Item 01

Descripción

Und.

OBRAS PROVISIONALES

01.01

ALMACEN CASETA Y GUARDIANIA

01.02

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m

01.03

FLETE TERRESTRE

glb

MOVILIZACION Y DESMOVILIZACION DE EQUIPO

glb

01.04 02

m2 u

TRABAJOS PRELIMINARES

02.01

TRAZO NIVELACION Y REPLANTEO

m2

02.02

EXCAVACION MANUAL EN TERRENO NORMAL

m3

ELIMINACION DE MATERIAL CARG.MECANICO L/VOLQUETE 10M3 D=10KM

m3

02.03 03

MOVIMIENTO DE TIERRAS

03.01

EXCAVACION DE ZANJAS PARA CIMIENTOS

m3

03.02

EXCAVACION DE ZANJAS PARA SARDINELES

m

03.03

RELLENO COMPACTADO MANUAL MATERIAL PROPIO

m3

03.04

RELLENO COMPACTADO CON AFIRMADO E=4"

m2

03.05

ACARREO DE MATERIAL EXCEDENTE

m3

04

OBRAS DE CONCRETO SIMPLE

04.01

SOLADO DE CONCRETO SIMPLE, MEZCLA 1:10 C:H, E=4"

m2

04.02

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA GRANDE

m3

04.03

FALSO PISO DE 4" DE CONCRETO 1:8

m2

04.04

ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINELES

m2

04.05

CONCRETO f'c=175 Kg/cm2 PARA SARDINELES

m

04.06

ENCOFRADO Y DESENCOFRADO NORMAL EN VEREDAS

m2

04.07

VEREDA DE CONCRETO f'c= 175 kg/cm2 INC. BRUÑADO

m2

04.08

JUNTA DE DILATACION, CADA 3 METROS E=1"

m

05 05.01

OBRAS DE CONCRETO ARMADO ZAPATAS

05.01.01

CONCRETO f'c=210 kg/cm2 PARA ZAPATAS

m3

05.01.02

ACERO fy=4200 kg/cm2 GRADO 60

kg

05.02

SOBRECIMIENTOS

05.02.01

CONCRETO f'c=175 kg/cm2 PARA SOBRECIMIENTOS

m3

05.02.02

ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS

m2

05.02.03

ACERO fy=4200 kg/cm2 GRADO 60

kg

05.03

COLUMNAS

05.03.01

CONCRETO f'c=210 kg/cm2 PARA COLUMNAS

m3

05.03.02

ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS

m2

05.03.03

ACERO fy=4200 kg/cm2 GRADO 60

kg

05.04

COLUMNAS DE CONFINAMIENTO

05.04.01

CONCRETO EN COLUMNAS DE CONFINAMIENTO f'c=175 kg/cm2

m3

05.04.02

ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS DE CONFINAMIENTO

m2

05.04.03

ACERO fy=4200 kg/cm2 GRADO 60

kg

05.04.04

JUNTA DE DILATACION CON TEKNOPORT EN COLUMNAS 1/2"

m2

05.04.05

TAPAJUNTAS

m

05.05 05.05.01

VIGAS CONCRETO EN VIGAS f'c=210 kg/cm2

m3

05.05.02

ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS

m2

05.05.03

ACERO fy=4200 kg/cm2 GRADO 60

kg

05.06

VIGAS DE CONFINAMIENTO

05.06.01

CONCRETO EN VIGAS DE CONFINAMIENTO f'c=175 kg/cm2

m3

05.06.02

ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS

m2

05.06.03

ACERO fy=4200 kg/cm2 GRADO 60

kg

05.07

LOSAS MACIZAS

05.07.01

CONCRETO EN LOSAS MACIZAS f'c=210 kg/cm2

m3

05.07.02

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZAS

m2

05.07.03

ACERO fy=4200 kg/cm2 GRADO 60

kg

05.08

PARAPETO TANQUE ELEVADO

05.08.01

CONCRETO f'c=175 kg/cm2 PARA PARAPETO

m3

05.08.02

ENCOFRADO Y DESENCOFRADO DE PARAPETO

m2

05.08.03

ACERO fy=4200 kg/cm2 GRADO 60

kg

06 06.01

COBERTURAS COBERTURA DE AUDITORIO

06.01.01

TIJERAL METALICO

u

06.01.02

CORREAS METALICAS

m

06.01.03

COBERTURA CON TEJA ANDINA COLOR ARCILLA 0.72x1.14m, e=5mm

m2

06.01.04

COLOCACION DE CUMBRERA PARA TEJA ANDINA

m

06.01.05

TIMPANO DE POLICARBONATO TRANSLUCIDO

m2

06.02

COBERTURA DE ALMACEN Y SS.HH.

06.02.01

CORREAS DE 2" x 3" DE MADERA

m

06.02.02

COBERTURA CON TEJA ANDINA 0.72x1.14 m, e=5 mm, CON TIRAFONES

m2

06.03

COBERTURA TANQUE ELEVADO

06.03.01

TUBO DE FIERRO 1 1/2" PARA TECHO DE TANQUE ELEVADO

m

06.03.02

COBERTURA CON TEJA ANDINA 0.72x1.14 m, e=5 mm, CON TIRAFONES

m2

06.03.03

COLOCACION DE CUMBRERA PARA TEJA ANDINA

m

07 07.01

SISTEMA DE DRENAJE PLUVIAL MOVIMIENTO DE TIERRAS

07.01.01

EXCAVACION DE ZANJAS PARA CANALETA

m

07.01.02

ACARREO DE MATERIAL EXCEDENTE

m3

07.02 07.02.01

OBRAS DE CONCRETO SIMPLE CANALETAS DE EVACUACION PLUVIAL

07.02.01.01

ENCOFRADO Y DESENCOFRADO NORMAL EN CANALETAS DE EVACUACIÓN PLUVIAL

m2

07.02.01.02

CONCRETO f'c=175 kg/cm2 PARA CANALETAS DE EVACUACIÓN PLUVIAL

m3

07.02.01.03

JUNTAS DE DILATACION EN CANALETAS 1"

m

07.02.02

COLUMNETAS

07.02.02.01

CONCRETO f'c=175 kg/cm2 PARA COLUMNETAS

m3

07.02.02.02

ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETAS

m2

07.02.02.03

CONCRETO f'c=175 kg/cm2 EN DADOS DE ANCLAJE

m3

07.03

CANALIZACIONES Y TUBERIAS

07.03.01

CANALETA DE FIERRO GALVANIZADO DE 6"

m

07.03.02

TUBERIA DE PVC SAL - P 4" P/EVACUACIÓN PLUVIAL

m

07.03.03

REJILLA DE F°G° Ø=1/2" PARA CANAL DE EVACUACIÓN

m

08

CAMARA DE REGISTRO DE LODOS

08.01

MOVIMIENTO DE TIERRAS

08.01.01

EXCAVACION DE CÁMARA DE REGISTRO DE LODOS

m3

08.01.02

ACARREO DE MATERIAL EXCEDENTE

m3

08.01.03

BASE DE HORMIGÓN e=10cm

m2

08.02 08.02.01

OBRAS DE CONCRETO ARMADO TAPA PARA CÁMARA DE REGISTRO DE LODOS

08.02.01.01

CONCRETO f'c=210 kg/cm2 PARA TAPA DE CAMARA DE REGISTRO DE LODOS

m3

08.02.01.02

ENCOFRADO Y DESENCOFRADO NORMAL EN TAPA DE CAMARA DE LODOS

m2

08.02.01.03

ACERO fy=4200 kg/cm2 GRADO 60

kg

08.02.02

PAREDES CAMARA DE REGISTRO DE LODOS

08.02.02.01

CONCRETO f'c=210 kg/cm2 EN PAREDES DE CAMARA DE REGISTRO DE LODOS

m3

08.02.02.02

ENCOFRADO Y DESENCOFRADO NORMAL EN PAREDES DE CAMARA DE REGISTRO DE

m2

08.02.02.03

ACERO fy=4200 kg/cm2 GRADO 60

kg

09 09.01

BIODIGESTOR MOVIMIENTO DE TIERRAS

09.01.01

EXCAVACION PARA BIODIGESTOR

m3

09.01.02

RELLENO CON MATERIAL PROPIO

m3

09.01.03

ACARREO DE MATERIAL EXCEDENTE

m3

TABLESTACADO DE TERRENO

m2

09.01.04 09.02 09.02.01 09.03

OBRAS DE CONCRETO SIMPLE SOLADO DE CONCRETO SIMPLE, MEZCLA 1:10 C:H, E=4"

m2

OBRAS DE CONCRETO ARMADO

09.03.01

ENCOFRADO Y DESENCOFRADO NORMAL EN BIODIGESTROR

m2

09.03.02

CONCRETO f'c=210 kg/cm2 EN TECHO DE BIODIGESTOR

m3

09.03.03

ACERO fy=4200 kg/cm2 GRADO 60

kg

09.04 09.04.01 10 10.01

MUROS DE ALBAÑILERIA MURO DE LADRILLO KING KONG DE ARCILLA, APAREJO DE CABEZA

m2

POZO DE PERCOLACION MOVIMIENTO DE TIERRAS

10.01.01

EXCAVACION PARA POZO DE PERCOLACION

m3

10.01.02

ACARREO DE MATERIAL EXCEDENTE

m3

10.01.03

RELLENO CON PIEDRA DE 6"

m3

10.01.04

RELLENO CON PIEDRA CHANCADA Ø 1/2"

m3

10.01.05

TABLESTACADO DE TERRENO

m2

10.02 10.02.01 10.03 10.03.01

OBRAS DE CONCRETO SIMPLE CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA GRANDE

m3

OBRAS DE CONCRETO ARMADO ENCOFRADO Y DESENCOFRADO NORMAL EN TAPA DE POZO DE PERCOLACION

m2

10.03.02

CONCRETO f'c=210 kg/cm2 en TAPA DE POZO DE PERCOLACION

m3

10.03.03

ACERO fy=4200 kg/cm2 GRADO 60

kg

10.04 10.04.01 11 11.01

MUROS Y TABIQUES DE ALBAÑILERIA MUROS DE LADRILLO KING KONG DE ARCILLA, APAREJO DE CABEZA

m2

JARDINERAS DE CONCRETO MOVIMIENTO DE TIERRAS

11.01.01

EXCAVACION DE ZANJAS PARA JARDINERAS

m3

11.01.02

ACARREO DE MATERIAL EXCEDENTE

m3

11.02 11.02.01

OBRAS DE CONCRETO ARMADO ENCOFRADO Y DESENCOFRADO NORMAL EN JARDINERAS

m2

11.02.02

CONCRETO f'c=140 kg/cm2 EN JARDINERAS

m3

11.02.03

ACERO fy=4200 kg/cm2 GRADO 60

kg

12 12.01

GRADAS DE CONCRETO MOVIMIENTO DE TIERRAS

12.01.01

EXCAVACION DE ZANJAS PARA CIMIENTOS

m3

12.01.02

CORTE EN TERRENO NORMAL

m3

12.01.03

RELLENO COMPACTADO MANUAL MATERIAL PROPIO

m3

12.01.04

ACARREO DE MATERIAL EXCEDENTE

m3

RELLENO CON AFIRMADO e=4"

m2

12.01.05 12.02

OBRAS DE CONCRETO SIMPLE

12.02.01

CIMIENTOS CORRIDOS MEZCLA CEMENTO-HORMIGON 1:10 + 30% P.G.

