I. PEKERJAAN PERSIAPAN KOMPONEN

SATUAN

PERKIRAAN KUANTITAS

HARGA SATUAN Rp

Btg Kg M3 M3 M3 Kg Kg

1.250 2.500 0.005 0.009 0.072 0.060 0.450

Rp11,550 Rp565 Rp75,000 Rp77,500 Rp11,550 Rp7,333 Rp12,320

Oh Oh Oh Oh

0.200 0.400 0.020 0.020

Rp30,000 Rp25,000 Rp31,500 Rp35,000

Btg Kg Lbr M3 M3 M3 Kg Kg

1.250 2.500 1.200 0.005 0.009 0.072 0.060 0.450

Rp11,550 Rp565

Oh Oh Oh Oh

0.200 0.400 0.020 0.020

Rp30,000 Rp25,000 Rp31,500 Rp35,000

1.1. 1 M' Pagar sementara dari kayu tinggi 2 meter BAHAN Dolken kayu Ø 8-10/400cm Semen portland Pasir beton Koral beton Kayu 5/7 Paku biasa 2"-5" Residu JUMLAH HARGA BAHAN TENAGA Tukang kayu Pekerja Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 1.2. 1 M' Pagar sementara dari seng tinggi 2 meter BAHAN Dolken kayu Ø 8-10/400cm Semen portland Seng gelombang 3" - 5" Pasir beton Koral beton Kayu 5/7 Paku biasa 2"-5" Meni Besi

Rp75,000 Rp77,500 Rp11,550 Rp7,333 Rp12,320

JUMLAH HARGA BAHAN TENAGA Tukang kayu Pekerja Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 1.2. 1 M' Pagar sementara dari kawat duri tinggi 1,8 meter

BAHAN Dolken kayu Ø 8-10/400cm Semen portland Kawat duri Pasir beton Koral beton Paku biasa 2"-5"

Btg Kg Kg M3 M3 Kg

1.000 2.000 25.000 0.005 0.009 0.060

Rp11,550 Rp565

Oh Oh Oh Oh

0.200 0.300 0.020 0.020

Rp30,000 Rp25,000 Rp31,500 Rp35,000

M3 Kg M3

0.012 0.020 0.007

Rp11,550 #REF! Rp1,500,000

Oh Oh Oh Oh

0.100 0.100 0.010 0.005

#REF! #REF! #REF! #REF!

1.250 0.180 0.850 1.100 35.000 0.150 0.100 0.150 30.000 0.250 2.000 0.080

Rp565 RpRp1,500,000

Rp75,000 Rp77,500 Rp7,333

JUMLAH HARGA BAHAN TENAGA Tukang kayu Pekerja Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 1.5. 1 M' Pengukuran dan Pemasangan Bowplank BAHAN Kayu 5/7 Paku biasa 2"-5" Kayu papan 3/20 JUMLAH HARGA BAHAN TENAGA Tukang kayu Pekerja Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

1.5. 1 M' Pembuatan kantor sementara, dengan lantai plesteran BAHAN Dolken kayu Ø 8-10/400cm Kayu Kayu biasa Besi strip Semen Portland Pasir pasang Pasir beton Koral beton Bata merah Seng plat Jendela nako Kaca polos

Btg M3 Kg Kg Kg M3 M3 M3 Bh Lbr Bh M2

Kunci tanam Plywood 4 mm

Bh Lmb

0.150 0.060

Oh Oh Oh Oh Oh

2.000 1.000 2.000 0.300 0.050

#REF!

Btg M3 Kg Kg M3 M3 Lbr

1.700 0.210 0.300 0.500 0.030 0.050 1.500

RpRpRp1,500,000

Oh Oh Oh Oh

2.000 2.000 0.200 0.050

#REF! RpRpRp-

Btg M3 Kg Lbr

3.000 0.276 0.700 1.500

#REF! RpRp1,500,000

Oh Oh Oh Oh

1.500 1.000 0.150 0.050

#REF! #REF! #REF! #REF!

JUMLAH HARGA BAHAN TENAGA Tukang kayu Tukang batu Pekerja Kepala tukang Mandor

#REF! RpRp-

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 1.3. 1 M2 Pembuatan gudang semen dan alat-alat BAHAN Dolken kayu Ø 8-10/400cm Kayu Paku biasa Semen Portland Pasir beton Koral beton Seng gelombang bljs 32 JUMLAH HARGA BAHAN TENAGA Tukang kayu Pekerja Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 1.4. 1 M2 Pembuatan rumah jaga/konstruksi kayu BAHAN Dolken kayu Ø 8-10/400cm Kayu Paku biasa Seng gelombang bljs 32 JUMLAH HARGA BAHAN TENAGA Tukang kayu Pekerja Kepala tukang Mandor

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 1.6. 1 M2 Membersihkan lapangan dan perataan TENAGA Pekerja Mandor

Oh Oh

0.100 0.050

#REF! #REF!

Btg M3 Kg Kg M3 M3 Lbr Lbr

1.250 0.186 0.300 18.000 0.030 0.050 1.500 1.350

RpRpRp1,500,000

Oh Oh Oh Oh

2.000 1.000 0.200 0.050

RpRpRpRp-

M3 Kg Btg

0.036 0.800 1.000

RpRpRp1,500,000

Oh Oh

0.300 0.0015

RpRp-

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 1.7. 1 M2 PEMBUATAN BEDENG BURUH BAHAN Dolken kayu Ø 8-10/400cm Kayu Paku biasa Semen Portland Pasir beton Koral beton Seng gelombang bljs 32 Plywood 4 mm JUMLAH HARGA BAHAN TENAGA Tukang kayu Pekerja Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 1.7. 1 M2 PEMBUATAN bak adukan ukuran (40 x 50 x 20) cm BAHAN Kayu terentang Paku biasa Kaso 5/7 JUMLAH HARGA BAHAN TENAGA Tukang kayu Mandor JUMLAH HARGA TENAGA

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 1.7. 1 M2 PEMBUATAN stegger dari bambu, ukuran (40 x 50 x 20) BAHAN Bambu O 6-8/600 cm Tali ijuk

M3 Kg

1.000 0.250

#REF! Rp-

Oh Oh Oh Oh

0.017 0.002 0.250 0.0130

RpRpRpRp-

M3 M3 M3

0.150 0.090 0.010

Rp70,000 Rp65,000 #REF!

Oh Oh

1.000 0.050

#REF! #REF!

Oh Oh

6.667 0.3330

RpRp-

JUMLAH HARGA BAHAN TENAGA Tukang kayu Kepala tukang Pekerja Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

1.8. 1 M2 PEMBUATAN JALAN SEMENTARA BAHAN Batu belah 15/20 Batu pecah 5/7 Pasir pasang JUMLAH HARGA BAHAN TENAGA Pekerja Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 1.7. 1 M3 bongkaran beton bertulang TENAGA Pekerja Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 1.7. 1 M3 bongkaran dinding tembok bata merah TENAGA

Pekerja Mandor

Oh Oh

6.667 0.3330

RpRp-

Lbr

0.434

Rp70,000

Oh Oh Oh Oh

0.042 0.004 0.042 0.0020

Rp-

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 1.7. 1 M Pasang pagar kawat jaring galvanis, tinggi 1,00 m BAHAN Pagar kawat jaring JUMLAH HARGA BAHAN TENAGA Pekerja Kepala tukang Tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

Rp-

JUMLAH HARGA Rp

Rp14,438 Rp1,413 Rp375 Rp698 Rp832 Rp440 Rp5,544 Rp23,738

Rp6,000 Rp10,000 Rp630 Rp700 Rp700 Rp24,438 Rp2,444 Rp26,882

Rp14,438 Rp1,413 Rp375 Rp698 Rp832 Rp440 Rp5,544 Rp23,738

Rp6,000 Rp10,000 Rp630 Rp700 RpRp23,738 Rp2,374 Rp26,112

Rp11,550 Rp1,130 Rp375 Rp698 Rp440 Rp14,193

Rp6,000 Rp7,500 Rp630 Rp700 RpRp14,193 Rp1,419 Rp15,612

Rp139 #REF! Rp10,500 #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Rp706 RpRp1,275,000

#REF!

#REF! #REF! RpRp#REF! #REF! #REF! #REF!

RpRpRp450,000

#REF!

#REF! RpRpRp#REF! #REF! #REF! #REF!

#REF! RpRp1,050,000

#REF!

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

RpRpRp27,000,000

Rp-

RpRpRpRpRpRpRpRp-

RpRp#REF! Rp-

RpRpRp-

RpRpRp-

#REF! RpRp-

RpRpRpRpRpRpRpRp-

Rp10,500 Rp5,850 #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

RpRpRp#REF! #REF! #REF!

RpRpRp#REF! #REF! #REF!

Rp30,380 Rp-

Rp-

RpRp#REF! #REF! #REF!

II. PEKERJAAN GALIAN DAN URUGAN TANAH KOMPONEN

SATUAN

PERKIRAAN KUANTITAS

HARGA SATUAN Rp

JUMLAH HARGA Rp

Rp25,000

Rp10,000

Rp35,000

Rp1,400

2.1. 1 M3 GALIAN TANAH BIASA SEDALAM 1 METER TENAGA Pekerja Tukang gali Kepala tukang Mandor

Oh Oh Oh Oh

0.400 0.040

JUMLAH HARGA TENAGA

Rp11,400

JUMLAH HARGA TENAGA OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

Rp11,400 Rp1,140 Rp12,540

2.2. 1 M3 GALIAN TANAH BIASA SEDALAM 2 METER TENAGA Pekerja Tukang gali Kepala tukang Mandor

Oh Oh Oh Oh

0.526 0.052

Rp565

Rp297

Rp75,000

Rp3,900

JUMLAH HARGA TENAGA

Rp4,197

JUMLAH HARGA TENAGA OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

Rp15,597 Rp1,560 Rp17,157

2.3. 1 M3 GALIAN TANAH BIASA SEDALAM 3 METER TENAGA Pekerja Tukang gali Kepala tukang Mandor

Oh Oh Oh Oh

0.735 0.073

Rp35,000

Rp25,725

Rp-

Rp-

JUMLAH HARGA TENAGA

Rp25,725

JUMLAH HARGA TENAGA OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

Rp41,322 Rp4,132 Rp45,454

2.4. 1 M3 GALIAN TANAH KERAS SEDALAM 1 METER TENAGA Pekerja Tukang gali

Oh Oh

0.625 -

Rp75,000

Rp46,875

Kepala tukang Mandor

Oh Oh

0.062

Rp7,333

Rp455

JUMLAH HARGA TENAGA

Rp47,330

JUMLAH HARGA TENAGA OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

Rp88,652 Rp8,865 Rp97,517

2.5. 1 M3 GALIAN TANAH CADAS SEDALAM 1 METER TENAGA Pekerja Tukang gali Kepala tukang Mandor

Oh Oh Oh Oh

1.250 0.125

Rp-

Rp-

Rp-

Rp-

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

Rp88,652 Rp8,865 Rp97,517

2.6. 1 M3 GALIAN TANAH LUMPUR SEDALAM 1 METER TENAGA Pekerja Tukang gali Kepala tukang Mandor

Oh Oh Oh Oh

0.823 0.083

#REF!

#REF!

#REF!

#REF!

JUMLAH HARGA TENAGA

#REF!

JUMLAH HARGA TENAGA OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

#REF! #REF! #REF!

2.7. 1 M3 PEKERJAAN STRIPPING SETINGGI 1 METER TENAGA Pekerja Tukang gali Kepala tukang Mandor

Oh Oh Oh Oh

0.050 0.005

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 2.8. 1 M3 PEMBUANGAN TANAH SEJAUH 150 METER

Rp-

Rp-

Rp-

RpRp#REF! #REF! #REF!

TENAGA Pekerja Tukang gali Kepala tukang Mandor

Oh Oh Oh Oh

0.516 0.050

Rp-

Rp-

Rp-

Rp-

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

#REF! #REF! #REF!

2.9. 1 M3 URUGAN KEMBALI TENAGA Pekerja Tukang gali Kepala tukang Mandor

Oh Oh Oh Oh

0.192 0.019

Rp-

Rp-

Rp-

Rp-

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

#REF! #REF! #REF!

2.11. 1 M3 PEMADATAN TANAH TENAGA Pekerja Tukang gali Kepala tukang Mandor

Oh Oh Oh Oh

0.500 0.050

Rp-

Rp-

Rp-

Rp-

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

#REF! #REF! #REF!

2.12. 1 M3 URUGAN PASIR BAHAN Pasir urug

M3

1.200

Rp50,000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang gali Kepala tukang

Rp60,000 Rp450,000

Oh Oh Oh

0.300 -

Rp1,500,000

Rp450,000

Mandor

Oh

0.100

Rp-

Rp-

JUMLAH HARGA TENAGA

Rp450,000

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

Rp450,000 Rp45,000 Rp495,000

2.13. 1 M3 LAPISAN PUDEL CAMPURAN 1 Kp : 3 Ps : 7 TL BAHAN Pasir urug Kapur padam Tanah liat

M3 M3 M3

0.330 0.109 0.763

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala Tukang Mandor

Rp-

Oh Oh Oh Oh

0.833 0.416 0.040 0.083

Rp-

Rp-

Rp-

Rp-

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

2.14. 1 M3 LAPISAN PUDEL CAMPURAN 1 Kp : 5 TL BAHAN Kapur padam Tanah liat

M3 M3

0.200 1.000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.833 0.416 0.040 0.081

Rp-

Rp-

Rp-

Rp-

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

2.15. 1 M3 PEMASANGAN LAPISAN IJUK

BAHAN Ijuk

M3

1.200

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang gali Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.150 0.015

Rp-

Rp-

Rp-

Rp-

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

2.17. 1 M3 URUGAN SIRTU BAHAN Sirtu

M3

1.200

Rp-

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang gali Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.250 0.025

Rp-

Rp-

Rp-

Rp-

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

2.18. 1 M3 PEMBUATAN JALAN SEMENTARA TEBAL 25 CM BAHAN Batu belah Kerikil Pasir

M3 M3 M3

0.275 0.030 0.050

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang gali Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

1.000 0.100

Rp-

Rp-

Rp-

Rp-

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

III. PEKERJAAN PONDASI 3.1. PONDASI BATU KALI 1 PC:1 PS BAHAN Batu belah 15/20 cm Semen portland Pasir pasang

M3 Kg M3

1.100 392.000 0.314

Rp65,000 Rp565 Rp70,000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp314,960

Oh Oh Oh Oh

1.500 0.600 0.060 0.075

Rp25,000 Rp27,500 Rp31,500 Rp35,000

JUMLAH HARGA TENAGA

Rp317,585 Rp31,759 Rp349,344

M3 Kg M3

1.100 267.000 0.427

Rp65,000 Rp565 Rp70,000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp37,500 Rp16,500 Rp1,890 Rp2,625 Rp2,625

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 3.2. PONDASI BATU KALI 1 PC:2 PS BAHAN Batu belah 15/20 cm Semen portland Pasir pasang

Rp71,500 Rp221,480 Rp21,980

Rp71,500 Rp150,855 Rp29,890 Rp252,245

Oh Oh Oh Oh

1.500 0.600 0.060 0.075

Rp35,000 Rp25,000 Rp31,500 Rp27,500

Rp52,500 Rp15,000 Rp1,890 Rp2,063

JUMLAH HARGA TENAGA

Rp71,453

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

Rp323,698 Rp32,370 Rp356,067

3.3. PONDASI BATU KALI 1 PC:2,5 PS BAHAN Batu belah 15/20 cm Semen portland Pasir pasang

M3 Kg M3

1.100 392.000 0.314

Oh

1.500

JUMLAH HARGA BAHAN TENAGA Pekerja

Rp-

Tukang batu Kepala tukang Mandor

Oh Oh Oh

0.600 0.060 0.075

JUMLAH HARGA TENAGA

RpRpRpRp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 3.4. PONDASI BATU KALI 1 PC:3 PS BAHAN Batu belah 15/20 cm Semen portland Pasir pasang

M3 Kg M3

1.100 202.000 0.485

Oh Oh Oh Oh

1.500 0.600 0.060 0.075

M3 Kg M3

1.100 163.000 0.520

Oh Oh Oh Oh

1.500 0.600 0.060 0.075

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 3.5. PONDASI BATU KALI 1 PC:4 PS BAHAN Batu belah 15/20 cm Semen portland Pasir pasang JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 3.6. PONDASI BATU KALI 1 PC:5 PS BAHAN

RpRpRpRp-

Batu belah 15/20 cm Semen portland Pasir pasang

M3 Kg M3

1.100 136.000 0.544

Oh Oh Oh Oh

1.500 0.600 0.060 0.075

M3 Kg M3

1.100 117.000 0.561

Oh Oh Oh Oh

1.500 0.600 0.060 0.075

M3 Kg M3

1.100 91.000 0.561

Oh Oh Oh Oh

1.500 0.600 0.060 0.075

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 3.7. PONDASI BATU KALI 1 PC:6 PS BAHAN Batu belah 15/20 cm Semen portland Pasir pasang JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 3.8. PONDASI BATU KALI 1 PC:8 PS BAHAN Batu belah 15/20 cm Semen portland Pasir pasang JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 3.9. PONDASI BATU KALI 1 KP:1 SM:1 PS BAHAN Batu belah 15/20 cm M3 Kapur pasang Kg Semen merah M3 Pasir pasang M3

1.100 0.229 0.229 0.544

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

1.500 0.600 0.060 0.075

3.10. PONDASI BATU KALI 1 KP:1 SM: 2 PS BAHAN Batu belah 15/20 cm M3 Kapur pasang Kg Semen merah M3 Pasir pasang M3

1.100 0.170 0.170 0.340

JUMLAH HARGA TENAGA

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

1.500 0.600 0.060 0.075

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 3.11. PONDASI BATU KALI 1 PC: 1/4 KP: 4 PS BAHAN Batu belah 15/20 cm M3 Semen portland Kg

1.100 156.000

Kapur pasang Pasir pasang

M3 M3

0.032 0.584

Oh Oh Oh Oh

1.500 0.600 0.060 0.075

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 3.12. PONDASI BATU KALI 1 PC:3 KP : 10 PS BAHAN Batu belah 15/20 cm M3 Semen portland Kg Kapur pasang M3 Pasir pasang M3

