VME GROUP •
Mr V.Manickam – Chairman Known for his strong work ethic and result oriented vision has over the past 25 years led the VME group.
•
Mr M.Kannan joined the VME Group in 1998 and is an active member of the board who handles the administration and operations of the company with admirable ease.
•
Mr M.Karthik has been a member of the board since 1998 and has vast experience in executing various bridge projects undertaken by the VME group.
VME THROUGH THE YEARS
1986
VME Group was founded. One of the pioneers in mechanization of earthwork using excavators and other sophisticated equipment.
Ventured into building bridges for the Tamil Nadu State Highways based on Precast 1992 Technology. Won an accolade from World Bank team for quality and also speedy execution for the very first bridge. A bow string girder bridge at Katpadi for Southern Railways which won a National Award by the Indian Institute of Bridge Engineers. This bridge was completed in 1998 1998 where the entire span of 42 meters weighing 750 tons was cast separately and placed in position. Setup its own Ready mix concrete unit.
2008
Set up India’s First Completely Automated Precast Factory along with global associates VaBe and Elematic of Finland.
Diversified into Real Estate domain with VME Realty. 2010 Launched it First Project – Lakeside in August 2010 . The entire construction will be done using Precast Technology.
AN OUTSTANDING AWARD The group has over the last twenty five years focused on planning, execution and transfer of specialized projects in the field of construction like road over bridges, railway bridges and other prestigious highway projects.
AWARD WINNING PROJECT – MOST OUTSTANDING BRIDGE
ROB at Katpadi RailwayJunction for Southern Railway – Each Bowstring Girder of 42m span weighing 750 tons were cast and placed in position.
TESTIMONIES THAT HAVE STOOD THE TEST OF TIME Ekkaduthangal – Bridge across Adyar River, Chennai. 84 Precast prestressed beams were cast and placed in just 3 months in the year 1992.
Moorad Bridge – Railway Bridge in the back waters of Kerala. Special Sacrificial caisson were used for well foundation and each well weighing 300 Mt were placed in position after casting for the first time in Southern Railway.
TESTIMONIES THAT HAVE STOOD THE TEST OF TIME Palar River Project for Southern Railways.
This marvel in engineering was completed in 1998 in the short span of just 9 months using a Special launching girder. This rail bridge has 36 prestressed concrete box girders that are 20m long and its total length is 720 meters across the Palar River. Palakkarai Road Over- Bridge, Trichy for Tamil Nadu State Highways. Built in a congested area, this bridge has a total length of one km.The bridge has 10 spans of concrete box girder and reinforced earth retaining wall for approaches.
OUR PARTNERS Valkeakosken Betoni Oy One of the largest manufacturers and suppliers of precast elements in Finland. Valkeakosken Concrete Ltd was founded in 1993, in Finland, by Mr. Markku Lehtinen.
Equipment Supplier Elematic Oy Elematic is the leading supplier of precast concrete machinery and equipment worldwide and the only one-stop-supplier in the industry providing precasters on five continents for five decades.
FACTORY INAGURATION BY FINNISH AMBASSADOR – TERI HAKALA
VME PRECAST – FACILITY •
VME Precast uses cutting edge technology to create precast concrete elements which includes Hollow Core Slabs – for floor and roof slabs Wall Panels – for External, Internal and Sandwich panels Columns & Beams – for framed structures They are precisely cast in a controlled environment and properly cured.
•
Other products like Stair case, Water tanks, Boundary walls ,Gallery stands for stadiums and much more are also manufactured in our factory.
•
VME Precast is the only Precast factory in India offering a total building solution under one roof.
HOLLOW CORE SLABS Extruder – Hollow core slabs of varying depth are produced
HOLLOW CORE SLABS Transportation of Hollow Core Slabs
• • • • •
Longer spans and greater strengths of hollow core slabs is specially advantageous for long span buildings where unobstructed space is required. Grade of concrete used is M 60 HCS weigh 40 to 50 % less than conventional RCC slabs of the same dimensions. HCS are manufactured in 160, 200, 265mm thick as standard products. Annual Production capacity – 1,80,000 Sqm
HOLLOW CORE SLABS Hollow Core Slabs Stacked at Erection Site
HOLLOW CORE SLABS Erection of Hollow Core Slabs
HOLLOW CORE SLABS Erection of Hollow Core Slabs
HOLLOW CORE SLABS Erection of Hollow Core Slabs
HOLLOW CORE SLABS Hollow Core Slabs on Precast Beams
HOLLOW CORE SLABS TEST
2.5Mt
2.5Mt
265 mm thick Hollow Core Slab of 8m length is being tested by placing two blocks weighing 2.5Mt each. The slab was designed for 500kg/Sqm but the loading was 5 times more than the design load acting like a point load and the slab did not fail.
