RESUMEN DE LA VALORIZACIÓN Nº 03 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRIVAD: COMPAÑÍA MINERA ANTAPACCAY SA CONTRATISTA RESIDENTE SUPERVISOR

: JERGO SAC : ING. CESAR YABAR VELAZCO : BISONTE INGENIEROS CONTRATISTAS

JEFE DE SUPERVIS: ING. JUAN ROGER QUINTANILLA ANYAIPOMA

PRESUPUESTO BASE

S/.

19,946,071.66 (INCL. IGV)

ADELANTO DIRECTO ( INCL. IGV ) S/.

-

PRESUPUESTO CONTRATADO

S/.

19,933,413.12 (INCL. IGV)

ADELANTO POR MATERIALES ( INCL. IGV ) S/.

-

FACTOR DE RELACION:

ITEM

1.00

DESCRIPCION

0.00% 0.00% 0.99936536175

MES - JULIO 2018

PRESUPUESTO CONTRATADO

ANTERIOR

ACTUAL

ACUMULADO

SALDO POR VALORIZAR

VALORIZACION Componente 01 : ADECUADA INFRAESTRUCTURA PARA BENEFICO Y MANEJO DEL CAMAL

14,536,449.80

3,256,458.94

2,571,643.12

5,828,102.06

8,708,347.74

Componente 02 : ADECUADO EQUIPAMIENTO Y MAQUINARIA PARA EL BENEFICIO DEL CAMAL

2,259,000.76

0.00

0.00

0.00

2,259,000.76

Componente 03 : ADECUADA CAPACITACION EN EL MANEJO DEL EQUIPO E INFRAESTRUCTURA

108,000.00

0.00

0.00

0.00

108,000.00

###

###

2,571,643.12

5,828,102.06

###

DEL CAMAL TOTAL VALORIZACIÓN CONTRACTUAL 2.00

REAJUSTE DE PRECIOS Reintegros Presupuesto Principal TOTAL REAJUSTES

3.00

TOTAL VALORIZACIÓN BRUTA (VB)=(1) + (2)

4.00

AMORTIZACIONES

23,582.23

19,664.49

43,246.72

23,582.23

19,664.490

43,246.72

###

2,591,307.61

###

OTORGADO

5.00

6.00

Amortizacion de Adelanto Directo

0.00

0.00

0.00

0.00

Amortizacion de Adelanto por Materiales

0.00

0.00

0.00

0.00

0.00 0.00

TOTAL ADELANTOS

0.00

0.00

0.00

0.00

0.00

Deducción de Reintegro por Adelanto Directo

0.00

0.00

0.00

Deducción de Reintegro por Adelanto de Materiales

0.00

0.00

0.00

TOTAL DEDUCCION DE REINTEGROS

0.00

0.00

0.00

DEDUCCION DE REINTEGROS

VALORIZACION DE LA VALORIZACION = (VN+IGV)FR VALORIZACION NETA (VN)=VB-(04) - (5)

###

3,042,621.10

I.G.V. 18% FACTOR DE RELACION PORCENTAJE DE AVANCE MONTO A CANCELAR AL CONTRATISTA

###

3,055,802.42

16,903,450.56 3,280,041.17

0.9993654

###

2,591,307.61

5,871,348.78

590,407.41

466,435.37

1,056,842.79

0.9993654

0.9993654

0.9993654

19.27%

15.22% ###

34.48%

65.52%

RESUMEN DE LAS VALORIZACIONES TRAMITADAS JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRIVADA : COMPAÑÍA MINERA ANTAPACCAY SA CONTRATISTA

: CONSORCIO EDUCATIVO ESPINAR

RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR

: BISONTE INGENIEROS CONTRATISTAS

JEFE DE SUPERVISIO: ING. JUAN ROGER QUINTANILLA ANYAIPOMA

ITEM 1.00

DESCRIPCION

Valorización

Valorización

Valorización

Nº 04

Nº 05

Nº 06

Nº 07

Valorización Nº 08

Mayo 2018

Junio 2018

Julio 2018

Agosto 2018

Setiembre 2018

Octubre 2018

Noviembre 2017

Diciembre 2018

S/. 1,501,982.87 S/. 2,571,643.12

TOTAL

S/. 0.00

S/. 0.00

S/. 108,000.00

S/. 0.00

S/. 0.00

S/. 4,499,370.27

S/. 0.00

S/. 23,582.23

S/. 19,664.49

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 43,246.72

- Por Adelanto Directo

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

- Por Materiales

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

TOTAL REAJUSTES

S/. 0.00

S/. 23,582.23

S/. 19,664.49

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 43,246.72

S/. 425,744.28 S/. 1,525,565.10

###

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 4,542,616.99

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

REAJUSTES (R) Reajuste del Contrato Principal (R) Deducción del Reajuste que NO CORRESPONDE (D)

4.00

VALORIZACION BRUTA

5.00

ADELANTOS OTORGADOS

(VB = V+R-D)

Adelanto Directo

S/. 0.00

- Amortización de Adelanto Directo Adelanto de Materiales

S/. 0.00

S/. 0.00

S/. 0.00

- Amortización de Adelanto de Materiales TOTAL AMORTIZACIÓN DE ADELANTOS 6.00

Valorización

Nº 03

S/. 425,744.28

2.02

5.02

Valorización

Nº 02

S/. 2,259,000.76

2.01

5.01

Valorización

Nº 01

S/. 14,536,449.80

Componente 02 : ADECUADO EQUIPAMIENTO Y MAQUINARIA PARA EL BENEFICIO DEL CAMAL

Componente 03 : ADECUADA CAPACITACION EN EL MANEJO DEL EQUIPO E 1.03 INFRAESTRUCTURA 2.00

Valorización

VALORIZACIONES (V)

1.01 Componente 01 : ADECUADA INFRAESTRUCTURA PARA BENEFICO Y MANEJO DEL CAMAL 1.02

PRESUPUESTO

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

OTROS DESCUENTOS

6.01

Ausencia Personal Técnico Propuesto

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

6.02

Otros

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 425,744.28 S/. 1,525,565.10

###

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 4,542,616.99

S/. 274,601.72

S/. 466,435.36

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 817,671.06

S/. 502,059.43 S/. 1,799,024.37

###

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 0.00

S/. 5,356,886.21

TOTAL DESCUENTOS

6.00 VALORIZACION NETA

(VN = VB-A-D)

S/. 16,903,450.56

FACTOR DE RELACION: 0.999365361750637 I.G.V. (18%)

S/. 3,042,621.10 MONTO TOTAL A FACTURAR

S/. 19,933,413.12

S/. 76,633.97

RESUMEN DE VALORIZACIÓN POR COMPONENTES JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO" : MUNICIPALIDAD PROVINCIAL DE ESPINAR

ENTIDAD RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR

: BISONTE INGENIEROS CONTRATISTAS

JEFE DE SUPERVISI : ING. JUAN ROGER QUINTANILLA ANYAIPOMA PRESUPUESTO BASE ITEMS

MONTO I. 01.00

ACUMULADO ANTERIOR

VALORIZACIÓN DEL MES

ACUMULADO ACTUAL

SALDO POR VALORIZAR

DESCRIPCION %

MONTO

%

MONTO

%

MONTO

%

MONTO

%

Componente 01 : ADECUADA INFRAESTRUCTURA PARA BENEFICO Y MANEJO DEL CAMAL OBRAS PROVICIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD

592,992.26

4.21%

513,386.73

86.58%

39,711.42

6.70%

553,098.15

93.27%

39,894.11

6.73%

02.00

MITIGACION DE IMPACTO AMBIENTAL

142,716.02

1.01%

34,200.71

23.96%

16,438.23

11.52%

50,638.94

35.48%

92,077.08

64.52%

03.00

CONSTRUCCION DE ADMINISTRACION

699,473.07

4.97%

208,186.49

29.76%

46,789.39

6.69%

254,975.88

36.45%

444,497.19

63.55%

04.00

CONSTRUCCION DE SERVICIOS DEL PERSONAL

391,472.94

2.78%

29,818.37

7.62%

5,610.05

1.43%

35,428.42

9.05%

356,044.52

90.95%

05.00

CONSTRUCCION DE PRODUCCION

4,400,503.66

31.24%

963,532.46

21.90%

450,684.85

10.24%

1,414,217.31

32.14%

2,986,286.35

67.86%

06.00

CONSTRUCCION DE SERVICIOS COMPLEMENTARIOS

765,266.25

5.43%

66,818.48

8.73%

91,282.34

11.93%

158,100.82

20.66%

607,165.43

79.34%

1,213,693.60

8.62%

56,505.87

4.66%

516,548.01

42.56%

573,053.88

47.22%

640,639.72

52.78%

1.13%

0.00

0.00%

0.00

0.00%

0.00

0.00%

158,633.08

100.00%

07.00

CONSTRUCCION DE CORRALES

08.00

AREAS VERDES Y CIRCULACION

158,633.08

09.00

INSTALACIONES SANITARIAS EXTERIORES

424,505.63

3.01%

5,786.81

1.36%

33,072.40

7.79%

38,859.21

9.15%

385,646.42

90.85%

10.00

INSTALACIONES ELECTRICAS EXTERIORES

688,978.75

4.89%

36,366.31

5.28%

218,345.41

31.69%

254,711.72

36.97%

434,267.03

63.03%

11.00

CONSTRUCCIÓN DE CERCO PERIMETRICO

897,909.54

6.37%

364,174.39

40.56%

62,302.65

6.94%

426,477.04

47.50%

471,432.50

52.50%

12.00

CONSTRUCCION DE CISTERNA Y CAMARA DE BONBEO

274,619.87

1.95%

92,441.45

33.66%

24,335.87

8.86%

116,777.33

42.52%

157,842.54

57.48%

13.00

SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES

1,462,943.49

10.39%

342,497.64

23.41%

637,915.32

43.60%

980,412.96

67.02%

482,530.53

32.98%

1762949.96

12.52%

0.00

0.00%

116,939.64

6.63%

116,939.64

6.63%

1,646,010.32

93.37%

119550.68

0.85%

0.00

0.00%

0.00

0.00%

0.00

0.00%

119,550.68

100.00%

0.64%

0.00

0.00%

0.00

0.00%

0.00

0.00%

90,000.00

100.00%

II.

Componente 02 : ADECUADO EQUIPAMIENTO Y MAQUINARIA PARA EL BENEFICIO DEL CAMAL

14.00

EQUIPAMIENTO INDUSTRIAL

15.00

MOBILIARIO y EQUIPAMIENTO

III. 16.00

Componente 03 : ADECUADA CAPACITACION EN EL MANEJO DEL EQUIPO E INFRAESTRUCTURA CAPACITACION EN EL MANEJO DEL EQUIPO E INFRAESTRUCTURA DEL CAMAL

90,000.00

COSTO DIRECTO

14,086,208.80

GASTOS GENERALES

10.000%

UTILIDAD

10.000%

SUB TOTAL FR I.G.V. TOTAL

100.00%

S/.

1,408,620.88

2,713,715.78

19.27%

S/.

271,371.58

2,259,975.57

16.04%

S/.

225,997.56

4,973,691.29

35.31%

S/.

497,369.13

9,112,517.51 911,251.75

1,408,620.88

271,371.58

225,997.56

497,369.13

911,251.75

16,903,450.56

3,256,458.94

2,711,970.69

5,968,429.55

10,935,021.01

0.9994 18.000%

3,042,621.10 S/.

19,933,413.12

586,162.61 S/.

3,840,182.88

488,154.72 S/.

3,198,094.49

1,074,317.32 S/.

7,038,277.27

1,968,303.78 S/.

12,895,135.84

64.69%

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

01 01.01

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

OBRAS PROVICIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD OBRAS PROVISIONALES

592,992.26

513,386.73

39,711.42

553,098.15

39,894.11

01.01.01

CONSTRUCCION DE OFICINAS, ALMACEN, GUARDIANIA, VESTUARIOS Y SS.HH.

m2

306.00

199.83

61,147.98

263.57

52,669.19

86.13%

42.43

8,478.79

13.87%

306.00

61,147.98

100.00%

01.01.02

Cerco metálico acanalado para protección de obra. H = 2.40m

m

430.00

150.00

64,500.00

255.54

38,331.00

59.43%

80.00

12,000.00

18.60%

335.54

50,331.00

78.03%

01.01.03

Portón Metálico de 4.0mx 2.4m

und

1.00

1,250.00

1,250.00

-

0.00%

1.00

1,250.00

100.00%

1.00

1,250.00

100.00%

-

-

0.00%

01.01.04

CARTEL DE IDENTIFICACION DE OBRA 4.80M X 3.60M

und

1.00

1,552.90

1,552.90

1.00

0.00%

1.00

1,552.90

100.00%

-

-

0.00%

01.02

1,552.90

100.00%

-

-

INSTALACIONES PROVISIONALES

94.46

14,169.00

0.00% 21.97%

-

01.02.01

INSTALACION DE AGUA TEMPORAL PARA LA CONSTRUCCION

und

1.00

4,354.39

4,354.39

0.65

2,830.35

65.00%

0.10

435.44

10.00%

0.75

3,265.79

75.00%

0.25

1,088.60

25.00%

01.02.02

INSTALACION DE DESAGUE TEMPORAL PARA LA CONSTRUCCION

und

1.00

6,535.05

6,535.05

0.65

4,247.78

65.00%

0.10

653.51

10.00%

0.75

4,901.29

75.00%

0.25

1,633.76

25.00%

01.02.03

ENERGIA ELECTRICA TEMPORAL PARA LA CONSTRUCCION

und

1.00

5,070.49

5,070.49

0.65

3,295.82

65.00%

0.10

507.05

10.00%

0.75

3,802.87

75.00%

0.25

1,267.62

25.00%

01.03

TRABAJOS PRELIMINARES

-

01.03.01

LIMPIEZA DE TERRENO MANUAL

m2

7,225.72

1.51

10,910.84

7,225.72

10,910.84

100.00%

-

-

0.00%

7,225.72

10,910.84

100.00%

-

-

01.03.02

TRAZO NIVELES Y REPLANTEO PRELIMINAR

M2

7,225.72

3.23

23,339.08

7,225.72

23,339.08

100.00%

-

-

0.00%

7,225.72

23,339.08

100.00%

-

-

01.03.03

TRAZO, NIVELES, REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO

mes

3.00

4,831.63

14,494.89

2.00

9,663.26

66.67%

0.30

10.00%

2.30

11,112.75

76.67%

0.70

01.03.04

CORTE EN TERRENO CON MAQUINARIA

m3

11,729.60

10.38

121,753.25

11,729.60

121,753.25

100.00%

-

-

0.00%

11,729.60

121,753.25

100.00%

-

-

0.00%

01.03.05

ELIMINACION DE MATERIAL EXCEDENTE D = 2 Km

m3

13,489.04

13.93

187,902.33

13,489.04

187,902.33

100.00%

-

-

0.00%

13,489.04

187,902.33

100.00%

-

-

0.00%

01.03.06

FLETE TERRESTRE AREQUIPA - ESPINAR

TON

19.00

214.15

4,068.85

17.70

3,790.46

93.16%

0.60

128.49

3.16%

18.30

3,918.95

96.32%

0.70

149.90

3.68%

01.03.07

FLETE TERRESTRE AREQUIPA - ESPINAR

VJE

4.00

8,478.42

33,913.68

3.00

25,435.26

75.00%

0.70

5,934.89

17.50%

3.70

31,370.15

92.50%

0.30

2,543.53

7.50%

01.04

1,449.49

SEGURIDAD Y SALUD EN EL TRABAJO

3,382.14

0.00% 0.00% 23.33%

-

01.04.01

EQUIPOS DE PROTECCION INDIVIDUAL

jgo

1.00

44,037.50

44,037.50

0.53

23,339.88

53.00%

0.17

7,486.38

17.00%

0.70

30,826.25

70.00%

0.30

13,211.25

30.00%

01.04.02

EQUIPOS DE PROTECCION COLECTIVA

jgo

1.00

945.76

945.76

0.53

501.25

53.00%

0.17

160.78

17.00%

0.70

662.03

70.00%

0.30

283.73

30.00%

01.04.03

SEÑALIZACION TEMPORAL DE SEGURIDAD

jgo

1.00

4,577.05

4,577.05

0.53

2,425.84

53.00%

0.17

778.10

17.00%

0.70

3,203.94

70.00%

0.30

1,373.11

30.00%

01.04.04

RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS

jgo

1.00

2,638.22

2,638.22

0.53

1,398.26

53.00%

0.17

448.50

17.00%

0.70

1,846.75

70.00%

0.30

791.47

30.00%

02 02.01

MITIGACION DE IMPACTO AMBIENTAL

02.01.01

PLAN DE MANEJO AMBIENTAL

02.01.02

PLAN DE MANEJO DE RESIDUOS SOLIDOS

02.01.02.01 02.01.02.01.01 02.01.03 02.01.03.01

142,716.02

34,200.71

16,438.23

50,638.93

92,077.09

PLAN DE MANEJO AMBIENTAL GLB

1.00

330.00

330.00

GLB

1.00

7,773.47

7,773.47

0.20

-

-

0.00%

-

1,554.69

20.00%

0.25

-

0.00%

-

25.00%

0.45

-

0.00%

1.00

330.00

100.00%

3,498.06

45.00%

0.55

4,275.41

55.00%

PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS PLAN DE MANEJO DE RESIDUOS SOLIDOS CONSTRUCCION

1,943.37

PLAN DE VIGILANCIA AMBIENTAL PROGRAMA DE MONITOREO AMBIENTAL

02.01.03.01.01

MONITOREO DE LA CALIDAD DE AIRE

GLB

1.00

24,600.00

24,600.00

0.15

3,690.00

15.00%

-

-

0.00%

0.15

3,690.00

15.00%

0.85

20,910.00

85.00%

02.01.03.01.02

MONITOREO DE LOS NIVELES SONOROS

GLB

1.00

3,600.00

3,600.00

0.15

540.00

15.00%

-

-

0.00%

0.15

540.00

15.00%

0.85

3,060.00

85.00%

02.01.03.01.03

MONITOREO DE LA CALIDAD DE SUELOS

GLB

1.00

6,000.00

6,000.00

0.15

900.00

15.00%

-

-

0.00%

0.15

900.00

15.00%

0.85

5,100.00

85.00%

02.01.03.01.04

MONITOREO DE LA CALIDAD DE EFLUENTES

GLB

1.00

13,500.00

13,500.00

0.15

2,025.00

15.00%

-

-

0.00%

0.15

2,025.00

15.00%

0.85

11,475.00

85.00%

GLB

1.00

6,090.48

6,090.48

0.40

2,436.19

40.00%

0.20

1,218.10

20.00%

0.60

3,654.29

60.00%

0.40

2,436.19

40.00%

glb

1.00

400.00

400.00

0.50

200.00

50.00%

0.20

80.00

20.00%

0.70

280.00

70.00%

0.30

120.00

30.00%

GLB

1.00

4,167.96

4,167.96

0.00%

-

0.00%

-

0.00%

1.00

4,167.96

100.00%

02.01.04 02.01.04.01 02.01.05 02.01.05.01 02.01.06 02.01.06.01 02.01.06.01.01 02.01.06.02

PLAN DE SALUD Y SEGURIDAD ACUPACIONAL CHARLAS DE INDUCCION A TRABAJADORES DE LA OBRA PLAN DE SEÑALIZACION AMBIENTAL PROGRAMA DE SEÑALIZACION AMBIENTAL PLAN DE RELACIONES COMUNITARIAS PROGRAMA DE PROMOCION SOCIAL Y FORTALECIMIENTO DE CAPACIDADES CAPACITACION DE RIESGOS AMBIENTALES (POBLADORES DE LA ZONA)

-

-

-

-

PROGRAMA DE MONITOREO Y VIGILANCIA CIUDADANA

4

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

02.01.06.02.01 02.01.07

TALLERES DE IMPLEMENTACION DEL PMA (CONSTRUCCION Y OPERACION)

P. U.

AVANCE ANTERIOR

P. TOTAL

GLB

1.00

2,065.70

2,065.70

METRADO -

MONTO

AVANCE ACTUAL %

-

METRADO

0.00%

-

MONTO

AVANCE ACUMULADO %

-

METRADO

0.00%

-

MONTO

SALDO %

-

METRADO

MONTO

%

0.00%

1.00

2,065.70

100.00%

ACCIONES DE MITIGACION DE IMPACTO AMBIENTAL EN OBRA

02.01.07.01

RECOJO Y LIMPIEZA DE DESPERDICIOS

MES

7.00

2,962.28

20,735.96

2.50

7,405.70

35.71%

1.50

4,443.42

21.43%

4.00

11,849.12

57.14%

3.00

8,886.84

42.86%

02.01.07.02

CONSTRUCCION Y MANTENIMIENTO DE BOTADEROS (V=10.00M3)

UND

3.00

1,352.67

4,058.01

1.13

1,528.52

37.67%

1.07

1,447.36

35.67%

2.20

2,975.87

73.33%

0.80

1,082.14

26.67%

02.01.07.03

RECUPERACION DEL ENTORNO A MANO

M2

2,817.00

4.00

11,268.00

800.06

3,200.24

28.40%

216.94

867.76

7.70%

1,017.00

4,068.00

36.10%

1,800.00

7,200.00

63.90%

02.01.07.04

RECUPERACION DEL ENTORNO CON EQUIPO

M2

1,578.00

2.45

3,866.10

500.00

1,225.00

31.69%

78.00

191.10

4.94%

578.00

1,416.10

36.63%

1,000.00

2,450.00

63.37%

02.01.07.05

LIMPIEZA FINAL DE OBRA

GLB

1.00

5,924.56

5,924.56

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

5,924.56

100.00%

DESMONTAJE DE INSTALACIONES PROVISIONALES

GLB

1.00

3,842.48

3,842.48

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

3,842.48

100.00%

glb

1.00

15,617.80

15,617.80

0.40

6,247.12

40.00%

0.40

40.00%

0.80

12,494.24

80.00%

0.20

3,123.56

20.00%

02.01.07.06 02.02 02.02.01 02.03

PLAN DE MONITOREO ARQUEOLÓGICO PLAN DE MONITOREO ARQUEOLOGICO

6,247.12

PLAN DE SEGURIDAD Y CONTINGENCIAS

02.03.01

SEÑAL INDICATIVA DE SALIDA

und

104.00

15.25

1,586.00

52.00

793.00

50.00%

-

-

0.00%

52.00

793.00

50.00%

52.00

793.00

50.00%

02.03.02

SEÑAL CARTEL DE EVACUACION PARA SER VISTOS A DISTANCIA

und

6.00

15.25

91.50

3.00

45.75

50.00%

-

-

0.00%

3.00

45.75

50.00%

3.00

45.75

50.00%

02.03.03

SEÑAL DIRECCIONAL DE SALIDA DERECHA O IZQUIERDA

und

148.00

15.25

2,257.00

60.00

915.00

40.54%

-

-

0.00%

60.00

915.00

40.54%

88.00

1,342.00

59.46%

02.03.04

ZONA SEGURA EN CASO DE SISMOS

und

165.00

15.25

2,516.25

60.00

915.00

36.36%

-

-

0.00%

60.00

915.00

36.36%

105.00

1,601.25

63.64%

02.03.05

SEÑAL DE RUTA DE EVACUACION

und

16.00

15.25

244.00

8.00

122.00

50.00%

-

-

0.00%

8.00

122.00

50.00%

8.00

122.00

50.00%

02.03.06

SEÑAL DE NUMERO DE PISO

und

19.00

15.25

289.75

-

0.00%

-

-

0.00%

-

0.00%

19.00

289.75

100.00%

02.03.07

SEÑAL DE UBICACIÓN DE EXTINTOR

und

36.00

15.25

549.00

27.78%

-

-

0.00%

27.78%

26.00

396.50

72.22%

02.03.08

SEÑAL DE GABINETE CONTRA INCENDIOS

und

12.00

15.25

183.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.00

183.00

100.00%

02.03.09

SEÑAL DE PROHIBIDO DEPOSITAR OBJETOS, MANTENER LIBRE EL PASO

und

3.00

15.25

45.75

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

45.75

100.00%

02.03.10

SEÑAL DE TABLERO DE DISTRIBUCION PELIGRO ELECTRICO

und

33.00

15.25

503.25

-

-

0.00%

-

-

0.00%

-

-

0.00%

33.00

503.25

100.00%

02.03.11

SEÑAL DE ZONA SEGURIDAD

und

20.00

30.50

610.00

50.00%

-

-

0.00%

50.00%

10.00

305.00

50.00%

03 03.01 03.01.01

CONSTRUCCION DE ADMINISTRACION

10.00

10.00

699,473.07

152.50

305.00

208,186.49

10.00

10.00

46,789.39

152.50

305.00

254,975.89

444,497.19

ESTRUCTURAS MOVIMIENTO DE TIERRAS

-

0.00%

0.00%

-

-

0.00%

03.01.01.01

EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS EN TERRENO NORMAL

m3

192.15

50.57

9,717.03

192.15

9,717.03

100.00%

-

-

0.00%

192.15

9,717.03

100.00%

-

-

0.00%

03.01.01.02

EXCAVACION DE ZANJAS PARA ZAPATAS EN TERRENO NORMAL

m3

9.79

60.69

594.16

9.79

594.16

100.00%

-

-

0.00%

9.79

594.16

100.00%

-

-

03.01.01.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

61.62

33.75

2,079.68

0.00%

-

-

0.00%

-

03.01.01.04

NIVELACION INTERIOR Y COMPACTADO C/EQUPO.

m2

342.10

8.85

3,027.59

0.00%

-

-

0.00%

03.01.01.05

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

161.36

25.29

4,080.79

161.36

4,080.79

100.00%

-

-

0.00%

161.36

4,080.79

100.00%

-

-

0.00%

03.01.01.06

ELIMINACION DE MATERIAL EXCEDENTE D = 2 Km

m3

161.36

13.93

2,247.74

161.36

2,247.74

100.00%

-

-

0.00%

161.36

2,247.74

100.00%

-

-

0.00%

03.01.02

-

-

-

-

0.00%

-

-

-

-

0.00%

0.00%

61.62

2,079.68

100.00%

0.00%

342.10

3,027.59

100.00%

OBRAS DE CONCRETO SIMPLE

-

03.01.02.01

CONCRETO PARA SOLADO C:H 1:10 E=2"

m2

6.75

23.19

156.53

6.75

156.53

100.00%

-

-

0.00%

6.75

156.53

100.00%

-

-

0.00%

03.01.02.02

CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS

m3

136.94

206.03

28,213.75

136.94

28,213.75

100.00%

-

-

0.00%

136.94

28,213.75

100.00%

-

-

0.00%

03.01.02.03

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

m2

30.18

49.13

1,482.74

30.18

1,482.74

100.00%

-

-

0.00%

30.18

1,482.74

100.00%

-

-

0.00%

03.01.02.04

CONCRETO f´c= 140 kg/cm PARA SOBRECIMIENTOS

m3

2.26

374.06

845.38

2.26

845.38

100.00%

-

-

0.00%

2.26

845.38

100.00%

-

-

0.00%

03.01.03 03.01.03.01

OBRAS DE CONCRETO ARMADO

-

ZAPATAS

-

03.01.03.01.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

03.01.03.01.02

CONCRETO f´c= 210 kg/cm PARA ZAPATAS

03.01.03.01.03

CURADO DE CONCRETO

03.01.03.02 03.01.03.02.01

93.00

5.06

470.58

93.00

470.58

100.00%

-

-

0.00%

93.00

470.58

100.00%

-

-

0.00%

m3

3.38

432.28

1,461.11

3.38

1,461.11

100.00%

-

-

0.00%

3.38

1,461.11

100.00%

-

-

0.00%

m2

6.75

1.93

13.03

6.75

13.03

100.00%

-

-

0.00%

6.75

13.03

100.00%

-

-

0.00%

SOBRECIMIENTO ARMADO ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

694.00

5.06

3,511.64

694.00

3,511.64

100.00%

-

-

0.00%

694.00

3,511.64

100.00%

-

-

0.00%

5

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

03.01.03.02.02

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

m2

132.36

49.13

6,502.85

132.36

6,502.85

100.00%

-

-

0.00%

132.36

6,502.85

100.00%

-

-

0.00%

03.01.03.02.03

CONCRETO f´c= 210 kg/cm2 PARA SOBRECIMIENTOS

m3

16.55

450.05

7,448.33

16.55

7,448.33

100.00%

-

-

0.00%

16.55

7,448.33

100.00%

-

-

0.00%

03.01.03.02.04

CURADO DE CONCRETO

m2

132.36

1.93

255.45

132.36

255.45

100.00%

-

-

0.00%

132.36

255.45

100.00%

-

-

0.00%

03.01.03.03

COLUMNAS

-

03.01.03.03.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

1,890.00

5.06

9,563.40

1,890.00

9,563.40

100.00%

-

-

0.00%

1,890.00

9,563.40

100.00%

-

-

0.00%

03.01.03.03.02

ENCOFRADO Y DESENCOFRADO DE COLUMNAS

m2

193.66

59.71

11,563.44

193.66

11,563.44

100.00%

-

-

0.00%

193.66

11,563.44

100.00%

-

-

0.00%

03.01.03.03.03

CONCRETO f´c= 210 kg/cm2 PARA COLUMNAS

m3

21.46

557.01

11,953.43

21.46

11,953.43

100.00%

-

-

0.00%

21.46

11,953.43

100.00%

-

-

0.00%

03.01.03.03.04

CURADO DE CONCRETO

m2

193.66

1.93

373.76

193.66

373.76

100.00%

-

-

0.00%

193.66

373.76

100.00%

-

-

0.00%

03.01.03.04

PLACAS

-

03.01.03.04.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

232.00

5.06

1,173.92

232.00

1,173.92

100.00%

-

-

0.00%

232.00

1,173.92

100.00%

-

-

0.00%

03.01.03.04.02

ENCOFRADO Y DESENCOFRADO EN MUROS

m2

26.88

67.06

1,802.57

26.88

1,802.57

100.00%

-

-

0.00%

26.88

1,802.57

100.00%

-

-

0.00%

03.01.03.04.03

CONCRETO f´c= 210 kg/cm2 PARA PLACAS

m3

3.36

557.01

1,871.55

3.36

1,871.55

100.00%

-

-

0.00%

3.36

1,871.55

100.00%

-

-

0.00%

03.01.03.04.04

CURADO DE CONCRETO

m2

26.88

1.93

51.88

26.88

51.88

100.00%

-

-

0.00%

26.88

51.88

100.00%

-

-

0.00%

03.01.03.05

VIGAS

-

-

03.01.03.05.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

1,566.00

5.06

7,923.96

1,566.00

7,923.96

100.00%

0.00%

1,566.00

7,923.96

100.00%

03.01.03.05.02

ENCOFRADO Y DESENCOFRADO DE VIGAS

m2

153.21

74.12

11,355.93

53.62

3,974.31

35.00%

99.59

7,381.62

65.00%

153.21

11,355.93

100.00%

-0.00

03.01.03.05.03

CONCRETO f´c= 210kg/cm2 PARA VIGAS

m3

18.64

557.01

10,382.67

6.52

3,631.71

34.98%

10.00

5,570.10

53.65%

16.52

9,201.81

88.63%

2.12

CURADO DE CONCRETO

m2

153.21

1.93

295.70

53.62

103.49

35.00%

99.59

192.21

65.00%

153.21

295.70

100.00%

-

03.01.03.05.04 03.01.03.06

03.01.04.01

PRUEBAS DE CONTROL DE CALIDAD DEL CONCRETO

und

18.00

18.36

330.48

10.00

183.60

55.56%

5.00

27.78%

15.00

275.40

83.33%

3.00

TIJERALES METALICOS

1,180.86 -

0.00% 0.00% 11.37% 0.00%

55.08

16.67%

6,529.99

11.09

72,417.59

03.01.04.01.02

MECANIZADOS

KG

2,560.92

11.09

28,400.60

-

MONTAJE ESTRUCTURA METALICAS

KG

6,529.99

3.14

20,504.17

-

03.01.04.01.03

-

-

KG

2,957.52

32,798.90

45.29%

-

-

0.00%

-

0.00%

-

-

0.00%

-

2,957.52

-

0.00%

-

-

0.00%

-

32,798.90

45.29%

3,572.47

39,618.69

54.71%

-

0.00%

2,560.92

28,400.60

100.00%

-

0.00%

6,529.99

20,504.17

100.00%

ARQUITECTURA

-

MUROS Y TABIQUES DE ALBAÑILERIA

-

03.02.01.01

MUROS DE LADRILLO KK DE CABEZA MEZCLA 1:5

m2

229.65

128.18

29,436.54

215.34

27,602.28

93.77%

03.02.01.02

MUROS DE LADRILLO KK DE SOGA MEZCLA 1:5

m2

158.71

79.68

12,646.01

39.68

3,161.70

25.00%

90.00

03.02.02

91.80

ESTRUCTURA METALICA

CARPINTERIA METALICA

03.02.01

-

-

03.01.04.01.01

03.02

-

VARIOS

03.01.03.06.01 03.01.04

-

-

-

0.00%

215.34

27,602.28

93.77%

14.31

1,834.26

6.23%

7,171.20

56.71%

129.68

10,332.90

81.71%

29.03

2,313.11

18.29%

REVOQUES ENLUCIDOS Y MOLDURAS

-

03.02.02.01

TARRAJEO EN MUROS INTERIORES C:A 1:4 E=1.5CM

m2

964.30

24.10

23,239.63

-

-

0.00%

241.08

5,809.91

25.00%

241.08

5,809.91

25.00%

723.23

17,429.72

75.00%

03.02.02.02

TARRAJEO EN MUROS EXTERIORES C:A 1:4 E=1.5CM

m2

329.45

28.43

9,366.26

-

-

0.00%

82.36

2,341.57

25.00%

82.36

2,341.57

25.00%

247.09

7,024.69

75.00%

03.02.02.03

TARRAJEO DE SUPERFICIES DE COLUMNAS E= 1.5 CM

m2

39.18

36.18

1,417.53

-

-

0.00%

9.80

354.38

25.00%

9.80

354.38

25.00%

29.39

1,063.15

75.00%

03.02.02.04

VESTIDURA DE DERRAMES

m

145.60

16.50

2,402.40

-

-

0.00%

36.40

600.60

25.00%

36.40

600.60

25.00%

109.20

1,801.80

75.00%

03.02.02.05

BRUÑAS 1 cm

m

503.53

6.66

3,353.51

-

-

0.00%

125.88

838.38

25.00%

125.88

838.38

25.00%

377.65

2,515.13

75.00%

03.02.03

CIELORRASOS

-

03.02.03.01

FALSO CIELO RASO CON PLANCHA DE FIBROCEMENTO 8MM C/PINT. LATEX

M2

35.55

87.64

3,115.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

35.55

3,115.60

100.00%

03.02.03.02

FALSO CIELORRASO CON BALDOSAS ACUSTICAS DE FIBRA MINERAL 120 x 120 cm

m2

230.75

85.00

19,613.75

-

-

0.00%

-

-

0.00%

-

-

0.00%

230.75

19,613.75

100.00%

03.02.03.03

FALSO CIELORRASO CON BALDOSAS DE FIBRA MINERAL CON LAMINADO TIPO MADERA 0.61 M2 x 0.61 M, E = 15 mm, CON RECUBRIMIENTO DE VINIL

108.94

119.46

13,013.97

-

-

0.00%

-

-

0.00%

-

-

0.00%

108.94

13,013.97

100.00%

03.02.04

PISOS Y PAVIMENTOS

-

03.02.04.01

CONTRAPISO E=40 mm

m2

342.69

28.37

9,722.12

-

-

0.00%

-

-

0.00%

-

-

0.00%

342.69

9,722.12

100.00%

03.02.04.02

PISO PORCELANATO ANTIDESLIZANTE 60x60cm

m2

314.93

74.36

23,418.19

-

-

0.00%

-

-

0.00%

-

-

0.00%

314.93

23,418.19

100.00%

03.02.05 03.02.05.01

CONTRAZOCALOS CONTRAZOCALO DE PORCELANATO H=10 CM

m

149.13

46.17

6,885.33

-

-

0.00%

-

-

0.00%

-

-

0.00%

149.13

6,885.33

100.00%

6

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

03.02.06 03.02.06.01 03.02.07 03.02.07.01 03.02.07.02 03.02.08

P. U.

ZOCALOS

AVANCE ANTERIOR

P. TOTAL

METRADO -

ZOCALO DE PORCELANATO

m2

50.82

85.19

4,329.36

COBERTURA DE ALUZING TIPO TR3 E=0.45mm INC/ ACCESORIOS

M2

403.02

70.87

28,562.03

CUMBRERA DE ALUZING INC/ ACCESORIOS

M

28.50

48.34

1,377.69

COBERTURAS

-

CARPINTERIA DE MADERA

-

MONTO

AVANCE ACTUAL %

-

-

0.00%

-

-

0.00%

325.00

23,032.75

METRADO

-

0.00%

MONTO

AVANCE ACUMULADO %

METRADO

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

SALDO %

-

80.64%

-

MONTO

325.00

23,032.75

0.00%

METRADO 50.82 -

MONTO

% -

4,329.36 -

0.00% 100.00% 0.00%

80.64%

78.02

5,529.28

19.36%

-

0.00%

28.50

1,377.69

100.00%

-

0.00%

-

-

0.00%

03.02.08.01

PUERTA MADERA (0.90X2.10) CONTRAP. C/ 1 HOJA BATIENTE. MADERA (MAD. CEDRO, FORRO MDF PLASTIFICADO 6MM)

m2

3.78

695.59

2,629.33

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.78

2,629.33

100.00%

03.02.08.02

PUERTA MADERA (0.80X2.10) CONTRAP. C/ 1 HOJA BATIENTE. MADERA (MAD. CEDRO, FORRO MDF PLASTIFICADO 6MM) C/ REJILLA MAD.

m2

3.36

704.60

2,367.46

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.36

2,367.46

100.00%

03.02.08.03

PUERTA MADERA (1.20X2.10) CONTRAP. C/ 2 HOJA BATIENTE MADERA (MAD. CEDRO, FORRO MDF PLASTIFICADO 6MM) C/ VISOR DE VIDRIO 6mm

m2

10.08

731.36

7,372.11

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.08

7,372.11

100.00%

03.02.08.04

MARCO DE MADERA CEDRO 4"X 2"

m

41.80

24.12

1,008.22

-

-

0.00%

-

-

0.00%

-

-

0.00%

41.80

1,008.22

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

1,444.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

03.02.09

CARPINTERÍA METÁLICA

-

03.02.09.01

PUERTA BLINDADA (0.80X2.10) CONTRAP. C/ 1 HOJA BATIENTE. LAMINA ROLADA EN FRIO #12 C/REF. INTERIOR 3/16" Y LANA MINERAL C/ VISOR DE VIDRIO 38mm ANTIBALAS

und

03.02.09.02

BARRA METALICA PARA MINUSVÁLIDOS EN SS.HH.; Ø = 2"

m

03.02.09.03

PANEL DIVISORIO METALICO EN CUBICULOS DE SS.HH., DUCHAS Y URINARIOS

m2

03.02.10

1.00

1,444.20

-

0.00%

1,444.20

100.00%

4.12

119.32

491.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.12

491.60

100.00%

18.09

1,016.94

18,396.44

-

-

0.00%

-

-

0.00%

-

-

0.00%

18.09

18,396.44

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

CARPINTERIA DE ALUMINIO

-

-

0.00%

03.02.10.01

VENTANA DE 1.20x1.10 C/ 1 HOJA PROYECTANTE C/1 HOJA FIJA EN CARP. DE ALUMINIO C/CRISTAL DE 6mm, TIPO V-3

m2

2.64

663.96

1,752.85

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.64

1,752.85

100.00%

03.02.10.02

VENTANA DE 1.50x1.10 C/ 1 HOJA PROYECTANTE C/1 HOJA FIJA EN CARP. DE ALUMINIO C/CRISTAL DE 6mm, TIPO V-4

m2

28.05

829.95

23,280.10

-

-

0.00%

-

-

0.00%

-

-

0.00%

28.05

23,280.10

100.00%

03.02.10.03

MAMPARA DE LONG. VARIABLE X 3.25 M DE ALTURA, DE UNA HOJA BATIENTE Y SOBRELUZ, EN CARPINTERÍA DE ALUMINIO CONVENCIONAL TIPO PV-1

m2

64.68

288.50

18,660.18

-

-

0.00%

-

-

0.00%

-

-

0.00%

64.68

18,660.18

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

03.02.11

CERRAJERÍA

-

-

0.00%

03.02.11.01

CERRADURA TIPO A

UND

4.00

82.65

330.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

330.60

100.00%

03.02.11.02

CERRADURA TIPO C

UND

4.00

73.19

292.76

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

292.76

100.00%

03.02.11.03

CERRADURA TIPO D

UND

3.00

62.95

188.85

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

188.85

100.00%

03.02.11.04

BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 3"

und

36.00

22.53

811.08

-

-

0.00%

-

-

0.00%

-

-

0.00%

36.00

811.08

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

03.02.12 03.02.12.01 03.02.12.02 03.02.13

VIDRIOS, CRISTALES Y SIMILARES

-

-

0.00%

PUERTA DE 0,80 X 2,10 DE HOJA BATIENTE Y SOBRELUZ EN CRISTAL TEMPLADO INCOLORO DE 6MM, TIPO PV-1

m2

6.72

380.00

2,553.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.72

2,553.60

100.00%

ESPEJOS C/ SISTEMA DE FIJACION

M2

2.93

126.43

370.44

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.93

370.44

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

PINTURA

-

-

0.00%

03.02.13.01

PINTURA LATEX EN CIELORRASO 2 MANOS

m2

314.93

19.96

6,286.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

314.93

6,286.00

100.00%

03.02.13.02

PINTURA LATEX EN MUROS INTERIORES 2 MANOS

m2

954.91

16.42

15,679.62

-

-

0.00%

-

-

0.00%

-

-

0.00%

954.91

15,679.62

100.00%

03.02.13.03

PINTURA LATEX EN MUROS EXTERIORES 2 MANOS

m2

349.04

19.96

6,966.84

-

-

0.00%

-

-

0.00%

-

-

0.00%

349.04

6,966.84

100.00%

03.02.13.04

PINTURA LATEX EN VIGAS 2 MANOS

m2

205.88

20.09

4,136.13

-

-

0.00%

-

-

0.00%

-

-

0.00%

205.88

4,136.13

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

03.02.14

VARIOS

-

-

-

0.00%

03.02.14.01

SELLADO DE JUNTAS DE CONSTRUCCION

M

192.20

35.21

6,767.36

-

-

0.00%

-

-

0.00%

-

-

0.00%

192.20

6,767.36

100.00%

03.02.14.02

SELLADOR PARA PORCELANATO

m2

380.66

17.47

6,650.13

-

-

0.00%

-

-

0.00%

-

-

0.00%

380.66

6,650.13

100.00%

03.02.14.03

LIMPIEZA FINAL DE OBRA

m2

403.02

1.51

608.56

-

-

0.00%

-

-

0.00%

-

-

0.00%

403.02

608.56

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

5.00

03.03 03.03.01 03.03.01.01 03.03.01.01.01

INSTALACIONES SANITARIAS SISTEMA DE AGUA FRÍA SALIDA DE AGUA FRÍA SALIDA DE AGUA FRIA CON TUBO PVC TIPO ROSCA DE 1/2"

PTO

5.00

78.00

390.00

-

390.00

0.00% 100.00%

7

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

03.03.01.01.02 03.03.01.01.03 03.03.01.02

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

SALIDA DE AGUA FRIA CON TUBO PVC TIPO ROSCA DE 1"

PTO

2.00

86.97

173.94

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

173.94

100.00%

SALIDA DE AGUA FRIA CON TUBO PVC TIPO ROSCA DE 1 1/4"

pto

6.00

86.08

516.48

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

516.48

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

87.44

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.94

RED DE DISTRIBUCION AGUA NTP ISO 399.166_x000D_

-

03.03.01.02.01

TUBO PVC CON UNION TIPO ROSCA DE 1/2" PN10 (ENTERRADA)

M

03.03.01.02.02

TUBO PVC CON UNION TIPO ROSCA DE 1" PN10 (ENTERRADA)

03.03.01.02.03

TUBO PVC CON UNION TIPO ROSCA DE 1 1/4" PN10 (ENTERRADA)

03.03.01.02.04

PRUEBA HIDRÁULICA EN TUBERIAS Y DESINFECCION

03.03.01.03

P. U.

4.94

17.70

m

1.95

24.34

47.46

-

-

0.00%

-

-

0.00%

-

-

0.00%

m

10.36

20.22

209.48

-

-

0.00%

-

-

0.00%

-

-

0.00%

M

17.25

1.83

31.57

-

-

0.00%

-

-

0.00%

-

-

0.00%

17.25

-

-

0.00%

-

0.00%

-

-

0.00%

-

ACCESORIOS PARA REDES DE AGUA FRÍA

-

-

0.00%

87.44

100.00%

1.95

47.46

100.00%

10.36

209.48

100.00%

31.57

100.00%

-

0.00%

03.03.01.03.01

CODO PVC TIPO ROSCA DE 1/2" 90°

und

3.00

11.50

34.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

34.50

100.00%

03.03.01.03.02

CODO PVC TIPO ROSCA DE 1" 90°

und

1.00

10.30

10.30

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

10.30

100.00%

03.03.01.03.03

CODO PVC TIPO ROSCA DE 1 1/4" 90°

und

4.00

15.08

60.32

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

60.32

100.00%

03.03.01.03.04

TEE PVC TIPO ROSCA DE 1/2"

und

3.00

24.52

73.56

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

73.56

100.00%

03.03.01.03.05

TEE PVC TIPO ROSCA DE 1"

und

2.00

26.22

52.44

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

52.44

100.00%

03.03.01.03.06

TEE PVC TIPO ROSCA DE 1 1/4"

und

6.00

26.64

159.84

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

159.84

100.00%

03.03.01.03.07

REDUCCION PVC TIPO ROSCA DE 1" A 1/2"

und

1.00

16.63

16.63

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

16.63

100.00%

03.03.01.03.08

REDUCCION PVC TIPO ROSCA DE 1 1/4" A 1"

und

1.00

16.63

16.63

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

16.63

100.00%

03.03.01.03.09

REDUCCION PVC TIPO ROSCA DE 1 1/4" A 1/2"

und

1.00

17.05

17.05

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

17.05

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

03.03.01.04 03.03.01.04.01 03.03.01.04.02 03.03.02 03.03.02.01

LLAVES Y VÁLVULAS

UND

2.00

161.53

323.06

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

323.06

100.00%

NICHO Y TAPA PARA VALVULA EN PARED

UND

2.00

88.83

177.66

-

177.66

100.00%

SISTEMA DE DESAGÜE Y VENTILACIÓN SALIDA DE DESAGÜE Y VENTILACIÓN

-

-

0.00%

-

0.00%

-

-

0.00%

2.00

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

3.50

50.00%

3.50

325.68

50.00%

SALIDA DE DESAGÜE PVC 2"

pto

7.00

93.05

651.35

03.03.02.01.02

SALIDA DE DESAGÜE PVC 4"

pto

6.00

100.10

600.60

-

03.03.02.01.03

SALIDA DE VENTILACIÓN PVC 2"

PTO

2.00

93.05

186.10

1.00

REDES DE RECOLECCION DE DESAGUE

-

3.50

325.68 93.05

50.00%

-

-

0.00%

0.00%

-

-

0.00%

-

50.00%

-

-

0.00%

1.00

-

0.00%

-

-

-

0.00%

325.68 -

6.00

600.60

100.00%

1.00

93.05

50.00%

-

0.00%

-

M

20.19

23.33

471.03

-

-

0.00%

-

-

0.00%

-

-

0.00%

20.19

03.03.02.02.02

TUBERIA PVC SAL 4" DESAGUE (ENTERRADA)

M

12.34

25.28

311.96

-

-

0.00%

-

-

0.00%

-

-

0.00%

03.03.02.02.03

TUBERIA PVC SAP 2" EN MONTANTE

M

6.80

43.38

294.98

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

0.00%

TUBERIA PVC SAL 2" DESAGUE (ENTERRADA)

ACCESORIOS DE REDES DE DESAGÜE

0.00%

50.00%

93.05

03.03.02.02.01

03.03.02.03

0.00%

VALVULA DE COMPUERTA DE BRONCE 1 1/4"

03.03.02.01.01

03.03.02.02

-

-

0.00%

471.03

100.00%

12.34

311.96

100.00%

6.80

294.98

100.00%

-

0.00%

03.03.02.03.01

SUMIDERO DE BRONCE DE 4"

UND

2.00

87.66

175.32

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

175.32

100.00%

03.03.02.03.02

REGISTRO ROSCADO DE BRONCE 2"

UND

3.00

77.49

232.47

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

232.47

100.00%

03.03.02.03.03

REGISTRO ROSCADO DE BRONCE 4"

und

4.00

91.96

367.84

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

367.84

100.00%

03.03.02.03.04

CODO PVC SAL DE 2"X90°

UND

2.00

20.63

41.26

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

41.26

100.00%

03.03.02.03.05

CODO PVC SAL DE 2"X45°

und

8.00

19.61

156.88

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.00

156.88

100.00%

03.03.02.03.06

CODO PVC SAL DE 4"X45°

und

2.00

22.16

44.32

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

44.32

100.00%

03.03.02.03.07

YEE PVC 2"

und

5.00

24.11

120.55

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

120.55

100.00%

03.03.02.03.08

YEE PVC 4"

und

6.00

26.66

159.96

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

159.96

100.00%

03.03.02.03.09

YEE PVC 4"X2"

und

3.00

26.66

79.98

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

79.98

100.00%

03.03.02.03.10

TEE PVC SAL 2"x2"

und

4.00

31.19

124.76

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

124.76

100.00%

03.03.02.03.11

SOMBRERO DE VENTILACION PVC DE 2"

UND

2.00

15.27

30.54

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

30.54

100.00%

03.03.03 03.03.03.01 03.03.03.01.01

SISTEMA DE EVACUACIÓN DE AGUAS PLUVIALES

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

CANALETA Y MONTANTES PLUVIALES

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

CANALETA SEMICIRCULAR DE PLANCHA GALVANIZADA D=6" E=0.5 MM

M

81.36

57.32

4,663.56

-

81.36

4,663.56

0.00% 0.00% 100.00%

8

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

03.03.03.01.02

SOPORTE DE F°G° DE 1"X3/8"

UND

46.00

38.75

1,782.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

46.00

1,782.50

100.00%

03.03.03.01.03

MONTANTE PVC SAL DESAGUE D=3''

M

65.70

20.09

1,319.91

-

-

0.00%

-

-

0.00%

-

-

0.00%

65.70

1,319.91

100.00%

03.03.03.01.04

CODO PVC SAL 3"x45°

UND

18.00

20.46

368.28

-

-

0.00%

-

-

0.00%

-

-

0.00%

18.00

368.28

100.00%

03.03.03.01.05

CODO PVC SAL 3"X90°

UND

9.00

16.06

144.54

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.00

144.54

100.00%

03.03.03.01.06

ABRAZADERA DE SUJECIÓN 3"

UND

54.00

28.03

1,513.62

-

-

0.00%

-

-

0.00%

-

-

0.00%

54.00

1,513.62

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

03.03.03.02

COLUMNETA PROTECTORA DE CONCRETO

-

03.03.03.02.01

ENCOFRADO Y DESENCOFRADO DE COLUMNETAS

m2

10.80

03.03.03.02.02

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

03.03.03.02.03

CONCRETO f´c= 175 kg/cm2 PARA COLUMNETAS

m3

03.03.03.02.04

TARRAJEO DE SUPERFICIES DE COLUMNAS E= 1.5 CM

m2

03.03.04

-

-

0.00%

59.71

644.87

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.80

644.87

100.00%

72.00

5.06

364.32

-

-

0.00%

-

-

0.00%

-

-

0.00%

72.00

364.32

100.00%

1.26

503.88

634.89

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.26

634.89

100.00%

9.90

36.18

358.18

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.90

358.18

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

APARATOS SANITARIOS Y ACCESORIOS

-

-

0.00%

03.03.04.01

LAVATORIO CERAMICO VITRIFICANTE 45X60 CM S/PEDESTAL

UND

5.00

200.00

1,000.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

1,000.00

100.00%

03.03.04.02

INODORO DE CERÁMICA VITRIFICADA CON VÁLVULA FLUXÓMETRO

und

4.00

466.10

1,864.40

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

1,864.40

100.00%

03.03.04.03

INODORO DE CERÁMICA VITRIFICADA CON VÁLVULA FLUXÓMETRO DISCAP.

und

2.00

466.10

932.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

932.20

100.00%

03.03.04.04

URINARIO DE CERAMICA VITRIFICADA CON VALVULA FLUXÓMETRO

UND

2.00

432.25

864.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

864.50

100.00%

03.03.04.05

BARRA METÁLICA CROMADA DE APOYO PARA MINUSVÁLIDO H-12

UND

4.00

155.00

620.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

620.00

100.00%

03.03.04.06

SUMIDERO CROMADO DE 2"

und

2.00

6.90

13.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

13.80

100.00%

03.03.04.07

ESPEJO ADOSADO MARCO METALICO ANCHO=VARIABLE, ALTURA=90CM

UND

2.00

84.75

169.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

169.50

100.00%

03.03.04.08

JABONERA CROMADA PARA JABON LIQUIDO

und

5.00

52.71

263.55

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

263.55

100.00%

03.03.04.09

DISPENSADOR METALICO INDUSTRIAL DE PAPEL H=0.45M

UND

6.00

105.00

630.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

630.00

100.00%

03.03.04.10

DISPENSADOR DE ACERO INOXIDABLE PARA PAPEL TOALLA

PZA

2.00

105.00

210.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

210.00

100.00%

03.03.04.11

COLOCACION DE APARATOS SANITARIOS

UND

13.00

137.46

1,786.98

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.00

1,786.98

100.00%

03.03.04.12

COLOCACION DE ACCESORIOS SANITARIOS

UND

21.00

33.81

710.01

-

-

0.00%

-

-

0.00%

-

-

0.00%

21.00

710.01

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

4,856.73

-

-

0.00%

-

0.00%

-

-

0.00%

03.04 03.04.01 03.04.01.01

INSTALACIONES ELECTRICAS INSTALACIONES ELECTRICAS SALIDAS

0.00%

03.04.01.01.01

SALIDA PARA ALUMBRADO

und

107.00

45.39

03.04.01.01.02

SALIDA PARA INTERRUPTOR

und

15.00

45.39

680.85

-

-

0.00%

7.00

317.73

46.67%

7.00

317.73

03.04.01.01.03

SALIDA PARA TOMACORRIENTE

und

37.00

44.81

1,657.97

-

-

0.00%

19.00

851.39

51.35%

19.00

851.39

03.04.01.01.04

SALIDA PARA CAJA DE PASO EN TECHO

und

3.00

62.03

186.09

-

-

0.00%

-

03.04.01.01.05

SALIDA PARA SECADORA DE MANOS

und

2.00

52.53

105.06

-

-

0.00%

2.00

105.06

100.00%

2.00

105.06

100.00%

-

-

0.00%

03.04.01.01.06

SALIDA PARA RACK

und

1.00

79.51

79.51

-

-

0.00%

1.00

79.51

100.00%

1.00

79.51

100.00%

-

-

0.00%

-

-

0.00%

0.00%

-

-

03.04.01.02

TUBERIAS

-

-

-

-

0.00%

-

0.00%

-

-

-

107.00

4,856.73

100.00%

46.67%

8.00

363.12

53.33%

51.35%

18.00

806.58

48.65%

0.00%

3.00

186.09

100.00%

0.00%

03.04.01.02.01

TUBO PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 35 mm (1 1/4")

UND

8.00

18.61

148.88

-

-

0.00%

4.00

74.44

50.00%

4.00

74.44

50.00%

4.00

74.44

50.00%

03.04.01.02.02

TUBO PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

UND

310.00

11.39

3,530.90

-

-

0.00%

155.00

1,765.45

50.00%

155.00

1,765.45

50.00%

155.00

1,765.45

50.00%

03.04.01.02.03

CURVA PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 35 mm (1 1/4")

und

4.00

7.03

28.12

-

-

0.00%

2.00

14.06

50.00%

2.00

14.06

50.00%

2.00

14.06

50.00%

03.04.01.02.04

CURVA PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

und

330.00

6.92

2,283.60

-

-

0.00%

165.00

1,141.80

50.00%

165.00

1,141.80

50.00%

165.00

1,141.80

50.00%

03.04.01.02.05

UNION PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 35 mm (1 1/4")

und

4.00

9.56

38.24

-

-

0.00%

2.00

19.12

50.00%

2.00

19.12

50.00%

2.00

19.12

50.00%

03.04.01.02.06

UNION PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

und

220.00

9.46

2,081.20

-

-

0.00%

110.00

1,040.60

50.00%

110.00

1,040.60

50.00%

110.00

1,040.60

50.00%

03.04.01.02.07

CONEXION PVC SAP PARA INSTALACIONES ELECTRICAS DE 35MM (1 1/4")

und

4.00

9.97

39.88

-

-

0.00%

2.00

19.94

50.00%

2.00

19.94

50.00%

2.00

19.94

50.00%

03.04.01.02.08

CONEXION PVC SAP PARA INSTALACIONES ELECTRICAS DE 20MM (3/4")

und

340.00

7.42

2,522.80

-

-

0.00%

170.00

1,261.40

50.00%

170.00

1,261.40

50.00%

170.00

1,261.40

50.00%

-

-

0.00%

03.04.01.03

CONDUCTORES

-

-

0.00%

-

-

0.00%

-

-

0.00%

03.04.01.03.01

CABLE NH80 2.5mm2

m

3,900.00

2.10

8,190.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

3,900.00

8,190.00

100.00%

03.04.01.03.02

CABLE NH80 4.0mm2

m

1,400.00

2.45

3,430.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1,400.00

3,430.00

100.00%

9

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

03.04.01.04

ARTEFACTOS DE ILUMINACION

AVANCE ANTERIOR

P. TOTAL

METRADO -

03.04.01.04.01

Luminaria para empotrar tipo reflector de aluminio, lampara fluoresfente T5 de 4x14W und

03.04.01.04.02

Luminaria para adosar tipo hermetico lineal, lámpara fluoresfente T5 de 1x28W.

03.04.01.04.03

Luminaria Spot LED, para empotrar en Techo de 3W, luz blanca cálida.

03.04.01.04.04 03.04.01.04.05 03.04.01.05

P. U.

MONTO

AVANCE ACTUAL %

-

-

0.00%

15,360.36

-

-

0.00%

14.25

57.00

269.48

und

2.00

230.06

460.12

-

-

0.00%

und

10.00

190.03

1,900.30

-

-

0.00%

Luminaria Spot LED, para empotrar en Techo de 5W, luz blanca cálida.

und

26.00

250.03

6,500.78

-

-

Luz de emergencia

und

12.00

303.26

3,639.12

-

INTERRUPTORES

METRADO

-

MONTO

AVANCE ACUMULADO %

-

0.00%

METRADO -

3,840.09

25.00%

14.25

0.50

115.03

25.00%

2.50

475.08

25.00%

0.00%

6.50

1,625.20

-

0.00%

3.00

909.78

-

-

0.00%

MONTO

SALDO %

-

0.00%

METRADO -

3,840.09

25.00%

42.75

0.50

115.03

25.00%

2.50

475.08

25.00%

25.00%

6.50

1,625.20

25.00%

3.00

909.78

-

0.00%

-

MONTO

% -

0.00%

11,520.27

75.00%

1.50

345.09

75.00%

7.50

1,425.23

75.00%

25.00%

19.50

4,875.59

75.00%

25.00%

9.00

2,729.34

75.00%

-

0.00%

-

-

0.00%

03.04.01.05.01

Interruptor Simple

und

7.00

23.84

166.88

-

-

0.00%

-

-

0.00%

-

-

0.00%

7.00

166.88

100.00%

03.04.01.05.02

Interruptor Doble

und

6.00

24.20

145.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

145.20

100.00%

03.04.01.05.03

Interruptor Triple

und

2.00

39.09

78.18

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

78.18

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

03.04.01.06

TOMACORRIENTES

-

-

0.00%

03.04.01.06.01

Tomacorriente doble con puesta a tierra 250 V.

und

20.00

34.32

686.40

-

-

0.00%

-

-

0.00%

-

-

0.00%

20.00

686.40

100.00%

03.04.01.06.02

Tomacorriente doble con puesta a tierra 250 V, con tapa de protección para piso.

und

17.00

56.46

959.82

-

-

0.00%

-

-

0.00%

-

-

0.00%

17.00

959.82

100.00%

03.04.01.06.03

Tomacorriente simple(Luz de emergencia)

und

12.00

22.50

270.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.00

270.00

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

03.04.01.07 03.04.01.07.01 03.04.01.08

EQUIPOS ELECTRICOS_x000D_ UPS de 3KW

und

1.00

4,577.86

4,577.86

-

-

0.00%

73.96

221.88

-

-

0.00%

1.00

CAJAS DE PASO

-

-

-

0.00%

-

33.33%

1.00

71.16

33.33%

1.00

100.18

100.00%

1.00

50.00%

1.00

106.03

-

0.00%

-

-

0.00%

-

03.04.01.08.01

CAJA DE PASO DE 100 X 100 X 50 mm

und

3.00

03.04.01.08.02

CAJA DE PASO DE 150 X 150 X 75 mm

und

3.00

71.16

213.48

-

-

0.00%

1.00

03.04.01.08.03

CAJA DE PASO 200X200X100mm.