1.100 61.000 0.147 0.492

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

1.500 0.600 0.060 0.075

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 3.13. PONDASI BATU KALI 1/4 PC: 1 KP : 4 PS BAHAN Batu belah 15/20 cm M3 Semen portland Kg Kapur pasang M3 Pasir pasang M3

1.100 41.000 0.131 0.523

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

1.500 0.600 0.060 0.075

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 3.14. PONDASI BATU KOSONG BAHAN Batu belah 15/20 cm Pasir urug

M3 M3

1.200 0.300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Rp-

Oh Oh Oh Oh

0.780 0.390 0.039 0.039

RpRpRpRp-

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

3.15. PONDASI SIKLOP 40 % BATU KALI BAHAN Besi beton Kg Semen portland Kg Pasir beton M3 Koral beton M3 Kawat beton Kg

75.000 202.000 0.320 0.490 0.800

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

3.000 0.850 0.085 0.150

M3 Kg

0.450 280.000

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 3.16. PONDASI SUMURAN D=100 CM BAHAN Batu belah 15/20 cm Semen portland

Pasir beton Koral beton

M3 M3

0.450 0.670

Oh Oh Oh Oh

2.380 0.300 0.030 0.080

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 3.17. PEMBUATAN TIANG PANCANG 40X40 CM, BETON BERTULANG BAHAN Pasir urug darat M3 0.019 Pasir beton M3 0.094 Koral beton M3 0.150 Semen portland Kg 60.500 Besi beton Kg 45.000 Kawat beton Kg 0.900 Kayu kaso 5/7 M3 0.032 Paku Kg 0.120 Minyak bekisting Lt 0.090 Plamuur tembok Kg 0.240 JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

1.000 0.670 0.067 0.050

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 3.18. PEMBUATAN TIANG PANCANG 35X35 CM, BETON BERTULANG BAHAN Pasir urug darat M3 0.016 Pasir beton M3 0.080 Koral beton M3 0.125 Semen portland Kg 49.000 Besi beton Kg 34.500 Kawat beton Kg 0.700

RpRpRpRpRpRp-

Kayu kaso 5/7 Paku Minyak bekisting Plamuur tembok

M3 Kg Lt Kg

0.027 0.120 0.090 0.200

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

RpRpRpRpRp-

Oh Oh Oh Oh

0.800 0.500 0.050 0.040

RpRpRpRp-

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

3.19. PEMBUATAN POER (KEPALA TIANG PANCANG) TENAGA Mandor Oh 0.165 Pekerja Oh 3.900 Kepala tukang Oh 0.245 Tukang batu Oh 0.350 Tukang kayu Oh 1.040 Tukang besi Oh 1.050

RpRpRpRpRpRp-

JUMLAH HARGA TENAGA

Rp-

BAHAN Kayu terentang Pasir beton Koral beton Semen portland Besi beton Kawat beton Paku Minyak bekisting

M3 M3 M3 Kg Kg Kg Kg Lt

0.200 0.520 0.780 323.000 150.000 2.250 1.500 0.400

RpRpRpRpRpRpRpRp-

JUMLAH HARGA BAHAN

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

IV. PEKERJAAN DINDING KOMPONEN

SATUAN

PERKIRAAN KUANTITAS

HARGA SATUAN Rp

JUMLAH HARGA Rp

4.1. 1 M2 PAS. BATA MERAH 1 BATA, 1 PC : 1 PS JUMLAH HARGA TENAGA BAHAN Bata merah 5x11x12 Semen portland Pasir pasang

Rp-

Bh Kg M3

140.0000 64.0300 0.0590

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.6500 0.2000 0.0200 0.0300

RpRpRpRp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

4.2. 1 M2 PAS. BATA MERAH 1 BATA, 1 PC : 2 PS JUMLAH HARGA TENAGA BAHAN Bata merah 5x11x12 Semen portland Pasir pasang

Rp-

Bh Kg M3

140.0000 43.5000 0.0800

#REF! Rp565 #REF!

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.6500 0.2000 0.0200 0.0300

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRpRp-

RpRpRpRpRpRpRp-

4.3. 1 M2 PAS. BATA MERAH 1 BATA, 1 PC : 3 PS BAHAN Bata merah 5x11x12 Semen portland

#REF! Rp24,578 #REF!

Bh Kg

140.0000 32.9500

Pasir pasang

M3

0.0910

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.6500 0.2000 0.0200 0.0300

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

4.4. 1 M2 PAS. BATA MERAH 1 BATA, 1 PC : 4 PS BAHAN Bata merah 5x11x12 Semen portland Pasir pasang

Bh Kg M3

140.0000 26.5500 0.0930

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.6500 0.2000 0.0200 0.0300

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

4.5. 1 M2 PAS. BATA MERAH 1 BATA, 1 PC : 5 PS BAHAN Bata merah 5x11x12 Semen portland Pasir pasang

Bh Kg M3

140.0000 22.2000 0.1020

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.6500 0.2000 0.0200 0.0300

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

4.6. 1 M2 PAS. BATA MERAH 1 BATA, 1 PC : 6 PS BAHAN Bata merah 5x11x12 Semen portland Pasir pasang

Bh Kg M3

140.0000 22.2000 0.1020

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.6500 0.2000 0.0200 0.0300

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

#REF! #REF! #REF!

4.7. 1 M2 PAS. BATA MERAH 1 BATA, 1 PC : 3 KP : 10 PS BAHAN Bata merah 5x11x12 Semen portland Pasir pasang Kapur pasang

Bh Kg M3 M3

140.0000 10.0800 0.0925 0.0275

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.6500 0.2000 0.0200 0.0300

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

4.8. 1 M2 PAS. BATA MERAH 1/2 BATA, 1 PC : 1 PS BAHAN

Bata merah 5x11x12 Semen portland Pasir pasang

Bh Kg M3

70.0000 27.8000 0.0280

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.3200 0.1000 0.0100 0.0150

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

4.9. 1 M2 PAS. BATA MERAH 1/2 BATA, 1 PC : 2 PS BAHAN Bata merah 5x11x12 Semen portland Pasir pasang

Bh Kg M3

70.0000 18.9500 0.0380

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.3200 0.1000 0.0100 0.0150

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

4.10. 1 M2 PAS. BATA MERAH 1/2 BATA, 1 PC : 3 PS BAHAN Bata merah 5x11x12 Semen portland Pasir pasang

Bh Kg M3

70.0000 14.3700 0.0400

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang

RpRpRpRp-

Oh Oh Oh

0.3200 0.1000 0.0100

RpRpRp-

Mandor

Oh

0.0150

Rp-

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

4.11. 1 M2 PAS. BATA MERAH 1/2 BATA, 1 PC : 4 PS BAHAN Bata merah 5x11x12 Semen portland Pasir pasang

Bh Kg M3

70.0000 11.5000 0.0430

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.3200 0.1000 0.0100 0.0150

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

4.12. 1 M2 PAS. BATA MERAH 1/2 BATA, 1 PC : 5 PS BAHAN Bata merah 5x11x12 Semen portland Pasir pasang

Bh Kg M3

70.0000 9.6800 0.0450

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

RpRpRpRp-

Oh Oh Oh Oh

0.3200 0.1000 0.0100 0.0150

RpRpRpRp-

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

4.13. 1 M2 PAS. BATA MERAH 1/2 BATA, 1 PC : 6 PS

BAHAN Bata merah 5x11x12 Semen portland Pasir pasang

Bh Kg M3

70.0000 8.3200 0.0490

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.3200 0.1000 0.0100 0.0150

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

4.14. 1 M2 PAS. BATA MERAH 1/2 BATA, 1 PC : 8 PS BAHAN Bata merah 5x11x12 Semen portland Pasir pasang

Bh Kg M3

70.0000 6.5000 0.0500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.3200 0.1000 0.0100 0.0150

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

4.15. 1 M2 PAS. BATA MERAH 1/2 BATA, 1 PC : 3 KP: 10 PS BAHAN Bata merah 5x11x12 Semen portland Pasir pasang Kapur padam

Bh Kg M3 M3

70.0000 4.5000 0.0500 0.0150

JUMLAH HARGA BAHAN TENAGA Pekerja

Rp-

Oh

0.3200

Tukang batu Kepala tukang Mandor

Oh Oh Oh

0.1000 0.0100 0.0150

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

4.16. 1 M2 PAS. BATA MERAH 1/2 BATA, 1 KP : 1 SM : 1 PS BAHAN Bata merah 5x11x12 Semen merah/bata merah tumbuk Pasir pasang Kapur padam

Bh Kg M3 M3

70.0000 0.0180 0.0180 0.0180

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.3200 0.1000 0.0100 0.0150

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

4.17. 1 M2 PAS. BATA MERAH 1/2 BATA, 1 KP : 1 SM : 2 PS BAHAN Bata merah 5x11x12 Semen merah Pasir pasang Kapur padam

Bh Kg M3 M3

70.0000 0.0140 0.0280 0.0140

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.3200 0.1000 0.0100 0.0150

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT

RpRp-

HARGA SATUAN PEKERJAAN

Rp-

4.17. 1 M2 PAS. Dinding hollowblock (HB. 20) BAHAN Hollow block (HB. 20) Semen portland Pasir pasang Besi beton polos

Bh Kg M3 Kg

12.5000 13.5000 0.0480 1.9500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.3500 0.1500 0.0150 0.0170

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

4.17. 1 M2 PAS. Dinding hollowblock (HB. 15 BAHAN Hollow block (HB. 15) Semen portland Pasir pasang Besi beton polos

Bh Kg M3 Kg

12.5000 10.4500 0.0380 1.9500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.3200 0.1200 0.0120 0.0150

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

4.17. 1 M2 PAS. Dinding hollowblock (HB. 10) BAHAN Hollow block (HB. 10) Semen portland Pasir pasang

Bh Kg M3

12.5000 7.5000 0.0270

Besi beton polos

Kg

1.9500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.3200 0.1000 0.0100 0.0150

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

4.17. 1 M2 PAS. Dinding conblock (CB. 20) BAHAN Concrete block (CB 20) Semen portland Pasir beton Pasir pasang Besi beton polos Paku biasa 2"-5" Kayu terentang Kawat beton Koral beton

Bh Kg M3 M3 Kg Kg Kg Kg Kg

12.5000 14.0500 0.0040 0.0420 3.8700 0.0060 0.0010 0.0300 0.0050

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Tukang besi Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.3700 0.1570 0.0070 0.0164 0.0185

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

4.17. 1 M2 PAS. Dinding conblock (CB. 15) BAHAN Concrete block (CB 15) Semen portland

Bh Kg

12.5000 10.4600

Pasir beton Pasir pasang Besi beton polos O 8mm Paku biasa 2"-5" Kayu terentang Kawat beton Koral beton

M3 M3 Kg Kg Kg Kg Kg

0.0030 0.0320 0.8700 0.0040 0.0010 0.0200 0.0040

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Tukang besi Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.3400 0.1300 0.0070 0.0137 0.0170

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

4.17. 1 M2 PAS. Dinding conblock (CB. 10 BAHAN Concrete block (CB 10) Semen portland Pasir beton Pasir pasang Besi beton polos Paku biasa 2"-5" Kayu terentang Kawat beton Koral beton

Bh Kg M3 M3 Kg Kg Kg Kg Kg

12.5000 7.2000 0.0020 0.0210 2.5400 0.0030 0.0010 0.0150 0.0030

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Tukang besi Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.3400 0.1070 0.0070 0.0114 0.0170

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN

Rp-

OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRp-

4.17. 1 M2 PAS. Dinding latai BAHAN Bondbeam 40x20x20 cm Semen portland Pasir beton Besi beton polos Koral beton

Bh Kg M3 Kg Kg

2.5000 5.1000 0.0800 1.5000 0.1500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Tukang besi Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.1000 0.0300 0.0300 0.0060 0.0050

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

V. PEKERJAAN PLESTERAN KOMPONEN

SATUAN

1

2

PERKIRAAN KUANTITAS 3.0000

HARGA SATUAN Rp 4

JUMLAH HARGA Rp 5

5.1. 1 M2 PLESTERAN 1 PC : 1 PS, T=15 MM BAHAN Semen portland Pasir pasang

Kg M3

12.9200 0.0130

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.2000 0.1500 0.0150 0.0100

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.2. 1 M2 PLESTERAN 1 PC : 2 PS, T=15 MM BAHAN Semen portland Pasir pasang

Kg M3

8.5200 0.0170

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.2000 0.1500 0.0150 0.0100

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.3. 1 M2 PLESTERAN 1 PC : 3 PS, T=15 MM BAHAN Semen portland Pasir pasang

Kg M3

6.4800 0.0190

Rp565 #REF!

Rp3,661 #REF!

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.2000 0.1500 0.0150 0.0100

RpRpRpRp-

RpRpRpRp-

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.4. 1 M2 PLESTERAN 1 PC : 4 PS, T=15 MM BAHAN Semen portland Pasir pasang

Kg M3

5.2000 0.0200

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.2000 0.1500 0.0150 0.0100

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.5. 1 M2 PLESTERAN 1 PC : 5 PS, T=15 MM BAHAN Semen portland Pasir pasang

Kg M3

4.3200 0.0220

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

RpRpRp-

Oh Oh Oh Oh

0.2000 0.1500 0.0150 0.0100

RpRpRpRp-

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT

RpRp-

HARGA SATUAN PEKERJAAN

Rp-

5.6. 1 M2 PLESTERAN 1 PC : 6 PS, T=15 MM BAHAN Semen portland Pasir pasang

Kg M3

3.6800 0.0230

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.2000 0.1500 0.0150 0.0100

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.7. 1 M2 PLESTERAN 1 PC : 8 PS, T=15 MM BAHAN Semen portland Pasir pasang

Kg M3

2.8800 0.0240

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.2000 0.1500 0.0150 0.0100

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.8. 1 M2 PLESTERAN 1 PC : 0,5 KP : 3 PS, T=15 MM BAHAN Semen portland Kapur padam Pasir pasang JUMLAH HARGA BAHAN TENAGA

Kg M3 M3

5.7600 0.0030 0.0130 Rp-

Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

0.2000 0.1500 0.0150 0.0100

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.9. 1 M2 PLESTERAN 1 PC : 3 KP : 10 PS, T=15 MM BAHAN Semen portland Kapur padam Pasir pasang

Kg M3 M3

1.8400 0.0060 0.0140

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.2000 0.1500 0.0150 0.0100

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.10. 1 M2 PLESTERAN 0,5 PC : 1 KP : 4 PS, T=15 MM BAHAN Semen portland Kapur padam Pasir pasang

Kg M3 M3

3.0000 0.0050 0.0190

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.2000 0.1500 0.0150 0.0100

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.11. 1 M2 PLESTERAN 1 KP : 1 SM : 1 PS, T=15 MM BAHAN Semen Merah Kapur padam Pasir pasang

M3 M3 M3

0.0090 0.0090 0.0090

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.2000 0.1500 0.0150 0.0100

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.12. 1 M2 PLESTERAN 1 KP : 1 SM : 2 PS, T=15 mm BAHAN Semen merah Kapur padam Pasir pasang

Kg M3 M3

0.0070 0.0070 0.0150

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.2000 0.1500 0.0150 0.0100

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.13. 1 M2 PLESTERAN 1 PC : 2 PS, T=20 MM BAHAN Semen portland Pasir pasang JUMLAH HARGA BAHAN TENAGA

Kg M3

14.2800 0.0230 Rp-

Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

0.2500 0.2000 0.0200 0.0125

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.14. 1 M2 PLESTERAN 1 PC : 3 PS, T=20 MM BAHAN Semen portland Pasir pasang

Kg M3

10.8000 0.0260

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.2500 0.2000 0.0200 0.0125

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.15. 1 M2 PLESTERAN 1 PC : 4 PS, T=20 MM BAHAN Semen portland Pasir pasang

Kg M3

8.6800 0.0280

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.2500 0.2000 0.0200 0.0125

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.16. 1 M2 PLESTERAN 1 PC : 5 PS, T=20 MM

BAHAN Semen portland Pasir pasang

Kg M3

7.2900 0.0280

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.2500 0.2000 0.0200 0.0125

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.17. 1 M2 PLESTERAN 1 PC : 6 PS, T=20 MM BAHAN Semen portland Pasir pasang

Kg M3

6.2400 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.2500 0.2000 0.0200 0.0125

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.18. 1 M2 PLESTERAN 1 KP : 2 SM : 2 PS, T=20 MM BAHAN Semen merah Kapur padam Pasir pasang

M3 M3 M3

0.9000 0.9000 0.9000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang

Rp-

Oh Oh Oh

0.2500 0.2000 0.0200

Mandor

Oh

0.0125

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.19. 1 M2 PLESTERAN 1 PC : 2 PS, T=25 MM BAHAN Semen portland Pasir pasang

Kg M3

15.5000 0.0130

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.3000 0.2000 0.0200 0.0130

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.20. 1 M2 PLESTERAN 1 PC : 3 PS, T=25 MM BAHAN Semen portland Pasir pasang

Kg M3

11.7500 0.0350

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.3000 0.2000 0.0200 0.0130

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.21. 1 M2 PLESTERAN 1 PC : 4 PS, T=25 MM BAHAN Semen portland

Kg

9.4800

Pasir pasang

M3

0.0380

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.3000 0.2000 0.0200 0.0130

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.22. 1 M2 PLESTERAN 1 PC : 5 PS, T=25 MM BAHAN Semen portland Pasir pasang

Kg M3

7.9400 0.0390

TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

0.3000 0.2000 0.0200 0.0130

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA BAHAN

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.23. 1 M2 PLESTERAN 1 PC : 2 PS, T=30 MM BAHAN Semen portland Pasir pasang

Kg M3

18.6500 0.0350

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA

Rp-

Oh Oh Oh Oh

0.3200 0.2500 0.0250 0.0150 Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.24. 1 M2 PLESTERAN 1 PC : 3 PS, T=30 MM BAHAN Semen portland Pasir pasang

Kg M3

14.1500 0.0390

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.3200 0.2500 0.0250 0.0150

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.25. 1 M2 PLESTERAN 1 PC : 4 PS, T=30 MM BAHAN Semen portland Pasir pasang

Kg M3

11.3800 0.0420

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.3200 0.2500 0.0250 0.0150

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.26. 1 M2 PLESTERAN 1 PC : 5 PS, T=30 MM BAHAN Semen portland Pasir pasang JUMLAH HARGA BAHAN