m3

12.02.02

ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS

m2

12.02.03

CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS

m3

12.02.04

ENCOFRADO Y DESENCOFRADO NORMAL EN GRADAS

m2

12.02.05

CONCRETO f'c=175 kg/cm2 EN GRADAS

m3

13 13.01

MURO DE CONTENCIÓN MOVIMIENTO DE TIERRAS

13.01.01

EXCAVACION DE ZANJAS PARA PUNTA, TALON Y DENTELLON

m3

13.01.02

RELLENO COMPACTADO MANUAL MATERIAL PROPIO EN MURO DE CONTENCION

m3

13.01.03

FILTRO DE GRAVA EN MUROS DE CONTENCION

m3

13.01.04

ACARREO DE MATERIAL EXCEDENTE

m3

13.01.05

TABLESTACADO DE TERRENO

m2

13.02 13.02.01 13.02.01.01 13.02.02

CONCRETO ARMADO DENTELLÓN CONCRETO EN DENTELLÓN f'c=210 kg/cm2

m3

PUNTA Y TALON DE MURO DE CONTENCION

13.02.02.01

CONCRETO f'c=210 Kg/cm2 PARA PUNTA Y TALON

m3

13.02.02.02

ACERO fy=4200 kg/cm2 GRADO 60

kg

13.02.03

PANTALLA

13.02.03.01

CONCRETO EN PANTALLA DE MURO DE CONTENCION f'c=210 kg/cm2

m3

13.02.03.02

ENCOFRADO NORMAL EN PANTALLA DE MURO DE CONTENCION

m2

13.02.03.03

ACERO fy=4200 kg/cm2 GRADO 60

kg

JUNTA DE CONSTRUCCION CON TEKNOPORT 1"

m2

13.02.03.04 13.03

SISTEMA DE DRENAJE

13.03.01

COLOCACION DE TUBERIA CORRUGADA PERFORADA 4"

m

13.03.02

LLORADERO DE 2"

m

14 14.01 15

MUROS Y TABIQUES DE ALBAÑILERIA MURO DE LADRILLO KING-KONG DE ARCILLA, APAREJO DE SOGA

m2

REVOQUES Y REVESTIMIENTOS

15.01

TARRAJEO RAYADO PRIMARIO

m2

15.02

TARRAJEO EN EXTERIORES

m2

15.03

TARRAJEO EN INTERIORES

m2

15.04

TARRAJEO EN SOBRECIMIENTOS

m2

15.05

TARRAJEO EN COLUMNAS

m2

15.06

TARRAJEO EN VIGAS

m2

15.07

TARRAJEO EN JARDINERAS

m2

15.08

VESTIDURA DE DERRAMES

m

15.09

REVESTIMIENTO DE GRADAS CON CEMENTO PULIDO

m2

15.10

REVESTIMIENTO CON CREAMICA RUSTICA EN GRADAS

m2

16 16.01 17

CIELO RASO CIELORRASOS CON MEZCLA DE CEMENTO-ARENA

m2

PISOS Y PAVIMENTOS

17.01

CONTRAPISO e = 4 cm

m2

17.02

CERÁMICA ALTO TRÁNSITO 0.45x0.45 m. ANTIDESLIZANTE, COLOR CLARO

m2

CERAMICA ALTO TRANSITO 0.45x0.45 m, COLOR CLARO

m2

17.03 18 18.01 18.01.01 18.01.02 18.02 18.02.01 19 19.01 20 20.01 21

ZOCALOS Y CONTRAZOCALOS ZOCALOS ZOCALO DE AZULEJO MARMOLIZADO COLOR GRIS 0.20x0.30 M

m2

ZOCALO CERAMICA 0.45x0.45 m, TRIANA

m2

CONTRAZOCALOS CONTRAZOCALO DE CERAMICA RUSTICA 0.45x0.45 m

m2

CARPINTERIA DE MADERA PUERTA DE MADERA APANELADA INC. ACABADO

m2

CARPINTERIA METALICA PROTECTORES METALICOS DE VENTANAS

m2

CERRAJERIA

21.01

BISAGRA ALUMINIZADA DE 4" PESADA EN PUERTA

pza

21.02

BISAGRA ALUMINIZADA DE 3" PESADA EN PUERTA

pza

21.03

CERRADURA PARA PUERTA 03 GOLPES

pza

21.04

CERRADURA PARA PUERTA 02 GOLPES

pza

CERRADURA PARA PUERTA DE BAÑO

pza

21.05 22 22.01 23

VIDRIOS, CRISTALES Y SIMILARES VIDRIO TEMPLADO e = 6 mm Sistema Directo

m2

PINTURA

23.01

PINTURA LATEX EN COLUMNAS

m2

23.02

PINTURA LATEX EN VIGAS Y CIELO RASO

m2

23.03

PINTURA LATEX EN INTERIORES

m2

23.04

PINTURA LATEX EN EXTERIORES

m2

PINTURA LATEX EN JARDINERAS

m2

23.05 24 24.01 25

VARIOS SEMBRIO DE GRASS EN JARDINERAS

m2

SALIDAS

25.01

SALIDA PARA ALUMBRADO

u

25.02

SALIDA PARA TOMACORRIENTES

u

25.03

SALIDA DE INTERRUPTORES

u

26

CANALIZACIONES, CONDUCTOS O TUBERIAS

26.01

TUBERIA PVC-SAP DE 20 mm Ø

m

26.02

TUBERIA PVC-SAP DE 25 mm Ø

m

27 27.01

CONDUCTORES Y CABLES DE ENERGÍA EN TUBERÍAS 2.5 mm2 THW

m

27.02 28 28.01 29 29.01 29.01.01 29.01.02 29.02 29.02.01 30 30.01 31 31.01

4 mm2 THW

m

TABLEROS DE DISTRIBUCIÓN TABLERO GENERAL

u

LUMINARIAS ILUMINACION INTERIOR EQUIPO FLUORESCENTE CON REJILLA ADOSABLE 2x40W

u

FOCO AHORRADOR DE ENERGIA DE 20W

u

ILUMINACION EXTERIOR PANTALLA PARA FOCO 25W

u

INSTALACIÓN DEL SISTEMA DE PUESTA A TIERRA POZO A TIERRA

u

APARATOS SANITARIOS Y ACCESORIOS SUMINISTRO DE APARATOS SANITARIOS

31.01.01

LAVATORIO FONTANA COLOR BLANCO

u

31.01.02

INODORO TIPO RAPID JET BLANCO

u

31.01.03

DUCHA 1 LLAVE INCLUYE ACCESORIOS

u

31.02 31.02.01 31.02.02 31.03 31.03.01 31.04 31.04.01 32 32.01 32.01.01 32.02

INSTALACIÓN DE APARATOS SANITARIOS INSTALACION DE LAVATORIO FONTANA

u

INSTALACIÓN DE INODORO TIPO RAPID JET BLANCO

u

SUMINISTRO DE ACCESORIOS LLAVE DE LAVATORIO ZUANA

u

INSTALACIÓN DE ACCESORIOS INSTALACIÓN DE LLAVE DE LAVATORIO ZUANA

u

SISTEMA DE AGUA FRIA SALIDA DE AGUA FRÍA SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"

pto

REDES DE DISTRIBUCIÓN

32.02.01

RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP

m

32.02.02

RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP

m

32.03

ACCESORIOS DE REDES DE AGUA

32.03.01

TEE SANITARIA

u

32.03.02

CODO 90°

u

32.04 32.04.01 33 33.01

VÁLVULAS VALVULAS DE COMPUERTA DE 1/2"

u

DESAGÜE Y VENTILACIÓN SALIDAS DE DESAGÜE

33.01.01

SALIDA PVC PARA DESAGÜE DE 2"

pto

33.01.02

SALIDA PVC PARA DESAGÜE DE 4"

pto

SALIDA PVC PARA VENTILACIÓN DE 2"

pto

33.01.03 33.02

REDES DE DERIVACIÓN

33.02.01

RED DE DERIVACIÓN PVC SAL PARA DESAGÜE DE 4"

m

33.02.02

RED DE DERIVACION PVC SAP PARA DESAGUE DE 4"

m

33.02.03

RED DE DERIVACIÓN PVC SAL PARA DESAGÜE DE 2"

m

33.02.04

RED DE DERIVACIÓN PVC SAL PARA VENTILACIÓN DE 2"

m

33.03 33.03.01

MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS PARA TUBERIAS DE DESAGUE

m3

33.03.02

RELLENO COMPACTADO MANUAL MATERIAL PROPIO

m3

33.03.03

ACARREO DE MATERIAL EXCEDENTE

m3

REPOSICION DE TROCHA

m2

33.03.04 33.04 33.04.01 33.05

CAMARAS DE INSPECCIÓN CAJA DE REGISTRO DE DESAGUE 12" X 24" ADITAMIENTOS VARIOS

33.05.01

SUMIDEROS DE 2"

33.05.02

REGISTROS ROSCADO DE 4"

34 34.01 35 35.01

pza

u pza

SUMINISTRO E INSTALACION DE SISTEMA DE TANQUE ELEVADO SUMINISTRO E INSTALACION DE TANQUE ELEVADO

glb

BIODIGESTOR SUMINISTRO E INSTALACION DE BIODIGESTOR

u

Metrado

Precio (S/.)

Rendimient o Unitario

Tiempo Unitario

f

Duración (d=tu/f)

