTRITO DE LA UNION,PROVINCIA DE BELLAVISTA DE SECHURA DE LA UNION,PROVINCIA PIURA DE SECHURA PI PROYECTO: LLACLLA, DISTRITO DE ABELARDO LLACLLA, PARDO DISTRITO LEZAMETADE-BOLOGNESI ABELARDO -PARDO ANCASH LEZAMETA -BOLOGNESI - ANCASH 1

Subpresupuesto: Cliente: Lugar:

MUNICIPALIDAD DISTRITAL DE BELLAVISTA DE LA UNION BELLAVISTA DE LA UNION PROVINCIA DE SECHURA -PIURA CRONOGRAMA VALORIZADO DE CRONOGRAMA AVANCE DE OBRA VALORIZADO DE AVANCE DE OBRA

Item 01.06.07 01.07 01.07.01

Descripción CURADO DE LOSA CON ANTISOL

Und

Utilidad

1.00

Total Final

6,000.00

glb

Mes 2 Parcial 637.19

6,000.00 6,000.00

S/.

457,670.28

148,831.58

9.77%

S/.

44,700.20

14,536.23

10.00%

S/.

45,767.03

14,883.16

S/.

548,137.51

178,250.97

S/.

98,664.75

32,085.17

S/.

646,802.26

210,336.14

Sub-Total Impuesto General a las Ventas

Parcial S/. 637.19

Costo Directo Gastos Generales

P. Unit. S/.

m2

FLETE FLETE TERRESTRE GENERAL

Metrado

18.00%

RECONSTRUCCION DE ACUEDUCTO TOMA FENCAL,DEL RECONSTRUCCION CASERIO MIRAFLORES,DISTRITO DE ACUEDUCTO TOMA FENCAL,DEL DE BELLAVISTA CASERIO DE LA UNION,PROVINCIA MIRAFLORES,DISTRITO DE SECHURA DE BELLAVISTA PIURA DE LA UNION,PROVINCIA DE SECHURA PI PROYECTO: LLACLLA, DISTRITO DE ABELARDO PARDO LEZAMETA LLACLLA, -BOLOGNESI DISTRITO DE - ANCASH ABELARDO PARDO LEZAMETA -BOLOGNESI - ANCASH 1

Subpresupuesto: Cliente: Lugar:

MUNICIPALIDAD DISTRITAL DE BELLAVISTA DE LA UNION BELLAVISTA DE LA UNION PROVINCIA DE SECHURA -PIURA CRONOGRAMA VALORIZADO DE AVANCE DE OBRA CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

Item 01.06.07 01.07 01.07.01

Descripción CURADO DE LOSA CON ANTISOL

Und

Utilidad

1.00

Total Final

6,000.00

glb

6,000.00 6,000.00

S/.

457,670.28

9.77%

S/.

44,700.20

10.00%

S/.

45,767.03

S/.

548,137.51

S/.

98,664.75

S/.

646,802.26

Sub-Total Impuesto General a las Ventas

%

637.19

Costo Directo Gastos Generales

Parcial Mes 2 S/.

P. Unit. S/.

m2

FLETE FLETE TERRESTRE GENERAL

Metrado

18.00%

32.5%

CALENDARIO DE UTILIZACION DE EQUIPO

Item

Descripción

Cantidad Und

PLAZO DE EJECUCION Semana 1

Semana 2

Semana 3

Semana 4

MANO DE OBRA 1.1

CAPATAZ

1

1

1

1

1.2

OPERARIO

1

1

1

1

1.3

OFICIAL

1

1

1

1

1.4

PEON

1

1

1

1

1.5

TOPOGRAFO

1

1

1

1

1

1.6

MANO DE OBRA - T

2

2

2

2

2

1.7

MANO DE OBRA - LT

1

1

1

1

1

1.8

MANO DE OBRA-A

1

1

1

1

1

1.9

2

2

2

1

1

1.11

MANO DE OBRA - SEÑALIZACION ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO MANO DE OBRA - PROTECCION COLECTIVA

1

1

1.12

CHARLAS DE CAPACITACION EN SEGURIDAD AL PERSONAL

1

1

1

1

1

1.13

MANO DE OBRA - CAPACITACION EN SEGURIDAD

1

1

1

1

1

2.1

ALAMBRE NEGRO Nro. 8

1

1

1

1

1

2.2

ALAMBRE NEGRO Nro.16

1

1

1

1

2.3

CLAVOS CON CABEZA DE 2 1/2", 3", 4"