Kg M3

8.1900 0.0450 Rp-

TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

0.3200 0.2500 0.0250 0.0150

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.27. 1 M2 BERAPEN 1 PC : 3 PS, T=30 MM BAHAN Semen portland Pasir pasang

Kg M3

7.0700 0.0210

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.1500 0.0700 0.0070 0.0080

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.28. 1 M2 BERAPEN 1 PC : 5 PS, T=15 MM BAHAN Semen portland Pasir pasang

Kg M3

5.6700 0.0230

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.1500 0.0700 0.0070 0.0080

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.29. 1 M2 PLESTERAN BETON 1 PC : 2 PS, T=15 MM BAHAN Semen portland Pasir pasang

Kg M3

9.3000 0.0180

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.2600 0.2000 0.0200 0.0130

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.30. 1 M2 PLESTERAN BETON 1 PC : 3 PS, T=15 MM BAHAN Semen portland Pasir pasang

Kg M3

7.0700 0.0210

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.2300 0.2000 0.0200 0.0130

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.31. 1 M2 PLESTERAN SKONING 1 PC : 2 PS BAHAN Semen portland Pasir pasang

Kg M3

0.5000 0.0020

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu

Rp-

Oh Oh

0.0570 0.0380

Kepala tukang Mandor

Oh Oh

0.0380 0.0020

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.32. 1 M2 PLESTERAN GRANITO 1 PC warna : 1 GRANITO, T=10 MM BAHAN PC warna Batu Granito

Kg Kg

0.1440 15.0000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.0500 0.0200 0.0020 0.0050

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.33. 1 M2 PLESTERAN TERASO 1 PC warna: 2 Batu Teraso, T=10MM BAHAN PC warna Batu Teraso

Kg Kg

0.4400 11.5000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.4500 0.2000 0.0200 0.0250

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.34. 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS BAHAN

Semen portland Pasir pasang

Kg M3

4.3200 0.0160

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.2500 0.1000 0.0100 0.0150

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.35. 1 M2 PLESTERAN SIAR ADUKAN 1 PC : 2 PS BAHAN Semen portland Pasir pasang

Kg M3

4.3200 0.0160

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.1500 0.0700 0.0070 0.0080

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

5.36. 1 M2 PLESTERAN WATERPROOF BATACOTE 3 Lapis BAHAN Semen portland Batacote Pasir pasang

Kg Kg M3

0.5000 2.9000 0.0160

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.3000 0.2000 0.0200 0.0150

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

VI. PEKERJAAN KAYU KOMPONEN

SATUAN

1

2

PERKIRAAN KUANTITAS 3.0000

HARGA SATUAN Rp 4

JUMLAH HARGA Rp 5

6.1. 1 M3 PASANG KUSEN PINTU & JENDELA KAYU JATI BAHAN Kayu jati, balok

M3

1.1000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

6.0000 20.0000 2.0000 0.3000

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.2. 1 M3 PASANG KUSEN PINTU & JENDELA KAYU KAMPER BAHAN Kayu kamper, balok

M3

1.2000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

6.0000 18.0000 2.0000 0.3000

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.3. 1 M3 PASANG KUSEN PINTU & JENDELA KAYU BORNEO BAHAN Kayu borneo, balok JUMLAH HARGA BAHAN TENAGA

M3

1.2000 Rp-

Pekerja Tukang kayu Kepala tukang Mandor

Oh Oh Oh Oh

6.0000 18.0000 2.0000 0.3000

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.4. 1 M3 PASANG KUSEN PINTU & JENDELA KAYU DAMAR LAUT BAHAN Kayu borneo damar laut, balok

M3

1.2000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

6.0000 18.0000 2.0000 0.3000

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.5. 1 M2 PASANG PINTU KLAMP KAYU KAMPER BAHAN Kayu kamper, papan Paku biasa 2"-5"

M3 Kg

0.0360 0.0500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.3500 1.0500 0.1050 0.0180

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.6. 1 M2 PASANG PINTU KLAMP KAYU BORNEO

BAHAN Kayu borneo, papan Paku biasa 2"-5"

M3 Kg

0.0360 0.0500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.3500 1.0500 0.1050 0.0180

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.7. 1 M2 PASANG PINTU PANEL KAYU JATI BAHAN Kayu jati, papan

M3

0.0400

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

1.0000 2.5000 0.2500 0.0500

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.8. 1 M2 PASANG PINTU PANEL KAYU KAMPER BAHAN Kayu kamper, papan

M3

0.0400

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA

Rp-

Oh Oh Oh Oh

1.0000 2.5000 0.2500 0.0500 Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.9. 1 M2 PASANG PINTU & JENDELA KACA KAYU JATI BAHAN Kayu jati

M3

0.0350

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.8000 2.0000 0.2000 0.0400

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.10. 1 M2 PASANG PINTU & JENDELA KACA KAYU KAMPER BAHAN Kayu kamper, papan

M3

0.0350

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.8000 2.0000 0.2000 0.0400

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.11. 1 M2 PASANG PINTU & JENDELA KACA KAYU BORNEO BAHAN Kayu borneo, papan

M3

0.0350

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu

Rp-

Oh Oh

0.8000 2.0000

Kepala tukang Mandor

Oh Oh

0.2000 0.0400

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.12. 1 M2 PASANG PINTU & JENDELA JALUSI KAYU JATI BAHAN Kayu jati, papan

M3

0.0640

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

1.0000 3.0000 0.3000 0.3000

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.13. 1 M2 PASANG PINTU & JENDELA JALUSI KAYU KAMPER BAHAN Kayu kamper, papan

M3

0.0640

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

1.0000 3.0000 0.3000 0.5000

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.14. 1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU JATI BAHAN Kayu jati, papan Paku biasa 1/2" - 1"

M3 Kg

0.0196 0.0300

Lem kayu Plywood 4' x 3' x 4 mm

Lt Lbr

0.3000 1.0000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.6000 2.0000 0.2000 0.0300

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.15. 1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU KAMPER BAHAN Kayu jati, papan Paku biasa 1/2" - 1" Lem kayu Plywood 4' x 3' x 4 mm

M3 Kg Lt Lbr

0.0196 0.0300 0.3000 1.0000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.6000 2.0000 0.2000 0.0300

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.16. 1 M3 PASANG JALUSI MATI KUSEN KAYU JATI BAHAN Kayu jati, papan Paku biasa 1/2" - 1"

M3 Kg

0.0600 0.1500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang

Rp-

Oh Oh Oh

0.5000 2.0000 0.2000

Mandor

Oh

0.0250

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.17. 1 M3 PASANG JALUSI MATI KUSEN KAYU KAMPER BAHAN Kayu kamper, papan Paku biasa 1/2" - 1"

M3 Kg

0.0600 0.1500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.5000 2.0000 0.2000 0.0250

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.18. 1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU BORNEO BAHAN Kayu borneo, papan Paku biasa 1/2" - 1" Lem kayu Plywood 4' x 3' x 4 mm

M3 Kg Lt Lbr

0.0196 0.0300 0.3000 1.0000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.6000 2.0000 0.2000 0.0300

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.19. 1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA KAYU JATI

BAHAN Kayu jati, papan Paku biasa 1/2" - 1" Lem kayu Taekwood 4' x 3' x 4 mm

M3 Kg Lt Lbr

0.0196 0.0300 0.3000 1.0000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.6000 2.0000 0.2000 0.0300

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.20. 1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA KAYU KAMPER BAHAN Kayu borneo, papan Paku biasa 1/2" - 1" Lem kayu Plywood 4' x 3' x 4 mm

M3 Kg Lt Lbr

0.0196 0.3000 0.3000 1.0000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.6000 2.0000 0.2000 0.0300

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.21. 1 M2 PASANG PINTU PLYWOOD & FORMIKA , RANGKA KAYU JATI BAHAN Kayu borneo, papan Paku biasa 1/2" - 1" Lem kayu Plywood 4' x 8' x 4 mm Formica 4' x 3' JUMLAH HARGA BAHAN

M3 Kg Lt Lbr Lbr

0.0196 0.3000 0.3000 1.0000 0.5000 Rp-

TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Oh Oh Oh Oh

0.8000 2.5000 0.2500 0.0400

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.22. 1 M2 PASANG PINTU PLYWOOD & FORMIKA, RANGKA KAYU KAMPER BAHAN Kayu kamper, papan Paku biasa 1/2" - 1" Lem kayu Plywood 4' x 8' x 4 mm Formica

M3 Kg Lt Lbr Lbr

0.0196 0.3000 0.8000 1.0000 0.5000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.8000 2.5000 0.2500 0.0400

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.23. 1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU JATI BAHAN Kayu jati, papan Paku biasa 1/2" - 1" Lem kayu Teakwood 4' x 8' x 4 mm Formika 4' x 8'

M3 Kg Lt Lbr Lbr

0.0196 0.3000 0.8000 0.5000 0.5000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.8000 2.5000 0.2500 0.0400

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.24. 1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU KAMPER (divernis) BAHAN Kayu kamper, papan Paku biasa 1/2" - 1" Lem kayu Teakwood 4' x 8' x 4 mm Vernis Formika 4' x 8'

M3 Kg Lt Lbr Lt Lbr

0.0196 0.3000 0.8000 0.5000 0.5000 0.5000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.8000 2.5000 0.2500 0.0400

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.25. 1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU JATI BAHAN Kayu jati, papan Paku biasa 1/2" - 1" Lem kayu Plywood 4' x 8' x 4 mm Formika 4' x 8'

M3 Kg Lt Lbr Lbr

0.0196 0.3000 1.2000 1.0000 1.0000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

1.0000 2.6000 0.2600 0.0500

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT

RpRp-

HARGA SATUAN PEKERJAAN

Rp-

6.26. 1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU KAMPER BAHAN Kayu kamper, papan Paku biasa 1/2" - 1" Lem kayu Plywood 4' x 8' x 4 mm Formika 4' x 8'

M3 Kg Lt Lbr Lbr

0.0196 0.3000 1.2000 1.0000 1.0000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

1.0000 2.6000 0.2600 0.0500

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.27. 1 M3 PASANG KONSTRUKSI KUDA-KUDA KAYU JATI BAHAN Kayu jati, balok Besi strip Paku biasa 2" - 5"

M3 Kg Kg

1.1000 15.0000 0.8000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

4.0000 12.0000 1.2000 0.2000

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.28. 1 M3 PASANG KONSTRUKSI KUDA-KUDA KAYU KAMPER BAHAN Kayu kamper, balok Besi strip Paku biasa 2" - 5"

M3 Kg Kg

1.1000 15.0000 0.8000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

4.0000 12.0000 1.2000 0.2000

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.29. 1 M3 PASANG KONSTRUKSI KUDA-KUDA KAYU BORNEO BAHAN Kayu borneo, balok Besi strip Paku biasa 2" - 5"

M3 Kg Kg

1.1000 15.0000 0.8000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

4.0000 12.0000 1.2000 0.2000

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.30. 1 M3 PASANG KONSTRUKSI KUDA-KUDA KAYU KRUING BAHAN Kayu jati, balok Besi strip Paku biasa 2" - 5"

M3 Kg Kg

1.1000 15.0000 0.8000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA

Rp-

Oh Oh Oh Oh

4.0000 12.0000 1.2000 0.2000 Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.31. 1 M2 PASANG KASO + RENG GENTENG KODOK KAYU KAMPER BAHAN Kayu kamper, balok Paku biasa 2" - 5"

M3 Kg

0.0120 0.1500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.1000 0.1000 0.0100 0.0050

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.32. 1 M2 PASANG KASO + RENG GENTENG KODOK KAYU BORNEO BAHAN Kayu borneo, balok Paku biasa 2" - 5"

M3 Kg

0.0120 0.1500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.1000 0.1000 0.0100 0.0050

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.33. 1 M2 PASANG KASO + RENG GENTENG MONIER KAYU JATI BAHAN Kayu jati, balok Paku biasa 2" - 5" JUMLAH HARGA BAHAN

M3 Kg

0.0140 0.1500 Rp-

TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Oh Oh Oh Oh

0.1000 0.1000 0.0100 0.0050

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.34. 1 M2 PASANG KASO + RENG GENTENG MONIER KAYU KAMPER BAHAN Kayu kamper, balok Paku biasa 2" - 5"

M3 Kg

0.0140 0.1500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.1000 0.1000 0.0100 0.0050

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.35. 1 M2 PASANG KASO + RENG GENTENG BETON KAYU BORNEO BAHAN Kayu borneo, balok Paku biasa 2" - 5"

M3 Kg

0.0140 0.1500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.1000 0.1000 0.0100 0.0050

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.36. 1 M2 PASANG KASO + RENG ATAP SIRAP KAYU KAMPER BAHAN Kayu kamper, balok Paku biasa 2" - 5"

M3 Kg

0.1650 0.2000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.1200 0.1200 0.0120 0.0060

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.37. 1 M2 PASANG KASO + RENG ATAP SIRAP KAYU BORNEO BAHAN Kayu borneo, balok M3 0.1650 Paku biasa 2" - 5" Kg 0.2000 JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.1200 0.1200 0.0120 0.0060

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.38. 1 M2 PASANG RANGKA LANGIT-LANGIT ( 1.00 x 1.00 ) M, KAYU JATI BAHAN Kayu jati, balok Paku biasa 2" - 5"

M3 Kg

0.0120 0.1000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang

Rp-

Oh Oh Oh

0.1500 0.2500 0.0250

Mandor

Oh

0.0750

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.39. 1 M2 PASANG RANGKA LANGIT-LANGIT ( 1.00 x 1.00 ) M, KAYU KAMPER BAHAN Kayu kamper, balok Paku biasa 2" - 5"

M3 Kg

0.0120 0.1000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.1500 0.2500 0.0250 0.0750

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.40. 1 M2 PASANG RANGKA LANGIT-LANGIT ( 1.00 x 1.00 ) M, KAYU BORNEO BAHAN Kayu borneo, balok Paku biasa 2" - 5"

M3 Kg

0.0120 0.1000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.1500 0.2500 0.0250 0.0750

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.41. 1 M2 PASANG RANGKA LANGIT-LANGIT ( 30 x 60 ) CM, KAYU JATI BAHAN Kayu jati, balok

M3

0.0230

Paku biasa 2" - 5"

Kg

0.1500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.2000 0.3000 0.0300 0.0100

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.42. 1 M2 PASANG RANGKA LANGIT-LANGIT ( 30 x 60 ) CM, KAYU KAMPER BAHAN Kayu kamper, balok Paku biasa 2" - 5"

M3 Kg

0.0230 0.1500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.2000 0.3000 0.0300 0.0100

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.43. 1 M2 PASANG RANGKA LANGIT-LANGIT ( 30 x 60 ) CM, KAYU BORNEO Kayu borneo, balok Paku biasa 2" - 5"

M3 Kg

0.0230 0.1500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA BAHAN

Rp-

Oh Oh Oh Oh

0.2000 0.3000 0.0300 0.0100 Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.44. 1 M2 PASANG RANGKA LANGIT-LANGIT ( 30 x 30 ) CM, KAYU JATI BAHAN Kayu jati, balok Paku biasa 2" - 5"

M3 Kg

0.0270 0.2000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.2000 0.3500 0.0350 0.0125

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.45. 1 M2 PASANG RANGKA LANGIT-LANGIT ( 30 x 30 ) CM, KAYU KAMPER BAHAN Kayu kamper, balok Paku biasa 2" - 5"

M3 Kg

0.0270 0.2000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.2500 0.3500 0.0350 0.0125

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.46. 1 M2 PASANG RANGKA LANGIT-LANGIT ( 30 x 30 ) CM, KAYU BORNEO BAHAN Kayu borneo, balok Paku biasa 2" - 5" JUMLAH HARGA BAHAN

M3 Kg

0.0270 0.2000 Rp-

TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Oh Oh Oh Oh

0.2500 0.3500 0.0350 0.0125

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.47. 1 M' PASANG LISPLANG UKURAN ( 3 x 20 ) CM, KAYU JATI BAHAN Kayu jati, papan Paku biasa 2" - 5"

M3 Kg

0.0072 0.0500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.1000 0.2000 0.0250 0.0050

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.48. 1 M' PASANG LISPLANG UKURAN ( 3 x 20 ) CM, KAYU KAMPER BAHAN Kayu kamper, papan Paku biasa 2" - 5"

M3 Kg

0.0072 0.0500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.1000 0.2000 0.0250 0.0050

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.49. 1 M' PASANG LISPLANG UKURAN ( 3 x 30 ) CM, KAYU JATI BAHAN Kayu jati, papan Paku biasa 2" - 5"

M3 Kg

0.0110 0.0500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.1100 0.2200 0.0220 0.0050

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.50. 1 M' PASANG LISPLANG UKURAN ( 3 x 30 ) CM, KAYU KAMPER BAHAN Kayu kamper, papan Paku biasa 2" - 5"

M3 Kg

0.0110 0.0500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.1100 0.2200 0.0220 0.0050

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.51. 1 M' PASANG LISPLANG UKURAN 2x ( 3 x 20 ) CM, KAYU KAMPER BAHAN Kayu kamper, papan Paku biasa 2" - 5"

M3 Kg

0.0145 0.0600

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang

Rp-

Oh Oh Oh

0.1500 0.2500 0.0250

Mandor

Oh

0.0750

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.52. 1 M2 PASANG LISPLANG UKURAN 2x ( 2 x 20 ) CM, KAYU KAMPER BAHAN Kayu kamper, papan Paku biasa 2" - 5"

M3 Kg

0.0086 0.0600

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.1000 0.1000 0.0100 0.0500

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.53. 1 M' PASANG LISPLANG UKURAN 2x ( 2 x 20 ) CM, KAYU BORNEO BAHAN Kayu borneo, papan Paku biasa 2" - 5"

M3 Kg

0.0088 0.0600

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.1000 0.1000 0.0100 0.0500

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.54. 1 M' PASANG RANGKA DINDING PEMISAH KAYU KAMPER BAHAN Kayu kamper, balok

M3

0.0195

Kayu kamper, papan Paku biasa 2" - 5"

M3 Kg

0.0070 0.1000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.1500 0.4500 0.0450 0.0750

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.55. 1 M2 PASANG RANGKA DINDING PEMISAH KAYU BORNEO BAHAN Kayu borneo, balok Kayu borneo, papan Paku biasa 2" - 5"

M3 M3 Kg

0.0195 0.0070 0.1000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.1500 0.4500 0.0450 0.0750