Duracion f Corregida Programada

48.00

60.21

45

1.07

1

1.07

1

1.07

1.00

1,090.40

1

1.00

1

1.00

1

1.00

1.00

12,227.83

1

1.00

1

1.00

1

1.00

1.00

7,311.15

1

1.00

1

1.00

1

1.00

301.90

1.36

500

0.60

1

0.60

1

0.60

36.00

32.19

6

6.00

1

6.00

1

6.00

165.10

21.13

120

1.38

1

1.38

1

1.38

98.15

24.62

4

24.54

1

24.54

1

24.54

26.60

1.64

60

0.44

1

0.44

1

0.44

89.44

21.04

6

14.91

1

14.91

1

14.91

227.27

19.88

150

1.52

1

1.52

1

1.52

11.34

9.85

20

0.57

1

0.57

1

0.57

33.75

28.10

100

0.34

1

0.34

1

0.34

15.15

212.02

25

0.61

1

0.61

1

0.61

143.04

35.22

100

1.43

1

1.43

1

1.43

21.28

37.64

8

2.66

1

2.66

1

2.66

26.60

38.14

20

1.33

1

1.33

1

1.33

18.85

45.52

8.5

2.22

1

2.22

1

2.22

88.69

52.34

100

0.89

1

0.89

1

0.89

31.67

1.87

90

0.35

1

0.35

1

0.35

16.88

358.51

20

0.84

1

0.84

1

0.84

468.72

4.29

250

1.87

1

1.87

1

1.87

10.79

361.92

12.5

0.86

1

0.86

1

0.86

143.83

30.29

16

8.99

1

8.99

1

8.99

363.01

4.29

250

1.45

1

1.45

1

1.45

7.12

414.41

12

0.59

1

0.59

1

0.59

100.80

40.42

12

8.40

1

8.40

1

8.40

1,170.42

4.29

250

4.68

1

4.68

1

4.68

1.17

374.14

15

0.08

1

0.08

1

0.08

6.48

40.42

12

0.54

1

0.54

1

0.54

241.86

4.29

250

0.97

1

0.97

1

0.97

7.02

4.70

30

0.23

1

0.23

1

0.23

46.80

22.10

25

1.87

1

1.87

1

1.87

6.79

388.94

15

0.45

1

0.45

1

0.45

69.80

45.60

10

6.98

1

6.98

1

6.98

604.52

4.29

250

2.42

1

2.42

1

2.42

0.95

349.80

20

0.05

1

0.05

1

0.05

12.65

45.60

10

1.27

1

1.27

1

1.27

51.94

4.29

250

0.21

1

0.21

1

0.21

2.89

384.25

15

0.19

1

0.19

1

0.19

32.37

37.05

15

2.16

1

2.16

1

2.16

305.76

4.29

250

1.22

1

1.22

1

1.22

0.10

357.70

12.5

0.01

1

0.01

1

0.01

4.16

50.25

8

0.52

1

0.52

1

0.52

5.51

4.29

250

0.02

1

0.02

1

0.02

6.00

2,379.18

0.9

6.67

1

6.67

1

6.67

229.68

99.89

80

2.87

1

2.87

1

2.87

180.87

47.49

40

4.52

1

4.52

1

4.52

19.14

61.69

75

0.26

1

0.26

1

0.26

18.90

110.12

45

0.42

1

0.42

1

0.42

41.44

22.81

50

0.83

1

0.83

1

0.83

35.22

60.87

40

0.88

1

0.88

1

0.88

7.40

46.66

80

0.09

1

0.09

1

0.09

3.04

60.87

40

0.08

1

0.08

1

0.08

1.30

61.69

75

0.02

1

0.02

1

0.02

48.66

3.29

30

1.62

1

1.62

1

1.62

10.84

9.85

20

0.54

1

0.54

1

0.54

43.79

29.39

20

2.19

1

2.19

1

2.19

6.33

326.15

30

0.21

1

0.21

1

0.21

97.32

1.77

100

0.97

1

0.97

1

0.97

0.36

317.21

30

0.01

1

0.01

1

0.01

5.04

41.31

10

0.50

1

0.50

1

0.50

0.22

318.42

35

0.01

1

0.01

1

0.01

46.28

28.34

20

2.31

1

2.31

1

2.31

34.20

25.71

60

0.57

1

0.57

1

0.57

48.66

111.12

5

9.73

1

9.73

1

9.73

1.15

24.62

4

0.29

1

0.29

1

0.29

1.27

9.85

20

0.06

1

0.06

1

0.06

1.00

30.69

100

0.01

1

0.01

1

0.01

0.06

380.69

15

0.00

1

0.00

1

0.00

1.40

33.36

15

0.09

1

0.09

1

0.09

5.32

4.29

250

0.02

1

0.02

1

0.02

0.38

384.25

15

0.03

1

0.03

1

0.03

7.56

41.31

10

0.76

1

0.76

1

0.76

21.84

4.29

250

0.09

1

0.09

1

0.09

5.65

24.62

4

1.41

1

1.41

1

1.41

1.81

19.69

5

0.36

1

0.36

1

0.36

4.22

9.85

20

0.21

1

0.21

1

0.21

10.68

15.27

30

0.36

1

0.36

1

0.36

0.31

28.10

100

0.00

1

0.00

1

0.00

4.41

33.36

15

0.29

1

0.29

1

0.29

0.34

380.69

15

0.02

1

0.02

1

0.02

27.60

4.29

250

0.11

1

0.11

1

0.11

9.73

84.08

6.7

1.45

1

1.45

1

1.45

9.69

24.62

4

2.42

1

2.42

1

2.42

10.66

9.85

20

0.53

1

0.53

1

0.53

0.38

118.39

15

0.03

1

0.03

1

0.03

5.14

131.22

7

0.73

1

0.73

1

0.73

18.46

15.27

30

0.62

1

0.62

1

0.62

0.85

212.02

25

0.03

1

0.03

1

0.03

4.78

33.36

15

0.32

1

0.32

1

0.32

0.69

380.69

15

0.05

1

0.05

1

0.05

26.32

4.29

250

0.11

1

0.11

1

0.11

9.42

84.08

6.7

1.41

1

1.41

1

1.41

12.04

24.62

4

3.01

1

3.01

1

3.01

13.24

9.85

20

0.66

1

0.66

1

0.66

53.48

46.44

9

5.94

1

5.94

1

5.94

6.04

348.28

7.5

0.81

1

0.81

1

0.81

117.43

4.29

250

0.47

1

0.47

1

0.47

3.20

24.62

4

0.80

1

0.80

1

0.80

0.90

24.62

4

0.23

1

0.23

1

0.23

0.30

21.04

6

0.05

1

0.05

1

0.05

4.18

9.85

20

0.21

1

0.21

1

0.21

12.82

19.88

150

0.09

1

0.09

1

0.09

18.60

212.02

25

0.74

1

0.74

1

0.74

5.34

30.29

16

0.33

1

0.33

1

0.33

0.40

368.32

12.5

0.03

1

0.03

1

0.03

6.78

43.65

8.5

0.80

1

0.80

1

0.80

1.31

440.65

6

0.22

1

0.22

1

0.22

54.95

32.83

3

18.32

1

18.32

1

18.32

49.06

20.69

6

8.18

1

8.18

1

8.18

9.78

127.60

14

0.70

1

0.70

1

0.70

6.48

9.85

20

0.32

1

0.32

1

0.32

47.20

15.27

30

1.57

1

1.57

1

1.57

1.43

353.08

25

0.06

1

0.06

1

0.06

10.44

353.08

25

0.42

1

0.42

1

0.42

536.18

4.29

250

2.14

1

2.14

1

2.14

9.17

444.75

10

0.92

1

0.92

1

0.92

91.71

42.92

10

9.17

1

9.17

1

9.17

938.35

4.29

250

3.75

1

3.75

1

3.75

2.25

33.38

20

0.11

1

0.11

1

0.11

40.76

41.62

50

0.82

1

0.82

1

0.82

28.00

5.93

80

0.35

1

0.35

1

0.35

114.69

58.21

9.5

12.07

1

12.07

1

12.07

23.95

18.33

15

1.60

1

1.60

1

1.60

110.80

21.81

12

9.23

1

9.23

1

9.23

96.49

18.85

15

6.43

1

6.43

1

6.43

9.51

21.81

12

0.79

1

0.79

1

0.79

52.55

28.74

8

6.57

1

6.57

1

6.57

52.82

32.38

7

7.55

1

7.55

1

7.55

18.42

21.81

12

1.54

1

1.54

1

1.54

105.59

8.11

25

4.22

1

4.22

1

4.22

6.30

27.11

8

0.79

1

0.79

1

0.79

7.72

79.37

3

2.57

1

2.57

1

2.57

31.53

33.62

10

3.15

1

3.15

1

3.15

142.51

27.87

80

1.78

1

1.78

1

1.78

8.95

56.20

7

1.28

1

1.28

1

1.28

133.55

45.42

7

19.08

1

19.08

1

19.08

34.16

43.16

8

4.27

1

4.27

1

4.27

21.67

70.79

4

5.42

1

5.42

1

5.42

57.68

79.37

3

19.23

1

19.23

1

19.23

18.15

381.83

1.8

10.08

1

10.08

1

10.08

37.31

130.47

10

3.73

1

3.73

1

3.73

16.00

13.87

12

1.33

1

1.33

1

1.33

16.00

12.67

12

1.33

1

1.33

1

1.33

2.00

67.46

10

0.20

1

0.20

1

0.20

2.00

57.86

10

0.20

1

0.20

1

0.20

2.00

61.74

4

0.50

1

0.50

1

0.50

31.71

135.59

10

3.17

1

3.17

1

3.17

52.55

8.57

35

1.50

1

1.50

1

1.50

84.35

9.43

30

2.81

1

2.81

1

2.81

104.94

8.57

35

3.00

1

3.00

1

3.00

110.80

8.57

35

3.17

1

3.17

1

3.17

18.42

9.47

30

0.61

1

0.61

1

0.61

14.92

28.13

200

0.07

1

0.07

1

0.07

18.00

55.36

4

4.50

1

4.50

1

4.50

9.00

34.04

8

1.13

1

1.13

1

1.13

7.00

34.22

8

0.88

1

0.88

1

0.88

110.05

4.81

80

1.38

1

1.38

1

1.38

193.64

4.94

80

2.42

1

2.42

1

2.42

220.10

5.22

120

1.83

1

1.83

1

1.83

580.92

5.22

120

4.84

1

4.84

1

4.84

1.00

353.36

2

0.50

1

0.50

1

0.50

11.00

101.29

8

1.38

1

1.38

1

1.38

2.00

30.89

10

0.20

1

0.20

1

0.20

5.00

56.28

8

0.63

1

0.63

1

0.63

1.00

418.61

2

0.50

1

0.50

1

0.50

2.00

63.68

5

0.40

1

0.40

1

0.40

2.00

167.00

4

0.50

1

0.50

1

0.50

2.00

74.92

8

0.25

1

0.25

1

0.25

2.00

56.77

4

0.50

1

0.50

1

0.50

2.00

56.77

4

0.50

1

0.50

1

0.50

2.00

34.81

10

0.20

1

0.20

1

0.20

2.00

22.71

10

0.20

1

0.20

1

0.20

6.00

60.87

3

2.00

1

2.00

1

2.00

24.30

9.18

30

0.81

1

0.81

1

0.81

10.20

9.50

30

0.34

1

0.34

1

0.34

10.00

7.42

35

0.29

1

0.29

1

0.29

15.00

7.19

35

0.43

1

0.43

1

0.43

2.00

49.07

6

0.33

1

0.33

1

0.33

6.00

65.23

4

1.50

1

1.50

1

1.50

4.00

92.77

3.5

1.14

1

1.14

1

1.14

2.00

68.86

3.5

0.57

1

0.57

1

0.57

20.80

27.78

20

1.04

1

1.04

1

1.04

26.00

49.35

20

1.30

1

1.30

1

1.30

6.80

14.32

30

0.23

1

0.23

1

0.23

7.00

14.32

30

0.23

1

0.23

1

0.23

12.22

24.62

4

3.06

1

3.06

1

3.06

5.83

21.04

6

0.97

1

0.97

1

0.97

7.03

9.85

20

0.35

1

0.35

1

0.35

5.00

84.52

150

0.03

1

0.03

1

0.03

3

110.52

5

0.60

1

0.60

1

0.60

2

41.38

4

0.50

1

0.50

1

0.50

2

26.47

8

0.25

1

0.25

1

0.25

1

445.68

1

1.00

1

1.00

1

1.00

1

1271.49

1

1.00

1

1.00

1

1.00

Item 01 01.01 01.02 01.03 01.04 02 02.01 02.02 02.03 03 03.01 03.02 03.03 03.04 03.05 04 04.01 04.02 04.03 04.04 04.05 04.06 04.07 04.08 05 05.01 05.01.01 05.01.02 05.02 05.02.01 05.02.02 05.02.03 05.03 05.03.01 05.03.02 05.03.03 05.04 05.04.01 05.04.02 05.04.03 05.04.04 05.04.05 05.05 05.05.01

