Simulasi Mbeneh.xlsx

  • Uploaded by: Khoirunnisa'
  • 0
  • 0
  • April 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Simulasi Mbeneh.xlsx as PDF for free.

More details

  • Words: 15,384
  • Pages: 75
Tabel 1.1 Data Inflow Bln/Year 1936 Jan 56 Feb 32 Mar 32 Apr 38 May 31 June 113 July 189 Aug 529 Sep 217 Oct 152 Nov 80 Dec 84

1937 53 27 26 20 27 28 32 54 171 125 56 31

1938 16 16 15 20 26 44 47 58 91 52 19 9

1939 6 44 179 130 94 183 179 395 318 262 276 99

1940 43 19 14 33 44 44 42 60 93 58 31 28

1941 88 22 46 27 20 32 101 63 100 136 52 23

1942 14 12 12 12 112 149 347 215 316 232 149 54

1943 37 20 15 76 51 52 110 139 201 241 113 52

1944 22 12 12 17 64 39 64 43 39 46 26 17

1945 14 16 7 14 16 56 42 154 146 101 89 30

1946 14 44 69 47 44 91 444 302 164 162 109 58

1947 30 22 35 30 36 80 253 237 276 300 185 94

1948 57 33 22 23 67 69 59 81 126 158 252 65

1949 39 21 33 28 32 52 95 117 174 236 238 86

1950 35 49 67 130 44 49 79 113 164 220 167 73

1951 41 25 19 36 100 159 297 321 250 253 126 63

1952 28 16 22 49 120 534 312 207 472 260 349 241

1953 84 48 28 26 44 58 158 253 297 338 195 84

1954 59 65 28 30 46 64 68 149 122 80 249 153

1955 53 56 53 31 48 121 180 638 417 449 241 123

1956 139 64 88 481 414 548 513 456 402 382 231 116

1957 54 36 38 32 42 65 117 69 69 132 60 43

1958 43 22 17 21 89 105 191 471 165 426 154 72

1959 32 26 36 44 23 39 42 96 245 211 96 46

1960 23 15 11 20 148 112 217 279 223 218 132 75

1961 37 17 22 33 32 41 78 111 139 95 58 54

1962 32 19 12 16 41 139 86 144 127 169 90 53

1963 44 28 16 15 49 46 60 141 163 137 105 46

1964 17 14 12 22 26 80 451 271 305 421 178 91

1965 32 15 14 16 19 22 28 67 152 78 62 48

1966 15 14 15 12 25 44 68 136 212 242 152 204

1967 58 22 16 15 15 15 20 35 52 91 20 10

1968 7 2 1 6 80 128 51 222 155 342 163 73

1969 35 20 27 42 43 84 178 132 197 115 75 62

Ratta-Rata 39.9117647 26.8529412 31.1470588 46.8235294 62.1176471 102.5 152.882353 198.764706 198.823529 203.529412 134.647059 72.3529412 105.862745

MENGHITUNG KAPASITAS WADUK DENGAN TINGKAT KEBERHAS

A PERHITUNGAN SIMULASI INPUT DATA Kapsitas Waduk (Asumsi) =

DIHASILKAN

Prosentase Kegagalan Tampun

50681949980.000 m

=

3

=

50681.950 juta m3

=

Prosentase Keandalan Tampun =

Jumlah Periode Gagal Keseluruhan = 25

dihasilkan tingkat keberhasilan sesuai rencan yaitu 94% dengan kapasitas waduk sebesar 50681949980.00

Outflow rata-rata perbulan = 80% inflow rata-rata perbulan 1 Simulasi Tahun 1936 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

Jumlah

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

Jumlah periode gagal = Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui

hari 3 31 28 31 30 31 30 31 30 31 30 31 30

Inflow m /s 4

juta m 5

56 32 32 38 31 113 189 529 217 152 80 84

149.990 77.414 85.709 98.496 83.030 292.896 506.218 1371.168 581.213 393.984 214.272 217.728

3

3

m3

Outflow

Sn-1

juta m 6

juta m3 7

3

226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

50605.106 50477.638 50336.513 50215.492 50071.688 50145.067 50424.450 51576.101 51036.329 50856.417 50669.388 50667.599

0

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp

[ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

2 Simulasi Tahun 1937 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

Jumlah

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

hari 3 31 28 31 30 31 30 31 30 31 30 31 30

Inflow m3/s 4

juta m3 5

53 27 26 20 27 28 32 54 171 125 56 31

141.955 65.318 69.638 51.840 72.317 72.576 85.709 139.968 458.006 324.000 149.990 80.352

Jumlah periode gagal =

m3

Outflow

Sn-1

juta m3 6

juta m3 7 226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

50582.720 50443.156 50285.960 50118.283 49963.765 49816.824 49675.699 49596.150 49827.322 49931.805 49854.961 49715.796

0

Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

3 Simulasi Tahun 1938 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

m3

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

Jumlah hari 3

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

31 28 31 30 31 30 31 30 31 30 31 30

Inflow m3/s 4

juta m3 5

16 16 15 20 26 44 47 58 91 52 19 9

Outflow

Sn-1

juta m3 6

juta m3 7

42.854 38.707 40.176 51.840 69.638 114.048 125.885 150.336 243.734 134.784 50.890 23.328

Jumlah periode gagal =

226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

49531.817 49365.641 49178.983 49011.306 48854.110 48748.641 48647.692 48578.511 48595.411 48510.678 48334.733 48138.544

0

Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

4 Simulasi Tahun 1939 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3 4

Januari Februari Maret April

Jumlah hari 3 31 28 31 30

Inflow m3/s 4

juta m3 5

6 44 179 130

16.070 106.445 479.434 336.960

m3

Outflow

Sn-1

juta m3 6

juta m3 7 226.834 204.883 226.834 219.517

47927.781 47829.343 48081.942 48199.385

5 6 7 8 9 10 11 12

Mei Juni Juli Agustus Sept Oktober November Desember

31 30 31 30 31 30 31 30

94 183 179 395 318 262 276 99

Jumlah periode gagal =

251.770 474.336 479.434 1023.840 851.731 679.104 739.238 256.608

226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

48163.480 48393.363 48391.144 48942.867 48763.441 48598.131 48650.949 48175.635

0

Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0

[ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

- Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

5 Simulasi Tahun 1940 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

Jumlah

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

Jumlah periode gagal =

hari 3 31 28 31 30 31 30 31 30 31 30 31 30

Inflow m /s 4

juta m 5

3

43 19 14 33 44 44 42 60 93 58 31 28

3

115.171 45.965 37.498 85.536 117.850 114.048 112.493 155.520 249.091 150.336 83.030 72.576 0

m3

Outflow

Sn-1

juta m 6

juta m3 7

3

226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

48026.881 47867.964 47678.627 47544.646 47435.661 47330.192 47215.851 47151.854 47174.111 47104.930 46961.126 46814.185

Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

6 Simulasi Tahun 1941 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

Jumlah

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

hari 3 31 28 31 30 31 30 31 30 31 30 31 30

Inflow m3/s 4

juta m3 5

88 22 46 27 20 32 101 63 100 136 52 23

235.699 53.222 123.206 69.984 53.568 82.944 270.518 163.296 267.840 352.512 139.277 59.616

Jumlah periode gagal = Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

m3

Outflow

Sn-1

juta m3 6

juta m3 7 226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

46823.050 46662.525 46558.897 46409.364 46236.098 46099.525 46143.209 46086.988 46127.994 46260.989 46173.432 46013.531

0

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

7 Simulasi Tahun 1942 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

Jumlah hari 3

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

31 28 31 30 31 30 31 30 31 30 31 30

Inflow m3/s 4

juta m3 5

14 12 12 12 112 149 347 215 316 232 149 54

37.498 29.030 32.141 31.104 299.981 386.208 929.405 557.280 846.374 601.344 399.082 139.968

Jumlah periode gagal =

m3

Outflow

Sn-1

juta m3 6

juta m3 7 226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

45824.194 45648.342 45453.648 45265.235 45338.382 45505.073 46207.644 46351.294 46633.071 46395.358 46185.778 45933.982

0

Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

8 Simulasi Tahun 1943 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

Jumlah hari

Inflow m3/s

juta m3

m3

Outflow

Sn-1

juta m3

juta m3

1 1 2 3 4 5 6 7 8 9 10 11 12

2

3

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

4 31 28 31 30 31 30 31 30 31 30 31 30

5

37 20 15 76 51 52 110 139 201 241 113 52

Jumlah periode gagal =

6

99.101 48.384 40.176 196.992 136.598 134.784 294.624 360.288 538.358 624.672 302.659 134.784

7 226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

45806.248 45649.750 45463.091 45440.566 45350.331 45265.598 45333.387 45474.158 45785.683 46190.838 46009.807 45849.249