UND

1.00

100.18

100.18

-

-

0.00%

1.00

03.04.01.08.04

CAJA DE PASO DE 300X300X100MM

und

2.00

106.03

212.06

-

-

0.00%

1.00

106.03

-

-

-

0.00%

-

-

-

0.00%

1,113.14

-

-

0.00%

10.00

795.10

71.43%

10.00

39.76

50.00%

0.50

0.00%

-

03.04.02 03.04.02.01

INSTALACIONES DE COMUNICACIONES SALIDAS

03.04.02.01.01

SALIDA PARA DATOS/VOZ

und

03.04.02.01.02

SALIDA PARA FLASHER LUMINOSO Y PULSADOR (LUZ PILOTO)

03.04.02.01.03

SALIDA PARA DETECTOR DE HUMO

03.04.02.01.04 03.04.02.01.05

73.96

-

4,577.86

0.00%

-

33.33%

2.00

147.92

66.67%

71.16

33.33%

2.00

142.32

66.67%

100.18

100.00%

-

50.00%

1.00

-

0.00%

-

-

-

0.00%

-

-

795.10

71.43%

4.00

39.76

50.00%

0.50

39.76

50.00%

0.00%

9.00

795.69

100.00%

73.96

-

0.00% 100.00%

106.03

0.00%

0.00% 50.00% 0.00% 0.00%

14.00

79.51

UND

1.00

79.51

79.51

-

-

0.00%

0.50

und

9.00

88.41

795.69

-

-

0.00%

-

SALIDA PARA DETECTOR DE TEMPERATURA

und

1.00

88.41

88.41

-

-

0.00%

-

0.00%

-

0.00%

1.00

88.41

100.00%

SALIDA PARA SIRENA

und

1.00

97.80

97.80

-

-

0.00%

0.50

48.90

50.00%

0.50

48.90

50.00%

0.50

48.90

50.00%

03.04.02.01.06

SALIDA PARA CENTRAL DE ALARMAS Y KEYPAD

und

1.00

97.80

97.80

-

-

0.00%

0.50

48.90

50.00%

0.50

48.90

50.00%

0.50

48.90

50.00%

03.04.02.01.07

SALIDA PARA CAMARAS UNIDIRECIONALES

und

3.00

79.51

238.53

-

-

0.00%

-

0.00%

-

0.00%

3.00

238.53

100.00%

SALIDA PARA CENTRAL DE VIGILANCIA

und

1.00

79.51

79.51

-

-

0.00%

0.50

39.76

50.00%

-

-

0.00%

991.62

-

-

0.00%

03.04.02.01.08 03.04.02.02

ARTEFACTOS DE COMUNICACIÓN

-

-

39.76

-

-

50.00%

0.50

50.00%

0.50

-

0.00%

-

39.76 -

0.00%

-

-

-

0.00%

-

-

0.00%

14.00

03.04.02.02.01

EQUIPO DATOS/VOZ

und

14.00

70.83

03.04.02.02.02

FLASHER LUMINOSO Y PULSADOR (LUZ PILOTO)

und

1.00

138.57

138.57

-

-

0.00%

-

-

0.00%

-

-

0.00%

03.04.02.02.03

DETECTOR DE HUMO

und

9.00

300.27

2,702.43

-

-

0.00%

-

-

0.00%

-

-

0.00%

03.04.02.02.04

DETECTOR DE TEMPERATURA

und

1.00

194.37

194.37

-

-

0.00%

-

-

0.00%

-

-

03.04.02.02.05

SIRENA

und

1.00

175.17

175.17

-

-

0.00%

-

-

0.00%

-

03.04.02.02.06

CENTRAL DE ALARMAS Y KEYPAD

und

1.00

1,669.83

1,669.83

-

-

0.00%

-

-

0.00%

03.04.02.02.07

CAMARAS UNIDIRECIONALES

und

3.00

359.79

1,079.37

-

-

0.00%

-

-

03.04.02.02.08

CENTRAL DE VIGILANCIA

und

1.00

5,271.11

5,271.11

-

-

0.00%

-

-

-

0.00%

03.04.02.03

TUBERIAS

-

318.04

-

28.57%

0.00%

991.62

100.00%

1.00

138.57

100.00%

9.00

2,702.43

100.00%

0.00%

1.00

194.37

100.00%

-

0.00%

1.00

175.17

100.00%

-

-

0.00%

1.00

1,669.83

100.00%

0.00%

-

-

0.00%

3.00

1,079.37

100.00%

-

0.00%

-

-

0.00%

1.00

5,271.11

100.00%

-

0.00%

-

-

0.00%

-

-

0.00%

03.04.02.03.01

TUBO PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 35 mm (1 1/4")

UND

18.00

18.61

334.98

-

-

0.00%

9.00

167.49

50.00%

9.00

167.49

50.00%

9.00

167.49

50.00%

03.04.02.03.02

TUBO PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

UND

48.00

11.39

546.72

-

-

0.00%

24.00

273.36

50.00%

24.00

273.36

50.00%

24.00

273.36

50.00%

03.04.02.03.03

CURVA PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 35 mm (1 1/4")

und

18.00

7.03

126.54

-

-

0.00%

9.00

63.27

50.00%

9.00

63.27

50.00%

9.00

63.27

50.00%

10

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

03.04.02.03.04

CURVA PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

und

70.00

6.92

484.40

-

-

0.00%

35.00

03.04.02.03.05

UNION PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 35 mm (1 1/4")

und

20.00

9.56

191.20

-

-

0.00%

03.04.02.03.06

UNION PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

und

70.00

9.46

662.20

-

-

0.00%

03.04.02.03.07

CONEXION PVC SAP PARA INSTALACIONES ELECTRICAS DE 35MM (1 1/4")

und

20.00

9.97

199.40

-

-

03.04.02.03.08

CONEXION PVC SAP PARA INSTALACIONES ELECTRICAS DE 20MM (3/4")

und

50.00

7.42

371.00

-

03.04.02.04

CONDUCTORES

03.04.02.04.01 03.04.02.04.02 03.04.02.05

03.04.02.07

04 04.01 04.01.01

242.20

50.00%

35.00

10.00

95.60

50.00%

35.00

331.10

50.00%

0.00%

10.00

99.70

-

0.00%

25.00

185.50

-

-

0.00%

MONTO

SALDO %

METRADO

242.20

50.00%

35.00

10.00

95.60

50.00%

35.00

331.10

50.00%

50.00%

10.00

99.70

50.00%

25.00

185.50

MONTO

%

242.20

50.00%

10.00

95.60

50.00%

35.00

331.10

50.00%

50.00%

10.00

99.70

50.00%

50.00%

25.00

185.50

50.00%

-

0.00%

-

-

0.00%

-

-

0.00%

800.00

3.08

2,464.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

800.00

2,464.00

100.00%

CABLE CONTRA INCENDIO FPL 4X18 AWG

m

200.00

3.09

618.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

200.00

618.00

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

UND

1.00

1,041.71

1,041.71

und

1.00

1,141.93

1,141.93

UND

1.00

800.00

800.00

RACK DE COMUNICACIONES RACK DE TELECOMUNICACIONES

-

SERVICIOS

03.04.02.07.01

METRADO

m

PATCH PANEL

03.04.02.06.01

AVANCE ACUMULADO %

CABLE UTP CATEGORIA 6

PATCH PANEL

03.04.02.05.01 03.04.02.06

-

MONTO

Puesta en Servicio de Instalaciónes de Comunicación

-

CONSTRUCCION DE SERVICIOS DEL PERSONAL

391,472.94

-

-

-

29,818.37

5,610.05

35,428.42

1,041.71 1,141.93 800.00

0.00% 100.00% 0.00% 100.00% 0.00% 100.00%

356,044.52

ESTRUCTURAS MOVIMIENTO DE TIERRAS

04.01.01.01

EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS EN TERRENO NORMAL

m3

128.05

50.57

6,475.49

128.05

6,475.49

100.00%

-

-

0.00%

128.05

6,475.49

100.00%

04.01.01.02

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

56.75

33.75

1,915.31

28.37

957.49

49.99%

-

-

0.00%

28.37

957.49

49.99%

28.38

957.82

50.01%

04.01.01.03

NIVELACION INTERIOR Y COMPACTADO C/EQUPO.

m2

116.75

8.85

1,033.24

0.00%

116.75

1,033.24

100.00%

04.01.01.04

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

81.99

25.29

2,073.53

66.89

1,691.65

81.58%

15.10

381.88

18.42%

81.99

2,073.53

100.00%

-

-

0.00%

04.01.01.05

ELIMINACION DE MATERIAL EXCEDENTE D = 2 Km

m3

81.99

13.93

1,142.12

66.89

931.78

81.58%

15.10

210.34

18.42%

81.99

1,142.12

100.00%

-

-

0.00%

04.01.02

-

-

0.00%

-

-

0.00%

-

-

-

OBRAS DE CONCRETO SIMPLE

-

0.00%

-

04.01.02.01

CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS

m3

71.30

206.03

14,689.94

86.28%

9.78

2,014.97

13.72%

71.30

14,689.94

100.00%

-

-

0.00%

04.01.02.02

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

m2

9.20

49.13

452.00

-

-

0.00%

9.20

452.00

100.00%

9.20

452.00

100.00%

-

0.00

0.00%

04.01.02.03

CONCRETO f´c= 140 kg/cm PARA SOBRECIMIENTOS

m3

0.69

374.06

258.10

-

-

0.00%

0.69

258.10

100.00%

0.69

258.10

100.00%

-

-0.00

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

04.01.03 04.01.03.01

OBRAS DE CONCRETO ARMADO SOBRECIMIENTO ARMADO

04.01.03.01.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

04.01.03.01.02

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

m2

04.01.03.01.03

CONCRETO f´c= 210 kg/cm2 PARA SOBRECIMIENTOS

m3

04.01.03.02

kg

04.01.03.02.02

ENCOFRADO Y DESENCOFRADO DE COLUMNAS

m2

04.01.03.02.03

CONCRETO f´c= 210 kg/cm2 PARA COLUMNAS

m3

04.01.03.02.04

CURADO DE CONCRETO

m2

kg

04.01.03.03.02

ENCOFRADO Y DESENCOFRADO DE VIGAS

m2

04.01.03.03.03

CONCRETO f´c= 210kg/cm2 PARA VIGAS

m3

04.01.03.03.04

CURADO DE CONCRETO

m2

04.01.03.04 04.01.03.04.01

-

0.00%

-

-

0.00%

-

-

0.00%

1,026.00

5,191.56

100.00%

168.11

49.13

8,259.24

-

-

0.00%

-

-

0.00%

-

-

0.00%

168.11

8,259.24

100.00%

14.48

450.05

6,516.72

-

-

0.00%

-

-

0.00%

-

-

0.00%

14.48

6,516.72

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

1,192.00

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

1,192.00

6,031.52

100.00%

223.53

59.71

13,346.98

-

-

0.00%

-

-

0.00%

-

-

0.00%

223.53

13,346.98

100.00%

10.47

557.01

5,831.89

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.47

5,831.89

100.00%

223.53

1.93

431.41

-

-

0.00%

-

-

0.00%

-

-

0.00%

223.53

431.41

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

470.00

-

-

0.00%

5.06

2,378.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

470.00

2,378.20

100.00%

38.59

74.12

2,860.29

-

-

0.00%

-

-

0.00%

-

-

0.00%

38.59

2,860.29

100.00%

3.86

557.01

2,150.06

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.86

2,150.06

100.00%

44.37

1.93

85.63

-

-

0.00%

-

-

0.00%

-

-

0.00%

44.37

85.63

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

und

-

6,031.52

VARIOS PRUEBAS DE CONTROL DE CALIDAD DEL CONCRETO

-

5.06

-

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

0.00%

-

VIGAS

04.01.03.03.01

0.00%

5,191.56

-

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

12,674.97

5.06

COLUMNAS

04.01.03.02.01

04.01.03.03

1,026.00

61.52

15.00

18.36

275.40

-

15.00

275.40

0.00% 100.00%

11

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

04.01.04 04.01.04.01

ESTRUCTURA METALICA TIJERALES METALICOS

04.01.04.01.01

CARPINTERIA METALICA

KG

04.01.04.01.02

MECANIZADOS

04.01.04.01.03

MONTAJE ESTRUCTURA METALICAS

04.02 04.02.01 04.02.01.01 04.02.02

P. U.

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

2,397.35

11.09

26,586.61

-

-

0.00%

-

-

0.00%

-

-

0.00%

KG

113.04

11.09

1,253.61

-

-

0.00%

-

-

0.00%

-

-

KG

2,397.35

3.14

7,527.68

-

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

ARQUITECTURA MUROS Y TABIQUES DE ALBAÑILERIA MUROS DE LADRILLO KK DE SOGA MEZCLA 1:5

AVANCE ANTERIOR

P. TOTAL

m2

306.31

79.68

24,406.78

REVOQUES ENLUCIDOS Y MOLDURAS

-

-

0.00% 0.00%

2,397.35

26,586.61

100.00%

0.00%

113.04

1,253.61

100.00%

0.00%

2,397.35

7,527.68

100.00%

306.31

-

-

0.00%

-

0.00%

-

-

0.00%

TARRAJEO EN MUROS INTERIORES C:A 1:4 E=1.5CM

m2

415.74

24.10

10,019.33

-

-

0.00%

-

-

0.00%

-

-

0.00%

415.74

10,019.33

100.00%

04.02.02.02

TARRAJEO EN MUROS EXTERIORES C:A 1:4 E=1.5CM

m2

120.14

28.43

3,415.58

-

-

0.00%

-

-

0.00%

-

-

0.00%

120.14

3,415.58

100.00%

04.02.02.03

VESTIDURA DE DERRAMES

m

139.90

16.50

2,308.35

-

-

0.00%

-

-

0.00%

-

-

0.00%

139.90

2,308.35

100.00%

04.02.02.04

BRUÑAS 1 cm

m

559.13

6.66

3,723.81

-

-

0.00%

-

-

0.00%

-

-

0.00%

559.13

3,723.81

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

04.02.03.01 04.02.04

CIELORRASOS FALSO CIELO RASO CON PLANCHA DE FIBROCEMENTO 8MM C/PINT. LATEX

M2

160.98

87.64

14,108.29

PISOS Y PAVIMENTOS

-

-

160.98

14,108.29

0.00% 100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

CONTRAPISO E=40 mm

m2

116.08

28.37

3,293.19

-

-

0.00%

-

-

0.00%

-

-

0.00%

116.08

3,293.19

100.00%

04.02.04.02

PISO PORCELANATO ANTIDESLIZANTE 60x60cm

m2

90.24

74.36

6,710.25

-

-

0.00%

-

-

0.00%

-

-

0.00%

90.24

6,710.25

100.00%

04.02.04.03

PISO T. INDUSTRIAL /C°-SEMIPULIDO C/VITRIFICANTE Y ENDURECEDOR C/VERDE PETROLEO

M2

9.41

17.18

161.66

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.41

161.66

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

04.02.05.01 04.02.05.02 04.02.06 04.02.06.01 04.02.07 04.02.07.01 04.02.07.02 04.02.08

CONTRAZOCALOS

-

-

0.00%

04.02.04.01

04.02.05

-

-

0.00% 100.00%

04.02.02.01

04.02.03

-

24,406.78

0.00%

-

0.00%

0.00%

CONTRAZOCALO SANITARIO DE CEMENTO PULIDO TIPO MEDIA CAÑA, CON BORDE DE PLATINA EN PISO, H =0.10 m

m

139.22

17.35

2,415.47

-

-

0.00%

-

-

0.00%

-

-

0.00%

139.22

2,415.47

100.00%

CONTRAZOCALO DE CEMENTO PULIDO H=20 CM

m

3.58

17.38

62.22

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.58

62.22

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

ZOCALOS ZOCALO DE PORCELANATO

m2

319.69

85.19

27,234.39

COBERTURA DE ALUZING TIPO TR3 E=0.45mm INC/ ACCESORIOS

M2

138.53

70.87

9,817.62

CUMBRERA DE ALUZING INC/ ACCESORIOS

M

9.60

48.34

464.06

COBERTURAS

-

CARPINTERIA DE MADERA

-

100.00

7,087.00

-

-

0.00%

72.19%

0.00% -

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

-

0.00%

100.00

7,087.00

0.00%

319.69 -

27,234.39 -

0.00% 100.00% 0.00%

72.19%

38.53

2,730.62

27.81%

-

0.00%

9.60

464.06

100.00%

-

0.00%

-

-

0.00%

04.02.08.01

PUERTA MADERA (1.20X2.10) CONTRAP. C/ 2 HOJA BATIENTE. MADERA (MAD. CEDRO, FORRO MDF PLASTIFICADO 6MM) C/ VISOR DE VIDRIO 6mm Y REJILLA MAD.

m2

5.04

739.86

3,728.89

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.04

3,728.89

100.00%

04.02.08.02

PUERTA MADERA (0.80X2.10) CONTRAP. C/ 1 HOJA BATIENTE. MADERA (MAD. CEDRO, FORRO MDF PLASTIFICADO 6MM) C/ REJILLA MAD.

m2

13.44

704.60

9,469.82

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.44

9,469.82

100.00%

04.02.08.03

PUERTA MADERA (0.90X2.10) CONTRAP. C/ 1 HOJA BATIENTE. MADERA (MAD. CEDRO, FORRO MDF PLASTIFICADO 6MM) C/ VISOR DE VIDRIO 6mm Y REJILLA MAD.

m2

3.78

704.09

2,661.46

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.78

2,661.46

100.00%

04.02.08.04

MARCO DE MADERA CEDRO 4"X 2"

m

61.00

24.12

1,471.32

-

-

0.00%

-

-

0.00%

-

-

0.00%

61.00

1,471.32

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

04.02.09

CARPINTERÍA METÁLICA

-

04.02.09.01

PUERTA METALICA (1.50X2.10) CONTRAP C/ 2 HOJA BATIENTE C/VISOR DE VIDRIO DE 6 mm

und

04.02.09.02

PANEL DIVISORIO METALICO EN CUBICULOS DE SS.HH., DUCHAS Y URINARIOS

m2

04.02.09.03

VENTANA METALICA VM 0.65X0.65 m

und

04.02.10 04.02.10.01 04.02.11

1,732.50

1,732.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

1,732.50

100.00%

41.26

1,016.94

41,958.94

-

-

0.00%

-

-

0.00%

-

-

0.00%

41.26

41,958.94

100.00%

2.00

170.27

340.54

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

340.54

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

m2

0.00%

1.00

CARPINTERIA DE ALUMINIO VENTANA DE 1.20x1.10 C/ 1 HOJA PROYECTANTE C/1 HOJA FIJA EN CARP. DE ALUMINIO C/CRISTAL DE 6mm, TIPO V-3

-

27.72

663.96

18,404.97

CERRAJERÍA

-

-

27.72

18,404.97 -

0.00% 100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

04.02.11.01

CERRADURA TIPO A

UND

3.00

82.65

247.95

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

247.95

100.00%

0.00%

04.02.11.02

CERRADURA TIPO B

UND

2.00

103.19

206.38

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

206.38

100.00%

12

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

04.02.11.03

CERRADURA TIPO C

UND

04.02.11.04

BARRA ANTIPANICO DE PUERTAS DE EMERGENCIA

04.02.11.05

BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 3"

04.02.11.06

FRENO HIDRÁULICO AEREO

UND

04.02.12 04.02.12.01 04.02.13

P. U.

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

8.00

73.19

585.52

-

-

0.00%

-

-

0.00%

-

-

0.00%

und

2.00

870.97

1,741.94

-

-

0.00%

-

-

0.00%

-

-

und

48.00

22.53

1,081.44

-

-

0.00%

-

-

0.00%

-

-

2.00

144.26

288.52

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

VIDRIOS, CRISTALES Y SIMILARES ESPEJOS C/ SISTEMA DE FIJACION

AVANCE ANTERIOR

P. TOTAL

M2

5.13

126.43

648.59

PINTURA

-

-

METRADO

MONTO

%

8.00

585.52

100.00%

0.00%

2.00

1,741.94

100.00%

0.00%

48.00

1,081.44

100.00%

-

0.00%

2.00

288.52

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

5.13

648.59

-

-

0.00%

-

0.00%

-

-

0.00%

PINTURA LATEX EN CIELORRASO 2 MANOS

m2

160.98

19.96

3,213.16

-

-

0.00%

-

-

0.00%

-

-

0.00%

160.98

3,213.16

100.00%

04.02.13.02

PINTURA LATEX EN MUROS INTERIORES 2 MANOS

m2

109.58

16.42

1,799.30

-

-

0.00%

-

-

0.00%

-

-

0.00%

109.58

1,799.30

100.00%

04.02.13.03

PINTURA LATEX EN MUROS EXTERIORES 2 MANOS

m2

141.59

19.96

2,826.14

-

-

0.00%

-

-

0.00%

-

-

0.00%

141.59

2,826.14

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

VARIOS

-

-

-

0.00% 100.00%

04.02.13.01

04.02.14

-

-

-

0.00%

0.00%

04.02.14.01

SELLADO DE JUNTAS DE CONSTRUCCION

M

132.00

35.21

4,647.72

-

-

0.00%

-

-

0.00%

-

-

0.00%

132.00

4,647.72

100.00%

04.02.14.02

SELLADOR PARA PORCELANATO

m2

417.38

17.47

7,291.63

-

-

0.00%

-

-

0.00%

-

-

0.00%

417.38

7,291.63

100.00%

04.02.14.03

LIMPIEZA FINAL DE OBRA

m2

138.53

1.51

209.18

-

-

0.00%

-

-

0.00%

-

-

0.00%

138.53

209.18

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

04.03 04.03.01 04.03.01.01

INSTALACIONES SANITARIAS SISTEMA DE AGUA FRÍA SALIDA DE AGUA FRÍA

0.00%

04.03.01.01.01

SALIDA DE AGUA FRIA CON TUBO PVC TIPO ROSCA DE 1/2"

PTO

18.00

78.00

1,404.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

18.00

1,404.00

100.00%

04.03.01.01.02

SALIDA DE AGUA FRIA CON TUBO PVC TIPO ROSCA DE 1"

PTO

3.00

86.97

260.91

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

260.91

100.00%

pto

5.00

86.08

430.40

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

430.40

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

04.03.01.01.03 04.03.01.02

SALIDA DE AGUA FRIA CON TUBO PVC TIPO ROSCA DE 1 1/4" RED DE DISTRIBUCIÓN DE AGUA FRÍA_x000D_

-

-

0.00%

04.03.01.02.01

TUBO PVC CON UNION TIPO ROSCA DE 1/2" PN10 (ENTERRADA)

M

10.83

17.70

191.69

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.83

191.69

100.00%

04.03.01.02.02

TUBO PVC CON UNION TIPO ROSCA DE 3/4" PN10 (ENTERRADA)

m

21.32

18.06

385.04

-

-

0.00%

-

-

0.00%

-

-

0.00%

21.32

385.04

100.00%

04.03.01.02.03

TUBO PVC CON UNION TIPO ROSCA DE 1" PN10 (ENTERRADA)

m

4.61

24.34

112.21

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.61

112.21

100.00%

04.03.01.02.04

TUBO PVC CON UNION TIPO ROSCA DE 1 1/4" PN10 (ENTERRADA)

m

11.41

20.22

230.71

-

-

0.00%

-

-

0.00%

-

-

0.00%

11.41

230.71

100.00%

04.03.01.02.05

PRUEBA HIDRÁULICA EN TUBERIAS Y DESINFECCION

M

48.17

1.83

88.15

-

-

0.00%

-

-

0.00%

-

-

0.00%

48.17

88.15

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

04.03.01.03

ACCESORIOS PARA REDES DE AGUA FRÍA

-

-

0.00%

04.03.01.03.01

CODO PVC TIPO ROSCA DE 1/2" 90°

und

7.00

11.50

80.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

7.00

80.50

100.00%

04.03.01.03.02

CODO PVC TIPO ROSCA DE 3/4" 90°

und

9.00

24.80

223.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.00

223.20

100.00%

04.03.01.03.03

CODO PVC TIPO ROSCA DE 1" 90°

und

1.00

10.30

10.30

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

10.30

100.00%

04.03.01.03.04

CODO PVC TIPO ROSCA DE 1 1/4" 90°

und

6.00

15.08

90.48

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

90.48

100.00%

04.03.01.03.05

TEE PVC TIPO ROSCA DE 3/4"

und

11.00

25.65

282.15

-

-

0.00%

-

-

0.00%

-

-

0.00%

11.00

282.15

100.00%

04.03.01.03.06

TEE PVC TIPO ROSCA DE 1"

und

3.00

26.22

78.66

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

78.66

100.00%

04.03.01.03.07

TEE PVC TIPO ROSCA DE 1 1/4"

und

9.00

26.64

239.76

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.00

239.76

100.00%

04.03.01.03.08

REDUCCION PVC TIPO ROSCA DE 1 1/4" A 1/2"

und

5.00

17.05

85.25

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

85.25

100.00%

04.03.01.03.09

REDUCCION PVC TIPO ROSCA DE 1 1/4" A 1"

und

1.00

16.63

16.63

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

16.63

100.00%

04.03.01.03.10

REDUCCION PVC TIPO ROSCA DE 1" A 3/4"

und

2.00

16.21

32.42

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

32.42

100.00%

04.03.01.03.11

REDUCCION PVC TIPO ROSCA DE 3/4" A 1/2"

und

14.00

20.61

288.54

-

-

0.00%

-

-

0.00%

-

-

0.00%

14.00

288.54

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

04.03.01.04

LLAVES Y VÁLVULAS

-

-

0.00%

04.03.01.04.01

VALVULA DE COMPUERTA DE BRONCE 3/4''

und

4.00

105.63

422.52

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

422.52

100.00%

04.03.01.04.02

VALVULA DE COMPUERTA DE BRONCE 1 1/4"

UND

2.00

161.53

323.06

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

323.06

100.00%

04.03.01.04.03

NICHO Y TAPA PARA VALVULA EN PARED

UND

6.00

88.83

532.98

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

532.98

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

04.03.02 04.03.02.01

SISTEMA DE AGUA CALIENTE INGRESO Y SALIDA DE AGUA CALIENTE

13

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

04.03.02.01.01

INGRESO DE AGUA CALIENTE CON TUBERIA CPVC 3/4"

M

4.70

28.04

131.79

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.70

131.79

100.00%

04.03.02.01.02

SALIDA DE AGUA CALIENTE CON TUBERIA CPVC 3/4"

M

7.78

28.04

218.15

-

-

0.00%

-

-

0.00%

-

-

0.00%

7.78

218.15

100.00%

04.03.02.01.03

CODO CPVC 3/4" C/R

PZA

7.00

25.97

181.79

-

-

0.00%

-

-

0.00%

-

-

0.00%

7.00

181.79

100.00%

und

2.00

105.63

211.26

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

211.26

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

04.03.02.01.04 04.03.02.02

VALVULA DE COMPUERTA DE BRONCE 3/4'' RED DE DISTRIBUCIÓN DE AGUA CALIENTE_x000D_

-

04.03.02.02.01

SALIDA DE AGUA CALIENTE CON TUBERIA CPVC 1/2"

pto

04.03.02.02.02

TUBERIA CPVC 1/2" C/R

04.03.02.02.03

TUBERIA CPVC 3/4" C/R

04.03.02.02.04

PRUEBA HIDRÁULICA EN TUBERIAS Y DESINFECCION

04.03.02.03

-

0.00%

6.00

78.68

472.08

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

472.08

100.00%

M

16.29

22.42

365.22

-

-

0.00%

-

-

0.00%

-

-

0.00%

16.29

365.22

100.00%

M

4.24

23.48

99.56

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.24

99.56

100.00%

M

20.53

1.83

37.57

-

-

0.00%

-

-

0.00%

-

-

0.00%

20.53

37.57

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

ACCESORIOS DE REDES DE AGUA CALIENTE

-

-

0.00%

04.03.02.03.01

CODO CPVC 1/2" C/R

PZA

9.00

25.97

233.73

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.00

233.73

100.00%

04.03.02.03.02

CODO CPVC 3/4" C/R

PZA

2.00

25.97

51.94

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

51.94

100.00%

04.03.02.03.03

TEE CPVC 1/2" C/R

PZA

1.00

30.96

30.96

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

30.96

100.00%

04.03.02.03.04

TEE CPVC 3/4" C/R

PZA

3.00

32.94

98.82

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

98.82

100.00%

04.03.02.03.05

REDUCCION CPVC DE 3/4" A 1/2"

PZA

5.00

25.55

127.75

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

127.75

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

04.03.02.04

LLAVES Y VÁLVULAS

-

-

0.00%

04.03.02.04.01

VALVULA DE COMPUERTA DE BRONCE 1/2"

und

1.00

68.36

68.36

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

68.36

100.00%

04.03.02.04.02

VALVULA DE COMPUERTA DE BRONCE 3/4''

und

1.00

105.63

105.63

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

105.63

100.00%

04.03.02.04.03

NICHO Y TAPA PARA VALVULA EN PARED

UND

2.00

88.83

177.66

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

177.66

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

04.03.02.05 04.03.02.05.01 04.03.03 04.03.03.01

TERMA SOLAR SUMINISTRO Y COLOCACION DE TERMA SOLAR 300 L

UND

1.00

2,203.39

SISTEMA DE DESAGÜE Y VENTILACIÓN SALIDA DE DESAGÜE Y VENTILACIÓN

2,203.39

-

2,203.39

0.00% 100.00% 0.00% 0.00%

04.03.03.01.01

SALIDA DE DESAGÜE PVC 2"

pto

14.00

93.05

1,302.70

-

-

0.00%

-

-

0.00%

-

-

0.00%

14.00

1,302.70

100.00%

04.03.03.01.02

SALIDA DE DESAGÜE PVC 4"

pto

5.00

100.10

500.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

500.50

100.00%

04.03.03.01.03

SALIDA DE VENTILACIÓN PVC 2"

PTO

2.00

93.05

186.10

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

186.10

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

04.03.03.02

ACCESORIOS DE REDES DE DESAGÜE

-

-

0.00%

04.03.03.02.01

TUBERIA PVC SAL 2" DESAGUE (ENTERRADA)

M

43.82

23.33

1,022.32

-

-

0.00%

-

-

0.00%

-

-

0.00%

43.82

1,022.32

100.00%

04.03.03.02.02

TUBERIA PVC SAL 4" DESAGUE (ENTERRADA)

M

20.90

25.28

528.35

-

-

0.00%

-

-

0.00%

-

-

0.00%

20.90

528.35

100.00%

04.03.03.02.03

TUBERIA PVC SAP 2" EN MONTANTE

M

6.45

43.38

279.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.45

279.80

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

04.03.03.03

ACCESORIOS DE REDES DE DESAGÜE

-

04.03.03.03.01

SUMIDERO DE BRONCE DE 2"

und

04.03.03.03.02

SUMIDERO DE BRONCE DE 4"

04.03.03.03.03

REGISTRO ROSCADO DE BRONCE 2"

04.03.03.03.04

-

0.00%

14.00

70.50

987.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

14.00

987.00

100.00%

UND

4.00

87.66

350.64

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

350.64

100.00%

UND

7.00

77.49

542.43

-

-

0.00%

-

-

0.00%

-

-

0.00%

7.00

542.43

100.00%

REGISTRO ROSCADO DE BRONCE 4"

und

4.00

91.96

367.84

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

367.84

100.00%

04.03.03.03.05

CODO PVC SAL DE 2"X45°

und

12.00

19.61

235.32

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.00

235.32

100.00%

04.03.03.03.06

CODO PVC SAL DE 4"X45°

und

4.00

22.16

88.64

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

88.64

100.00%

04.03.03.03.07

YEE PVC 2"

und

23.00

24.11

554.53

-

-

0.00%

-

-

0.00%

-

-

0.00%

23.00

554.53

100.00%

04.03.03.03.08

YEE PVC 4"

und

10.00

26.66

266.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.00

266.60

100.00%

04.03.03.03.09

YEE PVC 4"X2"

und

8.00

26.66

213.28

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.00

213.28

100.00%

04.03.03.03.10

SOMBRERO DE VENTILACION PVC DE 2"

UND

2.00

15.27

30.54

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

30.54

100.00%

04.03.04 04.03.04.01 04.03.04.01.01

SISTEMA DE EVACUACIÓN DE AGUAS PLUVIALES

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

CANALETA Y MONTANTES PLUVIALES

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

CANALETA SEMICIRCULAR DE PLANCHA GALVANIZADA D=6" E=0.5 MM

M

19.20

57.32

1,100.54

-

19.20

1,100.54

0.00% 0.00% 100.00%

14

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

04.03.04.01.02

SOPORTE DE F°G° DE 1"X3/8"

UND

12.00

38.75

465.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.00

465.00

100.00%

04.03.04.01.03

MONTANTE PVC SAL DESAGUE D=3''

M

29.20

20.09

586.63

-

-

0.00%

-

-

0.00%

-

-

0.00%

29.20

586.63

100.00%

04.03.04.01.04

CODO PVC SAL 3"x45°

UND

8.00

20.46

163.68

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.00

163.68

100.00%

04.03.04.01.05

CODO PVC SAL 3"X90°

UND

4.00

16.06

64.24

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

64.24

100.00%

04.03.04.01.06

ABRAZADERA DE SUJECIÓN 3"

UND

24.00

28.03

672.72

-

-

0.00%

-

-

0.00%

-

-

0.00%

24.00

672.72

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

04.03.04.02

COLUMNETA PROTECTORA DE CONCRETO

-

04.03.04.02.01

ENCOFRADO Y DESENCOFRADO DE COLUMNETAS

m2

04.03.04.02.02

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

04.03.04.02.03

CONCRETO f´c= 175 kg/cm2 PARA COLUMNETAS

m3

04.03.04.02.04

TARRAJEO DE SUPERFICIES DE COLUMNAS E= 1.5 CM

m2

04.03.05

4.80

-

0.00%

59.71

286.61

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.80

286.61

100.00%

32.00

5.06

161.92

-

-

0.00%

-

-

0.00%

-

-

0.00%

32.00

161.92

100.00%

0.56

503.88

282.17

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.56

282.17

100.00%

4.40

36.18

159.19

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.40

159.19

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

APARATOS SANITARIOS Y ACCESORIOS

-

-

0.00%

04.03.05.01

LAVATORIO CERAMICO VITRIFICANTE 45X60 CM S/PEDESTAL

UND

5.00

200.00

1,000.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

1,000.00

100.00%

04.03.05.02

LAVATORIO DE CERAMICA VITRIFICADA, DE 20"x18", AGUA FRIA Y CALIENTE, ANCON O SIMILAR

UND

6.00

237.29

1,423.74

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

1,423.74

100.00%

04.03.05.03

INODORO DE CERÁMICA VITRIFICADA CON VÁLVULA FLUXÓMETRO

und

3.00

466.10

1,398.30

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

1,398.30

100.00%

04.03.05.04

URINARIO DE CERAMICA VITRIFICADA CON VALVULA FLUXÓMETRO

UND

3.00

432.25

1,296.75

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

1,296.75

100.00%

04.03.05.05

BARRA METÁLICA CROMADA DE APOYO PARA MINUSVÁLIDO H-12

UND

6.00

155.00

930.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

930.00

100.00%

04.03.05.06

GRIFERIA METALICA ESFERICA Ø2" H=0.60M

UND

6.00

83.97

503.82

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

503.82

100.00%

04.03.05.07

SUMIDERO CROMADO DE 2"

und

10.00

6.90

69.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.00

69.00

100.00%

04.03.05.08

ESPEJO ADOSADO MARCO METALICO ANCHO=VARIABLE, ALTURA=90CM

UND

4.00

84.75

339.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

339.00

100.00%

04.03.05.09

JABONERA CROMADA PARA JABON LIQUIDO

und

11.00

52.71

579.81

-

-

0.00%

-

-

0.00%

-

-

0.00%

11.00

579.81

100.00%

04.03.05.10

JABONERA DE LOSA

und

6.00

23.73

142.38

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

142.38

100.00%

04.03.05.11

DISPENSADOR METALICO INDUSTRIAL DE PAPEL H=0.45M

UND

5.00

105.00

525.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

525.00

100.00%

04.03.05.12

DISPENSADOR DE ACERO INOXIDABLE PARA PAPEL TOALLA

PZA

2.00

105.00

210.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

210.00

100.00%

04.03.05.13

COLOCACION DE APARATOS SANITARIOS

UND

17.00

137.46

2,336.82

-

-

0.00%

-

-

0.00%

-

-

0.00%

17.00

2,336.82

100.00%

04.03.05.14

COLOCACION DE ACCESORIOS SANITARIOS

UND

50.00

33.81

1,690.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

50.00

1,690.50

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

04.04 04.04.01

INSTALACIONES ELECTRICAS SALIDAS

0.00% 0.00%

04.04.01.01

SALIDA PARA ALUMBRADO

und

37.00

45.39

1,679.43

-

-

0.00%

-

-

0.00%

-

-

0.00%

37.00

1,679.43

100.00%

04.04.01.02

SALIDA PARA INTERRUPTOR

und

16.00

45.39

726.24

-

-

0.00%

-

-

0.00%

-

-

0.00%

16.00

726.24

100.00%

04.04.01.03

SALIDA PARA CAJA DE PASO EN TECHO

und

4.00

62.03

248.12

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

248.12

100.00%

04.04.01.04

SALIDA PARA SECADORA DE MANOS

und

2.00

52.53

105.06

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

105.06

100.00%

04.04.01.05

SALIDA PARA DUCHA ELECTRICA

und

6.00

52.53

315.18

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

315.18

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

04.04.02

TUBERIAS

-

-

0.00%

04.04.02.01

TUBO CONDUIT DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

60.00

104.77

6,286.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

60.00

6,286.20

100.00%

04.04.02.02

TUBO PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

UND

20.00

11.39

227.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

20.00

227.80

100.00%

04.04.02.03

CURVA PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

und

30.00

6.92

207.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

30.00

207.60

100.00%

04.04.02.04

CURVA CONDUIT DE 90° DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

74.00

13.59

1,005.66

-

-

0.00%

-

-

0.00%

-

-

0.00%

74.00

1,005.66

100.00%

04.04.02.05

UNION PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

und

20.00

9.46

189.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

20.00

189.20

100.00%

04.04.02.06

UNIÓN CONDUIT EMT DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

74.00

9.60

710.40

-

-

0.00%

-

-

0.00%

-

-

0.00%

74.00

710.40

100.00%

04.04.02.07

CONEXION PVC SAP PARA INSTALACIONES ELECTRICAS DE 20MM (3/4")

und

40.00

7.42

296.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

40.00

296.80

100.00%

04.04.02.08

TERMINAL CONDUIT EMT DE ACERO GALVANIZADO 20 mm ? (3/4")

und

74.00

14.69

1,087.06

-

-

0.00%

-

-

0.00%

-

-

0.00%

74.00

1,087.06

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

04.04.03

CONDUCTORES

-

-

-

0.00%

04.04.03.01

CABLE NH80 2.5mm2

m

1,600.00

2.10

3,360.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1,600.00

3,360.00

100.00%

04.04.03.02

CABLE NH80 4.0mm2

m

50.00

2.45

122.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

50.00

122.50

100.00%

15

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

04.04.04 04.04.04.01 04.04.04.02 04.04.05

P. U.

ARTEFACTOS DE ILUMINACION

AVANCE ANTERIOR

P. TOTAL

METRADO -

MONTO

AVANCE ACTUAL %

-

-

0.00%

METRADO

MONTO

AVANCE ACUMULADO %

-

METRADO

0.00%

-

MONTO

SALDO %

-

0.00%

METRADO -

28.00

230.06

6,441.68

-

-

0.00%

7.00

1,610.42

25.00%

7.00

1,610.42

25.00%

21.00

4,831.26

75.00%

Luz de emergencia

und

9.00

303.26

2,729.34

-

-

0.00%

2.25

682.34

682.34

2,047.01

75.00%

-

-

0.00%

166.88

-

-

0.00%

INTERRUPTORES

-

25.00%

2.25

25.00%

6.75

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

-

0.00%

7.00

und

7.00

23.84

04.04.05.02

Interruptor Doble

und

1.00

24.20

24.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

04.04.05.03

Interruptor Conmutado Simple

und

8.00

31.62

252.96

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

2.00

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

04.04.07 04.04.07.01

05 05.01 05.01.01

0.00%

und

Interruptor Simple

04.04.06.01

% -

Luminaria para adosar tipo hermetico lineal, lámpara fluoresfente T5 de 1x28W.

04.04.05.01

04.04.06

MONTO

TABLEROS DE DISTRIBUCION TABLERO PARA DUCHAS

und

2.00

643.20

1,286.40

und

1.00

71.16

71.16

CAJAS DE PASO CAJA DE PASO DE 150 X 150 X 75 mm

-

CONSTRUCCION DE PRODUCCION

4,400,503.66

-

-

963,532.46

450,684.85

-

0.00%

166.88

100.00%

1.00

24.20

100.00%

8.00

252.96

100.00%

1,414,217.37

1,286.40 71.16

0.00% 100.00% 0.00% 100.00%

2,986,286.29

ESTRUCTURAS MOVIMIENTO DE TIERRAS

05.01.01.01

EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS EN TERRENO NORMAL

m3

232.73

50.57

11,769.16

232.73

11,769.16

100.00%

-

-

0.00%

232.73

11,769.16

100.00%

-

-

0.00%

05.01.01.02

EXCAVACION DE ZANJAS PARA VIGAS DE CIMENTACION EN TERRENO NORMAL

m3

1,011.24

50.57

51,138.41

1,011.24

51,138.41

100.00%

-

-

0.00%

1,011.24

51,138.41

100.00%

-

-

0.00%

05.01.01.03

EXCAVACION DE ZANJAS PARA ZAPATAS EN TERRENO NORMAL

m3

228.00

60.69

13,837.32

228.00

13,837.32

100.00%

-

-

0.00%

228.00

13,837.32

100.00%

-

-

05.01.01.04

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

1,194.38

33.75

40,310.33

0.00%

-

-

0.00%

05.01.01.05

NIVELACION INTERIOR Y COMPACTADO C/EQUPO.

m2

1,234.11

8.85

10,921.87

0.00%

-

-

0.00%

05.01.01.06

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

319.23

25.29

8,073.33

319.23

8,073.33

100.00%

-

-

0.00%

319.23

8,073.33

100.00%

-

-

0.00%

05.01.01.07

ELIMINACION DE MATERIAL EXCEDENTE D = 2 Km

m3

319.23

13.93

4,446.87

319.23

4,446.87

100.00%

-

-

0.00%

319.23

4,446.87

100.00%

-

-

0.00%

-

0.00%

0.00%

-

-

0.00%

05.01.02

OBRAS DE CONCRETO SIMPLE

-

-

-

-

-

0.00%

-

-

-

-

0.00%

0.00%

1,194.38

40,310.33

100.00%

0.00%

1,234.11

10,921.87

100.00%

05.01.02.01

CONCRETO PARA SOLADO C:H 1:10 E=2"

m2

213.24

23.19

4,945.04

213.24

4,945.04

100.00%

-

-

0.00%

213.24

4,945.04

100.00%

-

-

0.00%

05.01.02.02

CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS

m3

183.24

206.03

37,752.94

183.24

37,752.94

100.00%

-

-

0.00%

183.24

37,752.94

100.00%

-

-

0.00%

05.01.02.03

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

m2

538.80

49.13

26,471.24

538.80

26,471.24

100.00%

-

-

0.00%

538.80

26,471.24

100.00%

-

-

0.00%

05.01.02.04

CONCRETO f´c= 140 kg/cm PARA SOBRECIMIENTOS

m3

39.70

374.06

14,850.18

39.70

14,850.18

100.00%

-

-

0.00%

39.70

14,850.18

100.00%

-

-

0.00%

05.01.03 05.01.03.01

OBRAS DE CONCRETO ARMADO ZAPATAS

05.01.03.01.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

05.01.03.01.02

CONCRETO f´c= 210 kg/cm PARA ZAPATAS

05.01.03.01.03

CURADO DE CONCRETO

05.01.03.02

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

7,139.66

1,411.00

7,139.66

100.00%

-

-

0.00%

1,411.00

7,139.66

100.00%

-

-

0.00%

m3

43.02

432.28

18,596.69

43.02

18,596.69

100.00%

-

-

0.00%

43.02

18,596.69

100.00%

-

-

0.00%

m2

86.04

1.93

166.06

86.04

166.06

100.00%

-

-

0.00%

86.04

166.06

100.00%

-

-

0.00%

-

0.00%

0.00%

-

-

0.00%

VIGAS DE CIMENTACION

kg

05.01.03.02.02

ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION

05.01.03.02.03 05.01.03.02.04

-

-

0.00%

-

-

5,774.00

5.06

29,216.44

5,774.00

29,216.44

100.00%

-

-

0.00%

5,774.00

29,216.44

100.00%

-

-

0.00%

m2

337.80

55.62

18,788.44

337.80

18,788.44

100.00%

-

-

0.00%

337.80

18,788.44

100.00%

-

-

0.00%

CONCRETO f´c= 210kg/cm2 PARA VIGAS DE CIMENTACION

m3

50.67

418.06

21,183.10

50.67

21,183.10

100.00%

-

-

0.00%

50.67

21,183.10

100.00%

-

-

0.00%

CURADO DE CONCRETO

m2

337.80

1.93

651.95

337.80

651.95

100.00%

-

-

0.00%

337.80

651.95

100.00%

-

-

0.00%

-

0.00%

0.00%

-

-

0.00%

SOBRECIMIENTO ARMADO

-

05.01.03.03.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

05.01.03.03.02

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

05.01.03.03.03 05.01.03.03.04

05.01.03.04.01

-

5.06

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

05.01.03.04

-

1,411.00

05.01.03.02.01

05.01.03.03

-

-

-

0.00%

-

-

3,071.00

5.06

15,539.26

3,071.00

15,539.26

100.00%

-

-

0.00%

3,071.00

15,539.26

100.00%

-

-

0.00%

m2

654.08

49.13

32,134.95

654.08

32,134.95

100.00%

-

-

0.00%

654.08

32,134.95

100.00%

-

-

0.00%

CONCRETO f´c= 210 kg/cm2 PARA SOBRECIMIENTOS

m3

95.15

450.05

42,822.26

95.15

42,822.26

100.00%

-

-

0.00%

95.15

42,822.26

100.00%

-

-

0.00%

CURADO DE CONCRETO

m2

654.08

1.93

1,262.37

654.08

1,262.37

100.00%

-

-

0.00%

654.08

1,262.37

100.00%

-

-

0.00%

COLUMNAS ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

18,814.00

5.06

95,198.84

18,814.00

95,198.84

100.00%

-

-

0.00%

18,814.00

95,198.84

100.00%

-

-

0.00%

16

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

05.01.03.04.02

ENCOFRADO Y DESENCOFRADO DE COLUMNAS

m2

892.66

59.71

53,300.73

892.66

53,300.73

100.00%

-

-

0.00%

892.66

53,300.73

100.00%

-

-

0.00%

05.01.03.04.03

CONCRETO f´c= 210 kg/cm2 PARA COLUMNAS

m3

90.79

557.01

50,570.94

90.79

50,570.94

100.00%

-

-

0.00%

90.79

50,570.94

100.00%

-

-

0.00%

05.01.03.04.04

CURADO DE CONCRETO

m2

1,026.56

1.93

1,981.26

1,026.56

1,981.26

100.00%

-

-

0.00%

1,026.56

1,981.26

100.00%

-

-

0.00%

05.01.03.05

COLUMNA DE AMARRE (COLUMNETAS)

-

-

05.01.03.05.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

1,272.00

5.06

6,436.32

1,272.00

6,436.32

100.00%

0.00%

1,272.00

6,436.32

100.00%

-

-

0.00%

05.01.03.05.02

ENCOFRADO Y DESENCOFRADO DE COLUMNETAS

m2

197.25

59.71

11,777.80

65.25

3,896.08

33.08%

132.00

7,881.72

66.92%

197.25

11,777.80

100.00%

-

-

0.00%

05.01.03.05.03

CONCRETO f´c= 175 kg/cm2 PARA COLUMNETAS

m3

18.86

503.88

9,503.18

5.97

3,008.16

31.65%

12.89

6,495.02

68.35%

18.86

9,503.18

100.00%

-0.00

-

0.00%

05.01.03.05.04

CURADO DE CONCRETO

m2

226.84

1.93

437.80

75.20

145.14

33.15%

151.64

292.66

66.85%

226.84

437.80

100.00%

0.00

-

0.00%

05.01.03.06

-

-

VIGAS

-

-

05.01.03.06.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

6,972.00

5.06

35,278.32

6,972.00

35,278.32

100.00%

-

-

0.00%

6,972.00

35,278.32

100.00%

-

-

0.00%

05.01.03.06.02

ENCOFRADO Y DESENCOFRADO DE VIGAS

m2

370.53

74.12

27,463.68

370.53

27,463.68

100.00%

-

-

0.00%

370.53

27,463.68

100.00%

-

-

0.00%

05.01.03.06.03

CONCRETO f´c= 210kg/cm2 PARA VIGAS

m3

41.50

557.01

23,115.92

41.50

23,115.92

100.00%

-

-

0.00%

41.50

23,115.92

100.00%

-

-

0.00%

05.01.03.06.04

CURADO DE CONCRETO

m2

370.53

1.93

715.12

370.53

715.12

100.00%

-

-

0.00%

370.53

715.12

100.00%

-

-

0.00%

05.01.03.07

VIGAS DE AMARRE (VIGUETAS)

-

-

05.01.03.07.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

858.00

5.06

4,341.48

250.00

1,265.00

29.14%

608.00

3,076.48

70.86%

858.00

4,341.48

100.00%

05.01.03.07.02

ENCOFRADO Y DESENCOFRADO DE VIGAS DE CONFINAMIENTO

m2

141.00

74.12

10,450.92

48.00

3,557.76

34.04%

55.80

4,135.90

39.57%

103.80

7,693.66

73.62%

05.01.03.07.03

CONCRETO f´c= 175 kg/cm2 PARA VIGAS DE CONFINAMIENTO

m3

12.71

477.50

6,069.03

4.50

2,148.75

35.41%

4.93

2,352.17

38.76%

9.43

4,500.92

05.01.03.07.04

CURADO DE CONCRETO

m2

141.00

1.93

272.13

50.23

96.94

35.62%

54.46

105.11

38.63%

104.69

202.06

05.01.03.08

LOSA ALIGERADA

-

-

-

0.00%

-

0.00%

-

-

-

-

0.00%

37.20

2,757.26

26.38%

74.16%

3.28

1,568.11

25.84%

74.25%

36.31

70.07

25.75%

0.00%

-

-

0.00%

05.01.03.08.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

436.00

5.06

2,206.16

-

-

0.00%

436.00

2,206.16

100.00%

436.00

2,206.16

100.00%

-

-

0.00%

05.01.03.08.02

ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERDA

M2

41.32

60.98

2,519.69

-

-

0.00%

41.32

2,519.69

100.00%

41.32

2,519.69

100.00%

-

-

0.00%

05.01.03.08.03

CONCRETO f´c= 210 kg/cm2 PARA LOSA ALIGERADA

m3

12.41

423.58

5,256.63

-

-

0.00%

12.41

5,256.63

100.00%

12.41

5,256.63

100.00%

-

-

0.00%

05.01.03.08.04

LADRILLO HUECO DE ARCILLA h = 15 cm PARA TECHO

UND

345.00

4.40

1,518.00

-

-

0.00%

345.00

1,518.00

100.00%

345.00

1,518.00

100.00%

-

-

0.00%

05.01.03.08.05

CURADO DE CONCRETO

m2

47.52

1.93

91.71

-

-

0.00%

47.52

91.71

100.00%

47.52

91.71

100.00%

-

-

0.00%

-

-

0.00%

-

-

29,484.62

-

-

0.00%

05.01.03.09

LOSA MACIZA

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

5,827.00

05.01.03.09.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

5,827.00

05.01.03.09.02

ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERDA

M2

141.15

60.98

8,607.33

-

-

0.00%

-

-

0.00%

-

-

0.00%

05.01.03.09.03

CONCRETO f´c= 210 kg/cm2 PARA LOSA ALIGERADA

m3

283.93

423.58

120,267.07

-

-

0.00%

-

-

0.00%

-

-

0.00%

05.01.03.09.04

CORTE CON DISCO EN JUNTAS

m

471.97

3.29

1,552.78

-

-

0.00%

-

-

0.00%

-

-

05.01.03.09.05

CURADO DE CONCRETO

m2

1,632.62

1.93

3,150.96

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

05.01.03.10 05.01.03.10.01 05.01.03.10.02 05.01.04 05.01.04.01

5.06

-

VARIOS

-

JUNTA DE CONSTRUCCION CON TEKNOPORT e=1"

M

PRUEBAS DE CONTROL DE CALIDAD DEL CONCRETO

und

805.01

3.60

2,898.04

96.00

18.36

1,762.56

ESTRUCTURA METALICA TIJERALES METALICOS

100.00

141.15

8,607.33

100.00%

283.93

120,267.07

100.00%

0.00%

471.97

1,552.78

100.00%

-

0.00%

1,632.62

3,150.96

100.00%

-

0.00%

-

-

0.00%

12.42%

563.51

2,028.63

70.00%

663.51

2,388.63

82.42%

141.50

509.41

17.58%

72.00

1,321.92

75.00%

72.00

1,321.92

75.00%

24.00

440.64

25.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00% 0.00%

CARPINTERIA METALICA

KG

23,357.63

11.09

259,036.12

05.01.04.01.02

MECANIZADOS

KG

1,572.90

11.09

17,443.46

-

05.01.04.01.03

MONTAJE ESTRUCTURA METALICAS

KG

23,357.63

3.14

73,342.96

28,053.41

10.18

285,583.71

RIELES

100.00%

-

05.01.04.01.01

05.01.04.02

360.00

0.00%

29,484.62

-

18,956.31

210,225.48

81.16%

4,401.32

48,810.64

18.84%

23,357.63

259,036.12

100.00%

-

-

-

0.00%

1,572.90

17,443.46

100.00%

1,572.90

17,443.46

100.00%

-

-

-

-

0.00%

11,678.82

36,671.48

50.00%

11,678.82

36,671.48

50.00%

-

-

0.00%

-

-

0.00%

11,221.36

114,233.49

-

0.00%

-

-

0.00%

05.01.04.02.01

FABRICACIÓN CARPINTERIA METÁLICA

KG

05.01.04.02.02

CONCRETO f´c= 210 kg/cm2 PARA COLUMNAS

m3

8.60

557.01

4,790.29

-

-

0.00%

-

-

0.00%

-

-

0.00%

05.01.04.02.03

MONTAJE ESTRUCTURA METALICAS

KG

28,053.41

3.14

88,087.71

-

-

0.00%

-

-

0.00%

-

-

0.00%

05.01.04.02.04

UNIÓN PLACA BASE DE COLUMNA

KG

91.00

120.47

10,962.77

-

-

0.00%

-

-

0.00%

-

-

0.00%

05.01.04.02.05

UNIÓN VIGA - COLUMNA

UND

202.00

101.99

20,601.98

-

-

0.00%

-

-

0.00%

-

-

0.00%

40.00%

11,221.36

114,233.49

40.00%

11,678.82 16,832.05

36,671.48 -

0.00% 50.00% 0.00%

171,350.22

60.00%

8.60

4,790.29

100.00%

28,053.41

88,087.71

100.00%

91.00

10,962.77

100.00%

202.00

20,601.98

100.00%

17

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

05.01.04.02.06

UNIÓN VIGA - VIGA TIPO I

UND

58.00

37.30

2,163.40

-

-

0.00%

-

-

0.00%

-

-

0.00%

58.00

2,163.40

100.00%

05.01.04.02.07

UNIÓN VIGA - VIGA TIPO II

UND

484.00

27.30

13,213.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

484.00

13,213.20

100.00%

05.01.04.02.08

FABRICACIÓN E INSTALACION DE SOPORTE S-01

UND

100.00

63.54

6,354.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

100.00

6,354.00

100.00%

05.01.04.02.09

FABRICACIÓN E INSTALACION DE SOPORTE S-02

UND

350.00

57.54

20,139.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

350.00

20,139.00

100.00%

05.01.04.02.10

FABRICACIÓN E INSTALACION DE SOPORTE S-03

UND

1,050.00

67.47

70,843.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

1,050.00

70,843.50

100.00%

05.01.04.02.11

FABRICACIÓN E INSTALACIÓN DE RIEL TIPO TUBULAR

M

17.83

70.29

1,253.27

-

-

0.00%

-

-

0.00%

-

-

0.00%

17.83

1,253.27

100.00%

05.01.04.02.12

FABRICACIÓN E INSTALACIÓN DE RIEL TIPO PLETINA

M

511.13

58.30

29,798.88

-

-

0.00%

-

-

0.00%

-

-

0.00%

511.13

29,798.88

100.00%

05.01.04.02.13

FABRICACIÓN E INSTALACIÓN DE CAMBIO DE LÍNEA

M

84.00

557.83

46,857.72

-

-

0.00%

-

-

0.00%

-

-

0.00%

84.00

46,857.72

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

05.02 05.02.01

ARQUITECTURA MUROS Y TABIQUES DE ALBAÑILERIA

05.02.01.01

MUROS DE LADRILLO KK DE CABEZA MEZCLA 1:5

m2

219.04

128.18

28,076.55

-

-

0.00%

219.04

28,076.55

100.00%

219.04

28,076.55

100.00%

05.02.01.02

MUROS DE LADRILLO KK DE SOGA MEZCLA 1:5

m2

368.27

79.68

29,343.75

-

-

0.00%

276.20

22,007.82

75.00%

276.20

22,007.82

75.00%

632.75

15,249.28

05.02.02

REVOQUES ENLUCIDOS Y MOLDURAS

-

-

-

0.00%

05.02.02.01

TARRAJEO EN MUROS INTERIORES C:A 1:4 E=1.5CM

m2

1,265.50

24.10

30,498.55

-

-

0.00%

05.02.02.02

TARRAJEO EN MUROS EXTERIORES C:A 1:4 E=1.5CM

m2

325.13

28.43

9,243.45

-

-

0.00%

05.02.02.03

VESTIDURA DE DERRAMES

m

238.14

16.50

3,929.31

-

-

0.00%

88.14

1,454.31

37.01%

88.14

1,454.31

05.02.02.04

BRUÑAS 1 cm

m

627.71

6.66

4,180.55

-

-

0.00%

27.71

184.55

4.41%

27.71

184.55

4.41%

-

-

0.00%

540.45

-

-

0.00%

05.02.03

PISOS Y PAVIMENTOS

-

05.02.03.01

CONTRAPISO E=40 mm

m2

05.02.03.02

PISO PORCELANATO ANTIDESLIZANTE 60x60cm

05.02.03.03

PISO T. INDUSTRIAL /C°-SEMIPULIDO C/VITRIFICANTE Y ENDURECEDOR C/VERDE PETROLEO

05.02.04 05.02.04.01 05.02.04.02 05.02.05 05.02.05.01 05.02.06

-

-

-

0.00% 50.00% 0.00%

632.75 -

15,249.28 -

0.00%

50.00%

0.00%

325.13

9,243.45

100.00%

37.01%

150.00

2,475.00

62.99%

600.00

3,996.00

95.59%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

m2

19.54

74.36

1,452.99

-

-

0.00%

-

-

0.00%

-

-

0.00%

M2

1,195.52

17.18

20,539.03

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

1,452.99

100.00%

20,539.03

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

467.53

8,111.65

100.00%

CONTRAZOCALO DE CEMENTO PULIDO H=20 CM

127.62

17.38

2,218.04

-

-

0.00%

-

-

0.00%

-

-

0.00%

127.62

2,218.04

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

m

ZOCALOS ZOCALO DE PORCELANATO

m2

716.58

85.19

61,045.45

-

-

0.00%

1,700.86

73.01

124,179.79

-

-

0.00%

REVESTIMIENTO

-

-

-

0.00%

-

-

0.00%

M2

35.10

510.82

17,929.78

-

-

0.00%

-

-

0.00%

-

-

0.00%

REVESTIMIENTO CON LAMINA ACRILICO TRANSPARENTE E=1/8" TIPO INDUSTRIAL

M2

1,320.40

510.82

674,486.73

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

05.02.09

19.54 1,195.52

-

REVESTIMIENTO CON POLICARBONATO TRASLUCIDO E = 8 mm

05.02.08.02

100.00%

8,111.65

05.02.06.03

05.02.08.01

0.00%

540.45

17.35

05.02.06.02

05.02.08

19.05

-

467.53

M2

05.02.07.02

-

CONTRAZOCALO SANITARIO DE CEMENTO PULIDO TIPO MEDIA CAÑA, CON BORDE DE PLATINAm

REVESTIMIENTO CON PLANCHAS DE ALUZING TIPO TR4 E=0.45mm

05.02.07.01

0.00%

15,249.27

05.02.06.01

05.02.07

-

0.00% 25.00%

632.75

28.37

-

-

7,335.93

50.00%

19.05

CONTRAZOCALOS

92.07

COBERTURAS

-

COBERTURA DE ALUZING TIPO TR3 E=0.45mm INC/ ACCESORIOS

M2

CUMBRERA DE ALUZING INC/ ACCESORIOS

M

1,495.84

70.87

106,010.18

154.04

48.34

7,446.29

CARPINTERIA DE MADERA

-

PUERTA MADERA (0.90X2.10) CONTRAP. C/ 1 HOJA BATIENTE. MADERA (MAD. CEDRO, FORRO MDF PLASTIFICADO 6MM) C/ VISOR DE VIDRIO 6mm Y REJILLA MAD.