05.05.02 05.05.03 05.06 05.06.01 05.06.02 05.06.03 05.07 05.07.01 05.07.02 05.07.03 05.08 05.08.01 05.08.02 05.08.03 06 06.01 06.01.01 06.01.02 06.01.03 06.01.04 06.01.05 06.02 06.02.01 06.02.02 06.03 06.03.01 06.03.02 06.03.03 07 07.01 07.01.01 07.01.02 07.02 07.02.01 07.02.01.01 07.02.01.02 07.02.01.03 07.02.02 07.02.02.01 07.02.02.02 07.02.02.03 07.03 07.03.01 07.03.02 07.03.03 08

08.01 08.01.01 08.01.02 08.01.03 08.02 08.02.01 08.02.01.01 08.02.01.02 08.02.01.03 08.02.02 08.02.02.01 08.02.02.02 08.02.02.03 09 09.01 09.01.01 09.01.02 09.01.03 09.01.04 09.02 09.02.01 09.03 09.03.01 09.03.02 09.03.03 09.04 09.04.01 10 10.01 10.01.01 10.01.02 10.01.03 10.01.04 10.01.05 10.02 10.02.01 10.03 10.03.01 10.03.02 10.03.03 10.04 10.04.01 11 11.01 11.01.01 11.01.02

11.02 11.02.01 11.02.02 11.02.03 12 12.01 12.01.01 12.01.02 12.01.03 12.01.04 12.01.05 12.02 12.02.01 12.02.02 12.02.03 12.02.04 12.02.05 13 13.01 13.01.01 13.01.02 13.01.03 13.01.04 13.01.05 13.02 13.02.01 13.02.01.01 13.02.02 13.02.02.01 13.02.02.02 13.02.03 13.02.03.01 13.02.03.02 13.02.03.03 13.02.03.04 13.03 13.03.01 13.03.02 14 14.01 15 15.01 15.02 15.03 15.04 15.05

15.06 15.07 15.08 15.09 15.10 16 16.01 17 17.01 17.02 17.03 18 18.01 18.01.01 18.01.02 18.02 18.02.01 19 19.01 20 20.01 21 21.01 21.02 21.03 21.04 21.05 22 22.01 23 23.01 23.02 23.03 23.04 23.05 24 24.01 25 25.01 25.02 25.03 26 26.01 26.02 27 27.01

27.02 28 28.01 29 29.01 29.01.01 29.01.02 29.02 29.02.01 30 30.01 31 31.01 31.01.01 31.01.02 31.01.03 31.02 31.02.01 31.02.02 31.03 31.03.01 31.04 31.04.01 32 32.01 32.01.01 32.02 32.02.01 32.02.02 32.03 32.03.01 32.03.02 32.04 32.04.01 33 33.01 33.01.01 33.01.02 33.01.03 33.02 33.02.01 33.02.02 33.02.03 33.02.04 33.03 33.03.01

33.03.02 33.03.03 33.03.04 33.04 33.04.01 33.05 33.05.01 33.05.02 34 34.01 35 35.01

Descripción OBRAS PROVISIONALES ALMACEN CASETA Y GUARDIANIA CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m FLETE TERRESTRE MOVILIZACION Y DESMOVILIZACION DE EQUIPO TRABAJOS PRELIMINARES TRAZO NIVELACION Y REPLANTEO EXCAVACION MANUAL EN TERRENO NORMAL ELIMINACION DE MATERIAL CARG.MECANICO L/VOLQUETE 10M3 D=10KM MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS PARA CIMIENTOS EXCAVACION DE ZANJAS PARA SARDINELES RELLENO COMPACTADO MANUAL MATERIAL PROPIO RELLENO COMPACTADO CON AFIRMADO E=4" ACARREO DE MATERIAL EXCEDENTE OBRAS DE CONCRETO SIMPLE SOLADO DE CONCRETO SIMPLE, MEZCLA 1:10 C:H, E=4" CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA GRANDE FALSO PISO DE 4" DE CONCRETO 1:8 ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINELES CONCRETO f'c=175 Kg/cm2 PARA SARDINELES ENCOFRADO Y DESENCOFRADO NORMAL EN VEREDAS VEREDA DE CONCRETO f'c= 175 kg/cm2 INC. BRUÑADO JUNTA DE DILATACION, CADA 3 METROS E=1" OBRAS DE CONCRETO ARMADO ZAPATAS CONCRETO f'c=210 kg/cm2 PARA ZAPATAS ACERO fy=4200 kg/cm2 GRADO 60 SOBRECIMIENTOS CONCRETO f'c=175 kg/cm2 PARA SOBRECIMIENTOS ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS ACERO fy=4200 kg/cm2 GRADO 60 COLUMNAS CONCRETO f'c=210 kg/cm2 PARA COLUMNAS ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS ACERO fy=4200 kg/cm2 GRADO 60 COLUMNAS DE CONFINAMIENTO CONCRETO EN COLUMNAS DE CONFINAMIENTO f'c=175 kg/cm2 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS DE CONFINAMIENTO ACERO fy=4200 kg/cm2 GRADO 60 JUNTA DE DILATACION CON TEKNOPORT EN COLUMNAS 1/2" TAPAJUNTAS VIGAS CONCRETO EN VIGAS f'c=210 kg/cm2

ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS ACERO fy=4200 kg/cm2 GRADO 60 VIGAS DE CONFINAMIENTO CONCRETO EN VIGAS DE CONFINAMIENTO f'c=175 kg/cm2 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS ACERO fy=4200 kg/cm2 GRADO 60 LOSAS MACIZAS CONCRETO EN LOSAS MACIZAS f'c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZAS ACERO fy=4200 kg/cm2 GRADO 60 PARAPETO TANQUE ELEVADO CONCRETO f'c=175 kg/cm2 PARA PARAPETO ENCOFRADO Y DESENCOFRADO DE PARAPETO ACERO fy=4200 kg/cm2 GRADO 60 COBERTURAS COBERTURA DE AUDITORIO TIJERAL METALICO CORREAS METALICAS COBERTURA CON TEJA ANDINA COLOR ARCILLA 0.72x1.14m, e=5mm COLOCACION DE CUMBRERA PARA TEJA ANDINA TIMPANO DE POLICARBONATO TRANSLUCIDO COBERTURA DE ALMACEN Y SS.HH. CORREAS DE 2" x 3" DE MADERA COBERTURA CON TEJA ANDINA 0.72x1.14 m, e=5 mm, CON TIRAFONES COBERTURA TANQUE ELEVADO TUBO DE FIERRO 1 1/2" PARA TECHO DE TANQUE ELEVADO COBERTURA CON TEJA ANDINA 0.72x1.14 m, e=5 mm, CON TIRAFONES COLOCACION DE CUMBRERA PARA TEJA ANDINA SISTEMA DE DRENAJE PLUVIAL MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS PARA CANALETA ACARREO DE MATERIAL EXCEDENTE OBRAS DE CONCRETO SIMPLE CANALETAS DE EVACUACION PLUVIAL ENCOFRADO Y DESENCOFRADO NORMAL EN CANALETAS DE EVACUACIÓN PLUVIAL CONCRETO f'c=175 kg/cm2 PARA CANALETAS DE EVACUACIÓN PLUVIAL JUNTAS DE DILATACION EN CANALETAS 1" COLUMNETAS CONCRETO f'c=175 kg/cm2 PARA COLUMNETAS ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETAS CONCRETO f'c=175 kg/cm2 EN DADOS DE ANCLAJE CANALIZACIONES Y TUBERIAS CANALETA DE FIERRO GALVANIZADO DE 6" TUBERIA DE PVC SAL - P 4" P/EVACUACIÓN PLUVIAL REJILLA DE F°G° Ø=1/2" PARA CANAL DE EVACUACIÓN CAMARA DE REGISTRO DE LODOS

MOVIMIENTO DE TIERRAS EXCAVACION DE CÁMARA DE REGISTRO DE LODOS ACARREO DE MATERIAL EXCEDENTE BASE DE HORMIGÓN e=10cm OBRAS DE CONCRETO ARMADO TAPA PARA CÁMARA DE REGISTRO DE LODOS CONCRETO f'c=210 kg/cm2 PARA TAPA DE CAMARA DE REGISTRO DE LODOS ENCOFRADO Y DESENCOFRADO NORMAL EN TAPA DE CAMARA DE LODOS ACERO fy=4200 kg/cm2 GRADO 60 PAREDES CAMARA DE REGISTRO DE LODOS CONCRETO f'c=210 kg/cm2 EN PAREDES DE CAMARA DE REGISTRO DE LODOS ENCOFRADO Y DESENCOFRADO NORMAL EN PAREDES DE CAMARA DE REGISTRO DE LODOS ACERO fy=4200 kg/cm2 GRADO 60 BIODIGESTOR MOVIMIENTO DE TIERRAS EXCAVACION PARA BIODIGESTOR RELLENO CON MATERIAL PROPIO ACARREO DE MATERIAL EXCEDENTE TABLESTACADO DE TERRENO OBRAS DE CONCRETO SIMPLE SOLADO DE CONCRETO SIMPLE, MEZCLA 1:10 C:H, E=4" OBRAS DE CONCRETO ARMADO ENCOFRADO Y DESENCOFRADO NORMAL EN BIODIGESTROR CONCRETO f'c=210 kg/cm2 EN TECHO DE BIODIGESTOR ACERO fy=4200 kg/cm2 GRADO 60 MUROS DE ALBAÑILERIA MURO DE LADRILLO KING KONG DE ARCILLA, APAREJO DE CABEZA POZO DE PERCOLACION MOVIMIENTO DE TIERRAS EXCAVACION PARA POZO DE PERCOLACION ACARREO DE MATERIAL EXCEDENTE RELLENO CON PIEDRA DE 6" RELLENO CON PIEDRA CHANCADA Ø 1/2" TABLESTACADO DE TERRENO OBRAS DE CONCRETO SIMPLE CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA GRANDE OBRAS DE CONCRETO ARMADO ENCOFRADO Y DESENCOFRADO NORMAL EN TAPA DE POZO DE PERCOLACION CONCRETO f'c=210 kg/cm2 en TAPA DE POZO DE PERCOLACION ACERO fy=4200 kg/cm2 GRADO 60 MUROS Y TABIQUES DE ALBAÑILERIA MUROS DE LADRILLO KING KONG DE ARCILLA, APAREJO DE CABEZA JARDINERAS DE CONCRETO MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS PARA JARDINERAS ACARREO DE MATERIAL EXCEDENTE