1

1

1

1

1

2.4

CLAVOS CON CABEZA DE 3"

1

1

1

1

1

2.5

CLAVOS CON CABEZA DE 4"

1

1

1

2.6

ACERO

1

1

1

2.7

ARENA GRUESA

1

1

1

2.8

ARENA FINA

1

1

1

2.9

PIEDRA CHANCADA DE 1/2” Y 3/4"

1

1

1

2.10

AGUA

1

1

1

1

2.11

AGUA

1

1

1

1

2.12

ASFALTO LIQUIDO RC-250

1

1

1

1

2.13

MEZCLA ASFALTICA EN CALIENTE

1

1

1

2.14

TRANSPORTE DE MEZCLA ASFALTICA C/VOLQUETE 10M3

1

1

1

1

2.15

LADRILLO KK TIPO IV 24X13X09 CM

1

1

1

1

2.16

CEMENTO PORTLAND TIPO I (42.5kg)

1

1

1

1

2.17

PEGAMENTO PARA TUBERIA PVC

1

1

1

1

2.18

CAL (BOLSA X 20 kg)

1

1

1

1

2.19

CORDEL

1

1

1

1

2.20

IMPERMEABILIZANTE LIQUIDO PARA CONCRETO

1

1

1

1

2.21

EXTINTOR DE POLVO SECO

1

1

1

1

2.22

DISCO DE CORTE DE 16"

1

1

2.23

CASCO DE PROTECCION

1

1

2.24

BOTINES DE CUERO

1

1

2.25

TAPONES AUDITIVOS

1

1

2.26

GUANTES DE CUERO

1

1

2.27

RESPIRADOR CONTRA POLVO

1

1

2.28

CHALECOS REFLECTIVOS

1

1

1.10

1

1

1

1

MATERIALES

1

1

2.29

LENTES DE PROTECCION

1

1

2.30

MATERIALES - PROTECCION COLECTIVA

1

1

2.31

MATERIALES - SEÑALIZACION SEGURIDAD

1

1

2.32

CAMILLA

1

1

2.33

BOTIQUIN CON MEDICINA

1

2.34

CILINDRO VACIO

1

2.35

TAPA DE CONCRETO C/MARCO F°F PARA BUZON ø 0.60m

1

2.36

GASOLINA 95 OCTANOS

1

2.37

HORMIGON

1

2.38

AFIRMADO

1

2.39

MADERA TORNILLO

1

2.40

MADERA TORNILLO-A

1

2.41

KEROSENE INDUSTRIAL

1

2.42

TUBO PVC-SAP - 8" (5M)

1

2.43

TUBO PVC-SAP-4" (3M)

1

2.44

TUBO PVC-SAP - 6" (5M)

1

2.45

TAPON PVC SAL P/DESAGUE 08”

1

EQUIPOS

1

3.1

HERRAMIENTA

1

3.2

HERRAMIENTA-T

1

3.3

HERRAMIENTA - LT

1

3.4

COMP. NEUMATICA - 93 HP - 335/375 PCM

1

3.5

MARTILLO NEUMATICO - 25/29 KG

1

3.6

RETROEXCAVADORA S/LLANT. 62 HP -1 YD3

1

3.7

TRACTOR DE TIRO DE 60HP

1

3.8

PLANCHA COMPACTADORA VIBRAT. 4.0 HP

1

3.9

RODILLO NEUMATICO AUTOP. 81-100HP 5.5-20T

3.10

RODILLO TANDEM ESTATIC AUT 58-70HP 8-10T

1

1

3.11

MEZCLADORA DE CONC.(TAMBOR) 11 P3,18 HP

1

3.12

VIBRADOR A GASOLINA Y 1 3/4", 4 HP

1

3.13

CORTADORA DE CONCRETO 13 HP

1

3.14

CAMION VOLQUETE 4x2, 210/280 HP, 8 M3

1

3.15

TEODOLITO Y MIRA

1

3.16

BARREDORA MECANICA 10-20HP

3.17

PAVIMENTADORA SOBRE ORUGAS 105HP 10-16'

3.18

CAMION IMPRIMADOR 6x2 178-210HP 2000 GLN

CRONOGRAMA DE ADQUISICION DE MATERIALES

Item

Descripción

Und

Cant.