0

Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

9 Simulasi Tahun 1944 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3 4 5 6 7 8

Januari Februari Maret April Mei Juni Juli Agustus

Jumlah hari 3 31 28 31 30 31 30 31 30

Inflow m3/s 4 22 12 12 17 64 39 64 43

juta m3 5 58.925 29.030 32.141 44.064 171.418 101.088 171.418 111.456

m3

Outflow

Sn-1

juta m3 6

juta m3 7 226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517

45681.339 45505.487 45310.794 45135.341 45079.924 44961.495 44906.078 44798.017

9 10 11 12

Sept Oktober November Desember

31 30 31 30

39 46 26 17

104.458 119.232 69.638 44.064

Jumlah periode gagal =

226.834 219.517 226.834 219.517

44675.641 44575.356 44418.160 44242.707

0

Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

10 Simulasi Tahun 1945 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

Jumlah

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

Jumlah periode gagal = Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui

hari 3 31 28 31 30 31 30 31 30 31 30 31 30

Inflow m /s 4

juta m 5

14 16 7 14 16 56 42 154 146 101 89 30

37.498 38.707 18.749 36.288 42.854 145.152 112.493 399.168 391.046 261.792 238.378 77.760

3

3

m3

Outflow

Sn-1

juta m 6

juta m3 7

3

226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

44053.370 43887.195 43679.110 43495.881 43311.901 43237.536 43123.194 43302.845 43467.058 43509.333 43520.876 43379.119

0

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp

[ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

11 Simulasi Tahun 1946 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

Jumlah

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

hari 3 31 28 31 30 31 30 31 30 31 30 31 30

Inflow m3/s 4

juta m3 5

14 44 69 47 44 91 444 302 164 162 109 58

37.498 106.445 184.810 121.824 117.850 235.872 1189.210 782.784 439.258 419.904 291.946 150.336

Jumlah periode gagal =

m3

Outflow

Sn-1

juta m3 6

juta m3 7 226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

43189.782 43091.345 43049.320 42951.627 42842.642 42858.998 43821.373 43942.386 43591.542 43579.506 43444.230 43309.938

0

Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

12 Simulasi Tahun 1947 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati

=

25 % x Kap Tamp Wduk

m3

Peluang Kegagalan Tampungan Peluang Keandalan Tampungan No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

= =

Jumlah hari 3

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

31 28 31 30 31 30 31 30 31 30 31 30

6% 94%

Inflow m3/s 4

juta m3 5

30 22 35 30 36 80 253 237 276 300 185 94

80.352 53.222 93.744 77.760 96.422 207.360 677.635 614.304 739.238 777.600 495.504 243.648

Jumlah periode gagal =

Outflow

Sn-1

juta m3 6

juta m3 7 226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

43163.456 43011.796 42878.706 42736.949 42606.537 42594.380 43045.181 43439.968 43822.342 43868.021 43578.608 43334.069

0

Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

13 Simulasi Tahun 1948 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2

Januari Februari

Jumlah hari 3 31 28

Inflow m /s 4 3

57 33

juta m 5

3

152.669 79.834

m3

Outflow

Sn-1

juta m 6

juta m3 7

3

226.834 204.883

43235.773 43110.724

3 4 5 6 7 8 9 10 11 12

Maret April Mei Juni Juli Agustus Sept Oktober November Desember

31 30 31 30 31 30 31 30 31 30

22 23 67 69 59 81 126 158 252 65

Jumlah periode gagal =

58.925 59.616 179.453 178.848 158.026 209.952 337.478 409.536 674.957 168.480

226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

42942.814 42782.913 42735.532 42694.863 42626.054 42616.489 42727.133 42917.153 43365.275 43258.901

0

14 Simulasi Tahun 1949 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

Jumlah

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

Jumlah periode gagal = Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui

hari 3 31 28 31 30 31 30 31 30 31 30 31 30

Inflow m /s 4

juta m 5

39 21 33 28 32 52 95 117 174 236 238 86

104.458 50.803 88.387 72.576 85.709 134.784 254.448 303.264 466.042 611.712 637.459 222.912

3

3

m3

Outflow

Sn-1

juta m 6

juta m3 7

3

226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

43136.524 42982.445 42843.998 42697.057 42555.932 42471.199 42498.813 42582.560 42821.767 43213.962 43624.587 43262.296

0

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati

[ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

15 Simulasi Tahun 1950 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

Jumlah

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

hari 3 31 28 31 30 31 30 31 30 31 30 31 30

Inflow m3/s 4

juta m3 5

35 49 67 130 44 49 79 113 164 220 167 73

93.744 118.541 179.453 336.960 117.850 127.008 211.594 292.896 439.258 570.240 447.293 189.216

Jumlah periode gagal =

m3

Outflow

Sn-1

juta m3 6

juta m3 7 226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

43125.811 43039.469 42992.088 43109.531 43000.546 42908.037 42892.797 42966.176 43178.599 43529.322 43479.360 43228.600

0

Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

16 Simulasi Tahun 1951 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan

= =

25 % x Kap Tamp Wduk 6%

m3

Peluang Keandalan Tampungan

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

=

Jumlah hari 3

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

31 28 31 30 31 30 31 30 31 30 31 30

94%

Inflow m3/s 4

juta m3 5

41 25 19 36 100 159 297 321 250 253 126 63

109.814 60.480 50.890 93.312 267.840 412.128 795.485 832.032 669.600 655.776 337.478 163.296

Jumlah periode gagal =

Outflow

Sn-1

juta m3 6

juta m3 7 226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

43111.580 42967.178 42791.233 42665.028 42706.034 42898.645 43467.296 43841.115 43671.366 43664.859 43339.244 43172.379

0

Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

17 Simulasi Tahun 1952 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2

Januari Februari

Jumlah hari 3 31 28

Inflow m /s 4 3

28 16

juta m 5

3

74.995 38.707

m3

Outflow

Sn-1

juta m 6

juta m3 7

3

226.834 204.883

43020.540 42854.365

3 4 5 6 7 8 9 10 11 12

Maret April Mei Juni Juli Agustus Sept Oktober November Desember

31 30 31 30 31 30 31 30 31 30

22 49 120 534 312 207 472 260 349 241

Jumlah periode gagal =

58.925 127.008 321.408 1384.128 835.661 536.544 1264.205 673.920 934.762 624.672

226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

42686.455 42593.946 42688.520 43853.131 43781.206 43489.406 44209.750 43626.782 43880.306 43577.534

0

Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp

[ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

18 Simulasi Tahun 1953 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

Jumlah hari 3 31 28 31 30 31 30 31 30 31 30 31 30

Inflow m3/s 4

juta m3 5

84 48 28 26 44 58 158 253 297 338 195 84

224.986 116.122 74.995 67.392 117.850 150.336 423.187 655.776 795.485 876.096 522.288 217.728

m3

Outflow

Sn-1

juta m3 6

juta m3 7 226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

43170.530 43081.770 42929.931 42777.806 42668.821 42599.640 42795.993 43232.252 43741.030 43828.958 43467.833 43170.590

Jumlah periode gagal =

0

Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

19 Simulasi Tahun 1954 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

Jumlah

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

hari 3 31 28 31 30 31 30 31 30 31 30 31 30

Inflow m3/s 4

juta m3 5

59 65 28 30 46 64 68 149 122 80 249 153

158.026 157.248 74.995 77.760 123.206 165.888 182.131 386.208 326.765 207.360 666.922 396.576

Jumlah periode gagal = Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan

m3

Outflow

Sn-1

juta m3 6

juta m3 7 226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

43101.782 43054.147 42902.308 42760.551 42656.923 42603.294 42558.591 42725.282 42825.213 42813.056 43253.143 43347.649

0

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa

[ 7 ] [5]+[8]-[6]

[11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

20 Simulasi Tahun 1955 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

Jumlah hari 3

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

31 28 31 30 31 30 31 30 31 30 31 30

Inflow m /s 4

juta m 5

53 56 53 31 48 121 180 638 417 449 241 123

141.955 135.475 141.955 80.352 128.563 313.632 482.112 1653.696 1116.893 1163.808 645.494 318.816

3

Jumlah periode gagal =

3

m3

Outflow

Sn-1

juta m 6

juta m3 7

3

226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

43085.711 43016.304 42931.425 42792.260 42693.989 42788.104 43043.382 44477.561 44060.649 44114.881 43589.250 43269.889

0

21 Simulasi Tahun 1956 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3

Januari Februari Maret

Jumlah hari 3 31 28 31

Inflow m3/s 4

juta m3 5

139 64 88

372.298 154.829 235.699

m3

Outflow

Sn-1

juta m3 6

juta m3 7 226.834 204.883 226.834

43316.054 43120.536 43129.401

4 5 6 7 8 9 10 11 12

April Mei Juni Juli Agustus Sept Oktober November Desember

30 31 30 31 30 31 30 31 30

481 414 548 513 456 402 382 231 116

Jumlah periode gagal =

1246.752 1108.858 1420.416 1374.019 1181.952 1076.717 990.144 618.710 300.672

219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

44156.636 44052.614 44371.489 44317.775 44133.025 44020.473 43941.217 43562.466 43251.745