m2

MARCO DE MADERA CEDRO 4"X 2"

m

1,185.02

83,982.37

1,275.65

93,134.84

75.00%

1,275.65

79.22%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

-

0.00%

1,185.02

93,134.84

83,982.37

75.00%

716.58 425.22

61,045.45 -

0.00% 100.00% 0.00%

31,044.95

25.00%

35.10

17,929.78

100.00%

1,320.40

674,486.73

100.00%

-

-

0.00%

79.22%

310.82

22,027.81

20.78%

-

0.00%

154.04

7,446.29

100.00%

-

0.00%

-

-

0.00%

3.78

704.09

2,661.46

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.78

2,661.46

100.00%

10.20

24.12

246.02

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.20

246.02

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

CARPINTERÍA METÁLICA

-

-

-

0.00%

05.02.09.01

PUERTA METALICA (1.50X2.10) CONTRAP C/ 2 HOJA BATIENTE C/VISOR DE VIDRIO DE 6 mm

und

11.00

1,732.50

19,057.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

11.00

19,057.50

100.00%

05.02.09.02

PUERTA METALICA (1.00X2.10) CONTRAP C/ 1 HOJA BATIENTE C/VISOR DE VIDRIO DE 6 mm

und

2.00

1,155.00

2,310.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

2,310.00

100.00%

05.02.09.03

PUERTA METALICA (0.80X2.10) CONTRAP C/ 1 HOJA BATIENTE

und

3.00

924.00

2,772.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

2,772.00

100.00%

05.02.09.04

PUERTA METALICA (2.00 X 2.25) ENROLLABLE INCL/ACCESORIOS

UND

8.00

3,600.00

28,800.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.00

28,800.00

100.00%

05.02.09.05

PUERTA METALICA (2.40 X 5.00) ENROLLABLE INCL/ACCESORIOS

UND

2.00

9,600.00

19,200.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

19,200.00

100.00%

05.02.09.06

PUERTA METALICA (2.00X2.10) CONTRAP C/ 2 HOJA CORREDIZA S/DINTEL

UND

1.00

2,310.00

2,310.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

2,310.00

100.00%

05.02.09.07

PUERTA METALICA (0.70X2.10) CONTRAP C/ 1 HOJA CORREDIZA C/DINTEL

und

1.00

808.50

808.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

808.50

100.00%

18

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

05.02.09.08

BARANDA FE. Ø 2 1/2" C/LARGUEROS DE FE. Ø 1 1/2" AMBOS E=3/16" C/PASAMANOS FE Ø 2" E=2mm EN RAMPA H=0.90

M

05.02.09.09

BARANDA FE. Ø 2.5" C/LARGUEROS DE FE. Ø 1.5" AMBOS E=3/16"C/PASAMANOS FE Ø 2.5" E=2mm EN RAMPA DE ACCESO H=0.90

M

05.02.09.10

ESTRUCTURA METÁLICA C/MALLA DE ACERO AL CARBON DE 3/4" N°9, CALIBRE 10

m2

05.02.09.11

PROTECTOR DE ESQUINA ANGULO 1 1/2"X 3/32

und

05.02.09.12

TAPAJUNTA DE ACERO INOXIDABLE 4"X 5/16"

m

05.02.10

P. U.

3.13

123.60

25.81 159.92

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

386.87

-

-

0.00%

-

-

0.00%

-

-

0.00%

123.60

3,190.12

-

-

0.00%

-

-

0.00%

-

-

0.00%

415.28

66,411.58

-

-

0.00%

-

-

0.00%

-

-

0.00%

114.00

35.29

4,023.06

-

-

0.00%

-

-

0.00%

-

-

0.00%

22.12

58.84

1,301.54

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

CARPINTERIA DE ALUMINIO

-

3.13

MONTO

%

386.87

100.00%

25.81

3,190.12

100.00%

159.92

66,411.58

100.00%

114.00

4,023.06

100.00%

22.12

1,301.54

100.00%

-

0.00%

05.02.10.01

VENTANA DE 2.82x1.10 C/ 1 HOJA PROYECTANTE C/1 HOJA FIJA EN CARP. DE ALUMINIO C/CRISTAL DE 6mm, TIPO V-1

m2

6.20

1,560.00

9,672.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.20

9,672.00

100.00%

05.02.10.02

VENTANA DE 1.20x1.10 C/ 1 HOJA PROYECTANTE C/1 HOJA FIJA EN CARP. DE ALUMINIO C/CRISTAL DE 6mm, TIPO V-3

m2

3.60

663.96

2,390.26

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.60

2,390.26

100.00%

05.02.10.03

VENTANA DE 1.00x1.30 C/ 1 HOJA FIJA EN CARP. DE ALUMINIO C/CRISTAL DE 6mm, TIPO V-5

m2

1.30

653.90

850.07

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.30

850.07

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

05.02.11

CERRAJERÍA

-

-

0.00%

05.02.11.01

CERRADURA TIPO A

UND

13.00

82.65

1,074.45

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.00

1,074.45

100.00%

05.02.11.02

CERRADURA TIPO B

UND

3.00

103.19

309.57

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

309.57

100.00%

05.02.11.03

CERRADURA TIPO E

UND

2.00

40.59

81.18

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

81.18

100.00%

05.02.11.04

CERRADURA TIPO G

UND

10.00

40.59

405.90

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.00

405.90

100.00%

05.02.11.05

BARRA ANTIPANICO DE PUERTAS DE EMERGENCIA

und

1.00

870.97

870.97

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

870.97

100.00%

05.02.11.06

TIRADORES DE ACERO INOXIDABLE DE 16"

PZA

27.00

89.25

2,409.75

-

-

0.00%

-

-

0.00%

-

-

0.00%

27.00

2,409.75

100.00%

05.02.11.07

BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 3"

und

81.00

22.53

1,824.93

-

-

0.00%

-

-

0.00%

-

-

0.00%

81.00

1,824.93

100.00%

05.02.11.08

FRENO HIDRÁULICO AEREO

UND

2.00

144.26

288.52

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

288.52

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

05.02.12

PINTURA

-

-

0.00%

05.02.12.01

PINTURA LATEX EN MUROS INTERIORES 2 MANOS

m2

1,265.50

16.42

20,779.51

-

-

0.00%

-

-

0.00%

-

-

0.00%

1,265.50

20,779.51

100.00%

05.02.12.02

PINTURA LATEX EN MUROS EXTERIORES 2 MANOS

m2

325.13

19.96

6,489.59

-

-

0.00%

-

-

0.00%

-

-

0.00%

325.13

6,489.59

100.00%

05.02.12.03

PINTURA LATEX EN VIGAS 2 MANOS

m2

238.14

20.09

4,784.23

-

-

0.00%

-

-

0.00%

-

-

0.00%

238.14

4,784.23

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

05.02.13

VARIOS

-

05.02.13.01

SELLADO DE JUNTAS DE CONSTRUCCION

M

05.02.13.02

SELLADOR PARA PORCELANATO

05.02.13.03

LIMPIEZA FINAL DE OBRA

05.03 05.03.01 05.03.01.01

-

-

0.00%

950.00

35.21

33,449.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

m2

751.18

17.47

13,123.11

-

-

0.00%

-

-

0.00%

-

-

m2

1,495.84

1.51

2,258.72

-

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

INSTALACIONES SANITARIAS SISTEMA DE AGUA FRÍA SALIDA DE AGUA FRÍA

950.00

33,449.50

100.00%

0.00%

751.18

13,123.11

100.00%

0.00%

1,495.84

2,258.72

100.00%

0.00%

05.03.01.01.01

SALIDA DE AGUA FRIA CON TUBO PVC TIPO ROSCA DE 1/2"

PTO

1.00

78.00

78.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

78.00

100.00%

05.03.01.01.02

SALIDA DE LINEA DE PRODUCCION (DETALLE 01)

PTO

17.00

138.44

2,353.48

-

-

0.00%

-

-

0.00%

-

-

0.00%

17.00

2,353.48

100.00%

05.03.01.01.03

SALIDA PARA LIMPIEZA (DETALLE 02)

PTO

19.00

184.99

3,514.81

-

-

0.00%

-

-

0.00%

-

-

0.00%

19.00

3,514.81

100.00%

05.03.01.01.04

SALIDA PARA LIMPIEZA EN MESA (DETALLE 03)

PTO

16.00

151.05

2,416.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

16.00

2,416.80

100.00%

05.03.01.01.05

SALIDA A DESINFECTADOR 3/4" (DETALLE 04)

PTO

4.00

169.13

676.52

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

676.52

100.00%

05.03.01.01.06

SALIDA A DESINFECTADOR 1" (DETALLE 05)

PTO

3.00

381.41

1,144.23

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

1,144.23

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

05.03.01.02

RED DE DISTRIBUCIÓN DE AGUA FRÍA_x000D_

-

-

0.00%

05.03.01.02.01

TUBERIA DE F°G° C-40 1/2"

m

13.25

89.15

1,181.24

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.25

1,181.24

100.00%

05.03.01.02.02

TUBERIA DE F°G° C-40 3/4"

m

150.80

73.56

11,092.85

-

-

0.00%

-

-

0.00%

-

-

0.00%

150.80

11,092.85

100.00%

05.03.01.02.03

TUBERIA DE F°G° C-40 1"

m

59.70

86.62

5,171.21

-

-

0.00%

-

-

0.00%

-

-

0.00%

59.70

5,171.21

100.00%

05.03.01.02.04

TUBERIA DE F°G° C-40 1 1/2"

m

52.50

94.77

4,975.43

-

-

0.00%

-

-

0.00%

-

-

0.00%

52.50

4,975.43

100.00%

05.03.01.02.05

TUBERIA DE F°G° C-40 2"

m

51.70

100.67

5,204.64

-

-

0.00%

-

-

0.00%

-

-

0.00%

51.70

5,204.64

100.00%

19

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

05.03.01.02.06

TUBERIA DE F°G° C-40 2 1/2"

m

6.20

119.35

739.97

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.20

739.97

100.00%

05.03.01.02.07

TUBERIA DE F°G° C-40 3"

m

28.05

126.47

3,547.48

-

-

0.00%

-

-

0.00%

-

-

0.00%

28.05

3,547.48

100.00%

05.03.01.02.08

TUBO PVC UF ISO 1452 PN10 DN 90 mm Inc. Anillo

m

13.60

53.11

722.30

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.60

722.30

100.00%

05.03.01.02.09

TUBO PVC CON UNION TIPO ROSCA DE 1/2" PN10

m

4.70

17.70

83.19

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.70

83.19

100.00%

05.03.01.02.10

TUBO PVC CON UNION TIPO ROSCA DE 1" PN10

m

10.00

24.34

243.40

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.00

243.40

100.00%

05.03.01.02.11

TUBO PVC CON UNION TIPO ROSCA DE 1 1/2" PN10

M

79.20

20.89

1,654.49

-

-

0.00%

-

-

0.00%

-

-

0.00%

79.20

1,654.49

100.00%

05.03.01.02.12

TUBO PVC CON UNION TIPO ROSCA DE 2" PN10

M

12.60

27.99

352.67

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.60

352.67

100.00%

05.03.01.02.13

PRUEBA HIDRÁULICA EN TUBERIAS Y DESINFECCION

M

403.10

1.83

737.67

-

-

0.00%

-

-

0.00%

-

-

0.00%

403.10

737.67

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

05.03.01.03

ACCESORIOS PARA REDES DE AGUA FRÍA

-

-

0.00%

05.03.01.03.01

CODO FºGº C-40 D= 3"

und

4.00

59.72

238.88

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

238.88

100.00%

05.03.01.03.02

CODO FºGº C-40 D= 1 1/2"

und

12.00

30.73

368.76

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.00

368.76

100.00%

05.03.01.03.03

CODO FºGº C-40 D= 1"

und

10.00

28.87

288.70

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.00

288.70

100.00%

05.03.01.03.04

CODO FºGº C-40 D= 3/4"

und

26.00

25.56

664.56

-

-

0.00%

-

-

0.00%

-

-

0.00%

26.00

664.56

100.00%

05.03.01.03.05

CODO FºGº C-40 D= 1/2"

und

3.00

25.56

76.68

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

76.68

100.00%

05.03.01.03.06

TEE F°G° C-40 D= 3"

und

5.00

72.26

361.30

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

361.30

100.00%

05.03.01.03.07

TEE F°G° C-40 D= 2 1/2"

und

3.00

59.72

179.16

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

179.16

100.00%

05.03.01.03.08

TEE F°G° C-40 D= 2"

und

16.00

87.03

1,392.48

-

-

0.00%

-

-

0.00%

-

-

0.00%

16.00

1,392.48

100.00%

05.03.01.03.09

TEE F°G° C-40 D= 1 1/2"

und

8.00

30.73

245.84

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.00

245.84

100.00%

05.03.01.03.10

TEE F°G° C-40 D= 1"

und

9.00

28.87

259.83

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.00

259.83

100.00%

05.03.01.03.11

TEE F°G° C-40 D= 3/4"

und

3.00

25.56

76.68

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

76.68

100.00%

05.03.01.03.12

REDUCCION F°G° C-40 3" @ 2"

und

2.00

76.72

153.44

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

153.44

100.00%

05.03.01.03.13

REDUCCION F°G° C-40 3" @ 1"

und

3.00

68.49

205.47

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

205.47

100.00%

05.03.01.03.14

REDUCCION F°G° C-40 2 1/2" @ 2"

und

4.00

68.51

274.04

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

274.04

100.00%

05.03.01.03.15

REDUCCION F°G° C-40 2 1/2" @ 1 1/2"

und

1.00

68.51

68.51

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

68.51

100.00%

05.03.01.03.16

REDUCCION F°G° C-40 2" @ 1"

und

3.00

39.97

119.91

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

119.91

100.00%

05.03.01.03.17

REDUCCION F°G° C-40 2" @ 3/4"

und

14.00

37.97

531.58

-

-

0.00%

-

-

0.00%

-

-

0.00%

14.00

531.58

100.00%

05.03.01.03.18

REDUCCION F°G° C-40 1 1/2" @ 1"

und

9.00

30.65

275.85

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.00

275.85

100.00%

05.03.01.03.19

REDUCCION F°G° C-40 1" @ 3/4"

und

12.00

30.65

367.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.00

367.80

100.00%

05.03.01.03.20

REDUCCION F°G° C-40 1" @ 1/2"

und

12.00

28.65

343.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.00

343.80

100.00%

05.03.01.03.21

REDUCCION F°G° C-40 3/4" @ 1/2"

und

3.00

28.56

85.68

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

85.68

100.00%

05.03.01.03.22

ADAPTADOR F°G° D= 3" A PVC UF ISO 4422 D= 90mm

und

2.00

64.81

129.62

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

129.62

100.00%

05.03.01.03.23

ADAPTADOR F°G° D= 2" A PVC UF ISO 4422 D= 90mm

und

1.00

59.32

59.32

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

59.32

100.00%

05.03.01.03.24

CODO 90° PVC UF ISO 1452 DE 90mm

UND

3.00

25.29

75.87

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

75.87

100.00%

05.03.01.03.25

CODO PVC TIPO ROSCA DE 1/2" 90°

und

2.00

11.50

23.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

23.00

100.00%

05.03.01.03.26

CODO PVC TIPO ROSCA DE 1" 90°

und

4.00

10.30

41.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

41.20

100.00%

05.03.01.03.27

CODO PVC TIPO ROSCA DE 1 1/2" 90°

und

10.00

20.44

204.40

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.00

204.40

100.00%

05.03.01.03.28

CODO PVC TIPO ROSCA DE 2" 90°

und

2.00

22.90

45.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

45.80

100.00%

05.03.01.03.29

TEE PVC UF ISO 1452 DN=90mm PN10

und

2.00

149.30

298.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

298.60

100.00%

05.03.01.03.30

TAPON HEMBRA F°G° C-40 3/4"

und

1.00

69.57

69.57

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

69.57

100.00%

05.03.01.03.31

TAPON HEMBRA F°G° C-40 2"

und

1.00

75.27

75.27

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

75.27

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

05.03.01.04

LLAVES Y VÁLVULAS

-

-

0.00%

05.03.01.04.01

VALVULA DE COMPUERTA DE BONCE 3''

und

1.00

653.22

653.22

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

653.22

100.00%

05.03.01.04.02

VALVULA DE COMPUERTA DE BRONCE 2"

UND

1.00

328.28

328.28

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

328.28

100.00%

05.03.01.04.03

VALVULA DE COMPUERTA DE BRONCE 1/2"

und

3.00

68.36

205.08

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

205.08

100.00%

20

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

05.03.01.04.04 05.03.01.05

NICHO Y TAPA PARA VALVULA EN PARED

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

UND

2.00

88.83

177.66

4.00

21.96

87.84

OTROS

-

MONTO

AVANCE ACTUAL %

METRADO

-

-

0.00%

-

-

-

0.00%

-

-

0.00%

-

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

05.03.01.05.01

MANGUERA FLEXIBLE ACERO INOXIDABLE 3/4"

und

05.03.01.05.02

MANGUERA FLEXIBLE ACERO INOXIDABLE 1"

und

3.00

81.36

244.08

-

-

0.00%

-

-

0.00%

-

-

0.00%

05.03.01.05.03

MANGUERA RETRACTIL EN ESPIRAL 3/4" CON ACCESORIOS

und

14.00

169.00

2,366.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

05.03.01.05.04

PISTOLA DE ASPERCIÓN

und

16.00

58.47

935.52

-

-

0.00%

-

-

0.00%

-

-

0.00%

05.03.01.05.05

ABRAZADERA DE SUJECIÓN 3"

UND

10.00

28.03

280.30

-

-

0.00%

-

-

0.00%

-

-

05.03.01.05.06

ABRAZADERA DE SUJECION 2 1/2"

UND

2.00

32.49

64.98

-

-

0.00%

-

-

0.00%

-

05.03.01.05.07

ABRAZADERA DE SUJECION 2"

UND

10.00

35.73

357.30

-

-

0.00%

-

-

0.00%

05.03.01.05.08

ABRAZADERA DE SUJECION 1 1/2"

UND

7.00

27.48

192.36

-

-

0.00%

-

-

05.03.01.05.09

ABRAZADERA DE SUJECION 1"

UND

19.00

27.48

522.12

-

-

0.00%

-

05.03.01.05.10

ABRAZADERA DE SUJECION 3/4"

UND

43.00

28.40

1,221.20

-

-

0.00%

05.03.01.05.11

COLGADOR LATERAL PARA TUB. 1 1/2"

und

12.00

35.91

430.92

-

-

0.00%

-

-

-

-

-

05.03.02 05.03.02.01

SISTEMA DE DESAGÜE Y VENTILACIÓN ACCESORIOS DE REDES DE DESAGÜE

05.03.02.01.01

TUBERIA PVC SAL 2" DESAGUE (ENTERRADA)

M

05.03.02.01.02

TUBERIA PVC SAL 4" DESAGUE (ENTERRADA)

05.03.02.01.03

TUBERIA PVC SAL 6" DESAGUE (ENTERRADA)

05.03.02.02

METRADO 2.00

MONTO

%

177.66 -

100.00% 0.00%

87.84

100.00%

3.00

244.08

100.00%

14.00

2,366.00

100.00%

16.00

935.52

100.00%

0.00%

10.00

280.30

100.00%

-

0.00%

2.00

64.98

100.00%

-

-

0.00%

10.00

357.30

100.00%

0.00%

-

-

0.00%

7.00

192.36

100.00%

-

0.00%

-

-

0.00%

19.00

522.12

100.00%

-

-

0.00%

-

-

0.00%

43.00

1,221.20

100.00%

-

-

0.00%

-

-

0.00%

12.00

430.92

100.00%

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

3.85

89.82

100.00%

0.00% 0.00%

3.85

23.33

89.82

-

-

0.00%

-

-

0.00%

-

-

0.00%

M

87.00

25.28

2,199.36

-

-

0.00%

-

-

0.00%

-

-

0.00%

87.00

2,199.36

100.00%

M

125.64

38.76

4,869.81

-

-

0.00%

-

-

0.00%

-

-

0.00%

125.64

4,869.81

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

ACCESORIOS DE REDES DE DESAGÜE

-

-

0.00%

05.03.02.02.01

CODO PVC SAP 2" x 45°

und

1.00

24.00

24.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

24.00

100.00%

05.03.02.02.02

CODO PVC SAP 4" x 45°

und

16.00

39.78

636.48

-

-

0.00%

-

-

0.00%

-

-

0.00%

16.00

636.48

100.00%

05.03.02.02.03

CODO PVC SAP 6" x 45°

und

8.00

42.81

342.48

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.00

342.48

100.00%

05.03.02.02.04

CODO PVC SAP 4" x 90°

pza

2.00

33.15

66.30

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

66.30

100.00%

05.03.02.02.05

YEE PVC 4"

und

7.00

26.66

186.62

-

-

0.00%

-

-

0.00%

-

-

0.00%

7.00

186.62

100.00%

05.03.02.02.06

YEE PVC 6"

pza

11.00

40.60

446.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

11.00

446.60

100.00%

05.03.02.02.07

YEE PVC 6"x4"

pza

14.00

32.75

458.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

14.00

458.50

100.00%

05.03.02.02.08

SUMIDERO DE BRONCE DE 4"

UND

3.00

87.66

262.98

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

262.98

100.00%

05.03.02.02.09

REGISTRO ROSCADO DE BRONCE 2"

UND

2.00

77.49

154.98

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

154.98

100.00%

05.03.02.02.10

REGISTRO ROSCADO DE BRONCE 4"

und

2.00

91.96

183.92

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

183.92

100.00%

05.03.02.02.11

REDUCCION PVC SAL 6" x 4"

und

3.00

30.93

92.79

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

92.79

100.00%

05.03.02.02.12

REDUCCION PVC SAL 4" x 2"

und

1.00

19.15

19.15

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

19.15

100.00%

05.03.02.02.13

CAJA SUMIDERO CON TRAMPA DE SOLIDOS

und

33.00

191.33

6,313.89

-

-

0.00%

-

-

0.00%

-

-

0.00%

33.00

6,313.89

100.00%

05.03.02.02.14

SUMIDERO LONGITUDINAL TIPO RIGOLA

und

227.53

555.64

126,424.77

-

-

0.00%

-

-

0.00%

-

-

0.00%

227.53

126,424.77

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

5.00

05.03.02.03 05.03.02.03.01 05.03.03 05.03.03.01

CAJAS DE REGISTRO CAJA DE REGISTRO 0.60x0.60m

UND

5.00

376.64

1,883.20

-

1,883.20

SISTEMA DE EVACUACIÓN DE AGUAS PLUVIALES

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

CANALETA Y MONTANTES PLUVIALES

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

05.03.03.01.01

CANALETA SEMICIRCULAR DE PLANCHA GALVANIZADA D=6" E=0.5 MM

M

05.03.03.01.02

SOPORTE DE F°G° DE 1"X3/8"

05.03.03.01.03

MONTANTE PVC SAL DESAGUE D=3''

05.03.03.01.04

0.00% 100.00% 0.00% 0.00%

192.50

57.32

11,034.10

-

-

0.00%

-

-

0.00%

-

-

0.00%

192.50

11,034.10

100.00%

UND

97.25

38.75

3,768.44

-

-

0.00%

-

-

0.00%

-

-

0.00%

97.25

3,768.44

100.00%

M

18.00

20.09

361.62

-

-

0.00%

-

-

0.00%

-

-

0.00%

18.00

361.62

100.00%

CODO PVC SAL 3"x45°

UND

12.00

20.46

245.52

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.00

245.52

100.00%

05.03.03.01.05

CODO PVC SAL 3"X90°

UND

11.00

16.06

176.66

-

-

0.00%

-

-

0.00%

-

-

0.00%

11.00

176.66

100.00%

05.03.03.01.06

ABRAZADERA DE SUJECIÓN 3"

UND

17.00

28.03

476.51

-

-

0.00%

-

-

0.00%

-

-

0.00%

17.00

476.51

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

05.03.03.02

COLUMNETA PROTECTORA DE CONCRETO

-

-

-

0.00%

21

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

05.03.03.02.01

ENCOFRADO Y DESENCOFRADO DE COLUMNETAS

m2

11.20

05.03.03.02.02

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

18.00

05.03.03.02.03

CONCRETO f´c= 175 kg/cm2 PARA COLUMNETAS

m3

10.14

05.03.03.02.04

TARRAJEO DE SUPERFICIES DE COLUMNAS E= 1.5 CM

m2

11.10

36.18

05.03.04

59.71

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

668.75

-

-

0.00%

-

-

0.00%

-

-

0.00%

11.20

5.06

91.08

-

-

0.00%

-

-

0.00%

-

-

0.00%

503.88

5,109.34

-

-

0.00%

-

-

0.00%

-

-

0.00%

401.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

APARATOS SANITARIOS Y ACCESORIOS

-

MONTO

%

668.75

100.00%

18.00

91.08

100.00%

10.14

5,109.34

100.00%

11.10

401.60

100.00%

-

0.00%

05.03.04.01

LAVATORIO CERAMICO VITRIFICANTE 45X60 CM S/PEDESTAL

UND

1.00

200.00

200.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

200.00

100.00%

05.03.04.02

LAVATORIO DE ACERO INOX 60X60X90 CM

und

1.00

219.00

219.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

219.00

100.00%

05.03.04.03

JABONERA CROMADA PARA JABON LIQUIDO

und

1.00

52.71

52.71

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

52.71

100.00%

05.03.04.04

COLOCACION DE APARATOS SANITARIOS

UND

2.00

137.46

274.92

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

274.92

100.00%

05.03.04.05

COLOCACION DE ACCESORIOS SANITARIOS

UND

1.00

33.81

33.81

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

33.81

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

05.04 05.04.01 05.04.01.01

INSTALACIONES ELECTRICAS INSTALACIONES ELECTRICAS SALIDAS

05.04.01.01.01

SALIDA PARA ALUMBRADO

und

05.04.01.01.02

SALIDA PARA CAJA DE PULSADORES/01 Salida

05.04.01.01.03

SALIDA PARA CAJA DE PULSADORES/02 Salida

05.04.01.01.04

0.00%

153.00

45.39

6,944.67

-

-

0.00%

-

-

0.00%

-

-

0.00%

153.00

6,944.67

100.00%

UND

21.00

61.94

1,300.74

-

-

0.00%

-

-

0.00%

-

-

0.00%

21.00

1,300.74

100.00%

UND

6.00

66.94

401.64

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

401.64

100.00%

SALIDA PARA CAJA DE PULSADORES/03 Salida

UND

2.00

76.94

153.88

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

153.88

100.00%

05.04.01.01.05

SALIDA PARA TOMACORRIENTE

und

10.00

44.81

448.10

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.00

448.10

100.00%

05.04.01.01.06

SALIDA PARA FUERZA

und

14.00

68.61

960.54

-

-

0.00%

-

-

0.00%

-

-

0.00%

14.00

960.54

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

05.04.01.02

TUBERIAS

-

-

-

0.00%

05.04.01.02.01

TUBO CONDUIT DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

426.00

104.77

44,632.02

-

-

0.00%

-

-

0.00%

-

-

0.00%

426.00

44,632.02

100.00%

05.04.01.02.02

CURVA CONDUIT DE 90° DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

364.00

13.59

4,946.76

-

-

0.00%

-

-

0.00%

-

-

0.00%

364.00

4,946.76

100.00%

05.04.01.02.03

UNIÓN CONDUIT EMT DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

306.00

9.60

2,937.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

306.00

2,937.60

100.00%

05.04.01.02.04

TERMINAL CONDUIT EMT DE ACERO GALVANIZADO 20 mm ? (3/4")

und

428.00

14.69

6,287.32

-

-

0.00%

-

-

0.00%

-

-

0.00%

428.00

6,287.32

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

05.04.01.03 05.04.01.03.01 05.04.01.03.02 05.04.01.04

CONDUCTORES

-

-

-

0.00%

CABLE NH80 2.5mm2

m

6,000.00

2.10

12,600.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

6,000.00

12,600.00

100.00%

CABLE NH80 4.0mm2

m

1,100.00

2.45

2,695.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1,100.00

2,695.00

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

ARTEFACTOS DE ILUMINACION

-

-

-

0.00%

05.04.01.04.01

Luminaria para suspender tipo reflector campana de 70W, luz blanca, incluye accesorios de instalacion.

und

107.00

295.26

31,592.82

-

-

0.00%

26.75

7,898.21

25.00%

26.75

7,898.21

25.00%

80.25

23,694.61

75.00%

05.04.01.04.02

Luminaria para suspender tipo reflector campana de 150W, luz blanca

und

26.00

518.76

13,487.76

-

-

0.00%

6.50

3,371.94

25.00%

6.50

3,371.94

25.00%

19.50

10,115.82

75.00%

05.04.01.04.03

Luminaria para suspender tipo hermetico lineal, lámpara fluoresfente T5 de 1x28W

und

10.00

255.06

2,550.60

-

-

0.00%

2.50

637.65

25.00%

2.50

637.65

25.00%

7.50

1,912.95

75.00%

05.04.01.04.04

Luz de emergencia

und

10.00

303.26

3,032.60

-

-

0.00%

2.50

758.15

25.00%

2.50

758.15

25.00%

7.50

2,274.45

75.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

05.04.01.05

INTERRUPTORES

-

-

0.00%

05.04.01.05.01

Pulsadores con control Simple

und

11.00

82.47

907.17

-

-

0.00%

-

-

0.00%

-

-

0.00%

11.00

907.17

100.00%

05.04.01.05.02

Pulsadores con control Doble

und

2.00

163.47

326.94

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

326.94

100.00%

05.04.01.05.03

Pulsadores con control Triple

und

2.00

146.47

292.94

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

292.94

100.00%

05.04.01.05.04

Pulsadores con control Conmutado Simple

und

10.00

202.47

2,024.70

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.00

2,024.70

100.00%

05.04.01.05.05

Pulsadores con control Conmutado Doble

und

4.00

232.47

929.88

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

929.88

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

05.04.01.06

TOMACORRIENTES

-

-

0.00%

05.04.01.06.01

Tomacorriente doble con puesta a tierra 250 V.

und

10.00

34.32

343.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.00

343.20

100.00%

05.04.01.06.02

Tomacorriente Industrial en caja, para montar sobre panel, 50A, 3?.

und

14.00

60.50

847.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

14.00

847.00

100.00%

05.04.01.06.03

Tomacorriente Simple con puesta a tierra 250 V

und

10.00

34.32

343.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.00

343.20

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

26.32%

5.00

05.04.01.07 05.04.01.07.01

CAJAS DE PASO CAJA DE PASO DE 100 X 100 X 50 mm

und

19.00

73.96

1,405.24

5.00

369.80

369.80

26.32%

14.00

1,035.44

0.00% 73.68%

22

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

05.04.01.07.02 05.04.02 05.04.02.01

CAJA DE PASO DE 150 X 150 X 75 mm

und

3.00

P. U. 71.16

AVANCE ANTERIOR

P. TOTAL

METRADO

213.48

MONTO

AVANCE ACTUAL %

-

-

0.00%

METRADO 1.00

MONTO

AVANCE ACUMULADO %

71.16

METRADO

33.33%

1.00

MONTO

SALDO %

71.16

METRADO

33.33%

2.00

MONTO

%

142.32

INSTALACIONES DE SISTEMAS INDUSTRIALES

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

BANDEJAS ELECTRICAS DE 300x100mm

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

66.67% 0.00% 0.00%

05.04.02.01.01

BANDEJAS ELECTRICAS

und

70.00

88.66

6,206.20

-

-

0.00%

17.50

1,551.55

25.00%

17.50

1,551.55

25.00%

52.50

4,654.65

75.00%

05.04.02.01.02

Accesorios

UND

70.00

397.22

27,805.40

-

-

0.00%

17.50

6,951.35

25.00%

17.50

6,951.35

25.00%

52.50

20,854.05

75.00%

05.04.02.01.03

SOPORTE DE BANDEJA

und

70.00

493.32

34,532.40

-

-

0.00%

17.50

8,633.10

25.00%

17.50

8,633.10

25.00%

52.50

25,899.30

75.00%

05.04.02.01.04

Soportes de Distanciador para fijar en pared

und

70.00

222.50

15,575.00

-

-

0.00%

17.50

3,893.75

25.00%

17.50

3,893.75

25.00%

52.50

11,681.25

75.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

05.04.03 05.04.03.01

INSTALACIONES DE COMUNICACIONES SALIDAS

05.04.03.01.01

SALIDA PARA FLASHER LUMINOSO Y PULSADOR (LUZ PILOTO)

UND

05.04.03.01.02

SALIDA PARA DETECTOR DE HUMO

05.04.03.01.03

SALIDA PARA DETECTOR DE TEMPERATURA

05.04.03.01.04

0.00% 0.00%

6.00

79.51

477.06

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

477.06

100.00%

und

11.00

88.41

972.51

-

-

0.00%

-

-

0.00%

-

-

0.00%

11.00

972.51

100.00%

und

7.00

88.41

618.87

-

-

0.00%

-

-

0.00%

-

-

0.00%

7.00

618.87

100.00%

SALIDA PARA SIRENA

und

3.00

97.80

293.40

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

293.40

100.00%

05.04.03.01.05

SALIDA PARA CENTRAL DE ALARMAS Y KEYPAD

und

1.00

97.80

97.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

97.80

100.00%

05.04.03.01.06

SALIDA PARA CAMARAS UNIDIRECIONALES

und

6.00

79.51

477.06

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

477.06

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

05.04.03.02

ARTEFACTOS DE COMUNICACIÓN

-

-

0.00%

05.04.03.02.01

FLASHER LUMINOSO Y PULSADOR (LUZ PILOTO)

und

6.00

138.57

831.42

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

831.42

100.00%

05.04.03.02.02

DETECTOR DE HUMO

und

11.00

300.27

3,302.97

-

-

0.00%

-

-

0.00%

-

-

0.00%

11.00

3,302.97

100.00%

05.04.03.02.03

DETECTOR DE TEMPERATURA

und

7.00

194.37

1,360.59

-

-

0.00%

-

-

0.00%

-

-

0.00%

7.00

1,360.59

100.00%

05.04.03.02.04

SIRENA

und

3.00

175.17

525.51

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

525.51

100.00%

05.04.03.02.05

CENTRAL DE ALARMAS Y KEYPAD

und

1.00

1,669.83

1,669.83

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

1,669.83

100.00%

05.04.03.02.06

CAMARAS UNIDIRECIONALES

und

6.00

359.79

2,158.74

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

2,158.74

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

05.04.03.03

TUBERIAS

-

-

0.00%

05.04.03.03.01

TUBO CONDUIT DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

50.00

104.77

5,238.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

50.00

5,238.50

100.00%

05.04.03.03.02

CURVA CONDUIT DE 90° DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

70.00

13.59

951.30

-

-

0.00%

-

-

0.00%

-

-

0.00%

70.00

951.30

100.00%

05.04.03.03.03

UNIÓN CONDUIT EMT DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

70.00

9.60

672.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

70.00

672.00

100.00%

05.04.03.03.04

TERMINAL CONDUIT EMT DE ACERO GALVANIZADO 20 mm ? (3/4")

und

70.00

14.69

1,028.30

-

-

0.00%

-

-

0.00%

-

-

0.00%

70.00

1,028.30

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

05.04.03.04 05.04.03.04.01 05.04.03.04.02 05.05 05.05.01

CONDUCTORES

-

-

-

0.00%

CABLE UTP CATEGORIA 6

m

500.00

3.08

1,540.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

500.00

1,540.00

100.00%

CABLE CONTRA INCENDIO FPL 4X18 AWG

m

800.00

3.09

2,472.00

-

800.00

2,472.00

100.00%

INSTALACIONES MECANICAS_x000D_ AIRE COMPRIMIDO

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00% 0.00%

05.05.01.01

SUMINISTRO E INSTALACION DE EQUIPOS DE AIRE COMPRIMIDO

und

1.00

237,879.03

237,879.03

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

237,879.03

100.00%

05.05.01.02

VALVULA DE ESFERA DE 2 1/2"

und

2.00

669.22

1,338.44

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

1,338.44

100.00%

05.05.01.03

VALVULA CHECK DE BRONCE 2 1/2" (F°G°)

und

5.00

291.13

1,455.65

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

1,455.65

100.00%

05.05.01.04

TUBERIAS PARA AIRE, ASTM A53-SCH 40, DE 2 1/2"

m

35.90

100.44

3,605.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

35.90

3,605.80

100.00%

05.05.01.05

TUBERIAS PARA AIRE, ASTM A53-SCH 40, DE 2"

m

38.30

71.64

2,743.81

-

-

0.00%

-

-

0.00%

-

-

0.00%

38.30

2,743.81

100.00%

05.05.01.06

TUBERIAS PARA AIRE, ASTM A53-SCH 40, DE 1"

m

31.50

46.51

1,465.07

-

-

0.00%

-

-

0.00%

-

-

0.00%

31.50

1,465.07

100.00%

05.05.01.07

TUBERIAS PARA AIRE, ASTM A53-SCH 40, DE 1/2"

m

43.00

40.60

1,745.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

43.00

1,745.80

100.00%

05.05.01.08

TEE REDUCTORA , DE 2" A 1/2"

und

8.00

48.36

386.88

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.00

386.88

100.00%

05.05.01.09

TEE REDUCTORA , DE 1" A 1/2"

und

3.00

57.84

173.52

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

173.52

100.00%

05.05.01.10

FLETE DE ACCESORIOS DE AIRE COMPRIMIDO

und

1.00

2,000.00

2,000.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

2,000.00

100.00%

05.05.01.11

UNION ROSCADA DE 2,1/2"

und

12.00

51.54

618.48

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.00

618.48

100.00%

05.05.01.12

CODO FºGº C-40 D= 2 1/2"

und

8.00

35.31

282.48

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.00

282.48

100.00%

23

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

05.05.01.13

CODO FºGº C-40 D= 1"

und

6.00

28.87

05.05.01.14

CODO FºGº C-40 D= 1/2"

und

2.00

05.05.01.15

TEE F°G° C-40 D= 2 1/2"

und

4.00

05.05.02 05.05.02.01

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

%

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

25.56

51.12

-

-

0.00%

-

-

0.00%

-

-

0.00%

59.72

238.88

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

INSTALACION DE SISTEMA DE VAPOR SUMINISTRO E INSTALACIONES DE CALDEROS

173.22

100.00%

2.00

51.12

100.00%

4.00

238.88

100.00%

05.05.02.01.01

CALDERA Y EQUIPAMENTO

und

1.00

163,350.00

163,350.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

05.05.02.01.02

DUCTO DE SALIDA GASES O CHIMENEA

und

1.00

11,682.00

11,682.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

05.05.02.01.03

ABLANDADOR DE AGUA

und

1.00

23,840.00

23,840.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

05.05.02.01.04

TANQUE DE CONDENSADO

und

1.00

8,370.00

8,370.00

-

-

0.00%

-

-

0.00%

-

-

05.05.02.01.05

TANQUE DE PURGAS

und

1.00

7,804.00

7,804.00

-

-

0.00%

-

-

0.00%

-

05.05.02.01.06

SISTEMA DE DOSIFICADOR DE PRODUCTOS QUIMICOS

und

1.00

4,533.00

4,533.00

-

-

0.00%

-

-

0.00%

05.05.02.01.07

INSTALACION DE CALDERO EN CADA DE FUERZA

und

1.00

92,678.00

92,678.00

-

-

0.00%

-

-

-

-

0.00%

05.05.02.02

MONTO

173.22

TUBERIAS DE CONSUMO DE VAPOR

-

0.00% 0.00%

163,350.00

100.00%

1.00

11,682.00

100.00%

1.00

23,840.00

100.00%

0.00%

1.00

8,370.00

100.00%

-

0.00%

1.00

7,804.00

100.00%

-

-

0.00%

1.00

4,533.00

100.00%

0.00%

-

-

0.00%

1.00

92,678.00

100.00%

-

0.00%

-

-

0.00%

-

-

0.00%

05.05.02.02.01

TUBERIAS DE SCH 40 DE 1/2"

m

30.00

20.71

621.30

-

-

0.00%

-

-

0.00%

-

-

0.00%

30.00

621.30

100.00%

05.05.02.02.02

AISLAMIENTO DE TUBERIAS SCH40, DE 1/2"

m

30.00

199.06

5,971.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

30.00

5,971.80

100.00%

05.05.02.02.03

TUBERIAS DE SCH 40 DE 1 1/4"

m

64.40

27.97

1,801.27

-

-

0.00%

-

-

0.00%

-

-

0.00%

64.40

1,801.27

100.00%

05.05.02.02.04

AISLAMIENTO DE TUBERIAS SCH40, DE 1 1/4"

m

64.40

195.19

12,570.24

-

-

0.00%

-

-

0.00%

-

-

0.00%

64.40

12,570.24

100.00%

05.05.02.02.05

TUBERIAS DE SCH 40 DE 2"

m

9.50

36.38

345.61

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.50

345.61

100.00%

05.05.02.02.06

AISLAMIENTO DE TUBERIAS SCH40, DE 2"

m

9.50

199.06

1,891.07

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.50

1,891.07

100.00%

05.05.02.02.07

TUBERIAS DE SCH 40 DE 2 1/2"

m

32.60

51.98

1,694.55

-

-

0.00%

-

-

0.00%

-

-

0.00%

32.60

1,694.55

100.00%

05.05.02.02.08

AISLAMIENTO DE TUBERIAS SCH40, DE 2 1/2"

m

32.60

199.20

6,493.92

-

-

0.00%

-

-

0.00%

-

-

0.00%

32.60

6,493.92

100.00%

05.05.02.02.09

INSTALACION DE MANIFOLD DE VAPOR

UND

1.00

822.00

822.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

822.00

100.00%

05.05.02.02.10

AISLAMIENTO DE INSTALACION DE MANIFOLD DE VAPOR

UND

1.00

355.26

355.26

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

355.26

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

3.00

110.46

100.00%

05.05.02.03

ACCESORIOS PARA SISTEMA DE VAPOR

-

05.05.02.03.01

CODO DE SCH40 DE 1/2"

und

05.05.02.03.02

AISLAMIENTO DE CODO SCH40, DE 1/2"

05.05.02.03.03

CODO DE SCH40 DE 1 1/4"

05.05.02.03.04

-

0.00%

3.00

36.82

110.46

-

-

0.00%

-

-

0.00%

-

-

0.00%

und

3.00

89.34

268.02

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

268.02

100.00%

und

12.00

82.26

987.12

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.00

987.12

100.00%

AISLAMIENTO DE CODO SCH40, DE 1 1/4"

und

12.00

110.83

1,329.96

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.00

1,329.96

100.00%

05.05.02.03.05

CODO DE SCH40 DE 2"

und

4.00

79.86

319.44

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

319.44

100.00%

05.05.02.03.06

AISLAMIENTO DE CODO SCH40, DE 2"

und

4.00

116.18

464.72

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

464.72

100.00%

05.05.02.03.07

CODO DE SCH40 DE 2 1/2"

und

4.00

90.88

363.52

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

363.52

100.00%

05.05.02.03.08

AISLAMIENTO DE CODO SCH40, DE 2 1/2"

und

4.00

116.18

464.72

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

464.72

100.00%

05.05.02.03.09

TEE DE SCH40 DE 1 1/4"

und

1.00

156.76

156.76

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

156.76

100.00%

05.05.02.03.10

AISLAMIENTO DE TEE SCH40, DE 1 1/4"

und

1.00

157.88

157.88

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

157.88

100.00%

05.05.02.03.11

TEE DE SCH40 DE 2 1/2"

und

2.00

141.08

282.16

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

282.16

100.00%

05.05.02.03.12

AISLAMIENTO DE TEE SCH40, DE 2 1/2"

und

2.00

157.88

315.76

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

315.76

100.00%

05.05.02.03.13

REDUCCION DE SCH40 DE 2 1/2" A 1 1/4"

und

2.00

70.28

140.56

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

140.56

100.00%

05.05.02.03.14

AISLAMIENTO DE REDUCCION DE SCH40, DE 2 1/2" A 1 1/4"

und

2.00

49.89

99.78

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

99.78

100.00%

05.05.02.03.15

REDUCCION DE SCH40 DE 2 1/2" A 2"

und

1.00

75.28

75.28

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

75.28

100.00%

05.05.02.03.16

AISLAMIENTO DE REDUCCION DE SCH40, DE 2 1/2" A 2"

und

1.00

49.89

49.89

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

49.89

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

393.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

05.05.02.04

VALVULAS PARA SISTEMA DE VAPOR

-

05.05.02.04.01

VALVULA DE GLOBO DE 1/2"

und

2.00

196.80

05.05.02.04.02

AISLAMIENTO DE VALVULA GLOBO DE 1/2"

und

2.00

54.57

109.14

-

-

0.00%

-

-

0.00%

-

-

0.00%

05.05.02.04.03

VALVULA DE GLOBO DE 1 1/4"

und

4.00

474.28

1,897.12

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

393.60

100.00%

2.00

109.14

100.00%

4.00

1,897.12

100.00%

24

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

05.05.02.04.04

AISLAMIENTO DE VALVULA DE GLOBO DE 1 1/4"

und

4.00

69.60

278.40

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

278.40

100.00%

05.05.02.04.05

VALVULA DE GLOBO DE 2"

und

4.00

875.35

3,501.40

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

3,501.40

100.00%

05.05.02.04.06

AISLAMIENTO DE VALVULA DE GLOBO DE 2"

und

4.00

73.17

292.68

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

292.68

100.00%

05.05.02.04.07

VALVULA DE GLOBO DE 2 1/2"

und

1.00

1,018.24

1,018.24

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

1,018.24

100.00%

05.05.02.04.08

AISLAMIENTO DE VALVULA DE GLOBO DE 2 1/2"

und

1.00

73.17

73.17

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

73.17

100.00%

05.05.02.04.09

VALVULA CHECK DE BRONCE 2" (F°G°)

und

2.00

248.42

496.84

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

496.84

100.00%

05.05.02.04.10

AISLAMIENTO DE VALVULA CHECK DE 2"

und

2.00

62.06

124.12

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

124.12

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

5.00

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

2.00

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

05.05.02.05 05.05.02.05.01 05.05.02.06 05.05.02.06.01 05.05.02.07 05.05.02.07.01 05.05.03 05.05.03.01 05.05.03.01.01 05.05.03.01.02 05.05.03.02

PAQUETE PURGA PARA SISTEMA DE VAPOR PAQUETE DE PURGA PARA SISTEMA DE VAPOR

und

5.00

681.42

3,407.10

und

1.00

669.65

669.65

und

2.00

242.19

484.38

SEPARADOR DE GOTAS PARA SISTEMA DE VAPOR SEPARADOR DE GOTAS PARA SISTEMA DE VAPOR

-

ELIMINACION DE AIRE PARA SISTEMA DE VAPOR ELIMINACION DE AIRE PARA SISTEMA DE VAPOR

-

INSTALACION DE SISTEMA DE GAS SUMINISTRO DE EQUIPOS DE GLP_x000D_

-

-

-

3,407.10 669.65 484.38

0.00% 100.00% 0.00% 100.00% 0.00% 100.00% 0.00% 0.00%

SUMINISTRO DE EQUIPOS DE GLP

und

2.00

6,261.38

12,522.76

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

12,522.76

100.00%

TRASLADO Y MONTAJE DE TANQUES

vje

2.00

2,496.29

4,992.58

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

4,992.58

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

INSTALACION DE ACCESORIOS y CONEXION A TANQUES DE ALMACENAMIENTO

-

-

0.00%

05.05.03.02.01

SUMINISTRO E INSTALACION DE REGULADOR DE PRIMERA ETAPA

und

1.00

430.87

430.87

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

430.87

100.00%

05.05.03.02.02

SUMINISTRO E INSTALACION DE MANOMETRO

und

2.00

131.74

263.48

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

263.48

100.00%

05.05.03.02.03

INTERCONEXION DE TANQUES A VAPOR

und

1.00

387.54

387.54

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

387.54

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

05.05.03.03

TUBERIA DE CONSUMO DE GLP

-

-

0.00%

05.05.03.03.01

TUBERIA DE COBRE DE 1/2"

m

1.40

32.72

45.81

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.40

45.81

100.00%

05.05.03.03.02

TUBERIA DE COBRE DE 3/4"

m

12.50

43.64

545.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.50

545.50

100.00%

05.05.03.03.03

TUBERIA DE COBRE DE 1"

m

1.50

59.77

89.66

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.50

89.66

100.00%

05.05.03.03.04

TUBERIA DE COBRE DE 1 1/2"

m

5.15

80.82

416.22

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.15

416.22

100.00%

05.05.03.03.05

TUBERIA DE COBRE DE 2"

m

10.00

121.85

1,218.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.00

1,218.50

100.00%

05.05.03.03.06

TUBERIA DE COBRE DE 1/2" (ENTERRADA)

m

2.50

36.09

90.23

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.50

90.23

100.00%

05.05.03.03.07

TUBERIA DE COBRE DE 1" (ENTERRADA)

m

58.00

62.06

3,599.48

-

-

0.00%

-

-

0.00%

-

-

0.00%

58.00

3,599.48

100.00%

05.05.03.03.08

TUBERIA DE COBRE DE 1 1/2" (ENTERRADA)

m

54.00

83.80

4,525.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

54.00

4,525.20

100.00%

05.05.03.03.09

SUMINISTRO DE ACCESORIOS DE COBRE

jgo

1.00

1,173.06

1,173.06

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

1,173.06

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

05.05.03.04

SUMINISTRO e INSTALACION DE REGULADOR DE 2° ETAPA

-

-

0.00%

05.05.03.04.01

SUMINISTRO E INSTALACION DE REGULADOR DE SEGUNDA ETAPA

und

3.00

754.23

2,262.69

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

2,262.69

100.00%

05.05.03.04.02

SUMINISTRO E INSTALACION DE MANOMETRO DE BAJA PRESION

und

3.00

246.85

740.55

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

740.55

100.00%

05.05.03.04.03

SUMINISTRO E INSTALACION DE LINEA DE VENTEO

und

3.00

244.53

733.59

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

733.59

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

05.05.03.05 05.05.03.05.01

06 06.01 06.01.01 06.01.01.01

PRUEBAS DE HERMETICIDAD PRUEBAS DE HERMETICIDAD LINEAS DE CONSUMO Y VENTEO

und

1.00

5,918.35

CONSTRUCCION DE SERVICIOS COMPLEMENTARIOS

5,918.35

765,266.25

-

66,818.48

91,282.34

158,100.82

5,918.35

0.00% 100.00%

607,165.43

CUARTO DE MAQUINAS ESTRUCTURAS MOVIMIENTO DE TIERRAS

06.01.01.01.01

EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS EN TERRENO NORMAL

m3

65.49

50.57

3,311.83

06.01.01.01.02

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

17.86

33.75

602.78

65.49 -

3,311.83 -

100.00%

-

-

0.00%

0.00%

-

-

0.00%

65.49 -

3,311.83 -

100.00% 0.00%

17.86

602.78

0.00% 100.00%

25

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

06.01.01.01.03

NIVELACION INTERIOR Y COMPACTADO C/EQUPO.

m2

122.63

8.85

1,085.28

06.01.01.01.04

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

54.77

25.29

1,385.13

54.77

06.01.01.01.05

ELIMINACION DE MATERIAL EXCEDENTE D = 2 Km

m3

54.77

13.93

762.95

54.77

06.01.01.02 06.01.01.02.01 06.01.01.03 06.01.01.03.01

OBRAS DE CONCRETO SIMPLE CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS

m3

SOBRECIMIENTO ARMADO ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

06.01.01.03.01.02

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

m2

06.01.01.03.01.03

CONCRETO f´c= 210 kg/cm2 PARA SOBRECIMIENTOS

06.01.01.03.01.04

CURADO DE CONCRETO

ENCOFRADO Y DESENCOFRADO DE VIGAS

m2

06.01.01.03.03.03

CONCRETO f´c= 210kg/cm2 PARA VIGAS

m3

06.01.01.03.03.04

CURADO DE CONCRETO

m2

06.01.01.04 06.01.01.04.01

06.01.02 06.01.02.01 06.01.02.01.01 06.01.02.02

0.00%

0.00%

-

-

-

0.00%

-

29.54

6,086.13

62.02%

18.09

3,727.08

0.00% 37.98%

0.00%

-

-

0.00%

0.00%

-

-

0.00%

96.15%

8.00

40.48

3.85%

57.66

2,832.84

100.00%

200.00

1,012.00

96.15%

-

-

0.00%

200.00

1,012.00

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

7.21

3,244.86

100.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

57.66

111.28

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

658.00

3,329.48

100.00%

84.21

59.71

5,028.18

-

-

0.00%

-

-

0.00%

-

-

0.00%

84.21

5,028.18

100.00%

6.73

557.01

3,748.68

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.73

3,748.68

100.00%

84.21

1.93

162.53

-

-

0.00%

-

-

0.00%

-

-

0.00%

84.21

162.53

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

422.00

-

-

0.00%

5.06

2,135.32

-

-

0.00%

-

-

0.00%

-

-

0.00%

422.00

2,135.32

100.00%

54.41

74.12

4,032.87

-

-

0.00%

-

-

0.00%

-

-

0.00%

54.41

4,032.87

100.00%

6.80

557.01

3,787.67

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.80

3,787.67

100.00%

54.41

1.93

105.01

-

-

0.00%

-

-

0.00%

-

-

0.00%

54.41

105.01

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

15.00

18.36

TIJERALES METALICOS

06.01.01.04.01.02

0.00%

-

-

ESTRUCTURA METALICA

06.01.01.04.01.01

0.00%

-

-

und

-

-

3,329.48

VARIOS PRUEBAS DE CONTROL DE CALIDAD DEL CONCRETO

-

100.00%

-

-

06.01.01.03.03.02

100.00%

762.95

5.06

VIGAS kg

1,385.13

54.77

-

-

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

54.77

0.00%

-

111.28

06.01.01.03.03.01

0.00%

-

0.00%

3,244.86

m2

-

-

0.00%

1.93

CURADO DE CONCRETO

-

100.00%

-

450.05

06.01.01.03.02.04

100.00%

762.95

62.02%

100.00%

-

7.21

m3

1,385.13

6,086.13

1,085.28

0.00%

57.66

m2

0.00%

-

122.63

%

-

-

0.00%

MONTO

-

0.00%

-

METRADO

0.00%

m2

CONCRETO f´c= 210 kg/cm2 PARA COLUMNAS

SALDO %

0.00%

-

-

MONTO

-

m3

ENCOFRADO Y DESENCOFRADO DE COLUMNAS

METRADO

-

-

06.01.01.03.02.03

AVANCE ACUMULADO %

-

2,832.84

06.01.01.03.02.02

MONTO

-

49.13

658.00

-

METRADO

-

57.66

kg

AVANCE ACTUAL %

-

1,052.48

COLUMNAS

06.01.01.03.04.01

29.54

5.06

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

06.01.01.03.04

9,813.21

-

208.00

06.01.01.03.02.01

06.01.01.03.03

206.03

OBRAS DE CONCRETO ARMADO

06.01.01.03.01.01

06.01.01.03.02

47.63

-

MONTO

275.40

-

15.00

275.40

0.00% 100.00% 0.00% 0.00%

CARPINTERIA METALICA

KG

1,377.33

11.09

15,274.59

-

-

0.00%

-

-

0.00%

-

-

0.00%

1,377.33

15,274.59

100.00%

MONTAJE ESTRUCTURA METALICAS

KG

1,377.33

3.14

4,324.82

-

1,377.33

4,324.82

100.00%

ARQUITECTURA MUROS Y TABIQUES DE ALBALIÑERIA MUROS DE LADRILLO KK DE CABEZA MEZCLA 1:5

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

m2

128.66

128.18

16,491.64

REVOQUES ENLUCIDOS Y MOLDURAS

-

-

128.66

-

-

0.00%

-

0.00%

-

-

0.00%

TARRAJEO EN MUROS INTERIORES C:A 1:4 E=1.5CM

m2

167.00

24.10

4,024.70

-

-

0.00%

-

-

0.00%

-

-

0.00%

167.00

4,024.70

100.00%

06.01.02.02.02

TARRAJEO EN MUROS EXTERIORES C:A 1:4 E=1.5CM

m2

202.92

28.43

5,769.02

-

-

0.00%

-

-

0.00%

-

-

0.00%

202.92

5,769.02

100.00%

06.01.02.02.03

VESTIDURA DE DERRAMES

m

36.80

16.50

607.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

36.80

607.20

100.00%

06.01.02.02.04

BRUÑAS 1 cm

m

56.00

6.66

372.96

-

-

0.00%

-

-

0.00%

-

-

0.00%

56.00

372.96

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

06.01.02.03.01 06.01.02.04 06.01.02.04.01 06.01.02.04.02 06.01.02.05 06.01.02.05.01 06.01.02.06 06.01.02.06.01

CIELORRASOS FALSO CIELO RASO CON PLANCHA DE FIBROCEMENTO 8MM C/PINT. LATEX

-

-

-

0.00% 100.00%

06.01.02.02.01

06.01.02.03

-

16,491.64

0.00%

-

0.00%

0.00%

M2

144.47

87.64

12,661.35

-

-

0.00%

-

0.00%

-

-

0.00%

CONTRAPISO E=40 mm

m2

107.96

28.37

3,062.83

-

-

0.00%

-

-

0.00%

-

-

0.00%

107.96

3,062.83

100.00%

PISO DE CEMENTO PULIDO Y BRUÑADO, MEZC. C:A 1:4 CON ENDURECEDOR, e=2"

m2

107.96

23.18

2,502.51

-

-

0.00%

-

-

0.00%

-

-

0.00%

107.96

2,502.51

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

0.00%

-

0.00%

PISOS Y PAVIMENTOS

-

CONTRAZOCALOS CONTRAZOCALO DE CEMENTO PULIDO H=10 CM

m

41.95

17.41

730.35

144.47

70.87

10,238.59

COBERTURAS COBERTURA DE ALUZING TIPO TR3 E=0.45mm INC/ ACCESORIOS

M2

101.54

7,196.14

-

-

0.00% 70.28%

-

101.54

7,196.14

0.00% 70.28%

144.47 -

41.95 42.93

12,661.35 -

730.35 3,042.45

100.00% 0.00%

0.00% 100.00% 0.00% 29.72%

26

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

06.01.02.06.02 06.01.02.07 06.01.02.07.01 06.01.02.07.02 06.01.02.08 06.01.02.08.01 06.01.02.08.02 06.01.02.09

CUMBRERA DE ALUZING INC/ ACCESORIOS

M

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

13.00

48.34

628.42

CARPINTERÍA METÁLICA

-

MONTO

AVANCE ACTUAL %

-

-

0.00%

METRADO -

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

-

0.00%

-

-

0.00%

METRADO 13.00

MONTO

%

628.42

-

-

0.00%

-

0.00%

-

-

0.00%

-

PUERTA METALICA (3.00X2.50) C/ANGULARES (2 HOJAS)

und

2.00

4,125.00

8,250.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

8,250.00

100.00%

VENTANA METALICA VM 1.50X1.10 m

und

4.00

664.05

2,656.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

2,656.20

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

CERRAJERÍA

-

CERRADURA TIPO E

UND

BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 3"

und

-

100.00%

-

0.00%

0.00%

2.00

40.59

81.18

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

81.18

100.00%

15.00

22.53

337.95

-

-

0.00%

-

-

0.00%

-

-

0.00%

15.00

337.95

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

PINTURA

-

-

-

0.00%

06.01.02.09.01

PINTURA LATEX EN CIELORRASO 2 MANOS

m2

144.47

19.96

2,883.62

-

-

0.00%

-

-

0.00%

-

-

0.00%

144.47

2,883.62

100.00%

06.01.02.09.02

PINTURA LATEX EN MUROS INTERIORES 2 MANOS

m2

167.00

16.42

2,742.14

-

-

0.00%

-

-

0.00%

-

-

0.00%

167.00

2,742.14

100.00%

06.01.02.09.03

PINTURA LATEX EN MUROS EXTERIORES 2 MANOS

m2

202.92

19.96

4,050.28

-

-

0.00%

-

-

0.00%

-

-

0.00%

202.92

4,050.28

100.00%

06.01.02.09.04

PINTURA LATEX EN VIGAS 2 MANOS

m2

36.80

20.09

739.31

-

-

0.00%

-

-

0.00%

-

-

0.00%

36.80

739.31

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

06.01.02.10 06.01.02.10.01 06.01.03 06.01.03.01 06.01.03.01.01

VARIOS

-

LIMPIEZA FINAL DE OBRA

m2

144.47

1.51

INSTALACIONES SANITARIAS

218.15

-

144.47

218.15

0.00% 100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

SISTEMA DE EVACUACIÓN DE AGUAS PLUVIALES

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

CANALETA Y MONTANTES PLUVIALES

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

06.01.03.01.01.01

CANALETA SEMICIRCULAR DE PLANCHA GALVANIZADA D=6" E=0.5 MM

M

26.54

57.32

1,521.27

-

-

0.00%

-

-

0.00%

-

-

0.00%

26.54

1,521.27

100.00%

06.01.03.01.01.02

SOPORTE DE F°G° DE 1"X3/8"

UND

15.00

38.75

581.25

-

-

0.00%

-

-

0.00%

-

-

0.00%

15.00

581.25

100.00%

06.01.03.01.01.03

MONTANTE PVC SAL DESAGUE D=3''

M

13.60

20.09

273.22

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.60

273.22

100.00%

06.01.03.01.01.04

CODO PVC SAL 3"x45°

UND

8.00

20.46

163.68

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.00

163.68

100.00%

06.01.03.01.01.05

CODO PVC SAL 3"X90°

UND

4.00

16.06

64.24

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

64.24

100.00%

06.01.03.01.01.06

ABRAZADERA DE SUJECIÓN 3"