P. Unit. S/.

Parcial S/.

MANO DE OBRA 1.1

CAPATAZ

H-H

85.53

20.06

1715.73

1.2

OPERARIO

H-H

486.37

18.24

8871.40

1.3

OFICIAL

H-H

147.67

15.28

2256.36

1.4

PEON

H-H

1101.79

13.74

15138.61

1.5

TOPOGRAFO

H-H

2.99

21.07

63.03

1.6

MANO DE OBRA - T

GLB

1.00

70.00

70.00

1.7

MANO DE OBRA - LT

GLB

1.00

315.00

315.00

1.8

MANO DE OBRA-A

GLB

1.00

360.00

360.00

1.9

GLB

1.00

102.95

102.95

GLB

1.00

500.00

500.00

1.11

MANO DE OBRA - SEÑALIZACION ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO MANO DE OBRA - PROTECCION COLECTIVA

GLB

1.00

118.15

118.15

1.12

CHARLAS DE CAPACITACION EN SEGURIDAD AL PERSONAL

GLB

26.00

30.00

780.00

1.13

MANO DE OBRA - CAPACITACION EN SEGURIDAD

GLB

260.00

0.30

78.00

1.10

30369.23 MATERIALES 2.1

ALAMBRE NEGRO Nro. 8

kg

9.79

2.47

24.18

2.2

ALAMBRE NEGRO Nro.16

kg

28.91

2.47

71.40

2.3

CLAVOS CON CABEZA DE 2 1/2", 3", 4"

kg

2.32

2.80

6.49

2.4

CLAVOS CON CABEZA DE 3"

kg

0.77

2.80

2.15

2.5

CLAVOS CON CABEZA DE 4"

kg

6.55

2.80

18.35

2.6

ACERO

kg

622.06

2.40

1492.94

2.7

ARENA GRUESA

m3

28.10

58.60

1646.83

2.8

ARENA FINA

m3

1.31

102.50

134.48

2.9

PIEDRA CHANCADA DE 1/2” Y 3/4"

m3

10.47

70.64

739.74

2.10

AGUA

m3

27.87

5.68

158.30

2.11

AGUA

GLB

1.00

300.00

300.00

2.12

ASFALTO LIQUIDO RC-250

gal

39.46

9.51

375.29

2.13

MEZCLA ASFALTICA EN CALIENTE

m3

16.03

320.00

5130.11

2.14

TRANSPORTE DE MEZCLA ASFALTICA C/VOLQUETE 10M3

m3

16.03

46.64

747.71

2.15

LADRILLO KK TIPO IV 24X13X09 CM

und

50.00

0.85

42.50

2.16

CEMENTO PORTLAND TIPO I (42.5kg)

bl

182.43

16.95

3092.22

2.17

PEGAMENTO PARA TUBERIA PVC

gal

4.11

97.71

401.44

2.18

CAL (BOLSA X 20 kg)

bl

16.81

8.43

141.69

2.19

CORDEL

M

63.87

0.15

9.58

2.20

IMPERMEABILIZANTE LIQUIDO PARA CONCRETO

gal

2.50

13.56

33.85

2.21

EXTINTOR DE POLVO SECO

und

1.00

129.80

129.80

2.22

DISCO DE CORTE DE 16"

und

0.88

550.85

487.12

2.23

CASCO DE PROTECCION

und

10.00

9.24

92.40

2.24

BOTINES DE CUERO

par

10.00

44.83

448.30

PLAZO DE EJECUCION Semana 1

Semana 2

Semana 3

Semana 4

CRONOGRAMA DE ADQUISICION DE MATERIALES

Item

Descripción

Und

Cant.

P. Unit. S/.

Parcial S/.