0

Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati

[ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

22 Simulasi Tahun 1957 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

Jumlah hari 3 31 28 31 30 31 30 31 30 31 30 31 30

Inflow m3/s 4

juta m3 5

54 36 38 32 42 65 117 69 69 132 60 43

144.634 87.091 101.779 82.944 112.493 168.480 313.373 178.848 184.810 342.144 160.704 111.456

m3

Outflow

Sn-1

juta m3 6

juta m3 7 226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

43088.390 42970.598 42845.543 42708.970 42594.629 42543.592 42630.130 42589.461 42547.437 42670.064 42603.934 42495.873

Jumlah periode gagal =

0

Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

23 Simulasi Tahun 1958 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

Jumlah

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

hari 3 31 28 31 30 31 30 31 30 31 30 31 30

Inflow m3/s 4

juta m3 5

43 22 17 21 89 105 191 471 165 426 154 72

115.171 53.222 45.533 54.432 238.378 272.160 511.574 1220.832 441.936 1104.192 412.474 186.624

Jumlah periode gagal = Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan

m3

Outflow

Sn-1

juta m3 6

juta m3 7 226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

42384.210 42232.549 42051.248 41886.163 41897.706 41950.349 42235.090 43236.405 42710.974 43380.548 42681.512 42462.980

0

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa

[ 7 ] [5]+[8]-[6]

[11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

24 Simulasi Tahun 1959 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

Jumlah

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

hari 3 31 28 31 30 31 30 31 30 31 30 31 30

Inflow m /s 4

juta m 5

32 26 36 44 23 39 42 96 245 211 96 46

85.709 62.899 96.422 114.048 61.603 101.088 112.493 248.832 656.208 546.912 257.126 119.232

3

Jumlah periode gagal =

3

m3

Outflow

Sn-1

juta m 6

juta m3 7

3

226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

42321.854 42179.871 42049.459 41943.990 41778.759 41660.330 41545.989 41575.304 42004.677 42332.072 42362.365 42262.080

0

Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

25 Simulasi Tahun 1960 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

m3

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

Jumlah hari 3

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

31 28 31 30 31 30 31 30 31 30 31 30

Inflow m3/s 4

juta m3 5

23 15 11 20 148 112 217 279 223 218 132 75

61.603 36.288 29.462 51.840 396.403 290.304 581.213 723.168 597.283 565.056 353.549 194.400

Jumlah periode gagal =

Outflow

Sn-1

juta m3 6

juta m3 7 226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

42096.849 41928.254 41730.882 41563.205 41732.774 41803.561 42157.940 42661.591 42632.529 42607.619 42388.794 42236.963

0

Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

26 Simulasi Tahun 1961 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2

Januari Februari

Jumlah hari 3 31 28

Inflow m /s 4 3

37 17

juta m 5

3

99.101 41.126

m3

Outflow

Sn-1

juta m 6

juta m3 7

3

226.834 204.883

42109.229 41945.473

3 4 5 6 7 8 9 10 11 12

Maret April Mei Juni Juli Agustus Sept Oktober November Desember

31 30 31 30 31 30 31 30 31 30

22 33 32 41 78 111 139 95 58 54

Jumlah periode gagal =

58.925 85.536 85.709 106.272 208.915 287.712 372.298 246.240 155.347 139.968

226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

41777.564 41643.583 41502.457 41389.212 41371.293 41439.488 41584.952 41611.675 41540.188 41460.639

0

Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp

[ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

27 Simulasi Tahun 1962 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober

Jumlah hari 3 31 28 31 30 31 30 31 30 31 30

Inflow m /s 4

juta m 5

32 19 12 16 41 139 86 144 127 169

85.709 45.965 32.141 41.472 109.814 360.288 230.342 373.248 340.157 438.048

3

3

m3

Outflow

Sn-1

juta m 6

juta m3 7

3

226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

41319.513 41160.595 40965.902 40787.857 40670.837 40811.608 40815.116 40968.847 41082.170 41300.701

11 November 12 Desember

31 30

90 53

241.056 137.376

Jumlah periode gagal =

226.834 219.517

41314.923 41232.782

0

Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

28 Simulasi Tahun 1963 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

Jumlah

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

Jumlah periode gagal = Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui

hari 3 31 28 31 30 31 30 31 30 31 30 31 30

Inflow m /s 4

juta m 5

44 28 16 15 49 46 60 141 163 137 105 46

117.850 67.738 42.854 38.880 131.242 119.232 160.704 365.472 436.579 355.104 281.232 119.232

3

3

m3

Outflow

Sn-1

juta m 6

juta m3 7

3

226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

41123.797 40986.652 40802.672 40622.035 40526.443 40426.158 40360.028 40505.983 40715.728 40851.315 40905.712 40805.427

0

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati

[ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

29 Simulasi Tahun 1964 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

Jumlah

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

hari 3 31 28 31 30 31 30 31 30 31 30 31 30

Inflow m3/s 4

juta m3 5

17 14 12 22 26 80 451 271 305 421 178 91

45.533 33.869 32.141 57.024 69.638 207.360 1207.958 702.432 816.912 1091.232 476.755 235.872

Jumlah periode gagal =

m3

Outflow

Sn-1

juta m3 6

juta m3 7 226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

40624.126 40453.112 40258.419 40095.926 39938.730 39926.573 40907.697 41288.342 41395.505 41677.142 41055.348 40821.782

0

Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

30 Simulasi Tahun 1965 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati

=

25 % x Kap Tamp Wduk

m3

Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

= =

Jumlah hari 3

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

31 28 31 30 31 30 31 30 31 30 31 30

6% 94%

Inflow m /s 4

juta m 5

32 15 14 16 19 22 28 67 152 78 62 48

85.709 36.288 37.498 41.472 50.890 57.024 74.995 173.664 407.117 202.176 166.061 124.416

3

Jumlah periode gagal =

3

Outflow

Sn-1

juta m 6

juta m3 7

3

226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

40664.302 40495.707 40306.371 40128.326 39952.381 39789.888 39638.049 39592.196 39772.479 39755.138 39694.364 39599.263

0

Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

31 Simulasi Tahun 1966 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

Jumlah hari 3

Inflow m3/s 4

juta m3 5

m3

Outflow

Sn-1

juta m3 6

juta m3 7

1 2 3 4 5 6 7 8 9 10 11 12

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

31 28 31 30 31 30 31 30 31 30 31 30

15 14 15 12 25 44 68 136 212 242 152 204

Jumlah periode gagal =

40.176 33.869 40.176 31.104 66.960 114.048 182.131 352.512 567.821 627.264 407.117 528.768

226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

39412.605 39241.591 39054.933 38866.520 38706.646 38601.177 38556.474 38689.469 39030.456 39438.203 39618.485 39908.514

0

Keterangan : [ 1 ] Diketahui

[ 8 ] - Jika [6] < 0 maka [7] = 0

[ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

- Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

32 Simulasi Tahun 1967 Kapasitas tampungan efektif waduk Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

No

Bulan

1

2

1 2 3 4 5 6 7 8 9

Januari Februari Maret April Mei Juni Juli Agustus Sept

Jumlah hari 3 31 28 31 30 31 30 31 30 31

= = = =

50681949980.00 m3 25 % x Kap Tamp Wduk 6% 94%

Inflow m /s 4 3

58 22 16 15 15 15 20 35 52

juta m 5

3

155.347 53.222 42.854 38.880 40.176 38.880 53.568 90.720 139.277

Outflow

Sn-1

juta m 6

juta m3 7

3

226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834

39527.776 39376.116 39192.136 39011.499 38824.841 38644.204 38470.938 38342.141 38254.584

10 Oktober 11 November 12 Desember

30 31 30

91 20 10

235.872 53.568 25.920

Jumlah periode gagal =

219.517 226.834 219.517

38270.939 38097.672 37904.075

1

Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

33 Simulasi Tahun 1968 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

Jumlah

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

Jumlah periode gagal = Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui

hari 3 31 28 31 30 31 30 31 30 31 30 31 30

Inflow m /s 4

juta m 5

7 2 1 6 80 128 51 222 155 342 163 73

18.749 4.838 2.678 15.552 214.272 331.776 136.598 575.424 415.152 886.464 436.579 189.216

3

3

m3

Outflow

Sn-1

juta m 6

juta m3 7

3

226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

37695.990 37495.946 37271.790 37067.825 37055.263 37167.522 37077.286 37433.193 37621.511 38288.458 38113.820 37873.774