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.56. 1 M2 PASANG RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KAMPER BAHAN Kayu kamper, balok Kayu kamper, papan Paku biasa 2" - 5"

M3 M3 Kg

0.0195 0.0070 0.1000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.1500 0.4500 0.0450 0.0750

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.57. 1 M2 PASANG RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPER BAHAN Kayu kamper, balok Kayu kamper, papan Paku biasa 2" - 5" Lem kayu Plywood 4' x 8' x 4'

M3 M3 Kg Lt Lbr

0.0195 0.0070 0.1000 0.5600 1.0000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.2000 0.6000 0.0600 0.0100

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.58. 1 M2 PASANG DINDING LAMBRIZIRING DARI PAPAN JATI BAHAN Kayu jati, balok Paku biasa 2" - 5" Paku sekrup 3.5"

M3 Kg M3

0.0070 0.1000 0.1500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.6000 1.8000 0.1800 0.0300

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.59. 1 M2 PASANG PLYWOOOD T=4MM, UNTUK DINDING

BAHAN Plywood 4' x 8' x 4' mm Paku biasa 1/2" - 1"

Lbr Kg

0.4000 0.0500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.0250 0.0750 0.0075 0.0013

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

6.60. 1 M' PASANG LIST PLAFOND - KAYU PROFIL BAHAN Kayu profil

M'

1.0500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.0210 0.0210 0.0020 0.0010

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

VII. PEKERJAAN BETON KOMPONEN

SATUAN

1

2

PERKIRAAN KUANTITAS 3.0000

HARGA SATUAN Rp 4

JUMLAH HARGA Rp 5

7.1. 1 M3 MEMBUAT BETON TUMBUK, 1 PC : 3 PS : 5 KR BAHAN Semen portland Pasir beton Koral beton

Kg M3 M3

218.0000 0.5200 0.8700

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

1.6500 0.2500 0.0250 0.0800

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

7.2. 1 M3 MEMBUAT BETON TUMBUK, 1 PC : 3 PS : 6 KR BAHAN Semen portland Pasir beton Koral beton

Kg M3 M3

197.0000 0.4700 0.9400

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

1.6500 0.2500 0.0250 0.0800

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

7.3. 1 M3 MEMBUAT BETON TUMBUK, 1 PC : 4 PS : 6 KR BAHAN Semen portland

Kg

173.0000

Pasir beton Koral beton

M3 M3

0.5700 0.8700

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

1.6500 0.2500 0.0250 0.0800

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

7.4. 1 M3 MEMBUAT LANTAI KERJA BETON TUMBUK, 1 PC : 3 PS : 5 KR, T = 5 CM BAHAN Semen portland Pasir beton Koral beton

Kg M3 M3

10.0000 0.0260 0.0440

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

1.1500 0.0200 0.0020 0.0060

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

7.5. 1 M3 MEMBUAT BETON BERTULANG 1 PC : 2 PS : 3 KR BAHAN Semen portland Pasir beton Koral beton

Kg M3 M3

323.0000 0.5200 0.7800

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

1.6500 0.0250 0.0250 0.0800

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

7.6. 1 M3 MEMBUAT BETON BERTULANG 1 PC : 2 PS : 4 KR BAHAN Semen portland Pasir beton Koral beton

Kg M3 M3

280.0000 0.4500 0.9000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

1.6500 0.2500 0.0250 0.0800

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

7.7. 1 M3 MEMBUAT BETON BERTULANG 1 PC : 2 PS : 2.5 KR BAHAN Semen portland Pasir beton Koral beton

Kg M3 M3

352.0000 0.5600 0.7000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

1.6500 0.2500 0.0250 0.0800

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

7.8. 1 M3 MEMBUAT BETON BERTULANG 1 PC : 1.5 PS : 3 KR BAHAN

Semen portland Pasir beton Koral beton

Kg M3 M3

357.0000 0.4200 0.5400

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

1.6500 0.2500 0.0250 0.0800

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

7.9. 1 M3 MEMBUAT BETON BERTULANG, 1 PC : 1.5 PS : 2.5 KR BAHAN Semen portland Pasir beton Koral beton

Kg M3 M3

386.0000 0.4700 0.7800

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

1.6500 0.2500 0.0250 0.0800

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

7.10. 1 M3 MEMBUAT BETON BERTULANG, 1 PC : 1 PS : 2 KR BAHAN Semen portland Pasir beton Koral beton

Kg M3 M3

479.0000 0.3700 0.7400

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang

Rp-

Oh Oh Oh

1.6500 0.2500 0.0250

Mandor

Oh

0.0800

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

7.11. 1 M3 MEMBUAT TIANG PANCANG PRESTRESSED BETON BAHAN Semen portland Pasir beton Koral beton Rapidant

Kg M3 M3 Gln

440.0000 0.5000 0.8000 2.4600

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

1.6500 0.2500 0.0250 0.0800

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

7.12. 1 M3 MEMBUAT BETON DENGAN PUZZDITH - 100 XR BAHAN Semen portland Pasir beton Koral beton Puzzdith - 100 XR

Kg M3 M3 Ltr

336.0000 0.5400 0.8100 1.0000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

1.6500 0.2500 0.0250 0.0800

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

7.13. 1 M3 MEMBUAT BETON BERTULANG, 1 PC : 2 PS : 3 KR BAHAN Semen portland Pasir beton Koral beton

Kg M3 M3

336.0000 0.5400 0.8100

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

2.0000 0.3500 0.0350 1.0000

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

7.14. 1 M3 MEMBUAT BETON BERTULANG, 1 PC : 2 PS : 4 KR BAHAN Semen portland Pasir beton Koral beton

Kg M3 M3

291.0000 0.4700 0.9300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

2.0000 0.3500 0.0350 1.0000

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

7.15. 1 M3 MEMBUAT BETON BERTULANG, 1 PC : 1.5 PS : 3 KR BAHAN Semen portland Pasir beton Koral beton 2/3 JUMLAH HARGA BAHAN TENAGA

Kg M3 M3

367.0000 0.4400 0.8800 Rp-

Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

2.0000 0.3500 0.0350 1.0000

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

7.16. 1 M3 MEMBUAT BETON BERTULANG, 1 PC : 1.5 PS : 2.5 KR BAHAN Semen portland Pasir beton Koral beton 2/3

Kg M3 M3

400.0000 0.4800 0.8000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

2.0000 0.3500 0.0350 1.0000

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

7.17. 1 M3 MEMBUAT BETON BERTULANG, 1 PC : 1 PS : 1 KR BAHAN Semen portland Pasir beton Koral beton

Kg M3 M3

615.0000 0.5200 0.5200

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

2.0000 0.3500 0.0350 1.0000

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

7.18. 1 M3 MEMBUAT BETON KEDAP AIR DENGAN STROROX - 100 BAHAN Semen portland Pasir beton Koral beton 2/3 Strorox - 100

Kg M3 M3 Kg

400.0000 0.4800 0.8000 1.2000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

2.0000 0.3500 0.0350 1.0000

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

7.19. 1 M' MEMASANG PVC WATERSTOP LEBAR 150 MM BAHAN Waterstop lebar 150mm

M'

1.0500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Rp-

Oh Oh Oh Oh

0.0500 0.0300 0.0030 0.0020

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

7.20. 1 M' MEMASANG PVC WATERSTOP LEBAR 200 MM BAHAN Waterstop lebar 200mm

M'

1.0500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu

Rp-

Oh Oh

0.0500 0.0350

Kepala tukang Mandor

Oh Oh

0.0035 0.0020

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

RpRpRp-

7.21. 1 M' MEMASANG PVC WATERSTOP LEBAR 230 MM BAHAN Waterstop lebar 230mm

M'

1.0500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Mandor

Err:522

Oh Oh Oh

0.5500 0.3500 0.0030

JUMLAH HARGA TENAGA

Rp-

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

Err:522 Err:522 Err:522

7.22. 1 M' MEMASANG PVC WATERSTOP LEBAR 250 MM BAHAN Waterstop lebar 250mm

M'

1.0500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Mandor

Err:522

Oh Oh Oh

0.5500 0.3500 0.0030

JUMLAH HARGA TENAGA

Err:522

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

Err:522 Err:522 Err:522

7.23. 1 M' MEMASANG PVC WATERSTOP LEBAR 300 MM BAHAN Waterstop lebar 300mm JUMLAH HARGA BAHAN

M'

1.0500 Err:522

TENAGA Pekerja Tukang batu Mandor

Oh Oh Oh

0.5500 0.3500 0.0030

JUMLAH HARGA TENAGA

Err:522

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

Err:522 Err:522 Err:522

7.24. 1 M' MEMASANG PVC WATERSTOP LEBAR 320 MM BAHAN Waterstop lebar 320mm

M'

1.0500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Mandor

Err:522

Oh Oh Oh

0.5500 0.3500 0.0030

JUMLAH HARGA TENAGA

Err:522

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

Err:522 Err:522 Err:522

7.25. PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR BAHAN Besi beton (polos / ulir) Kawat beton

Kg Kg

1.0500 0.0150

Oh Oh Oh Oh

0.0070 0.0070 0.0007 0.0003

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang besi Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 7.26. KABEL PRESSTRESSED POLOS / STRANDS BAHAN

Besi presstressed polos Kawat beton

Kg Kg

1.0500 0.0100

Oh Oh Oh Oh

0.0050 0.0050 0.0005 0.0003

Kg Kg

1.0200 0.8050

Oh Oh Oh Oh

0.0250 0.0250 0.0025 0.0015

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang besi Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 7.27. JARING KAWAT BAJA BAHAN Besi Jaring kawat baja Kawat beton JUMLAH HARGA BAHAN TENAGA Pekerja Tukang besi Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 7.28. PASANG BEKISTING UNTUK PONDASI BAHAN Kayu terentang Paku biasa 2' - 5" Minyak bekisting

M3 Kg Lt

0.0400 0.3000 0.1000

Oh Oh Oh Oh

0.3000 0.2600 0.0260 0.0050

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 7.29. PASANG BEKISTING UNTUK SLOOF BAHAN Kayu terentang Paku biasa 2' - 5" Minyak bekisting

M3 Kg Lt

0.0450 0.3000 0.1000

TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Oh Oh Oh Oh

0.3000 0.2600 0.0260 0.0050

JUMLAH HARGA TENAGA JUMLAH HARGA BAHAN JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 7.30. PASANG BEKISTING UNTUK KOLOM BAHAN Kayu terentang Paku biasa 2' - 5" Minyak bekisting Balok kayu borneo Plywood tebal 9mm Dolken kayu galam dia- 8-10/4 m

M3 Kg Lt M3 Lbr Btg

0.0400 0.4000 0.2000 0.0150 0.3500 2.0000

Oh Oh Oh Oh

0.3000 0.3300 0.0330 0.0060

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 7.31. PASANG BEKISTING UNTUK BALOK BAHAN

Kayu terentang Paku biasa 2' - 5" Minyak bekisting Balok kayu borneo Plywood tebal 9mm Dolken kayu galam dia- 8-10/4 m

M3 Kg Lt M3 Lbr Btg

0.0400 0.4000 0.2000 0.0180 0.3500 2.0000

Oh Oh Oh Oh

0.3200 0.3300 0.0330 0.0060

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 7.32. PASANG BEKISTING UNTUK LANTAI BAHAN Kayu terentang Paku biasa 2' - 5" Minyak bekisting Balok kayu borneo Plywood tebal 9mm Dolken kayu galam dia- 8-10/4 m

M3 Kg Lt M3 Lbr Btg

0.0400 0.4000 0.2000 0.0150 0.3500 6.0000

Oh Oh Oh Oh

0.3200 0.3300 0.0330 0.0060

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 7.33. PASANG BEKISTING UNTUK DINDING BAHAN Kayu terentang Paku biasa 2' - 5" Minyak bekisting Balok kayu borneo Plywood tebal 9mm Dolken kayu galam dia- 8-10/4 m

M3 Kg Lt M3 Lbr Btg

0.0300 0.4000 0.2000 0.0200 0.3500 0.3000

Formtie/penjaga jarak bkstg/spacer

Bh

4.0000

Oh Oh Oh Oh

0.3200 0.3300 0.0330 0.0060

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 7.34. PASANG BEKISTING UNTUK TANGGA BAHAN Kayu terentang Paku biasa 2' - 5" Minyak bekisting Balok kayu borneo Plywood tebal 9mm Dolken kayu galam dia- 8-10/4 m

M3 Kg Lt M3 Lbr Btg

0.0300 0.4000 0.1500 0.0150 0.3500 2.0000

Oh Oh Oh Oh

0.3200 0.3300 0.0330 0.0060

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 7.35. MEMBUAT BETON DENGAN MUTU K 225 BAHAN Semen portland Pasir beton Koral beton

Kg M3 M3

388.0000 0.6500 0.6500

Oh Oh Oh Oh

6.0000 1.0000 0.1000 0.3000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 7.36. MEMBUAT BETON DENGAN MUTU K275 BAHAN Semen portland Pasir beton Koral beton

Kg M3 M3

400.0000 0.4000 0.8200

Oh Oh Oh Oh

6.0000 1.0000 0.1000 0.3000

M3 Kg Btg

0.0264 0.6000 0.5000

Oh Oh Oh Oh

0.1500 0.0500 0.0050 0.0070

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 7.37. PASANG JEMBATAN COR BAHAN Kayu terentang Paku biasa 2' - 5" Dolken kayu galam dia- 8-10/4m JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 7.38. MEMBUAT PONDASI BETON BERTULANG (150KG BESI + BEKISTING) BAHAN Kayu terentang Paku biasa 2' - 5" Minyak bekisting

M3 Kg Lt

0.2000 1.5000 0.4000

Besi beton polos Kawat beton Semen portland Pasir beton Koral beton

Kg Kg Kg M3 M3

150.0000 2.2500 323.0000 0.5200 0.7800

Oh Oh Oh Oh Oh Oh

3.9000 0.3500 1.0400 1.0500 0.2450 0.1650

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 7.39. MEMBUAT SLOOF BETON BERTULANG (200KG BESI + BEKISTING) BAHAN Kayu terentang Paku biasa 2' - 5" Minyak bekisting Besi beton polos Kawat beton Semen portland Pasir beton Koral beton

M3 Kg Lt Kg Kg Kg M3 M3

0.2700 2.0000 0.6000 200.0000 3.0000 323.0000 0.5200 0.7800

Oh Oh Oh Oh Oh Oh

4.8500 0.3500 1.5600 1.4000 0.3310 0.1700

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 7.40. MEMBUAT KOLOM BETON BERTULANG (300KG BESI + BEKISTING) BAHAN Kayu terentang

M3

0.4000

Paku biasa 2' - 5" Minyak bekisting Besi beton polos Kawat beton Semen portland Pasir beton Koral beton Kayu borneo, balok Plywood 9mm Dolken dia 8cm / 4

Kg Lt Kg Kg Kg M3 M3 M3 Lbr Btg

4.0000 2.0000 300.0000 4.5000 323.0000 0.5200 0.7800 0.1500 3.5000 20.0000

Oh Oh Oh Oh Oh Oh

7.3000 0.3500 3.3000 2.1000 0.5700 0.2500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 7.41. MEMBUAT BALOK BETON BERTULANG (200KG BESI + BEKISTING) BAHAN Kayu terentang Paku biasa 2' - 5" Minyak bekisting Besi beton polos Kawat beton Semen portland Pasir beton Koral beton Kayu borneo, balok Plywood 9mm Dolken dia 8cm / 4

M3 Kg Lt Kg Kg Kg M3 M3 M3 Lbr Btg

0.3200 3.2000 1.6000 200.0000 3.0000 323.0000 0.5200 0.7800 0.1400 2.8000 16.0000

Oh Oh Oh Oh Oh Oh

5.9600 0.3500 2.8000 1.4000 0.4550 0.2080

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor JUMLAH HARGA TENAGA

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 7.42. MEMBUAT BALOK BETON BERTULANG (150KG BESI + BEKISTING) BAHAN Kayu terentang Paku biasa 2' - 5" Minyak bekisting Besi beton polos Kawat beton Semen portland Pasir beton Koral beton Kayu borneo, balok Plywood 9mm Dolken dia 8cm / 4

M3 Kg Lt Kg Kg Kg M3 M3 M3 Lbr Btg

0.3200 3.2000 1.6000 150.0000 2.2500 323.0000 0.5200 0.7800 0.1200 2.8000 32.0000

Oh Oh Oh Oh Oh Oh

5.8000 0.3500 2.8000 1.0500 0.4200 0.1850

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 7.43. MEMBUAT DINDING BETON BERTULANG (150KG BESI + BEKISTING) BAHAN Kayu terentang Paku biasa 2' - 5" Minyak bekisting Besi beton polos Kawat beton Semen portland Pasir beton Koral beton Kayu borneo, balok Plywood 9mm Dolken dia 8cm / 4 JUMLAH HARGA BAHAN TENAGA

M3 Kg Lt Kg Kg Kg M3 M3 M3 Lbr Btg

0.2400 3.2000 1.6000 150.0000 2.2500 323.0000 0.5200 0.7800 0.1600 2.8000 24.0000

Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor

Oh Oh Oh Oh Oh Oh

5.8000 0.3500 2.6400 1.0500 0.4000 0.1930

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 7.44. MEMBUAT TANGGA BETON BERTULANG (200KG BESI + BEKISTING) BAHAN Kayu terentang Paku biasa 2' - 5" Minyak bekisting Besi beton polos Kawat beton Semen portland Pasir beton Koral beton Kayu borneo, balok Plywood 9mm Dolken dia 8cm / 4

M3 Kg Lt Kg Kg Kg M3 M3 M3 Lbr Btg

0.2500 3.0000 1.2000 200.0000 3.0000 323.0000 0.5200 0.7800 0.1050 2.5000 14.0000

Oh Oh Oh Oh Oh Oh

5.6000 0.3500 2.3000 1.4000 0.4050 0.2020

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 7.45. MEMBUAT KOLOM PENGUAT BETON BERTULANG (11x11)CM BAHAN Kayu terentang Paku biasa 2' - 5" Besi beton polos Kawat beton Semen portland Pasir beton Koral beton