2.25

TAPONES AUDITIVOS

par

10.00

2.12

21.20

2.26

GUANTES DE CUERO

par

10.00

12.63

126.30

2.27

RESPIRADOR CONTRA POLVO

und

10.00

2.46

24.60

2.28

CHALECOS REFLECTIVOS

und

10.00

7.54

75.40

2.29

LENTES DE PROTECCION

und

10.00

5.34

53.40

2.30

MATERIALES - PROTECCION COLECTIVA

GLB

1.00

1181.52

1181.52

2.31

MATERIALES - SEÑALIZACION SEGURIDAD

GLB

1.00

1029.48

1029.48

2.32

CAMILLA

und

1.00

250.00

250.00

2.33

BOTIQUIN CON MEDICINA

und

1.00

296.61

296.61

2.34

CILINDRO VACIO

und

1.00

67.80

67.80

2.35

TAPA DE CONCRETO C/MARCO F°F PARA BUZON ø 0.60m

und

5.00

300.00

1500.00

2.36

GASOLINA 95 OCTANOS

gal

88.43

11.02

974.52

2.37

HORMIGON

m3

0.02

40.14

0.80

2.38

AFIRMADO

m3

53.92

33.60

1811.68

2.39

MADERA TORNILLO

p2

252.66

4.40

1111.69

2.40

MADERA TORNILLO-A

GLB

1.00

240.00

240.00

2.41

KEROSENE INDUSTRIAL

gal

9.87

9.55

94.22

2.42

TUBO PVC-SAP - 8" (5M)

M

193.20

23.19

4480.26

2.43

TUBO PVC-SAP-4" (3M)

M

18.49

7.42

137.18

2.44

TUBO PVC-SAP - 6" (5M)

M

17.03

15.40

262.20

2.45

TAPON PVC SAL P/DESAGUE 08”

und

4.42

36.76

162.54 29628.27

EQUIPOS 3.1

HERRAMIENTA

%MO

958.30

3.2

HERRAMIENTA-T

GLB

1.00

280.00

280.00

3.3

HERRAMIENTA - LT

GLB

1.00

35.00

35.00

3.4

COMP. NEUMATICA - 93 HP - 335/375 PCM

h-m

2.71

99.81

270.11

3.5

MARTILLO NEUMATICO - 25/29 KG

h-m

2.71

4.49

12.16

3.6

RETROEXCAVADORA S/LLANT. 62 HP -1 YD3

h-m

6.85

124.08

849.87

3.7

TRACTOR DE TIRO DE 60HP

h-m

0.25

57.69

14.23

3.8

PLANCHA COMPACTADORA VIBRAT. 4.0 HP

h-m

78.60

24.16

1898.92

3.9

RODILLO NEUMATICO AUTOP. 81-100HP 5.5-20T

h-m

1.21

127.67

154.29

3.10

RODILLO TANDEM ESTATIC AUT 58-70HP 8-10T

h-m

1.21

93.28

112.73

3.11

MEZCLADORA DE CONC.(TAMBOR) 11 P3,18 HP

h-m

14.31

10.65

152.39

3.12

VIBRADOR A GASOLINA Y 1 3/4", 4 HP

h-m

12.48

4.95

61.78

3.13

CORTADORA DE CONCRETO 13 HP

h-m

60.78

10.00

607.82

3.14

CAMION VOLQUETE 4x2, 210/280 HP, 8 M3

h-m

3.87

196.77

760.75

3.15

TEODOLITO Y MIRA

h-m

2.99

13.46

40.27

3.16

BARREDORA MECANICA 10-20HP

h-m

0.25

46.79

11.54

3.17

PAVIMENTADORA SOBRE ORUGAS 105HP 10-16'

h-m

1.21

133.17

160.94

PLAZO DE EJECUCION Semana 1

Semana 2

Semana 3

Semana 4

CRONOGRAMA DE ADQUISICION DE MATERIALES

Item 3.18

Descripción

CAMION IMPRIMADOR 6x2 178-210HP 2000 GLN

Und

Cant.

P. Unit. S/.

Parcial S/.

h-m

0.25

122.29

30.16 6411.24

PLAZO DE EJECUCION Semana 1

Semana 2

Semana 3

Semana 4

Related Documents

Cronograma Valorizado
June 2020 5
Cronograma Valorizado
October 2019 14
Cronograma
May 2020 29
Cronograma
August 2019 56
Cronograma
June 2020 8

More Documents from ""