12

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati

[ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

[10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

34 Simulasi Tahun 1969 Kapasitas tampungan efektif waduk

=

50681949980.00

Tanpungan mati Peluang Kegagalan Tampungan Peluang Keandalan Tampungan

= = =

25 % x Kap Tamp Wduk 6% 94%

No

Bulan

1

2

1 2 3 4 5 6 7 8 9 10 11 12

Jumlah

Januari Februari Maret April Mei Juni Juli Agustus Sept Oktober November Desember

hari 3 31 28 31 30 31 30 31 30 31 30 31 30

Inflow m3/s 4

juta m3 5

35 20 27 42 43 84 178 132 197 115 75 62

93.744 48.384 72.317 108.864 115.171 217.728 476.755 342.144 527.645 298.080 200.880 160.704

Jumlah periode gagal = Keterangan : [ 1 ] Diketahui [ 2 ] Diketahui [ 3 ] Diketahui [ 4 ] Diketahui [ 5 ] [5].[3].24.60.60 [ 6 ] 80%.Rata-rata inflow pernulan [ 7 ] [5]+[8]-[6]

B HASIL SIMULASI Jumlah Keseluruan Periode Gagal = 25

m3

Outflow

Sn-1

juta m3 6

juta m3 7 226.834 204.883 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517 226.834 219.517

37740.684 37584.186 37429.668 37319.015 37207.352 37205.563 37455.484 37578.111 37878.922 37952.337 37847.820 37789.007

12

[ 8 ] - Jika [6] < 0 maka [7] = 0 - Jika [6] < Kapasitas Tampungan maka [7] = [6] - Jika [6] > Kapasitas Tampumgan maka [7] = Kapasitas Tamp [ 9 ] [7]+Tampungan mati [10] - Jika [6] - [7] < Kapasitas Tampungan Waduk maka [10] = 0 - Jika [6] - [7] > Kapasitas Tampungan maka [10] = [6] - Kapa [11] - Jika (18) < Tampungan Mati maka (21) = Gagal - Jika (18) > Tampungan Mati maka (21) = Sukses

Prosentase Kegagalan Tampungan = 0.061 = 6% Prosentase Keandalan Tampungan = 94% dihasilkan tingkat keberhasilan sesuai rencana yaitu 94% dengan kapasitas waduk sebesar

Grafik Hubungan Inflow dan Outflow i nflow

outflow

1400 1200 1000

Juta m3

800 600 400 200 0 53 19

36 19

J

600 400 200 0 53 19

36 19

Gambar 1 Grafik Hubungan Inflow dan Outflow

Grafik Hubungan S total periode dan Kapasitas Waduk S tota l peri ode

ka pas i tas waduk

64000 62000 60000

Juta m3

58000 56000 54000 52000 50000 48000 53 19

36 19

Gambar 2 Grafik Hubungan S total periode dan Kapasitas Waduk

GAN TINGKAT KEBERHASILAN 94%

AN Prosentase Kegagalan Tampungan 0.061 6% Prosentase Keandalan Tampungan 94%

ngkat keberhasilan sesuai rencana ngan kapasitas waduk sebesar m3

=

12670487495.00 m3

S akhir periode S total periode spill out juta m3 8 50681.94998 50605.1061588 50477.6380365 50336.5126153 50215.4916271 50071.6878059 50145.0668176 50424.4501965 50681.94998 50681.94998 50681.94998 50669.3877588 50667.5987706

juta m3 juta m3 9 10 63352.437475 63275.59365382 0 63148.12553147 0 63007.00011029 0 62885.97912206 0 62742.17530088 0 62815.55431265 0 63094.93769147 0 63352.437475 0 63352.437475 0 63352.437475 0 63339.87525382 0 63338.08626559 0

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

S akhir periode S total periode spill out juta m3 8 50667.5987706 50582.7197494 50443.1556271 50285.9598059 50118.2828176 49963.7653965 49816.8244082 49675.6989871 49596.1499988 49827.3221776 49931.8051894 49854.9613682 49715.79638

juta m3 juta m3 9 10 63338.08626559 63253.20724441 0 63113.64312206 0 62956.44730088 0 62788.77031265 0 62634.25289147 0 62487.31190324 0 62346.18648206 0 62266.63749382 0 62497.80967265 0 62602.29268441 0 62525.44886324 0 62386.283875 0

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

S akhir periode S total periode spill out juta m3 8 49715.79638 49531.8165588 49365.6412365 49178.9830153 49011.3060271 48854.1102059 48748.6412176 48647.6917965 48578.5108082 48595.4109871 48510.6779988 48334.7333776 48138.5443894

juta m3 juta m3 9 10 62386.283875 62202.30405382 0 62036.12873147 0 61849.47051029 0 61681.79352206 0 61524.59770088 0 61419.12871265 0 61318.17929147 0 61248.99830324 0 61265.89848206 0 61181.16549382 0 61005.22087265 0 60809.03188441 0

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

S akhir periode S total periode spill out juta m3 8 48138.5443894 47927.7805682 47829.3428459 48081.9422247 48138.5443894

juta m3 juta m3 9 10 60809.03188441 60598.26806324 0 60499.83034088 0 60752.42971971 0 60809.03188441 0

Keterangan 11 Sukses Sukses Sukses Sukses

48138.5443894 48138.5443894 48138.5443894 48138.5443894 48138.5443894 48138.5443894 48138.5443894 48138.5443894

60809.03188441 60809.03188441 60809.03188441 60809.03188441 60809.03188441 60809.03188441 60809.03188441 60809.03188441

0 0 0 0 0 0 0 0

Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0

as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

S akhir periode S total periode spill out juta m3 8 48138.5443894 48026.8813682 47867.9636459 47678.6270247 47544.6460365 47435.6614153 47330.1924271 47215.8510059 47151.8540176 47174.1109965 47104.9300082 46961.1261871 46814.1851988

juta m3 juta m3 9 10 60809.03188441 60697.36886324 0 60538.45114088 0 60349.11451971 0 60215.13353147 0 60106.14891029 0 60000.67992206 0 59886.33850088 0 59822.34151265 0 59844.59849147 0 59775.41750324 0 59631.61368206 0 59484.67269382 0

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

S akhir periode S total periode spill out juta m3 8 46814.1851988 46814.1851988 46662.5250765 46558.8972553 46409.3642671 46236.0980459 46099.5250576 46143.2092365 46086.9882482 46127.9940271 46260.9890388 46173.4316176 46013.5306294

juta m3 juta m3 9 10 59484.67269382 59484.67269382 0 59333.01257147 0 59229.38475029 0 59079.85176206 0 58906.58554088 0 58770.01255265 0 58813.69673147 0 58757.47574324 0 58798.48152206 0 58931.47653382 0 58843.91911265 0 58684.01812441 0

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

=

12670487495.00 m3

S akhir periode S total periode spill out juta m3 8 46013.5306294 45824.1940082 45648.3418859 45453.6484647 45265.2354765 45338.3820553 45505.0730671 46013.5306294 46013.5306294 46013.5306294 46013.5306294 46013.5306294 45933.9816412

juta m3 juta m3 9 10 58684.01812441 58494.68150324 0 58318.82938088 0 58124.13595971 0 57935.72297147 0 58008.86955029 0 58175.56056206 0 58684.01812441 0 58684.01812441 0 58684.01812441 0 58684.01812441 0 58684.01812441 0 58604.46913618 0

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

S akhir periode S total periode spill out juta m3

juta m3

juta m3

Keterangan

8 45933.9816412 45806.24822 45649.7496976 45463.0914765 45440.5664882 45350.3306671 45265.5976788 45333.3874576 45474.1584694 45785.6826482 45933.9816412 45933.9816412 45849.2486529

9 58604.46913618 58476.735715 58320.23719265 58133.57897147 58111.05398324 58020.81816206 57936.08517382 58003.87495265 58144.64596441 58456.17014324 58604.46913618 58604.46913618 58519.73614794

10

11

0 0 0 0 0 0 0 0 0 0 0 0

Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

S akhir periode S total periode spill out juta m3 8 45849.2486529 45681.3392318 45505.4871094 45310.7936882 45135.3407 45079.9240788 44961.4950906 44906.0784694 44798.0174812

juta m3 juta m3 9 10 58519.73614794 58351.82672676 0 58175.97460441 0 57981.28118324 0 57805.828195 0 57750.41157382 0 57631.98258559 0 57576.56596441 0 57468.50497618 0

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

44675.64086 57346.128355 44575.3558718 57245.84336676 44418.1600506 57088.64754559 44242.7070624 56913.19455735