OBRAS DE CONCRETO ARMADO ENCOFRADO Y DESENCOFRADO NORMAL EN JARDINERAS CONCRETO f'c=140 kg/cm2 EN JARDINERAS ACERO fy=4200 kg/cm2 GRADO 60 GRADAS DE CONCRETO MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS PARA CIMIENTOS CORTE EN TERRENO NORMAL RELLENO COMPACTADO MANUAL MATERIAL PROPIO ACARREO DE MATERIAL EXCEDENTE RELLENO CON AFIRMADO e=4" OBRAS DE CONCRETO SIMPLE CIMIENTOS CORRIDOS MEZCLA CEMENTO-HORMIGON 1:10 + 30% P.G. ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS ENCOFRADO Y DESENCOFRADO NORMAL EN GRADAS CONCRETO f'c=175 kg/cm2 EN GRADAS MURO DE CONTENCIÓN MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS PARA PUNTA, TALON Y DENTELLON RELLENO COMPACTADO MANUAL MATERIAL PROPIO EN MURO DE CONTENCION FILTRO DE GRAVA EN MUROS DE CONTENCION ACARREO DE MATERIAL EXCEDENTE TABLESTACADO DE TERRENO CONCRETO ARMADO DENTELLÓN CONCRETO EN DENTELLÓN f'c=210 kg/cm2 PUNTA Y TALON DE MURO DE CONTENCION CONCRETO f'c=210 Kg/cm2 PARA PUNTA Y TALON ACERO fy=4200 kg/cm2 GRADO 60 PANTALLA CONCRETO EN PANTALLA DE MURO DE CONTENCION f'c=210 kg/cm2 ENCOFRADO NORMAL EN PANTALLA DE MURO DE CONTENCION ACERO fy=4200 kg/cm2 GRADO 60 JUNTA DE CONSTRUCCION CON TEKNOPORT 1" SISTEMA DE DRENAJE COLOCACION DE TUBERIA CORRUGADA PERFORADA 4" LLORADERO DE 2" MUROS Y TABIQUES DE ALBAÑILERIA MURO DE LADRILLO KING-KONG DE ARCILLA, APAREJO DE SOGA REVOQUES Y REVESTIMIENTOS TARRAJEO RAYADO PRIMARIO TARRAJEO EN EXTERIORES TARRAJEO EN INTERIORES TARRAJEO EN SOBRECIMIENTOS TARRAJEO EN COLUMNAS

TARRAJEO EN VIGAS TARRAJEO EN JARDINERAS VESTIDURA DE DERRAMES REVESTIMIENTO DE GRADAS CON CEMENTO PULIDO REVESTIMIENTO CON CREAMICA RUSTICA EN GRADAS CIELO RASO CIELORRASOS CON MEZCLA DE CEMENTO-ARENA PISOS Y PAVIMENTOS CONTRAPISO e = 4 cm CERÁMICA ALTO TRÁNSITO 0.45x0.45 m. ANTIDESLIZANTE, COLOR CLARO CERAMICA ALTO TRANSITO 0.45x0.45 m, COLOR CLARO ZOCALOS Y CONTRAZOCALOS ZOCALOS ZOCALO DE AZULEJO MARMOLIZADO COLOR GRIS 0.20x0.30 M ZOCALO CERAMICA 0.45x0.45 m, TRIANA CONTRAZOCALOS CONTRAZOCALO DE CERAMICA RUSTICA 0.45x0.45 m CARPINTERIA DE MADERA PUERTA DE MADERA APANELADA INC. ACABADO CARPINTERIA METALICA PROTECTORES METALICOS DE VENTANAS CERRAJERIA BISAGRA ALUMINIZADA DE 4" PESADA EN PUERTA BISAGRA ALUMINIZADA DE 3" PESADA EN PUERTA CERRADURA PARA PUERTA 03 GOLPES CERRADURA PARA PUERTA 02 GOLPES CERRADURA PARA PUERTA DE BAÑO VIDRIOS, CRISTALES Y SIMILARES VIDRIO TEMPLADO e = 6 mm Sistema Directo PINTURA PINTURA LATEX EN COLUMNAS PINTURA LATEX EN VIGAS Y CIELO RASO PINTURA LATEX EN INTERIORES PINTURA LATEX EN EXTERIORES PINTURA LATEX EN JARDINERAS VARIOS SEMBRIO DE GRASS EN JARDINERAS SALIDAS SALIDA PARA ALUMBRADO SALIDA PARA TOMACORRIENTES SALIDA DE INTERRUPTORES CANALIZACIONES, CONDUCTOS O TUBERIAS TUBERIA PVC-SAP DE 20 mm Ø TUBERIA PVC-SAP DE 25 mm Ø CONDUCTORES Y CABLES DE ENERGÍA EN TUBERÍAS 2.5 mm2 THW

4 mm2 THW TABLEROS DE DISTRIBUCIÓN TABLERO GENERAL LUMINARIAS ILUMINACION INTERIOR EQUIPO FLUORESCENTE CON REJILLA ADOSABLE 2x40W FOCO AHORRADOR DE ENERGIA DE 20W ILUMINACION EXTERIOR PANTALLA PARA FOCO 25W INSTALACIÓN DEL SISTEMA DE PUESTA A TIERRA POZO A TIERRA APARATOS SANITARIOS Y ACCESORIOS SUMINISTRO DE APARATOS SANITARIOS LAVATORIO FONTANA COLOR BLANCO INODORO TIPO RAPID JET BLANCO DUCHA 1 LLAVE INCLUYE ACCESORIOS INSTALACIÓN DE APARATOS SANITARIOS INSTALACION DE LAVATORIO FONTANA INSTALACIÓN DE INODORO TIPO RAPID JET BLANCO SUMINISTRO DE ACCESORIOS LLAVE DE LAVATORIO ZUANA INSTALACIÓN DE ACCESORIOS INSTALACIÓN DE LLAVE DE LAVATORIO ZUANA SISTEMA DE AGUA FRIA SALIDA DE AGUA FRÍA SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" REDES DE DISTRIBUCIÓN RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP ACCESORIOS DE REDES DE AGUA TEE SANITARIA CODO 90° VÁLVULAS VALVULAS DE COMPUERTA DE 1/2" DESAGÜE Y VENTILACIÓN SALIDAS DE DESAGÜE SALIDA PVC PARA DESAGÜE DE 2" SALIDA PVC PARA DESAGÜE DE 4" SALIDA PVC PARA VENTILACIÓN DE 2" REDES DE DERIVACIÓN RED DE DERIVACIÓN PVC SAL PARA DESAGÜE DE 4" RED DE DERIVACION PVC SAP PARA DESAGUE DE 4" RED DE DERIVACIÓN PVC SAL PARA DESAGÜE DE 2" RED DE DERIVACIÓN PVC SAL PARA VENTILACIÓN DE 2" MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS PARA TUBERIAS DE DESAGUE

RELLENO COMPACTADO MANUAL MATERIAL PROPIO ACARREO DE MATERIAL EXCEDENTE REPOSICION DE TROCHA CAMARAS DE INSPECCIÓN CAJA DE REGISTRO DE DESAGUE 12" X 24" ADITAMIENTOS VARIOS SUMIDEROS DE 2" REGISTROS ROSCADO DE 4" SUMINISTRO E INSTALACION DE SISTEMA DE TANQUE ELEVADO SUMINISTRO E INSTALACION DE TANQUE ELEVADO BIODIGESTOR SUMINISTRO E INSTALACION DE BIODIGESTOR

Duracion Programada

1 1 1 1

1 1 1

1 1 1 1 1

1 1 1 1 1 1 1 1

1 1

1 1 1

1 1 1

1 1 1 1 1

1

1 1

1 1 1

1 1 1

1 1 1

1 1 1 1 1

1 1

1 1 1

1 1

1 1 1

1 1 1

1 1 1

1 1 1

1 1 1

1 1 1

1 1 1 1

1

1 1 1

1

1 1 1 1 1

1

1 1 1

1

1 1

1 1 1

1 1 1 1 1

1 1 1 1 1

1 1 1 1 1

1

1 1

1 1 1 1

1 1

1

1 1 1 1 1

1 1 1 1 1

1

1 1 1

1 1

1

1

1

1 1 1 1 1

1

1 1 1 1 1

1

1 1 1

1 1

1

1

1

1 1

1

1

1 1 1

1 1

1

1

1

1 1

1 1

1

1 1 1

1 1 1 1

1

1 1 1

1

1 1

1

1

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA PROYECTO: UBICACIÓN: PLAZO DE EJECUCION: VALOR REFERENCIAL: FECHA: Item 01 01.01 01.02 01.03 01.04 02 02.01 02.02 02.03 03 03.01 03.02 03.03 03.04 03.05 04 04.01 04.02 04.03 04.04 04.05 04.06 04.07 04.08 05 05.01 05.01.01 05.01.02

"CREACION DE LOCAL COMUNAL EL ALISAR, EN EL CASERIO EL ALISAR, DISTRITO DE OTUZCO, PROVINCIA DE OTUZCO - LA LIBERTAD" USQUIL - OTUZCO - LA LIBERTAD 60 DÍAS CALENDARIOS S/. 381,255.35 JUNIO 2014 Descripción

OBRAS PROVISIONALES ALMACEN CASETA Y GUARDIANIA CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m FLETE TERRESTRE MOVILIZACION Y DESMOVILIZACION DE EQUIPO TRABAJOS PRELIMINARES TRAZO NIVELACION Y REPLANTEO EXCAVACION MANUAL EN TERRENO NORMAL ELIMINACION DE MATERIAL CARG.MECANICO L/VOLQUETE 10M3 D=10KM MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS PARA CIMIENTOS EXCAVACION DE ZANJAS PARA SARDINELES RELLENO COMPACTADO MANUAL MATERIAL PROPIO RELLENO COMPACTADO CON AFIRMADO E=4" ACARREO DE MATERIAL EXCEDENTE OBRAS DE CONCRETO SIMPLE SOLADO DE CONCRETO SIMPLE, MEZCLA 1:10 C:H, E=4" CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA GRANDE FALSO PISO DE 4" DE CONCRETO 1:8 ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINELES CONCRETO f'c=175 Kg/cm2 PARA SARDINELES ENCOFRADO Y DESENCOFRADO NORMAL EN VEREDAS VEREDA DE CONCRETO f'c= 175 kg/cm2 INC. BRUÑADO JUNTA DE DILATACION, CADA 3 METROS E=1" OBRAS DE CONCRETO ARMADO ZAPATAS CONCRETO f'c=210 kg/cm2 PARA ZAPATAS ACERO fy=4200 kg/cm2 GRADO 60

Und.

Metrado

30 DIAS

Precio (S/.)

Total

Monto (S/.)

30 DIAS (%)

Monto (S/.)

