LAPORAN MANAJEMEN PROYEK SURVEY LAPANGAN (TUGAS KELOMPOK)

DOSEN PEMBIMBING : CUT ELISA FARAHDILA M.Sc DISUSUN OLEH : RIZKI YAUMUS SHAFAR RAHMAD KHADAFI HABIB FAJRI AL HADDAD ARRIJAL FADHILUR RAHMAN M.ARIFIN MUHAMMAD FURQAN JURUSAN ARSITEKTUR

UNIVERSITAS ISLAM NEGERI AR-RANIRY BANDA ACEH SEMESTER GANJIL 2018

PERTANYAAN YANG DIAJUKAN : 1. KONTRAK DIMULAI TANGGAL BERAPA? 2. MULAI KERJA KAPAN? 3. JADWAL PELELANGAN KAPAN? 4. PROSES LELANG MELALUI APA? 5. SUMBER DANA DARIMANA? 6. KENDALA PADA PEKERJAAN APA SAJA? 7. JUMALAH PEKERJA DAN TUKANG BERAPA? 8. SISTEM KERJA BAGAIMANA? 9. SISTEM UPAH SEPERTI APA? 10. PERNAH TERJADI KECELAKAAN KERJA? 11. APA

ADA

PERUSAHAAN

LAIN

YANG

MEN-SUBKON

PEKERJAAN? 12. KUALITAS BETON? 13. PROGRESS BERAPA PERSEN? 14. DEVIASI BERAPA PERSEN? JAWABAN: 1. KONTRAK 18 MEI 2018 2. MULAI KERJA 25 MEI 2018 3. MARET 2018 4. MELALUI LPSE KEMENAG 5. APBN SBSN 6. KENDALA INTERNAL TUKANG DAN KESULITAN PEMBUATAN PONDASI 7. PEKERJA 150 ORANG DAN TUKAN 30 ORANG DIBIDANG MASING MASING 8. KERJA HANYA PADA SIANG HARI TANPA SHIFT 9. UPAH DIBAYAR MINGGUAN 10. PERNAH, PIHAK KONSULTANT PENGAWAS TERKENA ALAT BERAT, LUKA DIBAGIAN MULUT

11. ADA,

PEKERJAAN

IPAL

DAN

PEKERJAAN

MEKANIKAL

ELEKTRIKAL, HARUS DIKERJAKAN TIM AHLI 12. KUALITAS BETON K300, SUDAH TERUJI DI LAB UNSYIAH 13. PROGRESS HINGGA SAAT INI BARU 60% 14. DEVIASI PADA PROYEK -8%