UND

12.00

28.03

336.36

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.00

336.36

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

06.01.03.01.02

COLUMNETA PROTECTORA DE CONCRETO

-

06.01.03.01.02.01

ENCOFRADO Y DESENCOFRADO DE COLUMNETAS

m2

06.01.03.01.02.02

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

06.01.03.01.02.03

CONCRETO f´c= 175 kg/cm2 PARA COLUMNETAS

m3

06.01.03.01.02.04

TARRAJEO DE SUPERFICIES DE COLUMNAS E= 1.5 CM

m2

06.01.04 06.01.04.01

286.61

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.80

286.61

100.00%

32.00

5.06

161.92

-

-

0.00%

-

-

0.00%

-

-

0.00%

32.00

161.92

100.00%

0.56

503.88

282.17

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.56

282.17

100.00%

4.40

36.18

159.19

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.40

159.19

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

907.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

SALIDAS SALIDA PARA ALUMBRADO

und

06.01.04.01.02

SALIDA PARA INTERRUPTOR

06.01.04.01.03

SALIDA INSTALACIONES MECANICAS

0.00%

59.71

INSTALACIONES ELECTRICAS

06.01.04.01.01

06.01.04.02

4.80

-

20.00

45.39

und

2.00

45.39

90.78

-

-

0.00%

-

-

0.00%

-

-

0.00%

und

10.00

62.03

620.30

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

TUBERIAS

-

20.00

0.00% 0.00%

907.80

100.00%

2.00

90.78

100.00%

10.00

620.30

100.00%

-

-

0.00%

06.01.04.02.01

TUBO CONDUIT DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

70.00

104.77

7,333.90

-

-

0.00%

-

-

0.00%

-

-

0.00%

70.00

7,333.90

100.00%

06.01.04.02.02

CURVA CONDUIT DE 90° DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

60.00

13.59

815.40

-

-

0.00%

-

-

0.00%

-

-

0.00%

60.00

815.40

100.00%

06.01.04.02.03

UNIÓN CONDUIT EMT DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

60.00

9.60

576.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

60.00

576.00

100.00%

06.01.04.02.04

TERMINAL CONDUIT EMT DE ACERO GALVANIZADO 20 mm ? (3/4")

und

60.00

14.69

881.40

-

-

0.00%

-

-

0.00%

-

-

0.00%

60.00

881.40

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

06.01.04.03

CONDUCTORES

-

-

-

0.00%

06.01.04.03.01

CABLE NH80 2.5mm2

m

700.00

2.10

1,470.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

700.00

1,470.00

100.00%

06.01.04.03.02

CABLE NH80 4.0mm2

m

194.00

2.45

475.30

-

-

0.00%

-

-

0.00%

-

-

0.00%

194.00

475.30

100.00%

06.01.04.03.03

CABLE NH80 6mm2 NH80

m

100.00

2.25

225.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

100.00

225.00

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

25.00%

4.50

06.01.04.04 06.01.04.04.01

ARTEFACTOS DE ILUMINACION Luminaria para suspender tipo hermetico lineal, lámpara fluoresfente T5 de 1x28W

und

18.00

255.06

4,591.08

4.50

1,147.77

1,147.77

25.00%

13.50

3,443.31

0.00% 75.00%

27

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

06.01.04.04.02 06.01.04.05 06.01.04.05.01 06.01.04.05.02 06.01.04.06 06.01.04.06.01 06.02 06.02.01 06.02.01.01

Luz de emergencia

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

und

2.00

303.26

606.52

Interruptor Doble

und

1.00

24.20

24.20

Interruptor Triple

und

1.00

39.09

39.09

INTERRUPTORES

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

CAJA DE PASO DE 150 X 150 X 75 mm

und

3.00

71.16

CUARTO DE MAQUINAS (EQ. REFRIGERACION) ESTRUCTURAS MOVIMIENTO DE TIERRAS

213.48

1.00

39.09

100.00%

0.00%

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

100.00%

-

-

6.22

86.64

6.22

OBRAS DE CONCRETO SIMPLE

-

06.02.01.02.01

CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS

m3

6.22

06.02.01.02.02

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

m2

06.02.01.02.03

CONCRETO f´c= 140 kg/cm PARA SOBRECIMIENTOS

m3

kg

06.02.01.03.01.02

ENCOFRADO Y DESENCOFRADO DE COLUMNAS

m2

06.02.01.03.01.03

CONCRETO f´c= 210 kg/cm2 PARA COLUMNAS

m3

06.02.01.03.01.04

CURADO DE CONCRETO

m2

-

0.00%

9.33

0.00%

-

-

0.00%

-

157.30

100.00%

-

-

0.00%

6.22

157.30

100.00%

-

-

0.00%

86.64

100.01%

-

-

0.00%

6.22

86.64

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

3.11

104.96

0.00% 100.00%

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.22

1,281.51

100.00%

34.21

49.13

1,680.74

-

-

0.00%

-

-

0.00%

-

-

0.00%

34.21

1,680.74

100.00%

4.28

374.06

1,600.98

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.28

1,600.98

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

63.50

0.00% 0.00%

5.06

321.31

-

-

0.00%

-

-

0.00%

-

-

0.00%

63.50

321.31

100.00%

3.85

59.71

229.88

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.85

229.88

100.00%

0.24

557.01

133.68

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.24

133.68

100.00%

3.85

1.93

7.43

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.85

7.43

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

5.00

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

VARIOS

und

-

1,281.51

COLUMNAS ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

100.00%

100.00%

-

471.82

213.48

206.03

OBRAS DE CONCRETO ARMADO

06.02.01.03.01.01

-

-

157.30

06.02.03

0.00%

-

13.93

06.02.02.05.01

-

-

25.29

06.02.02.05

-

-

6.22

06.02.02.04.02

0.00%

3.00

6.22

06.02.02.04.01

-

0.00%

0.00%

m3

06.02.02.04

100.00%

0.00%

m3

06.02.02.03.02

24.20

-

ELIMINACION DE MATERIAL EXCEDENTE D = 2 Km

06.02.02.03.01

1.00

-

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

06.02.02.03

-

0.00%

-

06.02.01.01.04

06.02.02.02.02

0.00%

-

-

06.02.01.01.03

06.02.02.02.01

-

-

0.00%

-

06.02.02.02

-

0.00%

0.00%

104.96

06.02.02.01.01

0.00%

-

-

33.75

06.02.02.01

-

-

75.00%

-

471.82

-

454.89

0.00%

3.11

06.02.02

1.50

%

0.50

0.00%

M3

5.00

18.36

ESTRUCTURA METALICA TIJERALES METALICOS

06.02.01.04.01.02

25.00%

MONTO

25.00%

-

RELLENO Y COMPACTADO CON MATERIAL PROPIO

06.02.01.04.01.01

151.63

METRADO

-

06.02.01.01.02

PRUEBAS DE CONTROL DE CALIDAD DEL CONCRETO

SALDO %

-

9.33

06.02.01.03.02.01

MONTO

-

471.82

06.02.01.04.01

151.63

METRADO

-

50.57

06.02.01.04

AVANCE ACUMULADO %

-

9.33

06.02.01.03.02

0.50

MONTO

CAJAS DE PASO

m3

06.02.01.03.01

METRADO

-

EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS EN TERRENO NORMAL

06.02.01.03

AVANCE ACTUAL %

-

06.02.01.01.01

06.02.01.02

MONTO

91.80

-

91.80

0.00% 100.00% 0.00% 0.00%

CARPINTERIA METALICA

KG

1,377.33

11.09

15,274.59

-

-

0.00%

-

-

0.00%

-

-

0.00%

1,377.33

15,274.59

100.00%

MONTAJE ESTRUCTURA METALICAS

KG

1,377.33

3.14

4,324.82

-

1,377.33

4,324.82

100.00%

ARQUITECTURA PISOS Y PAVIMENTOS CONTRAPISO E=40 mm

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

m2

44.09

28.37

1,250.83

COBERTURA DE ALUZING TIPO TR3 E=0.45mm INC/ ACCESORIOS

M2

46.55

70.87

3,299.00

CUMBRERA DE ALUZING INC/ ACCESORIOS

M

3.89

48.34

188.04

COBERTURAS

-

CARPINTERÍA METÁLICA

-

PUERTA METÁLICA TIPO REJA C/ MALLA 0.70 x 1.75 M

UND

ESTRUCTURA METÁLICA C/MALLA DE ACERO AL CARBON DE 3/4" N°9, CALIBRE 10

m2

30.00

2,126.10

-

-

0.00%

64.45%

0.00% -

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

-

0.00%

30.00

2,126.10

0.00%

44.09 -

1,250.83 -

0.00% 0.00% 100.00% 0.00%

64.45%

16.55

1,172.90

35.55%

-

0.00%

3.89

188.04

100.00%

-

0.00%

-

-

0.00%

1.00

2,530.00

2,530.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

2,530.00

100.00%

79.77

415.28

33,126.89

-

-

0.00%

-

-

0.00%

-

-

0.00%

79.77

33,126.89

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

CERRAJERÍA

-

-

0.00%

CERRADURA TIPO E

UND

1.00

40.59

40.59

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

40.59

100.00%

BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 3"

und

3.00

22.53

67.59

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

67.59

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

VARIOS LIMPIEZA FINAL DE OBRA INSTALACIONES SANITARIAS

m2

46.55

1.51

70.29 -

-

46.55 -

70.29 -

0.00% 100.00% 0.00%

28

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

06.02.03.01

SISTEMA DE DESAGÜE Y VENTILACIÓN

06.02.03.01.01

REDES COLECTORAS DE DESAGÜE

06.02.03.01.01.01

TUBERIA PVC SAL 4" DESAGUE (ENTERRADA)

06.02.03.01.02

M

06.02.03.01.02.02

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

25.28

264.43 -

-

10.46

264.43 -

0.00% 0.00% 100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

SUMIDERO DE BRONCE DE 4"

UND

1.00

87.66

87.66

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

87.66

100.00%

REGISTRO ROSCADO DE BRONCE 4"

und

1.00

91.96

91.96

-

91.96

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

SISTEMA DE EVACUACIÓN DE AGUAS PLUVIALES

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

CANALETA Y MONTANTES PLUVIALES

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

06.02.03.02.01 06.02.03.02.01.01

CANALETA SEMICIRCULAR DE PLANCHA GALVANIZADA D=6" E=0.5 MM

M

06.02.03.02.01.02

SOPORTE DE F°G° DE 1"X3/8"

UND

06.02.03.02.01.03

MONTANTE PVC SAL DESAGUE D=3''

M

06.02.03.02.01.04

CODO PVC SAL 3"x45°

06.02.03.02.01.05 06.02.03.02.01.06 06.02.03.03

AVANCE ANTERIOR

P. TOTAL

10.46

ACCESORIOS DE REDES DE DESAGÜE

06.02.03.01.02.01

06.02.03.02

P. U.

12.20

57.32

699.30

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.00%

0.00% 0.00%

12.20

699.30

100.00%

8.00

38.75

310.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.00

310.00

100.00%

13.60

20.09

273.22

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.60

273.22

100.00%

UND

8.00

20.46

163.68

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.00

163.68

100.00%

CODO PVC SAL 3"X90°

UND

4.00

16.06

64.24

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

64.24

100.00%

ABRAZADERA DE SUJECIÓN 3"

UND

12.00

28.03

336.36

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.00

336.36

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

APARATOS SANITARIOS Y ACCESORIOS

-

-

0.00%

06.02.03.03.01

LAVATORIO CERAMICO VITRIFICANTE 45X60 CM S/PEDESTAL

UND

2.00

200.00

400.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

400.00

100.00%

06.02.03.03.02

LAVATORIO DE ACERO INOX 60X60X90 CM

und

3.00

219.00

657.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

657.00

100.00%

06.02.03.03.03

INODORO DE CERÁMICA VITRIFICADA SIFON JET O SIMILAR

und

2.00

466.10

932.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

932.20

100.00%

06.02.03.03.04

ESPEJO ADOSADO MARCO METALICO ANCHO=VARIABLE, ALTURA=90CM

UND

2.00

84.75

169.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

169.50

100.00%

06.02.03.03.05

JABONERA CROMADA PARA JABON LIQUIDO

und

2.00

52.71

105.42

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

105.42

100.00%

06.02.03.03.06

COLOCACION DE APARATOS SANITARIOS

UND

7.00

137.46

962.22

-

-

0.00%

-

-

0.00%

-

-

0.00%

7.00

962.22

100.00%

06.02.03.03.07

COLOCACION DE ACCESORIOS SANITARIOS

UND

4.00

33.81

135.24

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

135.24

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

06.02.04 06.02.04.01

INSTALACIONES ELECTRICAS SALIDAS

06.02.04.01.01 06.02.04.01.02 06.02.04.02

0.00% 0.00%

SALIDA PARA ALUMBRADO

und

9.00

45.39

408.51

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.00

408.51

100.00%

SALIDA PARA INTERRUPTOR

und

1.00

45.39

45.39

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

45.39

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

TUBERIAS

-

-

0.00%

06.02.04.02.01

TUBO CONDUIT DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

30.00

104.77

3,143.10

-

-

0.00%

-

-

0.00%

-

-

0.00%

30.00

3,143.10

100.00%

06.02.04.02.02

CURVA CONDUIT DE 90° DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

20.00

13.59

271.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

20.00

271.80

100.00%

06.02.04.02.03

UNIÓN CONDUIT EMT DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

20.00

9.60

192.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

20.00

192.00

100.00%

06.02.04.02.04

TERMINAL CONDUIT EMT DE ACERO GALVANIZADO 20 mm ? (3/4")

und

20.00

14.69

293.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

20.00

293.80

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

06.02.04.03

CONDUCTORES

-

-

-

0.00%

06.02.04.03.01

CABLE NH80 2.5mm2

m

300.00

2.10

630.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

300.00

630.00

100.00%

06.02.04.03.02

CABLE NH80 10mm2

m

100.00

3.92

392.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

100.00

392.00

100.00%

06.02.04.03.03

CABLE NH80 16mm2

m

60.00

4.09

245.40

-

-

0.00%

-

-

0.00%

-

-

0.00%

60.00

245.40

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

06.02.04.04

ARTEFACTOS DE ILUMINACION

06.02.04.04.01 06.02.04.04.02 06.02.04.05

06.03 06.03.01

0.00%

8.00

56.06

448.48

-

-

0.00%

2.00

112.12

25.00%

2.00

112.12

25.00%

6.00

336.36

75.00%

Luz de emergencia

1.00

303.26

303.26

-

-

0.00%

0.25

75.82

75.82

227.44

75.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

Interruptor Doble

und

und

1.00

24.20

24.20

und

1.00

71.16

71.16

CAJAS DE PASO

06.02.04.06.01

-

Luminaria tipo Hermético IP65, difusor acrílico con 01 fluorescente lineal de 36w con und balastro electronico para montaje adosado o suspendido.

INTERRUPTORES

06.02.04.05.01 06.02.04.06

-

CAJA DE PASO DE 150 X 150 X 75 mm LABORATORIO ESTRUCTURAS

-

-

-

25.00%

0.25

25.00%

0.75

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

24.20 71.16

0.00% 100.00% 0.00% 100.00%

-

29

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

06.03.01.01

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MOVIMIENTO DE TIERRAS

MONTO

% -

06.03.01.01.01

EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS EN TERRENO NORMAL

m3

108.40

50.57

5,481.79

06.03.01.01.02

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

32.00

33.75

1,080.00

06.03.01.01.03

NIVELACION INTERIOR Y COMPACTADO C/EQUPO.

m2

132.11

8.85

1,169.17

06.03.01.01.04

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

36.80

25.29

930.67

36.80

930.67

06.03.01.01.05

ELIMINACION DE MATERIAL EXCEDENTE D = 2 Km

m3

36.80

13.93

512.62

36.80

512.62

100.00%

06.03.01.02

METRADO

OBRAS DE CONCRETO SIMPLE

-

108.40 -

5,481.79 -

100.00%

-

-

0.00%

0.00%

-

-

0.00%

0.00%

-

-

0.00%

100.00%

-

-

0.00%

36.80

930.67

100.00%

-

-

0.00%

-

-

0.00%

36.80

512.62

100.00%

-

-

0.00%

-

0.00%

0.00%

-

-

0.00%

-

-

0.00%

108.40 -

-

5,481.79 -

-

100.00%

-

-

0.00%

0.00%

32.00

1,080.00

100.00%

0.00%

132.11

1,169.17

100.00%

06.03.01.02.01

CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS

m3

76.40

206.03

15,740.69

-

-

0.00%

76.40

15,740.69

100.00%

76.40

15,740.69

100.00%

-

-

0.00%

06.03.01.02.02

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

m2

40.10

49.13

1,970.11

-

-

0.00%

40.10

1,970.11

100.00%

40.10

1,970.11

100.00%

-

-

0.00%

06.03.01.02.03

CONCRETO f´c= 140 kg/cm PARA SOBRECIMIENTOS

m3

3.01

374.06

1,125.92

-

-

0.00%

3.01

1,125.92

100.00%

3.01

1,125.92

100.00%

-

-

0.00%

06.03.01.03 06.03.01.03.01

OBRAS DE CONCRETO ARMADO

-

SOBRECIMIENTO ARMADO

-

06.03.01.03.01.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

226.00

5.06

1,143.56

06.03.01.03.01.02

ENCOFRADO Y DESENCOFRADO

M2

64.32

67.61

4,348.68

-

06.03.01.03.01.03

CONCRETO f´c= 210 kg/cm2 PARA SOBRECIMIENTOS

m3

8.04

450.05

3,618.40

06.03.01.03.01.04

CURADO DE CONCRETO

m2

64.32

1.93

06.03.01.03.02

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

06.03.01.03.02.02

ENCOFRADO Y DESENCOFRADO DE COLUMNAS

m2

06.03.01.03.02.03

CONCRETO f´c= 210 kg/cm2 PARA COLUMNAS

06.03.01.03.02.04

CURADO DE CONCRETO

226.00

1,143.56

100.00%

-

-

0.00%

-

0.00%

64.32

4,348.68

100.00%

64.32

4,348.68

100.00%

-

-

0.00%

-

-

0.00%

8.04

3,618.40

100.00%

8.04

3,618.40

100.00%

-

-

0.00%

124.14

-

-

0.00%

64.32

124.14

100.00%

64.32

124.14

100.00%

-

-

0.00%

6,289.58

-

-

0.00%

1,243.00

6,289.58

100.00%

1,243.00

6,289.58

100.00%

12,377.88

-

-

0.00%

103.80

6,197.90

50.07%

103.80

6,197.90

50.07%

m3

13.15

557.01

7,324.68

-

-

0.00%

-

-

0.00%

-

-

m2

207.30

1.93

400.09

-

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

VIGAS

-

ENCOFRADO Y DESENCOFRADO DE VIGAS

m2

06.03.01.03.03.03

CONCRETO f´c= 210kg/cm2 PARA VIGAS

m3

06.03.01.03.03.04

CURADO DE CONCRETO

m2

545.00

PRUEBAS DE CONTROL DE CALIDAD DEL CONCRETO

0.00%

13.15

7,324.68

100.00%

0.00%

207.30

400.09

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

545.00

2,757.70

100.00%

58.52

74.12

4,337.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

58.52

4,337.50

100.00%

6.24

557.01

3,475.74

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.24

3,475.74

100.00%

58.52

1.93

112.94

-

-

0.00%

-

-

0.00%

-

-

0.00%

58.52

112.94

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

12.00

18.36

TIJERALES METALICOS

06.03.01.04.01.02

0.00% 49.93%

-

ESTRUCTURA METALICA

06.03.01.04.01.01

6,179.98

2,757.70

und

103.50

5.06

VARIOS

06.03.01.03.04.01

06.03.02.01

11.50%

5.06

06.03.01.03.03.02

06.03.02

131.56

59.71

kg

06.03.01.04.01

26.00

207.30

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

06.03.01.04

88.50%

1,243.00

06.03.01.03.03.01

06.03.01.03.04

1,012.00

COLUMNAS

06.03.01.03.02.01

06.03.01.03.03

200.00

220.32

-

12.00

220.32

0.00% 100.00% 0.00% 0.00%

CARPINTERIA METALICA

KG

2,054.71

11.09

22,786.73

-

-

0.00%

-

-

0.00%

-

-

0.00%

2,054.71

22,786.73

100.00%

MONTAJE ESTRUCTURA METALICAS

KG

2,054.71

3.14

6,451.79

-

2,054.71

6,451.79

100.00%

ARQUITECTURA MUROS Y TABIQUES DE ALBAÑILERIA

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

06.03.02.01.01

MUROS DE LADRILLO KK DE CABEZA MEZCLA 1:5

m2

74.80

128.18

9,587.86

-

-

0.00%

74.80

9,587.86

100.00%

74.80

9,587.86

100.00%

-

-

0.00%

06.03.02.01.02

MUROS DE LADRILLO KK DE SOGA MEZCLA 1:5

m2

99.86

79.68

7,956.84

-

-

0.00%

99.86

7,956.84

100.00%

99.86

7,956.84

100.00%

-

-

0.00%

-

-

0.00%

-

-

06.03.02.02

REVOQUES ENLUCIDOS Y MOLDURAS

-

-

0.00%

-

-

0.00%

0.00%

06.03.02.02.01

TARRAJEO EN MUROS INTERIORES C:A 1:4 E=1.5CM

m2

159.18

24.10

3,836.24

-

-

0.00%

-

-

0.00%

-

-

0.00%

159.18

3,836.24

100.00%

06.03.02.02.02

TARRAJEO EN MUROS EXTERIORES C:A 1:4 E=1.5CM

m2

123.99

28.43

3,525.04

-

-

0.00%

-

-

0.00%

-

-

0.00%

123.99

3,525.04

100.00%

06.03.02.02.03

TARRAJEO DE SUPERFICIES DE COLUMNAS E= 1.5 CM

m2

25.61

36.18

926.57

-

-

0.00%

-

-

0.00%

-

-

0.00%

25.61

926.57

100.00%

06.03.02.02.04

VESTIDURA DE DERRAMES

m

103.10

16.50

1,701.15

-

-

0.00%

-

-

0.00%

-

-

0.00%

103.10

1,701.15

100.00%

06.03.02.02.05

BRUÑAS 1 cm

m

232.68

6.66

1,549.65

-

-

0.00%

-

-

0.00%

-

-

0.00%

232.68

1,549.65

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

06.03.02.03 06.03.02.03.01

CIELORRASOS FALSO CIELO RASO CON PLANCHA DE FIBROCEMENTO 8MM C/PINT. LATEX

M2

172.97

87.64

15,159.09

-

172.97

15,159.09

0.00% 100.00%

30

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

06.03.02.04

P. U.

PISOS Y PAVIMENTOS

AVANCE ANTERIOR

P. TOTAL

METRADO -

MONTO

AVANCE ACTUAL %

-

-

0.00%

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

-

0.00%

-

-

0.00%

METRADO -

MONTO

% -

0.00%

06.03.02.04.01

CONTRAPISO E=40 mm

m2

132.11

28.37

3,747.96

-

-

0.00%

-

-

0.00%

-

-

0.00%

132.11

3,747.96

100.00%

06.03.02.04.02

PISO PORCELANATO ANTIDESLIZANTE 60x60cm

m2

92.68

74.36

6,891.68

-

-

0.00%

-

-

0.00%

-

-

0.00%

92.68

6,891.68

100.00%

06.03.02.04.03

PISO DE CEMENTO PULIDO Y BRUÑADO, MEZC. C:A 1:4 CON ENDURECEDOR, e=2"

m2

20.52

23.18

475.65

-

-

0.00%

-

-

0.00%

-

-

0.00%

20.52

475.65

100.00%

06.03.02.05 06.03.02.05.01 06.03.02.05.02 06.03.02.06 06.03.02.06.01 06.03.02.07 06.03.02.07.01 06.03.02.07.02 06.03.02.08

CONTRAZOCALOS

-

CONTRAZOCALO SANITARIO DE CEMENTO PULIDO TIPO MEDIA CAÑA, CON BORDE DE PLATINA EN PISO, H =0.10 m

m

22.10

17.35

383.44

-

-

0.00%

-

-

0.00%

-

-

0.00%

22.10

383.44

100.00%

CONTRAZOCALO DE CEMENTO PULIDO H=10 CM

m

17.37

17.41

302.41

-

-

0.00%

-

-

0.00%

-

-

0.00%

17.37

302.41

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

ZOCALOS ZOCALO DE PORCELANATO

m2

141.40

85.19

12,045.87

COBERTURA DE ALUZING TIPO TR3 E=0.45mm INC/ ACCESORIOS

M2

172.97

70.87

12,258.38

CUMBRERA DE ALUZING INC/ ACCESORIOS

M

21.45

48.34

1,036.89

COBERTURAS

-

CARPINTERIA DE MADERA

-

102.54

7,267.01

-

-

0.00%

59.28%

0.00% -

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

-

0.00%

102.54

7,267.01

0.00%

141.40 -

12,045.87 -

0.00% 100.00% 0.00%

59.28%

70.43

4,991.37

40.72%

-

0.00%

21.45

1,036.89

100.00%

-

0.00%

-

-

0.00%

06.03.02.08.01

PUERTA MADERA (0.90X2.10) CONTRAP. C/ 1 HOJA BATIENTE. MADERA (MAD. CEDRO, m2 FORRO MDF PLASTIFICADO 6MM)

3.78

695.59

2,629.33

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.78

2,629.33

100.00%

06.03.02.08.02

PUERTA MADERA (0.80X2.10) CONTRAP. C/ 1 HOJA BATIENTE. MADERA (MAD. CEDRO, m2 FORRO MDF PLASTIFICADO 6MM) C/ REJILLA MAD.

6.72

704.60

4,734.91

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.72

4,734.91

100.00%

06.03.02.08.03

PUERTA MADERA (0.90X2.10) CONTRAP. C/ 1 HOJA BATIENTE. MADERA (MAD. CEDRO, m2 FORRO MDF PLASTIFICADO 6MM) C/ VISOR DE VIDRIO 6mm Y REJILLA MAD.

3.78

704.09

2,661.46

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.78

2,661.46

100.00%

06.03.02.08.04

MARCO DE MADERA CEDRO 4"X 2"

40.40

24.12

974.45

-

-

0.00%

-

-

0.00%

-

-

0.00%

40.40

974.45

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

06.03.02.09

m

CARPINTERÍA METÁLICA

-

06.03.02.09.01

PUERTA METALICA (1.50X2.10) CONTRAP C/ 2 HOJA BATIENTE C/VISOR DE VIDRIO DE 6 mm

06.03.02.09.02

PUERTA METALICA 1.00X2.10M CONTRAP C/ 1 HOJA BATIENTE C/VISOR DE VIDRIO DE UND 6 mm

06.03.02.09.03

PUERTA BLINDADA (0.80X2.10) CONTRAP. C/ 1 HOJA BATIENTE. LAMINA ROLADA EN FRIO #12 C/REF. INTERIOR 3/16" Y LANA MINERAL C/ VISOR DE VIDRIO 38mm ANTIBALAS

und

06.03.02.09.04

PANEL DIVISORIO METALICO EN CUBICULOS DE SS.HH., DUCHAS Y URINARIOS

m2

06.03.02.09.05

VENTANA METALICA VM 1.50X1.10 m

und

06.03.02.10

und

-

0.00%

1.00

1,732.50

1,732.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

1,732.50

100.00%

1.00

1,270.50

1,270.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

1,270.50

100.00%

4.00

1,444.20

5,776.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

5,776.80

100.00%

19.85

1,016.94

20,186.26

-

-

0.00%

-

-

0.00%

-

-

0.00%

19.85

20,186.26

100.00%

2.00

664.05

1,328.10

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

1,328.10

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

CARPINTERIA DE ALUMINIO

-

-

0.00%

06.03.02.10.01

VENTANA DE 1.20x1.10 C/ 1 HOJA PROYECTANTE C/1 HOJA FIJA EN CARP. DE ALUMINIO C/CRISTAL DE 6mm, TIPO V-3

m2

9.60

663.96

6,374.02

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.60

6,374.02

100.00%

06.03.02.10.02

VENTANA DE 0.65x0.65 C/ 1 HOJA PROYECTANTE C/1 HOJA FIJA EN CARP. DE ALUMINIO C/CRISTAL DE 6mm, TIPO V-7

m2

1.27

212.52

269.90

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.27

269.90

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

06.03.02.11

CERRAJERÍA

-

-

0.00%

06.03.02.11.01

CERRADURA TIPO A

UND

3.00

82.65

247.95

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

247.95

100.00%

06.03.02.11.02

CERRADURA TIPO C

UND

5.00

73.19

365.95

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

365.95

100.00%

06.03.02.11.03

CERRADURA TIPO E

UND

5.00

40.59

202.95

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

202.95

100.00%

06.03.02.11.04

BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 3"

und

45.00

22.53

1,013.85

-

-

0.00%

-

-

0.00%

-

-

0.00%

45.00

1,013.85

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

1.26

06.03.02.12 06.03.02.12.01 06.03.02.13

VIDRIOS, CRISTALES Y SIMILARES ESPEJOS C/ SISTEMA DE FIJACION

M2

1.26

126.43

159.30

-

-

0.00%

-

0.00%

-

-

0.00%

172.97

19.96

3,452.48

-

-

0.00%

-

-

0.00%

-

-

0.00%

PINTURA

-

-

06.03.02.13.01

PINTURA LATEX EN CIELORRASO 2 MANOS

m2

06.03.02.13.02

PINTURA LATEX EN MUROS INTERIORES 2 MANOS

m2

52.23

16.42

857.62

-

-

0.00%

-

-

0.00%

-

-

0.00%

06.03.02.13.03

PINTURA LATEX EN MUROS EXTERIORES 2 MANOS

m2

142.97

19.96

2,853.68

-

-

0.00%

-

-

0.00%

-

-

0.00%

172.97

159.30 -

0.00% 100.00% 0.00%

3,452.48

100.00%

52.23

857.62

100.00%

142.97

2,853.68

100.00%

31

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

06.03.02.13.04 06.03.02.14

PINTURA LATEX EN VIGAS 2 MANOS

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

m2

52.61

20.09

1,056.93

93.00

35.21

3,274.53

VARIOS

-

MONTO

AVANCE ACTUAL %

METRADO

-

-

0.00%

-

-

-

0.00%

-

-

0.00%

-

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO 52.61

MONTO

%

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

93.00

3,274.53

100.00%

-

1,056.93 -

100.00% 0.00%

06.03.02.14.01

SELLADO DE JUNTAS DE CONSTRUCCION

M

06.03.02.14.02

SELLADOR PARA PORCELANATO

m2

238.52

17.47

4,166.94

-

-

0.00%

-

-

0.00%

-

-

0.00%

238.52

4,166.94

100.00%

06.03.02.14.03

LIMPIEZA FINAL DE OBRA

m2

172.97

1.51

261.18

-

-

0.00%

-

-

0.00%

-

-

0.00%

172.97

261.18

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

06.03.03 06.03.03.01 06.03.03.01.01 06.03.03.01.01.01 06.03.03.01.02

INSTALACIONES SANITARIAS SISTEMA DE AGUA FRÍA SALIDA DE AGUA FRÍA SALIDA DE AGUA FRIA CON TUBO PVC TIPO ROSCA DE 1/2"

PTO

15.00

78.00

1,170.00

REDES DE DISTRIBUCION DE AGUA FRIA

-

-

15.00

-

-

0.00%

-

0.00%

-

-

0.00%

TUBO PVC CON UNION TIPO ROSCA DE 1/2" PN10

m

26.78

17.70

474.01

-

-

0.00%

-

-

0.00%

-

-

0.00%

26.78

474.01

100.00%

06.03.03.01.02.02

TUBO PVC CON UNION TIPO ROSCA DE 3/4" PN10 (ENTERRADA)

m

22.31

18.06

402.92

-

-

0.00%

-

-

0.00%

-

-

0.00%

22.31

402.92

100.00%

06.03.03.01.02.03

PRUEBA HIDRÁULICA EN TUBERIAS Y DESINFECCION

M

49.09

1.83

89.83

-

-

0.00%

-

-

0.00%

-

-

0.00%

49.09

89.83

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

ACCESORIOS DE REDES DE AGUA

-

-

-

0.00% 100.00%

06.03.03.01.02.01

06.03.03.01.03

-

1,170.00

-

0.00%

0.00%

06.03.03.01.03.01

CODO PVC TIPO ROSCA DE 1/2" 90°

und

16.00

11.50

184.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

16.00

184.00

100.00%

06.03.03.01.03.02

CODO PVC TIPO ROSCA DE 3/4" 90°

und

9.00

24.80

223.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.00

223.20

100.00%

06.03.03.01.03.03

TEE PVC TIPO ROSCA DE 1/2"

und

6.00

24.52

147.12

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

147.12

100.00%

06.03.03.01.03.04

TEE PVC TIPO ROSCA DE 3/4"

und

6.00

25.65

153.90

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

153.90

100.00%

06.03.03.01.03.05

REDUCCION PVC TIPO ROSCA DE 3/4" A 1/2"

und

8.00

20.61

164.88

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.00

164.88

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

06.03.03.01.04

LLAVES Y VÁLVULAS

-

-

06.03.03.01.04.01

VALVULA DE COMPUERTA DE BRONCE 1/2"

und

4.00

68.36

273.44

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

06.03.03.01.04.02

VALVULA DE COMPUERTA DE BRONCE 3/4''

und

2.00

105.63

211.26

-

-

0.00%

-

-

0.00%

-

-

0.00%

06.03.03.01.04.03

NICHO Y TAPA PARA VALVULA EN PARED

UND

6.00

88.83

532.98

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

06.03.03.02 06.03.03.02.01

SISTEMA DE DESAGÜE Y VENTILACIÓN SALIDA DE DESAGÜE Y VENTILACIÓN

0.00%

273.44

100.00%

2.00

211.26

100.00%

6.00

532.98

100.00% 0.00% 0.00%

06.03.03.02.01.01

SALIDA DE DESAGÜE PVC 2"

pto

9.00

93.05

837.45

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.00

837.45

100.00%

06.03.03.02.01.02

SALIDA DE DESAGÜE PVC 4"

pto

2.00

100.10

200.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

200.20

100.00%

06.03.03.02.01.03

SALIDA DE VENTILACIÓN PVC 2"

PTO

2.00

93.05

186.10

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

186.10

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

06.03.03.02.02

REDES COLECTORAS DE DESAGÜE

-

-

0.00%

06.03.03.02.02.01

TUBERIA PVC SAL 2" DESAGUE (ENTERRADA)

M

24.32

23.33

567.39

-

-

0.00%

-

-

0.00%

-

-

0.00%

24.32

567.39

100.00%

06.03.03.02.02.02

TUBERIA PVC SAL 4" DESAGUE (ENTERRADA)

M

37.25

25.28

941.68

-

-

0.00%

-

-

0.00%

-

-

0.00%

37.25

941.68

100.00%

06.03.03.02.02.03

MONTANTE PVC 2" DESAGUE

M

6.80

32.24

219.23

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.80

219.23

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

06.03.03.02.03

ACCESORIOS DE REDES DE DESAGÜE

-

-

0.00%

06.03.03.02.03.01

SUMIDERO DE BRONCE DE 2"

und

5.00

70.50

352.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

352.50

100.00%

06.03.03.02.03.02

SUMIDERO DE BRONCE DE 4"

UND

5.00

87.66

438.30

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

438.30

100.00%

06.03.03.02.03.03

REGISTRO ROSCADO DE BRONCE 2"

UND

3.00

77.49

232.47

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

232.47

100.00%

06.03.03.02.03.04

REGISTRO ROSCADO DE BRONCE 4"

und

6.00

91.96

551.76

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

551.76

100.00%

06.03.03.02.03.05

CODO PVC SAL DE 2"X45°

und

7.00

19.61

137.27

-

-

0.00%

-

-

0.00%

-

-

0.00%

7.00

137.27

100.00%

06.03.03.02.03.06

CODO PVC SAL DE 4"X45°

und

2.00

22.16

44.32

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

44.32

100.00%

06.03.03.02.03.07

YEE PVC 2"

und

4.00

24.11

96.44

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

96.44

100.00%

06.03.03.02.03.08

YEE PVC 4"

und

5.00

26.66

133.30

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

133.30

100.00%

06.03.03.02.03.09

YEE PVC 4"X2"

und

6.00

26.66

159.96

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

159.96

100.00%

06.03.03.02.03.10

REDUCCION PVC SAL 4" x 2"

und

3.00

19.15

57.45

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

57.45

100.00%

06.03.03.02.03.11

SOMBRERO DE VENTILACION PVC DE 2"

UND

2.00

15.27

30.54

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

30.54

100.00%

32

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

06.03.03.03 06.03.03.03.01

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

CANALETA Y MONTANTES PLUVIALES

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

2,459.03

-

-

0.00%

-

-

0.00%

-

-

0.00%

42.90

M

42.90

57.32

06.03.03.03.01.02

SOPORTE DE F°G° DE 1"X3/8"

UND

24.00

38.75

930.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

06.03.03.03.01.03

MONTANTE PVC SAL DESAGUE D=3''

M

52.80

20.09

1,060.75

-

-

0.00%

-

-

0.00%

-

-

0.00%

06.03.03.03.01.04

CODO PVC SAL 3"x45°

UND

24.00

20.46

491.04

-

-

0.00%

-

-

0.00%

-

-

06.03.03.03.01.05

CODO PVC SAL 3"X90°

UND

28.00

16.06

449.68

-

-

0.00%

-

-

0.00%

-

06.03.03.03.01.06

ABRAZADERA DE SUJECIÓN 3"

UND

44.00

28.03

1,233.32

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

COLUMNETA PROTECTORA DE CONCRETO

-

06.03.03.03.02.01

ENCOFRADO Y DESENCOFRADO DE COLUMNETAS

m2

14.40

06.03.03.03.02.02

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

06.03.03.03.02.03

CONCRETO f´c= 175 kg/cm2 PARA COLUMNETAS

m3

06.03.03.03.02.04

TARRAJEO DE SUPERFICIES DE COLUMNAS E= 1.5 CM

m2

06.03.04.01

0.00% 0.00%

2,459.03

100.00%

24.00

930.00

100.00%

52.80

1,060.75

100.00%

0.00%

24.00

491.04

100.00%

-

0.00%

28.00

449.68

100.00%

-

-

0.00%

44.00

1,233.32

100.00%

0.00%

-

-

0.00%

-

-

0.00%

59.71

859.82

-

-

0.00%

-

-

0.00%

-

-

0.00%

14.40

859.82

100.00%

96.00

5.06

485.76

-

-

0.00%

-

-

0.00%

-

-

0.00%

96.00

485.76

100.00%

1.68

503.88

846.52

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.68

846.52

100.00%

13.20

36.18

477.58

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.20

477.58

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

1,724.82

-

-

0.00%

-

-

0.00%

-

-

0.00%

38.00

INSTALACIONES ELECTRICAS SALIDAS

06.03.04.01.01

SALIDA PARA ALUMBRADO

und

38.00

45.39

06.03.04.01.02

SALIDA PARA INTERRUPTOR

und

14.00

45.39

635.46

-

-

0.00%

-

-

0.00%

-

-

0.00%

06.03.04.01.03

SALIDA PARA TOMACORRIENTE

und

28.00

44.81

1,254.68

-

-

0.00%

-

-

0.00%

-

-

0.00%

06.03.04.01.04

SALIDA PARA TOMACORRIENTE INDUSTRIAL

und

1.00

88.33

88.33

-

-

0.00%

-

-

0.00%

-

-

06.03.04.01.05

SALIDA PARA FUERZA

und

3.00

68.61

205.83

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

06.03.04.02

%

-

CANALETA SEMICIRCULAR DE PLANCHA GALVANIZADA D=6" E=0.5 MM

06.03.04

MONTO

SISTEMA DE EVACUACIÓN DE AGUAS PLUVIALES

06.03.03.03.01.01

06.03.03.03.02

METRADO

TUBERIAS

-

0.00% 0.00%

1,724.82

100.00%

14.00

635.46

100.00%

28.00

1,254.68

100.00%

0.00%

1.00

88.33

100.00%

-

0.00%

3.00

205.83

100.00%

-

-

0.00%

-

-

0.00%

06.03.04.02.01

TUBO PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

UND

180.00

11.39

2,050.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

180.00

2,050.20

100.00%

06.03.04.02.02

CURVA PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

und

150.00

6.92

1,038.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

150.00

1,038.00

100.00%

06.03.04.02.03

UNION PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

und

150.00

9.46

1,419.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

150.00

1,419.00

100.00%

06.03.04.02.04

CONEXION PVC SAP PARA INSTALACIONES ELECTRICAS DE 20MM (3/4")

und

150.00

7.42

1,113.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

150.00

1,113.00

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

06.03.04.03 06.03.04.03.01 06.03.04.03.02 06.03.04.04

CONDUCTORES

1,600.00

2.10

3,360.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1,600.00

3,360.00

100.00%

CABLE NH80 4.0mm2

m

1,200.00

2.45

2,940.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1,200.00

2,940.00

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

ARTEFACTOS DE ILUMINACION

-

06.03.04.04.02

Luminaria para adosar tipo hermetico lineal, lámpara fluoresfente T5 de 1x28W.

06.03.04.04.03

Luz de emergencia

06.03.04.05.02 06.03.04.06

0.00%

m

Luminaria lineal para empotrar tipo reflector de aluminio, lampara fluoresfente T5 de und

06.03.04.05.01

-

CABLE NH80 2.5mm2

06.03.04.04.01

06.03.04.05

-

-

0.00%

6.00

279.48

1,676.88

-

-

0.00%

1.50

419.22

25.00%

1.50

419.22

25.00%

4.50

1,257.66

75.00%

und

23.00

230.06

5,291.38

-

-

0.00%

5.75

1,322.85

25.00%

5.75

1,322.85

25.00%

17.25

3,968.53

75.00%

und

9.00

303.26

2,729.34

-

-

0.00%

2.25

682.34

25.00%

2.25

682.34

25.00%

6.75

2,047.00

75.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

INTERRUPTORES

-

-

0.00%

Interruptor Simple

und

12.00

23.84

286.08

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.00

286.08

100.00%

Interruptor Doble

und

2.00

24.20

48.40

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

48.40

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

TOMACORRIENTES

-

-

0.00%

06.03.04.06.01

Tomacorriente doble con puesta a tierra 250 V.

und

25.00

34.32

858.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

25.00

858.00

100.00%

06.03.04.06.02

Tomacorriente doble con puesta a tierra 250 V, con tapa de protección para agua.

und

3.00

56.46

169.38

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

169.38

100.00%

06.03.04.06.03

Tomacorriente industrial con puesta a tierra 250V

und

3.00

60.50

181.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

181.50

100.00%

06.03.04.06.04

Placa de 6 salidas de Tomacorriente Industrial.

und

1.00

184.47

184.47

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

184.47

100.00%

06.03.04.06.05

Tomacorriente simple(Luz de emergencia)

und

9.00

22.50

202.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.00

202.50

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

06.03.04.07

CAJAS DE PASO

-

-

0.00%

06.03.04.07.01

CAJA DE PASO DE 100 X 100 X 50 mm

und

1.00

73.96

73.96

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

73.96

100.00%

06.03.04.07.02

CAJA DE PASO DE 150 X 150 X 75 mm

und

1.00

71.16

71.16

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

71.16

100.00%

33

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

06.03.04.08

P. U.

INSTALACIONES DE COMUNICACIONES

06.03.04.08.01

SALIDAS

06.03.04.08.01.01

SALIDA PARA DATOS/VOZ

06.03.04.08.02

EQUIPO DATOS/VOZ

06.03.04.08.03

METRADO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

2.00

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

2.00

79.51

159.02

und

14.00

70.83

991.62

-

TUBERIAS

MONTO

-

und

ARTEFACTOS DE COMUNICACIÓN

06.03.04.08.02.01

AVANCE ANTERIOR

P. TOTAL

-

-

-

14.00

991.62

0.00% 100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

TUBO PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 35 mm (1 1/4")

UND

18.00

18.61

334.98

-

-

0.00%

-

-

0.00%

-

-

0.00%

18.00

334.98

100.00%

06.03.04.08.03.02

TUBO PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

UND

4.00

11.39

45.56

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

45.56

100.00%

06.03.04.08.03.03

CURVA PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 35 mm (1 1/4")

und

4.00

7.03

28.12

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

28.12

100.00%

06.03.04.08.03.04

CURVA PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

und

4.00

6.92

27.68

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

27.68

100.00%

06.03.04.08.03.05

UNION PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 35 mm (1 1/4")

und

4.00

9.56

38.24

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

38.24

100.00%

06.03.04.08.03.06

UNION PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

und

4.00

9.46

37.84

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

37.84

100.00%

06.03.04.08.03.07

CONEXION PVC SAP PARA INSTALACIONES ELECTRICAS DE 35MM (1 1/4")

und

4.00

9.97

39.88

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

39.88

100.00%

06.03.04.08.03.08

CONEXION PVC SAP PARA INSTALACIONES ELECTRICAS DE 20MM (3/4")

und

4.00

7.42

29.68

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

29.68

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

100.00%

-

-

CONDUCTORES DE COMUNICACIÓN

06.03.04.08.04.01 06.04 06.04.01 06.04.01.01

CABLE UTP CATEGORIA 6

m

100.00

3.08

SUB-ESTACION ESTRUCTURAS MOVIMIENTO DE TIERRAS

308.00

06.04.01.01.01

EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS EN TERRENO NORMAL

m3

46.40

50.57

2,346.45

06.04.01.01.02

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

14.40

33.75

486.00

06.04.01.01.03

NIVELACION INTERIOR Y COMPACTADO C/EQUPO.

m2

52.51

8.85

464.71

06.04.01.01.04

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

36.80

25.29

930.67

36.80

930.67

06.04.01.01.05

ELIMINACION DE MATERIAL EXCEDENTE D = 2 Km

m3

36.80

13.93

512.62

36.80

512.62

100.00%

06.04.01.02 06.04.01.02.01 06.04.01.03 06.04.01.03.01

-

2,346.45 -

46.40

CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS

32.00

206.03

6,592.96

32.00

6,592.96

0.00%

0.00%

-

-

0.00%

0.00%

-

-

0.00%

100.00%

-

-

0.00%

36.80

930.67

100.00%

-

-

0.00%

-

-

0.00%

36.80

512.62

100.00%

-

-

0.00%

-

100.00%

-

-

0.00%

32.00

OBRAS DE CONCRETO ARMADO

-

6,592.96

SOBRECIMIENTO ARMADO

14.40

486.00

100.00%

0.00%

52.51

464.71

100.00%

100.00%

-

06.04.01.03.01.02

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

06.04.01.03.01.03 06.04.01.03.01.04

-

0.00%

-

kg

0.00%

0.00%

-

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

0.00% 100.00%

-

m3

308.00

-

-

2,346.45

100.00

-

0.00%

100.00%

OBRAS DE CONCRETO SIMPLE

06.04.01.03.01.01

06.04.01.03.02

46.40

-

-

0.00% 100.00%

06.03.04.08.03.01

06.03.04.08.04

-

159.02

0.00%

-

140.00

5.06

708.40

140.00

708.40

100.00%

-

-

0.00%

140.00

708.40

100.00%

-

-

0.00%

m2

35.10

49.13

1,724.46

35.10

1,724.46

100.00%

-

-

0.00%

35.10

1,724.46

100.00%

-

-

0.00%

CONCRETO f´c= 210 kg/cm2 PARA SOBRECIMIENTOS

m3

4.39

450.05

1,975.72

4.39

1,975.72

100.00%

-

-

0.00%

4.39

1,975.72

100.00%

-

-

0.00%

CURADO DE CONCRETO

m2

35.10

1.93

67.74

35.10

67.74

100.00%

-

-

0.00%

35.10

67.74

100.00%

-

-

0.00%

COLUMNAS

-

-

06.04.01.03.02.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

225.00

5.06

1,138.50

0.00%

225.00

1,138.50

100.00%

-

-

0.00%

06.04.01.03.02.02

ENCOFRADO Y DESENCOFRADO DE COLUMNAS

m2

48.95

59.71

2,922.80

-

-

0.00%

48.95

2,922.80

100.00%

48.95

2,922.80

100.00%

-

-

0.00%

06.04.01.03.02.03

CONCRETO f´c= 210 kg/cm2 PARA COLUMNAS

m3

3.06

557.01

1,704.45

-

-

0.00%

3.06

1,704.45

100.00%

3.06

1,704.45

100.00%

-

-

0.00%

06.04.01.03.02.04

CURADO DE CONCRETO

m2

48.95

1.93

94.47

-

-

0.00%

48.95

94.47

100.00%

48.95

94.47

100.00%

-

-

0.00%

06.04.01.03.03

225.00

1,138.50

100.00%

-

-

VIGAS

-

-

06.04.01.03.03.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

154.00

5.06

779.24

-

-

0.00%

154.00

779.24

100.00%

154.00

779.24

100.00%

-

-

0.00%

06.04.01.03.03.02

ENCOFRADO Y DESENCOFRADO DE VIGAS

m2

39.60

74.12

2,935.15

-

-

0.00%

39.60

2,935.15

100.00%

39.60

2,935.15

100.00%

-

-

0.00%

06.04.01.03.03.03

CONCRETO f´c= 210kg/cm2 PARA VIGAS

m3

1.58

557.01

880.08

-

-

0.00%

1.58

880.08

100.00%

1.58

880.08

100.00%

-

-

0.00%

06.04.01.03.03.04

CURADO DE CONCRETO

m2

39.60

1.93

76.43

-

-

0.00%

39.60

76.43

100.00%

39.60

76.43

100.00%

-

-

0.00%

06.04.01.03.04 06.04.01.03.04.01

VARIOS PRUEBAS DE CONTROL DE CALIDAD DEL CONCRETO

und

8.00

18.36

146.88

2.00

36.72

25.00%

6.00

110.16

75.00%

8.00

146.88

100.00%

-

-

0.00%

34

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

06.04.01.04 06.04.01.04.01

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

ESTRUCTURA METALICA

MONTO

% -

TIJERALES METALICOS

-

06.04.01.04.01.01

CARPINTERIA METALICA

KG

1,377.33

11.09

15,274.59

-

-

0.00%

-

-

0.00%

-

-

0.00%

1,377.33

15,274.59

100.00%

06.04.01.04.01.02

MONTAJE ESTRUCTURA METALICAS

KG

1,377.33

3.14

4,324.82

-

-

0.00%

-

-

0.00%

-

-

0.00%

1,377.33

4,324.82

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

100.00%

-

-

0.00%

0.00%

-

-

0.00%

06.04.02 06.04.02.01 06.04.02.01.01 06.04.02.02

ARQUITECTURA MUROS Y TABIQUES DE ALBAÑILERIA MUROS DE LADRILLO KK DE CABEZA MEZCLA 1:5

m2

89.18

128.18

REVOQUES ENLUCIDOS Y MOLDURAS

11,431.09 -

79.18

10,149.29

88.79%

-

-

0.00%

10.00

1,281.80 -

11.21% 0.00%

89.18 -

11,431.09 -

06.04.02.02.01

TARRAJEO EN MUROS INTERIORES C:A 1:4 E=1.5CM

m2

95.86

24.10

2,310.23

-

-

0.00%

95.86

2,310.23

100.00%

95.86

2,310.23

100.00%

-

-

0.00%

06.04.02.02.02

TARRAJEO EN MUROS EXTERIORES C:A 1:4 E=1.5CM

m2

95.86

28.43

2,725.30

-

-

0.00%

95.86

2,725.30

100.00%

95.86

2,725.30

100.00%

-

-

0.00%

06.04.02.02.03

VESTIDURA DE DERRAMES

m

27.36

16.50

451.44

-

-

0.00%

27.36

451.44

100.00%

27.36

451.44

100.00%

-

-

06.04.02.02.04

BRUÑAS 1 cm

m

31.26

6.66

208.19

-

-

0.00%

-

-

0.00%

M2

85.89

87.64

7,527.40

-

-

0.00%

-

-

0.00%

CONTRAPISO E=40 mm

m2

52.51

28.37

1,489.71

-

-

0.00%

-

PISO DE CEMENTO PULIDO Y BRUÑADO, MEZC. C:A 1:4 CON ENDURECEDOR, e=2"

m2

52.51

23.18

1,217.18

-

-

0.00%

-

-

-

0.00%

-

-

0.00%

06.04.02.03 06.04.02.03.01 06.04.02.04 06.04.02.04.01 06.04.02.04.02 06.04.02.05 06.04.02.05.01 06.04.02.06 06.04.02.06.01 06.04.02.06.02 06.04.02.07 06.04.02.07.01 06.04.02.07.02 06.04.02.08 06.04.02.08.01 06.04.02.08.02 06.04.02.09

CIELORRASOS FALSO CIELO RASO CON PLANCHA DE FIBROCEMENTO 8MM C/PINT. LATEX

-

PISOS Y PAVIMENTOS

-

CONTRAZOCALOS CONTRAZOCALO DE CEMENTO PULIDO H=10 CM

m

29.00

17.41

504.89

COBERTURA DE ALUZING TIPO TR3 E=0.45mm INC/ ACCESORIOS

M2

85.89

70.87

6,087.02

CUMBRERA DE ALUZING INC/ ACCESORIOS

M

12.20

48.34

589.75

COBERTURAS

-

CARPINTERÍA METÁLICA

-

PUERTA METÁLICA TIPO REJA C/ MALLA 2.00 x 2.30 M

UND

ESTRUCTURA METÁLICA C/MALLA DE ACERO AL CARBON DE 3/4" N°9, CALIBRE 10

m2

40.00

2,834.80

-

-

-

0.00%

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

52.51

1,489.71

100.00%

-

0.00%

-

-

0.00%

52.51

1,217.18

100.00%

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

0.00%

46.57%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

-

0.00%

40.00

2,834.80

0.00%

31.26 85.89 -

29.00 -

208.19

0.00%

-

7,527.40 -

504.89 -

100.00% 0.00% 100.00% 0.00%

0.00% 100.00% 0.00%

46.57%

45.89

3,252.22

53.43%

-

0.00%

12.20

589.75

100.00%

-

0.00%

-

-

0.00%

1.00

2,530.00

2,530.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

2,530.00

100.00%

11.60

415.28

4,817.25

-

-

0.00%

-

-

0.00%

-

-

0.00%

11.60

4,817.25

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

CERRAJERÍA

-

-

0.00%

CERRADURA TIPO B

UND

1.00

103.19

103.19

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

103.19

100.00%

BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 3"

und

3.00

22.53

67.59

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

67.59

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

PINTURA

-

-

0.00%

06.04.02.09.01

PINTURA LATEX EN CIELORRASO 2 MANOS

m2

85.89

19.96

1,714.36

-

-

0.00%

-

-

0.00%

-

-

0.00%

85.89

1,714.36

100.00%

06.04.02.09.02

PINTURA LATEX EN MUROS INTERIORES 2 MANOS

m2

102.70

16.42

1,686.33

-

-

0.00%

-

-

0.00%

-

-

0.00%

102.70

1,686.33

100.00%

06.04.02.09.03

PINTURA LATEX EN MUROS EXTERIORES 2 MANOS

m2

95.86

19.96

1,913.37

-

-

0.00%

-

-

0.00%

-

-

0.00%

95.86

1,913.37

100.00%

06.04.02.09.04

PINTURA LATEX EN VIGAS 2 MANOS

m2

5.20

20.09

104.47

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.20

104.47

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

06.04.02.10 06.04.02.10.01 06.04.03 06.04.03.01

VARIOS LIMPIEZA FINAL DE OBRA

m2

85.89

1.51

INSTALACIONES ELECTRICAS SALIDAS

129.69

-

85.89

129.69

0.00% 100.00%

06.04.03.01.01

SALIDA PARA ALUMBRADO

und

7.00

45.39

317.73

-

-

0.00%

7.00

317.73

100.00%

7.00

317.73

100.00%

-

-

0.00%

06.04.03.01.02

SALIDA PARA INTERRUPTOR

und

7.00

45.39

317.73

-

-

0.00%

7.00

317.73

100.00%

7.00

317.73

100.00%

-

-

0.00%

-

-

0.00%

-

-

06.04.03.02

TUBERIAS

-

-

0.00%

-

-

0.00%

0.00%

06.04.03.02.01

TUBO CONDUIT DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

16.00

104.77

1,676.32

-

-

0.00%

-

-

0.00%

-

-

0.00%

16.00

1,676.32

100.00%

06.04.03.02.02

CURVA CONDUIT DE 90° DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

16.00

13.59

217.44

-

-

0.00%

-

-

0.00%

-

-

0.00%

16.00

217.44

100.00%

06.04.03.02.03

UNIÓN CONDUIT EMT DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

16.00

9.60

153.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

16.00

153.60

100.00%

06.04.03.02.04

TERMINAL CONDUIT EMT DE ACERO GALVANIZADO 20 mm ? (3/4")

und

16.00

14.69

235.04

-

-

0.00%

-

-

0.00%

-

-

0.00%

16.00

235.04

100.00%

35

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

06.04.03.03

CONDUCTORES

06.04.03.03.01 06.04.03.04

CABLE NH80 2.5mm2

06.04.03.04.02

06.04.03.06

m

METRADO

MONTO

AVANCE ACTUAL %

-

-

0.00%

-

-

0.00%

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

METRADO -

MONTO

% -

0.00%

238.00

2.10

499.80

-

-

0.00%

0.00%

-

0.00%

-

Luminaria lineal para empotrar tipo reflector de aluminio, lampara fluoresfente T5 de und

6.00

279.48

1,676.88

-

-

0.00%

1.50

419.22

25.00%

1.50

419.22

25.00%

4.50

1,257.66

75.00%

Luz de emergencia

1.00

303.26

303.26

-

-

0.00%

0.25

75.82

75.82

227.44

75.00%

-

-

0.00%

-

-

0.00%

-

und

INTERRUPTORES

06.04.03.05.01

AVANCE ANTERIOR

P. TOTAL -

ARTEFACTOS DE ILUMINACION

06.04.03.04.01

06.04.03.05

P. U.

Interruptor Doble

und

1.00

24.20

24.20

TABLEROS PRINCIPALES_x000D_

-

-

-

-

-

238.00

25.00%

0.25

25.00%

0.75

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

24.20

0.00% 100.00%

-

-

0.00%

0.00%

-

0.00%

-

und

1.00

28,764.16

28,764.16

-

-

0.00%

0.25

7,191.04

25.00%

0.25

7,191.04

25.00%

0.75

21,573.12

75.00%

06.04.03.06.02

TABLERO DE TRANFERENCIA AUTOMATICO, INCLUYE COMPONENTES ACCESORIOS E INSTALACION

und

1.00

4,400.00

4,400.00

-

-

0.00%

0.25

1,100.00

25.00%

0.25

1,100.00

25.00%

0.75

3,300.00

75.00%

06.04.03.06.03

SUB TABLERO DE INTERRUPTORES STI, INCLUYE COMPONENTES ACCESORIOS E INSTALACION

und

1.00

1,525.42

1,525.42

-

-

0.00%

0.25

381.36

25.00%

0.25

381.36

25.00%

0.75

1,144.06

75.00%

-

-

0.00%

0.00%

-

0.00%

-

-

-

-

-

0.00%

TABLERO MODULAR DE 03 BLOQUES, INCLUYE COMPONENTES ACCESORIOS E INSTALACION

EQUIPOS ELECTRICOS_x000D_

-

-

100.00%

06.04.03.06.01

06.04.03.07

-

499.80

-

0.00%

0.00%

06.04.03.07.01

BANCO DE CONDENSADORES AUTOMATICO 50KVAR, INCLUYE COMPONENTES Y ACCESORIOS DE INSTALACION

und

1.00

9,000.00

9,000.00

-

-

0.00%

0.25

2,250.00

25.00%

0.25

2,250.00

25.00%

0.75

6,750.00

75.00%

06.04.03.07.02

MEDIDOR MULTIFUNCION

und

1.00

1,864.41

1,864.41

-

-

0.00%

0.25

466.10

25.00%

0.25

466.10

25.00%

0.75

1,398.31

75.00%

06.04.03.07.03

SUPRESOR DE TRANSITORIOS TVSS

und

1.00

2,500.00

2,500.00

-

-

0.00%

0.25

625.00

25.00%

0.25

625.00

25.00%

0.75

1,875.00

75.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

2.00

06.04.03.08

GRUPO ELECTROGENO

06.04.03.08.01 06.04.03.09

GRUPO ELECTROGENO DE 30KW

UND

1.00

22,104.63

22,104.63

und

2.00

73.96

147.92

CAJAS DE PASO

06.04.03.09.01 06.04.03.10

-

CAJA DE PASO DE 100 X 100 X 50 mm

-

-

-

22,104.63 147.92

INSTALACIONES DE SISTEMAS INDUSTRIALES

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

BANDEJAS ELECTRICAS DE 300x100mm

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

06.04.03.10.01

0.00% 100.00% 0.00% 100.00% 0.00% 0.00%

06.04.03.10.01.01

BANDEJAS ELECTRICAS

und

4.00

88.66

354.64

-

-

0.00%

1.00

88.66

25.00%

1.00

88.66

25.00%

3.00

265.98

75.00%

06.04.03.10.01.02

Accesorios

UND

4.00

397.22

1,588.88

-

-

0.00%

1.00

397.22

25.00%

1.00

397.22

25.00%

3.00

1,191.66

75.00%

06.04.03.10.01.03

SOPORTE DE BANDEJA

und

4.00

271.00

1,084.00

-

-

0.00%

1.00

271.00

25.00%

1.00

271.00

25.00%

3.00

813.00

75.00%

06.04.03.10.01.04

Soportes de Distanciador para fijar en pared

und

4.00

106.50

426.00

-

-

0.00%

1.00

106.50

25.00%

1.00

106.50

25.00%

3.00

319.50

75.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

412.65

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.16

06.05 06.05.01 06.05.01.01

TANQUE GLP ESTRUCTURAS MOVIMIENTO DE TIERRAS

06.05.01.01.01

EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS EN TERRENO NORMAL

m3

06.05.01.01.02

RELLENO Y COMPACTADO CON MATERIAL PROPIO

06.05.01.01.03

NIVELACION INTERIOR Y COMPACTADO C/EQUPO.