(%)

m2 u glb glb

48.00 1.00 1.00 1.00

60.21 1,090.40 12,694.99 7,311.15

2,890.08 1,090.40 12,694.99 7,311.15

2,890.08 1,090.40 9,521.24 5,483.36

100.00% 100.00% 75.00% 75.00%

0.00 0.00 3,173.75 1,827.79

0.00% 0.00% 25.00% 25.00%

m2 m3 m3

301.90 36.00 165.31

1.36 32.19 21.13

410.58 1,158.84 3,493.00

410.58 1,158.84 3,493.00

100.00% 100.00% 100.00%

0.00 0.00 0.00

0.00% 0.00% 0.00%

m3 m m3 m2 m3

98.15 26.60 89.44 227.27 11.34

24.62 1.64 21.04 19.88 9.85

2,416.45 43.62 1,881.82 4,518.13 111.70

2,416.45 43.62 1,881.82 4,518.13 111.70

100.00% 100.00% 100.00% 100.00% 100.00%

0.00 0.00 0.00 0.00 0.00

0.00% 0.00% 0.00% 0.00% 0.00%

m2 m3 m2 m2 m m2 m2 m

33.75 15.15 143.04 21.28 26.60 18.85 88.69 31.67

28.10 212.02 35.22 37.64 38.14 45.52 52.34 1.87

948.38 3,212.10 5,037.87 800.98 1,014.52 858.05 4,642.03 59.22

948.38 3,212.10 5,037.87 800.98 1,014.52 858.05 4,642.03 59.22

100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

m3 kg

16.88 468.72

358.51 4.29

6,051.65 2,010.81

6,051.65 2,010.81

100.00% 100.00%

0.00 0.00

0.00% 0.00%

Item 05.02 05.02.01 05.02.02 05.02.03 05.03 05.03.01 05.03.02 05.03.03 05.04 05.04.01 05.04.02 05.04.03 05.04.04 05.04.05 05.05 05.05.01 05.05.02 05.05.03 05.06 05.06.01 05.06.02 05.06.03 05.07 05.07.01 05.07.02 05.07.03 05.08 05.08.01 05.08.02 05.08.03 06 06.01 06.01.01 06.01.02

Descripción SOBRECIMIENTOS CONCRETO f'c=175 kg/cm2 PARA SOBRECIMIENTOS ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS ACERO fy=4200 kg/cm2 GRADO 60 COLUMNAS CONCRETO f'c=210 kg/cm2 PARA COLUMNAS ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS ACERO fy=4200 kg/cm2 GRADO 60 COLUMNAS DE CONFINAMIENTO CONCRETO EN COLUMNAS DE CONFINAMIENTO f'c=175 kg/cm2 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS DE CONFINAMIENTO ACERO fy=4200 kg/cm2 GRADO 60 JUNTA DE DILATACION CON TEKNOPORT EN COLUMNAS 1/2" TAPAJUNTAS VIGAS CONCRETO EN VIGAS f'c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS ACERO fy=4200 kg/cm2 GRADO 60 VIGAS DE CONFINAMIENTO CONCRETO EN VIGAS DE CONFINAMIENTO f'c=175 kg/cm2 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS ACERO fy=4200 kg/cm2 GRADO 60 LOSAS MACIZAS CONCRETO EN LOSAS MACIZAS f'c=210 kg/cm2 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZAS ACERO fy=4200 kg/cm2 GRADO 60 PARAPETO TANQUE ELEVADO CONCRETO f'c=175 kg/cm2 PARA PARAPETO ENCOFRADO Y DESENCOFRADO DE PARAPETO ACERO fy=4200 kg/cm2 GRADO 60 COBERTURAS COBERTURA DE AUDITORIO TIJERAL METALICO CORREAS METALICAS

Und.

Metrado

Precio (S/.)

30 DIAS Total

Monto (S/.)

30 DIAS (%)

Monto (S/.)

(%)

m3 m2 kg

10.79 143.83 363.01

361.92 30.29 4.29

3,905.12 4,356.61 1,557.31

3,905.12 4,356.61 1,557.31

100.00% 100.00% 100.00%

0.00 0.00 0.00

0.00% 0.00% 0.00%

m3 m2 kg

7.12 100.80 1,170.42

414.41 40.42 4.29

2,950.60 4,074.34 5,021.10

2,950.60 4,074.34 5,021.10

100.00% 100.00% 100.00%

0.00 0.00 0.00

0.00% 0.00% 0.00%

m3 m2 kg m2 m

1.17 6.48 241.86 7.02 46.80

374.14 40.42 4.29 4.70 22.10

437.74 261.92 1,037.58 32.99 1,034.28

437.74 261.92 1,037.58 32.99 1,034.28

100.00% 100.00% 100.00% 100.00% 100.00%

0.00 0.00 0.00 0.00 0.00

0.00% 0.00% 0.00% 0.00% 0.00%

m3 m2 kg

6.79 69.80 604.52

388.94 45.60 4.29

2,640.90 3,182.88 2,593.39

2,640.90 3,182.88 2,593.39

100.00% 100.00% 100.00%

0.00 0.00 0.00

0.00% 0.00% 0.00%

m3 m2 kg

0.95 12.65 51.94

349.80 45.60 4.29

332.31 576.84 222.82

332.31 576.84 222.82

100.00% 100.00% 100.00%

0.00% 0.00% 0.00%

m3 m2 kg

2.89 32.37 305.76

384.25 37.05 4.29

1,110.48 1,199.31 1,311.71

0.00 0.00 0.00

0.00% 0.00% 0.00%

0.00 0.00 0.00 0.00 1,110.48 1,199.31 1,311.71

100.00% 100.00% 100.00%

m3 m2 kg

0.10 4.16 5.51

357.70 50.25 4.29

35.77 209.04 23.64

0.00 0.00 0.00

0.00% 0.00% 0.00%

35.77 209.04 23.64

100.00% 100.00% 100.00%

u m

6.00 229.68

2,379.18 99.89

14,275.08 22,942.74

0.00 0.00

0.00% 0.00%

14,275.08 22,942.74

100.00% 100.00%

Item

Descripción

06.01.03 COBERTURA CON TEJA ANDINA COLOR ARCILLA 0.72x1.14m, e=5mm 06.01.04 COLOCACION DE CUMBRERA PARA TEJA ANDINA 06.01.05 TIMPANO DE POLICARBONATO TRANSLUCIDO 06.02 COBERTURA DE ALMACEN Y SS.HH. 06.02.01 CORREAS DE 2" x 3" DE MADERA 06.02.02 COBERTURA CON TEJA ANDINA 0.72x1.14 m, e=5 mm, CON TIRAFONES 06.03 COBERTURA TANQUE ELEVADO 06.03.01 TUBO DE FIERRO 1 1/2" PARA TECHO DE TANQUE ELEVADO 06.03.02 COBERTURA CON TEJA ANDINA 0.72x1.14 m, e=5 mm, CON TIRAFONES 06.03.03 COLOCACION DE CUMBRERA PARA TEJA ANDINA 07 SISTEMA DE DRENAJE PLUVIAL 07.01 MOVIMIENTO DE TIERRAS 07.01.01 EXCAVACION DE ZANJAS PARA CANALETA 07.01.02 ACARREO DE MATERIAL EXCEDENTE 07.02 OBRAS DE CONCRETO SIMPLE 07.02.01 CANALETAS DE EVACUACION PLUVIAL 07.02.01.01 ENCOFRADO Y DESENCOFRADO NORMAL EN CANALETAS DE EVACUACIÓN PLUVIAL 07.02.01.02 CONCRETO f'c=175 kg/cm2 PARA CANALETAS DE EVACUACIÓN PLUVIAL 07.02.01.03 JUNTAS DE DILATACION EN CANALETAS 1" 07.02.02 COLUMNETAS 07.02.02.01 CONCRETO f'c=175 kg/cm2 PARA COLUMNETAS 07.02.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETAS 07.02.02.03 CONCRETO f'c=175 kg/cm2 EN DADOS DE ANCLAJE 07.03 CANALIZACIONES Y TUBERIAS 07.03.01 CANALETA DE FIERRO GALVANIZADO DE 6" 07.03.02 TUBERIA DE PVC SAL - P 4" P/EVACUACIÓN PLUVIAL 07.03.03 REJILLA DE F°G° Ø=1/2" PARA CANAL DE EVACUACIÓN 08 CAMARA DE REGISTRO DE LODOS 08.01 MOVIMIENTO DE TIERRAS 08.01.01 EXCAVACION DE CÁMARA DE REGISTRO DE LODOS 08.01.02 ACARREO DE MATERIAL EXCEDENTE 08.01.03 BASE DE HORMIGÓN e=10cm 08.02 OBRAS DE CONCRETO ARMADO 08.02.01 TAPA PARA CÁMARA DE REGISTRO DE LODOS

Und.

Metrado

Precio (S/.)

30 DIAS Total

Monto (S/.)

30 DIAS (%)

Monto (S/.)

(%)

m2 m m2

180.87 19.14 18.90

47.49 61.69 112.64

8,589.52 1,180.75 2,128.90

0.00 0.00 0.00

0.00% 0.00% 0.00%

8,589.52 1,180.75 2,128.90

100.00% 100.00% 100.00%

m m2

41.44 35.22

22.81 60.87

945.25 2,143.84

0.00 0.00

0.00% 0.00%

945.25 2,143.84

100.00% 100.00%

m m2 m

7.40 3.04 1.30

46.66 60.87 61.69

345.28 185.04 80.20

0.00 0.00 0.00

0.00% 0.00% 0.00%

345.28 185.04 80.20

100.00% 100.00% 100.00%

m m3

48.66 10.84

3.29 9.85

160.09 106.77

0.00 0.00

0.00% 0.00%

160.09 106.77

100.00% 100.00%

m2 m3 m

43.79 6.33 97.32

29.39 326.15 1.77

1,286.99 2,064.53 172.26

0.00 0.00 0.00

0.00% 0.00% 0.00%

1,286.99 2,064.53 172.26

100.00% 100.00% 100.00%

m3 m2 m3

0.36 5.04 0.22

317.21 41.31 318.42

114.20 208.20 70.05

0.00 0.00 0.00

0.00% 0.00% 0.00%

114.20 208.20 70.05

100.00% 100.00% 100.00%

m m m

46.28 34.20 48.66

28.34 25.71 111.12

1,311.58 879.28 5,407.10

0.00 0.00 0.00

0.00% 0.00% 0.00%

1,311.58 879.28 5,407.10

100.00% 100.00% 100.00%

m3 m3 m2

1.15 1.27 1.00

24.62 9.85 30.69

28.31 12.51 30.69

0.00 0.00 0.00

0.00% 0.00% 0.00%

28.31 12.51 30.69

100.00% 100.00% 100.00%

Item

Descripción

08.02.01.01 CONCRETO f'c=210 kg/cm2 PARA TAPA DE CAMARA DE REGISTRO DE LODOS 08.02.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN TAPA DE CAMARA DE LODOS 08.02.01.03 ACERO fy=4200 kg/cm2 GRADO 60 08.02.02 PAREDES CAMARA DE REGISTRO DE LODOS 08.02.02.01 CONCRETO f'c=210 kg/cm2 EN PAREDES DE CAMARA DE REGISTRO DE LODOS 08.02.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN PAREDES DE CAMARA DE REGISTRO DE 08.02.02.03 ACERO fy=4200 kg/cm2 GRADO 60 09 BIODIGESTOR 09.01 MOVIMIENTO DE TIERRAS 09.01.01 EXCAVACION PARA BIODIGESTOR 09.01.02 RELLENO CON MATERIAL PROPIO 09.01.03 ACARREO DE MATERIAL EXCEDENTE 09.01.04 TABLESTACADO DE TERRENO 09.02 OBRAS DE CONCRETO SIMPLE 09.02.01 SOLADO DE CONCRETO SIMPLE, MEZCLA 1:10 C:H, E=4" 09.03 OBRAS DE CONCRETO ARMADO 09.03.01 ENCOFRADO Y DESENCOFRADO NORMAL EN BIODIGESTROR 09.03.02 CONCRETO f'c=210 kg/cm2 EN TECHO DE BIODIGESTOR 09.03.03 ACERO fy=4200 kg/cm2 GRADO 60 09.04 MUROS DE ALBAÑILERIA 09.04.01 MURO DE LADRILLO KING KONG DE ARCILLA, APAREJO DE CABEZA 10 POZO DE PERCOLACION 10.01 MOVIMIENTO DE TIERRAS 10.01.01 EXCAVACION PARA POZO DE PERCOLACION 10.01.02 ACARREO DE MATERIAL EXCEDENTE 10.01.03 RELLENO CON PIEDRA DE 6" 10.01.04 RELLENO CON PIEDRA CHANCADA Ø 1/2" 10.01.05 TABLESTACADO DE TERRENO 10.02 OBRAS DE CONCRETO SIMPLE 10.02.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA GRANDE 10.03 OBRAS DE CONCRETO ARMADO 10.03.01 ENCOFRADO Y DESENCOFRADO NORMAL EN TAPA DE POZO DE PERCOLACION 10.03.02 CONCRETO f'c=210 kg/cm2 en TAPA DE POZO DE PERCOLACION 10.03.03 ACERO fy=4200 kg/cm2 GRADO 60

Und.