0 0 0 0

Sukses Sukses Sukses Sukses

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

S akhir periode S total periode spill out juta m3 8 44242.7070624 44053.3704412 43887.1951188 43679.1096976 43495.8807094 43311.9008882 43237.5359 43123.1944788 43302.8454906 43467.0576694 43509.3326812 43520.87606 43379.1190718

juta m3 juta m3 9 10 56913.19455735 56723.85793618 0 56557.68261382 0 56349.59719265 0 56166.36820441 0 55982.38838324 0 55908.023395 0 55793.68197382 0 55973.33298559 0 56137.54516441 0 56179.82017618 0 56191.363555 0 56049.60656676 0

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

S akhir periode S total periode spill out juta m3 8 43379.1190718 43189.7824506 43091.3447282 43049.3201071 42951.6271188 42842.6424976 42858.9975094 43379.1190718 43379.1190718 43379.1190718 43379.1190718 43379.1190718 43309.9380835

juta m3 juta m3 9 10 56049.60656676 55860.26994559 0 55761.83222324 0 55719.80760206 0 55622.11461382 0 55513.12999265 0 55529.48500441 0 56049.60656676 0 56049.60656676 0 56049.60656676 0 56049.60656676 0 56049.60656676 0 55980.42557853 0

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

S akhir periode S total periode spill out juta m3 8 43309.9380835 43163.4558624 43011.79574 42878.7055188 42736.9485306 42606.5367094 42594.3797212 43045.1807 43309.9380835 43309.9380835 43309.9380835 43309.9380835 43309.9380835

juta m3 juta m3 9 10 55980.42557853 55833.94335735 0 55682.283235 0 55549.19301382 0 55407.43602559 0 55277.02420441 0 55264.86721618 0 55715.668195 0 55980.42557853 0 55980.42557853 0 55980.42557853 0 55980.42557853 0 55980.42557853 0

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

S akhir periode S total periode spill out juta m3 juta m3 juta m3 8 9 10 43309.9380835 55980.42557853 43235.7726624 55906.26015735 0 43110.72374 55781.211235 0

Keterangan 11 Sukses Sukses

42942.8143188 42782.9133306 42735.5319094 42694.8629212 42626.0543 42616.4893118 42727.1334906 42917.1525024 43309.9380835 43258.9010953

=

55613.30181382 55453.40082559 55406.01940441 55365.35041618 55296.541795 55286.97680676 55397.62098559 55587.63999735 55980.42557853 55929.38859029

0 0 0 0 0 0 0 0 0 0

12670487495.00 m3

S akhir periode S total periode spill out juta m3 8 43258.9010953 43136.5244741 42982.4451518 42843.9981306 42697.0571424 42555.9317212 42471.1987329 42498.8125118 42582.5595235 42821.7669024 43213.9619141 43258.9010953 43258.9010953

Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

juta m3 juta m3 9 10 55929.38859029 55807.01196912 0 55652.93264676 0 55514.48562559 0 55367.54463735 0 55226.41921618 0 55141.68622794 0 55169.30000676 0 55253.04701853 0 55492.25439735 0 55884.44940912 0 55929.38859029 0 55929.38859029 0

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

S akhir periode S total periode spill out juta m3 8 43258.9010953 43125.8108741 43039.4691518 42992.0877306 43109.5307424 43000.5461212 42908.0371329 42892.7965118 42966.1755235 43178.5989024 43258.9010953 43258.9010953 43228.6001071

juta m3 juta m3 9 10 55929.38859029 55796.29836912 0 55709.95664676 0 55662.57522559 0 55780.01823735 0 55671.03361618 0 55578.52462794 0 55563.28400676 0 55636.66301853 0 55849.08639735 0 55929.38859029 0 55929.38859029 0 55899.08760206 0

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

S akhir periode S total periode spill out juta m3 8 43228.6001071 43111.5802859 42967.1777635 42791.2331424 42665.0281541 42706.0339329 42898.6449447 43228.6001071 43228.6001071 43228.6001071 43228.6001071 43228.6001071 43172.3791188

juta m3 juta m3 9 10 55899.08760206 55782.06778088 0 55637.66525853 0 55461.72063735 0 55335.51564912 0 55376.52142794 0 55569.13243971 0 55899.08760206 0 55899.08760206 0 55899.08760206 0 55899.08760206 0 55899.08760206 0 55842.86661382 0

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

S akhir periode S total periode spill out juta m3 juta m3 juta m3 8 9 10 43172.3791188 55842.86661382 43020.5400976 55691.02759265 0 42854.3647753 55524.85227029 0

Keterangan 11 Sukses Sukses

42686.4553541 42593.9463659 42688.5201447 43172.3791188 43172.3791188 43172.3791188 43172.3791188 43172.3791188 43172.3791188 43172.3791188

55356.94284912 55264.43386088 55359.00763971 55842.86661382 55842.86661382 55842.86661382 55842.86661382 55842.86661382 55842.86661382 55842.86661382

0 0 0 0 0 0 0 0 0 0

Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

S akhir periode S total periode spill out juta m3 8 43172.3791188 43170.5304976 43081.7695753 42929.9305541 42777.8055659 42668.8209447 42599.6399565 42795.9929353 43172.3791188 43172.3791188 43172.3791188 43172.3791188 43170.5901306

juta m3 juta m3 9 10 55842.86661382 55841.01799265 0 55752.25707029 0 55600.41804912 0 55448.29306088 0 55339.30843971 0 55270.12745147 0 55466.48043029 0 55842.86661382 0 55842.86661382 0 55842.86661382 0 55842.86661382 0 55841.07762559 0

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

S akhir periode S total periode spill out juta m3 8 43170.5901306 43101.7815094 43054.1469871 42902.3079659 42760.5509776 42656.9231565 42603.2941682 42558.5911471 42725.2821588 42825.2127376 42813.0557494 43170.5901306 43170.5901306

juta m3 juta m3 9 10 55841.07762559 55772.26900441 0 55724.63448206 0 55572.79546088 0 55431.03847265 0 55327.41065147 0 55273.78166324 0 55229.07864206 0 55395.76965382 0 55495.70023265 0 55483.54324441 0 55841.07762559 0 55841.07762559 0

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

Mati maka (21) = Gagal n Mati maka (21) = Sukses

12670487495.00 m3

=

S akhir periode S total periode spill out juta m3 8 43170.5901306 43085.7111094 43016.3037871 42931.4247659 42792.2597776 42693.9887565 42788.1037682 43043.3815471 43170.5901306 43170.5901306 43170.5901306 43170.5901306 43170.5901306

juta m3 juta m3 9 10 55841.07762559 55756.19860441 0 55686.79128206 0 55601.91226088 0 55462.74727265 0 55364.47625147 0 55458.59126324 0 55713.86904206 0 55841.07762559 0 55841.07762559 0 55841.07762559 0 55841.07762559 0 55841.07762559 0

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

12670487495.00 m3

=

S akhir periode S total periode spill out juta m3 8 43170.5901306 43170.5901306 43120.5364082 43129.4013871

juta m3 juta m3 9 10 55841.07762559 55841.07762559 0 55791.02390324 0 55799.88888206 0

Keterangan 11 Sukses Sukses Sukses

43170.5901306 43170.5901306 43170.5901306 43170.5901306 43170.5901306 43170.5901306 43170.5901306 43170.5901306 43170.5901306

55841.07762559 55841.07762559 55841.07762559 55841.07762559 55841.07762559 55841.07762559 55841.07762559 55841.07762559 55841.07762559

0 0 0 0 0 0 0 0 0

Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

S akhir periode S total periode spill out juta m3 8 43170.5901306 43088.3895094 42970.5981871 42845.5431659 42708.9701776 42594.6287565 42543.5917682 42630.1303471 42589.4613588 42547.4367376 42670.0637494 42603.9335282 42495.87254

juta m3 juta m3 9 10 55841.07762559 55758.87700441 0 55641.08568206 0 55516.03066088 0 55379.45767265 0 55265.11625147 0 55214.07926324 0 55300.61784206 0 55259.94885382 0 55217.92423265 0 55340.55124441 0 55274.42102324 0 55166.360035 0

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

S akhir periode S total periode spill out juta m3 8 42495.87254 42384.2095188 42232.5493965 42051.2479753 41886.1629871 41897.7063659 41950.3493776 42235.0895565 42495.87254 42495.87254 42495.87254 42495.87254 42462.9795518

juta m3 juta m3 9 10 55166.360035 55054.69701382 0 54903.03689147 0 54721.73547029 0 54556.65048206 0 54568.19386088 0 54620.83687265 0 54905.57705147 0 55166.360035 0 55166.360035 0 55166.360035 0 55166.360035 0 55133.46704676 0

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

S akhir periode S total periode spill out juta m3 8 42462.9795518 42321.8541306 42179.8708082 42049.4589871 41943.9899988 41778.7589776 41660.3299894 41545.9885682 41575.30358 42004.6773588 42332.0723706 42362.3645494 42262.0795612

juta m3 juta m3 9 10 55133.46704676 54992.34162559 0 54850.35830324 0 54719.94648206 0 54614.47749382 0 54449.24647265 0 54330.81748441 0 54216.47606324 0 54245.791075 0 54675.16485382 0 55002.55986559 0 55032.85204441 0 54932.56705618 0