M3 Kg Kg Kg Kg M3 M3

0.0020 0.0100 3.0000 0.4500 4.0000 0.0060 0.0090

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor

Oh Oh Oh Oh Oh Oh

0.0600 0.0200 0.0200 0.0200 0.0060 0.0030

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 7.46. MEMBUAT RING BALOK BETON BERTULANG (10 x 15) CM TENAGA BAHAN Kayu albasiah Paku biasa 2' - 5" Besi beton polos Kawat beton Semen portland Pasir beton Koral beton

M3 Kg Kg Kg Kg M3 M3

0.0030 0.0200 3.6000 0.0500 5.5000 0.0090 0.0150

Oh Oh Oh Oh Oh Oh

0.1000 0.0330 0.0330 0.0330 0.0100 0.0050

JUMLAH HARGA BAHAN Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

VIII. PEKERJAAN PENUTUP ATAP 8.1. PASANG ATAP GENTENG PELENTONG KECIL BAHAN Genteng pelentong

Buah

25.0000

Oh Oh Oh Oh

0.1500 0.0750 0.0080 0.0080

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.2. PASANG ATAP GENTENG GENTENG KODOK / GLAZZUR BAHAN Genteng kodok

Buah

25.0000

Oh Oh Oh Oh

0.1500 0.0750 0.0080 0.0080

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.3. PASANG ATAP GENTENG PELENTONG SUPER / BESAR BAHAN Genteng pelentong super

Buah

12.0000

Oh Oh Oh Oh

0.1500 0.0600 0.0060 0.0080

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

8.4. PASANG GENTENG BUBUNG PELENTONG BAHAN Genteng bubung pelentong Semen portland Pasir pasang

Buah Kg M3

5.0000 8.0000 0.0320

Oh Oh Oh Oh

0.4000 0.2000 0.0200 0.0020

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.5. PASANG GENTENG BUBUNG KODOK GLAZZUR BAHAN Genteng bubung kodok Semen portland Pasir pasang

Buah Kg M3

5.0000 8.0000 0.0320

Oh Oh Oh Oh

0.4000 0.2000 0.0200 0.0020

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.6. PASANG GENTENG BUBUNG PELENTONG BESAR BAHAN Genteng bubung pelentong Semen portland Pasir pasang

Buah Kg M3

4.0000 8.0000 0.0320

Oh Oh Oh Oh

0.4000 0.2000 0.0200 0.0020

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.7. PASANG ROOF LIGHT FIBREGLASS ( 180 x 90 ) CM BAHAN Rooflight fibreglass Paku biasa 1/2" - 1"

Lbr Kg

0.6000 0.0500

Oh Oh Oh Oh

0.1400 0.0670 0.0070 0.0070

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.8. PASANG ATAP ASBES GELOMBANG ( 2.50 x 0.92 ) x 5 MM BAHAN Asbes gelombang Paku pancing 60 x 230

Lbr Kg

0.5000 0.1200

Oh Oh Oh Oh

0.1400 0.0750 0.0080 0.0080

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.9. PASANG ATAP ASBES GELOMBANG ( 2.25 x 0.92 ) x 5 MM BAHAN Asbes gelombang Paku pancing 60 x 230

Lbr Kg

0.6000 0.1200

Oh Oh Oh Oh

0.1400 0.0750 0.0080 0.0080

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.10. PASANG ATAP ASBES GELOMBANG ( 2.00 x 0.92 ) x 5 MM BAHAN Asbes gelombang Paku pancing 60 x 230

Lbr Kg

0.6000 0.1200

Oh Oh Oh Oh

0.1400 0.0700 0.0070 0.0070

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.11. PASANG ATAP ASBES GELOMBANG ( 1.80 x 0.92 ) x 5 MM BAHAN Asbes gelombang Paku pancing 60 x 230

Lbr Kg

0.7500 0.1200

Oh Oh Oh Oh

0.1400 0.0700 0.0070 0.0070

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.12. PASANG ATAP ASBES GELOMBANG ( 3.00 x 1.05 ) x 4 MM BAHAN Asbes gelombang Paku pancing

Lbr Kg

0.3500 0.1200

Oh Oh Oh

0.1400 0.0700 0.0070

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang

Mandor

Oh

0.0070

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.13. PASANG ATAP ASBES GELOMBANG ( 2.70 x 1.05 ) x 4 MM BAHAN Asbes gelombang Paku pancing

Lbr Kg

0.4200 0.1200

Oh Oh Oh Oh

0.1400 0.0700 0.0070 0.0070

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.14. PASANG ATAP ASBES GELOMBANG ( 2.40 x 1.05 ) x 4 MM BAHAN Asbes gelombang Paku pancing

Lbr Kg

0.4400 0.1200

Oh Oh Oh Oh

0.1400 0.0670 0.0070 0.0070

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.15. PASANG ATAP ASBES GELOMBANG ( 2.10 x 1.05 ) x 4 MM BAHAN Asbes gelombang Paku pancing

Lbr Kg

0.5100 0.1200

Oh Oh

0.1400 0.0670

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu

Kepala tukang Mandor

Oh Oh

0.0070 0.0070

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.16. PASANG ATAP ASBES GELOMBANG ( 1.50 x 1.05 ) x 4 MM BAHAN Asbes gelombang Paku pancing

Lbr Kg

0.8000 0.1200

Oh Oh Oh Oh

0.1400 0.0670 0.0070 0.0070

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.17. PASANG ATAP ASBES GELOMBANG ( 3.00 x 1.08 ) x 6 MM BAHAN Asbes gelombang Paku pancing

Lbr Kg

0.3700 0.1200

Oh Oh Oh Oh

0.1400 0.0670 0.0070 0.0070

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.18. PASANG ATAP ASBES GELOMBANG ( 2.70 x 1.08 ) x 6 MM BAHAN Asbes gelombang Paku pancing

Lbr Kg

0.3800 0.1200

Oh

0.1400

JUMLAH HARGA BAHAN TENAGA Pekerja

Tukang kayu Kepala tukang Mandor

Oh Oh Oh

0.0670 0.0070 0.0070

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.19. PASANG ATAP ASBES GELOMBANG ( 2.40 x 1.08 ) x 6 MM BAHAN Asbes gelombang Paku pancing

Lbr Kg

0.4600 0.1200

Oh Oh Oh Oh

0.1400 0.0670 0.0070 0.0070

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.20. PASANG ATAP ASBES GELOMBANG ( 2.10 x 1.08 ) x 6 MM BAHAN Asbes gelombang Paku pancing

Lbr Kg

0.4900 0.1200

Oh Oh Oh Oh

0.1400 0.0670 0.0070 0.0070

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.21. PASANG ATAP ASBES GELOMBANG ( 1.80 x 1.08 ) x 6 MM BAHAN Asbes gelombang Paku pancing JUMLAH HARGA BAHAN TENAGA

Lbr Kg

0.5700 0.1200

Pekerja Tukang kayu Kepala tukang Mandor

Oh Oh Oh Oh

0.1400 0.0670 0.0070 0.0070

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.22. PASANG BUBUNG STEL GELOMBANG 0.92 M BAHAN Bubung stel gelombang Paku sekrup 3,5"

Lbr Buah

2.4000 6.0000

Oh Oh Oh Oh

0.0840 0.1250 0.0130 0.0040

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.23. PASANG NOK STEL GELOMBANG 1.05 M BAHAN Nok stel gelombang Paku sekrup 3,5"

Lbr Buah

2.1000 6.0000

Oh Oh Oh Oh

0.0840 0.1250 0.0130 0.0040

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.24. PASANG NOK STEL GELOMBANG 1.08 M BAHAN Nok stel gelombang Paku sekrup 3,5" JUMLAH HARGA BAHAN

Lbr Buah

2.0500 6.0000

TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Oh Oh Oh Oh

0.0840 0.1250 0.0130 0.0040

Lbr Buah

1.2000 6.0000

Oh Oh Oh Oh

0.0840 0.1250 0.0130 0.0040

Lbr Buah

1.2000 6.0000

Oh Oh Oh Oh

0.0840 0.1250 0.0130 0.0040

Lbr Buah

1.2000 6.0000

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.25. PASANG NOK PATEN 0.92 M JUMLAH HARGA TENAGA BAHAN Nok paten Paku sekrup 3,5" JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.26. PASANG NOK PATEN 1.05 M BAHAN Nok paten Paku sekrup 3,5" JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.27. PASANG NOK PATEN 1.08 M BAHAN Nok paten Paku sekrup 3,5"

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Oh Oh Oh Oh

0.0840 0.1250 0.0130 0.0040

Lbr Buah

1.1000 6.0000

Oh Oh Oh Oh

0.1000 0.1500 0.0130 0.0040

Lbr Buah

1.1000 6.0000

Oh Oh Oh Oh

0.0840 0.1250 0.0130 0.0040

Buah Kg

11.0000 0.0300

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.28. PASANG NOK STEL RATA 0.92 M BAHAN Nok stel rata Paku sekrup 3,5" JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.29. PASANG NOK STEL RATA 1.05 M BAHAN Nok stel rata Paku sekrup 3,5" JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.30. PASANG ATAP GENTENG BETON BAHAN Genteng beton Paku biasa 2" - 5"

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Oh Oh Oh Oh

0.2000 0.1000 0.0100 0.0100

Buah Lbr Kg Buah

6.9000 0.3500 0.0300 0.5000

Oh Oh Oh Oh

0.2000 0.3000 0.0030 0.0100

Buah Kg

1.0200 0.2000

Oh Oh Oh Oh

0.2000 0.1000 0.0100 0.0010

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.31. PASANG ATAP GENTENG ASPAL BAHAN Genteng aspal Plywood 4" x 8" x 6 mm Paku biasa 1/2" - 1" Plastik aerator TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA BAHAN JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.32. PASANG ATAP GENTENG METAL BAHAN Genteng metal Paku biasa 2" - 5" JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.33. PASANG ATAP SIRAP

BAHAN Genteng sirap Paku biasa 1/2" - 1"

Buah Kg

60.0000 0.2000

Oh Oh Oh Oh

0.1660 0.2500 0.0250 0.0080

Buah Kg Kg M3 Kg

3.5000 0.0500 10.8000 0.0320 1.0000

Oh Oh Oh Oh

0.4000 0.2000 0.0200 0.0200

Buah Kg M3

2.0000 0.0500 0.0035

Oh Oh Oh Oh

0.1250 0.2500 0.0250 0.0060

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.34. PASANG NOK GENTENG BETON BAHAN Nok genteng beton Paku biasa 2" - 5" Semen abu-abu Pasir pasang Semen warna JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.35. PASANG NOK GENTENG ASPAL BAHAN Genteng aspal Paku biasa 1/2" - 1" Kayu borneo, balok JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN

OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.36. PASANG NOK GENTENG METAL BAHAN Genteng decra bond Paku biasa 1/2" - 1"

Buah Kg

1.1000 0.0500

Oh Oh Oh Oh

0.2500 0.1500 0.0150 0.0130

Lbr Kg Kg M3

0.4000 0.0600 0.0500 0.0040

Oh Oh Oh Oh

0.1250 0.2500 0.0250 0.0060

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.37. PASANG NOK SIRAP BAHAN Seng plat 3" x 6" bjls 28 Paku biasa 1/2" - 1" Paku biasa 2" - 5" Kayu borneo, papan tebal 3 cm JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.38. PASANG ATAP SENG GELOMBANG BAHAN Seng gelombang 3" x 6" bkls 28 Paku biasa 1/2" - 1"

Lbr Kg

0.7000 0.0200

Oh Oh Oh Oh

0.1200 0.0600 0.0060 0.0060

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.39. PASANG ATAP NOK SENG BAHAN Seng plat 3" x 6" bjls 28 Paku biasa 1/2" - 1"

Lbr Kg

0.3000 0.0400

Oh Oh Oh Oh

0.1500 0.0700 0.0080 0.0060

M2 Kg

1.0500 0.0200

Oh Oh Oh Oh

0.1500 0.7500 0.0080 0.0060

M2 Kg

1.2000 0.0400

Oh Oh Oh

0.1000 1.0000 0.0100

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.40. PASANG ATAP ALUMUNIUM BAHAN Atap alumunium gelombang T= 0.55 Paku hak panjang 15 cm JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.41. PASANG NOK ALUMUNIUM BAHAN Nok standar 40cm 18, swg 22 Paku hak panjang 15 cm JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang

Mandor

Oh

0.0100

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 8.42. PASANG ALUMUNIUM FOIL / SISALATION BAHAN Sisalation / alumunium foil

M2

1.0500

Oh Oh Oh Oh

0.1500 0.0500 0.0050 0.0080

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

IX. PEKERJAAN LANGIT-LANGIT 9.1. LANGIT-LANGIT ASBES ( 1.00 x 1.00 ) M, T = 5 MM BAHAN Pelat asbes tebal 5 mm Paku

Lbr Kg

1.1000 0.0100

Oh Oh Oh Oh

0.0300 0.0700 0.0070 0.0015

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 9.2. LANGIT-LANGIT ASBES ( 1.00 x 1.00 ) M, T = 4 MM BAHAN Pelat asbes tebal 4 mm Paku

Lbr Kg

1.1000 0.0100

Oh Oh Oh Oh

0.0300 0.0700 0.0070 0.0015

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 9.3. LANGIT-LANGIT ASBES ( 1.00 x 1.00 ) M, T = 3,5 MM BAHAN Pelat asbes tebal 3,5 mm Paku

Lbr Kg

1.1000 0.0100

Oh Oh

0.0300 0.0700

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu

Kepala tukang Mandor

Oh Oh

0.0070 0.0015

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 9.5. LANGIT-LANGIT AKUSTIK ( 30 x 30 ) CM BAHAN Akustik ukuran 30 x 30 cm Paku

Lbr Kg

11.5000 0.0500

Oh Oh Oh Oh

0.0600 0.1200 0.0120 0.0030

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 9.6. LANGIT-LANGIT AKUSTIK ( 30 x 60 ) CM BAHAN Akustik ukuran 30 x 60 cm Paku

Lbr Kg

5.8000 0.0500

Oh Oh Oh Oh

0.0600 0.1000 0.0100 0.0030

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 9.7. LANGIT-LANGIT AKUSTIK ( 60 x 120 ) CM BAHAN Akustik ukuran 60 x 120 cm Paku

Lbr Kg

1.5000 0.0500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Oh Oh Oh Oh

0.0600 0.1000 0.0100 0.0030

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 9.8. LANGIT-LANGIT PLYWOOD ( 30 x 60 ) CM, T = 4 MM BAHAN Plywood 4' x 8' x 4 mm Paku

Lbr Kg

0.3600 0.0300

Oh Oh Oh Oh

0.0700 0.1000 0.0100 0.0035

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 9.9. LANGIT-LANGIT PLYWOOD ( 30 x 60 ) CM, T = 6 MM BAHAN Plywood 4' x 8' x 6 mm Paku

Lbr Kg

0.3600 0.0300

Oh Oh Oh Oh

0.0700 0.1000 0.0100 0.0035

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 9.10. LANGIT-LANGIT PLYWOOD ( 60 x 120 ) CM, T = 4 MM

BAHAN Plywood 4' x 8' x 4 mm Paku

Lbr Kg

0.3750 0.0300

Oh Oh Oh Oh

0.0700 0.1000 0.0100 0.0035

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 9.11. LANGIT-LANGIT PLYWOOD ( 60 x 120 ) CM, T = 6 MM BAHAN Plywood 4' x 8' x 6 mm Paku

Lbr Kg

0.3750 0.0300

Oh Oh Oh Oh

0.0700 0.1000 0.0100 0.0035

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 9.12. LANGIT-LANGIT TEAKWOOD ( 30 x 60 ) CM, T = 4 MM BAHAN Teakwood 4' x 8' x 4 mm Paku

Lbr Kg

0.3600 0.0300

Oh Oh Oh Oh

0.0700 0.1000 0.0100 0.0035

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 9.13. LANGIT-LANGIT TEAKWOOD ( 60 x 120 ) CM, T = 4 MM BAHAN Teakwood 4' x 8' x 4 mm Paku

Lbr Kg

0.3750 0.0300

Oh Oh Oh Oh

0.0700 0.1000 0.0100 0.0035

M3 Kg Kg

0.0240 0.0100 0.0500

Oh Oh Oh Oh

0.2000 0.6000 0.0600 0.0100

M3 Kg Kg

0.0240 0.0100 0.0500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 9.14. LANGIT-LANGIT LAT KAYU JATI BAHAN Kayu jati, papan Paku Paku sekrup JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 9.15. LANGIT-LANGIT LAT KAYU RAMIN BAHAN Kayu ramin, papan Paku Paku sekrup JUMLAH HARGA BAHAN

TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Oh Oh Oh Oh

0.2000 0.6000 0.0600 0.0100

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 9.16. LANGIT-LANGIT LAT KAYU KAMPER BAHAN Kayu kamper, papan Paku Paku sekrup

M3 Kg Kg

0.0240 0.0100 0.0500

Oh Oh Oh Oh

0.2000 0.6000 0.0600 0.0100

Lbr Kg

0.3500 0.0300

Oh Oh Oh Oh

0.6000 0.1000 0.0100 0.0030

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 9.17. LANGIT-LANGIT SOFT BOARD BAHAN Soft board 4' x 8' x 4 mm Paku biasa JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 9.18. LANGIT-LANGIT AKUSTIK 60 X 120 CM + RANGKA ALLUMUNIUM

BAHAN Profil allumunium "T" Kawat seng polos Ramset / dinabolt Akustik arm strong 60 x 120

M' Kg Bh Lbr

3.6000 0.1500 1.0000 1.5000

Oh Oh Oh Oh

0.1500 0.5000 0.0500 0.0075

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 9.19. LIST LANGIT-LANGIT KAYU PROFIL BAHAN List kayu profil Paku

M' Kg

1.1000 0.0100

Oh Oh Oh Oh

0.0500 0.0500 0.0050 0.0030

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 9.20. LANGIT-LANGIT ASBES ( 1.00 x 1.00 ) M, T = 3.2 MM, RANGKA BORNEO BAHAN Kayu borneo, balok Paku biasa Asbes 1.00 x 1.00 m

M3 Kg Lbr

0.0120 0.0600 1.1000

Oh Oh Oh Oh

0.1800 0.3200 0.0320 0.0090

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 9.21. LANGIT-LANGIT PLYWOOD 4 MM + RANGKA KAYU BORNEO BAHAN Kayu borneo Paku biasa 2" - 5" Plywood 4' x 8' x 4 mm