ADVANTAGES OF HOLLOW CORE SLABS • Longer span and greater loads than conventional slabs of same depth. • Longer span, meaning less beams and columns required which gives more unobstructed space and saving for the client. • Gives better heat insulation and also can be used for insulation by filling cool ambient air in the holes of HCS which reduces airconditioning requirement of a building by 30%. • Does not require any scaffolding at site and erection can be done in all weather condition. • Better fire resistance and many more…..
PRECAST PRODUCTION PLANT Columns & Beams Production Bay
COLUMNS & BEAMS •
VME has a long range of standardized beams using both normal reinforcement and High Tensile steel for pre stressing.
•
BEAM - Our standard cross sections include IB-beams, RB-beams, LB-beams, ITB-beams and special flat beams FB-beams. In all types it is possible to provide exposed reinforcement for composite structure.
•
COLUMN - VME produces standard rectangular RCC columns.
•
Annual Production capacity - 18,000 Rm of columns and beams can be produced.
PRECAST COLUMNS Columns Stacked At Erection Site.
COLUMNS & BEAMS Columns & Beams Transportation to site.
COLUMNS & BEAMS Columns & Beams Transportation to site.
COLUMNS & BEAMS Erection of Columns & Beams at site.
COLUMNS & BEAMS Erection of Columns & Beams at site.
COLUMNS & BEAMS Erection of Columns & Beams at site.
ADVANTAGES OF PRECAST COLUMN & BEAM • Using Precast beams and columns will save considerable cost and time as time-consuming shuttering and scaffolding are avoided. • Higher quality and more accurate compared to in-situ work. • Grade concrete used is M 45. • Precast columns and beams are fast to install, and does not require any storage space on site, as the units are generally erected directly from the trailer into its final position. • Using prestressed beams will enable large spans, which opens up waste areas inside the building.
WALL PANELS CIRCULATING TABLE MOULD – Wall Panels are produced using Circulating Table Mould. •
150mm thick load bearing walls and 100mm thick partition wall panels provide more floor space compared to conventional system of Brick walls of 200mm thick, columns and beam frames.
•
Electrical conduits and boxes are placed into the panels in the factory.
•
Low maintenance cost.
•
Higher durability compared to in-stu structures.
•
Grade of Concrete used is M 35-40.
•
Annual Production capacity - 1,80,000 Sqm.
PRECAST PRODUCTION OF WALL PANELS Wall Panel Tables Moulds
PRECAST PRODUCTION OF WALL PANELS Demoulding of Wall Panel.
PRECAST WALL PANEL Transportation of Precast Wall Panel.
PRECAST WALL PANEL Erection of Precast Wall Panel.
PRECAST WALL PANEL Erection of Precast Wall Panel.
PRECAST WALL PANEL Erection of Precast Wall Panel.
FINISHED WALL PANELS – LAKESIDE, CHENNAI . Lake Side Model flat.
FINISHED WALL PANELS – LAKESIDE, CHENNAI . Lake Side Model flat interior.
ADVANTAGES OF WALL PANELS • Wall panels can be customized to clients specification to achieve best building design. • Energy Saving - Sandwich Panels with insulation, the air-conditioning requirement of a building can be brought down by 30%.
• Panels with façades to enhance the aesthetics can be done. • All Electrical Conduits can be done inbuilt in the factory. • Windows can be prefixed on the panels. • Does not require plastering and very less putty is required.