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

S akhir periode S total periode spill out juta m3 8 42262.0795612 42096.84854 41928.2540176 41730.8821965 41563.2052082 41732.7741871 41803.5611988 42157.9397776 42262.0795612 42262.0795612 42262.0795612 42262.0795612 42236.9625729

juta m3 juta m3 9 10 54932.56705618 54767.336035 0 54598.74151265 0 54401.36969147 0 54233.69270324 0 54403.26168206 0 54474.04869382 0 54828.42727265 0 54932.56705618 0 54932.56705618 0 54932.56705618 0 54932.56705618 0 54907.45006794 0

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

S akhir periode S total periode spill out juta m3 juta m3 juta m3 8 9 10 42236.9625729 54907.45006794 42109.2291518 54779.71664677 0 41945.4730294 54615.96052441 0

Keterangan 11 Sukses Sukses

41777.5636082 41643.58262 41502.4571988 41389.2122106 41371.2931894 41439.4882012 41584.95158 41611.6745918 41540.1875706 41460.6385824

54448.05110324 54314.070115 54172.94469382 54059.69970559 54041.78068441 54109.97569618 54255.439075 54282.16208677 54210.67506559 54131.12607735

0 0 0 0 0 0 0 0 0 0

Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

S akhir periode S total periode spill out juta m3 8 41460.6385824 41319.5131612 41160.5954388 40965.9020176 40787.8570294 40670.8372082 40811.60822 40815.1163988 40968.8474106 41082.1699894 41300.7010012

juta m3 juta m3 9 10 54131.12607735 53990.00065618 0 53831.08293382 0 53636.38951265 0 53458.34452441 0 53341.32470324 0 53482.095715 0 53485.60389382 0 53639.33490559 0 53752.65748441 0 53971.18849618 0

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

41314.92278 53985.410275 41232.7817918 53903.26928677

0 0

Sukses Sukses

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

12670487495.00 m3

=

S akhir periode S total periode spill out juta m3 8 41232.7817918 41123.7971706 40986.6522482 40802.6724271 40622.0354388 40526.4428176 40426.1578294 40360.0276082 40505.98262 40715.7275988 40851.3146106 40905.7123894 40805.4274012

juta m3 juta m3 9 10 53903.26928677 53794.28466559 0 53657.13974324 0 53473.15992206 0 53292.52293382 0 53196.93031265 0 53096.64532441 0 53030.51510324 0 53176.470115 0 53386.21509382 0 53521.80210559 0 53576.19988441 0 53475.91489618 0

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

12670487495.00 m3

=

S akhir periode S total periode spill out juta m3 8 40805.4274012 40624.12598 40453.1122576 40258.4188365 40095.9258482 39938.7300271 39926.5730388 40805.4274012 40805.4274012 40805.4274012 40805.4274012 40805.4274012 40805.4274012

juta m3 juta m3 9 10 53475.91489618 53294.613475 0 53123.59975265 0 52928.90633147 0 52766.41334324 0 52609.21752206 0 52597.06053382 0 53475.91489618 0 53475.91489618 0 53475.91489618 0 53475.91489618 0 53475.91489618 0 53475.91489618 0

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

S akhir periode S total periode spill out juta m3 8 40805.4274012 40664.30198 40495.7074576 40306.3708365 40128.3258482 39952.3812271 39789.8882388 39638.0492176 39592.1962294 39772.4788082 39755.13782 39694.3643988 39599.2634106

juta m3 juta m3 9 10 53475.91489618 53334.789475 0 53166.19495265 0 52976.85833147 0 52798.81334324 0 52622.86872206 0 52460.37573382 0 52308.53671265 0 52262.68372441 0 52442.96630324 0 52425.625315 0 52364.85189382 0 52269.75090559 0

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

12670487495.00 m3

=

S akhir periode S total periode spill out juta m3

juta m3 juta m3 8 9 10 39599.2634106 52269.75090559

Keterangan 11

39412.6051894 39241.5914671 39054.9332459 38866.5202576 38706.6460365 38601.1770482 38556.4740271 38689.4690388 39030.4556176 39438.2026294 39599.2634106 39599.2634106

52083.09268441 51912.07896206 51725.42074088 51537.00775265 51377.13353147 51271.66454324 51226.96152206 51359.95653382 51700.94311265 52108.69012441 52269.75090559 52269.75090559

0 0 0 0 0 0 0 0 0 0 0 0

Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

12670487495.00

=

S akhir periode S total periode spill out juta m3 8 39599.2634106 39527.7763894 39376.1162671 39192.1364459 39011.4994576 38824.8412365 38644.2042482 38470.9380271 38342.1410388 38254.5836176

juta m3 juta m3 9 10 52269.75090559 52198.26388441 0 52046.60376206 0 51862.62394088 0 51681.98695265 0 51495.32873147 0 51314.69174324 0 51141.42552206 0 51012.62853382 0 50925.07111265 0

Keterangan 11 Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses Sukses

38270.9386294 50941.42612441 38097.6724082 50768.15990324 37904.07542 50574.562915

0 0 0

Sukses Sukses Gagal

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

12670487495.00 m3

=

S akhir periode S total periode spill out juta m3 8 37904.07542 37695.9899988 37495.9458765 37271.7900553 37067.8250671 37055.2628459 37167.5218576 37077.2860365 37433.1930482 37621.5108271 37904.07542 37904.07542 37873.7744318

juta m3 juta m3 9 10 50574.562915 50366.47749382 0 50166.43337147 0 49942.27755029 0 49738.31256206 0 49725.75034088 0 49838.00935265 0 49747.77353147 0 50103.68054324 0 50291.99832206 0 50574.562915 0 50574.562915 0 50544.26192677 0

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

Keterangan 11 Gagal Gagal Gagal Gagal Gagal Gagal Gagal Gagal Gagal Gagal Gagal Gagal

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

=

12670487495.00 m3

S akhir periode S total periode spill out juta m3 8 37873.7744318 37740.6842106 37584.1856882 37429.6682671 37319.0152788 37207.3522576 37205.5632694 37455.4842482 37578.11126 37873.7744318 37873.7744318 37847.8202106 37789.0072224

juta m3 juta m3 9 10 50544.26192677 50411.17170559 0 50254.67318324 0 50100.15576206 0 49989.50277382 0 49877.83975265 0 49876.05076441 0 50125.97174324 0 50248.598755 0 50544.26192677 0 50544.26192677 0 50518.30770559 0 50459.49471735 0

mpungan maka [7] = [6] mpumgan maka [7] = Kapasitas Tampungan

as Tampungan Waduk maka [10] = 0 as Tampungan maka [10] = [6] - Kapasitas Tampungan Waduk Mati maka (21) = Gagal n Mati maka (21) = Sukses

Keterangan 11 Gagal Gagal Gagal Gagal Gagal Gagal Gagal Gagal Gagal Gagal Gagal Gagal

50681949980 m3

dan Outflow

utflow

3

3

gan asitas Waduk pas i tas waduk

53

1400 1200 1000 800

1936

1937

600 400 200

64000

0

62000 60000 58000 56000 54000 52000 50000 48000 36 19

1938

Inflow Outflow S total periode Kapasitas Bendung 1 149.990 149.9904 63275.59365382 50681.950 2 77.414 77.4144 63148.12553147 50681.950 3 85.709 85.7088 63007.00011029 50681.950 4 98.496 98.496 62885.97912206 50681.950 5 83.030 83.0304 62742.17530088 50681.950 6 292.896 292.896 62815.55431265 50681.950 7 506.218 506.2176 63094.93769147 50681.950 8 1371.168 1371.168 63352.437475 50681.950 9 581.213 581.2128 63352.437475 50681.950 10 393.984 393.984 63352.437475 50681.950 11 214.272 214.272 63339.87525382 50681.950 12 217.728 217.728 63338.08626559 50681.950 13 141.955 226.8342 63253.20724441 50681.950 14 65.318 204.8825 63113.64312206 50681.950 15 69.638 226.8342 62956.44730088 50681.950 16 51.840 219.517 62788.77031265 50681.950 17 72.317 226.8342 62634.25289147 50681.950 18 72.576 219.517 62487.31190324 50681.950 19 85.709 226.8342 62346.18648206 50681.950 20 139.968 219.517 62266.63749382 50681.950 21 458.006 226.8342 62497.80967265 50681.950 22 324.000 219.517 62602.29268441 50681.950 23 149.990 226.8342 62525.44886324 50681.950 24 80.352 219.517 62386.283875 50681.950 25 42.854 226.8342 62202.30405382 50681.950 26 38.707 204.8825 62036.12873147 50681.950 27 40.176 226.8342 61849.47051029 50681.950 28 51.840 219.517 61681.79352206 50681.950 29 69.638 226.8342 61524.59770088 50681.950 30 114.048 219.517 61419.12871265 50681.950 31 125.885 226.8342 61318.17929147 50681.950 32 150.336 219.517 61248.99830324 50681.950 33 243.734 226.8342 61265.89848206 50681.950