Metrado

Precio (S/.)

30 DIAS Total

Monto (S/.)

30 DIAS (%)

Monto (S/.)

(%)

m3 m2 kg

0.06 1.40 5.32

380.69 33.36 4.29

22.84 46.70 22.82

22.84 46.70 22.82

100.00% 100.00% 100.00%

0.00 0.00 0.00

0.00% 0.00% 0.00%

m3 m2 kg

0.38 7.56 21.84

384.25 41.31 4.29

146.02 312.30 93.69

146.02 312.30 93.69

100.00% 100.00% 100.00%

0.00 0.00 0.00

0.00% 0.00% 0.00%

m3 m3 m3 m2

5.65 1.81 4.22 10.68

24.62 19.69 9.85 15.27

139.10 35.64 41.57 163.08

139.10 35.64 41.57 163.08

100.00% 100.00% 100.00% 100.00%

0.00 0.00 0.00 0.00

0.00% 0.00% 0.00% 0.00%

m2

0.31

28.10

8.71

8.71

100.00%

0.00

0.00%

m2 m3 kg

4.41 0.34 27.60

33.36 380.69 4.29

147.12 129.43 118.40

147.12 129.43 118.40

100.00% 100.00% 100.00%

0.00 0.00 0.00

0.00% 0.00% 0.00%

m2

9.73

84.08

818.10

818.10

100.00%

0.00

0.00%

m3 m3 m3 m3 m2

9.69 10.66 0.38 5.14 18.46

24.62 9.85 118.39 131.22 15.27

238.57 105.00 44.99 674.47 281.88

238.57 105.00 44.99 674.47 281.88

100.00% 100.00% 100.00% 100.00% 100.00%

0.00 0.00 0.00 0.00 0.00

0.00% 0.00% 0.00% 0.00% 0.00%

m3

0.85

212.02

180.22

180.22

100.00%

0.00

0.00%

m2 m3 kg

4.78 0.69 26.32

33.36 380.69 4.29

159.46 262.68 112.91

159.46 262.68 112.91

100.00% 100.00% 100.00%

0.00 0.00 0.00

0.00% 0.00% 0.00%

Item

Descripción

10.04 MUROS Y TABIQUES DE ALBAÑILERIA 10.04.01 MUROS DE LADRILLO KING KONG DE ARCILLA, APAREJO DE CABEZA 11 JARDINERAS DE CONCRETO 11.01 MOVIMIENTO DE TIERRAS 11.01.01 EXCAVACION DE ZANJAS PARA JARDINERAS 11.01.02 ACARREO DE MATERIAL EXCEDENTE 11.02 OBRAS DE CONCRETO ARMADO 11.02.01 ENCOFRADO Y DESENCOFRADO NORMAL EN JARDINERAS 11.02.02 CONCRETO f'c=140 kg/cm2 EN JARDINERAS 11.02.03 ACERO fy=4200 kg/cm2 GRADO 60 12 GRADAS DE CONCRETO 12.01 MOVIMIENTO DE TIERRAS 12.01.01 EXCAVACION DE ZANJAS PARA CIMIENTOS 12.01.02 CORTE EN TERRENO NORMAL 12.01.03 RELLENO COMPACTADO MANUAL MATERIAL PROPIO 12.01.04 ACARREO DE MATERIAL EXCEDENTE 12.01.05 RELLENO CON AFIRMADO e=4" 12.02 OBRAS DE CONCRETO SIMPLE 12.02.01 CIMIENTOS CORRIDOS MEZCLA CEMENTO-HORMIGON 1:10 + 30% P.G. 12.02.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS 12.02.03 CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS 12.02.04 ENCOFRADO Y DESENCOFRADO NORMAL EN GRADAS 12.02.05 CONCRETO f'c=175 kg/cm2 EN GRADAS 13 MURO DE CONTENCIÓN 13.01 MOVIMIENTO DE TIERRAS 13.01.01 EXCAVACION DE ZANJAS PARA PUNTA, TALON Y DENTELLON 13.01.02 RELLENO COMPACTADO MANUAL MATERIAL PROPIO EN MURO DE CONTENCION 13.01.03 FILTRO DE GRAVA EN MUROS DE CONTENCION 13.01.04 ACARREO DE MATERIAL EXCEDENTE 13.01.05 TABLESTACADO DE TERRENO 13.02 CONCRETO ARMADO 13.02.01 DENTELLÓN 13.02.01.01 CONCRETO EN DENTELLÓN f'c=210 kg/cm2 13.02.02 PUNTA Y TALON DE MURO DE CONTENCION

Und.

Metrado

Precio (S/.)

30 DIAS Total

Monto (S/.)

30 DIAS (%)

Monto (S/.)

(%)

m2

9.42

84.08

792.03

792.03

100.00%

0.00

0.00%

m3 m3

12.04 13.24

24.62 9.85

296.42 130.41

296.42 130.41

100.00% 100.00%

0.00 0.00

0.00% 0.00%

m2 m3 kg

53.48 6.04 117.43

46.44 348.28 4.29

2,483.61 2,103.61 503.77

2,483.61 2,103.61 503.77

100.00% 100.00% 100.00%

0.00 0.00 0.00

0.00% 0.00% 0.00%

m3 m3 m3 m3 m2

3.20 0.90 0.30 4.18 12.82

24.62 24.62 21.04 9.85 19.88

78.78 22.16 6.31 41.17 254.86

78.78 22.16 6.31 41.17 254.86

100.00% 100.00% 100.00% 100.00% 100.00%

0.00 0.00 0.00 0.00 0.00

0.00% 0.00% 0.00% 0.00% 0.00%

m3 m2 m3 m2 m3

18.60 5.34 0.40 6.78 1.31

212.02 30.29 368.32 43.65 440.65

3,943.57 161.75 147.33 295.95 577.25

3,943.57 161.75 147.33 295.95 577.25

100.00% 100.00% 100.00% 100.00% 100.00%

0.00 0.00 0.00 0.00 0.00

0.00% 0.00% 0.00% 0.00% 0.00%

m3 m3 m3 m3 m2

54.95 49.06 9.78 6.48 47.20

32.83 20.69 127.60 9.85 15.27

1,804.01 1,015.05 1,247.93 63.83 720.74

1,804.01 1,015.05 1,247.93 63.83 720.74

100.00% 100.00% 100.00% 100.00% 100.00%

0.00 0.00 0.00 0.00 0.00

0.00% 0.00% 0.00% 0.00% 0.00%

m3

1.43

353.08

504.90

504.90

100.00%

0.00

0.00%

Item 13.02.02.01 13.02.02.02 13.02.03 13.02.03.01 13.02.03.02 13.02.03.03 13.02.03.04 13.03 13.03.01 13.03.02 14 14.01 15 15.01 15.02 15.03 15.04 15.05 15.06 15.07 15.08 15.09 15.10 16 16.01 17 17.01 17.02 17.03 18 18.01 18.01.01 18.01.02 18.02

Descripción CONCRETO f'c=210 Kg/cm2 PARA PUNTA Y TALON ACERO fy=4200 kg/cm2 GRADO 60 PANTALLA CONCRETO EN PANTALLA DE MURO DE CONTENCION f'c=210 kg/cm2 ENCOFRADO NORMAL EN PANTALLA DE MURO DE CONTENCION ACERO fy=4200 kg/cm2 GRADO 60 JUNTA DE CONSTRUCCION CON TEKNOPORT 1" SISTEMA DE DRENAJE COLOCACION DE TUBERIA CORRUGADA PERFORADA 4" LLORADERO DE 2" MUROS Y TABIQUES DE ALBAÑILERIA MURO DE LADRILLO KING-KONG DE ARCILLA, APAREJO DE SOGA REVOQUES Y REVESTIMIENTOS TARRAJEO RAYADO PRIMARIO TARRAJEO EN EXTERIORES TARRAJEO EN INTERIORES TARRAJEO EN SOBRECIMIENTOS TARRAJEO EN COLUMNAS TARRAJEO EN VIGAS TARRAJEO EN JARDINERAS VESTIDURA DE DERRAMES REVESTIMIENTO DE GRADAS CON CEMENTO PULIDO REVESTIMIENTO CON CREAMICA RUSTICA EN GRADAS CIELO RASO CIELORRASOS CON MEZCLA DE CEMENTO-ARENA PISOS Y PAVIMENTOS CONTRAPISO e = 4 cm CERÁMICA ALTO TRÁNSITO 0.45x0.45 m. ANTIDESLIZANTE, COLOR CLARO CERAMICA ALTO TRANSITO 0.45x0.45 m, COLOR CLARO ZOCALOS Y CONTRAZOCALOS ZOCALOS ZOCALO DE AZULEJO MARMOLIZADO COLOR GRIS 0.20x0.30 M ZOCALO CERAMICA 0.45x0.45 m, TRIANA CONTRAZOCALOS

Und.

Metrado

Precio (S/.)

30 DIAS Total

Monto (S/.)

30 DIAS (%)

Monto (S/.)