M3 Kg Lbr

0.0230 0.0600 0.3900

Oh Oh Oh Oh

0.2700 0.4000 0.0400 0.0135

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 9.24. LANGIT-LANGIT GYPSUMBOARD, T = 9 MM BAHAN Gypsum board ( 120 x 240 x 9 ) mm Paku sekrup

Lbr Kg

0.3640 0.1100

Oh Oh Oh Oh

0.1000 0.0500 0.0050 0.0050

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

9.22. LANGIT-LANGIT AKUSTIK ( 30 x 60 ) CM + RANGKA KAYU BORNEO BAHAN Kayu borneo Paku Akustik 30 x 60 cm

M3 Kg Lbr

0.0230 0.0600 5.8000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Oh Oh Oh Oh

0.2600 0.4000 0.0400 0.0130

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 9.23. LANGIT-LANGIT AKUSTIK ( 30 x 30 ) CM + RANGKA KAYU BORNEO BAHAN Kayu borneo, balok Paku Akustik 30x 30 cm

M3 Kg Lbr

0.0270 0.0600 11.5000

Oh Oh Oh Oh

0.3100 0.4700 0.0470 0.0155

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

X. PEKERJAAN SANITASI 10.1. MEMASANG 1 BUAH KLOSET DUDUK / MONOBLOK BAHAN Kloset duduk / monoblok Perlengkapan

Buah 0.3640 6 % harga kloset

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

3.3000 1.1000 0.0010 0.1600

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.2. MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN BAHAN Kloset jongkok porselen Semen portland Pasir pasang

Buah Kg M3

1.0000 6.0000 0.0100

Oh Oh Oh Oh

1.0000 1.5000 1.5000 0.1600

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.3. MEMASANG 1 BUAH KLOSET JONGKOK TERASO BAHAN Kloset jongkok teraso Bata merah 5 x 12 x 22 cm Semen portland Pasir pasang

Buah Buah Kg M3

1.0000 7.0000 6.0000 0.0100

Oh

1.0000

JUMLAH HARGA BAHAN TENAGA Pekerja

Tukang batu Kepala tukang Mandor

Oh Oh Oh

1.5000 0.3000 0.1100

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.4. MEMASANG 1 BUAH URINOIR BAHAN Urinoir Buah 1.0000 Perlengkapan 30 % harga urinoir Semen portland Kg 6.0000 Pasir pasang M3 0.0100 JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

1.0000 1.0000 0.1000 0.1000

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.5. MEMASANG 1 BUAH WASTAFEL BAHAN Wastafel Perlengkapan Semen abu-abu Pasir pasang

Buah 1.0000 12 % harga kloset Kg 6.0000 M3 0.0100

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

1.2000 1.4500 0.1500 0.1000

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.6. MEMASANG 1 BUAH BAK MANDI TERASO VOL = 0.30 M3

BAHAN Bak teraso Semen portland Pasir pasang

Buah Kg M3

1.0000 6.0000 0.0100

Oh Oh Oh Oh

2.1000 0.7500 0.0700 0.1100

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.7. MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOL = 0.30 M3 BAHAN Bak fibreglass Perlengkapan

Buah 1.0000 18 % harga bak

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

1.8000 2.7000 0.5450 0.1100

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.8. MEMASANG 1 BUAH BAK MANDI BATU BATA, VOL = 0.30 M3 BAHAN Batu bata Semen portland Pasir pasang Porselen 11 x 11 cm Semen nat

Buah Kg M3 Buah Kg

0.4000 120.0000 0.3000 360.0000 6.0000

Oh Oh

6.0000 3.0000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu

Kepala tukang Mandor

Oh Oh

0.3000 0.3000

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.9. MEMASANG 1 BUAH BADKIP PORSELEN BAHAN Badkip Perlengkapan

Buah 1.0000 20 % harga badkip

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

0.0750 0.7500 0.2500

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.10. MEMBUAT 1 BUAH BAK BETON, VOL = 1 M3 AIR BAHAN Beton 1/2 : 1 1/2 : 2 1/2 Besi beton Kayu cetakan Ubin porselen Perlengkapan

M3 0.9000 Kg 180.0000 M3 8.0000 M2 5.0000 10 % harga total bahan

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

3.5000 4.5000 0.9000 0.9000

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.11. MEMASANG 1 BUAH BAK FIBREGLASS, VOL = 1 M3 AIR BAHAN

Bak fibreglass Perlengkapan

Buah 1.0000 12 % harga bak

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

3.0000 4.5000 0.9000 0.9000

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.12. MEMASANG 1 M' PIPA PENYALUR AIR LIMBAH JENIS PIPA TANAH, DIA = 15 CM BAHAN Pipa tanah Semen portland Pasir pasang Pasir urug

Buah Kg M3 M3

1.6000 0.6800 0.0130 0.0110

Oh Oh Oh Oh

0.0600 0.0300 0.0030 0.0025

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.13. MEMASANG 1 M' PIPA PENYALUR AIR LIMBAH JENIS PIPA TANAH, DIA = 20 CM BAHAN Pipa tanah Semen portland Pasir pasang Pasir urug

Buah Kg M3 M3

1.6000 0.8700 0.0140 0.0140

Oh Oh Oh Oh

0.0800 0.0400 0.0040 0.0070

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.14. MEMASANG 1 M' PIPA BETON, DIA = 15 - 20 CM BAHAN Pipa beton Batu bata Semen portland Pasir pasang Pasir urug

Buah Buah Kg M3 M3

1.1000 0.0270 3.9200 0.0560 0.0240

Oh Oh Oh Oh

0.1400 0.0700 0.0070 0.0070

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.15. MEMASANG 1 M' PIPA BETON, DIA = 30 - 100 CM BAHAN Pipa beton Batu bata Semen portland Pasir pasang Pasir urug

Buah Buah Kg M3 M3

1.1000 0.5500 10.3000 0.0610 0.0690

Oh Oh Oh Oh

0.3800 0.1900 0.0190 0.0190

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.16. MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA (30x30 )CM, TINGGI 35 CM

BAHAN Batu bata Semen portland Pasir pasang Batu kerikil Besi beton Pasir beton

M3 Kg M3 M3 Kg M3

0.1450 44.0000 0.0700 0.0700 1.6000 0.0600

Oh Oh Oh Oh

3.2000 1.0150 0.0015 0.0160

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.17. MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA (45x45 )CM, TINGGI 50 CM BAHAN Batu bata Semen portland Pasir pasang Batu kerikil Besi beton Pasir beton

M3 Kg M3 M3 Kg M3

0.2500 77.0000 0.1300 0.0200 2.6000 0.0900

Oh Oh Oh Oh

1.4200 0.4730 0.0470 0.0710

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.18. MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA (60x60 )CM, TINGGI 65 CM BAHAN Batu bata Semen portland Pasir pasang Batu kerikil Besi beton

M3 Kg M3 M3 Kg

0.3710 114.0000 0.1840 0.0330 4.8500

Pasir beton

M3

0.1200

Oh Oh Oh Oh Oh

2.1600 0.7200 0.0720 0.1080 0.1000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor Tukang gali JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.19. MEMASANG 1 M' PIPA GALVANIS DIA = 1/2" BAHAN Pipa galvanis Perlengkapan

M' 1.2000 35.0 % harga pipa

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

0.0540 0.0900 0.0090 0.0270

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.20. MEMASANG 1 M' PIPA GALVANIS DIA = 3/4" BAHAN Pipa galvanis Perlengkapan

M' 1.2000 35.0 % harga pipa

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT

Oh Oh Oh Oh

0.0540 0.0900 0.0090 0.0270

HARGA SATUAN PEKERJAAN 10.21. MEMASANG 1 M' PIPA GALVANIS DIA = 1" BAHAN Pipa galvanis Perlengkapan

M' 1.2000 35.0 % harga pipa

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

0.0540 0.0900 0.0090 0.0270

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.22. MEMASANG 1 M' PIPA GALVANIS DIA = 1 1/2" BAHAN Pipa galvanis Perlengkapan

M' 1.2000 35.0 % harga pipa

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

0.1080 0.1800 0.0180 0.0054

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.23. MEMASANG 1 M' PIPA GALVANIS DIA = 3" BAHAN Pipa galvanis Perlengkapan

M' 1.2000 35.0 % harga pipa

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang

Oh Oh Oh

0.1080 0.1800 0.0180

Mandor

Oh

0.0054

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.24. MEMASANG 1 M' PIPA GALVANIS DIA = 4" BAHAN Pipa galvanis Perlengkapan

M' 1.2000 35.0 % harga pipa

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

0.1350 0.2250 0.0225 0.0068

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.25. MEMASANG 1 M' PIPA PVC TIPE AW DIA = 1/2 " BAHAN Pipa PVC Perlengkapan

M' 1.2000 35.0 % harga pipa

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

0.0360 0.0600 0.0060 0.0018

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.26. MEMASANG 1 M' PIPA PVC TIPE AW DIA = 3/4 " BAHAN Pipa PVC Perlengkapan JUMLAH HARGA BAHAN

M' 1.2000 35.0 % harga pipa

TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

0.0360 0.0600 0.0060 0.0018

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.27. MEMASANG 1 M' PIPA PVC TIPE AW DIA = 1 " BAHAN Pipa PVC Perlengkapan

M' 1.2000 35.0 % harga pipa

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

0.0360 0.0600 0.0060 0.0018

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.28. MEMASANG 1 M' PIPA PVC TIPE AW DIA = 1 1/2 " BAHAN Pipa PVC Perlengkapan

M' 1.2000 35.0 % harga pipa

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

0.0360 0.0600 0.0060 0.0018

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.29. MEMASANG 1 M' PIPA PVC TIPE AW DIA = 2 "

BAHAN Pipa PVC Perlengkapan

M' 1.2000 35.0 % harga pipa

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

0.0540 0.0900 0.0090 0.0027

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.30. MEMASANG 1 M' PIPA PVC TIPE AW DIA = 2 1/2 " BAHAN Pipa PVC Perlengkapan

M' 1.2000 35.0 % harga pipa

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

0.0360 0.0600 0.0060 0.0018

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.31. MEMASANG 1 M' PIPA PVC TIPE AW DIA = 3 " BAHAN Pipa PVC Perlengkapan

M' 1.2000 35.0 % harga pipa

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN

Oh Oh Oh Oh

0.0810 0.1350 0.0135 0.0041

OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.32. MEMASANG 1 M' PIPA PVC TIPE AW DIA = 4 " BAHAN Pipa PVC Perlengkapan

M' 1.2000 35.0 % harga pipa

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

0.0810 0.1350 0.0135 0.0041

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.33. MEMASANG 1 BUAH BAK CUCI PIRING STAINLESS STEEL BAHAN Bak cuci stainless steel Water drain + aksesoris

Buah set

1.0000 1.0000

Oh Oh Oh Oh

0.0300 0.3000 0.0300 0.0015

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.34. MEMASANG 1 BUAH BAK CUCI PIRING TERASO BAHAN Bak cuci teraso Water drain + aksesoris Semen portland Pasir JUMLAH HARGA BAHAN TENAGA

Buah set Kg M3

1.0000 1.0000 20.0000 0.0500

Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

0.0500 0.5000 0.0500 0.0025

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.35. MEMASANG 1 BUAH KRAN DIA 3/4" ATAU 1/2" BAHAN Kran air Seal tape

Buah Buah

1.0000 0.0250

Oh Oh Oh Oh

0.0100 0.1000 0.0100 0.0050

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 10.36. MEMASANG 1 BUAH FLOOR DRAIN BAHAN Floor drain

Buah

1.0000

Oh Oh Oh Oh

0.0100 0.1000 0.0100 0.0050

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

XI. PEKERJAAN BESI DAN ALUMINIUM 11.1. PASANG RANGKA ATAP BAJA BAHAN Besi profil WF Meni besi

Kg Kg

1.1000 0.0800

Oh Oh Oh Oh

0.0060 0.0600 0.0060 0.0003

M2

1.0000

Oh Oh Oh Oh

0.6500 0.6500 0.0650 0.0320

M2

1.0000

Oh Oh Oh Oh

1.0500 1.0500 0.1050 0.0053

JUMLAH HARGA BAHAN TENAGA Tukang besi Pekerja Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 11.2. PASANG PINTU BESI BAJA BAHAN Pintu besi baja JUMLAH HARGA BAHAN TENAGA Tukang besi konstruksi Pekerja Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 11.3. PASANG JENDELA BESI BAHAN Jendela besi JUMLAH HARGA BAHAN TENAGA Tukang besi konstruksi Pekerja Kepala tukang Mandor JUMLAH HARGA TENAGA

JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 11.4. PASANG JENDELA BESI TAHAN API BAHAN Jendela besi tahan api

M2

1.0000

Oh Oh Oh Oh

1.2000 1.0220 0.1200 0.0060

M2

1.0000

Oh Oh Oh Oh

1.2000 1.2000 0.1200 0.0060

M2

1.0000

Oh Oh Oh Oh

1.0500 1.0500 0.1050 0.0052

JUMLAH HARGA BAHAN TENAGA Tukang besi konstruksi Pekerja Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 11.5. PASANG PINTU GULUNG BESI BAHAN Pintu gulung besi JUMLAH HARGA BAHAN TENAGA Tukang besi konstruksi Pekerja Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 11.6. PASANG PINTU LIPAT BAHAN Pintu lipat JUMLAH HARGA BAHAN TENAGA Tukang besi konstruksi Pekerja Kepala tukang Mandor

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 11.7. PASANG PINTU SUNSCREEN ALUMINIUM BAHAN Sunsreen aluminium

M2

1.0000

Oh Oh Oh Oh

0.8000 0.0800 0.0800 0.0040

M2

1.0000

Oh Oh Oh Oh

1.5000 1.0500 0.1050 0.0052

M2

1.0000

Oh Oh

1.0500 1.0500

JUMLAH HARGA BAHAN TENAGA Tukang besi konstruksi Pekerja Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 11.8. PASANG ROLLING DOOR BAHAN roll door JUMLAH HARGA BAHAN TENAGA Tukang besi konstruksi Pekerja Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 11.9. PASANG PINTU ALUMINIUM BAHAN Pintu aluminium JUMLAH HARGA BAHAN TENAGA Tukang besi konstruksi Pekerja

Kepala tukang Mandor

Oh Oh

0.1050 0.0052

M2

1.0000

Oh Oh Oh Oh

0.3500 0.3500 0.0350 0.0018

M2

1.0000

Oh Oh Oh Oh

0.3500 0.3500 0.0350 0.0018

M2

11.5000

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 11.10. PASANG VENETIONS BLINDS BAHAN Venetions blinds JUMLAH HARGA BAHAN TENAGA Tukang kayu Pekerja Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 11.11. PASANG VERTIKALS BLINDS BAHAN Vertikals blinds JUMLAH HARGA BAHAN TENAGA Tukang kayu Pekerja Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 11.12. PASANG TERALI BESI BAHAN Besi strip 2 x 3 JUMLAH HARGA BAHAN TENAGA

Tukang las Pekerja Kepala tukang Mandor

Oh Oh Oh Oh

1.2000 1.2000 0.0120 0.0006

M2 Kg M3

1.1000 0.0200 0.0018

Oh Oh Oh Oh

0.1000 0.1000 0.0100 0.0005

M2 Kg M3

1.1000 0.0200 0.0018

Oh Oh Oh Oh

0.1000 0.1000 0.0100 0.0005

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 11.13. PASANG KAWAT HARMONIKA BAHAN Kawat harmonika Paku biasa 1/2" - 1" Kayu kamper, papan JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 11.14. PASANG KAWAT NYAMUK BAHAN Kawat nyamuk Paku biasa 1/2" - 1" Kayu kamper, papan JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 11.15. PASANG KAWAT KASSA

BAHAN Kawat kassa Paku biasa 1/2" - 1" Kayu kamper, papan

M2 Kg M3

1.1000 0.0200 0.0018

Oh Oh Oh Oh

0.1000 0.1000 0.0100 0.0005

M2 Kg M3

1.1000 0.0200 0.0018

Oh Oh Oh Oh

0.1000 0.1000 0.0100 0.0005

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 11.16. PASANG KAWAT BURUNG BAHAN Kawat burung Paku biasa 1/2" - 1" Kayu kamper, papan JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 11.17. PASANG JENDELA NAKO & TRALIS BAHAN Jendela nako Paku biasa 1/2" - 1" Besi strip

atau sekrup

M2 Kg M2

1.1000 0.0200 0.0250

Oh Oh Oh Oh

0.2000 0.2000 0.0200 0.0010

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 11.18. PASANG TALANG DATAR, SENG BJLS 28 BAHAN Seng plat 3' x 6' bjls 28 Paku biasa 1/2" - 1" Kayu borneo, papan Flincote / meni besi

Lbr Kg M3 Kg

0.5000 0.0150 0.0096 0.2500

Oh Oh Oh Oh

0.1500 0.4000 0.0250 0.0013

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 11.19. PASANG TALANG MIRING, SENG BJLS 28 BAHAN Seng plat 3' x 6' bjls 28 Paku biasa 1/2" - 1" Kayu borneo, papan Flincote / meni besi

Lbr Kg M3 Kg

0.5000 0.0150 0.0190 0.3000

Oh Oh Oh Oh

0.0400 0.4000 0.0250 0.0013

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 11.20. PASANG TALANG 1/2 LINGKARAN D-10CM, SENG BJLS 28 BAHAN Seng plat 3' x 6' bjls 28

Lbr

0.3000

Paku biasa 1/2" - 1" Kayu borneo, papan Flincote / meni besi

Kg M3 Kg

0.1000 0.0190 0.5000

Oh Oh Oh Oh

0.1500 0.2500 0.0250 0.0013

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 11.21. PASANG TALANG 1/2 LINGKARAN D-10CM, SENG BJLS 24 BAHAN Seng plat 3' x 6' bjls 24 Paku biasa 1/2" - 1" Kayu borneo, papan Flincote / meni besi

Lbr Kg M3 Kg

0.3000 0.1000 0.0190 0.5000

Oh Oh Oh Oh

0.1500 0.2500 0.0250 0.0013

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

XII. PEKERJAAN KUNCI & KACA 12.1. PASANG KUNCI TANAM ANTIK BAHAN Kunci tanam antik

Buah

1.0000

Oh Oh Oh Oh

0.0600 0.6000 0.0600 0.0030

Buah

1.0000

Oh Oh Oh Oh

0.0100 0.5000 0.0100 0.0050

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.2. PASANG KUNCI TANAM BIASA BAHAN Kunci tanam biasa JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.3. PASANG KUNCI TANAM KAMAR MANDI BAHAN Kunci tanam kamar mandi