1939

1940

1941

1942

34 134.784 219.517 61181.16549382 35 50.890 226.8342 61005.22087265 36 23.328 219.517 60809.03188441 37 16.070 226.8342 60598.26806324 38 106.445 204.8825 60499.83034088 39 479.434 226.8342 60752.42971971 40 336.960 219.517 60809.03188441 41 251.770 226.8342 60809.03188441 42 474.336 219.517 60809.03188441 43 479.434 226.8342 60809.03188441 44 1023.840 219.517 60809.03188441 45 851.731 226.8342 60809.03188441 46 679.104 219.517 60809.03188441 47 739.238 226.8342 60809.03188441 48 256.608 219.517 60809.03188441 49 115.171 226.8342 60697.36886324 50 45.965 204.8825 60538.45114088 51 37.498 226.8342 60349.11451971 52 85.536 219.517 60215.13353147 53 117.850 226.8342 60106.14891029 54 114.048 219.517 60000.67992206 55 112.493 226.8342 59886.33850088 56 155.520 219.517 59822.34151265 57 249.091 226.8342 59844.59849147 58 150.336 219.517 59775.41750324 59 83.030 226.8342 59631.61368206 60 72.576 219.517 59484.67269382 61 235.699 226.8342 59484.67269382 62 53.222 204.8825 59333.01257147 63 123.206 226.8342 59229.38475029 64 69.984 219.517 59079.85176206 65 53.568 226.8342 58906.58554088 66 82.944 219.517 58770.01255265 67 270.518 226.8342 58813.69673147 68 163.296 219.517 58757.47574324 69 267.840 226.8342 58798.48152206 70 352.512 219.517 58931.47653382 71 139.277 226.8342 58843.91911265 72 59.616 219.517 58684.01812441 73 37.498 226.8342 58494.68150324 74 29.030 204.8825 58318.82938088 75 32.141 226.8342 58124.13595971 76 31.104 219.517 57935.72297147 77 299.981 226.8342 58008.86955029 78 386.208 219.517 58175.56056206 79 929.405 226.8342 58684.01812441 80 557.280 219.517 58684.01812441 81 846.374 226.8342 58684.01812441

50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950

1943

1944

1945

1946

82 601.344 219.517 83 399.082 226.8342 84 139.968 219.517 85 99.101 226.8342 86 48.384 204.8825 87 40.176 226.8342 88 196.992 219.517 89 136.598 226.8342 90 134.784 219.517 91 294.624 226.8342 92 360.288 219.517 93 538.358 226.8342 94 624.672 219.517 95 302.659 226.8342 96 134.784 219.517 97 58.925 226.8342 98 29.030 204.8825 99 32.141 226.8342 100 44.064 219.517 101 171.418 226.8342 102 101.088 219.517 103 171.418 226.8342 104 111.456 219.517 105 104.458 226.8342 106 119.232 219.517 107 69.638 226.8342 108 44.064 219.517 109 37.498 226.8342 110 38.707 204.8825 111 18.749 226.8342 112 36.288 219.517 113 42.854 226.8342 114 145.152 219.517 115 112.493 226.8342 116 399.168 219.517 117 391.046 226.8342 118 261.792 219.517 119 238.378 226.8342 120 77.760 219.517 121 37.498 226.8342 122 106.445 204.8825 123 184.810 226.8342 124 121.824 219.517 125 117.850 226.8342 126 235.872 219.517 127 1189.210 226.8342 128 782.784 219.517 129 439.258 226.8342

58684.01812441 58684.01812441 58604.46913618 58476.735715 58320.23719265 58133.57897147 58111.05398324 58020.81816206 57936.08517382 58003.87495265 58144.64596441 58456.17014324 58604.46913618 58604.46913618 58519.73614794 58351.82672676 58175.97460441 57981.28118324 57805.828195 57750.41157382 57631.98258559 57576.56596441 57468.50497618 57346.128355 57245.84336676 57088.64754559 56913.19455735 56723.85793618 56557.68261382 56349.59719265 56166.36820441 55982.38838324 55908.023395 55793.68197382 55973.33298559 56137.54516441 56179.82017618 56191.363555 56049.60656676 55860.26994559 55761.83222324 55719.80760206 55622.11461382 55513.12999265 55529.48500441 56049.60656676 56049.60656676 56049.60656676

50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950

1947

1948

1949

1950

130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177

419.904 291.946 150.336 80.352 53.222 93.744 77.760 96.422 207.360 677.635 614.304 739.238 777.600 495.504 243.648 152.669 79.834 58.925 59.616 179.453 178.848 158.026 209.952 337.478 409.536 674.957 168.480 104.458 50.803 88.387 72.576 85.709 134.784 254.448 303.264 466.042 611.712 637.459 222.912 93.744 118.541 179.453 336.960 117.850 127.008 211.594 292.896 439.258

219.517 226.8342 219.517 226.8342 204.8825 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 204.8825 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 204.8825 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 204.8825 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342

56049.60656676 56049.60656676 55980.42557853 55833.94335735 55682.283235 55549.19301382 55407.43602559 55277.02420441 55264.86721618 55715.668195 55980.42557853 55980.42557853 55980.42557853 55980.42557853 55980.42557853 55906.26015735 55781.211235 55613.30181382 55453.40082559 55406.01940441 55365.35041618 55296.541795 55286.97680676 55397.62098559 55587.63999735 55980.42557853 55929.38859029 55807.01196912 55652.93264676 55514.48562559 55367.54463735 55226.41921618 55141.68622794 55169.30000676 55253.04701853 55492.25439735 55884.44940912 55929.38859029 55929.38859029 55796.29836912 55709.95664676 55662.57522559 55780.01823735 55671.03361618 55578.52462794 55563.28400676 55636.66301853 55849.08639735

50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950

1951

1952

1953

1954

178 570.240 219.517 55929.38859029 179 447.293 226.8342 55929.38859029 180 189.216 219.517 55899.08760206 181 109.814 226.8342 55782.06778088 182 60.480 204.8825 55637.66525853 183 50.890 226.8342 55461.72063735 184 93.312 219.517 55335.51564912 185 267.840 226.8342 55376.52142794 186 412.128 219.517 55569.13243971 187 795.485 226.8342 55899.08760206 188 832.032 219.517 55899.08760206 189 669.600 226.8342 55899.08760206 190 655.776 219.517 55899.08760206 191 337.478 226.8342 55899.08760206 192 163.296 219.517 55842.86661382 193 74.995 226.8342 55691.02759265 194 38.707 204.8825 55524.85227029 195 58.925 226.8342 55356.94284912 196 127.008 219.517 55264.43386088 197 321.408 226.8342 55359.00763971 198 1384.128 219.517 55842.86661382 199 835.661 226.8342 55842.86661382 200 536.544 219.517 55842.86661382 201 1264.205 226.8342 55842.86661382 202 673.920 219.517 55842.86661382 203 934.762 226.8342 55842.86661382 204 624.672 219.517 55842.86661382 205 224.986 226.8342 55841.01799265 206 116.122 204.8825 55752.25707029 207 74.995 226.8342 55600.41804912 208 67.392 219.517 55448.29306088 209 117.850 226.8342 55339.30843971 210 150.336 219.517 55270.12745147 211 423.187 226.8342 55466.48043029 212 655.776 219.517 55842.86661382 213 795.485 226.8342 55842.86661382 214 876.096 219.517 55842.86661382 215 522.288 226.8342 55842.86661382 216 217.728 219.517 55841.07762559 217 158.026 226.8342 55772.26900441 218 157.248 204.8825 55724.63448206 219 74.995 226.8342 55572.79546088 220 77.760 219.517 55431.03847265 221 123.206 226.8342 55327.41065147 222 165.888 219.517 55273.78166324 223 182.131 226.8342 55229.07864206 224 386.208 219.517 55395.76965382 225 326.765 226.8342 55495.70023265

50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950

1955

1956

1957

1958

226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273

207.360 666.922 396.576 141.955 135.475 141.955 80.352 128.563 313.632 482.112 1653.696 1116.893 1163.808 645.494 318.816 372.298 154.829 235.699 1246.752 1108.858 1420.416 1374.019 1181.952 1076.717 990.144 618.710 300.672 144.634 87.091 101.779 82.944 112.493 168.480 313.373 178.848 184.810 342.144 160.704 111.456 115.171 53.222 45.533 54.432 238.378 272.160 511.574 1220.832 441.936