(%)

m3 kg

10.44 536.18

353.08 4.29

3,686.16 2,300.21

3,686.16 2,300.21

100.00% 100.00%

0.00 0.00

0.00% 0.00%

m3 m2 kg m2

9.17 91.71 938.35 2.25

444.75 42.92 4.29 33.38

4,078.36 3,936.19 4,025.52 75.11

4,078.36 3,936.19 4,025.52 75.11

100.00% 100.00% 100.00% 100.00%

0.00 0.00 0.00 0.00

0.00% 0.00% 0.00% 0.00%

m m

40.76 28.00

41.62 5.93

1,696.43 166.04

1,696.43 166.04

100.00% 100.00%

0.00 0.00

0.00% 0.00%

m2

114.69

58.21

6,676.10

5,007.08

75.00%

1,669.03

25.00%

m2 m2 m2 m2 m2 m2 m2 m m2 m2

23.95 110.80 96.49 9.51 52.55 52.82 18.42 105.59 6.30 7.72

18.33 21.81 18.85 21.81 28.74 32.38 21.81 8.11 27.11 79.37

439.00 2,416.55 1,818.84 207.41 1,510.29 1,710.31 401.74 856.33 170.79 612.74

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

439.00 2,416.55 1,818.84 207.41 1,510.29 1,710.31 401.74 856.33 170.79 612.74

100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

m2

31.53

33.62

1,060.04

0.00

0.00%

1,060.04

100.00%

m2 m2 m2

142.51 8.95 133.55

27.87 56.20 45.42

3,971.75 502.99 6,065.84

0.00 0.00 0.00

0.00% 0.00% 0.00%

3,971.75 502.99 6,065.84

100.00% 100.00% 100.00%

m2 m2

34.16 21.67

43.16 70.79

1,474.35 1,534.02

0.00 0.00

0.00% 0.00%

1,474.35 1,534.02

100.00% 100.00%

Item 18.02.01 19 19.01 20 20.01 21 21.01 21.02 21.03 21.04 21.05 22 22.01 23 23.01 23.02 23.03 23.04 23.05 24 24.01 25 25.01 25.02 25.03 26 26.01 26.02 27 27.01 27.02 28 28.01 29

Descripción CONTRAZOCALO DE CERAMICA RUSTICA 0.45x0.45 m CARPINTERIA DE MADERA PUERTA DE MADERA APANELADA INC. ACABADO CARPINTERIA METALICA PROTECTORES METALICOS DE VENTANAS CERRAJERIA BISAGRA ALUMINIZADA DE 4" PESADA EN PUERTA BISAGRA ALUMINIZADA DE 3" PESADA EN PUERTA CERRADURA PARA PUERTA 03 GOLPES CERRADURA PARA PUERTA 02 GOLPES CERRADURA PARA PUERTA DE BAÑO VIDRIOS, CRISTALES Y SIMILARES VIDRIO TEMPLADO e = 6 mm Sistema Directo PINTURA PINTURA LATEX EN COLUMNAS PINTURA LATEX EN VIGAS Y CIELO RASO PINTURA LATEX EN INTERIORES PINTURA LATEX EN EXTERIORES PINTURA LATEX EN JARDINERAS VARIOS SEMBRIO DE GRASS EN JARDINERAS SALIDAS SALIDA PARA ALUMBRADO SALIDA PARA TOMACORRIENTES SALIDA DE INTERRUPTORES CANALIZACIONES, CONDUCTOS O TUBERIAS TUBERIA PVC-SAP DE 20 mm Ø TUBERIA PVC-SAP DE 25 mm Ø CONDUCTORES Y CABLES DE ENERGÍA EN TUBERÍAS 2.5 mm2 THW 4 mm2 THW TABLEROS DE DISTRIBUCIÓN TABLERO GENERAL LUMINARIAS

Und.

Metrado

Precio (S/.)

30 DIAS Total

Monto (S/.)

30 DIAS (%)

Monto (S/.)

(%)

m2

57.68

79.37

4,578.06

0.00

0.00%

4,578.06

100.00%

m2

18.15

381.83

6,930.21

0.00

0.00%

6,930.21

100.00%

m2

37.31

130.47

4,867.84

0.00

0.00%

4,867.84

100.00%

pza pza pza pza pza

16.00 16.00 2.00 2.00 2.00

13.87 12.67 67.46 57.86 61.74

221.92 202.72 134.92 115.72 123.48

0.00 0.00 0.00 0.00 0.00

0.00% 0.00% 0.00% 0.00% 0.00%

221.92 202.72 134.92 115.72 123.48

100.00% 100.00% 100.00% 100.00% 100.00%

m2

31.71

135.59

4,299.56

0.00

0.00%

4,299.56

100.00%

m2 m2 m2 m2 m2

52.55 84.35 104.94 110.80 18.42

8.70 9.59 8.70 8.70 9.47

457.19 808.92 912.98 963.96 174.44

0.00 0.00 0.00 0.00 0.00

0.00% 0.00% 0.00% 0.00% 0.00%

457.19 808.92 912.98 963.96 174.44

100.00% 100.00% 100.00% 100.00% 100.00%

m2

14.92

28.13

419.70

0.00

0.00%

419.70

100.00%

u u u

18.00 9.00 7.00

55.36 34.04 34.22

996.48 306.36 239.54

0.00 0.00 0.00

0.00% 0.00% 0.00%

996.48 306.36 239.54

100.00% 100.00% 100.00%

m m

110.05 193.64

4.81 4.94

529.34 956.58

0.00 0.00

0.00% 0.00%

529.34 956.58

100.00% 100.00%

m m

220.10 580.92

5.22 5.22

1,148.92 3,032.40

0.00 0.00

0.00% 0.00%

1,148.92 3,032.40

100.00% 100.00%

u

1.00

353.36

353.36

0.00

0.00%

353.36

100.00%

Item 29.01 29.01.01 29.01.02 29.02 29.02.01 30 30.01 31 31.01 31.01.01 31.01.02 31.01.03 31.02 31.02.01 31.02.02 31.03 31.03.01 31.04 31.04.01 32 32.01 32.01.01 32.02 32.02.01 32.02.02 32.03 32.03.01 32.03.02 32.04 32.04.01 33 33.01 33.01.01 33.01.02

Descripción ILUMINACION INTERIOR EQUIPO FLUORESCENTE CON REJILLA ADOSABLE 2x40W FOCO AHORRADOR DE ENERGIA DE 20W ILUMINACION EXTERIOR PANTALLA PARA FOCO 25W INSTALACIÓN DEL SISTEMA DE PUESTA A TIERRA POZO A TIERRA APARATOS SANITARIOS Y ACCESORIOS SUMINISTRO DE APARATOS SANITARIOS LAVATORIO FONTANA COLOR BLANCO INODORO TIPO RAPID JET BLANCO DUCHA 1 LLAVE INCLUYE ACCESORIOS INSTALACIÓN DE APARATOS SANITARIOS INSTALACION DE LAVATORIO FONTANA INSTALACIÓN DE INODORO TIPO RAPID JET BLANCO SUMINISTRO DE ACCESORIOS LLAVE DE LAVATORIO ZUANA INSTALACIÓN DE ACCESORIOS INSTALACIÓN DE LLAVE DE LAVATORIO ZUANA SISTEMA DE AGUA FRIA SALIDA DE AGUA FRÍA SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" REDES DE DISTRIBUCIÓN RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP ACCESORIOS DE REDES DE AGUA TEE SANITARIA CODO 90° VÁLVULAS VALVULAS DE COMPUERTA DE 1/2" DESAGÜE Y VENTILACIÓN SALIDAS DE DESAGÜE SALIDA PVC PARA DESAGÜE DE 2" SALIDA PVC PARA DESAGÜE DE 4"

Und.

Metrado

Precio (S/.)

30 DIAS Total

Monto (S/.)

30 DIAS (%)

Monto (S/.)

(%)

u u

11.00 2.00

101.29 30.89

1,114.19 61.78

0.00 0.00

0.00% 0.00%

1,114.19 61.78

100.00% 100.00%

u

5.00

56.28

281.40

0.00

0.00%

281.40

100.00%

u

1.00

418.61

418.61

0.00

0.00%

418.61

100.00%

u u u

2.00 2.00 2.00

63.68 167.00 74.92

127.36 334.00 149.84

0.00 0.00 0.00

0.00% 0.00% 0.00%

127.36 334.00 149.84

100.00% 100.00% 100.00%

u u

2.00 2.00

56.77 56.77

113.54 113.54

0.00 0.00

0.00% 0.00%

113.54 113.54

100.00% 100.00%

u

2.00

34.81

69.62

0.00

0.00%

69.62

100.00%

u

2.00

22.71

45.42

0.00

0.00%

45.42

100.00%

pto

6.00

60.87

365.22

0.00

0.00%

365.22

100.00%

m m

24.30 10.20

9.18 9.50

223.07 96.90

0.00 0.00

0.00% 0.00%

223.07 96.90

100.00% 100.00%

u u

10.00 15.00

7.42 7.19

74.20 107.85

0.00 0.00

0.00% 0.00%

74.20 107.85

100.00% 100.00%

u

2.00

49.07

98.14

0.00

0.00%

98.14

100.00%

pto pto

6.00 4.00

65.23 92.77

391.38 371.08

391.38 371.08

100.00% 100.00%

0.00 0.00

0.00% 0.00%

Item 33.01.03 33.02 33.02.01 33.02.02 33.02.03 33.02.04 33.03 33.03.01 33.03.02 33.03.03 33.03.04 33.04 33.04.01 33.05 33.05.01 33.05.02 34 34.01 35 35.01

Descripción SALIDA PVC PARA VENTILACIÓN DE 2" REDES DE DERIVACIÓN RED DE DERIVACIÓN PVC SAL PARA DESAGÜE DE 4" RED DE DERIVACION PVC SAP PARA DESAGUE DE 4" RED DE DERIVACIÓN PVC SAL PARA DESAGÜE DE 2" RED DE DERIVACIÓN PVC SAL PARA VENTILACIÓN DE 2" MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS PARA TUBERIAS DE DESAGUE RELLENO COMPACTADO MANUAL MATERIAL PROPIO ACARREO DE MATERIAL EXCEDENTE REPOSICION DE TROCHA CAMARAS DE INSPECCIÓN CAJA DE REGISTRO DE DESAGUE 12" X 24" ADITAMIENTOS VARIOS SUMIDEROS DE 2" REGISTROS ROSCADO DE 4" SUMINISTRO E INSTALACION DE SISTEMA DE TANQUE ELEVADO SUMINISTRO E INSTALACION DE TANQUE ELEVADO BIODIGESTOR SUMINISTRO E INSTALACION DE BIODIGESTOR Costo Directo Gastos Generales Utilidades Sub Total I.G.V. Valor Referencial Avance Físico Mensual Avance Físico Acumulado

Und.

Metrado

Precio (S/.)

30 DIAS Total

Monto (S/.)

30 DIAS (%)

Monto (S/.)

(%)

pto

2.00

68.86

137.72

137.72

100.00%

0.00

0.00%

m m m m

20.80 26.00 6.80 7.00

27.78 49.35 14.32 14.32

577.82 1,283.10 97.38 100.24

577.82 1,283.10 97.38 100.24

100.00% 100.00% 100.00% 100.00%

0.00 0.00 0.00 0.00

0.00% 0.00% 0.00% 0.00%

m3 m3 m3 m2

12.22 5.66 7.22 5.00

24.62 21.04 9.85 84.52

300.86 119.09 71.12 422.60

0.00 0.00 0.00 0.00

0.00% 0.00% 0.00% 0.00%

300.86 119.09 71.12 422.60

100.00% 100.00% 100.00% 100.00%

pza

3.00

110.52

331.56

0.00

0.00%

331.56

100.00%

u pza

2.00 2.00

41.38 26.47

82.76 52.94

0.00 0.00

0.00% 0.00%

82.76 52.94

100.00% 100.00%

glb

1.00

445.68

445.68

0.00

0.00%

445.68

100.00%

u

1.00

1,271.49

1,271.49

0.00

0.00%

1,271.49

100.00%

10.0% 5% 18%

280,954.56 28,095.46 14,047.73 323,097.75 58,157.60 381,255.35 100.00%

141,304.52 14,130.45 7,065.23 162,500.20 29,250.04 191,750.23 50.29% 50.29% 50.29%

139,650.04 13,965.00 6,982.50 160,597.55 28,907.56 189,505.10 49.71% 49.71% 100.00%

Related Documents

Cronograma Valorizado
June 2020 5
Cronograma Valorizado
October 2019 14
Cronograma
May 2020 29
Cronograma
August 2019 56
Cronograma
June 2020 8

More Documents from ""