Buah

1.0000

Oh Oh Oh Oh

0.0050 0.5000 0.0050 0.0025

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN

OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.4. PASANG KUNCI SILINDER BAHAN Kunci silinder

Buah

1.0000

Oh Oh Oh Oh

0.0050 0.5000 0.0050 0.0003

Buah

1.0000

Oh Oh Oh Oh

0.0150 0.1500 0.0150 0.0008

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.5. PASANG ENGSEL PINTU BAHAN Engsel pintu JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.6. PASANG ENGSEL JENDELA KUPU-KUPU BAHAN Engsel jendela

Buah

1.0000

Oh Oh Oh Oh

0.0100 0.1000 0.0100 0.0005

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.7. PASANG ENGSEL ANGIN BAHAN Engsel angin

Buah

1.0000

Oh Oh Oh Oh

0.0200 0.2000 0.0200 0.0100

Buah

1.0000

Oh Oh Oh Oh

0.0150 0.1500 0.0150 0.0008

Buah

1.0000

Oh Oh Oh

0.0150 0.1500 0.0150

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.8. PASANG SPRING KNIP BAHAN Spring knip JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.9. PASANG KAIT ANGIN BAHAN Kait angin JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang

Mandor

Oh

0.0008

Buah

1.0000

Oh Oh Oh Oh

0.0500 0.5000 0.0500 0.0025

Buah

1.0000

Oh Oh Oh Oh

0.0200 0.2000 0.0200 0.0010

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.10. PASANG DOOR CLOSER BAHAN Door closer JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.11. PASANG KUNCI SELOT BAHAN Kunci selot JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.12. PASANG PEGANGAN PINTU / DOOR HOLDER BAHAN Door holder

Buah

1.0000

Oh

0.0500

JUMLAH HARGA BAHAN TENAGA Pekerja

Tukang kayu Kepala tukang Mandor

Oh Oh Oh

0.5000 0.0500 0.0025

Buah

1.0000

Oh Oh Oh Oh

0.0100 0.1000 0.0100 0.0005

Buah

1.0000

Oh Oh Oh Oh

0.0600 0.6000 0.0600 0.0030

Buah

1.0000

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.13. PASANG DOOR STOP BAHAN Door stop JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.14. PASANG REL PINTU DORONG BAHAN Rel pintu dorong JUMLAH HARGA BAHAN TENAGA Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.15. PASANG KUNCI LEMARI BAHAN Kunci lemari JUMLAH HARGA BAHAN

TENAGA Pekerja Tukang kayu Kepala tukang Mandor

Oh Oh Oh Oh

0.0250 0.2500 0.0250 0.0013

M2

1.1000

Oh Oh Oh Oh

0.0150 0.1500 0.0150 0.0008

M2

1.1000

Oh Oh Oh Oh

0.0150 0.1500 0.0150 0.0008

M2

1.1000

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.16. PASANG KACA, T = 3 MM BAHAN Kaca JUMLAH HARGA BAHAN Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.17. PASANG KACA, T = 5 MM BAHAN Kaca JUMLAH HARGA BAHAN Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.18. PASANG KACA, T = 8 MM BAHAN Kaca polos JUMLAH HARGA BAHAN

Pekerja Tukang kayu Kepala tukang Mandor

Oh Oh Oh Oh

0.0165 0.1650 0.0165 0.0008

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.19. PASANG KACA BURAM, T = 12 MM BAHAN Kaca buram Sealent

M2 Kg

1.1000 0.0500

Oh Oh Oh Oh

0.0250 0.2500 0.0250 0.0013

JUMLAH HARGA BAHAN Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.20. PASANG KACA CERMIN, T = 5 MM BAHAN Kaca cermin

M2

1.1000

Oh Oh Oh Oh

0.0150 0.1500 0.0150 0.0008

JUMLAH HARGA BAHAN Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.21. PASANG KACA CERMIN, T = 6 MM BAHAN Kaca cermin JUMLAH HARGA BAHAN

M2

1.1000

Pekerja Tukang kayu Kepala tukang Mandor

Oh Oh Oh Oh

0.0150 0.1500 0.0150 0.0008

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.22. PASANG KACA CERMIN, T = 8 MM BAHAN Kaca cermin

M2

1.1000

Oh Oh Oh Oh

0.0165 0.1650 0.0165 0.0008

JUMLAH HARGA BAHAN Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.23. PASANG KACA "WIREGLASS" , T = 5 MM BAHAN Kaca wireglass

M2

1.1000

Oh Oh Oh Oh

0.0150 0.1500 0.0150 0.0008

M2

1.1000

Oh

0.0150

JUMLAH HARGA BAHAN Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 12.24. PASANG KACA PATRI, T = 5 MM BAHAN Kaca patri JUMLAH HARGA BAHAN Pekerja

Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

Oh Oh Oh

0.1500 0.0150 0.0008

XIII. PEKERJAAN PENUTUP LANTAI & DINDING 13.1. PASANG LANTAI UBIN PC ABU-ABU UKURAN 40X40 CM BAHAN Ubin abu-abu 40x40 cm Semen portland Pasir pasang

Buah Kg M3

6.6300 9.8000 0.0215

Oh Oh Oh Oh

0.2500 0.1200 0.0120 0.0125

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.2. PASANG LANTAI UBIN PC ABU-ABU UKURAN 30X30 CM BAHAN Ubin abu-abu 30x30 cm Semen portland Pasir pasang

Buah Kg M3

11.8700 10.0000 0.0215

Oh Oh Oh Oh

0.2600 0.1250 0.0125 0.0130

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.3. PASANG LANTAI UBIN PC ABU-ABU UKURAN 20X20 CM BAHAN Ubin abu-abu 20x20 cm Semen portland Pasir pasang

Buah Kg M3

26.5000 10.4000 0.0135

Oh

0.2700

JUMLAH HARGA BAHAN TENAGA Pekerja

Tukang batu Kepala tukang Mandor

Oh Oh Oh

0.1300 0.0130 0.0135

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.4. PASANG LANTAI UBIN WARNA UKURAN 40X40 CM BAHAN Ubin warna 40x40 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

6.6300 8.1600 0.0230 0.9000

Oh Oh Oh Oh

0.2500 0.1200 0.0120 0.0125

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.5. PASANG LANTAI UBIN WARNA UKURAN 30X30 CM BAHAN Ubin warna 30x30 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

11.8700 8.3600 0.0230 0.9000

Oh Oh Oh Oh

0.2500 0.1200 0.1200 0.0125

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.6. PASANG LANTAI UBIN WARNA UKURAN 20X20 CM

BAHAN Ubin warna 20x20 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

26.5000 8.7600 0.0230 0.9000

Oh Oh Oh Oh

0.2700 0.1300 0.0130 0.0135

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.7. PASANG LANTAI UBIN TERASO UKURAN 40X40 CM BAHAN Ubin teraso 40x40 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

6.2500 8.8000 0.0215 0.9000

Oh Oh Oh Oh

0.2500 0.1200 0.0120 0.0125

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.8. PASANG LANTAI UBIN TERASO UKURAN 30X30 CM BAHAN Ubin teraso 30x30 cm Semen portland Pasir pasang Semen warna JUMLAH HARGA BAHAN TENAGA

Buah Kg M3 Kg

1.8700 10.0000 0.0215 1.5400

Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

0.2600 0.1250 0.0125 0.0130

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.9. PASANG LANTAI UBIN GRANITO UKURAN 40X40 CM BAHAN Ubin granito 40x40 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

6.9300 9.8000 0.0215 1.3000

Oh Oh Oh Oh

0.2500 0.1200 0.0120 0.0125

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.10. PASANG LANTAI UBIN GRANITO UKURAN 30X30 CM BAHAN Ubin granito 40x40 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

11.8700 10.0000 0.0215 1.5000

Oh Oh Oh Oh

0.2600 0.1250 0.0125 0.0130

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

13.11. PASANG LANTAI UBIN TERALUX KERANG UKURAN 40X40 CM BAHAN Ubin teralux kerang 40x40 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

6.2500 8.8000 0.0215 1.3000

Oh Oh Oh Oh

0.2500 0.1200 0.0120 0.0125

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.12. PASANG LANTAI UBIN TERASO UKURAN 30X30 CM BAHAN Ubin teralux kerang 30x30 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

11.8070 10.0000 0.0215 1.1250

Oh Oh Oh Oh

0.2500 0.1200 0.0120 0.0125

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.13. PASANG LANTAI UBIN TERALUX MARMER UKURAN 60X60 CM BAHAN Ubin teralux marmer 60x60 cm Semen portland Pasir pasang Semen warna JUMLAH HARGA BAHAN

Buah Kg M3 Kg

5.6000 8.1900 0.0450 1.0000

TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

0.2500 0.1200 0.0120 0.0125

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.14. PASANG LANTAI UBIN TERALUX MARMER UKURAN 40X40 CM BAHAN Ubin teralux marmer 40x40 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

6.2500 8.8000 0.0215 1.3000

Oh Oh Oh Oh

0.6720 0.2240 0.0220 0.0340

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.15. PASANG LANTAI UBIN TERALUX MARMER UKURAN 30X30 CM BAHAN Ubin teralux marmer 30x30 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

11.8700 10.0000 0.0215 1.5000

Oh Oh Oh Oh

0.7000 0.3400 0.0340 0.0350

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

13.16. PASANG PLINT UBIN PC ABU-ABU UKURAN 15X20 CM BAHAN Plint ubin 15x20 cm Semen portland Pasir pasang

Buah Kg M3

5.3000 1.5600 0.0040

Oh Oh Oh Oh

0.0600 0.0300 0.0030 0.0030

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.17. PASANG PLINT UBIN PC ABU-ABU UKURAN 10X30 CM BAHAN Plint ubin 10x30 cm Semen portland Pasir pasang

Buah Kg M3

3.5300 1.5600 0.0030

Oh Oh Oh Oh

0.0600 0.0300 0.0030 0.0030

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.18. PASANG PLINT UBIN PC ABU-ABU UKURAN 10X40 CM BAHAN Plint ubin 10x40 cm Semen portland Pasir pasang

Buah Kg M3

2.6500 1.5600 0.0030

Oh

0.0600

JUMLAH HARGA BAHAN TENAGA Pekerja

Tukang batu Kepala tukang Mandor

Oh Oh Oh

0.0300 0.0030 0.0030

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.19. PASANG PLINT UBIN WARNA UKURAN 10X20 CM BAHAN Plint ubin pc warna 10x20 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

5.3000 1.2000 0.0030 0.1900

Oh Oh Oh Oh

0.0600 0.0300 0.0030 0.0030

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.20. PASANG PLINT UBIN WARNA UKURAN 10X30 CM BAHAN Plint ubin pc warna 10x30 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

3.3300 1.6500 0.0032 0.1000

Oh Oh Oh Oh

0.0600 0.0300 0.0030 0.0030

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.21. PASANG PLINT UBIN WARNA UKURAN 10X40 CM

BAHAN Plint ubin pc warna 10x40 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

2.6500 1.2000 0.0030 0.1000

Oh Oh Oh Oh

0.0840 0.0400 0.0040 0.0040

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.22. PASANG PLINT UBIN TERASO UKURAN 10X30 CM BAHAN Plint ubin teraso 10x30 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

3.5300 1.5600 0.0030 0.1900

Oh Oh Oh Oh

0.0840 0.0400 0.0040 0.0040

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.23. PASANG PLINT UBIN TERASO UKURAN 10X40 CM BAHAN Plint ubin teraso 10x40 cm Semen portland Pasir pasang Semen warna JUMLAH HARGA BAHAN TENAGA

Buah Kg M3 Kg

2.6500 1.2000 0.0030 0.1000

Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

0.0800 0.0400 0.0040 0.0040

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.24. PASANG PLINT UBIN GRANITO UKURAN 10X40 CM BAHAN Plint ubin granito 10x40 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

2.6500 1.2000 0.0030 0.1000

Oh Oh Oh Oh

0.0600 0.0300 0.0030 0.0030

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.25. PASANG PLINT UBIN GRANITO UKURAN 10X30 CM BAHAN Plint ubin granito 10x30 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

3.3300 1.6500 0.0032 0.1000

Oh Oh Oh Oh

0.9000 0.0900 0.0090 0.0045

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

13.26. PASANG PLINT UBIN TERALUX KERANG UKURAN 10X40 CM BAHAN Plint ubin teralux kerang 10x40 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

2.5000 1.6500 0.0032 0.1000

Oh Oh Oh Oh

0.9000 0.0900 0.0090 0.0045

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.27. PASANG PLINT UBIN TERALUX KERANG UKURAN 10X30 CM BAHAN Plint ubin teralux kerang 10x30 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

3.3300 1.6500 0.0032 0.1000

Oh Oh Oh Oh

0.9000 0.0900 0.0090 0.0045

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.28. PASANG PLINT UBIN TERALUX MARMER UKURAN 10X60 CM BAHAN Plint ubin teralux marmer 10x60 cm Semen portland Pasir pasang Semen warna JUMLAH HARGA BAHAN

Buah Kg M3 Kg

1.7000 1.6500 0.0032 0.1000

TENAGA Pekerja Tukang batu Kepala tukang Mandor

Oh Oh Oh Oh

0.9000 0.0900 0.0090 0.0045

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.29. PASANG PLINT UBIN TERALUX MARMER UKURAN 10X40 CM BAHAN Plint ubin teralux maemer 10x40 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

2.5000 1.6500 0.0032 0.1000

Oh Oh Oh Oh

0.9000 0.0900 0.0090 0.0045

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.30. PASANG PLINT UBIN TERALUX MARMER UKURAN 10X30 CM BAHAN Plint ubin teralux maemer 10x30 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

3.3300 1.6500 0.0032 0.1000

Oh Oh Oh Oh

0.9000 0.0900 0.0090 0.0045

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

13.31. PASANG TERASO COR DITEMPAT BAHAN Bahan teraso cor

M3

0.0036

Oh Oh Oh Oh

0.9000 0.0900 0.0090 0.0045

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.32. PASANG TERALUX COR DITEMPAT, T=3CM BAHAN Bahan teralux cor

M3

0.0036

Oh Oh Oh Oh

0.9000 0.0900 0.0090 0.0045

M2 Kg M3

1.0500 14.1400 0.0400

Oh Oh Oh Oh

0.2700 0.1500 0.0150 0.0135

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.33. PASANG UBIN TAHAN ASAM BAHAN Ubin tahan asam Semen tahan asam Pasir pasang JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.34. PASANG LANTAI KERAMIK ARTISTIK 10X20 CM BAHAN Ubin keramik artistik 10x20 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

50.0000 11.3800 0.0420 1.5000

Oh Oh Oh Oh

0.6200 0.3500 0.0350 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.35. PASANG LANTAI KERAMIK ARTISTIK 10X10 CM BAHAN Ubin keramik artistik 10x10 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

50.0000 11.3800 0.0420 2.0000

Oh Oh Oh Oh

0.6200 0.3500 0.0350 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.36. PASANG LANTAI KERAMIK ARTISTIK 5X20 CM BAHAN Ubin keramik artistik 5x20 cm Semen portland

Buah Kg

100.0000 11.3800

Pasir pasang Semen warna

M3 Kg

0.0420 1.5000

Oh Oh Oh Oh

0.6200 0.3500 0.0350 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.37. PASANG PLINT KERAMIK ARTISTIK 10X20 CM BAHAN Plint keramik artistik 10x20 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

5.0000 1.6500 0.0032 0.1000

Oh Oh Oh Oh

0.0900 0.0900 0.0090 0.0045

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.38. PASANG PLINT KERAMIK ARTISTIK 10X10 CM BAHAN Plint keramik artistik 10x10 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

0.0000 1.6500 0.0032 0.1200

Oh Oh Oh Oh

0.0900 0.0900 0.0090 0.0045

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.39. PASANG PLINT KERAMIK ARTISTIK 5X20 CM BAHAN Plint keramik artistik 5x20 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

5.0000 0.8500 0.0022 0.0800

Oh Oh Oh Oh

0.0900 0.0900 0.0090 0.0045

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.40. INTERNAL COVE ARTISTIK (5x5x20) CM BAHAN Internal cove (5x5x20)cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

10.0000 1.4150 0.0390 1.2000

Oh Oh Oh Oh

0.7500 0.4500 0.0450 0.3750

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.41. PASANG PLINT VINYL TANPA ADUKAN BAHAN Lt vinyl karet 30x30 kwl I

Buah

3.5000

Lem vinyl

Kg

0.0800

Oh Oh Oh Oh

0.0800 0.0800 0.0080 0.0040

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.42. PASANG LANTAI KERAMIK 10X20 CM BAHAN Ubin keramik 10x20 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

50.0000 11.3800 0.0420 1.5000

Oh Oh Oh Oh

0.6200 0.3500 0.0350 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.43. PASANG LANTAI KERAMIK 15X15 CM BAHAN Ubin keramik 15x15 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

44.0000 11.3800 0.0420 1.5000

Oh Oh Oh Oh

0.6200 0.3500 0.0350 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.44. PASANG LANTAI KERAMIK 20X20 CM BAHAN Ubin keramik 20x20 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

25.0000 11.3800 0.0420 1.5000

Oh Oh Oh Oh

0.6200 0.3500 0.0350 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.45. PASANG LANTAI KERAMIK 25X25 CM BAHAN Ubin keramik 25x25 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

16.0000 11.3800 0.0420 1.5000

Oh Oh Oh Oh

0.6200 0.3500 0.0350 0.0300

TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA BAHAN JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

13.46. PASANG LANTAI KERAMIK 15X20 CM BAHAN Ubin keramik 15x20 cm Semen portland

Buah Kg

35.0000 11.3800

Pasir pasang Semen warna

M3 Kg

0.0420 1.5000

Oh Oh Oh Oh

0.6200 0.3500 0.0350 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.47. PASANG LANTAI KERAMIK 33X33 CM BAHAN Ubin keramik 33x33 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

10.0000 11.3800 0.0420 1.5000

Oh Oh Oh Oh

0.6200 0.3500 0.0350 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.48. PASANG LANTAI KERAMIK 33X33 CM ANTI SLIP BAHAN Ubin keramik 33x33 cm anti slip Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