06.05.01.01.04 06.05.01.01.05 06.05.01.02

8.16

50.57

M3

2.72

33.75

91.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

m2

35.60

8.85

315.06

-

-

0.00%

-

-

0.00%

-

-

0.00%

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

5.44

25.29

137.58

-

-

0.00%

-

-

0.00%

-

-

0.00%

ELIMINACION DE MATERIAL EXCEDENTE D = 2 Km

m3

5.44

13.93

75.78

-

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

OBRAS DE CONCRETO SIMPLE

-

06.05.01.02.01

CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS

m3

5.44

06.05.01.02.02

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

m2

06.05.01.02.03

CONCRETO f´c= 140 kg/cm PARA SOBRECIMIENTOS

m3

06.05.01.03 06.05.01.03.01

kg

06.05.01.03.01.02

ENCOFRADO Y DESENCOFRADO DE COLUMNAS

m2

06.05.01.03.01.03

CONCRETO f´c= 210 kg/cm2 PARA COLUMNAS

m3

2.72

91.80

100.00%

35.60

315.06

100.00%

5.44

137.58

100.00%

0.00%

5.44

75.78

100.00%

-

0.00%

-

-

0.00%

1,120.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.44

1,120.80

100.00%

29.92

49.13

1,469.97

-

-

0.00%

-

-

0.00%

-

-

0.00%

29.92

1,469.97

100.00%

3.74

374.06

1,398.98

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.74

1,398.98

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

COLUMNAS ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

100.00%

206.03

OBRAS DE CONCRETO ARMADO

06.05.01.03.01.01

0.00%

412.65

55.57

0.00% 0.00%

5.06

281.18

-

-

0.00%

-

-

0.00%

-

-

0.00%

55.57

281.18

100.00%

4.40

59.71

262.72

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.40

262.72

100.00%

0.28

557.01

155.96

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.28

155.96

100.00%

36

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

06.05.01.03.01.04

CURADO DE CONCRETO

06.05.01.03.02

PRUEBAS DE CONTROL DE CALIDAD DEL CONCRETO

06.05.01.04.01.02 06.05.02 06.05.02.01

AVANCE ACTUAL %

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

-

-

-

-

METRADO -

MONTO

AVANCE ACUMULADO %

METRADO

SALDO %

METRADO

%

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

4.40

MONTO

-

8.49 91.80

100.00% 0.00% 100.00% 0.00% 0.00%

1,377.33

11.09

15,274.59

-

-

0.00%

-

-

0.00%

-

-

0.00%

1,377.33

15,274.59

100.00%

MONTAJE ESTRUCTURA METALICAS

KG

1,377.33

3.14

4,324.82

-

1,377.33

4,324.82

100.00%

m2

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

UND

ESTRUCTURA METÁLICA C/MALLA DE ACERO AL CARBON DE 3/4" N°9, CALIBRE 10

m2

0.00%

28.37

1,128.27

-

-

0.00%

-

0.00%

-

-

0.00%

-

1.00

2,530.00

2,530.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

2,530.00

100.00%

41.79

415.28

17,354.55

-

-

0.00%

-

-

0.00%

-

-

0.00%

41.79

17,354.55

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

PUERTA METÁLICA TIPO REJA C/ MALLA 0.70 x 1.75 M

0.00%

39.77

-

-

39.77

1,128.27 -

-

100.00% 0.00%

0.00%

CERRADURA TIPO E

UND

1.00

40.59

40.59

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

40.59

100.00%

BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 3"

und

3.00

22.53

67.59

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

67.59

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

LIMPIEZA FINAL DE OBRA

m2

39.77

1.51

CONSTRUCCION DE CORRALES

60.05

1,213,693.60

-

56,505.87

516,548.01

39.77

573,053.88

60.05

0.00% 100.00%

640,639.72

ESTRUCTURAS MOVIMIENTO DE TIERRAS

07.01.01.01

EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS EN TERRENO NORMAL

m3

304.02

50.57

15,374.29

07.01.01.02

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

85.26

33.75

2,877.53

07.01.01.03

NIVELACION INTERIOR Y COMPACTADO C/EQUPO.

m2

2,387.21

8.85

21,126.81

70.00%

1,671.05

07.01.01.04

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

251.58

25.29

6,362.46

251.58

6,362.46

100.00%

-

-

0.00%

251.58

07.01.01.05

ELIMINACION DE MATERIAL EXCEDENTE D = 2 Km

m3

251.58

13.93

3,504.51

251.58

3,504.51

100.00%

-

-

0.00%

251.58

07.01.02

MONTO

KG

VARIOS

06.05.02.04.01

07.01.01

91.80

CERRAJERÍA

06.05.02.03.02

07.01

18.36

CARPINTERÍA METÁLICA

06.05.02.03.01

07

5.00

MONTO

CARPINTERIA METALICA

CONTRAPISO E=40 mm

06.05.02.02.02

06.05.02.04

und

PISOS Y PAVIMENTOS

06.05.02.02.01

06.05.02.03

8.49

ARQUITECTURA

06.05.02.01.01 06.05.02.02

1.93

TIJERALES METALICOS

06.05.01.04.01.01

METRADO

4.40

ESTRUCTURA METALICA

06.05.01.04.01

AVANCE ANTERIOR

P. TOTAL

m2

VARIOS

06.05.01.03.02.01 06.05.01.04

P. U.

304.02 -

15,374.30 -

100.00%

-

-

0.00%

0.00%

-

-

0.00%

0.00%

1,671.05

14,788.77

304.02 -

OBRAS DE CONCRETO SIMPLE

15,374.29 -

100.00%

-

-

0.00%

0.00%

85.26

2,877.53

100.00%

14,788.77

70.00%

716.16

6,338.04

30.00%

6,362.46

100.00%

-

-

0.00%

3,504.51

100.00%

-

-

0.00%

-

-

07.01.02.01

CONCRETO f´c= 140 kg/cm PARA PISOS

m3

477.44

374.06

178,591.21

-

-

0.00%

334.21

125,013.84

70.00%

334.21

125,013.84

70.00%

143.23

53,577.37

30.00%

07.01.02.02

ENCOFRADO Y DESENCOFRADO DE SARDINELES

m2

1,085.79

37.15

40,337.10

-

-

0.00%

760.05

28,235.97

70.00%

760.05

28,235.97

70.00%

325.74

12,101.13

30.00%

07.01.02.03

CONCRETO f´c= 140 kg/cm PARA MUROS Y SARDINELES

m3

218.76

374.06

81,829.37

-

-

0.00%

153.13

57,280.56

70.00%

153.13

57,280.56

70.00%

65.63

24,548.81

30.00%

07.01.03 07.01.03.01

ESTRUCTURA METALICA

-

TIJERALES METALICOS

-

07.01.03.01.01

CARPINTERIA METALICA

KG

28,435.18

11.09

315,346.15

-

-

0.00%

07.01.03.01.02

MECANIZADOS

KG

226.08

11.09

2,507.23

-

-

0.00%

-

-

0.00%

-

MONTAJE ESTRUCTURA METALICAS

KG

28,435.18

3.14

89,286.47

-

07.01.03.01.03 07.02 07.02.01 07.02.01.01 07.02.02 07.02.02.01 07.02.02.02 07.02.03 07.02.03.01

ARQUITECTURA PISOS Y PAVIMENTOS CONCRETO EN FALSOPISO MEZCLA 1:8 CEMENTO-HORMIGON E=4"

17,061.11

189,207.69

60.00%

-

0.00%

226.08

2,507.23

100.00%

28,435.18

89,286.47

100.00%

0.00%

-

0.00%

-

-

0.00%

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

M2

548.34

70.87

38,860.86

CUMBRERA DE ALUZING INC/ ACCESORIOS

M

73.69

48.34

3,562.17

-

2,000.00

40.00%

-

COBERTURA DE ALUZING TIPO TR3 E=0.45mm INC/ ACCESORIOS

16.85

126,138.46

-

47,717.04

M

11,374.07

-

34.17

ESCALERA Y CORREDOR DE ARREO METALICA

40.00%

-

1,396.46

CARPINTERÍA METÁLICA

126,138.46

-

m2

COBERTURAS

11,374.07

33,700.00

350.68

24,852.69

977.52

0.00%

33,401.93

70.00%

977.52

-

0.00%

63.95%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

350.68

33,401.93 24,852.69

70.00% 0.00%

418.94 -

14,315.11 -

0.00% 0.00% 30.00% 0.00%

63.95%

197.66

14,008.17

36.05%

-

0.00%

73.69

3,562.17

100.00%

-

0.00%

-

0.00%

16.85

33,700.00

0.00% 100.00%

37

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

07.02.03.02

BARANDA F.N. Ø 2" C/LARGUEROS DE FE. Ø 1 1/2" AMBOS E=2.5mm C/PASAMANOS FE Ø 2" E=2.5mm EN RAMPA H=0.90

M

16.85

07.02.03.03

CORRAL DE F.N. C/ PARAN.Ø 2” Y LARG.Ø 1.5" C/PASAMANOS FE Ø 2", e=2.5mm, H=1.80m

M

07.02.03.04

PUERTA DE F.N.(1.86X1.80) PARANTES Ø 2” Y LARGUEROS Ø 1.5" C/PASAMANOS Ø 2", E=2.5mm, C/1 HOJA BATIENTE

UND

07.02.03.05

PUERTA DE F.N.(0.80X1.80) PARANTES Ø 2” Y LARGUEROS Ø 1.5" C/PASAMANOS Ø 2", E=2.5mm, C/1 HOJA BATIENTE

UND

07.02.03.06

PUERTA DE F.N.(2.85X1.80) PARANTES Ø 2” Y LARGUEROS Ø 1.5" C/PASAMANOS Ø 2", E=2.5mm, C/ 1 HOJA DOBLE ACCION

UND

07.02.03.07

PUERTA DE F.N.(1.40X1.80) PARANTES Ø 2” Y LARGUEROS Ø 1.5" C/PASAMANOS Ø 2", e=2.5mm, C/ 1 HOJA BATIENTE

07.02.03.08

PUERTA DE F.N.(2.80X1.80) PARANTES Ø 2” Y LARGUEROS Ø 1.5" C/PASAMANOS Ø 2", E=2.5MM, C/2 HOJAS BATIENTES

07.02.03.09

PUERTA DE F.N.(1.80X1.80) PARANTES Ø 2” Y LARGUEROS Ø 1.5" C/PASAMANOS Ø 2", E=2.5MM, C/1HOJA BATIENTE

07.02.04 07.02.04.01 07.02.05 07.02.05.01 07.03 07.03.01 07.03.01.01 07.03.01.01.01 07.03.01.02

P. U.

METRADO

METRADO

-

-

0.00%

8.43

534.37

254.24

135,858.23

-

-

0.00%

13.00

1,914.24

24,885.12

-

-

0.00%

17.00

913.00

15,521.00

-

-

5.00

2,848.80

14,244.00

-

-

UND

9.00

1,480.00

13,320.00

-

UND

8.00

2,801.60

22,412.80

-

UND

1.00

1,857.60

1,857.60

m2

267.19

67,929.11

50.00%

6.50

12,442.56

50.00%

0.00%

8.50

7,760.50

0.00%

2.50

7,122.00

-

0.00%

4.50

-

0.00%

4.00

-

-

0.00%

0.50

928.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

-

-

-

-

-

40.59

1,948.32

1,768.22

1.51

2,670.01

SISTEMA DE AGUA FRÍA SALIDA DE AGUA FRÍA

METRADO 8.43

48.00

INSTALACIONES SANITARIAS

AVANCE ACUMULADO % 50.00%

UND

MONTO 1,041.33

-

SALIDA DE AGUA FRIA CON TUBO PVC TIPO ROSCA DE 1/2"

AVANCE ACTUAL %

2,082.66

VARIOS LIMPIEZA FINAL DE OBRA

MONTO

123.60

CERRAJERÍA CERRADURA TIPO G

AVANCE ANTERIOR

P. TOTAL

MONTO

SALDO %

METRADO

MONTO

%

1,041.33

50.00%

8.43

1,041.33

50.00%

267.19

67,929.11

50.00%

267.19

67,929.12

50.00%

6.50

12,442.56

50.00%

6.50

12,442.56

50.00%

50.00%

8.50

7,760.50

50.00%

8.50

7,760.50

50.00%

50.00%

2.50

7,122.00

50.00%

2.50

7,122.00

50.00%

6,660.00

50.00%

4.50

6,660.00

50.00%

4.50

6,660.00

50.00%

11,206.40

50.00%

4.00

11,206.40

50.00%

4.00

11,206.40

50.00%

928.80

928.80

50.00%

50.00%

0.50

50.00%

0.50

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

0.00%

-

-

0.00%

-

-

819.00

70.00%

4.50

351.00

30.00%

-

-

PTO

15.00

78.00

1,170.00

-

-

0.00%

10.50

819.00

70.00%

10.50

48.00 1,768.22

1,948.32 2,670.01

0.00% 100.00% 0.00% 100.00%

0.00%

REDES DE DISTRIBUCION DE AGUA FRIA

07.03.01.02.01

TUBO PVC CON UNION TIPO ROSCA DE 1/2" PN10 (ENTERRADA)

M

65.76

17.70

1,163.95

-

-

0.00%

52.61

931.16

80.00%

52.61

931.16

80.00%

13.15

232.79

20.00%

07.03.01.02.02

TUBO PVC CON UNION TIPO ROSCA DE 3/4" PN10 (ENTERRADA)

m

84.69

18.06

1,529.50

-

-

0.00%

65.00

1,173.90

76.75%

65.00

1,173.90

76.75%

19.69

355.60

23.25%

07.03.01.02.03

TUBO PVC CON UNION TIPO ROSCA DE 1" PN10 (ENTERRADA)

m

28.74

24.34

699.53

-

-

0.00%

28.74

699.53

100.00%

28.74

699.53

100.00%

-

-

0.00%

07.03.01.02.04

PRUEBA HIDRÁULICA EN TUBERIAS Y DESINFECCION

M

179.19

1.83

327.92

-

-

0.00%

179.19

327.92

100.00%

179.19

327.92

100.00%

-

-

0.00%

0.00%

07.03.01.03

ACCESORIOS DE REDES DE AGUA

07.03.01.03.01

CODO PVC TIPO ROSCA DE 1/2" 90°

und

19.00

11.50

218.50

-

-

0.00%

19.00

218.50

100.00%

19.00

218.50

100.00%

-

-

07.03.01.03.02

CODO PVC TIPO ROSCA DE 3/4" 90°

und

2.00

24.80

49.60

-

-

0.00%

2.00

49.60

100.00%

2.00

49.60

100.00%

-

-

07.03.01.03.03

TEE PVC TIPO ROSCA DE 3/4"

und

16.00

25.65

410.40

-

-

0.00%

10.00

256.50

62.50%

10.00

256.50

62.50%

6.00

07.03.01.03.04

TEE PVC TIPO ROSCA DE 1"

und

3.00

26.22

78.66

-

-

0.00%

3.00

78.66

100.00%

3.00

78.66

100.00%

-

07.03.01.03.05

REDUCCION PVC TIPO ROSCA DE 1" A 3/4"

und

4.00

16.21

64.84

-

-

0.00%

3.00

48.63

75.00%

3.00

48.63

75.00%

1.00

16.21

25.00%

REDUCCION PVC TIPO ROSCA DE 3/4" A 1/2"

und

20.00

20.61

412.20

-

-

0.00%

10.00

206.10

50.00%

10.00

206.10

50.00%

10.00

206.10

50.00%

07.03.01.03.06 07.03.01.04

153.90 -

0.00% 37.50% 0.00%

LLAVES Y VÁLVULAS

07.03.01.04.01

VALVULA DE COMPUERTA DE BRONCE 1/2"

und

20.00

68.36

1,367.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

20.00

1,367.20

100.00%

07.03.01.04.02

VALVULA FLOTADORA 1/2''

und

15.00

98.02

1,470.30

-

-

0.00%

-

-

0.00%

-

-

0.00%

15.00

1,470.30

100.00%

07.03.01.04.03

NICHO Y TAPA PARA VALVULA EN PARED

UND

15.00

88.83

1,332.45

-

-

0.00%

-

-

0.00%

-

-

0.00%

15.00

1,332.45

100.00%

07.03.01.04.04

CAJA DE REGISTRO PARA VAL. DE AGUA 10"X20" C/TAPA Y MARCO DE FIERRO

UND

5.00

226.12

1,130.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

1,130.60

100.00%

07.03.01.05

RED ROCIADORES PARA LAVADO DE ANIMALES

07.03.01.05.01

TUBERIA DE F°G° C-40 3/4"

m

13.00

73.56

956.28

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.00

956.28

100.00%

07.03.01.05.02

TUBERIA DE F°G° C-40 1"

m

7.60

86.62

658.31

-

-

0.00%

-

-

0.00%

-

-

0.00%

7.60

658.31

100.00%

07.03.01.05.03

CODO FºGº C-40 D= 3/4"

und

6.00

25.56

153.36

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

153.36

100.00%

07.03.01.05.04

CODO FºGº C-40 D= 1"

und

8.00

28.87

230.96

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.00

230.96

100.00%

07.03.01.05.05

TEE F°G° C-40 D= 3/4"

und

26.00

25.56

664.56

-

-

0.00%

-

-

0.00%

-

-

0.00%

26.00

664.56

100.00%

07.03.01.05.06

NIPLE F°G° C-40 3/4" L=0.35m

und

24.00

25.56

613.44

-

-

0.00%

-

-

0.00%

-

-

0.00%

24.00

613.44

100.00%

38

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

07.03.01.05.07

REDUCCION F°G° C-40 3/4" @ 1/2"

und

07.03.01.05.08

REDUCCION F°G° C-40 1" @ 3/4"

und

07.03.01.05.09

ABRAZADERA DE SUJECION 3/4"

UND

07.03.01.05.10

ROCIADOR PARA RODILUVIO

und

16.00

07.03.02 07.03.02.01

P. U.

16.00

28.56

2.00 40.00

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

456.96

-

-

0.00%

-

-

0.00%

-

-

0.00%

30.65

61.30

-

-

0.00%

-

-

0.00%

-

-

0.00%

28.40

1,136.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

77.20

1,235.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

16.00

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

SISTEMA DE DESAGÜE Y VENTILACIÓN REDES COLECTORAS DE DESAGÜE

16.00

456.96

100.00%

2.00

61.30

100.00%

40.00

1,136.00

100.00%

1,235.20

100.00%

07.03.02.01.01

TRAZO, NIVELES Y REPLANTEO

m2

48.41

3.32

160.72

36.31

120.55

75.01%

12.10

40.17

24.99%

48.41

160.72

100.00%

-

-

0.00%

07.03.02.01.02

EXCAVACION DE ZANJAS EN TERRENO NORMAL

m3

11.35

50.57

573.97

8.51

430.35

74.98%

2.84

143.62

25.02%

11.35

573.97

100.00%

-

-

0.00%

07.03.02.01.03

REFINE Y CONFORMACION DE FONDO Y COSTADO

M2

121.03

14.89

1,802.14

90.77

1,351.57

75.00%

30.26

450.57

25.00%

121.03

1,802.14

100.00%

-

-

0.00%

07.03.02.01.04

CAMA DE ARENA PARA APOYO DE TUBERIAS

M3

6.05

33.37

201.89

4.54

151.50

75.04%

1.51

50.39

24.96%

6.05

201.89

100.00%

-

-

07.03.02.01.05

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

9.68

33.75

326.70

-

0.00%

-

0.00%

-

07.03.02.01.06

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

2.08

25.29

52.60

1.56

39.45

75.00%

0.52

13.15

25.00%

2.08

52.60

100.00%

-

-

0.00%

07.03.02.01.07

INSTALACION DE TUBERIA DE PVC-U D=110mm NTP ISO 4435-SERIE 20

M

83.18

47.13

3,920.27

62.39

2,940.44

75.01%

20.79

979.83

24.99%

83.18

3,920.27

100.00%

-

-

0.00%

07.03.02.01.08

INSTALACION DE TUBERIA DE PVC-U D=160mm NTP ISO 4435 - SERIE 20

M

37.85

48.54

1,837.24

28.39

1,378.05

75.01%

9.46

459.19

24.99%

37.85

1,837.24

100.00%

-

-

0.00%

-

07.03.02.02

ACCESORIOS DE REDES DE DESAGÜE

-

-

-

-

0.00%

-

0.00%

9.68

-

0.00%

-

-

0.00%

-

326.70

0.00% 100.00%

0.00%

07.03.02.02.01

TRAMPA "P" SAL 4"

und

4.00

79.73

318.92

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

318.92

100.00%

07.03.02.02.02

REGISTRO ROSCADO DE BRONCE 4"

und

4.00

91.96

367.84

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

367.84

100.00%

07.03.02.02.03

CANASTILLA SOLIDOS DE FIERRO INOX. SEGÚN DETALLE

und

4.00

96.33

385.32

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

385.32

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

07.03.02.03 07.03.02.03.01 07.03.02.03.02 07.03.02.04

CAJAS DE REGISTRO

UND

9.00

226.12

2,035.08

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.00

2,035.08

100.00%

CAJA DE REGISTRO 0.60x0.60m

UND

3.00

376.64

1,129.92

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

1,129.92

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

78.29

-

-

0.00%

-

-

0.00%

-

-

0.00%

CANALETA

-

TRAZO, NIVELES Y REPLANTEO

m2

23.58

3.32

07.03.02.04.02

EXCAVACION DE ZANJAS EN TERRENO NORMAL

07.03.02.04.03

REFINE Y CONFORMACION DE FONDO Y COSTADO

m3

6.29

50.57

318.09

-

-

0.00%

-

-

0.00%

-

-

0.00%

M2

120.52

14.89

1,794.54

-

-

0.00%

-

-

0.00%

-

-

0.00%

07.03.02.04.04

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

7.86

25.29

198.78

-

-

0.00%

-

-

0.00%

-

-

0.00%

07.03.02.04.05

ENCOFRADO Y DESENCOFRADO EN CANALES LATERALES

M2

41.92

60.87

2,551.67

-

-

0.00%

-

-

0.00%

-

-

07.03.02.04.06

CONCRETO f´c= 175 KG/CM2 EN CANALES LATERALES

M3

1.83

360.08

658.95

-

-

0.00%

-

-

0.00%

-

07.03.02.04.07

CANALETA TIPO PARRILLA FRP

m

52.40

56.30

2,950.12

-

-

0.00%

-

-

0.00%

07.03.02.04.08

ÁNGULO DE Fe 1 1/2"x1 1/2"x1/8"

M

104.80

18.89

1,979.67

-

-

0.00%

-

-

07.03.03.01 07.03.03.01.01 07.03.03.02 07.03.03.02.01 07.03.03.03

23.58

-

100.00%

6.29

318.09

100.00%

120.52

1,794.54

100.00%

7.86

198.78

100.00%

0.00%

41.92

2,551.67

100.00%

-

0.00%

1.83

658.95

100.00%

-

-

0.00%

52.40

2,950.12

100.00%

0.00%

-

-

0.00%

104.80

1,979.67

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

SALIDA DE DESAGUE Y VENTILACION

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

50.00%

7.50

50.00%

7.50

-

-

0.00%

-

-

0.00%

SALIDA DE DESAGUE PVC 2"

PTO

15.00

93.05

1,395.75

m

56.60

19.33

1,094.08

-

-

0.00%

15.00

25.62

384.30

-

-

0.00%

-

REDES DE RECOLECCION DE DESAGUE TUBERIA PVC 4" SAP DESAGUE (ENTERRADA)

-

ACCESORIOS DE REDES DE DESAGUE

-

7.50

697.88

28.30

547.04

-

TAPON REJILLA DE 2"

und

07.03.03.03.02

CODO PVC SAP DE 4"X45°

UND

5.00

32.36

161.80

-

-

0.00%

2.50

07.03.03.03.03

YEE PVC SAP DE 4"X2"

UND

15.00

36.52

547.80

-

-

0.00%

7.50

07.03.03.03.04

REGISTRO ROSCADO DE BRONCE 4"

und

5.00

91.96

459.80

-

-

0.00%

-

CANALETA Y MONTANTES PLUVIALES

-

0.00%

78.29

SISTEMA DE EVACUACIÓN DE AGUAS PLUVIALES

07.03.03.03.01

07.03.03.04

0.00%

CAJA DE REGISTRO 0.30x0.60m

07.03.02.04.01

07.03.03

-

0.00% 50.00%

28.30

697.88 547.04

0.00% 50.00%

28.30

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

15.00

-

80.90

50.00%

2.50

80.90

50.00%

273.90

50.00%

7.50

273.90

50.00%

-

0.00%

-

-

0.00%

697.87 547.04 -

0.00% 0.00% 50.00% 0.00% 50.00% 0.00%

384.30

100.00%

2.50

80.90

50.00%

7.50

273.90

50.00%

5.00

459.80

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

07.03.03.04.01

CANALETA SEMICIRCULAR DE PLANCHA GALVANIZADA D=6" E=0.5 MM

M

148.28

57.32

8,499.41

-

-

0.00%

-

-

0.00%

-

-

0.00%

148.28

-

8,499.41

-

100.00%

0.00%

07.03.03.04.02

SOPORTE DE F°G° DE 1"X3/8"

UND

105.00

38.75

4,068.75

-

-

0.00%

-

-

0.00%

-

-

0.00%

105.00

4,068.75

100.00%

07.03.03.04.03

MONTANTE PVC SAL DESAGUE D=3''

M

58.60

20.09

1,177.27

-

-

0.00%

-

-

0.00%

-

-

0.00%

58.60

1,177.27

100.00%

39

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

07.03.03.04.04

CODO PVC SAL 3"x45°

UND

46.00

20.46

941.16

-

-

0.00%

-

-

0.00%

-

-

0.00%

46.00

941.16

100.00%

07.03.03.04.05

CODO PVC SAL 3"X90°

UND

20.00

16.06

321.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

20.00

321.20

100.00%

07.03.03.04.06

YEE PVC SAP DE 4"X3"

UND

2.00

38.52

77.04

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

77.04

100.00%

07.03.03.04.07

ABRAZADERA DE PLATINA CIRCULAR 3/16X1",D=3"

UND

60.00

28.03

1,681.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

60.00

1,681.80

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

07.03.03.05

REDES DE DERIVACION

-

07.03.03.05.01

TRAZO, NIVELES Y REPLANTEO

m2

64.30

3.32

213.48

-

-

0.00%

37.18

07.03.03.05.02

EXCAVACION DE ZANJAS EN TERRENO NORMAL

07.03.03.05.03

REFINE Y CONFORMACION DE FONDO Y COSTADO

m3

33.84

50.57

1,711.29

-

-

0.00%

M2

227.99

14.89

3,394.77

-

-

0.00%

07.03.03.05.04

CAMA DE ARENA PARA APOYO DE TUBERIAS

M3

7.83

33.37

261.29

-

-

07.03.03.05.05

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

30.62

33.75

1,033.43

-

07.03.03.05.06

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

4.02

25.29

101.67

07.03.03.05.07

TUBERIA PVC 3" DESAGUE (ENTERRADA)

M

36.35

24.68

897.12

07.03.03.05.08

TUBERIA PVC SAL 4" DESAGUE (ENTERRADA)

M

86.43

25.28

07.03.03.05.09

INSTALACION DE TUBERIA PVC ISO 4435 UF 160 MM

M

33.74

52.49

07.03.03.06

-

0.00%

123.42

57.82%

37.18

14.87

752.00

43.94%

74.35

1,107.10

32.61%

0.00%

4.65

155.07

-

0.00%

-

-

-

0.00%

4.02

101.67

100.00%

4.02

101.67

100.00%

-

-

0.00%

5.00

123.40

13.76%

5.00

123.40

13.76%

2,184.95

-

-

0.00%

86.43

2,184.95

100.00%

86.43

2,184.95

100.00%

-

-

0.00%

1,771.01

-

-

0.00%

33.74

1,771.01

100.00%

33.74

1,771.01

100.00%

-

-

0.00%

-

123.42

57.81%

14.87

752.00

43.94%

74.35

1,107.10

32.61%

59.35%

4.65

155.07

59.35%

3.18

106.22

40.65%

0.00%

-

0.00%

30.62

1,033.43

100.00%

-

27.12

90.06

42.19%

18.97

959.29

56.06%

153.64

2,287.67

67.39%

31.35

773.72

0.00% 86.24%

CAJAS DE REGISTRO Y BUZONES

07.03.03.06.01

CAJA DE REGISTRO 0.30x0.60m

UND

8.00

226.12

1,808.96

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.00

1,808.96

100.00%

07.03.03.06.02

CAJA DE REGISTRO 0.60x0.60m

UND

3.00

376.64

1,129.92

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

1,129.92

100.00%

23.00

45.39

1,043.97

-

-

0.00%

-

-

0.00%

-

-

0.00%

23.00

1,043.97

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

07.04 07.04.01 07.04.01.01 07.04.02

INSTALACIONES ELECTRICAS SALIDAS SALIDA PARA ALUMBRADO

und

TUBERIAS

-

-

-

0.00%

07.04.02.01

TUBO PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 25 mm (1")

UND

20.00

18.59

371.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

20.00

371.80

100.00%

07.04.02.02

TUBO CONDUIT DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

50.00

104.77

5,238.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

50.00

5,238.50

100.00%

07.04.02.03

CURVA PVC SAP PARA INSTALACIONES ELECTRICAS DE 25MM (1")

und

8.00

6.42

51.36

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.00

51.36

100.00%

07.04.02.04

CURVA CONDUIT DE 90° DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

46.00

13.59

625.14

-

-

0.00%

-

-

0.00%

-

-

0.00%

46.00

625.14

100.00%

07.04.02.05

UNIÓN PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 25 mm (1")

und

40.00

11.40

456.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

40.00

456.00

100.00%

07.04.02.06

UNIÓN CONDUIT EMT DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

46.00

9.60

441.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

46.00

441.60

100.00%

07.04.02.07

CONEXIÓN PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 25 mm (1")

und

8.00

11.06

88.48

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.00

88.48

100.00%

07.04.02.08

TERMINAL CONDUIT EMT DE ACERO GALVANIZADO 20 mm ? (3/4")

und

46.00

14.69

675.74

-

-

0.00%

-

-

0.00%

-

-

0.00%

46.00

675.74

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

07.04.03 07.04.03.01 07.04.04 07.04.04.01 07.04.05 07.04.05.01 07.04.06 07.04.06.01 07.04.07 07.04.07.01

08 08.01 08.01.01 08.01.01.01

CONDUCTORES CABLE NLT de 3x14AWG

M

900.00

3.71

3,339.00

und

23.00

255.06

5,866.38

und

1.00

1,065.70

1,065.70

und

5.00

73.96

369.80

und

4.00

431.10

1,724.40

ARTEFACTOS DE ILUMINACION Luminaria para suspender tipo hermetico lineal, lámpara fluoresfente T5 de 1x28W

-

TABLEROS DE DISTRIBUCION SUB TABLERO DE INTERRUPTORES STI

-

CAJAS DE PASO CAJA DE PASO DE 100 X 100 X 50 mm

-

BUZON DE REGISTRO BUZON DE REGISTRO DE 300X300X300 MM

-

AREAS VERDES Y CIRCULACION

158,633.08

-

5.75

1,466.60

0.25

266.43

-

-

-

-

0.00%

-

25.00%

5.75

1,466.60

900.00 17.25

0.00%

-

25.00%

0.25

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

-

-

0.00% 25.00%

-

266.43

0.00%

-

25.00%

0.75

-

3,339.00 4,399.78 799.27 369.80 1,724.40

0.00% 100.00% 0.00% 75.00% 0.00% 75.00% 0.00% 100.00% 0.00% 100.00%

158,633.08

ARQUITECTURA VEREDAS Y SARDINELES SARDINEL DE CONCRETO f'c=175 Kg/cm2 (15X40)

M

996.03

86.12

85,778.10

-

-

0.00%

-

-

0.00%

-

-

0.00%

996.03

85,778.10

100.00%

40

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

08.01.01.02

VEREDA DE CONCRETO f'c=175 Kg/cm2 H=6" cm

m2

529.26

100.32

53,095.36

-

-

0.00%

-

-

0.00%

-

-

0.00%

529.26

53,095.36

100.00%

08.01.01.03

RAMPA DE CONCRETO F'C = 175 Kg/cm2, E = 6"; ACABADO EN CEMENTO SEMI - PULIDO Y BRUÑADO, INC. BASE GRANULAR

M2

187.69

99.51

18,677.03

-

-

0.00%

-

-

0.00%

-

-

0.00%

187.69

18,677.03

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

08.01.02 08.01.02.01

09 09.01 09.01.01 09.01.01.01 09.01.02

VARIOS LIMPIEZA FINAL DE OBRA

m2

716.95

1.51

INSTALACIONES SANITARIAS EXTERIORES

1,082.59

424,505.63

-

5,786.81

33,072.40

716.95

38,859.20

1,082.59

0.00% 100.00%

385,646.43

SISTEMA DE AGUA FRÍA OBRAS PRELIMINARES TRAZO, NIVELES Y REPLANTEO

m2

321.03

3.32

1,065.82

80.26

266.46

25.00%

-

MOVIMIENTO DE TIERRAS

-

0.00%

80.26

266.46

25.00%

240.77

-

799.36

75.00%

-

09.01.02.01

EXCAVACION DE ZANJAS EN TERRENO NORMAL

m3

211.88

50.57

10,714.77

42.38

2,143.16

20.00%

-

-

0.00%

42.38

2,143.16

20.00%

169.50

8,571.61

09.01.02.02

REFINE Y CONFORMACION DE FONDO Y COSTADO

M2

1,091.49

14.89

16,252.29

218.30

3,250.49

20.00%

-

-

0.00%

218.30

3,250.49

20.00%

873.19

13,001.80

80.00%

09.01.02.03

CAMA DE ARENA PARA APOYO DE TUBERIAS

M3

19.26

33.37

642.71

0.00%

-

-

0.00%

0.00%

19.26

642.71

100.00%

09.01.02.04

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

192.62

33.75

6,500.93

0.00%

-

-

0.00%

-

0.00%

192.62

6,500.93

100.00%

09.01.02.05

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

25.04

25.29

633.26

20.01%

-

-

0.00%

5.01

20.01%

20.03

506.56

79.99%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

7.00

09.01.03 09.01.03.01 09.01.04

SALIDA DE AGUA FRÍA SALIDA DE AGUA FRIA CON TUBO PVC TIPO ROSCA DE 1/2"

PTO

5.01

126.70

-

-

0.00%

-

-

0.00%

-

126.70

7.00

78.00

546.00

-

-

0.00%

-

0.00%

-

-

0.00%

147.50

17.70

2,610.75

-

-

0.00%

-

-

0.00%

-

-

0.00%

RED DE DISTRIBUCIÓN DE AGUA FRÍA_x000D_

-

-

09.01.04.01

TUBO PVC CON UNION TIPO ROSCA DE 1/2" PN10 (ENTERRADA)

M

09.01.04.02

TUBO PVC CON UNION TIPO ROSCA DE 3/4" PN10 (ENTERRADA)

m

52.55

18.06

949.05

-

-

0.00%

-

-

0.00%

-

-

0.00%

09.01.04.03

TUBO PVC CON UNION TIPO ROSCA DE 1" PN10 (ENTERRADA)

m

224.70

24.34

5,469.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

09.01.04.04

TUBO PVC CON UNION TIPO ROSCA DE 1 1/2" NTP ISO 399.166

M

26.80

21.23

568.96

-

-

0.00%

-

-

0.00%

-

-

0.00%

09.01.04.05

TUBO PVC CON UNION TIPO ROSCA DE 2" PN10

M

95.50

27.99

2,673.05

-

-

0.00%

-

-

0.00%

-

-

09.01.04.06

TUBO PVC UF ISO 1452 PN10 DN 90 mm Inc. Anillo

m

95.00

53.11

5,045.45

-

-

0.00%

-

-

0.00%

-

09.01.04.07

PRUEBA HIDRÁULICA EN TUBERIAS Y DESINFECCION

M

642.05

1.83

1,174.95

-

-

0.00%

-

-

0.00%

09.01.04.08

DADO DE CONCRETO, F'c=100 kg/cm2 TIPO I

UND

8.00

135.23

1,081.84

-

-

0.00%

-

-

09.01.04.09

DADO DE CONCRETO, F'c=100 kg/cm2 TIPO II

UND

8.00

11.59

92.72

-

-

0.00%

-

09.01.04.10

CONEXION DOMICILIARIA DE DESAGUE

GLB

1.00

3,038.49

3,038.49

-

-

0.00%

-

-

-

0.00%

69.00

-

-

0.00%

09.01.05

ACCESORIOS PARA REDES DE AGUA FRÍA

-

09.01.05.01

CODO PVC TIPO ROSCA DE 1/2" 90°

und

09.01.05.02

CODO PVC TIPO ROSCA DE 3/4" 90°

09.01.05.03

CODO PVC TIPO ROSCA DE 1" 90°

09.01.05.04

-

546.00 -

0.00% 100.00% 0.00%

2,610.75

100.00%

52.55

949.05

100.00%

224.70

5,469.20

100.00%

26.80

568.96

100.00%

0.00%

95.50

2,673.05

100.00%

-

0.00%

95.00

5,045.45

100.00%

-

-

0.00%

642.05

1,174.95

100.00%

0.00%

-

-

0.00%

8.00

1,081.84

100.00%

-

0.00%

-

-

0.00%

8.00

92.72

100.00%

-

0.00%

-

-

0.00%

1.00

3,038.49

100.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

-

0.00%

6.00

6.00

11.50

und

1.00

24.80

24.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

und

12.00

10.30

123.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

CODO PVC TIPO ROSCA DE 2" 90°

und

4.00

22.90

91.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

09.01.05.05

CODO 90° PVC UF ISO 1452 DE 90mm

UND

7.00

25.29

177.03

-

-

0.00%

-

-

0.00%

-

-

09.01.05.06

TEE PVC TIPO ROSCA DE 3/4"

und

6.00

25.65

153.90

-

-

0.00%

-

-

0.00%

-

09.01.05.07

TEE PVC TIPO ROSCA DE 1"

und

12.00

26.22

314.64

-

-

0.00%

-

-

0.00%

09.01.05.08

TEE PVC TIPO ROSCA DE 1 1/2"

und

7.00

35.20

246.40

-

-

0.00%

-

-

09.01.05.09

TEE PVC TIPO ROSCA DE 2"

und

3.00

38.79

116.37

-

-

0.00%

-

09.01.05.10

TEE PVC UF ISO 1452 DN=90mm PN10

und

1.00

149.30

149.30

-

-

0.00%

09.01.05.11

REDUCCION PVC TIPO ROSCA DE 3/4" A 1/2"

und

8.00

20.61

164.88

-

-

09.01.05.12

REDUCCION PVC TIPO ROSCA DE 1" A 1/2"

und

7.00

16.63

116.41

-

09.01.05.13

REDUCCION PVC TIPO ROSCA DE 1" A 3/4"

und

5.00

16.21

81.05

09.01.05.14

REDUCCION PVC TIPO ROSCA DE 1 1/2" a 3/4"

UND

1.00

19.17

19.17

147.50

-

80.00%

-

0.00%

69.00

100.00%

1.00

24.80

100.00%

12.00

123.60

100.00%

4.00

91.60

100.00%

0.00%

7.00

177.03

100.00%

-

0.00%

6.00

153.90

100.00%

-

-

0.00%

12.00

314.64

100.00%

0.00%

-

-

0.00%

7.00

246.40

100.00%

-

0.00%

-

-

0.00%

3.00

116.37

100.00%

-

-

0.00%

-

-

0.00%

1.00

149.30

100.00%

0.00%

-

-

0.00%

-

-

0.00%

8.00

164.88

100.00%

-

0.00%

-

-

0.00%

-

-

0.00%

7.00

116.41

100.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

81.05

100.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

19.17

100.00%

41

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

09.01.05.15

REDUCCION PVC TIPO ROSCA DE 1 1/2" A 1"

und

3.00

22.92

68.76

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

68.76

100.00%

09.01.05.16

REDUCCION PVC TIPO ROSCA DE 2" A 1 1/2"

und

2.00

24.06

48.12

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

48.12

100.00%

09.01.05.17

REDUCCION PVC TIPO ROSCA DE 2" A 1"

UND

2.00

28.65

57.30

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

57.30

100.00%

09.01.05.18

REDUCCION PVC UF ISO 1452 DE 90mm A 63mm

UND

1.00

28.26

28.26

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

28.26

100.00%

09.01.05.19

ADAPTADOR PVC UF ISO 1452 DN=63mm A 2" PVC TIPO ROSCA

und

1.00

27.17

27.17

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

27.17

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

09.01.06

VALVULAS

-

-

0.00%

09.01.06.01

VALVULA DE COMPUERTA DE BRONCE 1/2"

und

7.00

68.36

478.52

-

-

0.00%

-

-

0.00%

-

-

0.00%

7.00

478.52

100.00%

09.01.06.02

VALVULA DE COMPUERTA DE BRONCE 1"

und

6.00

157.97

947.82

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

947.82

100.00%

09.01.06.03

VALVULA DE COMPUERTA DE BRONCE 1 1/4"

UND

2.00

161.53

323.06

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

323.06

100.00%

09.01.06.04

VALVULA DE AIRE 1/2"

UND

2.00

64.26

128.52

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

128.52

100.00%

09.01.06.05

VALVULA DE BOLA DE ACERO INOXIDABLE 3/4"

und

2.00

188.18

376.36

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

376.36

100.00%

09.01.06.06

VALVULA CHECK DE BRONCE 1"

und

2.00

122.99

245.98

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

245.98

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

09.01.07 09.01.07.01 09.01.07.02 09.02 09.02.01 09.02.01.01 09.02.02

CAJAS DE VALVULAS

-

-

0.00%

CAJA DE REGISTRO PARA VAL. DE AGUA 10"X20" C/TAPA Y MARCO DE FIERRO

UND

10.00

226.12

2,261.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.00

2,261.20

100.00%

CAJA DE REGISTRO PARA VAL. DE AGUA 12"X24" C/TAPA Y MARCO DE FIERRO

UND

9.00

226.12

2,035.08

-

2,035.08

100.00%

SISTEMA DE DESAGÜE Y VENTILACIÓN OBRAS PRELIMINARES TRAZO, NIVELES Y REPLANTEO

-

-

0.00%

-

0.00%

-

-

0.00%

9.00

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

m2

373.22

3.32

1,239.09

MOVIMIENTO DE TIERRAS EN REDES Y BUZONES

-

136.68

453.78

-

-

0.00%

-

-

0.00%

139.80

7,069.69

30.82%

139.80

7,069.69

30.82%

313.78

15,867.85

69.18%

09.02.02.02

REFINE Y CONFORMACION DE FONDO Y COSTADO

M2

1,584.51

14.89

23,593.35

-

-

0.00%

500.48

7,452.15

31.59%

500.48

7,452.15

31.59%

1,084.03

16,141.20

68.41%

09.02.02.03

CAMA DE ARENA PARA APOYO DE TUBERIAS

M3

30.67

33.37

1,023.46

-

-

0.00%

20.50

684.09

66.84%

20.50

684.09

66.84%

10.17

339.37

33.16%

09.02.02.04

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

438.33

33.75

14,793.64

-

-

0.00%

0.00%

438.33

14,793.64

100.00%

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

19.83

25.29

501.50

-

-

0.00%

-

-

0.00%

09.02.03

REDES COLECTORAS DE DESAGÜE

-

19.83

501.50

100.00%

19.83

501.50

-

0.00% 63.38%

22,937.54

-

-

785.31

50.57

-

0.00%

236.54

453.58

0.00%

-

36.62%

m3

-

-

453.78

EXCAVACION DE ZANJAS EN TERRENO NORMAL

-

0.00%

136.68

09.02.02.01

09.02.02.05

-

36.62%

0.00%

100.00%

-

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

-

0.00%

0.00%

0.00% 0.00%

09.02.03.01

INSTALACION DE TUBERIA PVC ISO 4435 UF 110 MM

M

173.00

26.73

4,624.29

-

-

0.00%

09.02.03.02

INSTALACION DE TUBERIA PVC ISO 4435 UF 160 MM

M

217.00

52.49

11,390.33

-

-

0.00%

139.80

7,338.10

64.42%

139.80

7,338.10

64.42%

09.02.03.03

INSTALACION DE TUBERIA PVC ISO 4435 UF 200 MM

M

232.03

69.70

16,172.49

-

-

0.00%

88.00

6,133.60

37.93%

88.00

6,133.60

37.93%

09.02.03.04

PRUEBA HIDRÁULICA EN TUBERIAS Y DESINFECCION

M

622.03

1.83

1,138.31

-

-

0.00%

139.80

255.83

22.47%

139.80

255.83

22.47%

482.23

882.48

77.53%

09.02.03.05

CONEXION DOMICILIARIA DE DESAGUE

GLB

1.00

3,038.49

3,038.49

-

-

0.00%

1.00

3,038.49

100.00%

09.02.04

CAJAS DE REGISTRO Y BUZONES

-

-

-

-

0.00%

-

-

0.00%

173.00

4,624.29

100.00%

77.20

4,052.23

35.58%

144.03

10,038.89

62.07%

-

-

0.00%

-

0.00%

-

-

0.00%

09.02.04.01

CAJA DE REGISTRO 0.30x0.60m

UND

27.00

226.12

6,105.24

-

-

0.00%

-

-

0.00%

-

-

0.00%

27.00

6,105.24

100.00%

09.02.04.02

CAJA DE REGISTRO 0.60x0.60m

UND

5.00

376.64

1,883.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

1,883.20

100.00%

09.02.04.03

BUZON PRINCIPAL

und

8.00

283.20

2,265.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.00

2,265.60

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

09.03 09.03.01

SISTEMA DE EVACUACIÓN DE AGUAS PLUVIALES CANALES LATERALES

09.03.01.01

TRAZO, NIVELES Y REPLANTEO

m2

52.48

3.32

174.23

-

-

0.00%

-

-

0.00%

-

-

0.00%

09.03.01.02

EXCAVACION DE ZANJAS EN TERRENO NORMAL

09.03.01.03

REFINE Y CONFORMACION DE FONDO Y COSTADO

m3

21.35

50.57

1,079.67

-

-

0.00%

-

-

0.00%

-

-

M2

137.86

14.89

2,052.74

-

-

0.00%

-

-

0.00%

-

-

09.03.01.04

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

27.75

25.29

701.80

-

-

0.00%

-

-

0.00%

-

09.03.01.05

ENCOFRADO Y DESENCOFRADO EN CANALES LATERALES

M2

116.87

60.87

7,113.88

-

-

0.00%

-

-

0.00%

09.03.01.06

CONCRETO f´c= 175 KG/CM2 EN CANALES LATERALES

M3

11.70

360.08

4,212.94

-

-

0.00%

-

-

09.03.01.07

SELLADO DE JUNTAS DE CONSTRUCCION

M

55.00

35.21

1,936.55

-

-

0.00%

-

09.03.01.08

REJILLA CON ÁNGULO DE Fe 1"x3/16 @1" DE 1.00 x 0.36 m

m

104.95

87.14

9,145.34

-

-

0.00%

-

-

-

0.00%

0.00% 0.00%

52.48

174.23

100.00%

0.00%

21.35

1,079.67

100.00%

0.00%

137.86

2,052.74

100.00%

-

0.00%

27.75

701.80

100.00%

-

-

0.00%

116.87

7,113.88

100.00%

0.00%

-

-

0.00%

11.70

4,212.94

100.00%

-

0.00%

-

-

0.00%

55.00

1,936.55

100.00%

-

0.00%

-

-

0.00%

104.95

9,145.34

100.00%

42

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

09.03.02

P. U.

DRENAJE PLUVIAL

AVANCE ANTERIOR

P. TOTAL

METRADO -

MONTO

AVANCE ACTUAL %

-

-

0.00%

814.40

-

-

0.00%

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

245.30

09.03.02.01

TRAZO, NIVELES Y REPLANTEO

m2

245.30

3.32

09.03.02.02

EXCAVACION DE ZANJAS EN TERRENO NORMAL

m3

178.72

50.57

9,037.87

-

-

0.00%

-

-

0.00%

-

-

0.00%

09.03.02.03

REFINE Y CONFORMACION DE FONDO Y COSTADO

M2

960.17

14.89

14,296.93

-

-

0.00%

-

-

0.00%

-

-

0.00%

09.03.02.04

CAMA DE ARENA PARA APOYO DE TUBERIAS

M3

12.27

33.37

409.45

-

-

0.00%

-

-

0.00%

-

-

09.03.02.05

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

166.45

33.75

5,617.69

-

-

0.00%

-

-

0.00%

-

09.03.02.06

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

15.94

25.29

403.12

-

-

0.00%

-

-

0.00%

09.03.02.07

TUBERIA PVC UF ISO 4422 C-15 DN 90 mm Inc. Anillo

m

189.10

53.11

10,043.10

-

-

0.00%

-

-

09.03.02.08

TUBERIA PVC UF ISO 4422 C-15 DN 110 mm Inc. Anillo

m

301.50

53.11

16,012.67

-

-

0.00%

-

09.03.02.09

TAPON PVC SAP 4"

und

30.00

78.83

2,364.90

-

-

0.00%

09.03.02.10

GEOTEXTIL 200gr/m2 PARA SUB DRENAJE

M2

1,058.29

8.48

8,974.30

-

-

09.03.02.11

RELLENO COMPACTADO CON MATERIAL DE PRESTAMO (GRAVA)

M3

166.45

123.90

20,623.16

-

09.03.03

REDES DE DERIVACION

-

09.03.03.01

TRAZO, NIVELES Y REPLANTEO

m2

09.03.03.02

EXCAVACION DE ZANJAS EN TERRENO NORMAL

09.03.03.03

REFINE Y CONFORMACION DE FONDO Y COSTADO

09.03.03.04

% -

0.00%

178.72

9,037.87

100.00%

960.17

14,296.93

100.00%

0.00%

12.27

409.45

100.00%

-

0.00%

166.45

5,617.69

100.00%

-

-

0.00%

15.94

403.12

100.00%

0.00%

-

-

0.00%

189.10

10,043.10

100.00%

-

0.00%

-

-

0.00%

301.50

16,012.67

100.00%

-

-

0.00%

-

-

0.00%

30.00

2,364.90

100.00%

0.00%

-

-

0.00%

-

-

0.00%

1,058.29

8,974.30

100.00%

-

0.00%

-

-

0.00%

-

-

0.00%

166.45

20,623.16

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

1,104.63

-

-

0.00%

m3

301.35

50.57

15,239.27

-

-

M2

1,411.97

14.89

21,024.23

-

-

CAMA DE ARENA PARA APOYO DE TUBERIAS

M3

16.64

33.37

555.28

-

09.03.03.05

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

284.71

33.75

9,608.96

09.03.03.06

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

21.63

25.29

09.03.03.07

TUBERIA PVC-SAL 3" DESAGUE

M

31.30

25.71

09.03.03.08

TUBERIA PVC SAL 4" DESAGUE (ENTERRADA)

M

69.50

09.03.03.09

INSTALACION DE TUBERIA PVC ISO 4435 UF 110 MM

M

137.65

09.03.03.10

INSTALACION DE TUBERIA PVC ISO 4435 UF 160 MM

M

09.03.03.11

INSTALACION DE TUBERIA PVC ISO 4435 UF 250MM

15.42

51.19

4.63%

0.00%

11.90

601.78

0.00%

46.26

688.81

-

0.00%

3.08

102.91

-

-

0.00%

-

547.02

-

-

0.00%

804.72

-

-

0.00%

-

-

0.00%

-

-

25.28

1,756.96

-

-

0.00%

-

-

0.00%

-

-

26.73

3,679.38

-

-

0.00%

-

-

0.00%

-

-

306.00

52.49

16,061.94

-

-

0.00%

M

55.45

73.05

4,050.62

-

-

0.00%

-

MONTO

100.00%

3.32

CAJAS DE REGISTRO Y BUZONES

-

814.40

332.72

09.03.04

METRADO

15.42

25.70 -

389.97

1,348.99

15.42

51.19

4.63%

3.95%

11.90

601.78

3.28%

46.26

688.81

18.53%

3.08

102.91

0.00%

-

71.29%

8.40%

15.42

25.70

389.97

1,348.99

-

-

0.00%

317.30

1,053.44

95.37%

3.95%

289.45

14,637.49

96.05%

3.28%

1,365.71

20,335.42

96.72%

18.53%

13.56

452.37

81.47%

0.00%

284.71

9,608.96

100.00%

71.29%

6.21

157.05

28.71%

0.00%

31.30

804.72

100.00%

0.00%

69.50

1,756.96

100.00%

0.00%

137.65

3,679.38

100.00%

8.40%

280.30

14,712.95

91.60%

55.45

4,050.62

100.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

09.03.04.01

CAJA DE REGISTRO 0.30x0.60m

UND

15.00

226.12

3,391.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

15.00

3,391.80

100.00%

09.03.04.02

CAJA DE REGISTRO 0.60x0.60m

UND

23.00

376.64

8,662.72

-

-

0.00%

-

-

0.00%

-

-

0.00%

23.00

8,662.72

100.00%

09.03.04.03

BUZON D=1.20m H<1.50m

UND

4.00

765.27

3,061.08

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

3,061.08

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

09.04 09.04.01

SISTEMA DE AGUA CONTRA INCENDIOS OBRAS PRELIMINARES

-

-

0.00%

0.00% 0.00%

09.04.01.01

TRAZO, NIVELES Y REPLANTEO

m2

173.64

3.32

576.48

-

-

0.00%

-

-

0.00%

-

-

0.00%

173.64

576.48

100.00%

09.04.01.02

EXCAVACION DE ZANJAS EN TERRENO NORMAL

m3

127.57

50.57

6,451.21

-

-

0.00%

-

-

0.00%

-

-

0.00%

127.57

6,451.21

100.00%

09.04.01.03

REFINE Y CONFORMACION DE FONDO Y COSTADO

M2

598.87

14.89

8,917.17

-

-

0.00%

-

-

0.00%

-

-

0.00%

598.87

8,917.17

100.00%

09.04.01.04

CAMA DE ARENA PARA APOYO DE TUBERIAS

M3

8.68

33.37

289.65

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.68

289.65

100.00%

09.04.01.05

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

118.89

33.75

4,012.54

-

-

0.00%

-

-

0.00%

-

-

0.00%

118.89

4,012.54

100.00%

09.04.01.06

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

11.29

25.29

285.52

-

-

0.00%

-

-

0.00%

-

-

0.00%

11.29

285.52

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

09.04.02

REDES DE DISTRIBUCIÓN DE AGUA CONTRA INCENDIOS

-

09.04.02.01

RED DE DISTRIBUCION 2 1/2" ACI ACERO SCH 40 MONTANTE

M

09.04.02.02

RED ACI TUBERÍA PVC UF ISO 1452 PN10 DN 75 mm Inc. Anillo

09.04.02.03

RED ACI TUBERÍA PVC UF ISO 1452 PN10 DN 110 mm Inc. Anillo

09.04.02.04

DADO DE CONCRETO, F'c=100 kg/cm2 TIPO I

09.04.02.05

DADO DE CONCRETO, F'c=100 kg/cm2 TIPO II

09.04.03 09.04.03.01

14.40

87.28

1,256.83

-

-

0.00%

-

-

0.00%

-

-

0.00%

M

88.75

21.54

1,911.68

-

-

0.00%

-

-

0.00%

-

-

0.00%

M

200.65

21.53

4,319.99

-

-

0.00%

-

-

0.00%

-

-

0.00%

UND

10.00

135.23

1,352.30

-

-

0.00%

-

-

0.00%

-

-

0.00%

UND

7.00

11.59

81.13

-

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

-

0.00%

-

0.00%

-

ACCESORIOS DE REDES SUMINISTRO E INSTALACION DE ACCESORIOS PARA REDES DE ACI

GLB

1.00

2,102.85

2,102.85

-

14.40

-

0.00%

1,256.83

100.00%

88.75

1,911.68

100.00%

200.65

4,319.99

100.00%

10.00

1,352.30

100.00%

0.00%

7.00

81.13

100.00%

-

0.00%

-

-

0.00%

1.00

2,102.85

0.00% 100.00%

43

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

09.04.03.02

VALVULA FIRE CHECK DE Ø4"

UND

1.00

478.99

478.99

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

478.99

100.00%

09.04.03.03

VALVULA ANGULARES DE 1 1/2"

und

6.00

309.67

1,858.02

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

1,858.02

100.00%

09.04.03.04

VALVULA HIDRANTE SIAMESA CROMADA TIPO POSTE

UND

1.00

412.28

412.28

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

412.28

100.00%

09.04.03.05

VALVULA DE AIRE AUTOMATICA DE 1 1/2"

UND

1.00

131.98

131.98

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

131.98

100.00%

09.04.03.06

CAJA PARA VALVULA FIRE CHECK 10" X 20" PREFABRICADA INC. TAPA METÁLICA

UND

2.00

191.46

382.92

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

382.92

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

6.00

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

09.04.04 09.04.04.01 09.04.05 09.04.05.01

10 10.01 10.01.01

INSTALACIONES ESPECIALES GABINETE CONTRAINCENDIO

UND

6.00

991.80

5,950.80

289.00

1.83

528.87

PRUEBAS HIDRAULICAS Y DESINFECCION PRUEBA HIDRÁULICA EN TUBERIAS Y DESINFECCION

M

INSTALACIONES ELECTRICAS EXTERIORES

688,978.75

-

-

36,366.31

218,345.41

289.00

254,711.83

5,950.80 528.87

0.00% 100.00% 0.00% 100.00%

434,266.92

RED PRIMARIA Y TRANSFORMADOR POSTES DE C°A°C°

10.01.01.01

Poste de C.A.C. de 9/300/150/285 m.

und

1.00

504.24

504.24

1.00

504.24

100.00%

-

-

0.00%

1.00

504.24

100.00%

-

-

0.00%

10.01.01.02

Poste de C.A.C. de 12/200/150/330 m.

und

1.00

720.34

720.34

1.00

720.34

100.00%

-

-

0.00%

1.00

720.34

100.00%

-

-

0.00%

10.01.01.03

Poste de C.A.C. de 13/300/160/355 m.

und

7.00

830.51

5,813.57

5.00

4,152.55

71.43%

2.00

1,661.02

28.57%

7.00

5,813.57

100.00%

-

-

0.00%

10.01.01.04

Poste de C.A.C. de 13/400/180/375 m.

und

6.00

1,093.22

6,559.32

5.00

5,466.10

83.33%

1.00

1,093.22

16.67%

6.00

6,559.32

100.00%

-

-

0.00%

0.00%

-

0.00%

-

-

10.01.02

CONDUCTORES Y ACCESORIOS

-

-

-

0.00%

-

-

0.00%

10.01.02.01

Conductor de aleación de Aluminio AAAC de 25 mm²

m

2,412.90

1.33

3,209.16

-

-

0.00%

1,206.45

1,604.58

50.00%

1,206.45

1,604.58

50.00%

1,206.45

1,604.58

50.00%

10.01.02.02

Conductor de Cu aislado Tipo N2XSY (XLPE) - Subterraneo, Unipolar de 1 x 50 mm², 18/30 kV.

m

107.10

53.39

5,718.07

-

-

0.00%

26.78

1,429.52

25.00%

26.78

1,429.52

25.00%

80.33

4,288.55

75.00%

10.01.02.03

Conductor de Cu electrolitico aislado Tipo N2XOH (XLPE) Subter Unipolar de 1x150 mm²,0.6/1KV (Para conexión Transfor.a Tablero)

m

80.00

57.96

4,636.80

-

-

0.00%

20.00

1,159.20

25.00%

20.00

1,159.20

25.00%

60.00

3,477.60

75.00%

-

-

0.00%

10.01.03

FERRETERIA PARA ARMADOS

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.01.03.01

Armado Trifásico de Fin de Línea Tipo AT5 , compuesta por:

jgo

1.00

349.63

349.63

-

-

0.00%

1.00

349.63

100.00%

1.00

349.63

100.00%

-

-

0.00%

10.01.03.02

Armado Trifásico de Derivación y Seccionamiento Tipo AT5-S

jgo

1.00

355.35

355.35

-

-

0.00%

1.00

355.35

100.00%

1.00

355.35

100.00%

-

-

0.00%

10.01.03.03

Armado Trifásico de Ángulo de 30° a 90° Tipo ATV4

jgo

1.00

203.40

203.40

-

-

0.00%

1.00

203.40

100.00%

1.00

203.40

100.00%

-

-

0.00%

10.01.03.04

Armado Trifásico de Alineamiento Para DMS Tipo ATV5

jgo

8.00

555.92

4,447.36

-

-

0.00%

8.00

4,447.36

100.00%

8.00

4,447.36

100.00%

-

-

0.00%

10.01.03.05

Armado Trifásico de Ángulo Para DMS Tipo ATV7

jgo

1.00

803.30

803.30

-

-

0.00%

1.00

803.30

100.00%

1.00

803.30

100.00%

-

-

0.00%

10.01.03.06

Armado Trifásico de Anclaje y Seccionamiento Para DMS Tipo ATV8-S

jgo

1.00

624.56

624.56

-

-

0.00%

1.00

624.56

100.00%

1.00

624.56

100.00%

-

-

0.00%

10.01.03.07

Armado Trifásico de Anclaje Para DMS Tipo ATV8

jgo

2.00

1,726.00

3,452.00

-

-

0.00%

2.00

3,452.00

100.00%

2.00

3,452.00

100.00%

-

-

0.00%

10.01.03.08

Armado Trifásico de Fin de Línea Para DMS Tipo ATV9

jgo

1.00

1,705.66

1,705.66

-

-

0.00%

1.00

1,705.66

100.00%

1.00

1,705.66

100.00%

-

-

0.00%

10.01.03.09

Armado Trifásico Soporte de Pararrayos Tipo SOP-P

jgo

1.00

561.35

561.35

-

-

0.00%

1.00

561.35

100.00%

1.00

561.35

100.00%

-

-

0.00%

10.01.03.10

Armado de seccionamiento en poste tipo SECC-M

jgo

1.00

348.30

348.30

-

-

0.00%

1.00

348.30

100.00%

1.00

348.30

100.00%

-

-

0.00%

10.01.03.11

Armado soporte de transformador Monoposte SAM

und

1.00

334.74

334.74

-

-

0.00%

1.00

334.74

100.00%

1.00

334.74

100.00%

-

-

0.00%

-

-

0.00%

0.00%

-

-

10.01.04 10.01.04.01 10.01.04.02 10.01.05 10.01.05.01 10.01.05.02 10.01.06 10.01.06.01 10.01.07 10.01.07.01

AISLADORES

-

-

0.00%

-

-

0.00%

Aislador de porcelana tipo Pin clase ANSI 56-4

und

30.00

101.70

3,051.00

-

-

0.00%

7.50

762.75

25.00%

7.50

762.75

25.00%

22.50

2,288.25

75.00%

AISLADOR POLIMÉRICO TIPO SUSPENSION, RPP-25

und

30.00

63.56

1,906.80

-

-

0.00%

7.50

476.70

25.00%

7.50

476.70

25.00%

22.50

1,430.10

75.00%

-

-

0.00%

0.00%

-

ACCESORIOS PARA AISLADORES

-

-

-

0.00%

-

-

0.00%

Espiga de FoGo para cruceta, 19 x 432 mm, cabeza de plomo de 35 mm Ø, con tuerca, contratuerca y arandela

und

30.00

29.66

889.80

-

-

0.00%

7.50

222.45

25.00%

7.50

222.45

25.00%

22.50

667.35

75.00%

GRILLETES DE AOGO, 16 MM Ø X 19 MM ABERTURA, 77 MM CON PASADOR DE SEGURIDAD

und

30.00

8.47

254.10

-

-

0.00%

7.50

63.53

25.00%

7.50

63.53

25.00%

22.50

190.57

75.00%

-

-

0.00%

0.00%

-

-

-

0.00%

25.00%

0.25

-

-

0.00%

-

-

0.00%

ACCESORIOS PARA CONDUCTOR. ACCESORIOS PARA CONDUCTOR

jgo

1.00

6,194.02

6,194.02

jgo

4.00

335.50

1,342.00

RETENIDAS RETENIDA INCLINADA PARA MT

-

0.25

1,548.51

1.00

335.50

-

0.00%

-

25.00%

1.00

1,548.51 335.50

0.00%

-

25.00%

0.75

0.00%

-

25.00%

3.00

4,645.51 1,006.50

0.00% 75.00% 0.00% 75.00%

44

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

10.01.07.02

RETENIDA INCLINADA PARA BT

jgo

1.00

268.82

268.82

-

-

0.00%

0.25

67.21

25.00%

0.25

67.21

25.00%

0.75

201.61

75.00%

10.01.07.03

RETENIDA AEREA PARA ARMADO ATV8, ATV9

jgo

2.00

281.91

563.82

-

-

0.00%

0.50

140.96

25.00%

0.50

140.96

25.00%

1.50

422.86

75.00%

10.01.07.04

RETENIDA AEREA PARA POSTE DE 13 m

jgo

1.00

310.72

310.72

-

-

0.00%

0.25

77.68

25.00%

0.25

77.68

25.00%

0.75

233.04

75.00%

-

-

0.00%

0.00%

-

0.00%

-

10.01.08 10.01.08.01 10.01.08.02 10.01.09 10.01.09.01

PUESTA A TIERRA

-

-

0.00%

jgo

3.00

754.79

2,264.37

-

-

0.00%

2.25

1,698.28

75.00%

2.25

1,698.28

75.00%

0.75

566.09

25.00%

PUESTA A TIERRA PARA CABEZA TERMINAL

und

3.00

871.34

2,614.02

-

-

0.00%

0.75

653.51

25.00%

0.75

653.51

25.00%

2.25

1,960.51

75.00%

-

-

0.00%

0.00%

-

0.00%

-

-

-

0.00%

25.00%

0.25

25.00%

0.75

MATERIALES PARA RED SUBTERRANEA MATERIALES PARA RED SUBTERRANEA

1.00

1,273.39

1,273.39

-

-

0.00%

10.01.10.01

Seccionador fusible unipolar tipo CUT OUT, 27 KV, 100 A. Y 170 KV BIL con portafusible de e jgo

6.00

508.47

3,050.82

-

-

10.01.10.02

Pararrayos unipolares de 24 KV. de tension nominal y 10 KA., 170 KV BIL.

jgo

9.00

338.31

3,044.79

-

10.01.10.03

TRANSFORMADOR COMBINADO DE MEDIDA 3Ø (TRAFOMIX)

jgo

1.00

8,898.31

8,898.31

-

10.01.10.04

CELDA DE REMONTE DE CABLES CON BARRAS

jgo

1.00

18,200.00

18,200.00

10.01.10.05

CELDA DE SALIDA CON SECCIONADOR - PORTAFUS. 24 KV, 630 A

jgo

1.00

12,881.36

10.01.10.06

CELDA DE TRANSFORMACIÓN PARA TRANSFORMADOR TRIFASICO DE 160 KVA

jgo

1.00

10.01.10.07

TRANSFORMADOR TRIFASICO EN ACEITE DE 160 KVA

jgo

10.01.10.08

TABLERO PARA SISTEMA DE MEDICIÓN 3Ø 380/220 V.