PRECAST FOOTING FOR VILLA PROJECT
PRECAST FOOTING FOR VILLA PROJECT
ADVANTAGES OF PRECAST Quality Control In VME, the Precast Elements are produced in a controlled environment in a state-of-the-art plant. Hence the highest levels of quality control can be maintained as opposed to on-site pouring of concrete Strength Precast elements casted in the factory are of higher grade concrete mix proportions as compared to the conventional way of on-site construction. Weather Dependency Precast concrete elements are cured in the plant itself which cuts down the time required for curing and at the same time ensures proper effective curing. Dependency on the weather is also avoided as changes in the weather will not delay production or affect the erection schedule. Weather Resistance Unlike other precast materials that can rust, rot or degrade in the presence of moisture, precast concrete actually gets stronger if the un-hydrated cement particles in it react with water, thus making it completely water-resistant. Durability Using precast concrete elements improves construction quality and thus extends the life cycle of buildings. Corrosion & Fire Resistance Precast concrete is designed to withstand the most common corrosive agents. Most precast materials other than concrete and steel are flammable or do not perform well in high temperatures. In fact, even steel looses its structural capacity quickly which can lead a building to collapse. Precast concrete is one of the few non-combustible building materials which does not loose its structural capacity nearly as quickly as steel, and performs very well even in elevated temperatures.
ADVANTAGES OF PRECAST Insulation Precast Sandwich panels have an insulated membrane between two concrete layers which reduces huge heat transmission thus saving energy to a large extent. Water Tightness When precast concrete products are produced in a quality-controlled environment and used with high-quality sealants, it makes the finished product completely water-proof. Efficiency Precast technology saves up to 50% of construction time.
Environment friendly Precast technology contributes to best green building practice in a number of ways. Buildings made with precast sandwich panels can achieve anywhere between 30 to 40% savings in energy. Apart from this, less community disturbance also takes place as less dust, noise and waste are created at the construction site . Low Maintenance Precast concrete produces products of the highest quality, where stringent quality control measures are adopted so the usual post construction problems like leakage or cracks can be avoided. Seismic Buildings made with precast concrete elements have also got better resistance to seismic conditions. Aesthetics Precast concrete products can be given distinctive facades like marble, granite and brickwork.
QUALITY MANAGEMENT Certificate of ISO 14001 : 2004 & OHSAS 1800 : 2007 Standard.
PRECAST APPLICATION PARKS
SPORT ARENA
RESIDENTIAL BUILDINGS (HIGH RISE & LOW RISE)
INDUSTRIAL BUILDINGS
COMMERCIAL BUILDINGS
OTHER APPLICATIONS • WATER TANKS • STP • STAIRCASE
SUCCESSFULLY COMPLETED PROJECTS • • • • • • • • • • •
MAC Chidambaram Cricket Stadium, Chennai. Lanson Toyota Showroom, ECR, Chennai. Ten Square Shopping Mall, Koyambedu, Chennai. Chennai Silks, Mall, Tiruneveli. St Joseph Engineering College, Chennai. Khivraj Car Showroom Project, Chennai. Infosys, Chennai. SIEMENS – power project, Gujarat. ITC Cigarette Factory Extension Plant, Bangalore. TVS Motors – Warehouse, Hosur. Novotel Ibis Combo Hotel, Chennai.
MAC CRICKET STADIUM, CHENNAI •
CLIENT - Ganesan Builders, MAC cricket stadium.
•
6000 Rm of gallery steps.
•
Duration - 45days.
•
Highlight - In the original design rise and tread were designed as separate elements, to reduce the number of joints and to speed up the erection process alternate design was suggested by us to make two rise and tread together as one piece. Our design was accepted and we supplied the gallery steps within a short duration of 45days and the same was erected within the stipulated time before the world cup match.
•
CONTRACT VALUE – Rs 250 lacs.
MAC CRICKET STADIUM, CHENNAI
MAC CRICKET STADIUM, CHENNAI
LANSON TOYOTA CAR SHOWROOM, CHENNAI
• • • • •
CLIENT – LANSON TOYOTA, CHENNAI. TYPE – CAR SHOWROOM. AREA – 10,000sqft. DURATION - 45days (Sep 2010 to Oct 2010). HIGHLIGHT – Additional space of 10,000Sqft for the Existing building was done using precast. With very little space for crane movement keeping the existing building erection was successfully carried out. • VALUE – Rs 80lacs. • PRECAST WORK – 265mm Hollow core slabs of 8m long used as roof slabs, precast RCC Columns, Pre tensioned beams, precast staircase and some precast walls for stability.