219.517 226.8342 219.517 226.8342 204.8825 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 204.8825 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 204.8825 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 204.8825 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342

55483.54324441 55841.07762559 55841.07762559 55756.19860441 55686.79128206 55601.91226088 55462.74727265 55364.47625147 55458.59126324 55713.86904206 55841.07762559 55841.07762559 55841.07762559 55841.07762559 55841.07762559 55841.07762559 55791.02390324 55799.88888206 55841.07762559 55841.07762559 55841.07762559 55841.07762559 55841.07762559 55841.07762559 55841.07762559 55841.07762559 55841.07762559 55758.87700441 55641.08568206 55516.03066088 55379.45767265 55265.11625147 55214.07926324 55300.61784206 55259.94885382 55217.92423265 55340.55124441 55274.42102324 55166.360035 55054.69701382 54903.03689147 54721.73547029 54556.65048206 54568.19386088 54620.83687265 54905.57705147 55166.360035 55166.360035

50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950

1959

1960

1961

1962

55166.360035 274 1104.192 219.517 55166.360035 275 412.474 226.8342 276 186.624 219.517 55133.46704676 277 85.709 226.8342 54992.34162559 278 62.899 204.8825 54850.35830324 279 96.422 226.8342 54719.94648206 280 114.048 219.517 54614.47749382 281 61.603 226.8342 54449.24647265 282 101.088 219.517 54330.81748441 283 112.493 226.8342 54216.47606324 54245.791075 284 248.832 219.517 285 656.208 226.8342 54675.16485382 286 546.912 219.517 55002.55986559 287 257.126 226.8342 55032.85204441 288 119.232 219.517 54932.56705618 54767.336035 289 61.603 226.8342 290 36.288 204.8825 54598.74151265 291 29.462 226.8342 54401.36969147 292 51.840 219.517 54233.69270324 293 396.403 226.8342 54403.26168206 294 290.304 219.517 54474.04869382 295 581.213 226.8342 54828.42727265 296 723.168 219.517 54932.56705618 297 597.283 226.8342 54932.56705618 298 565.056 219.517 54932.56705618 299 353.549 226.8342 54932.56705618 300 194.400 219.517 54907.45006794 301 99.101 226.8342 54779.71664677 302 41.126 204.8825 54615.96052441 303 58.925 226.8342 54448.05110324 54314.070115 304 85.536 219.517 305 85.709 226.8342 54172.94469382 306 106.272 219.517 54059.69970559 307 208.915 226.8342 54041.78068441 308 287.712 219.517 54109.97569618 54255.439075 309 372.298 226.8342 310 246.240 219.517 54282.16208677 311 155.347 226.8342 54210.67506559 312 139.968 219.517 54131.12607735 313 85.709 226.8342 53990.00065618 314 45.965 204.8825 53831.08293382 315 32.141 226.8342 53636.38951265 316 41.472 219.517 53458.34452441 317 109.814 226.8342 53341.32470324 53482.095715 318 360.288 219.517 319 230.342 226.8342 53485.60389382 320 373.248 219.517 53639.33490559 321 340.157 226.8342 53752.65748441

50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950

1963

1964

1965

1966

322 438.048 219.517 53971.18849618 53985.410275 323 241.056 226.8342 324 137.376 219.517 53903.26928677 325 117.850 226.8342 53794.28466559 326 67.738 204.8825 53657.13974324 327 42.854 226.8342 53473.15992206 328 38.880 219.517 53292.52293382 329 131.242 226.8342 53196.93031265 330 119.232 219.517 53096.64532441 331 160.704 226.8342 53030.51510324 53176.470115 332 365.472 219.517 333 436.579 226.8342 53386.21509382 334 355.104 219.517 53521.80210559 335 281.232 226.8342 53576.19988441 336 119.232 219.517 53475.91489618 53294.613475 337 45.533 226.8342 338 33.869 204.8825 53123.59975265 339 32.141 226.8342 52928.90633147 340 57.024 219.517 52766.41334324 341 69.638 226.8342 52609.21752206 342 207.360 219.517 52597.06053382 343 1207.958 226.8342 53475.91489618 344 702.432 219.517 53475.91489618 345 816.912 226.8342 53475.91489618 346 1091.232 219.517 53475.91489618 347 476.755 226.8342 53475.91489618 348 235.872 219.517 53475.91489618 53334.789475 349 85.709 226.8342 350 36.288 204.8825 53166.19495265 351 37.498 226.8342 52976.85833147 352 41.472 219.517 52798.81334324 353 50.890 226.8342 52622.86872206 354 57.024 219.517 52460.37573382 355 74.995 226.8342 52308.53671265 356 173.664 219.517 52262.68372441 357 407.117 226.8342 52442.96630324 52425.625315 358 202.176 219.517 359 166.061 226.8342 52364.85189382 360 124.416 219.517 52269.75090559 361 40.176 226.8342 52083.09268441 362 33.869 204.8825 51912.07896206 363 40.176 226.8342 51725.42074088 364 31.104 219.517 51537.00775265 365 66.960 226.8342 51377.13353147 366 114.048 219.517 51271.66454324 367 182.131 226.8342 51226.96152206 368 352.512 219.517 51359.95653382 369 567.821 226.8342 51700.94311265

50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950

1968

1969

627.264 407.117 528.768 155.347 53.222 42.854 38.880 40.176 38.880 53.568 90.720 139.277 235.872 53.568 25.920 18.749 4.838 2.678 15.552 214.272 331.776 136.598 575.424 415.152 886.464 436.579 189.216 93.744 48.384 72.317 108.864 115.171 217.728 476.755 342.144 527.645 298.080 200.880 160.704

219.517 226.8342 219.517 226.8342 204.8825 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 204.8825 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 204.8825 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 219.517 226.8342 219.517

52108.69012441 52269.75090559 52269.75090559 52198.26388441 52046.60376206 51862.62394088 51681.98695265 51495.32873147 51314.69174324 51141.42552206 51012.62853382 50925.07111265 50941.42612441 50768.15990324 50574.562915 50366.47749382 50166.43337147 49942.27755029 49738.31256206 49725.75034088 49838.00935265 49747.77353147 50103.68054324 50291.99832206 50574.562915 50574.562915 50544.26192677 50411.17170559 50254.67318324 50100.15576206 49989.50277382 49877.83975265 49876.05076441 50125.97174324 50248.598755 50544.26192677 50544.26192677 50518.30770559 50459.49471735

50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950 50681.950

400.000 350.000

kapasitas tampungan (m3)

1967

370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408

300.000 250.000 200.000 150.000 100.000 50.000 0.000 1930 1935 1940

65000.000 63000.000 61000.000 59000.000 57000.000 55000.000 53000.000 51000.000 49000.000 47000.000 45000.000

1 21 41 61 81 01 21 1 1

51000.000 49000.000 47000.000 45000.000

1 21 41 61 81 01 21 1 1

Grafik Inflow dan Outflow i nflow

outflow

1400 1200 1000 800 600 400 200

4000

0

2000

0000

8000

6000

4000

2000

0000

8000 59 19

36 19

400.000

kapasitas tampungan (m3)

350.000 300.000 250.000 200.000 i nflow outflow

150.000 100.000 50.000 0.000 1930 1935 1940 1945 1950 1955 1960 1965 1970 1975

Tahun

Chart Title

65000.000 63000.000 61000.000 59000.000 57000.000 55000.000 53000.000 51000.000 49000.000 47000.000 45000.000

1800.000 1600.000 1400.000 1200.000 1000.000 800.000 600.000 400.000 200.000 0.000 1 4 7 0 2 4 7 93 6 9 11 13 162 185 08 31 4 7 0 2 2 25 27 0 23 6 9 2 3 3 34 36 9 3

Inflow

Outfl ow

1 21 41 61 81 01 21 41 61 81 01 21 41 61 81 01 21 41 61 81 01 1 1 1 1 1 2 2 2 2 2 3 3 3 3 3 4

Outfl ow Inflow

51000.000 49000.000 47000.000 45000.000

1 4 7 0 2 4 7 93 6 9 11 13 162 185 08 31 4 7 0 2 2 25 27 0 23 6 9 2 3 3 34 36 9 3

Inflow

Outfl ow

1 21 41 61 81 01 21 41 61 81 01 21 41 61 81 01 21 41 61 81 01 1 1 1 1 1 2 2 2 2 2 3 3 3 3 3 4

Outfl ow Inflow

Related Documents

Simulasi
April 2020 36
Simulasi
June 2020 26
Simulasi
June 2020 20
Simulasi
June 2020 21
Mig Simulasi
April 2020 30
Simulasi Bpd.docx
December 2019 44

More Documents from "Raden Patah"