10.01.10.09

MEDIDOR ELECTRÓNICO MULTIFUNCIÓN

10.01.11

-

PUESTA A TIERRA MT y/o BT COMPUESTA POR:

jgo

10.01.10

-

-

-

0.25

318.35

0.00%

-

0.00%

-

0.00%

4.00

2,033.88

66.67%

4.00

2,033.88

66.67%

2.00

-

0.00%

6.30

2,131.35

70.00%

6.30

2,131.35

70.00%

-

0.00%

0.75

6,673.73

75.00%

0.75

6,673.73

75.00%

-

-

0.00%

0.75

13,650.00

75.00%

0.75

13,650.00

12,881.36

-

-

0.00%

0.75

9,661.02

75.00%

0.75

18,200.00

18,200.00

-

-

0.00%

0.75

13,650.00

75.00%

1.00

33,559.32

33,559.32

-

-

0.00%

0.75

25,169.49

jgo

1.00

184.53

184.53

-

-

0.00%

0.75

jgo

1.00

1,864.41

1,864.41

-

-

0.00%

0.75

-

-

0.00%

EQUIPOS DE TRANSFORMACION, PROTECCION Y MANIOBRA_x000D_

-

MONTAJE ELECTROMECANICO

-

10.01.11.01

REPLANTEO TOPOGRAFICO Y UBICACIÓN DE ESTRUCTURAS

m

10.01.11.02

EXCAVACION DE ZANJAS EN TERRENO NORMAL

m3

10.01.11.03

-

318.35 -

955.04 -

0.00% 75.00% 0.00%

1,016.94

33.33%

2.70

913.44

30.00%

0.25

2,224.58

25.00%

75.00%

0.25

4,550.00

25.00%

9,661.02

75.00%

0.25

3,220.34

25.00%

0.75

13,650.00

75.00%

0.25

4,550.00

25.00%

75.00%

0.75

25,169.49

75.00%

0.25

8,389.83

25.00%

138.40

75.00%

0.75

138.40

75.00%

0.25

46.13

25.00%

1,398.31

75.00%

0.75

1,398.31

75.00%

0.25

466.10

25.00%

0.00%

-

0.00%

-

-

0.00%

-

-

815.00

1.53

1,246.95

-

-

0.00%

815.00

1,246.95

100.00%

815.00

1,246.95

100.00%

-

-

0.00%

30.80

50.57

1,557.56

-

-

0.00%

30.80

1,557.56

100.00%

30.80

1,557.56

100.00%

-

-

0.00%

Izaje de poste de Cº Aº Cº de 9 m, en zona accesible, incluye vaciado con concreto ciclópeo und

1.00

373.49

373.49

-

-

0.00%

1.00

373.49

100.00%

1.00

373.49

100.00%

-

-

0.00%

10.01.11.04

Izaje de poste de Cº Aº Cº de 12 y 13 m, en zona accesible, incluye vaciado con concreto cic und

14.00

336.94

4,717.16

-

-

0.00%

14.00

4,717.16

100.00%

14.00

4,717.16

100.00%

-

-

0.00%

10.01.11.05

Montaje de Armados ATV5.

jgo

1.00

138.00

138.00

-

-

0.00%

1.00

138.00

100.00%

1.00

138.00

100.00%

-

-

0.00%

10.01.11.06

Montaje de Armados AT5-S, incluye montaje de Cut-Out y conexionado.

jgo

1.00

138.00

138.00

-

-

0.00%

1.00

138.00

100.00%

1.00

138.00

100.00%

-

-

0.00%

10.01.11.07

Montaje de Armados ATV4.

jgo

1.00

138.00

138.00

-

-

0.00%

1.00

138.00

100.00%

1.00

138.00

100.00%

-

-

0.00%

10.01.11.08

Montaje de Armados ATV5.

jgo

8.00

138.00

1,104.00

-

-

0.00%

8.00

1,104.00

100.00%

8.00

1,104.00

100.00%

-

-

0.00%

10.01.11.09

Montaje de Armados ATV7.

jgo

1.00

138.00

138.00

-

-

0.00%

1.00

138.00

100.00%

1.00

138.00

100.00%

-

-

0.00%

10.01.11.10

Montaje de Armados ATV8-S.

jgo

1.00

138.00

138.00

-

-

0.00%

1.00

138.00

100.00%

1.00

138.00

100.00%

-

-

0.00%

10.01.11.11

Montaje de Armados ATV8.

jgo

2.00

138.00

276.00

-

-

0.00%

2.00

276.00

100.00%

2.00

276.00

100.00%

-

-

0.00%

10.01.11.12

Montaje de Armados ATV9.

jgo

1.00

138.00

138.00

-

-

0.00%

1.00

138.00

100.00%

1.00

138.00

100.00%

-

-

0.00%

10.01.11.13

Montaje de Armados Soporte de pararrayos Tipo SOP-P

jgo

1.00

138.00

138.00

-

-

0.00%

1.00

138.00

100.00%

1.00

138.00

100.00%

-

-

0.00%

10.01.11.14

Montaje de Armados SECC, incluye montaje de Cut-Out, Pararrayos y conexionado.

jgo

1.00

207.00

207.00

-

-

0.00%

1.00

207.00

100.00%

1.00

207.00

100.00%

-

-

10.01.11.15

Instalación de retenida Inclinada de MT, incluye material de relleno

jgo

4.00

55.91

223.64

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

10.01.11.16

Instalación de retenida Inclinada de BT, incluye material de relleno

jgo

1.00

55.91

55.91

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.01.11.17

Instalación de retenida Aerea Para Armado ATV8 y ATV9, incluye material de relleno

und

2.00

139.75

279.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.01.11.18

Instalación de retenida Aerea Para Poste de 13 m, incluye material de relleno

und

1.00

139.75

139.75

-

-

0.00%

-

-

0.00%

-

-

10.01.11.19

Instalación del sistema de puesta a tierra MT y/o BT incluye material de relleno y conexionado de ferreteria al SPT.

und

3.00

105.09

315.27

-

-

0.00%

2.00

66.67%

2.00

10.01.11.20

Instalación del sistema de puesta a tierra para cabeza terminal incluye material de relleno y conexionado de ferreteria al SPT

und

3.00

139.75

419.25

-

-

0.00%

-

-

0.00%

-

10.01.11.21

Tendido y puesta en flecha de conductores de AAAC 16 - 50 mm²

m

2.41

1.14

2.75

-

-

0.00%

-

-

0.00%

-

10.01.11.22

Instalación de Terminación exterior unipolar para conductor N2XSY de 50 mm²

und

3.00

116.13

348.39

-

-

0.00%

-

-

0.00%

10.01.11.23

Instalación de Terminación Interior unipolar para conductor N2XSY de 50 mm²

und

9.00

116.13

1,045.17

-

-

0.00%

-

-

10.01.11.24

Montaje de S.E. Monoposte (TRAFOMIX), incluye montaje armado, trafo, tablero y conexiona jgo

1.00

1,012.07

1,012.07

-

-

0.00%

-

-

210.18

0.00%

223.64

100.00%

1.00

55.91

100.00%

2.00

279.50

100.00%

0.00%

1.00

139.75

100.00%

66.67%

1.00

105.09

33.33%

-

0.00%

3.00

419.25

100.00%

-

0.00%

2.41

2.75

100.00%

-

-

0.00%

3.00

348.39

100.00%

0.00%

-

-

0.00%

9.00

1,045.17

100.00%

0.00%

-

-

0.00%

1.00

1,012.07

100.00%

210.18

45

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

10.01.11.25

Montaje de Celda de Remonte de Cables con Barras

jgo

1.00

456.62

456.62

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

456.62

100.00%

10.01.11.26

Montaje de Celda de Salida con Seccionador - Portafus. 24 KV y conexionado

jgo

1.00

685.83

685.83

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

685.83

100.00%

10.01.11.27

Montaje de Celda de Transformación Para Transformador 3Ø de 300 KVA. Y conexionado

jgo

1.00

516.60

516.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

516.60

100.00%

10.01.11.28

Montaje de Transformador en aceite en caseta, incluye conexionado a barras de Cu y accesorjgo

1.00

589.77

589.77

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

589.77

100.00%

10.01.11.29

Pruebas y Puesta en Servicio

815.00

0.41

334.15

-

-

0.00%

-

-

0.00%

-

-

0.00%

815.00

334.15

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

50.00%

9.42

476.37

100.00%

-

-

20.86

50.01%

0.84

20.85

49.99%

10.01.12

m

MONTAJE RED SUBTERRANEA

-

0.00%

10.01.12.01

EXCAVACION DE ZANJAS EN TERRENO NORMAL

m3

9.42

50.57

476.37

4.71

238.18

50.00%

4.71

10.01.12.02

LECHO DE ARENA

M3

1.68

24.83

41.7100

0.84

20.86

50.01%

-

-

0.00%

0.84

10.01.12.03

Intalacion de Tubo de F°G° de 11/2" (Bajada/Subida)

und

1.00

57.61

57.61

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

57.61

100.00%

10.01.12.04

Intalacion de Tubo de F°G° de 4" (Bajada/Subida) Hacia/Desde Red Subterranea

und

1.00

57.61

57.61

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

57.61

100.00%

10.01.12.05

COLOCACIÓN DE TUBO DE PVC DE 4"Ø, L= 3M., (PARA TENDIDO DE COND. SUBTERR.)

UND

2.67

57.61

153.82

1.34

50.19%

-

-

0.00%

1.34

50.19%

1.33

76.62

49.81%

10.01.12.06

Tendido de Cond. Tipo N2XSY (XLPE) - Subterraneo Cobre, Unipolar de 50 mm².

m

107.10

1.06

113.53

-

-

0.00%

-

-

0.00%

-

0.00%

107.10

113.53

100.00%

10.01.12.07

Tendido de Cond. Tipo N2XOH (XLPE) - Subterraneo Cobre, Unipolar de 1-1x120 mm², 0.6/1kv m

80.00

1.06

84.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

80.00

84.80

100.00%

10.01.12.08

Colocacion de Ladrillos de Proteccion Mecánica de Red Subterranea M.T.

m

13.71

1.34

18.37

-

-

0.00%

6.86

9.19

50.00%

6.86

9.19

50.03%

6.86

9.18

49.97%

10.01.12.09

Colocacion de Cinta Plastica Señalizadora de Red Subterranea M.T.

m

8.00

1.22

9.76

-

-

0.00%

4.00

4.88

50.00%

4.00

4.88

50.00%

4.00

4.88

50.00%

10.01.12.10

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

4.76

33.75

160.65

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.76

160.65

100.00%

10.01.12.11

INSTALACIÓN DE BUZONES DE CONCRETO

und

3.00

2,137.98

6,413.94

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

6,413.94

100.00%

10.01.12.12

Instalación de piedra de canto rodado Ø de 1" - 2"

M2

0.49

35.41

17.35

-

-

0.00%

0.25

8.68

50.00%

0.25

8.68

50.03%

0.25

8.67

49.97%

10.01.12.13

Canaleta Portacables de concreto f'c=175 kg/cm², incluye Materiales

M

14.00

86.96

1,217.44

-

-

0.00%

-

-

0.00%

-

-

0.00%

14.00

1,217.44

100.00%

10.01.12.14

Canaleta de C°A°, f'c=210 kg/cm², para celdas de Transformación, incluye Materiales

m

3.00

540.24

1,620.72

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

1,620.72

100.00%

10.01.12.15

Instalación de tapa metalica de plancha de fierro estriado de 0.4 x 1m, e=3mm

und

14.00

116.13

1,625.82

-

-

0.00%

-

-

0.00%

-

-

0.00%

14.00

1,625.82

100.00%

10.01.12.16

ELIMINACION DE MATERIAL EXCEDENTE D = 2 Km

m3

44.00

13.93

612.92

-

-

0.00%

50.00%

22.00

306.46

50.00%

-

-

0.00%

10.01.13

TRABAJOS COMPLEMENTARIOS

-

10.01.13.01

Señaliz y pintado de: estructuras, simbologia SPT caja de registro del electrodo y codigo de SED. (numeración otorgada por ELSE, codigo y numero de alimentador, señal de peligro, fases) Altura=5,0 m, incluye los trámites

und

10.01.13.02

Obtención de CIRA y Plan de Monitoreo Arqueológico

10.01.13.03

Trámite de Corte y Reconexión ante ELSE para empalme a la red de M.T. pública

10.01.13.04 10.01.13.05 10.02 10.02.01 10.02.01.01 10.02.01.01.01 10.02.01.02

77.20

22.00

238.18

306.46

50.00%

22.00

77.20 -

306.46

-

-

0.00%

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

23.00

876.76

0.00%

50.00%

0.50

50.00%

0.50

6,000.00

50.00%

0.00%

-

0.00%

1.00

500.00

100.00%

23.00

38.12

876.76

-

-

0.00%

-

glb

1.00

12,000.00

12,000.00

-

-

0.00%

0.50

GLB

1.00

500.00

500.00

-

-

0.00%

-

Elaboración de expediente de replanteo de Alimentadores Aéreos y Subterraneos de B.T. (04 Ejemplares)

glb

1.00

1,991.55

1,991.55

-

-

0.00%

0.50

995.78

50.00%

0.50

995.78

50.00%

0.50

995.77

50.00%

FLETE TERRESTRE AREQUIPA - ESPINAR

VJE

1.00

8,478.42

8,478.42

-

-

0.00%

0.50

4,239.21

50.00%

0.50

4,239.21

50.00%

0.50

4,239.21

50.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

RED DE DISTRIBUCION SECUNDARIA (RED DE DISTRIBUCIÓN DE TABLEROS Y ALUMBRADO EXTERIOR) INSTALACIONES ELECTRICAS SALIDAS SALIDA PARA ALUMBRADO EXTERIOR

und

44.00

75.17

3,307.48

TUBERIAS

-

-

-

6,000.00 -

10.00

751.70

0.00%

-

22.73% 0.00%

10.00 -

6,000.00 -

751.70 -

22.73% 0.00%

34.00 -

2,555.78 -

100.00%

0.00% 77.27% 0.00%

10.02.01.02.01

TUBO PVC SAP PARA INSTALACIONES ELÉCTRICAS DE ? 100 mm (4")

UND

75.00

108.86

8,164.50

11.25

1,224.68

15.00%

18.75

2,041.13

25.00%

30.00

3,265.80

40.00%

45.00

4,898.70

60.00%

10.02.01.02.02

TUBO PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 50 mm (2")

UND

120.00

48.21

5,785.20

18.00

867.78

15.00%

30.00

1,446.30

25.00%

48.00

2,314.08

40.00%

72.00

3,471.12

60.00%

10.02.01.02.03

TUBO PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 40 mm (1 1/2")

UND

15.00

15.66

234.90

2.25

35.24

15.00%

3.75

58.73

25.00%

6.00

93.96

40.00%

9.00

140.94

60.00%

10.02.01.02.04

TUBO PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 35 mm (1 1/4")

UND

10.00

18.61

186.10

1.50

27.92

15.00%

2.50

46.53

25.00%

4.00

74.44

40.00%

6.00

111.66

60.00%

10.02.01.02.05

CURVA PVC SAP PARA INSTALACION ELECTRICA DE 100 mm (4")

und

75.00

10.88

816.00

11.25

122.40

15.00%

18.75

204.00

25.00%

30.00

326.40

40.00%

45.00

489.60

60.00%

10.02.01.02.06

CURVA PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 50 mm (2")

und

120.00

13.14

1,576.80

18.00

236.52

15.00%

30.00

394.20

25.00%

48.00

630.72

40.00%

72.00

946.08

60.00%

10.02.01.02.07

CURVA PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 40 mm (1 1/2")

und

24.00

6.52

156.48

3.60

23.47

15.00%

6.00

39.12

25.00%

9.60

62.59

40.00%

14.40

93.89

60.00%

10.02.01.02.08

CURVA PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 35 mm (1 1/4")

und

10.00

7.03

70.30

1.50

10.55

15.00%

2.50

17.58

25.01%

4.00

28.12

40.00%

6.00

42.18

60.00%

10.02.01.02.09

UNIÓN PVC SAP PARA INSTALACIONES ELÉCTRICAS 100 mm (4)

und

75.00

11.68

876.00

11.25

131.40

15.00%

18.75

219.00

25.00%

30.00

350.40

40.00%

45.00

525.60

60.00%

46

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

10.02.01.02.10

UNION PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 50 mm (2")

und

120.00

10.50

1,260.00

18.00

189.00

15.00%

30.00

315.00

25.00%

48.00

504.00

40.00%

72.00

756.00

60.00%

10.02.01.02.11

UNION PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 40 mm (1 1/2")

und

30.00

9.16

274.80

4.50

41.22

15.00%

7.50

68.70

25.00%

12.00

109.92

40.00%

18.00

164.88

60.00%

10.02.01.02.12

UNION PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 35 mm (1 1/4")

und

10.00

9.56

95.60

1.50

14.34

15.00%

2.50

23.90

25.00%

4.00

38.24

40.00%

6.00

57.36

60.00%

10.02.01.02.13

CONEXIÓN PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 100 mm (4")

und

75.00

13.87

1,040.25

11.25

156.04

15.00%

18.75

260.06

25.00%

30.00

416.10

40.00%

45.00

624.15

60.00%

10.02.01.02.14

CONEXION PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 50 mm (2")

und

240.00

19.82

4,756.80

36.00

713.52

15.00%

60.00

1,189.20

25.00%

96.00

1,902.72

40.00%

144.00

2,854.08

60.00%

10.02.01.02.15

CONEXION PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 40 mm (1 1/2")

und

30.00

8.61

258.30

4.50

38.75

15.00%

7.50

64.58

25.00%

12.00

103.32

40.00%

18.00

154.98

60.00%

10.02.01.02.16

CONEXION PVC SAP PARA INSTALACIONES ELECTRICAS DE 35MM (1 1/4")

und

20.00

9.97

199.40

3.00

29.91

15.00%

5.00

49.85

25.00%

8.00

79.76

40.00%

12.00

119.64

60.00%

0.00%

-

10.02.01.03

CONDUCTORES

-

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.02.01.03.01

CABLE N2XOH 2-1x4mm2

m

400.00

8.89

3,556.00

-

-

0.00%

100.00

889.00

25.00%

100.00

889.00

25.00%

300.00

2,667.00

75.00%

10.02.01.03.02

CABLE N2XOH 2-1x6mm2

m

700.00

10.36

7,252.00

-

-

0.00%

175.00

1,813.00

25.00%

175.00

1,813.00

25.00%

525.00

5,439.00

75.00%

10.02.01.03.03

CABLE N2XOH 2-1x10mm2

m

220.00

12.90

2,838.00

-

-

0.00%

55.00

709.50

25.00%

55.00

709.50

25.00%

165.00

2,128.50

75.00%

10.02.01.03.04

CABLE N2XOH 2-1X16MM2

m

250.00

13.20

3,300.00

-

-

0.00%

62.50

825.00

25.00%

62.50

825.00

25.00%

187.50

2,475.00

75.00%

10.02.01.03.05

CABLE N2X0H 4-1x6mm2

m

70.00

17.92

1,254.40

-

-

0.00%

17.50

313.60

25.00%

17.50

313.60

25.00%

52.50

940.80

75.00%

10.02.01.03.06

CABLE 4-1x10mm2 N2XOH

m

328.00

22.75

7,462.00

-

-

0.00%

82.00

1,865.50

25.00%

82.00

1,865.50

25.00%

246.00

5,596.50

75.00%

10.02.01.03.07

CABLE 4-1x16mm2 N2XOH

m

30.00

23.09

692.70

-

-

0.00%

7.50

173.18

25.00%

7.50

173.18

25.00%

22.50

519.52

75.00%

10.02.01.03.08

CABLE 4-1x25mm2 N2XOH

m

460.00

33.88

15,584.80

-

-

0.00%

115.00

3,896.20

25.00%

115.00

3,896.20

25.00%

345.00

11,688.60

75.00%

10.02.01.03.09

CABLE 4-1x35MM2 N2XOH

m

110.00

43.12

4,743.20

-

-

0.00%

27.50

1,185.80

25.00%

27.50

1,185.80

25.00%

82.50

3,557.40

75.00%

10.02.01.03.10

CABLE 4-1X70MM2 N2XOH

m

70.00

30.13

2,109.10

-

-

0.00%

17.50

527.28

25.00%

17.50

527.28

25.00%

52.50

1,581.82

75.00%

10.02.01.03.11

CABLE PARA TIERRA AMARILLO CON FRANJA VERDE DE 4 mm2

m

400.00

7.00

2,800.00

-

-

0.00%

100.00

700.00

25.00%

100.00

700.00

25.00%

300.00

2,100.00

75.00%

10.02.01.03.12

CABLE PARA TIERRA AMARILLO CON FRANJA VERDE DE 6 mm2

m

500.00

7.53

3,765.00

-

-

0.00%

125.00

941.25

25.00%

125.00

941.25

25.00%

375.00

2,823.75

75.00%

10.02.01.03.13

CABLE PARA TIERRA AMARILLO CON FRANJA VERDE DE 10 mm2

m

220.00

8.58

1,887.60

-

-

0.00%

55.00

471.90

25.00%

55.00

471.90

25.00%

165.00

1,415.70

75.00%

10.02.01.03.14

CABLE DE TIERRA AMARILLO CON FRANJA VERDE DE 16 mm2

m

250.00

11.73

2,932.50

-

-

0.00%

62.50

733.13

25.00%

62.50

733.13

25.00%

187.50

2,199.37

75.00%

10.02.01.03.15

CABLE DESNUDO DE Cu DE 10 mm2

M

150.00

7.72

1,158.00

-

-

0.00%

37.50

289.50

25.00%

37.50

289.50

25.00%

112.50

868.50

75.00%

10.02.01.03.16

CABLE DESNUDO DE Cu DE 16 mm2

m

60.00

10.48

628.80

-

-

0.00%

15.00

157.20

25.00%

15.00

157.20

25.00%

45.00

471.60

75.00%

10.02.01.03.17

CABLE DESNUDO Cu DE 50mm2

m

50.00

51.14

2,557.00

-

-

0.00%

12.50

639.25

25.00%

12.50

639.25

25.00%

37.50

1,917.75

75.00%

-

-

0.00%

10.02.01.04 10.02.01.04.01 10.02.01.04.02 10.02.01.04.03 10.02.01.05

ARTEFACTOS PARA ALUMBRADO EXTERIOR Lámpara de Halogenuro Metálico de 50 W. tubular, alta presion, 220V. Luminaria con fotometria adecuada para vanos de 30m. y calles de 4-8 metros, con equipo Auxiliar apta lamparas de vapor de Halogenuro metálico alta presion de 50 W. Hermeticidad IP 65 para bloque Optico, IP 44 Para Eqp Aux. electricos, Resist. Impac Pastorales incluye accesorios de instalación

-

-

0.00%

-

-

0.00%

-

-

0.00%

und

44.00

56.06

2,466.64

-

-

0.00%

11.00

616.66

25.00%

11.00

616.66

25.00%

33.00

1,849.98

75.00%

und

44.00

459.48

20,217.12

-

-

0.00%

11.00

5,054.28

25.00%

11.00

5,054.28

25.00%

33.00

15,162.84

75.00%

UND

44.00

59.41

2,614.04

-

-

0.00%

11.00

653.51

25.00%

11.00

653.51

25.00%

33.00

1,960.53

75.00%

-

-

0.00%

TABLEROS DE DISTRIBUCION

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.02.01.05.01

TABLERO DE DISTRIBUCIÓN TD-01 (ADMINISTRACIÓN), INCLUYE COMPONENTES ACCESORIOS E INSTALACION

und

1.00

9,322.03

9,322.03

-

-

0.00%

0.25

2,330.51

25.00%

0.25

2,330.51

25.00%

0.75

6,991.52

75.00%

10.02.01.05.02

TABLERO DE DISTRIBUCIÓN TD-01-11 (Administración), INCLUYE COMPONENTES ACCESORIOS E INSTALACION

und

1.00

3,050.85

3,050.85

-

-

0.00%

0.25

762.71

25.00%

0.25

762.71

25.00%

0.75

2,288.14

75.00%

10.02.01.05.03

TABLERO DE DISTRIBUCIÓN TD-02(SERVICIO DEL PERSONAL), INCLUYE COMPONENTES ACCESORIOS E INSTALACION

und

1.00

3,559.32

3,559.32

-

-

0.00%

0.25

889.83

25.00%

0.25

889.83

25.00%

0.75

2,669.49

75.00%

10.02.01.05.04

TABLERO DE DISTRIBUCIÓN TD-03(CENTRO DE PRODUCCIÓN), INCLUYE COMPONENTES ACCESORIOS E INSTALACION

und

1.00

3,728.81

3,728.81

-

-

0.00%

0.25

932.20

25.00%

0.25

932.20

25.00%

0.75

2,796.61

75.00%

10.02.01.05.05

TABLERO DE DISTRIBUCIÓN TD-04(CUARTO DE MAQUINAS 2), INCLUYE COMPONENTES ACCESORIOS E INSTALACION

und

1.00

3,220.34

3,220.34

-

-

0.00%

0.25

805.09

25.00%

0.25

805.09

25.00%

0.75

2,415.25

75.00%

10.02.01.05.06

TABLERO DE DISTRIBUCIÓN TD-05(CUARTO DE MAQUINAS 1), INCLUYE COMPONENTES ACCESORIOS E INSTALACION

und

1.00

3,474.58

3,474.58

-

-

0.00%

0.25

868.65

25.00%

0.25

868.65

25.00%

0.75

2,605.93

75.00%

10.02.01.05.07

TABLERO DE DISTRIBUCIÓN TD-06(CUARTO DE MAQUINAS 1), INCLUYE COMPONENTES ACCESORIOS E INSTALACION

und

1.00

3,305.08

3,305.08

-

-

0.00%

0.25

826.27

25.00%

0.25

826.27

25.00%

0.75

2,478.81

75.00%

10.02.01.05.08

TABLERO DE DISTRIBUCIÓN TD-07(SERVICIOS COMPLEMENTARIOS), INCLUYE COMPONENTES ACCESORIOS E INSTALACION

und

1.00

3,474.58

3,474.58

-

-

0.00%

0.25

868.65

25.00%

0.25

868.65

25.00%

0.75

2,605.93

75.00%

47

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

10.02.01.05.09

TABLERO DE DISTRIBUCIÓN TD-08 (CORRALES), INCLUYE COMPONENTES ACCESORIOS E INSTALACION

und

1.00

2,372.88

2,372.88

-

-

0.00%

0.25

593.22

25.00%

0.25

593.22

25.00%

0.75

1,779.66

75.00%

10.02.01.05.10

TABLERO DE DISTRIBUCIÓN TD-09 (CONTROL 2), INCLUYE COMPONENTES ACCESORIOS E INSTALACION

und

1.00

1,864.41

1,864.41

-

-

0.00%

0.25

466.10

25.00%

0.25

466.10

25.00%

0.75

1,398.31

75.00%

10.02.01.05.11

TABLERO DE DISTRIBUCIÓN TD-10(CONTROL 1), INCLUYE COMPONENTES ACCESORIOS E INSTALACION

und

1.00

2,457.63

2,457.63

-

-

0.00%

0.25

614.41

25.00%

0.25

614.41

25.00%

0.75

1,843.22

75.00%

10.02.01.05.12

TABLERO DE DISTRIBUCIÓN TD-11(CUARTO DE PODER), INCLUYE COMPONENTES ACCESORIOS E INSTALACION

und

1.00

10,084.75

10,084.75

-

-

0.00%

0.25

2,521.19

25.00%

0.25

2,521.19

25.00%

0.75

7,563.56

75.00%

10.02.01.05.13

TABLERO DE DISTRIBUCIÓN TD-11-01(CUARTO DE PODER), INCLUYE COMPONENTES ACCESORIOS E INSTALACION

und

1.00

1,525.42

1,525.42

-

-

0.00%

0.25

381.36

25.00%

0.25

381.36

25.00%

0.75

1,144.06

75.00%

10.02.01.05.14

TABLERO DE DISTRIBUCIÓN TD-11-02(CONTROL 3), INCLUYE COMPONENTES ACCESORIOS E INSTALACION

und

1.00

1,525.42

1,525.42

-

-

0.00%

0.25

381.36

25.00%

0.25

381.36

25.00%

0.75

1,144.06

75.00%

10.02.01.05.15

TABLERO DE DISTRIBUCIÓN TD-12(TANQUE CISTERNA -CUARTO DE BOMBAS), INCLUYE COMPONENTES ACCESORIOS E INSTALACION

und

1.00

2,033.90

2,033.90

-

-

0.00%

0.25

508.48

25.00%

0.25

508.48

25.00%

0.75

1,525.42

75.00%

10.02.01.05.16

TABLERO DE EMERGENCIATE-01(CENTRO DE PRODUCCIÓN), INCLUYE COMPONENTES ACCESORIOS E INSTALACION

und

1.00

1,779.66

1,779.66

-

-

0.00%

0.25

444.92

25.00%

0.25

444.92

25.00%

0.75

1,334.74

75.00%

10.02.01.05.17

TABLERO DE EMERGENCIATE-02(CENTRO DE PRODUCCIÓN), INCLUYE COMPONENTES ACCESORIOS E INSTALACION

und

1.00

2,033.90

2,033.90

-

-

0.00%

0.25

508.48

25.00%

0.25

508.48

25.00%

0.75

1,525.42

75.00%

10.02.01.05.18

TABLERO DE EMERGENCIATE-03(CENTRO DE PRODUCCIÓN), INCLUYE COMPONENTES ACCESORIOS E INSTALACION

und

1.00

2,033.90

2,033.90

-

-

0.00%

0.25

508.48

25.00%

0.25

508.48

25.00%

0.75

1,525.42

75.00%

-

-

0.00%

-

0.00%

-

0.00%

-

-

0.00%

8.00

3,050.88

57.14%

6.00

2,288.16

42.86%

10.02.01.06

POSTES DE C°A°C°

-

-

-

0.00%

10.02.01.06.01

POSTES DE C°A°C° DE 8/200/140/260

und

14.00

381.36

5,339.04

8.00

3,050.88

57.14%

10.02.01.06.02

Poste de C.A.C. de 8/300/150/270 m.

und

26.00

440.68

11,457.68

20.00

8,813.60

76.92%

0.00%

20.00

8,813.60

76.92%

6.00

2,644.08

23.08%

10.02.01.06.03

TRAZO, NIVELES Y REPLANTEO

m2

40.00

3.32

132.80

-

-

0.00%

10.00

33.20

25.00%

10.00

33.20

25.00%

30.00

99.60

75.00%

10.02.01.06.04

EXCAVACION DE ZANJAS EN TERRENO NORMAL

m3

56.00

50.57

2,831.92

-

-

0.00%

14.00

707.98

25.00%

14.00

707.98

25.00%

42.00

2,123.94

75.00%

10.02.01.06.05

IZADO DE POSTES DE CAC DE 8/200

und

14.00

336.94

4,717.16

-

-

0.00%

3.50

1,179.29

25.00%

3.50

1,179.29

25.00%

10.50

3,537.87

75.00%

10.02.01.06.06

IZADO DE POSTES DE CAC DE 8/300

und

26.00

336.94

8,760.44

-

-

0.00%

6.50

2,190.11

25.00%

6.50

2,190.11

25.00%

19.50

6,570.33

75.00%

10.02.01.06.07

CONCRETO f´c= 175 kg/cm2

m3

18.20

503.88

9,170.62

-

-

0.00%

4.55

2,292.65

25.00%

4.55

2,292.65

25.00%

13.65

6,877.97

75.00%

-

-

0.00%

-

0.00%

-

-

0.00%

10.02.01.07 10.02.01.07.01 10.02.01.07.02 10.02.01.08 10.02.01.08.01 10.02.01.09

BUZON DE REGISTRO

-

-

-

-

-

0.00%

BUZON DE REGISTRO DE 300X200X200 MM

und

40.00

411.10

16,444.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

40.00

16,444.00

100.00%

BUZON DE REGISTRO DE 800X800X1000 MM

und

16.00

452.73

7,243.68

-

-

0.00%

-

-

0.00%

-

-

0.00%

16.00

7,243.68

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

EMPALMES EMPALME SUBTERRANEO

und

43.00

75.31

3,238.33

TENDIDO DE TUBERIAS PARA TABLEROS DE DISTRIBUCIÓN_x000D_

-

-

-

-

0.00%

228.00

3.32

756.96

-

-

0.00%

57.00

189.24

25.00%

57.00

189.24

25.00%

171.00

567.72

75.00%

10.02.01.09.02

EXCAVACION DE ZANJAS EN TERRENO NORMAL

m3

136.80

50.57

6,917.98

-

-

0.00%

34.20

1,729.49

25.00%

34.20

1,729.49

25.00%

102.60

5,188.49

75.00%

10.02.01.09.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

91.20

33.75

3,078.00

-

-

0.00%

22.80

769.50

25.00%

22.80

769.50

25.00%

68.40

2,308.50

75.00%

10.02.01.09.04

LECHO DE ARENA

M3

45.60

24.83

1,132.25

-

-

0.00%

11.40

283.06

25.00%

11.40

283.06

25.00%

34.20

849.19

75.00%

10.02.01.09.05

TENDIDO DE TUBERIAS

m

380.00

15.66

5,950.80

-

-

0.00%

95.00

1,487.70

25.00%

95.00

1,487.70

25.00%

285.00

4,463.10

75.00%

-

-

0.00%

-

0.00%

-

-

-

0.00%

0.00%

-

-

-

0.00% 100.00%

m2

-

-

3,238.33

TRAZO, NIVELES Y REPLANTEO

TENDIDO DE TUBERIAS PARA ALUMBRADO EXTERIOR_x000D_

0.00%

43.00

-

10.02.01.09.01

10.02.01.10

-

-

-

0.00%

0.00%

10.02.01.10.01

TRAZO, NIVELES Y REPLANTEO

m2

600.00

3.32

1,992.00

300.00

996.00

50.00%

150.00

498.00

25.00%

450.00

1,494.00

75.00%

150.00

498.00

25.00%

10.02.01.10.02

EXCAVACION DE ZANJAS EN TERRENO NORMAL

m3

360.00

50.57

18,205.20

160.00

8,091.20

44.44%

90.00

4,551.30

25.00%

250.00

12,642.50

69.44%

110.00

5,562.70

30.56%

10.02.01.10.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

90.00

33.75

3,037.50

0.00%

22.50

759.38

25.00%

22.50

759.38

25.00%

67.50

2,278.12

75.00%

10.02.01.10.04

LECHO DE ARENA

M3

90.00

24.83

2,234.70

16.67%

22.50

558.68

25.00%

37.50

931.13

41.67%

52.50

1,303.57

58.33%

10.02.01.10.05

TENDIDO DE TUBERIAS

m

1,000.00

15.66

15,660.00

250.00

3,915.00

25.00%

250.00

3,915.00

25.00%

750.00

11,745.00

75.00%

10.02.01.11

SISTEMA DE PUESTA A TIERRA

-

10.02.01.11.01

EXCAVACION DE ZANJAS EN TERRENO NORMAL

m3

10.02.01.11.02

PUESTA ATIERRA PARA TABLEROS

und

15.00

372.45

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

360.00

50.57

18,205.20

-

-

0.00%

90.00

4,551.30

25.00%

90.00

4,551.30

25.00%

270.00

13,653.90

75.00%

15.00

1,990.26

29,853.90

-

-

0.00%

3.75

7,463.48

25.00%

3.75

7,463.48

25.00%

11.25

22,390.42

75.00%

48

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

10.02.01.11.03 10.02.01.11.04 10.02.01.12 10.02.01.12.01 10.02.01.13

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

PUESTA ATIERRA PARA PARARRAYOS

und

9.00

2,356.67

21,210.03

-

-

0.00%

2.25

5,302.51

25.00%

2.25

5,302.51

25.00%

6.75

15,907.52

75.00%

ENLACE EQUIPOTENCIAL

und

1.00

4,396.03

4,396.03

-

-

0.00%

0.25

1,099.01

25.00%

0.25

1,099.01

25.00%

0.75

3,297.02

75.00%

-

-

0.00%

0.00%

-

0.00%

-

-

-

0.00%

33.33%

1.00

33.33%

2.00

SISTEMA DE PARARRAYOS SISTEMA DE PARARRAYOS

UND

3.00

10,462.90

31,388.70

SEÑALIZACIÓN Y PRUEBAS ELÉCTRICAS

-

1.00

10,462.90

10,462.90

20,925.80

-

-

0.00%

-

0.00%

-

-

0.00%

SEÑALIZACIÓN DE TABLEROS

und

24.00

58.13

1,395.12

-

-

0.00%

-

-

0.00%

-

-

0.00%

24.00

1,395.12

100.00%

10.02.01.13.02

SEÑALIZACIÓN DE TABLERO MODULAR 1 BLOQUE

und

1.00

58.13

58.13

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

58.13

100.00%

10.02.01.13.03

SEÑALIZACIÓN DE TABLERO MODULAR 3 BLOQUES

und

1.00

58.13

58.13

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

58.13

100.00%

10.02.01.13.04

PRUEBAS ELECTRICAS (RESISTENCIA PUESTA A TIERRA)

und

25.00

692.82

17,320.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

25.00

17,320.50

100.00%

10.02.01.13.05

PRUEBAS ELECTRICAS (CONTINUIDAD)

und

25.00

619.02

15,475.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

25.00

15,475.50

100.00%

10.02.01.13.06

PRUEBAS ELECTRICAS (AISLAMIENTO)

und

25.00

44.97

1,124.25

-

-

0.00%

-

-

0.00%

-

-

0.00%

25.00

1,124.25

100.00%

10.02.01.14.01

-

0.00% 66.67%

10.02.01.13.01

10.02.01.14

-

-

INSTALACIONES DE SISTEMAS INDUSTRIALES

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

BANDEJAS ELECTRICAS DE 300x100mm

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

0.00% 0.00%

10.02.01.14.01.01

BANDEJAS ELECTRICAS

und

30.00

88.66

2,659.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

30.00

2,659.80

100.00%

10.02.01.14.01.02

Accesorios

UND

30.00

397.22

11,916.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

30.00

11,916.60

100.00%

10.02.01.14.01.03

SOPORTE DE BANDEJA

und

30.00

271.00

8,130.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

30.00

8,130.00

100.00%

10.02.01.14.01.04

Soportes de Distanciador para fijar en pared

und

30.00

106.50

3,195.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

30.00

3,195.00

100.00%

11 11.01 11.01.01 11.01.01.01

CONSTRUCCIÓN DE CERCO PERIMETRICO

897,909.54

364,174.39

62,302.65

MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS EN TERRENO NORMAL

m3

30.05

50.57

1,519.63

11.01.01.01.02

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

7.79

33.75

262.91

11.01.01.01.03

NIVELACION INTERIOR Y COMPACTADO C/EQUPO.

m2

23.12

8.85

204.61

11.01.01.01.04

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

25.60

25.29

647.42

10.58

267.57

11.01.01.01.05

ELIMINACION DE MATERIAL EXCEDENTE D = 2 Km

m3

25.60

13.93

356.61

10.58

147.38

41.33%

OBRAS DE CONCRETO SIMPLE

-

11.01.01.02.01

CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS

m3

22.26

11.01.01.02.02

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

m2

11.01.01.02.03

CONCRETO f´c= 140 kg/cm PARA SOBRECIMIENTOS

m3

11.01.01.03 11.01.01.03.01

kg

11.01.01.03.01.02

ENCOFRADO Y DESENCOFRADO DE COLUMNAS

m2

11.01.01.03.01.03

CONCRETO f´c= 210 kg/cm2 PARA COLUMNAS

11.01.01.03.01.04

CURADO DE CONCRETO

-

30.02%

-

-

0.00%

9.02

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

41.33%

-

-

0.00%

10.58

267.57

-

-

0.00%

10.58

147.38

41.33%

-

0.00%

-

-

0.00%

-

-

0.00%

-

456.14 -

30.02%

21.03

1,063.49

69.98%

0.00%

7.79

262.91

100.00%

0.00%

23.12

204.61

100.00%

41.33%

15.02

379.85

58.67%

15.02

209.23

58.67%

-

-

0.00%

-

-

0.00%

22.26

4,586.23

100.00%

37.56

49.13

1,845.32

-

-

0.00%

-

-

0.00%

-

-

0.00%

37.56

1,845.32

100.00%

2.82

374.06

1,054.85

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.82

1,054.85

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

100.00%

-

-

-

0.00%

63.99

59.71

3,820.84

-

-

0.00%

-

-

0.00%

-

-

0.00%

m3

4.62

557.01

2,573.39

-

-

0.00%

-

-

0.00%

-

-

m2

63.99

1.93

123.50

-

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

ENCOFRADO Y DESENCOFRADO DE VIGAS

m2

11.01.01.03.02.03

CONCRETO f´c= 210kg/cm2 PARA VIGAS

m3

11.01.01.03.02.04

CURADO DE CONCRETO

m2

192.00

308.00

1,558.48

100.00%

308.00

1,558.48

0.00%

63.99

3,820.84

100.00%

0.00%

4.62

2,573.39

100.00%

0.00%

63.99

123.50

100.00%

-

-

0.00%

5.06

971.52

-

-

0.00%

-

-

0.00%

-

-

0.00%

192.00

971.52

100.00%

20.28

74.12

1,503.15

-

-

0.00%

-

-

0.00%

-

-

0.00%

20.28

1,503.15

100.00%

1.52

557.01

846.66

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.52

846.66

100.00%

20.28

1.93

39.14

-

-

0.00%

-

-

0.00%

-

-

0.00%

20.28

39.14

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

VARIOS

und

0.00%

0.00%

-

11.01.01.03.02.02

-

-

1,558.48

kg

-

-

VIGAS

PRUEBAS DE CONTROL DE CALIDAD DEL CONCRETO

-

5.06

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

11.01.01.03.03.01

-

456.14

308.00

11.01.01.03.02.01

11.01.01.03.03

-

4,586.23

COLUMNAS ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

9.02

206.03

OBRAS DE CONCRETO ARMADO

11.01.01.03.01.01

11.01.01.03.02

471,432.51

ESTRUCTURAS

11.01.01.01.01

11.01.01.02

426,477.03

CASETA DE CONTROL

12.00

18.36

220.32

-

12.00

220.32

0.00% 100.00%

49

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

11.01.01.04 11.01.01.04.01 11.01.01.04.02 11.01.02 11.01.02.01 11.01.02.01.01 11.01.02.02

P. U.

ESTRUCTURA METALICA

AVANCE ANTERIOR

P. TOTAL

METRADO -

MONTO

AVANCE ACTUAL %

-

-

0.00%

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

-

0.00%

-

-

0.00%

METRADO -

MONTO

% -

0.00%

CARPINTERIA METALICA

KG

737.21

11.09

8,175.66

-

-

0.00%

-

-

0.00%

-

-

0.00%

737.21

8,175.66

100.00%

MONTAJE ESTRUCTURA METALICAS

KG

737.21

3.14

2,314.84

-

737.21

2,314.84

100.00%

ARQUITECTURA MUROS Y TABIQUES DE ALBAÑILERIA MUROS DE LADRILLO KK DE SOGA MEZCLA 1:5

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

m2

55.25

79.68

4,402.32

REVOQUES ENLUCIDOS Y MOLDURAS

-

-

55.25

-

-

0.00%

-

0.00%

-

-

0.00%

TARRAJEO EN MUROS INTERIORES C:A 1:4 E=1.5CM

m2

89.73

24.10

2,162.49

-

-

0.00%

-

-

0.00%

-

-

0.00%

89.73

2,162.49

100.00%

11.01.02.02.02

TARRAJEO EN MUROS EXTERIORES C:A 1:4 E=1.5CM

m2

74.73

28.43

2,124.57

-

-

0.00%

-

-

0.00%

-

-

0.00%

74.73

2,124.57

100.00%

11.01.02.02.03

VESTIDURA DE DERRAMES

m

30.90

16.50

509.85

-

-

0.00%

-

-

0.00%

-

-

0.00%

30.90

509.85

100.00%

11.01.02.02.04

BRUÑAS 1 cm

m

29.48

6.66

196.34

-

-

0.00%

-

-

0.00%

-

-

0.00%

29.48

196.34

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

11.01.02.03.01 11.01.02.04 11.01.02.04.01 11.01.02.04.02 11.01.02.05 11.01.02.05.01 11.01.02.05.02 11.01.02.06 11.01.02.06.01 11.01.02.07 11.01.02.07.01 11.01.02.07.02 11.01.02.08

CIELORRASOS FALSO CIELO RASO CON PLANCHA DE FIBROCEMENTO 8MM C/PINT. LATEX

87.64

3,512.61

-

-

0.00%

-

0.00%

-

-

0.00%

CONTRAPISO E=40 mm

m2

19.12

28.37

542.43

-

-

0.00%

-

-

0.00%

-

-

0.00%

19.12

542.43

100.00%

PISO DE CEMENTO PULIDO Y BRUÑADO, MEZC. C:A 1:4 CON ENDURECEDOR, e=2"

m2

7.26

23.18

168.29

-

-

0.00%

-

-

0.00%

-

-

0.00%

7.26

168.29

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

PISOS Y PAVIMENTOS

-

CONTRAZOCALOS

-

11.01.02.11.02 11.01.02.12 11.01.02.12.01 11.01.02.13

-

-

100.00% 0.00%

0.00%

17.35

265.46

-

-

0.00%

-

-

0.00%

-

-

0.00%

15.30

265.46

100.00%

CONTRAZOCALO DE CEMENTO PULIDO H=10 CM

m

15.86

17.41

276.12

-

-

0.00%

-

-

0.00%

-

-

0.00%

15.86

276.12

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

ZOCALOS ZOCALO DE PORCELANATO

m2

34.27

85.19

2,919.46

COBERTURA DE ALUZING TIPO TR3 E=0.45mm INC/ ACCESORIOS

M2

40.08

70.87

2,840.47

CUMBRERA DE ALUZING INC/ ACCESORIOS

M

9.32

48.34

450.53

COBERTURAS

-

CARPINTERIA DE MADERA

-

MARCO DE MADERA CEDRO 4"X 2"

11.01.02.11.01

-

3,512.61

15.30

PUERTA MADERA (0.80X2.10) CONTRAP. C/ 1 HOJA BATIENTE. MADERA (MAD. CEDRO, m2 FORRO MDF PLASTIFICADO 6MM) C/ REJILLA MAD.

11.01.02.11

40.08

m

11.01.02.08.03

11.01.02.10.01

-

CONTRAZOCALO SANITARIO DE CEMENTO PULIDO TIPO MEDIA CAÑA, CON BORDE DE PLATINA EN PISO, H =0.10 m

11.01.02.08.02

11.01.02.10

0.00%

40.08

PUERTA MADERA (0.90X2.10) CONTRAP. C/ 1 HOJA BATIENTE. MADERA (MAD. CEDRO, m2 FORRO MDF PLASTIFICADO 6MM)

11.01.02.09.01

-

0.00%

M2

11.01.02.08.01

11.01.02.09

-

-

0.00% 100.00%

11.01.02.02.01

11.01.02.03

-

4,402.32

0.00%

m

1,771.75

-

0.00%

62.38%

0.00% -

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

-

0.00%

25.00

1,771.75

0.00%

34.27 -

2,919.46 -

0.00% 100.00% 0.00%

62.38%

15.08

1,068.72

37.62%

-

0.00%

9.32

450.53

100.00%

-

0.00%

1.89

1,314.67

100.00%

-

0.00%

1.89

695.59

1,314.67

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.68

704.60

1,183.73

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.68

1,183.73

100.00%

10.10

24.12

243.61

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.10

243.61

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

4.00

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

9.90

CARPINTERÍA METÁLICA VENTANA METALICA VM 0.65X0.65 m

25.00

-

-

-

-

0.00%

und

4.00

170.27

681.08

m2

9.90

829.95

8,216.51

-

-

0.00%

-

0.00%

-

-

0.00%

-

CERRADURA TIPO C

UND

4.00

73.19

292.76

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

292.76

100.00%

BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 3"

und

12.00

22.53

270.36

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.00

270.36

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

1.08

CARPINTERIA DE ALUMINIO VENTANA DE 1.50x1.10 C/ 1 HOJA PROYECTANTE C/1 HOJA FIJA EN CARP. DE ALUMINIO C/CRISTAL DE 6mm, TIPO V-4

-

CERRAJERÍA

-

VIDRIOS, CRISTALES Y SIMILARES ESPEJOS C/ SISTEMA DE FIJACION

M2

1.08

126.43

136.54

PINTURA

-

-

-

-

-

681.08 8,216.51 -

136.54 -

100.00% 0.00% 100.00% 0.00%

0.00% 100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

11.01.02.13.01

PINTURA LATEX EN CIELORRASO 2 MANOS

m2

80.16

19.96

1,599.99

-

-

0.00%

-

-

0.00%

-

-

0.00%

80.16

1,599.99

100.00%

0.00%

11.01.02.13.02

PINTURA LATEX EN MUROS INTERIORES 2 MANOS

m2

94.37

16.42

1,549.56

-

-

0.00%

-

-

0.00%

-

-

0.00%

94.37

1,549.56

100.00%

11.01.02.13.03

PINTURA LATEX EN MUROS EXTERIORES 2 MANOS

m2

74.73

19.96

1,491.61

-

-

0.00%

-

-

0.00%

-

-

0.00%

74.73

1,491.61

100.00%

11.01.02.13.04

PINTURA LATEX EN VIGAS 2 MANOS

m2

13.00

20.09

261.17

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.00

261.17

100.00%

50

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

11.01.02.14 11.01.02.14.01 11.01.02.14.02 11.01.03 11.01.03.01 11.01.03.01.01 11.01.03.01.01.01 11.01.03.01.02

P. U.

VARIOS

AVANCE ANTERIOR

P. TOTAL

METRADO -

MONTO

AVANCE ACTUAL %

-

-

0.00%

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

-

0.00%

-

-

0.00%

METRADO -

MONTO

% -

0.00%

SELLADOR PARA PORCELANATO

m2

43.22

17.47

755.05

-

-

0.00%

-

-

0.00%

-

-

0.00%

43.22

755.05

100.00%

LIMPIEZA FINAL DE OBRA

m2

40.08

1.51

60.52

-

40.08

60.52

100.00%

INSTALACIONES SANITARIAS SISTEMA DE AGUA FRÍA SALIDA DE AGUA FRÍA SALIDA DE AGUA FRIA CON TUBO PVC TIPO ROSCA DE 1/2"

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

PTO

26.00

78.00

2,028.00

REDES DE DISTRIBUCION DE AGUA FRIA

-

-

26.00

-

-

0.00%

-

0.00%

-

-

0.00%

TUBO PVC CON UNION TIPO ROSCA DE 1/2" PN10 (ENTERRADA)

M

11.78

17.70

208.51

-

-

0.00%

-

-

0.00%

-

-

0.00%

11.78

208.51

100.00%

11.01.03.01.02.02

TUBO PVC CON UNION TIPO ROSCA DE 3/4" PN10 (ENTERRADA)

m

71.34

18.06

1,288.40

-

-

0.00%

-

-

0.00%

-

-

0.00%

71.34

1,288.40

100.00%

11.01.03.01.02.03

TUBO PVC CON UNION TIPO ROSCA DE 1" PN10 (ENTERRADA)

m

31.38

24.34

763.79

-

-

0.00%

-

-

0.00%

-

-

0.00%

31.38

763.79

100.00%

11.01.03.01.02.04

PRUEBA HIDRÁULICA EN TUBERIAS Y DESINFECCION

M

114.50

1.83

209.54

-

-

0.00%

-

-

0.00%

-

-

0.00%

114.50

209.54

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

ACCESORIOS DE REDES DE AGUA

-

-

0.00% 100.00%

11.01.03.01.02.01

11.01.03.01.03

-

2,028.00

-

0.00%

0.00%

11.01.03.01.03.01

CODO PVC TIPO ROSCA DE 1/2" 90°

und

9.00

11.50

103.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.00

103.50

100.00%

11.01.03.01.03.02

CODO PVC TIPO ROSCA DE 3/4" 90°

und

9.00

24.80

223.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.00

223.20

100.00%

11.01.03.01.03.03

CODO PVC TIPO ROSCA DE 1" 90°

und

7.00

10.30

72.10

-

-

0.00%

-

-

0.00%

-

-

0.00%

7.00

72.10

100.00%

11.01.03.01.03.04

TEE PVC TIPO ROSCA DE 3/4"

und

15.00

25.65

384.75

-

-

0.00%

-

-

0.00%

-

-

0.00%

15.00

384.75

100.00%

11.01.03.01.03.05

TEE PVC TIPO ROSCA DE 1"

und

1.00

26.22

26.22

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

26.22

100.00%

11.01.03.01.03.06

TEE PVC TIPO ROSCA DE 1/2"

und

3.00

24.52

73.56

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

73.56

100.00%

11.01.03.01.03.07

REDUCCION PVC TIPO ROSCA DE 3/4" A 1/2"

und

20.00

20.61

412.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

20.00

412.20

100.00%

11.01.03.01.03.08

REDUCCION PVC TIPO ROSCA DE 1" A 3/4"

und

4.00

16.21

64.84

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

64.84

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

11.01.03.01.04

LLAVES Y VÁLVULAS

-

11.01.03.01.04.01

VALVULA DE COMPUERTA DE BRONCE 1/2"

und

2.00

11.01.03.01.04.02

VALVULA GLOBO 1"

UND

11.01.03.01.04.03

VALVULA CHECK DE BRONCE 1"

und

11.01.03.01.04.04

VALVULA DE COMPUERTA DE BRONCE 1"

11.01.03.01.04.05

NICHO Y TAPA PARA VALVULA EN PARED

11.01.03.01.05

-

0.00%

68.36

136.72

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

136.72

100.00%

2.00

79.01

158.02

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

158.02

100.00%

2.00

122.99

245.98

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

245.98

100.00%

und

2.00

157.97

315.94

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

315.94

100.00%

UND

4.00

88.83

355.32

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

355.32

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

SISTEMA DE DOSIFICACIÓN

-

-

0.00%

11.01.03.01.05.01

BOMBA DOSIFICADORA DE PRODUCTOS QUIMICOS INC/ACCESORIOS

und

4.00

431.26

1,725.04

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

1,725.04

100.00%

11.01.03.01.05.02

TANQUE DE AGUA 1100 LITROS CON ESTRUCTURA METALICA

und

2.00

3,221.85

6,443.70

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

6,443.70

100.00%

11.01.03.01.05.03

BOMBA JET 1.0 HP

und

2.00

1,194.70

2,389.40

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

2,389.40

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

11.01.03.02 11.01.03.02.01

SISTEMA DE DESAGÜE Y VENTILACIÓN SALIDA DE DESAGÜE Y VENTILACIÓN

0.00% 0.00%

11.01.03.02.01.01

SALIDA DE DESAGÜE PVC 2"

pto

4.00

93.05

372.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

372.20

100.00%

11.01.03.02.01.02

SALIDA DE DESAGÜE PVC 4"

pto

4.00

100.10

400.40

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

400.40

100.00%

11.01.03.02.01.03

SALIDA DE VENTILACIÓN PVC 2"

PTO

2.00

93.05

186.10

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

186.10

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

11.01.03.02.02

REDES COLECTORAS DE DESAGÜE

-

-

0.00%

11.01.03.02.02.01

TUBERIA PVC SAL 2" DESAGUE (ENTERRADA)

M

7.56

23.33

176.37

-

-

0.00%

-

-

0.00%

-

-

0.00%

7.56

176.37

100.00%

11.01.03.02.02.02

TUBERIA PVC SAL 4" DESAGUE (ENTERRADA)

M

8.86

25.28

223.98

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.86

223.98

100.00%

11.01.03.02.02.03

MONTANTE PVC 2" DESAGUE

M

6.80

32.24

219.23

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.80

219.23

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

11.01.03.02.03

ACCESORIOS DE REDES DE DESAGÜE

-

-

0.00%

11.01.03.02.03.01

SUMIDERO DE BRONCE DE 2"

und

4.00

70.50

282.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

282.00

100.00%

11.01.03.02.03.02

REGISTRO ROSCADO DE BRONCE 4"

und

4.00

91.96

367.84

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

367.84

100.00%

11.01.03.02.03.03

CODO PVC SAL DE 4"X45°

und

2.00

22.16

44.32

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

44.32

100.00%

51

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

11.01.03.02.03.04

CODO PVC SAL DE 2"X45°

und

1.00

19.61

19.61

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

19.61

100.00%

11.01.03.02.03.05

YEE PVC 4"

und

8.00

26.66

213.28

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.00

213.28

100.00%

11.01.03.02.03.06

YEE PVC 4"X2"

und

4.00

26.66

106.64

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

106.64

100.00%

11.01.03.02.03.07

YEE PVC 2"

und

1.00

24.11

24.11

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

24.11

100.00%

11.01.03.02.03.08

REDUCCION PVC SAL 4" x 2"

und

6.00

19.15

114.90

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

114.90

100.00%

11.01.03.02.03.09

SOMBRERO DE VENTILACION PVC DE 2"