LANSON TOYOTA CAR SHOWROOM, CHENNAI
LANSON TOYOTA CAR SHOWROOM, CHENNAI
TEN SQUARE MALL, CHENNAI • • • • •
CLIENT – TEN SQUARE. TYPE - Commercial building. LOCATION - Koyambedu - chennai, 50km from factory. Area – 1,25,000sqft (semi basement+4floors). DURATION – Completed cast in place foundation in 4months and precast erection in 4months (Nov 2010 to Feb 2010). • HIGHLIGHT - The area was low lying area and dewatering was a herculean task after heavy rains. Precast elements were cast during foundation works and kept read for erection. In erection also one side of the building there was no space for crane movements and all elements were erected from other side. With all difficulties the entire project was completed in a short span of 8 months. • VALUE – Rs. 800 lacs. • Precast Elements – 265mm Hollow core slabs of 10m long used as roof slabs, precast RCC Columns, Pre tensioned beams of 12m long, precast staircase and some precast walls for stability.
TEN SQUARE MALL, CHENNAI
TEN SQUARE MALL, CHENNAI
CHENNAI SILKS SHOWROOM, TIRUNELVELI. • • • • •
• •
CLIENT – CHENNAI SILKS TYPE - Commercial Building. LOCATION – Tirunelveli, 700km from factory. PROJECT SIZE - 140000sqft, semi basement + 8storey building. HIGHLIGHT – No setbacks on the sides were available for placing the cranes in the entire stretch of 100metre long building. Precast elements were erected from behind and marched forward. With only one crane the entire precast elements were erected in a short span of 5months. 10000Mt of precast elements were transported from factory to site (700Km). VALUE – Rs 1200lacs. PRECAST ELEMENTS – All elements except the foundation were in precast. 265mm Hollow Core Slabs as roof elements, Precast Sandwich wall panels with thermal insulation for all external walls, Precast lift core walls, Precast Staircase, Precast RCC Columns and Precast Pre-tensioned Beams.
CHENNAI SILKS SHOWROOM, TIRUNELVELI.
CHENNAI SILKS SHOWROOM, TIRUNELVELI.
CHENNAI SILKS SHOWROOM, TIRUNELVELI.
KHIVRAJ MOTORS – CAR SHOWROOM, CHENNAI. • • • • • • •
CLIENT – KHIVRAJ MOTORS. TYPE – Car Showroom Project. LOCATION – Perungudi, 50km from factory. PROJECT SIZE – 40,000sqft, Ground + 3 floors. HIGHLIGHT – Plinth Beams in the foundation are done in precast. VALUE – Rs 400lacs. PRECAST ELEMENTS – All elements except the foundation are in precast. 265mm Hollow Core Slabs as roof elements, Precast wall panels for all External & Internal walls, Precast lift core walls, Precast Staircase, Precast RCC Columns.
KHIVRAJ MOTORS – CAR SHOWROOM, CHENNAI.
KHIVRAJ MOTORS – CAR SHOWROOM, CHENNAI.
INFOSYS, CHENNAI
• CLIENT – INFOSYS, CHENNAI. • TYPE – Precast fins.
• LOCATION – Mahindra world city, 20km from factory • PROJECT SIZE – 70 Nos of Precast fins for elevation.
• VALUE – Rs 100lacs.
INFOSYS, CHENNAI
INFOSYS, CHENNAI
SIEMENS COOLING TOWER , GUJARAT
•
CLIENT – SIEMENS ENERGY.
•
TYPE – SUPPLY OF PRECAST COLUMN & BEAMS FOR COOLING TOWER – 4500 ELEMENTS.
•
LOCATION – DAHEJ, GUJARAT – 1800Kms.
•
VALUE – 1800 LACS.
SIEMENS COOLING TOWER , GUJARAT
SIEMENS COOLING TOWER , GUJARAT. From: Agarwal, Sanjay (E F ES SPEL EN CTEC) [mailto:
[email protected]] Sent: Saturday, August 25, 2012 9:41 AM
To: MANICKAM KARTHIK
Cc: Namboodripad, V. (E F ES SPEL EN CTEC); Maggo, Ajay (E F ES SPEL EPC BA); Vme Precast Shanker VP Shanker VP; kannan manickam; kishore-dgm - FINANCE - VME PRECAST PVT LTD; prabhu; Singh, Ashwani Kumar (E F ES SPEL EPC EN CTEC); Rajan, R-Sundar (E F ES SPEL EN)
Subject: RE: Draft SO-01 to M/s VME for Supply of Precast concrete elements for Additional 02nos. units (Unit 52URA & 53URA) Dear Mr. Karthik,
We have received an excellent feedback from our engineers during client (TEL & TCE) visit to your factory on 24-Aug.It was reported that factory production facilities and environment was excellent. All the quality related issues were demonstrated very well and it appears client was very much satisfied.I sincerely thank to the management of VME and entire team for their support and hard work. I hope VME will continue to demonstrate the same quality for the production of precast elements for 52 & 53 Units.Siemens will look forward for more business with VME in future as well. With best regards,
Sanjay Agarwal DGM - CIVIL
Siemens AG - Energy Sector
Fossil Power Generation Division
Energy Solutions
E F ES SPEL EN CE&PL
Siemens Power Engineering Pvt. Ltd.
