4.3- CRONOGRAMA DE EJECUCION VALORIZADO Proyecto:

"MEJORAMIENTO Y AMPLIACION DE LA I.E. Nº 34030 DE LA COMUNIDAD CAMPESINA DE YURAJHUANCA DISTRITO DE SIMON BOLIVAR –PASCO-PASCO"

UBICACIÓN: LUGAR: YURAJHUANCA, DIST.: SIMO BOLIVAR, PROV. : PASCO, DPTO.: PASCO FECHA: PL AZO:

Sep-09 75 DIAS CALENDARIOS

DESCRIPCION

ITEM *********

ESTRUCTURAS

01.01

OBRAS PROVISIONALES

01.03 01.04 01.05

15 DIAS

100%

5,200.00

5,200.00

3,345.03

3,345.03

6,715.05

6,715.05

44,503.11

44,503.11

17,124.73

17,124.73

32,098.35

25,678.68

29,064.55

8,719.37

100% 100%

MOVIMIENTO DE TIERRAS

100%

CONCRETO SIMPLE CONCRETO ARMADO ZAPATAS

01.06.04

3º MES

30 DIAS

1,631.03

OBRAS PRELIMINARES

01.06.01

01.06.03

2º MES

30 DIAS

1,631.03 DEMOLICIONES

01.06

01.06.02

1º MES

MEJORAMIENTO Y AMPLIACION DE LA I E Nº 34030

01

01.02

SUB-TOTAL

100%

100%

COLUMNAS

80%

VIGAS

30%

LOSAS ALIGERADAS

25,667.82

ESCALERAS

100% 5,720.90

02

ARQUITECTURA

02.01

ALBAÑILERIA REVOQUES ENLUCIDOS Y MOLDURAS

8,572.51

70% 20,002.53 100%

14,443.50 02.03

5,720.90 30%

28,575.04 02.02

70% 20,345.19 100%

25,667.82 01.06.05

20% 6,419.67

14,443.50

CIELORRASOS

100% 27,851.53

02.04 02.05 02.06 02.07 02.08 02.09 02.10 02.11

PISOS Y PAVIMENTOS

27,851.53 100%

25,192.07

25,192.07

1,972.09

1,972.09

2,484.94

2,484.94

1,028.50

1,028.50

17,195.79

17,195.79

9,307.83

2,792.35

13,789.33

6,894.67

CONTRAZOCALOS

100%

ZOCALOS

100%

REVESTIMIENTOS

100%

CUBIERTAS

100%

CARPINTERIA DE MADERA

30%

CARPINTERIA METALICA

50%

VIDRIOS, CRISTALES Y SIMILARES PINTURA 9,622.14

03

INSTALACIONES SANITARIAS

03.01

APARATOS Y ACCESORIOS SANITARIOS

50% 6,894.67 100%

14,770.62 02.12

70% 6,515.48

14,770.62 40%

60%

3,848.86

5,773.28 100%

1,700.50

1,700.50

4.3- CRONOGRAMA DE EJECUCION VALORIZADO Proyecto:

"MEJORAMIENTO Y AMPLIACION DE LA I.E. Nº 34030 DE LA COMUNIDAD CAMPESINA DE YURAJHUANCA DISTRITO DE SIMON BOLIVAR –PASCO-PASCO"

UBICACIÓN: LUGAR: YURAJHUANCA, DIST.: SIMO BOLIVAR, PROV. : PASCO, DPTO.: PASCO FECHA: PL AZO:

Sep-09 75 DIAS CALENDARIOS

DESCRIPCION

ITEM *********

1º MES

2º MES

3º MES

30 DIAS

30 DIAS

15 DIAS

MEJORAMIENTO Y AMPLIACION DE LA I E Nº 34030

04

INSTALACIONES ELECTRICAS

04.01

SISTEMA DE II.EE.

04.02

SUB-TOTAL

100% 3,431.20

3,431.20

2,305.40

2,305.40

ARTEFACTOS ELECTRICOS

04.03

100%

TABLERO DE DISTRIBUCION PARA CORRIENTE ALTERNA

04.04

100% 270.00

270.00

580.08

580.08

617.04

617.04

927.49

927.49

SISTEMA PUESTA A TIERRA

05

100%

SISTEMA DE DESAGUE

06

100%

SISTEMA DE AGUA FRIA Y CONTRA INCENDIO

07

100%

CANALIZACIONES Y/O TUBERIAS

100% 1,045.33

08

1,045.33

VARIOS

100% 595.40

09

595.40

MOBILIARIOS

100% 20,748.00

20,748.00 COSTO DIRECTO GASTOS GENERALES UTILIDAD

10.00% 10.00%

SUBTOTAL

19.00%

IGV

PRESUPUESTO DE OB RA

369,524.39 36,952.44 36,952.44 443,429.27 84251.56 527,680.83

AVANCE MENSUAL AVANCE ACUMULADO

*********

SUPERVISION DE OBRA

1.00

COSTO DE SUPERVISION DE OBRA

13,376.11

122,534.84 12,253.48 12,253.48 147,041.80 27,937.94 174,979.75

156,998.87 15,699.89 15,699.89 188,398.65 35,795.74 224,194.39

89,990.68 8,999.07 8,999.07 107,988.82 20,517.88 128,506.69

33.16 33.16

42.49 75.65

24.35 100.00

33.16%

42.49%

24.35%

4,435.52

5,683.51

3,257.08

Related Documents

Cronograma Valorizado
June 2020 5
Cronograma Valorizado
October 2019 14
Cronograma
May 2020 29
Cronograma
August 2019 56
Cronograma
June 2020 8