UND

2.00

15.27

30.54

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

30.54

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

11.01.03.02.04

RODILUVIO

-

11.01.03.02.04.01

TRAZO, NIVELES Y REPLANTEO

m2

15.30

3.32

50.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

11.01.03.02.04.02

EXCAVACION DE ZANJAS EN TERRENO NORMAL

11.01.03.02.04.03

REFINE Y CONFORMACION DE FONDO Y COSTADO

m3

6.21

50.57

314.04

-

-

0.00%

-

-

0.00%

-

-

M2

42.90

14.89

638.78

-

-

0.00%

-

-

0.00%

-

-

11.01.03.02.04.04

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

5.45

25.29

137.83

-

-

0.00%

-

-

0.00%

-

11.01.03.02.04.05

ENCOFRADO Y DESENCOFRADO EN CANALES LATERALES

M2

33.30

60.87

2,026.97

-

-

0.00%

-

-

0.00%

11.01.03.02.04.06

CONCRETO f´c= 175 KG/CM2 EN CANALES LATERALES

M3

3.27

360.08

1,177.46

-

-

0.00%

-

-

11.01.03.02.04.07

REJILLA CON ÁNGULO DE Fe 1"x3/16 @1" DE 1.00 x 0.36 m

m

34.00

87.14

2,962.76

-

-

0.00%

-

11.01.03.02.04.08

CANASTILLA SOLIDOS DE FIERRO INOX. SEGÚN DETALLE

und

3.00

96.33

288.99

-

-

0.00%

11.01.03.02.04.09

ROCIADOR PARA RODILUVIO

und

18.00

77.20

1,389.60

-

-

0.00%

-

-

0.00%

11.01.03.02.05

CAJAS DE REGISTRO

-

11.01.03.02.05.01

CAJA DE REGISTRO 0.30x0.60m

UND

7.00

11.01.03.02.05.02

CAJA DE REGISTRO 0.60x0.60m

UND

11.01.03.02.05.03

INSTALACIONES DE VALVULA CONTROLADORA DE NIVEL / INC. ACCESORIOS PLU und

11.01.03.02.06

m2

11.01.03.02.06.02

EXCAVACION DE ZANJAS EN TERRENO NORMAL

11.01.03.02.06.03

REFINE Y CONFORMACION DE FONDO Y COSTADO

11.01.03.02.06.04

50.80

100.00%

0.00%

6.21

314.04

100.00%

0.00%

42.90

638.78

100.00%

-

0.00%

5.45

137.83

100.00%

-

-

0.00%

33.30

2,026.97

100.00%

0.00%

-

-

0.00%

3.27

1,177.46

100.00%

-

0.00%

-

-

0.00%

34.00

2,962.76

100.00%

-

-

0.00%

-

-

0.00%

3.00

288.99

100.00%

-

-

0.00%

-

-

0.00%

18.00

1,389.60

100.00%

-

0.00%

-

-

0.00%

-

-

0.00%

1,582.84

-

-

0.00%

-

-

0.00%

-

-

0.00%

7.00

1,582.84

100.00%

3.00

376.64

1,129.92

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

1,129.92

100.00%

2.00

2,130.30

4,260.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

4,260.60

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

3.60

11.95

100.00%

-

TRAZO, NIVELES Y REPLANTEO

0.00%

15.30

226.12

TRAMPA DE GRASA

11.01.03.02.06.01

-

-

0.00%

3.60

3.32

11.95

-

-

0.00%

-

-

0.00%

-

-

0.00%

m3

3.28

50.57

165.87

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.28

165.87

100.00%

M2

11.27

14.89

167.81

-

-

0.00%

-

-

0.00%

-

-

0.00%

11.27

167.81

100.00%

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

3.28

25.29

82.95

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.28

82.95

100.00%

11.01.03.02.06.05

ENCOFRADO Y DESENCOFRADO

M2

10.23

67.61

691.65

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.23

691.65

100.00%

11.01.03.02.06.06

CONCRETO f´c= 175 kg/cm2

m3

2.02

503.88

1,017.84

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.02

1,017.84

100.00%

11.01.03.02.06.07

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

92.06

5.06

465.82

-

-

0.00%

-

-

0.00%

-

-

0.00%

92.06

465.82

100.00%

11.01.03.02.06.08

TUBERIA PVC SAL 4" DESAGUE (ENTERRADA)

M

34.85

25.28

881.01

-

-

0.00%

-

-

0.00%

-

-

0.00%

34.85

881.01

100.00%

11.01.03.02.06.09

CODO PVC SAL 4"X90°

UND

2.00

17.76

35.52

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

35.52

100.00%

11.01.03.02.06.10

TEE PVC SAL 4"

UND

2.00

29.73

59.46

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

59.46

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

11.01.03.02.07 11.01.03.02.07.01 11.01.03.03 11.01.03.03.01

CAJA BUZON DE BOMBA PARA RODILUVIO CAJA BUZON PARA BOMBA A PRESION

GLB

1.00

5,110.66

5,110.66

-

5,110.66

SISTEMA DE EVACUACIÓN DE AGUAS PLUVIALES

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

CANALETA Y MONTANTES PLUVIALES

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00% 100.00% 0.00% 0.00%

11.01.03.03.01.01

CANALETA SEMICIRCULAR DE PLANCHA GALVANIZADA D=6" E=0.5 MM

M

18.42

57.32

1,055.83

-

-

0.00%

-

-

0.00%

-

-

0.00%

18.42

1,055.83

100.00%

11.01.03.03.01.02

SOPORTE DE F°G° DE 1"X3/8"

UND

12.00

38.75

465.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.00

465.00

100.00%

11.01.03.03.01.03

MONTANTE PVC SAL DESAGUE D=3''

M

14.40

20.09

289.30

-

-

0.00%

-

-

0.00%

-

-

0.00%

14.40

289.30

100.00%

11.01.03.03.01.04

CODO PVC SAL 3"x45°

UND

8.00

20.46

163.68

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.00

163.68

100.00%

11.01.03.03.01.05

CODO PVC SAL 3"X90°

UND

4.00

16.06

64.24

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

64.24

100.00%

11.01.03.03.01.06

ABRAZADERA DE SUJECIÓN 3"

UND

12.00

28.03

336.36

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.00

336.36

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

11.01.03.03.02

COLUMNETA PROTECTORA DE CONCRETO

-

11.01.03.03.02.01

ENCOFRADO Y DESENCOFRADO DE COLUMNETAS

m2

11.01.03.03.02.02

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

-

0.00%

4.80

59.71

286.61

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.80

286.61

100.00%

32.00

5.06

161.92

-

-

0.00%

-

-

0.00%

-

-

0.00%

32.00

161.92

100.00%

52

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

11.01.03.03.02.03 11.01.03.03.02.04 11.01.03.04

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

CONCRETO f´c= 175 kg/cm2 PARA COLUMNETAS

m3

0.56

503.88

282.17

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.56

282.17

100.00%

TARRAJEO DE SUPERFICIES DE COLUMNAS E= 1.5 CM

m2

4.40

36.18

159.19

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.40

159.19

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

APARATOS SANITARIOS Y ACCESORIOS

-

-

0.00%

11.01.03.04.01

LAVATORIO CERAMICO VITRIFICANTE 45X60 CM S/PEDESTAL

UND

1.00

200.00

200.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

200.00

100.00%

11.01.03.04.02

INODORO DE CERÁMICA VITRIFICADA CON VÁLVULA FLUXÓMETRO

und

2.00

466.10

932.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

932.20

100.00%

11.01.03.04.03

SUMIDERO CROMADO DE 2"

und

2.00

6.90

13.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

13.80

100.00%

11.01.03.04.04

ESPEJO ADOSADO MARCO METALICO ANCHO=VARIABLE, ALTURA=90CM

UND

2.00

84.75

169.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

169.50

100.00%

11.01.03.04.05

JABONERA CROMADA PARA JABON LIQUIDO

und

2.00

52.71

105.42

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

105.42

100.00%

11.01.03.04.06

COLOCACION DE APARATOS SANITARIOS

UND

3.00

137.46

412.38

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

412.38

100.00%

11.01.03.04.07

COLOCACION DE ACCESORIOS SANITARIOS

UND

6.00

33.81

202.86

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

202.86

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

11.01.04 11.01.04.01 11.01.04.01.01

INSTALACIONES ELECTRICAS INSTALACIONES ELECTRICAS SALIDAS

0.00%

11.01.04.01.01.01

SALIDA PARA ALUMBRADO

und

8.00

45.39

363.12

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.00

363.12

100.00%

11.01.04.01.01.02

SALIDA PARA INTERRUPTOR

und

6.00

45.39

272.34

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

272.34

100.00%

11.01.04.01.01.03

SALIDA PARA TOMACORRIENTE

und

6.00

44.81

268.86

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

268.86

100.00%

11.01.04.01.01.04

SALIDA PARA BOMBAS

und

2.00

79.51

159.02

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

159.02

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

11.01.04.01.02

TUBERIAS

-

-

0.00%

11.01.04.01.02.01

TUBO PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

UND

36.00

11.39

410.04

-

-

0.00%

-

-

0.00%

-

-

0.00%

36.00

410.04

100.00%

11.01.04.01.02.02

CURVA PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

und

56.00

6.92

387.52

-

-

0.00%

-

-

0.00%

-

-

0.00%

56.00

387.52

100.00%

11.01.04.01.02.03

UNION PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

und

52.00

9.46

491.92

-

-

0.00%

-

-

0.00%

-

-

0.00%

52.00

491.92

100.00%

11.01.04.01.02.04

CONEXION PVC SAP PARA INSTALACIONES ELECTRICAS DE 20MM (3/4")

und

52.00

7.42

385.84

-

-

0.00%

-

-

0.00%

-

-

0.00%

52.00

385.84

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

11.01.04.01.03 11.01.04.01.03.01 11.01.04.01.03.02 11.01.04.01.04

CONDUCTORES

-

-

-

0.00%

CABLE NH80 2.5mm2

m

280.00

2.10

588.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

280.00

588.00

100.00%

CABLE NH80 4.0mm2

m

240.00

2.45

588.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

240.00

588.00

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

ARTEFACTOS DE ILUMINACION

-

-

0.00%

11.01.04.01.04.01

Luminaria lineal para empotrar tipo reflector de aluminio, lampara fluoresfente und

2.00

279.48

558.96

-

-

0.00%

0.50

139.74

25.00%

0.50

139.74

25.00%

1.50

419.22

75.00%

11.01.04.01.04.02

Luminaria para adosar tipo hermetico lineal, lámpara fluoresfente T5 de 1x28W. und

4.00

230.06

920.24

-

-

0.00%

1.00

230.06

25.00%

1.00

230.06

25.00%

3.00

690.18

75.00%

11.01.04.01.04.03

Luz de emergencia

2.00

303.26

606.52

-

-

0.00%

0.50

151.63

25.00%

0.50

151.63

25.00%

1.50

454.89

75.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

6.00

11.01.04.01.05 11.01.04.01.05.01 11.01.04.01.06 11.01.04.01.06.01 11.01.04.01.06.02 11.01.04.01.07 11.01.04.01.07.01 11.01.04.01.08 11.01.04.01.08.01 11.01.04.01.08.02 11.01.04.02 11.01.04.02.01 11.01.04.02.01.01 11.01.04.02.01.02 11.01.04.02.02

und

INTERRUPTORES Interruptor Simple

-

-

0.00%

und

6.00

23.84

143.04

-

-

0.00%

-

0.00%

-

-

0.00%

-

Tomacorriente doble con puesta a tierra 250 V.

und

6.00

34.32

205.92

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

205.92

100.00%

Tomacorriente simple(Luz de emergencia)

und

2.00

22.50

45.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

45.00

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

2.00

TOMACORRIENTES

-

EQUIPOS ELECTRICOS_x000D_ UPS de 3KW

-

-

143.04 -

-

100.00% 0.00%

0.00%

und

2.00

4,577.86

9,155.72

-

-

0.00%

-

0.00%

-

-

0.00%

-

CAJA DE PASO DE 100 X 100 X 50 mm

und

2.00

73.96

147.92

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

147.92

100.00%

CAJA DE PASO DE 150 X 150 X 75 mm

und

2.00

71.16

142.32

-

142.32

100.00%

CAJAS DE PASO

-

INSTALACIONES DE COMUNICACIONES SALIDAS

-

9,155.72 -

-

-

0.00%

-

0.00%

-

-

0.00%

2.00

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

100.00% 0.00%

0.00% 0.00%

SALIDA PARA DATOS/VOZ

und

2.00

79.51

159.02

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

159.02

100.00%

SALIDA PARA CENTRAL DE VIGILANCIA

und

2.00

79.51

159.02

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

159.02

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

ARTEFACTOS DE COMUNICACIÓN

-

-

0.00%

53

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

11.01.04.02.02.01

EQUIPO DATOS/VOZ

und

2.00

11.01.04.02.02.02

CAMARAS UNIDIRECIONALES

und

2.00

11.01.04.02.02.03

CENTRAL DE VIGILANCIA

und

2.00

11.01.04.02.03

UND

11.01.04.02.03.02

CURVA PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

11.01.04.02.03.03

UNION PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

11.01.04.02.03.04

CONEXION PVC SAP PARA INSTALACIONES ELECTRICAS DE 20MM (3/4")

11.02.01 11.02.01.01

CABLE UTP CATEGORIA 6

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

141.66

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

359.79

719.58

-

-

0.00%

-

-

0.00%

-

-

0.00%

5,271.11

10,542.22

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

113.90

-

-

0.00%

-

-

0.00%

-

-

0.00%

MONTO

%

141.66

100.00%

2.00

719.58

100.00%

2.00

10,542.22

100.00%

-

0.00%

10.00

11.39

und

8.00

6.92

55.36

-

-

0.00%

-

-

0.00%

-

-

0.00%

und

14.00

9.46

132.44

-

-

0.00%

-

-

0.00%

-

-

0.00%

und

12.00

7.42

89.04

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.00

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00% 0.00%

CONDUCTORES

11.01.04.02.04.01

AVANCE ANTERIOR

P. TOTAL

-

TUBO PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

11.02

70.83

TUBERIAS

11.01.04.02.03.01

11.01.04.02.04

P. U.

m

190.00

3.08

CERCO PERIMETRICO ESTRUCTURAS MOVIMIENTO DE TIERRAS

585.20

-

10.00

113.90

100.00%

8.00

55.36

100.00%

14.00

132.44

100.00%

89.04

100.00%

190.00

585.20

0.00% 100.00%

11.02.01.01.01

EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS EN TERRENO NORMAL

m3

359.09

50.57

18,159.18

359.09

18,159.18

100.00%

-

-

0.00%

359.09

18,159.18

100.00%

-

-

11.02.01.01.02

EXCAVACION DE ZANJAS PARA ZAPATAS EN TERRENO NORMAL

m3

21.12

60.69

1,281.77

21.12

1,281.77

100.00%

-

-

0.00%

21.12

1,281.77

100.00%

-

-

11.02.01.01.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

50.69

33.75

1,710.79

0.00%

-

-

0.00%

11.02.01.01.04

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

308.40

25.29

7,799.44

308.40

7,799.44

100.00%

-

-

0.00%

308.40

7,799.44

100.00%

-

-

0.00%

11.02.01.01.05

ELIMINACION DE MATERIAL EXCEDENTE D = 2 Km

m3

308.40

13.93

4,296.01

308.40

4,296.01

100.00%

-

-

0.00%

308.40

4,296.01

100.00%

-

-

0.00%

11.02.01.02

-

-

-

OBRAS DE CONCRETO SIMPLE

-

0.00%

50.69

-

1,710.79

0.00% 100.00%

-

11.02.01.02.01

CONCRETO PARA SOLADO C:H 1:10 E=2"

m2

369.65

23.19

8,572.18

345.94

8,022.35

93.59%

-

-

0.00%

345.94

8,022.35

93.59%

23.71

549.83

6.41%

11.02.01.02.02

CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS

m3

287.28

206.03

59,188.30

267.79

55,172.77

93.22%

-

-

0.00%

267.79

55,172.77

93.22%

19.49

4,015.53

6.78%

11.02.01.02.03

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

m2

598.49

49.13

29,403.81

568.88

27,949.07

95.05%

-

-

0.00%

568.88

27,949.07

95.05%

29.61

1,454.74

4.95%

11.02.01.02.04

CONCRETO f´c= 140 kg/cm PARA SOBRECIMIENTOS

m3

168.90

374.06

63,178.73

158.90

59,438.13

94.08%

-

-

0.00%

158.90

59,438.13

94.08%

10.00

3,740.60

5.92%

11.02.01.03 11.02.01.03.01

OBRAS DE CONCRETO ARMADO

-

ZAPATAS

-

11.02.01.03.01.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

11.02.01.03.01.02

CONCRETO f´c= 210 kg/cm PARA ZAPATAS CURADO DE CONCRETO

11.02.01.03.01.03 11.02.01.03.02

-

180.32

5.06

912.42

180.32

912.42

100.00%

-

-

0.00%

180.32

912.42

100.00%

-

m3

5.28

432.28

2,282.44

2.64

1,141.22

50.00%

-

-

0.00%

2.64

1,141.22

50.00%

2.64

1,141.22

50.00%

m2

10.56

1.93

20.38

5.28

10.19

50.00%

-

-

0.00%

5.28

10.19

50.00%

5.28

10.19

50.00%

COLUMNAS

-

11.02.01.03.02.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

11.02.01.03.02.02

ENCOFRADO Y DESENCOFRADO DE COLUMNAS

m2

11.02.01.03.02.03

CONCRETO f´c= 210 kg/cm2 PARA COLUMNAS

11.02.01.03.02.04

CURADO DE CONCRETO

11.02.01.03.03

-

10,332.18

5.06

52,280.83

10,332.18

52,280.83

100.00%

822.04

59.71

49,084.01

600.15

35,834.96

73.01%

m3

70.25

557.01

39,129.95

55.00

30,635.55

m2

822.04

1.93

1,586.54

322.04

621.54

6,900.00

5.06

34,914.00

3,980.00

-

-

0.00%

-

0.00%

10,332.18

52,280.83

100.00%

121.89

7,278.05

14.83%

722.04

43,113.01

87.84%

78.29%

7.25

4,038.32

10.32%

62.25

34,673.87

39.18%

250.00

482.50

30.41%

572.04

1,104.04

20,138.80

57.68%

1,449.00

7,331.94

21.00%

5,429.00

VIGAS

-

-

-

0.00%

100.00

5,971.00

88.61%

8.00

4,456.08

11.39%

69.59%

250.00

482.50

30.41%

27,470.74

78.68%

1,471.00

7,443.26

21.32%

-

12.16%

-

11.02.01.03.03.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

11.02.01.03.03.02

ENCOFRADO Y DESENCOFRADO DE VIGAS

m2

632.24

74.12

46,861.63

282.20

20,916.66

44.63%

189.67

14,058.49

30.00%

471.87

34,975.15

74.63%

160.37

11,886.48

25.37%

11.02.01.03.03.03

CONCRETO f´c= 210kg/cm2 PARA VIGAS

m3

57.79

557.01

32,189.61

22.56

12,566.15

39.04%

20.23

11,266.36

35.00%

42.79

23,832.51

74.04%

15.00

8,357.10

25.96%

11.02.01.03.03.04

CURADO DE CONCRETO

m2

632.24

1.93

1,220.22

126.45

244.04

20.00%

347.73

671.12

55.00%

474.18

915.17

75.00%

158.06

305.05

25.00%

11.02.01.03.04

VARIOS

-

-

11.02.01.03.04.01

JUNTA DE CONSTRUCCION CON TEKNOPORT e=1"

M

262.50

3.60

945.00

-

-

0.00%

196.88

708.75

75.00%

196.88

708.75

75.00%

65.63

236.25

25.00%

11.02.01.03.04.02

SELLADO DE JUNTAS DE CONSTRUCCION

M

525.00

35.21

18,485.25

-

-

0.00%

393.75

13,863.94

75.00%

393.75

13,863.94

75.00%

131.25

4,621.31

25.00%

11.02.01.03.04.03

PRUEBAS DE CONTROL DE CALIDAD DEL CONCRETO

und

38.00

18.36

697.68

-

-

0.00%

28.50

523.26

75.00%

28.50

523.26

75.00%

9.50

174.42

25.00%

11.02.01.04 11.02.01.04.01

ESTRUCTURA METALICA TIJERALES METALICOS

-

-

-

-

54

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

11.02.01.04.01.01 11.02.01.04.01.02 11.02.02

11.02.02.02.02 11.02.02.03

11.02.02.03.02 11.02.02.04

11.02.02.04.02 11.02.02.05

SALDO %

METRADO

MONTO

%

0.00%

-

-

0.00%

-

-

0.00%

737.21

8,175.66

100.00%

MONTAJE ESTRUCTURA METALICAS

KG

737.21

3.14

2,314.84

-

-

0.00%

-

-

0.00%

-

-

0.00%

737.21

2,314.84

100.00%

-

-

m2

1,473.41

150.78

222,160.76 -

COBERTURA DE ALUZING TIPO TR3 E=0.45mm INC/ ACCESORIOS

M2

93.26

70.87

6,609.34

CUMBRERA DE ALUZING INC/ ACCESORIOS

M

35.82

48.34

1,731.54 -

-

-

0.00%

-

-

0.00%

58.00

4,110.46

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

62.19%

-

58.00

4,110.46

1,473.41 -

222,160.76 -

100.00% 0.00%

62.19%

35.26

2,498.88

37.81%

-

0.00%

35.82

1,731.54

100.00%

-

0.00%

-

-

0.00%

PUERTA METÁLICA TIPO REJA C/ MALLA 2.00 x 2.80 M

UND

3.00

3,080.00

9,240.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

9,240.00

100.00%

PUERTA METÁLICA TIPO REJA 6.00 x 5.00 M C/2 HOJA BATIENTE

UND

4.00

5,600.00

22,400.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

22,400.00

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

CERRADURA TIPO F

UND

7.00

40.59

284.13

-

-

0.00%

-

-

0.00%

-

-

0.00%

7.00

284.13

100.00%

CERRADURA TIPO G

UND

7.00

40.59

284.13

-

-

0.00%

-

-

0.00%

-

-

0.00%

7.00

284.13

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

LIMPIEZA FINAL DE OBRA

m2

368.35

1.51

CONSTRUCCION DE CISTERNA Y CAMARA DE BONBEO

556.21

274,619.87

-

92,441.45

24,335.87

368.35

116,777.33

556.21

0.00% 100.00%

157,842.54

CISTERNA ESTRUCTURAS MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS EN TERRENO NORMAL

m3

526.79

50.57

26,639.77

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

200.68

33.75

6,772.95

12.01.01.01.03

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

375.03

25.29

9,484.51

375.03

12.01.01.01.04

ELIMINACION DE MATERIAL EXCEDENTE D = 2 Km

m3

375.03

13.93

5,224.17

375.03

526.79 -

26,639.77

100.00%

-

-

0.00%

0.00%

-

-

0.00%

9,484.51

100.00%

-

-

0.00%

375.03

9,484.51

100.00%

-

-

0.00%

5,224.17

100.00%

-

-

0.00%

375.03

5,224.17

100.00%

-

-

0.00%

-

526.79 -

OBRAS DE CONCRETO SIMPLE CONCRETO PARA SOLADO C:H 1:10 E=2"

26,639.77 -

100.00% 0.00%

200.68

m2

90.25

23.19

2,092.90

90.25

2,092.90

100.00%

-

-

0.00%

90.25

OBRAS DE CONCRETO ARMADO

2,092.90

LOSA MACIZA DE BASE TANQUE CISTERNA

100.00%

-

kg

12.01.01.03.01.02

CONCRETO fc´=280 kg/cm2 LOSA DE CISTERNA

12.01.01.03.01.03

CURADO DE CONCRETO

0.00% 100.00%

-

0.00%

-

-

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

6,772.95

-

-

12.01.01.03.01.01

-

1,090.00

5.06

5,515.40

1,090.00

5,515.40

100.00%

-

-

0.00%

1,090.00

5,515.40

100.00%

-

-

0.00%

m3

26.62

462.06

12,300.04

26.62

12,300.04

100.00%

-

-

0.00%

26.62

12,300.04

100.00%

-

-

0.00%

m2

90.25

1.93

174.18

90.25

174.18

100.00%

-

-

0.00%

90.25

174.18

100.00%

-

-

0.00%

MUROS DE TANQUE CISTERNA

-

12.01.01.03.02.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

12.01.01.03.02.02

ENCOFRADO Y DESENCOFRADO EN MUROS DE TANQUE CISTERNA

m2

12.01.01.03.02.03

CONCRETO fc´=280 kg/cm PARA MUROS

12.01.01.03.02.04

CURADO DE CONCRETO

12.01.01.03.03

MONTO

-

12.01.01.01.02

12.01.01.03.02

METRADO

-

12.01.01.01.01

12.01.01.03.01

AVANCE ACUMULADO %

8,175.66

VARIOS

11.02.02.05.01

12.01.01.03

MONTO

11.09

CERRAJERÍA

11.02.02.04.01

12.01.01.02.01

METRADO

737.21

CARPINTERÍA METÁLICA

11.02.02.03.01

12.01.01.02

AVANCE ACTUAL %

KG

COBERTURAS

11.02.02.02.01

12.01.01.01

MONTO

CARPINTERIA METALICA

MUROS DE LADRILLO KK DE CABEZA CARAVISTA MEZCLA 1:5

11.02.02.02

12.01.01

METRADO

MUROS Y TABIQUES DE ALBAÑILERIA

11.02.02.01.01

12.01

AVANCE ANTERIOR

P. TOTAL

ARQUITECTURA

11.02.02.01

12

P. U.

-

0.00%

-

-

2,616.00

5.06

13,236.96

2,616.00

13,236.96

100.00%

-

-

0.00%

2,616.00

13,236.96

100.00%

295.20

63.64

18,786.53

90.00

5,727.60

30.49%

-

-

0.00%

90.00

5,727.60

30.49%

m3

36.90

498.16

18,382.10

12.52

6,236.96

33.93%

-

-

0.00%

12.52

6,236.96

m2

295.20

1.93

569.74

90.65

174.95

30.71%

-

-

0.00%

90.65

174.95

LOSA MACIZA DE TECHO TANQUE CISTERNA

-

-

0.00%

205.20

13,058.93

69.51%

33.93%

24.38

12,145.14

66.07%

30.71%

204.55

394.79

69.29%

-

-

12.01.01.03.03.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

878.00

5.06

4,442.68

60.62%

345.80

1,749.75

39.38%

878.00

4,442.68

100.00%

-

-

0.00%

12.01.01.03.03.02

ENCOFRADO Y DESENCOFRADO DE TECHO DE CISTERNA

M2

76.87

66.56

5,116.47

-

-

0.00%

76.87

5,116.47

100.00%

76.87

5,116.47

100.00%

-

-

0.00%

12.01.01.03.03.03

CONCRETO fc´=280 kg/cm2 TECHO DE CISTERNA

m3

16.06

471.38

7,570.36

-

-

0.00%

16.06

7,570.36

100.00%

16.06

7,570.36

100.00%

-

-

0.00%

12.01.01.03.03.04

CURADO DE CONCRETO

m2

76.87

1.93

148.36

-

-

0.00%

76.87

148.36

100.00%

76.87

148.36

100.00%

-

-

0.00%

-

-

0.00%

0.00%

-

-

0.00%

-

-

0.00%

100.00%

-

-

0.00%

12.01.01.03.04 12.01.01.03.04.01

REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO CON IMPERMEABILIZANTE C:A 1:2 E=1.5CM

m2

259.15

33.68

8,728.17

532.20

2,692.93

259.15

8,728.17

0.00% 100.00%

259.15

8,728.17

55

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

12.02 12.02.01 12.02.01.01

P. U.

CASA DE FUERZAS Y/O BOMBAS ESTRUCTURAS MOVIMIENTO DE TIERRAS

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

100.00%

-

-

M3

4.70

33.75

158.63

12.02.01.01.03

NIVELACION INTERIOR Y COMPACTADO C/EQUPO.

m2

11.56

8.85

102.31

12.02.01.01.04

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

15.46

25.29

390.98

15.46

390.98

12.02.01.01.05

ELIMINACION DE MATERIAL EXCEDENTE D = 2 Km

m3

15.46

13.93

215.36

15.46

215.36

100.00%

-

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

m2

CONCRETO f´c= 140 kg/cm PARA SOBRECIMIENTOS

m3

12.02.01.03 12.02.01.03.01

kg

12.02.01.03.01.02

ENCOFRADO Y DESENCOFRADO DE COLUMNAS

m2

12.02.01.03.01.03

CONCRETO f´c= 210 kg/cm2 PARA COLUMNAS

12.02.01.03.01.04

CURADO DE CONCRETO

12.02.01.03.02

-

0.00%

-

-

0.00%

15.46

390.98

100.00%

-

-

0.00%

-

-

0.00%

15.46

215.36

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

4.70

158.63

100.00%

0.00%

11.56

102.31

100.00%

0.00%

-

-

0.00%

-

-

0.00%

13.44

2,769.04

100.00%

23.76

49.13

1,167.33

-

-

0.00%

-

-

0.00%

-

-

0.00%

23.76

1,167.33

100.00%

1.78

374.06

665.83

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.78

665.83

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

100.00%

-

-

-

0.00%

-

-

0.00%

-

-

0.00%

m3

1.36

557.01

757.53

-

-

0.00%

-

-

0.00%

-

-

m2

24.89

1.93

48.04

-

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

CURADO DE CONCRETO

m2

84.00

157.00

794.42

100.00%

157.00

794.42

0.00%

24.89

1,486.18

100.00%

0.00%

1.36

757.53

100.00%

0.00%

24.89

48.04

100.00%

-

-

0.00%

5.06

425.04

-

-

0.00%

-

-

0.00%

-

-

0.00%

84.00

425.04

100.00%

8.30

74.12

615.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.30

615.20

100.00%

0.62

557.01

345.35

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.62

345.35

100.00%

8.30

1.93

16.02

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.30

16.02

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

6.00

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

VARIOS

und

0.00%

-

-

12.02.01.03.02.04

12.02.02.02

-

-

0.00%

0.00%

1,486.18

m3

12.02.02.01.01

0.00% 100.00%

-

59.71

m2

12.02.02.01

0.00%

24.89

CONCRETO f´c= 210kg/cm2 PARA VIGAS

12.02.02

-

0.00%

ENCOFRADO Y DESENCOFRADO DE VIGAS

6.00

18.36

ESTRUCTURA METALICA TIJERALES METALICOS

12.02.01.04.01.02

-

-

917.34

-

12.02.01.03.02.03

12.02.01.04.01.01

0.00%

-

18.14

-

12.02.01.03.02.02

12.02.01.04.01

0.00%

794.42

kg

12.02.01.04

-

5.06

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

PRUEBAS DE CONTROL DE CALIDAD DEL CONCRETO

-

-

-

VIGAS

12.02.01.03.03.01

-

-

100.00%

157.00

12.02.01.03.02.01

12.02.01.03.03

-

917.34

2,769.04

COLUMNAS ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

18.14

206.03

OBRAS DE CONCRETO ARMADO

12.02.01.03.01.01

%

-

RELLENO Y COMPACTADO CON MATERIAL PROPIO

12.02.01.02.03

MONTO

-

12.02.01.01.02

12.02.01.02.02

METRADO

0.00%

917.34

13.44

SALDO %

-

50.57

m3

MONTO

0.00%

18.14

CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS

METRADO

-

m3

12.02.01.02.01

AVANCE ACUMULADO %

-

EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS EN TERRENO NORMAL

OBRAS DE CONCRETO SIMPLE

MONTO

-

12.02.01.01.01

12.02.01.02

METRADO

110.16

-

110.16

0.00% 100.00% 0.00% 0.00%

CARPINTERIA METALICA

KG

1,377.33

11.09

15,274.59

-

-

0.00%

-

-

0.00%

-

-

0.00%

1,377.33

15,274.59

100.00%

MONTAJE ESTRUCTURA METALICAS

KG

1,377.33

3.14

4,324.82

-

1,377.33

4,324.82

100.00%

ARQUITECTURA MUROS Y TABIQUES DE ALBAÑILERIA MUROS DE LADRILLO KK DE SOGA MEZCLA 1:5

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

m2

33.71

79.68

2,686.01

REVOQUES ENLUCIDOS Y MOLDURAS

-

-

33.71

-

-

0.00%

-

0.00%

-

-

0.00%

TARRAJEO EN MUROS INTERIORES C:A 1:4 E=1.5CM

m2

43.11

24.10

1,038.95

-

-

0.00%

-

-

0.00%

-

-

0.00%

43.11

1,038.95

100.00%

12.02.02.02.02

TARRAJEO EN MUROS EXTERIORES C:A 1:4 E=1.5CM

m2

43.11

28.43

1,225.62

-

-

0.00%

-

-

0.00%

-

-

0.00%

43.11

1,225.62

100.00%

12.02.02.02.03

VESTIDURA DE DERRAMES

m

11.80

16.50

194.70

-

-

0.00%

-

-

0.00%

-

-

0.00%

11.80

194.70

100.00%

12.02.02.02.04

BRUÑAS 1 cm

m

17.82

6.66

118.68

-

-

0.00%

-

-

0.00%

-

-

0.00%

17.82

118.68

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

12.02.02.03.01 12.02.02.04 12.02.02.04.01 12.02.02.04.02 12.02.02.05 12.02.02.05.01

CIELORRASOS FALSO CIELO RASO CON PLANCHA DE FIBROCEMENTO 8MM C/PINT. LATEX

-

-

-

0.00% 100.00%

12.02.02.02.01

12.02.02.03

-

2,686.01

0.00%

-

0.00%

0.00%

M2

39.98

87.64

3,503.85

-

-

0.00%

-

0.00%

-

-

0.00%

CONTRAPISO E=40 mm

m2

21.66

28.37

614.49

-

-

0.00%

-

-

0.00%

-

-

0.00%

21.66

614.49

100.00%

PISO DE CEMENTO PULIDO Y BRUÑADO, MEZC. C:A 1:4 CON ENDURECEDOR, e=2"

m2

21.66

23.18

502.08

-

-

0.00%

-

-

0.00%

-

-

0.00%

21.66

502.08

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

PISOS Y PAVIMENTOS

-

CONTRAZOCALOS CONTRAZOCALO DE CEMENTO PULIDO H=20 CM

m

16.64

17.38

289.20

-

-

39.98 -

16.64

3,503.85 -

289.20

100.00% 0.00%

0.00% 100.00%

56

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

12.02.02.06 12.02.02.06.01 12.02.02.06.02 12.02.02.07 12.02.02.07.01 12.02.02.07.02 12.02.02.08 12.02.02.08.01 12.02.02.08.02 12.02.02.09

P. U.

COBERTURAS

AVANCE ANTERIOR

P. TOTAL

METRADO -

COBERTURA DE ALUZING TIPO TR3 E=0.45mm INC/ ACCESORIOS

M2

CUMBRERA DE ALUZING INC/ ACCESORIOS

M

39.98

70.87

2,833.38

6.15

48.34

297.29

CARPINTERÍA METÁLICA

-

20.00

MONTO

AVANCE ACTUAL %

1,417.40

METRADO

0.00%

MONTO

AVANCE ACUMULADO %

-

0.00%

METRADO -

50.03%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

-

0.00%

20.00

MONTO

SALDO %

1,417.40

0.00%

METRADO -

MONTO

% -

0.00%

50.03%

19.98

1,415.98

49.97%

-

0.00%

6.15

297.29

100.00%

-

0.00%

-

-

0.00%

PUERTA METÁLICA TIPO REJA C/ MALLA 2.00 x 2.30 M

UND

1.00

2,530.00

2,530.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

2,530.00

100.00%

VENTANA METALICA VM 1.50X1.10 m

und

1.00

664.05

664.05

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

664.05

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

CERRAJERÍA

-

-

0.00%

CERRADURA TIPO B

UND

1.00

103.19

103.19

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

103.19

100.00%

BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 3"

und

6.00

22.53

135.18

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

135.18

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

PINTURA

-

-

0.00%

12.02.02.09.01

PINTURA LATEX EN CIELORRASO 2 MANOS

m2

39.98

19.96

798.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

39.98

798.00

100.00%

12.02.02.09.02

PINTURA LATEX EN MUROS INTERIORES 2 MANOS

m2

44.88

16.42

736.93

-

-

0.00%

-

-

0.00%

-

-

0.00%

44.88

736.93

100.00%

12.02.02.09.03

PINTURA LATEX EN MUROS EXTERIORES 2 MANOS

m2

43.11

19.96

860.48

-

-

0.00%

-

-

0.00%

-

-

0.00%

43.11

860.48

100.00%

12.02.02.09.04

PINTURA LATEX EN VIGAS 2 MANOS

m2

10.00

20.09

200.90

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.00

200.90

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

12.02.02.10 12.02.02.10.01 12.02.03 12.02.03.01 12.02.03.01.01

VARIOS

-

LIMPIEZA FINAL DE OBRA

m2

39.98

INSTALACIONES SANITARIAS SISTEMA DE AGUA FRÍA TUBERIAS

12.02.03.01.01.01

TUBERIA DE F°G° C-40 1"

m

2.20

12.02.03.01.01.02

TUBERIA DE F°G° C-40 1 1/2"

m

12.02.03.01.01.03

TUBERIA DE F°G° C-40 2"

m

12.02.03.01.01.04

TUBERIA DE F°G° C-40 2 1/2"

12.02.03.01.01.05

TUBERIA DE F°G° C-40 3"

12.02.03.01.02

1.51

60.37

-

39.98

60.37

0.00% 100.00%

0.00%

86.62

190.56

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.20

190.56

100.00%

3.00

94.77

284.31

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

284.31

100.00%

1.20

100.67

120.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.20

120.80

100.00%

m

12.50

119.35

1,491.88

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.50

1,491.88

100.00%

m

14.20

126.47

1,795.87

-

-

0.00%

-

-

0.00%

-

-

0.00%

14.20

1,795.87

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

VALVULAS

-

-

0.00%

12.02.03.01.02.01

VALVULA DE COMPUERTA DE BRONCE 1"

und

2.00

157.97

315.94

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

315.94

100.00%

12.02.03.01.02.02

VALVULA DE COMPUERTA DE BRONCE 1 1/2" (F°G°)

und

6.00

198.69

1,192.14

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

1,192.14

100.00%

12.02.03.01.02.03

VALVULA DE COMPUERTA DE BRONCE 2" (F°G°)

und

4.00

297.48

1,189.92

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

1,189.92

100.00%

12.02.03.01.02.04

VALVULA DE COMPUERTA DE BRONCE 2 1/2" (F°G°)

und

2.00

448.95

897.90

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

897.90

100.00%

12.02.03.01.02.05

VALVULA DE COMPUERTA DE BRONCE 3" (F°G°)

und

1.00

770.22

770.22

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

770.22

100.00%

12.02.03.01.02.06

VALVULA CHECK DE BRONCE 1" (F°G°)

und

2.00

142.87

285.74

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

285.74

100.00%

12.02.03.01.02.07

VALVULA CHECK DE BRONCE 2" (F°G°)

und

2.00

248.42

496.84

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

496.84

100.00%

12.02.03.01.02.08

VALVULA CHECK DE BRONCE 2 1/2" (F°G°)

und

1.00

291.13

291.13

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

291.13

100.00%

12.02.03.01.02.09

VALVULA CHECK DE BRONCE 3" (F°G°)

und

1.00

248.42

248.42

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

248.42

100.00%

12.02.03.01.02.10

VALVULA DE PIE DE BRONCE 2" (F°G°)

und

1.00

285.61

285.61

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

285.61

100.00%

12.02.03.01.02.11

VALVULA DE PIE DE BRONCE 2 1/2" (F°G°)

und

1.00

314.86

314.86

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

314.86

100.00%

12.02.03.01.02.12

VALVULA DE PIE DE BRONCE 3" (F°G°)

und

1.00

644.36

644.36

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

644.36

100.00%

12.02.03.01.02.13

VALVULA DE ALIVIO 3/4"

und

2.00

309.67

619.34

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

619.34

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

12.02.03.01.03

ACCESORIOS

-

-

0.00%

12.02.03.01.03.01

SUMINISTRO E INSTALACION DE ACCESORIOS PARA SISTEMA DE BOMBEO AGUA DOMESTICA

und

1.00

1,717.34

1,717.34

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

1,717.34

100.00%

12.02.03.01.03.02

SUMINISTRO E INSTALACION DE ACCESORIOS PARA SISTEMA DE BOMBEO AGUA DE PRODUCCION

und

1.00

2,234.77

2,234.77

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

2,234.77

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

2.00

12.02.03.01.04 12.02.03.01.04.01

SISTEMA DE BOMBEO AGUA DOMESTRICA ELECTROBOMBA CENTRIFUGA HORIZONTAL Pot= 3 HP

und

2.00

1,874.35

3,748.70

-

3,748.70

0.00% 100.00%

57

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

12.02.03.01.04.02 12.02.03.01.05

TANQUE HIDRONEUMATICO DE 300 L

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

und

2.00

2,060.79

4,121.58

SISTEMA DE BOMBEO AGUA PRODUCCION

-

MONTO

AVANCE ACTUAL %

-

-

0.00%

METRADO -

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

-

0.00%

-

-

0.00%

METRADO 2.00

MONTO

%

4,121.58

-

-

0.00%

-

0.00%

-

-

0.00%

-

12.02.03.01.05.01

ELECTROBOMBA CENTRIFUGA HORIZONTAL Pot= 12.50 HP

und

2.00

11,120.33

22,240.66

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

22,240.66

100.00%

12.02.03.01.05.02

TANQUE HIDRONEUMATICO DE 500 L

und

3.00

3,315.02

9,945.06

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

9,945.06

100.00%

12.02.03.01.05.03

COMPRESORA DE AIRE PARA TANQUE HIDRONEUMATICO 2.00 HP

und

1.00

602.31

602.31

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

602.31

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

12.02.03.02 12.02.03.02.01

SISTEMA DE AGUA CONTRA INCENDIOS TUBERIAS

-

100.00% 0.00%

0.00% 0.00%

12.02.03.02.01.01

TUBERIA DE ACERO SCHEDULE 40 D= 4"

m

12.20

91.12

1,111.66

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.20

1,111.66

100.00%

12.02.03.02.01.02

TUBERIA DE ACERO SCHEDULE 40 D= 2"

m

5.30

104.77

555.28

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.30

555.28

100.00%

12.02.03.02.01.03

TUBERIA DE ACERO SCHEDULE 40 D= 1 1/2"

m

2.00

98.87

197.74

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

197.74

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

12.02.03.02.02

VALVULAS

-

-

0.00%

12.02.03.02.02.01

VALVULA DE COMPUERTA DE BRONCE 1 1/2" (F°G°)

und

1.00

198.69

198.69

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

198.69

100.00%

12.02.03.02.02.02

VALVULA DE COMPUERTA DE BRONCE 2" (F°G°)

und

2.00

297.48

594.96

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

594.96

100.00%

12.02.03.02.02.03

VALVULA DE COMPUERTA DE BRONCE BB OS&Y - 4" (F°G°)

und

2.00

476.48

952.96

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

952.96

100.00%

12.02.03.02.02.04

VALVULA DE ALIVIO DE 2''

UND

1.00

358.36

358.36

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

358.36

100.00%

12.02.03.02.02.05

VALVULA CHECK DE BRONCE 1 1/2" (ACI)

und

1.00

103.60

103.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

103.60

100.00%

12.02.03.02.02.06

VALVULA CHECK DE BRONCE BB 4" (ACI)

und

1.00

213.77

213.77

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

213.77

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

12.02.03.02.03

ACCESORIOS

12.02.03.02.03.01 12.02.03.02.04

SUMINISTRO E INSTALACION DE ACCESORIOS PARA SISTEMA DE BOMBEO ACI

12.02.03.02.04.02

-

0.00%

und

1.00

1,543.34

1,543.34

-

-

0.00%

-

0.00%

-

-

0.00%

-

ELECTROBOMBA 15 HP

und

1.00

5,264.24

5,264.24

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

5,264.24

100.00%

BOMBA JOCKEY DE 1.0 HP

und

1.00

1,655.99

1,655.99

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

1,655.99

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

SISTEMA DE AGUA CONTRA INCENDIOS

12.02.03.02.04.01

12.02.03.02.05

-

-

OTROS

-

-

1,543.34 -

-

100.00% 0.00%

0.00%

12.02.03.02.05.01

DADO DE CONCRETO 0.80mX0.80mX0.20m (f'c=140 kg/cm2)

und

2.00

53.78

107.56

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

107.56

100.00%

12.02.03.02.05.02

TAPA SANITARIA 0,60 x 0,60 m

UND

3.00

312.86

938.58

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

938.58

100.00%

12.02.03.02.05.03

PRUEBA HIDRÁULICA EN TUBERIAS Y DESINFECCION

M

1.00

1.83

1.83

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

1.83

100.00%

12.02.03.02.05.04

LIMPIEZA Y DESINFECCION DE CISTERNA

GLB

1.00

191.27

191.27

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

191.27

100.00%

12.02.03.03 12.02.03.03.01

SISTEMA DE DRENAJE

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

TUBERIAS

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

5.00

12.02.03.03.01.01 12.02.03.03.02

TUBERIA PVC SAL 4" DESAGUE (ENTERRADA)

M

5.00

25.28

126.40

-

-

0.00%

-

0.00%

-

-

0.00%

-

87.66

350.64

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

ACCESORIOS

-

-

126.40 -

12.02.03.03.02.01

SUMIDERO DE BRONCE DE 4"

UND

4.00

12.02.03.03.02.02

SUMIDERO DE BRONCE DE 6"

und

1.00

92.74

92.74

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.02.03.03.02.03

CAJUELA SUMIDERO DE PLATINA 3/4" x 3/16" 0.30mX0.30m

und

5.00

178.28

891.40

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

136.17

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

12.02.03.03.03

ACCESORIOS VARIOS SISTEMA DE DRENAJE

12.02.03.03.03.01 12.02.04 12.02.04.01

SUMINISTRO E INSTALACION DE ACCESORIOS PARA SISTEMA DE DRENAJE

und

1.00

302.58

INSTALACIONES ELECTRICAS SALIDAS

302.58

-

1.00

92.74

100.00%

5.00

891.40

100.00%

und

3.00

45.39

12.02.04.01.02

SALIDA PARA INTERRUPTOR

und

1.00

45.39

45.39

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.02.04.01.03

SALIDA PARA FUERZA

und

7.00

68.61

480.27

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00% 100.00%

SALIDA PARA ALUMBRADO

TUBERIAS

0.00% 100.00%

350.64

12.02.04.01.01

12.02.04.02

0.00%

302.58

0.00% 100.00% 0.00% 0.00%

136.17

100.00%

1.00

45.39

100.00%

7.00

480.27

100.00%

-

0.00%

12.02.04.02.01

TUBO PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

UND

24.00

11.39

273.36

-

-

0.00%

-

-

0.00%

-

-

0.00%

24.00

273.36

100.00%

12.02.04.02.02

TUBO CONDUIT DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

30.00

104.77

3,143.10

-

-

0.00%

-

-

0.00%

-

-

0.00%

30.00

3,143.10

100.00%

58

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

12.02.04.02.03

CURVA PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

und

30.00

6.92

207.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

30.00

207.60

100.00%

12.02.04.02.04

CURVA CONDUIT DE 90° DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

28.00

13.59

380.52

-

-

0.00%

-

-

0.00%

-

-

0.00%

28.00

380.52

100.00%

12.02.04.02.05

UNION PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

und

30.00

9.46

283.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

30.00

283.80

100.00%

12.02.04.02.06

UNIÓN CONDUIT EMT DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

14.00

9.60

134.40

-

-

0.00%

-

-

0.00%

-

-

0.00%

14.00

134.40

100.00%

12.02.04.02.07

CONEXION PVC SAP PARA INSTALACIONES ELECTRICAS DE 20MM (3/4")

und

30.00

7.42

222.60

-

-

0.00%

-

-

0.00%

-

-

0.00%

30.00

222.60

100.00%

12.02.04.02.08

TERMINAL CONDUIT EMT DE ACERO GALVANIZADO 20 mm ? (3/4")

und

14.00

14.69

205.66

-

-

0.00%

-

-

0.00%

-

-

0.00%

14.00

205.66

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

12.02.04.03 12.02.04.03.01 12.02.04.03.02 12.02.04.04 12.02.04.04.01 12.02.04.04.02 12.02.04.05 12.02.04.05.01 12.02.04.06 12.02.04.06.01 12.02.04.06.02 12.02.04.07 12.02.04.07.01

13 13.01

CONDUCTORES

-

-

-

0.00%

CABLE NH80 2.5mm2

m

130.00

2.10

273.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

130.00

273.00

100.00%

CABLE NH80 4.0mm2

m

320.00

2.45

784.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

320.00

784.00

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

ARTEFACTOS DE ILUMINACION

-

-

0.00%

Luminaria para suspender tipo hermetico lineal, lámpara fluoresfente T5 de 2x28W

und

2.00

305.06

610.12

-

-

0.00%

0.50

152.53

25.00%

0.50

152.53

25.00%

1.50

457.59

75.00%

Luz de emergencia

und

1.00

303.26

303.26

-

-

0.00%

0.25

75.82

75.82

227.44

75.00%

-

-

0.00%

-

-

0.00%

INTERRUPTORES Interruptor Simple

-

25.00%

0.25

25.00%

0.75

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

-

0.00%

und

1.00

23.84

23.84

-

-

0.00%

-

0.00%

-

-

0.00%

-

Tomacorriente doble con puesta a tierra 250 V, con tapa de protección para agua.

und

1.00

56.46

56.46

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

56.46

100.00%

Tomacorriente simple(Luz de emergencia)

und

1.00

22.50

22.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

22.50

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

TOMACORRIENTES

-

CAJAS DE PASO CAJA DE PASO DE 150 X 150 X 75 mm

und

1.00

71.16

SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES

71.16

1,462,943.49

-

-

342,497.64

637,915.32

980,413.00

23.84 -

71.16

100.00% 0.00%

0.00% 100.00%

482,530.49

TRABAJOS PRELIMINARES

13.01.01

LIMPIEZA DE TERRENO MANUAL

m2

562.60

1.51

849.53

562.60

849.53

100.00%

-

-

0.00%

562.60

849.53

100.00%

-

-

0.00%

13.01.02

TRAZO, NIVELES Y REPLANTEO

m2

562.60

3.32

1,867.83

562.60

1,867.83

100.00%

-

-

0.00%

562.60

1,867.83

100.00%

-

-

0.00%

13.02

MOVIMIENTO DE TIERRAS

-

-

13.02.01

CORTE EN TERRENO CON MAQUINARIA

m3

275.65

10.38

2,861.25

275.65

2,861.25

100.00%

-

-

0.00%

275.65

2,861.25

100.00%

-

-

0.00%

13.02.02

EXCAVACION MANUAL PARA CAMARAS Y ESTRUCTURAS

M3

742.29

13.53

10,043.18

742.29

10,043.18

100.00%

-

-

0.00%

742.29

10,043.18

100.00%

-

-

0.00%

13.02.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

101.46

33.75

3,424.28

101.46

3,424.28

100.00%

-

-

0.00%

101.46

3,424.28

100.00%

-

-

0.00%

13.02.04

RELLENO COMPACTADO CON MATERIAL DE PRESTAMO (GRAVA)

M3

66.24

123.90

8,207.14

66.24

8,207.14

100.00%

-

-

0.00%

66.24

8,207.14

100.00%

-

-

0.00%

13.02.05

ELIMINACION DE MATERIAL EXCEDENTE D = 2 Km

m3

850.25

13.93

11,843.98

850.25

11,843.98

100.00%

-

-

0.00%

850.25

11,843.98

100.00%

-

-

0.00%

13.03

TANQUE CISTERNA

-

-

13.03.01

TRAZO, NIVELES Y REPLANTEO

m2

6.24

3.32

20.72

6.24

20.72

99.98%

-

-

0.00%

6.24

20.72

100.00%

-

-

0.00%

13.03.02

NIVELACION INTERIOR Y APISONADO MANUAL

M2

6.24

2.22

13.85

6.24

13.85

100.02%

-

-

0.00%

6.24

13.85

100.00%

-

-

0.00%

13.03.03

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

521.70

5.06

2,639.80

521.70

2,639.80

100.00%

-

-

0.00%

521.70

2,639.80

100.00%

-

-

13.03.04

ENCONFRADO Y DESENCOFRADO CARAVISTA

M2

33.12

72.41

2,398.22

-

-

0.00%

-

-

0.00%

-

-

0.00%

33.12

13.03.05

CONCRETO f´c= 140 KG/CM2 SOLADO e=0.10 m

M2

0.62

34.10

21.14

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.03.06

CONCRETO f´c= 210 kg/cm

m3

5.06

418.06

2,115.38

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.03.07

TARRAJEO CON IMPERMEABILIZANTE C:A 1:2 E=1.5CM

m2

22.56

33.68

759.82

-

-

0.00%

-

-

0.00%

-

-

13.03.08

TAPA METALICA ESTRIADA 0.75x0.75

und

1.00

60.00

60.00

-

-

0.00%

-

-

0.00%

-

13.03.09

TUBERIA DE VENTILACION F°G° 3"

UND

1.00

81.20

81.20

-

-

0.00%

-

-

0.00%

13.03.10

SUMINISTRO E INSTALACION DE EQUIPO BOMBEO 2HP INC/ACC.

JGO

2.00

3,573.63

7,147.26

-

-

0.00%

-

-

0.00%

13.04

0.00%

2,398.22

100.00%

0.62

21.14

100.00%

5.06

2,115.38

100.00%

0.00%

22.56

759.82

100.00%

-

0.00%

1.00

60.00

100.00%

-

-

0.00%

1.00

81.20

100.00%

-

-

0.00%

2.00

7,147.26

100.00%

CAMARA DE TRAMPA DE GRASA

-

-

13.04.01

TRAZO, NIVELES Y REPLANTEO

m2

18.36

3.32

60.96

18.36

60.96

99.99%

-

-

0.00%

18.36

60.96

100.00%

-

-

0.00%

13.04.02

NIVELACION INTERIOR Y APISONADO MANUAL

M2

18.36

2.22

40.76

18.36

40.76

100.00%

-

-

0.00%

18.36

40.76

100.00%

-

-

0.00%

59

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

13.04.03

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

1,143.66

5.06

5,786.92

-

-

0.00%

1,143.66

5,786.92

100.00%

1,143.66

5,786.92

100.00%

-

-

0.00%

13.04.04

ENCONFRADO Y DESENCOFRADO CARAVISTA

M2

105.76

72.41

7,658.08

-

-

0.00%

105.76

7,658.08

100.00%

105.76

7,658.08

100.00%

-

-

0.00%

13.04.05

CONCRETO f´c= 140 KG/CM2 SOLADO e=0.10 m

M2

1.84

34.10

62.74

0.00%

1.84

62.74

100.00%

-

-

0.00%

13.04.06

CONCRETO f´c= 210 kg/cm

m3

13.57

418.06

5,673.07

-

-

0.00%

13.57

5,673.07

100.00%

13.57

5,673.07

100.00%

-

-

0.00%

13.04.07

TARRAJEO CON IMPERMEABILIZANTE C:A 1:2 E=1.5CM

m2

71.10

33.68

2,394.65

-

-

0.00%

71.10

2,394.65

100.00%

71.10

2,394.65

100.00%

-

-

0.00%

13.04.08

CURADO DE CONCRETO

m2

105.76

1.93

204.12

-

-

0.00%

105.76

204.12

100.00%

105.76

204.12

100.00%

-

-

0.00%

13.05

1.84

62.74

100.01%

-

-

CAMARA ECUALIZADOR

-

-

13.05.01

TRAZO, NIVELES Y REPLANTEO

m2

14.96

3.32

49.67

14.96

49.67

99.99%

-

-

0.00%

14.96

49.67

100.00%

-

-

0.00%

13.05.02

NIVELACION INTERIOR Y APISONADO MANUAL

M2

14.96

2.22

33.21

14.96

33.21

100.00%

-

-

0.00%

14.96

33.21

100.00%

-

-

0.00%

13.05.03

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

1,084.36

5.06

5,486.86

-

-

0.00%

1,084.36

5,486.86

100.00%

1,084.36

5,486.86

100.00%

-

-

0.00%

13.05.04

ENCONFRADO Y DESENCOFRADO CARAVISTA

M2

81.88

72.41

5,928.93

-

-

0.00%

81.88

5,928.93

100.00%

81.88

5,928.93

100.00%

-

-

0.00%

13.05.05

CONCRETO f´c= 140 KG/CM2 SOLADO e=0.10 m

M2

1.50

34.10

51.15

-

-

0.00%

1.50

51.15

100.00%

1.50

51.15

100.00%

-

-

0.00%

13.05.06

CONCRETO f´c= 210 kg/cm

m3

13.58

418.06

5,677.25

-

-

0.00%

13.58

5,677.25

100.00%

13.58

5,677.25

100.00%

-

-

0.00%

13.05.07

TARRAJEO CON IMPERMEABILIZANTE C:A 1:2 E=1.5CM

m2

65.00

33.68

2,189.20

-

-

0.00%

65.00

2,189.20

100.00%

65.00

2,189.20

100.00%

-

-

0.00%

13.05.08

TAPA METALICA ESTRIADA 1.0x1.0

und

1.00

90.00

90.00

-

-

0.00%

1.00

90.00

100.00%

1.00

90.00

100.00%

-

-

0.00%

13.05.09

TUBERIA DE VENTILACION F°G° 3"

UND

1.00

81.20

81.20

-

-

0.00%

1.00

81.20

100.00%

1.00

81.20

100.00%

-

-

0.00%

13.05.10

CURADO DE CONCRETO

m2

81.88

1.93

158.03

-

-

0.00%

81.88

158.03

100.00%

81.88

158.03

100.00%

-

-

0.00%

-

-

0.00%

0.00%

-

-

0.00% 0.00%

13.06

CAMARA DE LODOS

-

-

0.00%

-

-

13.06.01

TRAZO, NIVELES Y REPLANTEO

m2

17.38

3.32

57.70

17.38

57.70

100.00%

-

-

0.00%

17.38

57.70

100.00%

-

-

13.06.02

NIVELACION INTERIOR Y APISONADO MANUAL

M2

17.38

2.22

38.58

17.38

38.58

100.01%

-

-

0.00%

17.38

38.58

100.00%

-

-

13.06.03

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

929.52

5.06

4,703.37

-

-

0.00%

-

-

0.00%

-

-

0.00%

929.52

4,703.37

100.00%

13.06.04

ENCONFRADO Y DESENCOFRADO CARAVISTA

M2

85.71

72.41

6,206.26

-

-

0.00%

-

-

0.00%

-

-

0.00%

85.71

6,206.26

100.00%

13.06.05

CONCRETO f´c= 140 KG/CM2 SOLADO e=0.10 m

M2

16.98

34.10

579.02

-

-

0.00%

-

-

0.00%

-

-

0.00%

16.98

579.02

100.00%

13.06.06

CONCRETO f´c= 210 kg/cm

m3

10.78

418.06

4,506.69

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.78

4,506.69

100.00%

13.06.07

TARRAJEO CON IMPERMEABILIZANTE C:A 1:2 E=1.5CM

m2

43.00

33.68

1,448.24

-

-

0.00%

-

-

0.00%

-

-

0.00%

43.00

1,448.24

100.00%

13.06.08

SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS

JGO

1.00

915.90

915.90

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

915.90

100.00%

13.06.09

CURADO DE CONCRETO

m2

85.71

1.93

165.42

-

-

0.00%

-

-

0.00%

-

-

0.00%

85.71

165.42

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00% 0.00%

13.07 13.07.01

LECHO DE SECADO LOSA DE SECADO

13.07.01.01

TRAZO NIVELES Y REPLANTEO

m

39.00

2.32

90.48

39.00

90.48

100.00%

-

-

0.00%

39.00

90.48

100.00%

-

-

13.07.01.02

EXCAVACION DE ZANJAS EN TERRENO NORMAL

m3

19.50

50.57

986.12

19.50

986.12

100.00%

-

-

0.00%

19.50

986.12

100.00%

-

-

13.07.01.03

NIVELACION INTERIOR Y APISONADO MANUAL

M2

39.00

2.22

86.58

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.07.01.04

RELLENO COMPACTADO CON MATERIAL DE PRESTAMO (GRAVA)

M3

9.75

123.90

1,208.03

-

-

0.00%

-

-

0.00%

-

-

13.07.01.05

ENCOFRADO Y DESENCOFRADO DE LOSA

m2

30.20

45.70

1,380.14

-

-

0.00%

-

-

0.00%

-

-

13.07.01.06

CONCRETO f´c= 175 kg/cm2

m3

14.59

503.88

7,351.61

-

-

0.00%

-

-

0.00%

-

13.07.01.07

TARRAJEO INTERIOR PULIDO C/IMPERMEABILIZANTE MEZCLA C:A 1:4 E=1.5CM

m2

36.58

27.97

1,023.14

-

-

0.00%

-

-

0.00%

13.07.01.08

CURADO DE CONCRETO

m2

39.00

1.93

75.27

-

-

0.00%

-

-

-

-

-

0.00%

-

-

-

0.00%

13.07.02 13.07.02.01

COLUMNAS, COBERTURA Y ESTRUCTURAS METALICA COLUMNAS

0.00%

0.00%

39.00

86.58

100.00%

0.00%

9.75

1,208.03

100.00%

0.00%

30.20

1,380.14

100.00%

-

0.00%

14.59

7,351.61

100.00%

-

-

0.00%

36.58

1,023.14

100.00%

0.00%

-

-

0.00%

39.00

75.27

100.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

-

0.00%

-

-

0.00% 0.00%

13.07.02.01.01

TRAZO NIVELES Y REPLANTEO

m

1.44

2.32

3.34

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.44

3.34

100.00%

13.07.02.01.02

EXCAVACION DE ZANJAS PARA ZAPATAS EN TERRENO NORMAL

m3

1.73

60.69

104.99

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.73

104.99

100.00%

13.07.02.01.03

NIVELACION INTERIOR Y PERFILADO

m2

2.40

10.11

24.26

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.40

24.26

100.00%

13.07.02.01.04

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

129.59

5.06

655.73

-

-

0.00%

-

-

0.00%

-

-

0.00%

129.59

655.73

100.00%

13.07.02.01.05

ENCOFRADO Y DESENCOFRADO DE COLUMNAS

m2

18.56

59.71

1,108.22

-

-

0.00%

-

-

0.00%

-

-

0.00%

18.56

1,108.22

100.00%

60

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

13.07.02.01.06

CONCRETO f´c= 140 KG/CM2 SOLADO e=0.10 m

M2

13.07.02.01.07

CONCRETO f´c= 210 kg/cm2 PARA COLUMNAS

13.07.02.01.08

CURADO DE CONCRETO

13.07.02.02 13.07.02.02.01 13.07.02.03

P. U.

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

0.14

34.10

4.77

-

-

0.00%

-

-

0.00%

-

-

0.00%

m3

1.75

557.01

974.77

-

-

0.00%

-

-

0.00%

-

-

m2

18.56

1.93

35.82

-

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

COBERTURAS COBERT. P/ LECHO SECADO CON CALAM 1.80 x 0.83 M INC/ACCESORIOS

AVANCE ANTERIOR

P. TOTAL

-

100.00%

0.00%

1.75

974.77

100.00%

0.00%

18.56

35.82

100.00%

73.40

4,227.84

-

-

0.00%

-

0.00%

-

-

0.00%

466.24

10.18

4,746.32

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

% 4.77

57.60

ESTRUCTURAS METÁLICAS Y COBERTURAS

MONTO

0.14

m2

-

METRADO

57.60 -

4,227.84 -

0.00% 100.00% 0.00%

13.07.02.03.01

SUMINISTRO, HABILITACION E INSTALACION DE TUBERIA 3"X2"X3mm

KG

13.07.02.03.02

SUMINISTRO, HABILITACION E INSTALACION DE PLANCHA EN APOYOS

KG

6.87

10.18

69.94

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.07.02.03.03

MONTAJE ESTRUCTURA METALICAS

KG

466.24

3.14

1,463.99

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00% 0.00%

13.07.02.04

CAMARA DE REUNION

-

13.07.02.04.01

TRAZO NIVELES Y REPLANTEO

m

13.07.02.04.02

EXCAVACION DE ZANJAS EN TERRENO NORMAL

13.07.02.04.03

466.24

4,746.32

100.00%

6.87

69.94

100.00%

466.24

1,463.99

100.00%

2.60

2.32

6.03

2.60

6.03

100.03%

-

-

0.00%

2.60

6.03

100.00%

-

-

m3

11.43

50.57

578.02

11.43

578.02

100.00%

-

-

0.00%

11.43

578.02

100.00%

-

-

NIVELACION INTERIOR Y APISONADO MANUAL

M2

16.31

2.22

36.21

-

-

0.00%

-

-

0.00%

-

-

0.00%

16.31

36.21

100.00%

13.07.02.04.04

SUMINISTRO E INSTALACION DE TUBERIA DN=160mm Y ACCESORIOS

M

34.20

48.54

1,660.07

-

-

0.00%

-

-

0.00%

-

-

0.00%

34.20

1,660.07

100.00%

13.07.02.04.05

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

19.20

33.75

648.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

19.20

648.00

100.00%

13.07.02.04.06

ENCOFRADO Y DESENCOFRADO

M2

5.16

67.61

348.87

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.16

348.87

100.00%

13.07.02.04.07

CONCRETO f´c= 140 KG/CM2 SOLADO e=0.10 m

M2

2.02

34.10

68.88

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.02

68.88

100.00%

13.07.02.04.08

TAPA METALICA ESTRIADA 0.75x0.75

und

2.00

60.00

120.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

120.00

100.00%

13.07.02.04.09

SUMINISTRO E INSTALACION DE EQUIPO BOMBEO SUMERGIDO 2HP INC/ACC.