Civil Engineering & Plant Layout
Plot No 78, JIL Building, Tower B, Sector 18, Gurgaon 122015 INDIA
Tel.: +91 124 284 2086
Mobil: +91 9899197613 mailto:
[email protected]
SIEMENS COOLING TOWER , GUJARAT Transportation of elements
SIEMENS COOLING TOWER , GUJARAT
SIEMENS COOLING TOWER , GUJARAT
SIEMENS COOLING TOWER , GUJARAT
SIEMENS COOLING TOWER , GUJARAT
SIEMENS COOLING TOWER , GUJARAT
SIEMENS COOLING TOWER , GUJARAT
ITC CIGARETTE FACTORY, BANGALORE • • • •
CLIENT – ITC LIMITED. TYPE – SUPPLY AND ERECTION OF PRECAST ELEMENTS. LOCATION – BANGALORE – 320 Kms. VALUE – 3000 LACS.
ITC CIGARETTE FACTORY, BANGALORE
ITC CIGARETTE FACTORY, BANGALORE
ITC CIGARETTE FACTORY, BANGALORE
TVS MOTORS FACTORY, HOSUR
• CLIENT – TVS MOTORS LIMITED. • TYPE – SUPPLY AND ERECTION OF PRECAST ELEMENTS FOR WAREHOUSE MAZZANINE FLOOR. • LOCATION – HOSUR – 285 Kms. • VALUE – 700 LACS.
TVS MOTORS FACTORY, HOSUR
TVS MOTORS FACTORY, HOSUR
TVS MOTORS FACTORY, HOSUR
TVS MOTORS FACTORY, HOSUR
TVS MOTORS FACTORY, HOSUR
NOVOTEL IBIS COMBO HOTEL, CHENNAI. • CLIENT – ACCOR, INTERGLOBE & PACIFICA PARTNERS. • TYPE – Total precast hotel project with two basement levels and 14 storey with a total building height of 60 meters. • LOCATION – Shollinganalur, OMR, Chennai. • PROJECT SIZE – 300000 Sqft. • VALUE – Rs 4000lacs.
NOVOTEL IBIS COMBO HOTEL, CHENNAI.
NOVOTEL IBIS COMBO HOTEL, CHENNAI. Precast retaining wall.
NOVOTEL IBIS COMBO HOTEL, CHENNAI. BASEMENT LEVEL
NOVOTEL IBIS COMBO HOTEL, CHENNAI.
NOVOTEL IBIS COMBO HOTEL, CHENNAI.
NOVOTEL IBIS COMBO HOTEL, CHENNAI.
NOVOTEL IBIS COMBO HOTEL, CHENNAI.
NOVOTEL IBIS COMBO HOTEL, CHENNAI. PRECAST CONCRETE STAIRCASE
NOVOTEL IBIS COMBO HOTEL, CHENNAI. SPLICE SLEEVE IN PRECAST CONCRETE COLOUMNS AND BEAMS
NOVOTEL IBIS COMBO HOTEL, CHENNAI.
NOVOTEL IBIS COMBO HOTEL, CHENNAI.
NOVOTEL IBIS COMBO HOTEL, CHENNAI.
NOVOTEL IBIS COMBO HOTEL, CHENNAI.
WE USE WHAT WE PROMOTE
• VME PRECAST FACTORY • TYPE – ALL PRECAST ELEMENTS – COLUMNS AND RUNWAY BEAMS. • LOCATION – CHENNAI. • VALUE – 1000 LACS.
WE USE WHAT WE PROMOTE VME factory
VME PRECAST FACTORY, CHENNAI
VME PRECAST FACTORY, CHENNAI
ON GOING PROJECTS • • • • •
VME Realty – Lakeside Residential Housing Project, Chennai. SRM Engineering, Hostel Bldg, Trichy. IL&S - Stadium, Trivandrum. Agricultural College – Indoor sports hall, Bapatla, AP. BEST IT Building, Guindy , Chennai.