10.0000 11.3800 0.0420 1.5000

Oh Oh Oh Oh

0.6200 0.3500 0.0350 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.49. PASANG LANTAI KERAMIK 10X33 CM BAHAN Ubin keramik 10x33 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

33.0000 11.3800 0.0420 1.5000

Oh Oh Oh Oh

0.6200 0.3500 0.0350 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.50. PASANG LANTAI MOSAIK 30X30 CM, EX LOKAL BAHAN Ubin mosaik 30x30 cm Semen portland Pasir pasang Semen warna

Buah Kg M3 Kg

12.0000 14.1500 0.0390 2.0000

Oh Oh Oh Oh

0.6200 0.3500 0.0350 0.0300

Buah

1.0520

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.51. PASANG LANTAI MARMER BAHAN Marmer

Semen portland Pasir pasang Semen warna

Kg M3 Kg

14.1500 0.0390 2.0000

Oh Oh Oh Oh

0.6200 0.3500 0.0350 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.52. PASANG LANTAI KARPET 100% WOOL BAHAN Feltex carpet 100% wool T-21 Lem vinyl

M2 Kg

1.0500 0.3500

Oh Oh Oh Oh

0.1700 0.1700 0.0170 0.0085

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.53. PASANG LANTAI KARPET 80% WOOL, 20% NYLON BAHAN Carpet 80% wool, 20% nylon Lem vinyl

M2 Kg

1.0500 0.3500

Oh Oh Oh Oh

0.1700 0.1700 0.0170 0.0085

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN

OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.54. PASANG UNDERLYER, T = 6 MM BAHAN Underlyer t=6mm/rubber corrugated

M2

1.0500

Oh Oh Oh Oh

0.1200 0.1200 0.0120 0.0060

M2 Kg

1.0500 0.3500

Oh Oh Oh Oh

0.1700 0.1700 0.0170 0.0085

M2 Kg

1.0500 0.6000

Oh Oh Oh

0.6500 0.3500 0.0350

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.55. PASANG LANTAI KARPET BAHAN Carpet Lem vinyl JUMLAH HARGA BAHAN TENAGA Pekerja Tukang Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.56. PASANG LANTAI PARQUET JATI BAHAN Parquet jati Lem vinyl JUMLAH HARGA BAHAN TENAGA Pekerja Tukang Kepala tukang

Mandor

Oh

0.0325

M2 Kg

1.0500 0.6000

Oh Oh Oh Oh

0.6500 0.3500 0.0350 0.0325

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.57. PASANG GYMFLOOR BAHAN Gymfloor Lem vinyl JUMLAH HARGA BAHAN TENAGA Pekerja Tukang Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.58. PASANG DINDING PORSELIN 11X11 CM, PUTIH BAHAN Porselin 11x11 cm Semen abu-abu Pasir pasang Semen warna

Buah Kg M3 Kg

83.0000 9.3000 0.0180 1.5000

Oh Oh Oh Oh

0.6200 0.5000 0.0500 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.59. PASANG DINDING PORSELIN 11X11 CM, WARNA BAHAN Porselin 11x11 cm warna Semen abu-abu

Buah Kg

83.0000 9.3000

Pasir pasang Semen warna

M3 Kg

0.0180 1.5000

Oh Oh Oh Oh

0.6200 0.5000 0.0500 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.60. PASANG DINDING PORSELIN 15X15 CM, PUTIH BAHAN Porselin 15x15 cm Semen abu-abu Pasir pasang Semen warna

Buah Kg M3 Kg

45.0000 9.3000 0.0180 1.5000

Oh Oh Oh Oh

0.6000 0.4500 0.0450 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.61. PASANG DINDING PORSELIN 15X15 CM, WARNA BAHAN Porselin 15x15 cm warna Semen abu-abu Pasir pasang Semen warna

Buah Kg M3 Kg

45.0000 9.3000 0.0180 1.5000

Oh Oh Oh Oh

0.6000 0.4500 0.0450 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.62. PASANG DINDING PORSELIN 10X20 CM, WARNA BAHAN Porselin 10x20 cm Semen abu-abu Pasir pasang Semen warna

Buah Kg M3 Kg

50.0000 9.3000 0.0180 1.5000

Oh Oh Oh Oh

0.6000 0.4500 0.0450 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.63. PASANG DINDING PORSELIN 20X20 CM, WARNA BAHAN Porselin 20x20 cm warna Semen abu-abu Pasir pasang Semen warna

Buah Kg M3 Kg

25.0000 9.3000 0.0180 1.5000

Oh Oh Oh Oh

0.6000 0.4500 0.0450 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.64. PASANG DINDING KERAMIK ARTISTIK 10X20 CM BAHAN Keramik artistik 10x20cm

Buah

100.0000

Semen abu-abu Pasir pasang Semen warna

Kg M3 Kg

9.3000 0.0180 1.5000

Oh Oh Oh Oh

0.6000 0.4500 0.0450 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.65. PASANG DINDING KERAMIK ARTISTIK 5X20 CM BAHAN Keramik artistik 5x20cm Semen abu-abu Pasir pasang Semen warna

Buah Kg M3 Kg

100.0000 9.3000 0.0180 1.5000

Oh Oh Oh Oh

0.6000 0.4500 0.0450 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.66. PASANG DINDING KERAMIK 10X20 CM BAHAN Keramik 10x20 cm Semen abu-abu Pasir pasang Semen warna

Buah Kg M3 Kg

50.0000 9.3000 0.0180 1.5000

Oh Oh Oh

0.6000 0.4500 0.0450

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang

Mandor

Oh

0.0300

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.67. PASANG DINDING KERAMIK 15X15 CM BAHAN Keramik 15x15 cm Semen abu-abu Pasir pasang Semen warna

Buah Kg M3 Kg

45.0000 9.3000 0.0180 1.5000

Oh Oh Oh Oh

0.6000 0.4500 0.0450 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.68. PASANG DINDING KERAMIK 20X20 CM BAHAN Keramik 20x20 cm Semen abu-abu Pasir pasang Semen warna

Buah Kg M3 Kg

25.0000 9.3000 0.0180 1.5000

Oh Oh Oh Oh

0.6000 0.1000 0.0450 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.69. PASANG DINDING KERAMIK 10X20 CM BAHAN

Keramik 10x20 cm Semen abu-abu Pasir pasang Semen warna

Buah Kg M3 Kg

50.0000 9.3000 0.0180 1.5000

Oh Oh Oh Oh

0.6000 0.1250 0.0125 0.0300

Buah Buah Kg M3 Kg

1.0200 2.0000 12.4400 0.0250 1.5000

Oh Oh Oh Oh

0.7200 0.6500 0.0650 0.0350

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.70. PASANG DINDING MARMER BAHAN Marmer Paku pancing 60x230 Semen abu-abu Pasir pasang Semen warna JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.71. PASANG DINDING BATA PELAPIS 7X3X24 CM BAHAN Bata pelapis dinding Semen abu-abu Pasir pasang

Buah Kg M3

60.0000 12.4400 0.0250

Oh Oh

0.6500 0.5000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu

Kepala tukang Mandor

Oh Oh

0.0500 0.0300

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.72. PASANG DINDING BATA KLINKER 5X5X24 CM BAHAN Bata pelapis klinker Semen abu-abu Pasir pasang

Buah Kg M3

80.0000 12.4400 0.0250

Oh Oh Oh Oh

0.6200 0.3500 0.0350 0.0300

M2 Kg M3

1.0500 11.7500 0.0350

Oh Oh Oh Oh

0.6200 0.3500 0.0350 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.73. PASANG DINDING BATU PAROS BAHAN Batu paros Semen abu-abu Pasir pasang JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.74. PASANG DINDING BATU TEMPEL HITAM BAHAN Batu tempel hitam

M2

1.0500

Semen abu-abu Pasir pasang

Kg M3

11.7500 0.0350

Oh Oh Oh Oh

0.6200 0.3500 0.0350 0.0300

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.75. PASANG LANTAI VINYL KARET 30X30 CM KL I BAHAN Vinyl karet 30x30 cm KL I Lem viny

Buah Kg

11.0500 0.3500

Oh Oh Oh Oh

0.1500 0.1500 0.0150 0.0075

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.76. PASANG LANTAI VINYL KARET 30X30 CM KL II BAHAN Vinyl karet 30x30 cm KL II Lem viny

Buah Kg

11.0500 0.3500

Oh Oh Oh Oh

0.1500 0.1500 0.0150 0.0075

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT

HARGA SATUAN PEKERJAAN 13.77. PASANG LANTAI VINYL ASBES 30X30 CM BAHAN Vinyl asbes 30x30 cm Lem viny

Buah Kg

11.0500 0.3500

Oh Oh Oh Oh

0.1500 0.1500 0.0150 0.0075

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.78. PASANG LANTAI VINYL MOTIF KEMBANG 30X30 CM BAHAN Vinyl motif kembang x DN Lem viny

Buah Kg

11.0500 0.3500

Oh Oh Oh Oh

0.1500 0.1500 0.0150 0.0075

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.79. PASANG WALL COVERING LEBAR 50 CM BAHAN Vinyl wall covering lebar 50 cm Lem viny

M2 Kg

1.1000 0.2500

Oh Oh Oh

0.7500 0.1700 0.0170

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang

Mandor

Oh

0.0085

Kg

3.0000

Oh Oh Oh Oh

0.1200 0.1200 0.0120 0.0060

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.80. FLOOR HARDENER FERROVAX BAHAN Floor hardener ferrovax JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.81. FLOOR HARDENER MASTERCRON BAHAN Mastercron "S"

Kg

5.0000

Oh Oh Oh Oh

0.1200 0.1200 0.0120 0.0060

M3 Kg

0.0024 0.0500

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang batu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 13.82. PLINT KAYU 2X10 CM BAHAN Kayu jati papan Paku sekrup 3.5" JUMLAH HARGA BAHAN TENAGA

Pekerja Tukang kayu Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

Oh Oh Oh Oh

0.1200 0.1200 0.0120 0.0060

14. PEKERJAAN PENGECATAN 14.1 1 M2 MENGIKIS/MENGEROK PERMUKAAN CAT TEMBOK LAMA BAHAN Soda Api

Kg

0.0500

Oh Oh Oh Oh

0.1500 0.0025

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang cat Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 14.2. 1 M2 MENCUCI BIDANG PERMUKAAN TEMBOK YANG PERNAH DI CAT BAHAN Sabun

Kg

0.0500

Oh Oh Oh Oh

0.1500 0.0025

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang cat Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 14.3. 1 M2 MENGEROK KARAT CAT LAMA PERMUKAAN BAJA DENGAN CARA MANUAL BAHAN Sabun

Kg

0.0500

Oh Oh Oh Oh

0.1500 0.0025

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang cat Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN

OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 14.4. 1 M2 MENYABUN PERMUKAAN TEMBOK LAMA BAHAN Sabun

Kg

0.0500

Oh Oh Oh Oh

0.1500 0.0025

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang cat Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

14.5. 1 M2 MENGEROK KARAT ATAU CAT PERMUKAAN BAJA DGN PANCAR PASIR (SANBLASTING) DENGAN TINGKA BAHAN Pasir Silika BBM

Kg Ltr

40.0000 10.0000

Oh Oh Oh Oh

0.5000 1.6000 0.8000 1.6000

JUMLAH HARGA BAHAN TENAGA Mandor Pekerja Kepala tukang Tukang cat JUMLAH HARGA TENAGA PERALATAN Kompresor, Blasting Spot Selang dan Nozzle

sewa Hr

JUMLAH HARGA PERALATAN JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 14.6. 1 M2 MENDEMPUL DAN MENGGOSOK KAYU BAHAN Dempul jadi Minyak Cat Batu Apung

Kg Kg Kg

0.0800 0.0200 0.0100

JUMLAH HARGA BAHAN TENAGA Mandor Pekerja Kepala tukang Tukang cat

Oh Oh Oh Oh

0.0025 0.0400 0.0040 0.0400

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 14.7. 1 M2 PENGECATAN BIDANG KAYU LAMA BAHAN Plamir Cat Dasar Cat Penutup

Kg Kg Kg

0.1500 0.1700 0.1700

Oh Oh Oh Oh

0.0025 0.0700 0.0075 0.0750

JUMLAH HARGA BAHAN TENAGA Mandor Pekerja Kepala tukang Tukang cat JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 14.8. 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR), 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP BAHAN Cat Meni Plamir Cat Dasar Cat Penutup 2 kali

Kg Kg Kg Kg

0.2000 0.1500 0.1700 0.2600

Oh Oh Oh Oh

0.0700 0.0090 0.0060 0.0025

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang cat Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN

OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 14.9. 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR), 1 LAPIS CAT DASAR, 3 LAPIS CAT PENUTUP BAHAN Cat Meni Plamir Cat Dasar Cat Penutup 3 kali

Kg Kg Kg Kg

0.2000 0.1500 0.1700 0.3500

Oh Oh Oh Oh

0.0700 0.1050 0.0040 0.0025

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang cat Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 14.10. 1 M2 PELABURAN BIDANG KAYU DENGAN TEAK OIL BAHAN Teak Oil

Ltr

0.3600

Oh Oh Oh Oh

0.0400 0.0630 0.0630 0.0025

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang cat Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 14.11. 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR BAHAN Politur Politur jadi Ampelas JUMLAH HARGA BAHAN TENAGA

Ltr Ltr Lbr

0.1500 0.3720 2.0000

Pekerja Tukang cat Kepala tukang Mandor

Oh Oh Oh Oh

0.0600 0.0160 0.0025

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 14.12. 1 M2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER BAHAN Residu atau Ter

Ltr

0.3500

Oh Oh Oh Oh

0.1000 0.0060

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang cat Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 14.13. 1 M2 PELABURAN BIDANG KAYU DENGAN VERNIS BAHAN Vernis Dempul Ampelas Kuas

Ltr Kg Lbr Bh

0.1500 0.0500 0.1000 0.0100

Oh Oh Oh Oh

0.1600 0.1600 0.0160 0.0025

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang cat Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 14.14. 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) BAHAN

Plamir Cat Dasar Cat Penutup 2 kali

Kg Kg Kg

0.1000 0.1000 0.2600

Oh Oh Oh Oh

0.0200 0.0630 0.0063 0.0025

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang cat Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 14.15. 1 M2 PENGECATAN TEMBOK LAMA ( 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) BAHAN Cat Dasar Cat Penutup 2 kali

Kg Kg

0.1200 0.1800

Oh Oh Oh Oh

0.0280 0.0420 0.0042 0.0025

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang cat Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 14.16. 1 M2 MELABUR TEMBOK DENGAN KALKARIUM BAHAN Kalkarium

Kg

0.1000

Oh Oh Oh Oh

0.0280 0.0420 0.0042 0.0025

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang cat Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT

HARGA SATUAN PEKERJAAN 14.17. 1 M2 MELABUR TEMBOK DENGAN KAPUR SIRIH BAHAN Ampelas Alang-alang Perancah Kayu Kapur Sirih

Lbr Ikat M3 Kg

0.1000 0.2500 0.0020 0.1500

Oh Oh Oh Oh

0.1500 0.0010 0.0001 0.0025

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang cat Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 14.18. 1 M2 MELABUR TEMBOK LAMA DENGAN KAPUR SIRIH (UNTUK PEMELIHARAAN) BAHAN Perancah Kayu Kapur Sirih

M3 Kg

0.0020 0.3000

Oh Oh Oh Oh

0.0400 0.0050 0.0005 0.0025

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang cat Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 14.19. 1 M2 PEMASANGAN WALL PAPER BAHAN Wall Paper Perekat

M3 Kg

1.2000 0.2000

Oh

0.0200

JUMLAH HARGA BAHAN TENAGA Pekerja

Tukang cat Kepala tukang Mandor

Oh Oh Oh

0.2000 0.0020 0.0025

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 14.20. 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI BAHAN Meni Besi Kuas

Kg Bh

0.1000 0.0100

Oh Oh Oh Oh

0.0200 0.2000 0.0200 0.0100

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang cat Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN 14.21. 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI DAN PERANCAH BAHAN Meni Besi Kuas Perancah Kayu

Kg Bh M3

0.1000 0.0100 0.0020

Oh Oh Oh Oh

0.2500 0.2250 0.0225 0.0075

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang cat Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

14.22. 1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG (GALBANI) SECARA MANUAL SISTEM 4 LAPIS CAT KONVE BAHAN Meni (Read Lead) A

Kg

0.1000

Meni (Read Lead) B Aluminium C Aluminium B Pengencer Perancah Kayu

Kg Kg Kg Ltr M3

0.1000 0.0400 0.0400 0.0100 0.0020

Oh Oh Oh Oh

0.0060 0.0060 0.0225 0.0075

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang cat Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

14.23. 1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG (GALBANI) SECARA MANUAL SISTEM 1 LAPIS CAT MUTAK BAHAN Cat

Kg

0.3000

Oh Oh Oh Oh

0.0060 0.0600 0.0120 0.0060

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang cat Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

14.24. 1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG (GALBANI) SECARA MANUAL SISTEM 3 LAPIS CAT KONVE BAHAN Cat Dasar Cat Antara Cat Penutup

Kg Kg Kg

0.1100 0.1700 0.0800

Oh Oh Oh Oh

0.5000 0.8000 0.3000 0.2000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang cat Kepala tukang Mandor

JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

14.25. 1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG (GALBANI) SECARA SEMPROT (AIRLESS SPRAY) DENGAN BAHAN Cat Dasar

Kg

0.3000

Oh Oh Oh Oh

0.4000 0.7000 0.2000 0.2000

JUMLAH HARGA BAHAN TENAGA Pekerja Tukang cat Kepala tukang Mandor JUMLAH HARGA TENAGA JUMLAH HARGA TENAGA DAN BAHAN OVER HEAD DAN PROFIT HARGA SATUAN PEKERJAAN

LASTING) DENGAN TINGKAT KEBERSIHAN Sa 2 1/2

APIS CAT PENUTUP

APIS CAT PENUTUP

CAT PENUTUP)

SISTEM 4 LAPIS CAT KONVENSIONAL DGN TEBAL 200 um

SISTEM 1 LAPIS CAT MUTAKHIR DGN TEBAL 200 um

SISTEM 3 LAPIS CAT KONVENSIONAL DGN TEBAL 200 um

(AIRLESS SPRAY) DENGAN SISTEM 1 LAPIS CAT MUTAKHIR DGN TEBAL 200 um