LAKESIDE, CHENNAI Ongoing Project
• • • • •
CLIENT – VME REALTY. TYPE - Residential Building. LOCATION – Chembarambakkam, Chennai 30km from factory. PROJECT SIZE – 3,00,000sqft, Stilt + 4 floors. HIGHLIGHT – First Residential Project in India built completely in Precast. • VALUE – Rs 3000lacs. • PRECAST ELEMENTS – All elements except the foundation are in precast. 200mm Hollow Core Slabs as roof elements, Precast Sandwich wall panels with thermal insulation for all external walls, Precast lift core walls, Precast Staircase, Precast RCC Columns.
LAKESIDE, CHENNAI
LAKESIDE, CHENNAI
LAKESIDE, CHENNAI
LAKESIDE, CHENNAI
SRM UNIVERSITY, TRICHY Ongoing Project • CLIENT – SRM UNIVERSITY • TYPE - Hostel Building • LOCATION – Trichy, 300km from factory • PROJECT SIZE – 2,00,000sqft, Ground + 10 floors • HIGHLIGHT – First Hostel Project in India built completely in Precast. • VALUE – Rs 2000 lacs • PRECAST ELEMENTS – All elements except the foundation are in precast. 265mm Hollow Core Slabs as roof elements, Precast wall panels for all External & Internal walls, Precast lift core walls, Precast Staircase, Precast RCC Columns.
SRM UNIVERSITY, TRICHY
SRM UNIVERSITY, TRICHY
SRM UNIVERSITY, TRICHY
IL&FS – STADIIUM , TRIVANDRUM Ongoing Project
• • • •
CLIENT – IL&FS Township & Urban Assets Limited. TYPE – Supply and Erection of precast Raker Beams – 214 nos. LOCATION – Karyavattom, Trivandrum, Kerala. VALUE – Rs. 1000lacs.
IL&FS – STADIIUM , TRIVANDRUM Precast Raker Beams
IL&FS – STADIIUM , TRIVANDRUM Precast Raker Beams
IL&FS – STADIIUM , TRIVANDRUM Precast Raker Beams
IL&FS – STADIIUM , TRIVANDRUM Precast Raker Beams
IL&FS – STADIIUM , TRIVANDRUM Precast Raker Beams
Agricultural College , Indoor Sports Hall, Bapatla, A.P Ongoing Project • • • • •
CLIENT – Agricultural College – Indoor sports hall, Bapatla, AP TYPE – Total precast sports hall. LOCATION – Bapatla, A.P. PROJECT SIZE – 16,000 sq.ft VALUE – Rs 305lacs.
Agricultural College , Indoor Sports Hall, Bapatla, A.P
BEST IT BUILDING, Guindy, Chennai. Ongoing Project • • • • • • •
CLIENT – RRD Corporation Pvt Ltd, Tirupur. TYPE – IT Building. LOCATION – Guindy, industrial estate, Chennai. PROJECT SIZE – 73,000 sq.ft, Basement + Stilt+ 9 floors. VALUE – Rs 922 lacs. HIGHLIGHT – Precast wall as façade. PRECAST ELEMENTS – All elements except the foundation are in precast. Hollow Core Slabs as roof elements, Precast wall panels for all External & Internal walls, Precast lift core walls, Precast Staircase, Precast RCC Columns and Beams.
BEST IT BUILDING, Guindy, Chennai.
PRECAST STANDARD PRODUCTS • READY MADE STORAGE TANKS – 13500 lits & 7000 lits
• READY MADE CONTAINER HOUSES / OFFICE • READY MADE TOILETS – SINGLE & MULTIPLE
• TOILETS FOR MUNCIPALITY • GARBAGE COLLECTION BINS • FOOT OVER BRIDGES FOR RAILWAYS.
•INDCAST.
READY MADE STORAGE TANKS - AQUAFORT
13500 Litres
6000 Litres
Aquafort Instant Storage tanks come into use right from domestic to commercial and industrial purpose and are available in 13500 litres – 6000 litres capacity
STANDARD PRECAST HOME / OFFICE - DWELLO
STANDARD PRECAST TOILET
PRECAST GARBAGE COLLECTION BINS CUSTOM MADE – PRECAST GARBAGE COLLECTION BINS
PRECAST FOOT OVER BRIDGE CUSTOM MADE – FOOT OVER BRIDGE FOR RAILWAYS