JGO

1.00

5,012.39

5,012.39

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

5,012.39

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00% 0.00%

13.08 13.08.01

CUARTO DE PODER MOVIMIENTO DE TIERRAS

0.00%

13.08.01.01

TRAZO NIVELES Y REPLANTEO PRELIMINAR

M2

4.40

3.23

14.21

4.40

14.21

100.01%

-

-

0.00%

4.40

14.21

100.00%

-

-

13.08.01.02

EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS EN TERRENO NORMAL

m3

6.05

50.57

305.95

6.05

305.95

100.00%

-

-

0.00%

6.05

305.95

100.00%

-

-

13.08.01.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

0.47

33.75

15.86

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.47

15.86

100.00%

13.08.01.04

NIVELACION INTERIOR Y APISONADO MANUAL

M2

4.65

2.22

10.32

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.65

10.32

100.00%

13.08.01.05

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

2.79

25.29

70.56

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.79

70.56

100.00%

13.08.01.06

ELIMINACION DE MATERIAL EXCEDENTE D = 2 Km

m3

2.79

13.93

38.86

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.79

38.86

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

13.08.02

OBRAS DE CONCRETO SIMPLE

-

-

0.00%

0.00%

13.08.02.01

CONCRETO PARA SOLADO C:H 1:10 E=2"

m2

4.65

23.19

107.83

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.65

107.83

100.00%

13.08.02.02

CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS

m3

3.26

206.03

671.66

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.26

671.66

100.00%

13.08.02.03

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

m2

7.44

49.13

365.53

-

-

0.00%

-

-

0.00%

-

-

0.00%

7.44

365.53

100.00%

13.08.02.04

CONCRETO f´c= 140 kg/cm PARA SOBRECIMIENTOS

m3

0.56

374.06

209.47

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.56

209.47

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

448.97

-

-

0.00%

-

-

0.00%

-

-

0.00%

88.73

13.08.03 13.08.03.01

OBRAS DE CONCRETO ARMADO COLUMNAS

13.08.03.01.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

88.73

13.08.03.01.02

ENCOFRADO Y DESENCOFRADO DE COLUMNAS

m2

10.80

59.71

644.87

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.08.03.01.03

CONCRETO f´c= 210 kg/cm2 PARA COLUMNAS

m3

2.97

557.01

1,654.32

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.08.03.01.04

CURADO DE CONCRETO

m2

10.80

1.93

20.84

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

13.08.03.02

VIGAS

-

13.08.03.02.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

74.52

13.08.03.02.02

ENCOFRADO Y DESENCOFRADO DE VIGAS

m2

13.08.03.02.03

CONCRETO f´c= 210kg/cm2 PARA VIGAS

m3

13.08.03.02.04

CURADO DE CONCRETO

m2

13.08.03.03

5.06

LOSA ALIGERADA

0.00% 0.00%

448.97

100.00%

10.80

644.87

100.00%

2.97

1,654.32

100.00%

10.80

20.84

100.00%

-

-

0.00%

5.06

377.07

-

-

0.00%

-

-

0.00%

-

-

0.00%

74.52

377.07

100.00%

16.38

74.12

1,214.09

-

-

0.00%

-

-

0.00%

-

-

0.00%

16.38

1,214.09

100.00%

0.75

557.01

417.76

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.75

417.76

100.00%

16.38

1.93

31.61

-

-

0.00%

-

-

0.00%

-

-

0.00%

16.38

31.61

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

61

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

13.08.03.03.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

24.80

13.08.03.03.02

ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERDA

M2

13.08.03.03.03

CONCRETO f´c= 210 kg/cm2 PARA LOSA ALIGERADA

m3

13.08.03.03.04

LADRILLO HUECO DE ARCILLA h = 15 cm PARA TECHO

UND

13.08.03.03.05

CURADO DE CONCRETO

m2

13.08.04 13.08.04.01 13.08.05 13.08.05.01 13.08.05.02 13.08.06 13.08.06.01 13.08.07

P. U.

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

-

-

0.00%

-

-

0.00%

-

-

0.00%

24.80

125.49

100.00%

9.91

60.98

604.31

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.91

604.31

100.00%

1.12

423.58

474.41

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.12

474.41

100.00%

30.00

4.40

132.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

30.00

132.00

100.00%

9.91

1.93

19.13

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.91

19.13

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

79.68

1,429.46

-

-

0.00%

-

0.00%

-

-

0.00%

TARRAJEO EN MUROS INTERIORES C:A 1:4 E=1.5CM

m2

40.60

24.10

978.46

-

-

0.00%

-

-

0.00%

-

-

0.00%

40.60

978.46

100.00%

VESTIDURA DE DERRAMES

m

2.50

16.50

41.25

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.50

41.25

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

6.49

REVOQUES ENLUCIDOS Y MOLDURAS

-

CIELORRASOS CIELORRASO CON TARRAJEO DE CEMENTO ARENA C:A 1:4

m2

6.49

40.03

259.79

PISOS Y PAVIMENTOS

-

-

-

17.94 -

-

-

0.00%

-

0.00%

-

-

0.00%

-

4.10

34.17

140.10

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.10

13.08.07.02

CONTRAPISO E=40 mm

m2

4.10

28.37

116.32

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.08.07.03

PISO DE CEMENTO FROTACHADO C:A 1:2 e= 1.5 cm

M2

4.10

36.61

150.10

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

VEREDAS

-

100.00% 100.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

7.00

13.08.08.02

ENCOFRADO Y DESENCOFRADO DE VEREDAS

m2

2.55

45.70

116.54

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.08.08.03

VEREDA DE CONCRETO FC=140KG/CM2 ESP 4" ACABADO CON MEZCLA 1:2

M2

7.00

66.66

466.62

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

13.08.11.01 13.08.12 13.08.12.01 13.08.12.02 13.09 13.09.01 13.10 13.10.01

-

0.00%

61.95

100.00%

2.55

116.54

100.00%

7.00

466.62

100.00%

-

0.00%

PUERTA METÁLICA 0.9m x 2.35 m

und

1.00

1,163.00

1,163.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

1,163.00

100.00%

VENTANA DE METAL DE 1.40x1.10

und

1.00

80.00

80.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

80.00

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

0.46

3.94

CERRAJERIA CERRADURA DE MANIJA DOS GOLPES

-

-

0.00%

PZA

1.00

79.97

79.97

P2

0.46

8.57

3.94

-

-

0.00%

-

0.00%

-

-

0.00%

-

PINTURA LATEX EN CIELORRASO 2 MANOS

m2

6.49

19.96

129.54

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.49

129.54

100.00%

PINTURA LATEX EN MUROS INTERIORES 2 MANOS

m2

40.60

16.42

666.65

-

-

0.00%

-

-

0.00%

-

-

0.00%

40.60

666.65

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

75.00%

0.75

75.00%

0.25

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00% 0.00%

VIDRIOS, CRISTALES Y SIMILARES VIDRIO CRUDO INCOLORO DE 6MM

-

PINTURA

-

PLANTA DE TRATAMIENTO DE AGUA RESIDUALES (PTARD) PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES INDUSTRIAL

GLB

1.00

785,400.00

CASETA DE CONTROL MOVIMIENTO DE TIERRAS

785,400.00

-

-

0.75

589,050.00

589,050.00

79.97

-

196,350.00

13.10.01.01

TRAZO, NIVELES Y REPLANTEO

m2

12.25

3.32

40.67

12.25

40.67

100.00%

-

-

0.00%

12.25

40.67

100.00%

-

-

13.10.01.02

EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS EN TERRENO NORMAL

m3

10.80

50.57

546.16

10.80

546.16

100.00%

-

-

0.00%

10.80

546.16

100.00%

-

-

13.10.01.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

0.83

33.75

28.01

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.83

13.10.01.04

NIVELACION INTERIOR Y APISONADO MANUAL

M2

8.31

2.22

18.45

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.10.01.05

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

4.98

25.29

125.94

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.10.01.06

ELIMINACION DE MATERIAL EXCEDENTE D = 2 Km

m3

4.98

13.93

69.37

-

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

13.10.02

0.00%

116.32

61.95

13.08.11

-

0.00% 100.00%

150.10

8.85

13.08.10.01

259.79

4.10

7.00

13.08.10

-

0.00%

4.10

m2

-

-

100.00%

100.00%

NIVELACION INTERIOR Y COMPACTADO C/EQUPO.

CARPINTERIA METALICA

1,429.46

140.10

13.08.08.01

13.08.09.02

0.00%

17.94

m2

13.08.09.01

-

m2

CONCRETO EN FALSOPISO MEZCLA 1:8 CEMENTO-HORMIGON E=4"

13.08.09

%

125.49

13.08.07.01

13.08.08

MONTO

5.06

ALBAÑILERIA MUROS DE LADRILLO KK DE SOGA MEZCLA 1:5

AVANCE ANTERIOR

P. TOTAL

OBRAS DE CONCRETO SIMPLE

-

13.10.02.01

CONCRETO PARA SOLADO C:H 1:10 E=2"

m2

13.10.02.02

CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS

13.10.02.03

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

100.00% 0.00% 100.00% 0.00%

0.00% 25.00%

0.00%

28.01

100.00%

8.31

18.45

100.00%

4.98

125.94

100.00%

0.00%

4.98

69.37

100.00%

-

0.00%

8.31

192.71

100.00%

-

0.00%

8.31

23.19

192.71

-

-

0.00%

-

-

0.00%

-

-

0.00%

m3

5.81

206.03

1,197.03

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.81

1,197.03

100.00%

m2

13.29

49.13

652.94

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.29

652.94

100.00%

62

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

13.10.02.04 13.10.03 13.10.03.01

CONCRETO f´c= 140 kg/cm PARA SOBRECIMIENTOS

m3

COLUMNAS ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

13.10.03.01.02

ENCOFRADO Y DESENCOFRADO DE COLUMNAS

m2

13.10.03.01.03

CONCRETO f´c= 210 kg/cm2 PARA COLUMNAS

m3

13.10.03.01.04

CURADO DE CONCRETO

m2

177.46

kg

13.10.03.02.02

ENCOFRADO Y DESENCOFRADO DE VIGAS

m2

13.10.03.02.03

CONCRETO f´c= 210kg/cm2 PARA VIGAS

m3

13.10.03.02.04

CURADO DE CONCRETO

m2

-

-

-

SALDO %

METRADO

MONTO

%

-

0.00%

-

-

0.00%

1.00

374.06

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

100.00% 0.00% 0.00%

-

-

0.00%

177.46

897.95

100.00%

22.80

59.71

1,361.39

-

-

0.00%

-

-

0.00%

-

-

0.00%

22.80

1,361.39

100.00%

1.29

557.01

718.54

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.29

718.54

100.00%

22.80

1.93

44.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

22.80

44.00

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

125.38

-

-

0.00%

5.06

634.42

-

-

0.00%

-

-

0.00%

-

-

0.00%

125.38

634.42

100.00%

25.74

74.12

1,907.85

-

-

0.00%

-

-

0.00%

-

-

0.00%

25.74

1,907.85

100.00%

1.33

557.01

740.82

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.33

740.82

100.00%

25.74

1.93

49.68

-

-

0.00%

-

-

0.00%

-

-

0.00%

25.74

49.68

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERDA

M2

CONCRETO f´c= 210 kg/cm2 PARA LOSA ALIGERADA

m3

13.10.03.03.04

LADRILLO HUECO DE ARCILLA h = 15 cm PARA TECHO

13.10.03.03.05

CURADO DE CONCRETO

13.10.07

-

-

MONTO

0.00%

13.10.03.03.03

13.10.06.01

-

-

METRADO

-

13.10.03.03.02

13.10.06

0.00%

AVANCE ACUMULADO %

-

46.12

13.10.05.02

-

MONTO

0.00%

kg

13.10.05.01

-

METRADO

-

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

13.10.05

AVANCE ACTUAL %

-

LOSA ALIGERADA

-

-

0.00%

5.06

233.37

-

-

0.00%

-

-

0.00%

-

-

0.00%

46.12

233.37

100.00%

20.07

60.98

1,223.87

-

-

0.00%

-

-

0.00%

-

-

0.00%

20.07

1,223.87

100.00%

2.67

423.58

1,130.96

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.67

1,130.96

100.00%

UND

77.00

4.40

338.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

77.00

338.80

100.00%

m2

20.07

1.93

38.74

-

-

0.00%

-

-

0.00%

-

-

0.00%

20.07

38.74

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

ALBAÑILERIA MUROS DE LADRILLO KK DE SOGA MEZCLA 1:5

374.06

MONTO

897.95

13.10.03.03.01

13.10.04.01

METRADO

-

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

13.10.04

AVANCE ANTERIOR

P. TOTAL

5.06

VIGAS

13.10.03.02.01

13.10.03.03

374.06

OBRAS DE CONCRETO ARMADO

13.10.03.01.01

13.10.03.02

1.00

P. U.

-

-

-

0.00%

m2

45.67

79.68

3,638.99

-

-

0.00%

-

0.00%

-

-

0.00%

TARRAJEO EN MUROS INTERIORES, MEZCLA C:A 1:5

M2

60.70

24.10

1,462.87

-

-

0.00%

-

-

0.00%

-

-

0.00%

60.70

1,462.87

100.00%

VESTIDURA DE DERRAMES

m

24.60

16.50

405.90

-

-

0.00%

-

-

0.00%

-

-

0.00%

24.60

405.90

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

REVOQUES ENLUCIDOS Y MOLDURAS

-

CIELORRASOS CIELORRASO CON TARRAJEO DE CEMENTO ARENA C:A 1:4

m2

24.15

40.03

966.72

PISOS Y PAVIMENTOS

-

-

-

45.67 -

24.15

3,638.99 -

966.72

0.00%

0.00% 100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

13.10.07.01

CONCRETO EN FALSOPISO MEZCLA 1:8 CEMENTO-HORMIGON E=4"

m2

9.61

34.17

328.37

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.61

328.37

100.00%

13.10.07.02

CONTRAPISO E=40 mm

m2

9.61

28.37

272.64

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.61

272.64

100.00%

13.10.07.03

PISO DE CEMENTO FROTACHADO, MEZC. C:A 1:4 e=2"

m2

9.61

21.31

204.79

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.61

204.79

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

13.10.08

VEREDAS

-

13.10.08.01

NIVELACION INTERIOR Y COMPACTADO C/EQUPO.

m2

13.10.08.02

ENCOFRADO Y DESENCOFRADO DE VEREDAS

13.10.08.03

VEREDA DE CONCRETO FC=140KG/CM2 ESP 4" ACABADO CON MEZCLA 1:2

13.10.09

12.15

8.85

107.53

-

-

0.00%

-

-

0.00%

-

-

0.00%

m2

3.53

45.70

161.32

-

-

0.00%

-

-

0.00%

-

-

M2

12.15

66.66

809.92

-

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

CARPINTERÍA METÁLICA

-

-

100.00%

-

0.00%

0.00%

12.15

107.53

100.00%

0.00%

3.53

161.32

100.00%

0.00%

12.15

809.92

100.00%

-

0.00%

13.10.09.01

PUERTA METÁLICA 0.9m x 2.35 m

und

1.00

1,163.00

1,163.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

1,163.00

100.00%

13.10.09.02

VENTANA DE METAL V1 DE 1.65x1.40

und

1.00

930.93

930.93

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

930.93

100.00%

13.10.09.03

VENTANA DE METAL V2 DE 1.26x1.40

und

1.00

705.25

705.25

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

705.25

100.00%

13.10.09.04

VENTANA DE METAL V3 DE 1.68x1.40

und

1.00

947.86

947.86

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

947.86

100.00%

13.10.09.05

VENTANA DE METAL V4 V-5 DE 0.65x0.5

und

2.00

130.97

261.94

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

261.94

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

13.10.10 13.10.10.01 13.10.11 13.10.11.01 13.10.12

CERRAJERIA CERRADURA DE MANIJA DOS GOLPES

PZA

1.00

79.97

79.97

70.67

8.26

583.73

VIDRIOS, CRISTALES Y SIMILARES VIDRIO TRANSPARENTE DE 6mm PINTURA

P2

-

-

-

70.67 -

79.97 583.73 -

0.00% 100.00% 0.00% 100.00% 0.00%

63

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

13.10.12.01 13.10.12.02 13.10.13 13.10.13.01

P. U.

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

PINTURA LATEX EN CIELORRASO 2 MANOS

m2

14.17

19.96

282.83

-

-

0.00%

-

-

0.00%

-

-

0.00%

14.17

282.83

100.00%

PINTURA LATEX EN MUROS INTERIORES 2 MANOS

m2

60.70

16.42

996.69

-

60.70

996.69

100.00%

INSTALACIONES SANITARIAS SISTEMA DE AGUA FRIA

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00% 0.00%

13.10.13.01.01

SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"

PTO

2.00

77.03

154.06

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

154.06

100.00%

13.10.13.01.02

TUBERIA PVC SAP DE 1/2" C/R

M

8.62

17.73

152.83

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.62

152.83

100.00%

13.10.13.01.03

VALVULA DE COMPUERTA DE BRONCE 1/2"

und

1.00

68.36

68.36

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

68.36

100.00%

13.10.13.01.04

CAJA PARA LLAVE DE VALVULAS

UND

1.00

166.24

166.24

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

166.24

100.00%

13.10.13.01.05

CODO PVC SAP 1/2" 90° C/R

und

5.00

11.50

57.50

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

57.50

100.00%

13.10.13.01.06

TEE PVC SAP 1/2"

und

1.00

24.52

24.52

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

24.52

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

13.10.13.02

SISTEMA DE DESAGUE

-

-

0.00%

13.10.13.02.01

SALIDAS DE PVC SAL PARA DESAGUE DE 4"

PTO

1.00

107.98

107.98

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

107.98

100.00%

13.10.13.02.02

SALIDAS DE PVC SAL PARA DESAGUE DE 2"

PTO

4.00

93.16

372.64

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

372.64

100.00%

13.10.13.02.03

TUBERIA PVC SAL 2" DESAGUE (ENTERRADA)

M

2.95

23.33

68.82

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.95

68.82

100.00%

13.10.13.02.04

TUBERIA PVC SAL 4" DESAGUE (ENTERRADA)

M

6.84

25.28

172.92

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.84

172.92

100.00%

13.10.13.02.05

REGISTROS ROSCADO DE BRONCE DE 4"

UND

1.00

91.96

91.96

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

91.96

100.00%

13.10.13.02.06

CODO PVC SAL DE 4"X45°

und

1.00

22.16

22.16

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

22.16

100.00%

13.10.13.02.07

YEE PVC 4"

und

2.00

26.66

53.32

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

53.32

100.00%

13.10.13.02.08

YEE PVC 4"X2"

und

1.00

26.66

26.66

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

26.66

100.00%

13.10.13.02.09

REDUCCION PVC SAL 4" x 2"

und

3.00

19.15

57.45

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

57.45

100.00%

13.10.13.02.10

SOMBRERO DE VENTILACION PVC DE 2"

UND

1.00

15.27

15.27

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

15.27

100.00%

13.10.13.02.11

SUMIDERO DE BRONCE DE 2"

und

2.00

70.50

141.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

141.00

100.00%

13.10.13.02.12

CAJA DE REGISTRO DE 12" x 24" P/DESAGUE (0.30x0.60)

UND

1.00

376.64

376.64

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

376.64

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

13.10.13.03

APARATOS SANITARIOS Y ACCESORIOS

-

-

0.00%

13.10.13.03.01

INODORO TANQUE BAJO BLANCO INC. ACCESORIOS

und

1.00

190.00

190.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

190.00

100.00%

13.10.13.03.02

LAVATORIO DE PARED INC. ACCESORIOS

und

1.00

200.00

200.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

200.00

100.00%

13.10.13.03.03

GRIFO PARA LAVATORIO DE 1/2"

pza

1.00

33.90

33.90

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

33.90

100.00%

13.10.13.03.04

COLOCACION DE ACCESORIOS SANITARIOS

UND

3.00

33.81

101.43

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

101.43

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

13.11 13.11.01 13.11.01.01 13.11.01.01.01 13.11.01.02

CERCO PERIMETRICO CERCO PERIMETRICO TRABAJOS PRELIMINARES TRAZO NIVELES Y REPLANTEO

m

0.00%

96.73

2.32

224.41

-

-

0.00%

-

0.00%

-

-

0.00%

-

50.57

87.49

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.73

87.49

100.00%

MOVIMIENTO DE TIERRAS

-

-

96.73

224.41 -

100.00% 0.00%

13.11.01.02.01

EXCAVACION DE ZANJAS EN TERRENO NORMAL

m3

1.73

13.11.01.02.02

PERFILADO DE ZANJAS

m2

23.04

7.58

174.64

-

-

0.00%

-

-

0.00%

-

-

0.00%

23.04

174.64

100.00%

13.11.01.02.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

0.12

33.75

4.05

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.12

4.05

100.00%

13.11.01.02.04

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

0.38

25.29

9.61

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.38

9.61

100.00%

13.11.01.02.05

ELIMINACION DE MATERIAL EXCEDENTE D = 2 Km

m3

0.38

13.93

5.29

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.38

5.29

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

13.11.01.03 13.11.01.03.01 13.11.01.03.02 13.11.01.04

OBRAS DE CONCRETO SIMPLE

-

0.00%

CONCRETO PARA SOLADO C:H 1:10 E=2"

m2

2.16

23.19

50.09

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.16

50.09

100.00%

CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS

m3

1.73

206.03

356.43

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.73

356.43

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

POSTE Y ALAMBRE DE PUAS

-

13.11.01.04.01

POSTE PREFABRICADO DE CONCRETO INCLUYE LA COLOCACION

und

13.11.01.04.02

ALAMBRE DE PUAS N° 10 PARA CERCO PERIMETRICO

m

-

0.00%

30.00

366.39

10,991.70

-

-

0.00%

-

-

0.00%

-

-

0.00%

30.00

10,991.70

100.00%

266.25

4.32

1,150.20

-

-

0.00%

-

-

0.00%

-

-

0.00%

266.25

1,150.20

100.00%

64

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

13.11.01.04.03 13.11.02 13.11.02.01 13.11.02.01.01 13.11.02.02

MALLA OLIMPICA COCADA 2" PARA CERCO PERIMETRICO H=1.75

M

88.75

P. U. 87.92

PUERTAS PRINCIPALES DE ACCESO TRABAJOS PRELIMINARES TRAZO NIVELES Y REPLANTEO

m

AVANCE ANTERIOR

P. TOTAL

METRADO

7,802.90

MONTO

AVANCE ACTUAL %

-

-

0.00%

-

-

-

-

-

-

-

-

0.00%

METRADO -

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO 88.75

MONTO

%

-

0.00%

-

-

0.00%

7,802.90

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

-

0.00%

100.00% 0.00% 0.00%

16.28

2.32

37.77

-

-

0.00%

-

0.00%

-

-

0.00%

-

50.57

467.77

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.25

467.77

100.00%

MOVIMIENTO DE TIERRAS

-

-

16.28

37.77 -

100.00% 0.00%

13.11.02.02.01

EXCAVACION DE ZANJAS EN TERRENO NORMAL

m3

9.25

13.11.02.02.02

PERFILADO DE ZANJAS

m2

5.92

7.58

44.87

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.92

44.87

100.00%

13.11.02.02.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

0.22

33.75

7.43

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.22

7.43

100.00%

13.11.02.02.04

ACARREO DE MATERIAL EXCEDENTE EN CARRETILLA (50 M )

m3

0.59

25.29

14.92

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.59

14.92

100.00%

13.11.02.02.05

ELIMINACION DE MATERIAL EXCEDENTE D = 2 Km

m3

0.59

13.93

8.22

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.59

8.22

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

13.11.02.03

OBRAS DE CONCRETO SIMPLE

-

0.00%

13.11.02.03.01

CONCRETO PARA SOLADO C:H 1:10 E=2"

m2

3.70

23.19

85.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.70

85.80

100.00%

13.11.02.03.02

CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS

m3

2.96

206.03

609.85

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.96

609.85

100.00%

13.11.02.03.03

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

m2

2.96

49.13

145.42

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.96

145.42

100.00%

13.11.02.03.04

CONCRETO f´c= 140 kg/cm PARA SOBRECIMIENTOS

m3

0.44

374.06

164.59

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.44

164.59

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

13.11.02.04 13.11.02.04.01

OBRAS DE CONCRETO ARMADO COLUMNAS

13.11.02.04.01.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

88.73

13.11.02.04.01.02

ENCOFRADO Y DESENCOFRADO DE COLUMNAS

m2

13.11.02.04.01.03

CONCRETO f´c= 210 kg/cm2 PARA COLUMNAS

m3

13.11.02.04.01.04

CURADO DE CONCRETO

m2

13.11.02.05 13.11.02.05.01 13.11.02.06 13.11.02.06.01 13.11.02.07 13.11.02.07.01 13.11.02.08 13.11.02.08.01 13.12 13.12.01

448.97

-

-

0.00%

-

-

0.00%

-

-

0.00%

88.73

448.97

100.00%

10.80

59.71

644.87

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.80

644.87

100.00%

0.54

557.01

300.79

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.54

300.79

100.00%

10.80

1.93

20.84

-

-

0.00%

-

-

0.00%

-

-

0.00%

10.80

20.84

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

2.00

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00% 0.00%

m2

10.58

79.68

843.01

m2

21.16

28.43

601.58

2.00

3,559.32

7,118.64

21.16

19.96

422.35

REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO EN MUROS EXTERIORES C:A 1:4 E=1.5CM

-

CARPINTERÍA METÁLICA PUERTA METALICA PRINCIPAL DE F°N° Ø 1.5" Y DE MALLA GALVANIZADA

und

PINTURA PINTURA LATEX EN MUROS EXTERIORES 2 MANOS MURO DE CONTENCION_x000D_

m2

MOVIMIENTO DE TIERRAS

-

-

-

-

10.58 21.16

21.16

843.01 601.58 7,118.64 422.35

13.12.01.01

CORTE EN TERRENO CON MAQUINARIA

m3

1,103.41

10.38

11,453.40

1,103.41

11,453.40

100.00%

-

-

0.00%

1,103.41

11,453.40

100.00%

-

-

13.12.01.02

EXCAVACION DE ZANJAS EN TERRENO NORMAL

m3

4.88

50.57

246.78

4.88

246.78

100.00%

-

-

0.00%

4.88

246.78

100.00%

-

-

13.12.01.03

RELLENO Y COMPACTADO CON MATERIAL PROPIO

M3

816.75

33.75

27,565.31

326.70

11,026.13

40.00%

-

-

0.00%

326.70

11,026.13

40.00%

ELIMINACION DE MATERIAL EXCEDENTE D = 2 Km

m3

364.42

13.93

5,076.37

364.42

5,076.37

100.00%

-

-

0.00%

364.42

5,076.37

100.00%

13.12.01.04 13.12.02

0.00%

5.06

ALBAÑILERIA MUROS DE LADRILLO KK DE SOGA MEZCLA 1:5

0.00%

OBRAS DE CONCRETO SIMPLE

490.05 -

-

16,539.18 -

0.00% 100.00% 0.00% 100.00% 0.00% 100.00% 0.00% 100.00%

0.00% 60.00% 0.00%

-

13.12.02.01

CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS

m3

4.88

206.03

1,005.43

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.88

1,005.43

100.00%

13.12.02.02

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

m2

17.00

49.13

835.21

-

-

0.00%

-

-

0.00%

-

-

0.00%

17.00

835.21

100.00%

13.12.02.03

CONCRETO f'c=140 KG/CM2 + 25%PM CIMIENTOS

m3

2.34

296.01

692.66

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.34

692.66

100.00%

13.12.02.04

CONCRETO PARA SOLADO C:H 1:10 E=4"

m2

200.32

57.63

11,544.44

100.00%

-

-

0.00%

13.12.03 13.12.03.01

200.32

11,544.44

200.32

OBRAS DE CONCRETO ARMADO

11,544.44

100.00%

-

-

ZAPATAS

-

0.00%

-

-

-

13.12.03.01.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

7,739.70

5.06

39,162.88

7,739.70

39,162.88

100.00%

-

-

0.00%

7,739.70

39,162.88

100.00%

-

-

0.00%

13.12.03.01.02

ENCOFRADO Y DESENCOFRADO

M2

91.84

67.61

6,209.30

91.84

6,209.30

100.00%

-

-

0.00%

91.84

6,209.30

100.00%

-

-

0.00%

65

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

13.12.03.01.03

CONCRETO f´c= 210 kg/cm PARA ZAPATAS

13.12.03.02

m3

131.13

P. U. 432.28

AVANCE ANTERIOR

P. TOTAL

METRADO

56,684.88

131.13

MONTO

AVANCE ACTUAL %

56,684.88

100.00%

METRADO -

MONTO

AVANCE ACUMULADO %

-

0.00%

METRADO 131.13

PANTALLA

MONTO

SALDO %

56,684.88

100.00%

METRADO -

-

MONTO

% -

0.00%

-

13.12.03.02.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

6,659.55

5.06

33,697.32

6,659.55

33,697.32

100.00%

-

-

0.00%

6,659.55

33,697.32

100.00%

-

-

0.00%

13.12.03.02.02

ENCOFRADO Y DESENCOFRADO DE MUROS DE CONTENCION

m2

732.96

65.33

47,884.28

732.96

47,884.28

100.00%

-

-

0.00%

732.96

47,884.28

100.00%

-

-

0.00%

13.12.03.02.03

CONCRETO f´c= 210 kg/cm

m3

135.00

418.06

56,438.10

135.00

56,438.10

100.00%

-

-

0.00%

135.00

56,438.10

100.00%

-

-

0.00%

13.12.03.02.04

CURADO DE CONCRETO

m2

1,465.92

1.93

2,829.23

1,465.92

2,829.23

100.00%

-

-

0.00%

1,465.92

2,829.23

100.00%

-

-

0.00%

13.12.03.03

VIGAS

-

-

13.12.03.03.01

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

715.61

5.06

3,620.99

580.48

2,937.23

81.12%

-

-

0.00%

580.48

2,937.23

81.12%

135.13

683.76

18.88%

13.12.03.03.02

ENCOFRADO Y DESENCOFRADO DE VIGAS

m2

49.08

74.12

3,637.81

35.28

2,614.95

71.88%

-

-

0.00%

35.28

2,614.95

71.88%

13.80

1,022.86

28.12%

13.12.03.03.03

CONCRETO f´c= 210kg/cm2 PARA VIGAS

m3

5.94

557.01

3,308.64

3.54

1,971.82

59.60%

-

-

0.00%

3.54

1,971.82

59.60%

2.40

1,336.82

40.40%

13.12.03.03.04

CURADO DE CONCRETO

m2

49.08

1.93

94.72

35.28

68.09

71.89%

-

-

0.00%

35.28

68.09

71.89%

13.80

26.63

28.11%

13.12.03.04

JUNTAS

13.12.03.04.01

JUNTAS ASFALTICAS

13.12.03.05

M

129.00

8.67

1,118.43

110.00

953.70

85.27%

-

DRENAJE

13.12.03.05.01

RELLENO CON MATERIAL FILTRANTE

13.12.03.06

-

0.00%

110.00

m3

185.63

74.18

13,770.03

94.58

7,015.94

50.95%

91.05

6,754.09

953.70

85.27%

19.00

49.05%

185.63

GRADAS

13,770.04

164.73

14.73%

100.00%

-

-

-0.01

0.00%

-

13.12.03.06.01

CONCRETO fc´=175 kg/cm PARA GRADAS

m3

1.93

419.27

809.19

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.93

809.19

100.00%

13.12.03.06.02

TARRAJEO DE GRADAS Y GRADERIAS

m2

21.37

47.59

1,017.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

21.37

1,017.00

100.00%

13.12.03.06.03

ENCOFRADO Y DESENCOFRADO

M2

21.37

67.61

1,444.83

-

-

0.00%

-

-

0.00%

-

-

0.00%

21.37

1,444.83

100.00%

13.12.03.06.04

BARANDA METALICA TIPO 01 H=1.00 (SEGÚN DISEÑO)

m

45.00

223.02

10,035.90

-

-

0.00%

-

-

0.00%

-

-

0.00%

45.00

10,035.90

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

13.13 13.13.01 13.14 13.14.01

COBERTURA PTAR INSTALACION DE COBERTURA CON PLANCHA PLEGABLE

M2

194.78

PISOS Y PAVIMENTOS MOVIMIENTO DE TIERRAS

13.14.01.01

CORTE EN TERRENO CON MAQUINARIA

m3

536.30

13.14.01.02

NIVELACION INTERIOR Y COMPACTADO C/EQUPO.

m2

13.14.01.03

COLOCACION DE MATERIAL CLASIFICADO INC. COMPAC. CON MAQUINARIA

m3

13.14.01.04

RELLENO COMPACTADO CON MATERIAL DE PRESTAMO (GRAVA)

M3

13.14.02

249.15

48,529.44

-

194.78

48,529.44

0.00% 100.00% 0.00% 0.00%

10.38

5,566.79

-

-

0.00%

-

-

0.00%

-

-

0.00%

536.30

5,566.79

100.00%

346.00

8.85

3,062.10

-

-

0.00%

-

-

0.00%

-

-

0.00%

346.00

3,062.10

100.00%

65.76

58.88

3,871.95

-

-

0.00%

-

-

0.00%

-

-

0.00%

65.76

3,871.95

100.00%

25.20

123.90

3,122.28

-

-

0.00%

-

-

0.00%

-

-

0.00%

25.20

3,122.28

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

OBRAS DE CONCRETO SIMPLE

-

-

-

0.00%

13.14.02.01

ENCOFRADO Y DESENCOFRADO DE LOSA DE PAVIMENTACION

m2

12.42

40.67

505.12

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.42

505.12

100.00%

13.14.02.02

CONCRETO f'c=210 kg/cm2 PARA PAVIMENTO RIGIDO

m3

56.85

426.15

24,226.63

-

-

0.00%

-

-

0.00%

-

-

0.00%

56.85

24,226.63

100.00%

13.14.02.03

JUNTAS ASFALTICAS

M

82.80

8.67

717.88

-

-

0.00%

-

-

0.00%

-

-

0.00%

82.80

717.88

100.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

13.15 13.15.01

AREAS VERDES MOVIMIENTO DE TIERRAS

0.00% 0.00%

13.15.01.01

CORTE EN TERRENO CON MAQUINARIA

m3

52.11

10.38

540.90

-

-

0.00%

-

-

0.00%

-

-

0.00%

52.11

540.90

100.00%

13.15.01.02

COLOCACION DE MATERIAL TIERRA NEGRA

m3

25.01

54.91

1,373.30

-

-

0.00%

-

-

0.00%

-

-

0.00%

25.01

1,373.30

100.00%

13.15.01.03

PLANTACION DE PLANTONES Y/ARBUSTOS

und

20.00

71.34

1,426.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

20.00

1,426.80

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

13.15.02

OBRAS DE CONCRETO SIMPLE

13.15.02.01 13.15.02.02 13.16

-

-

-

0.00%

ENCOFRADO Y DESENCOFRADO DE SARDINELES

m2

31.40

37.15

1,166.51

-

-

0.00%

-

-

0.00%

-

-

0.00%

31.40

1,166.51

100.00%

CONCRETO F'C= 175 KG/CM2 EN SARDINEL

m3

2.36

440.00

1,038.40

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.36

1,038.40

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

VARIOS

-

-

0.00%

13.16.01

MEDIDOR DE CAUDALES PREFABRICADO BOWLUS

UND

1.00

694.92

694.92

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

694.92

100.00%

13.16.02

MEDIDOR DE CAUDALES AUTOMATICO

UND

1.00

2,542.37

2,542.37

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

2,542.37

100.00%

13.16.03

MEDIDOR DE CAUDALES TIPO HELICE 4"

UND

1.00

2,118.64

2,118.64

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.00

2,118.64

100.00%

66

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

13.17 13.17.01

P. U.

INSTALACIONES ELETRICAS (PTAR) SALIDAS

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00% 0.00%

13.17.01.01

SALIDA PARA ALUMBRADO

und

11.00

45.39

499.29

-

-

0.00%

-

-

0.00%

-

-

0.00%

11.00

499.29

100.00%

13.17.01.02

SALIDA PARA INTERRUPTOR

und

3.00

45.39

136.17

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

136.17

100.00%

13.17.01.03

SALIDA PARA TOMACORRIENTE

und

4.00

44.81

179.24

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

179.24

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

93.96

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

13.17.02

TUBERIAS

-

13.17.02.01

TUBO PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 40 mm (1 1/2")

UND

13.17.02.02

TUBO PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 35 mm (1 1/4")

UND

2.00

18.61

37.22

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.17.02.03

TUBO CONDUIT DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

30.00

104.77

3,143.10

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.17.02.04

CURVA PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 40 mm (1 1/2")

und

6.00

6.52

39.12

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.17.02.05

CURVA PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 35 mm (1 1/4")

und

4.00

7.03

28.12

-

-

0.00%

-

-

0.00%

-

-

13.17.02.06

CURVA CONDUIT DE 90° DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

26.00

13.59

353.34

-

-

0.00%

-

-

0.00%

-

13.17.02.07

UNION PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 40 mm (1 1/2")

und

4.00

9.16

36.64

-

-

0.00%

-

-

0.00%

13.17.02.08

UNION PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 35 mm (1 1/4")

und

2.00

9.56

19.12

-

-

0.00%

-

-

13.17.02.09

UNIÓN CONDUIT EMT DE ACERO GALVANIZADO 20 mm ? (3/4")

UND

26.00

9.60

249.60

-

-

0.00%

-

13.17.02.10

CONEXION PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 40 mm (1 1/2")

und

4.00

8.61

34.44

-

-

0.00%

13.17.02.11

CONEXIÓN PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 35 mm (1 1/4")

und

8.00

12.10

96.80

-

-

13.17.02.12

TERMINAL CONDUIT EMT DE ACERO GALVANIZADO 20 mm ? (3/4")

und

28.00

14.69

411.32

-

13.17.03 13.17.03.01 13.17.03.02 13.17.04

6.00

15.66

CONDUCTORES

-

100.00%

2.00

37.22

100.00%

30.00

3,143.10

100.00%

6.00

39.12

100.00%

0.00%

4.00

28.12

100.00%

-

0.00%

26.00

353.34

100.00%

-

-

0.00%

4.00

36.64

100.00%

0.00%

-

-

0.00%

2.00

19.12

100.00%

-

0.00%

-

-

0.00%

26.00

249.60

100.00%

-

-

0.00%

-

-

0.00%

4.00

34.44

100.00%

0.00%

-

-

0.00%

-

-

0.00%

8.00

96.80

100.00%

-

0.00%

-

-

0.00%

-

-

0.00%

28.00

411.32

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

2.10

840.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

400.00

840.00

100.00%

CABLE NH80 4.0mm2

m

100.00

2.45

245.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

100.00

245.00

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

305.06

-

-

0.00%

0.25

76.27

25.00%

0.25

76.27

25.00%

0.75

ARTEFACTOS DE ILUMINACION

305.06

13.17.04.02

Luminaria para adosar tipo hermetico lineal, lámpara fluoresfente T5 de 1x28W.

und

1.00

230.06

230.06

-

-

0.00%

0.25

57.52

25.00%

0.25

57.52

25.00%

13.17.04.03

Luminaria para suspender tipo hermetico lineal, lámpara fluoresfente T5 de 1x28W

und

7.00

255.06

1,785.42

-

-

0.00%

1.75

446.36

25.00%

1.75

446.36

25.00%

13.17.04.04

Luz de emergencia

und

2.00

303.26

606.52

-

-

0.00%

0.50

151.63

25.00%

0.50

151.63

-

-

0.00%

-

0.00%

-

-

-

0.00%

-

0.00%

13.17.06.02 13.17.07 13.17.07.01 13.17.07.02 13.17.08 13.17.08.01 13.17.09 13.17.09.01 13.17.09.01.01 13.17.09.02 13.17.09.02.01 13.17.09.03

0.00%

400.00

1.00

13.17.06.01

-

m

und

13.17.06

-

CABLE NH80 2.5mm2

Luminaria para suspender tipo hermetico lineal, lámpara fluoresfente T5 de 2x28W

13.17.05.01

0.00%

93.96

13.17.04.01

13.17.05

-

INTERRUPTORES Interruptor Simple

-

-

0.00%

228.79

75.00%

0.75

172.54

75.00%

5.25

1,339.06

75.00%

25.00%

1.50

454.89

75.00%

-

0.00%

-

-

-

0.00%

3.00

-

0.00%

und

3.00

23.84

71.52

-

-

0.00%

-

0.00%

-

-

0.00%

-

Tomacorriente doble con puesta a tierra 250 V.

und

4.00

34.32

137.28

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

137.28

100.00%

Tomacorriente simple(Luz de emergencia)

und

2.00

22.50

45.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

45.00

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

TOMACORRIENTES

-

CAJA DE PASO

-

-

71.52 -

-

100.00% 0.00%

0.00%

CAJA DE PASO DE 100X150X75 MM

und

5.00

71.16

355.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

5.00

355.80

100.00%

CAJA DE PASO DE 150 X 150 X 75 mm

und

3.00

71.16

213.48

-

-

0.00%

-

-

0.00%

-

-

0.00%

3.00

213.48

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

3.00

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

0.00%

-

0.00%

-

-

0.00%

BUZON DE REGISTRO BUZON DE REGISTRO DE 600X600X300 MM

und

3.00

163.82

INSTALACIONES DE COMUNICACIONES SALIDAS SALIDA PARA DATOS/VOZ

und

1.00

79.51

79.51

und

14.00

70.83

991.62

ARTEFACTOS DE COMUNICACIÓN EQUIPO DATOS/VOZ

491.46

-

TUBERIAS

-

-

-

-

14.00

491.46

79.51 991.62 -

0.00% 100.00% 0.00% 0.00% 100.00% 0.00% 100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

13.17.09.03.01

TUBO PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

UND

2.00

11.39

22.78

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

22.78

100.00%

0.00%

13.17.09.03.02

CURVA PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

und

2.00

6.92

13.84

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

13.84

100.00%

67

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 01 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

UND

PRESUPUESTO BASE METRADO

13.17.09.03.03 13.17.09.03.04 13.17.09.04

P. U.

AVANCE ANTERIOR

P. TOTAL

MONTO

AVANCE ACTUAL %

METRADO

MONTO

AVANCE ACUMULADO %

METRADO

MONTO

SALDO %

METRADO

MONTO

%

UNION PVC SAP PARA INSTALACIONES ELÉCTRICAS DE 20 mm (3/4")

und

2.00

9.46

18.92

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

18.92

100.00%

CONEXION PVC SAP PARA INSTALACIONES ELECTRICAS DE 20MM (3/4")

und

2.00

7.42

14.84

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

14.84

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

0.00%

-

0.00%

-

-

0.00%

CONDUCTORES DE COMUNICACIÓN

13.17.09.04.01

METRADO

CABLE UTP CATEGORIA 6

m

30.00

3.08

92.40

-

-

30.00

92.40

0.00% 100.00%

0.00

COSTO DIRECTO GASTOS GENERALES UTILIDAD

(10%) (10%)

SUBTOTAL

12,113,708.16

2,713,715.78

2,143,035.93

4,856,751.85

7,256,956.31

1,211,370.82

271,371.58

214,303.60

485,675.19

725,695.63

1,211,370.82

271,371.58

214,303.59

485,675.19

725,695.63

14,536,449.80

3,256,458.94

2,571,643.12

5,828,102.23

8,708,347.57

2,616,560.96

586,162.61

462,895.76

1,049,058.40

1,567,502.56

COSTO EJECUCION DE LA OBRA

17,153,010.76

3,842,621.54

3,034,538.89

6,877,160.63

10,275,850.13

COSTO CON FR=0.999365361750637

17,142,124.81

3,840,182.87

3,032,613.06

6,872,796.12

10,269,328.68

22.40%

17.69%

40.09%

59.91%

IMPUESTO I.G.V.

% DE EJECUCIÓN CONTRACTUAL

(18%)

68

]

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 02 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

14 14.01

UND

PRESUPUESTO BASE METRADO

P. U.

EQUIPAMIENTO INDUSTRIAL

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

1,762,949.96

AVANCE ACTUAL %

METRADO

-

MONTO

AVANCE ACUMULADO %

METRADO

116,939.64

MONTO

SALDO %

METRADO

116,939.64

MONTO

%

1,646,010.32

EQUIPO IMPORTADO

14.01.01

EQUIPO

14.01.01.01

EQUIPOS BOVINOS

JGO

1.00

330,648.89

330,648.89

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

330,648.89

100.00%

14.01.01.02

EQUIPOS OVINOS

JGO

1.00

26,781.26

26,781.26

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

26,781.26

100.00%

14.01.01.03

EQUIPOS PARA PLATAFORMAS

JGO

1.00

218,811.42

218,811.42

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

218,811.42

100.00%

14.01.01.04

EQUIPOS PARA VISCERAS

JGO

1.00

82,497.34

82,497.34

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

82,497.34

100.00%

14.01.01.05

EQUIPOS PARA MESAS

JGO

1.00

54,511.82

54,511.82

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

54,511.82

100.00%

14.01.01.06

EQUIPOS PARA CONDUCTOS

JGO

1.00

6,968.46

6,968.46

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

6,968.46

100.00%

14.01.01.07

Sistema de recoleccion y bombeo de sangre

JGO

1.00

119,479.35

119,479.35

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

119,479.35

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

14.01.02

SERVICIOS

-

0.00%

14.01.02.01

FLETE MARÍTIMO

GLB

1.00

46,970.00

46,970.00

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

46,970.00

100.00%

14.01.02.02

MONTAJE

GLB

1.00

174,824.63

174,824.63

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

174,824.63

100.00%

14.01.02.03

PAGO DE ADUANAS

GLB

1.00

97,420.80

97,420.80

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

97,420.80

100.00%

14.01.02.04

GASTO POR TRANFERENCIA BANCARIA

GLB

1.00

16,146.60

16,146.60

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

16,146.60

100.00%

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

-

-

0.00%

-

0.00%

-

-

0.00%

-

-

14.02

EQUIPO NACIONAL

14.02.01

EQUIPO

0.00% 0.00%

14.02.01.01

EQUIPOS PARA CARROS

JGO

1.00

150,229.28

150,229.28

-

-

0.00%

0.50

75,114.64

50.00%

0.50

75,114.64

50.00%

0.50

75,114.64

50.00%

14.02.01.02

EQUIPOS PARA GANCHOS

JGO

1.00

62,650.00

62,650.00

-

-

0.00%

0.50

31,325.00

50.00%

0.50

31,325.00

50.00%

0.50

31,325.00

50.00%

14.02.01.03

EQUIPOS PARA RIELES

JGO

1.00

21,000.00

21,000.00

-

-

0.00%

0.50

10,500.00

50.00%

0.50

10,500.00

50.00%

0.50

10,500.00

50.00%

14.02.01.04

Camaras y Sistema de refrigeracion

GLB

1.00

354,010.11

354,010.11

-

-

0.00%

0.00%

-

0.00%

1.00

354,010.11

100.00%

15

119,550.68

MOBILIARIO y EQUIPAMIENTO

-

-

-

-

-

119,550.68

15.01

AREA DE ADMINISTRACION

GLB

1.00

66,750.00

66,750.00

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

66,750.00

100.00%

15.02

AREA DE PRODUCCION

GLB

1.00

7,350.00

7,350.00

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

7,350.00

100.00%

15.03

AREA DE SERVICIOS DEL PERSONAL

GLB

1.00

12,180.00

12,180.00

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

12,180.00

100.00%

15.04

AREA DE SERVICIOS COMPLEMENTARIOS

GLB

1.00

24,660.68

24,660.68

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

24,660.68

100.00%

15.05

AREA DE CASETA DE CONTROL

GLB

1.00

8,610.00

8,610.00

-

-

0.00%

-

0.00%

-

-

0.00%

1.00

8,610.00

100.00%

0.00

COSTO DIRECTO GASTOS GENERALES UTILIDAD

(10%) (10%)

SUBTOTAL

1,882,500.64

0.00

116,939.64

116,939.64

1,765,561.00

188,250.06

0.00

11,693.96

11,693.96

176,556.10

188,250.06

0.00

11,693.96

11,693.96

176,556.10

2,259,000.76

0.00

140,327.57

140,327.57

2,118,673.20

406,620.14

0.00

25,258.96

25,258.96

381,361.18

COSTO EJECUCION DE LA OBRA

2,665,620.90

0.00

165,586.53

165,586.53

2,500,034.38

COSTO CON FR=0.999365361750637

2,663,929.19

0.00

165,481.44

165,481.44

2,498,447.76

0.00%

6.21%

6.21%

93.79%

IMPUESTO I.G.V.

% DE EJECUCIÓN CONTRACTUAL

(18%)

VALORIZACIÓN DE OBRA Nº 03 - COMPONENTE 03 JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

RESIDENTE : ING. CESAR YABAR VELAZCO SUPERVISO: BISONTE INGENIEROS CONTRATISTAS JEFE DE SU : ING. JUAN ROGER QUINTANILLA ANYAIPOMA ITEM

16 16.01

UND

PRESUPUESTO BASE METRADO

P. U.

CAPACITACION EN EL MANEJO DEL EQUIPO E INFRAESTRUCTURA DEL CAMAL

AVANCE ANTERIOR

P. TOTAL

METRADO

MONTO

90,000.00 MES

CAPACITACION EN EL MANEJO DEL EQUIPO E INFRAESTRUCTURA DEL CAMAL

3.00

30,000.00

90,000.00

AVANCE ACTUAL %

METRADO

MONTO

-

-

AVANCE ACUMULADO %

METRADO

MONTO

0.00%

-

-

SALDO %

METRADO

0.00%

-

-

MONTO

%

90,000.00 0.00%

3.00

90,000.00

100.00%

0.00

COSTO DIRECTO GASTOS GENERALES UTILIDAD

(10%) (10%)

SUBTOTAL IMPUESTO I.G.V.

(18%)

90,000.00

0.00

0.00

0.00

90,000.00

9,000.00

0.00

0.00

0.00

9,000.00

9,000.00

0.00

0.00

0.00

9,000.00

108,000.00

0.00

0.00

0.00

108,000.00

19,440.00

0.00

0.00

0.00

19,440.00

COSTO EJECUCION DE LA OBRA

127,440.00

0.00

0.00

0.00

127,440.00

COSTO CON FR=0.999365361750637

127,359.12

% DE EJECUCIÓN CONTRACTUAL

0.00

0.00

0.00

127,359.12

0.00%

0.00%

0.00%

0.00%

70

CALCULO DE REAJUSTE JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRIVADA : COMPAÑÍA MINERA ANTAPACCAY SA CONTRATISTA

: JERGO SAC

RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR

: BISONTE INGENIEROS CONTRATISTAS

JEFE DE SUPERVISI : ING. JUAN ROGER QUINTANILLA ANYAIPOMA Componente 01 : ADECUADA INFRAESTRUCTURA PARA BENEFICO Y MANEJO DEL CAMAL 1.1 ESTRUCTURAS ###

MONTO CONTRATADO COMPONENTE 01

S/. 0.00

ADELANTO DIRECTO

VALORIZACIÓN Nº

Periodo

1

AL 31 MAYO 18

2

AL 30 JUNI 18

3

AL 31 JUL 18

4 5

SIIGV

AVANCE MENSUAL

Fecha de reajuste (*) Mayo- 2018

Programado Mensual (A)

FACTOR REAJUSTE

Ejecutado

Acumulado

Mensual (B)

Acumulado

K

REAJUSTE PROGRAMADO Programado F = A *(K-1)

Acumulado

185,771.48

185,771.48

425,744.28

425,744.28

1.006

1,114.63

1,114.63

Jun - 2018

1,465,953.01

1,651,724.48

1,501,982.87

1,927,727.15

1.014

20,523.34

21,637.97

Jul - 2018

1,195,184.58

2,846,909.07

1,067,896.98

2,995,624.13

1.014

16,732.58

38,370.55

AL 30 AGOS 18

Agos - 2018

1,424,819.37

4,271,728.43

0.00

2,995,624.13

1.000

0.00

38,370.55

AL 31 SEPT 18

Sept - 2018

411,537.12

4,683,265.56

0.00

2,995,624.13

1.000

0.00

38,370.55

6

AL 30 OCT 18

Oct - 2018

1,079,996.76

5,763,262.32

0.00

2,995,624.13

1.000

0.00

38,370.55

7

AL 31 NOV 18

Nov- 2018

1,997,639.69

7,760,902.02

0.00

2,995,624.13

1.000

0.00

38,370.55

8

AL 31 DIC 18

Dic - 2018

220,771.73

7,981,673.75

0.00

2,995,624.13

1.000

0.00

38,370.55

Reintegro por Reajuste de Pre (*) CUADRO DE COEFICIENTE DE REAJUSTE : K (Conocido a la Fecha de la Valorización) MESES

Abril-18

Mayo-18

Jun - 2018

Jul - 2018

Agos - 2018

Sept - 2018

Oct - 2018

Nov- 2018

CALCULO DE REAJUSTE JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRIVADA : COMPAÑÍA MINERA ANTAPACCAY SA CONTRATISTA

: JERGO SAC

RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR

: BISONTE INGENIEROS CONTRATISTAS

JEFE DE SUPERVISI : ING. JUAN ROGER QUINTANILLA ANYAIPOMA 1.006

"K"

1.014

1.014

1.2 ARQUITECTURA ###

MONTO CONTRATADO COMPONENTE 01

S/. 0.00

ADELANTO DIRECTO

VALORIZACIÓN Nº

Periodo

SIIGV

Fecha de reajuste (*)

AVANCE MENSUAL Programado Mensual (A)

Acumulado

Ejecutado Mensual (B)

Acumulado

FACTOR REAJUSTE K

REAJUSTE PROGRAMADO Programado F = A *(K-1)

Acumulado

CALCULO DE REAJUSTE JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRIVADA : COMPAÑÍA MINERA ANTAPACCAY SA CONTRATISTA

: JERGO SAC

RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR

: BISONTE INGENIEROS CONTRATISTAS

JEFE DE SUPERVISI : ING. JUAN ROGER QUINTANILLA ANYAIPOMA

1

AL 31 MAYO 18

Mayo- 2018

-

2

AL 30 JUNI 18

Jun - 2018

80,938.98

3

AL 31 JUL 18

Jul - 2018

4

AL 30 AGOS 18

5

-

0.00

-

1.009

0.00

0.00

80,938.98

0.00

-

1.016

1,295.02

1,295.02

344,069.90

425,008.88

247,910.09

247,910.09

1.018

6,193.26

7,488.28

Agos - 2018

752,048.86

1,177,057.74

0.00

247,910.09

1.000

0.00

7,488.28

AL 31 SEPT 18

Sept - 2018

1,392,466.10

2,569,523.84

0.00

247,910.09

1.000

0.00

7,488.28

6

AL 30 OCT 18

Oct - 2018

291,232.38

2,860,756.22

0.00

247,910.09

1.000

0.00

7,488.28

7

AL 31 NOV 18

Nov- 2018

666,871.68

3,527,627.90

0.00

247,910.09

1.000

0.00

7,488.28

8

AL 31 DIC 18

Dic - 2018

100,518.72

3,628,146.62

0.00

247,910.09

1.000

0.00

7,488.28

Reintegro por Reajuste de Pre (*) CUADRO DE COEFICIENTE DE REAJUSTE : K (Conocido a la Fecha de la Valorización) MESES

Abril-18

Mayo-18

Jun - 2018

"K"

1.009

1.016

1.018

Jul - 2018

Agos - 2018

Sept - 2018

Oct - 2018

Nov- 2018

CALCULO DE REAJUSTE JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRIVADA : COMPAÑÍA MINERA ANTAPACCAY SA CONTRATISTA

: JERGO SAC

RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR

: BISONTE INGENIEROS CONTRATISTAS

JEFE DE SUPERVISI : ING. JUAN ROGER QUINTANILLA ANYAIPOMA

1.3 INSTALACIONES SANITARIAS

S/. 0.00

ADELANTO DIRECTO

VALORIZACIÓN Nº

Periodo

SIIGV

S/. 803,847.49

MONTO CONTRATADO COMPONENTE 01

Fecha de reajuste (*)

Mayo- 2018

AVANCE MENSUAL Programado Mensual (A)

Ejecutado

Acumulado

1

AL 31 MAYO 18

-

2

AL 30 JUNI 18

Jun - 2018

11,105.36

3

AL 31 JUL 18

Jul - 2018

4

AL 30 AGOS 18

5 6

FACTOR REAJUSTE

Mensual (B)

-

Acumulado

K

REAJUSTE PROGRAMADO Programado F = A *(K-1)

Acumulado

0.00

-

1.005

0.00

0.00

11,105.36

0.00

-

1.016

177.69

177.69

83,560.12

94,665.48

8,196.77

8,196.77

1.018

1,504.08

1,681.77

Agos - 2018

59,481.73

154,147.21

0.00

8,196.77

1.000

0.00

1,681.77

AL 31 SEPT 18

Sept - 2018

283,050.91

437,198.12

0.00

8,196.77

1.000

0.00

1,681.77

AL 30 OCT 18

Oct - 2018

56,020.74

493,218.86

0.00

8,196.77

1.000

0.00

1,681.77

CALCULO DE REAJUSTE JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRIVADA : COMPAÑÍA MINERA ANTAPACCAY SA CONTRATISTA

: JERGO SAC

RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR

: BISONTE INGENIEROS CONTRATISTAS

JEFE DE SUPERVISI : ING. JUAN ROGER QUINTANILLA ANYAIPOMA 7

AL 31 NOV 18

Nov- 2018

272,846.17

766,065.04

0.00

8,196.77

1.000

0.00

1,681.77

8

AL 31 DIC 18

Dic - 2018

37,782.46

803,847.49

0.00

8,196.77

1.000

0.00

1,681.77

Reintegro por Reajuste de Pre (*) CUADRO DE COEFICIENTE DE REAJUSTE : K (Conocido a la Fecha de la Valorización) MESES

Abril-18

Mayo-18

Jun - 2018

"K"

1.005

1.016

1.018

Jul - 2018

Agos - 2018

Sept - 2018

Oct - 2018

Nov- 2018

CALCULO DE REAJUSTE JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRIVADA : COMPAÑÍA MINERA ANTAPACCAY SA CONTRATISTA

: JERGO SAC

RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR

: BISONTE INGENIEROS CONTRATISTAS

JEFE DE SUPERVISI : ING. JUAN ROGER QUINTANILLA ANYAIPOMA 1.4 INSTALACIONES ELECTRICAS ###

MONTO CONTRATADO COMPONENTE 01

S/. 0.00

ADELANTO DIRECTO

VALORIZACIÓN Nº

Periodo

1

AL 31 MAYO 18

2

AL 30 JUNI 18

3

AL 31 JUL 18

4

AL 30 AGOS 18

5

SIIGV

Fecha de reajuste (*)

Mayo- 2018

AVANCE MENSUAL Programado Mensual (A)

FACTOR REAJUSTE

Ejecutado

Acumulado

Mensual (B)

Acumulado

K

REAJUSTE PROGRAMADO Programado F = A *(K-1)

Acumulado

1,987.44

1,987.44

0.00

-

1.008

15.90

15.90

Jun - 2018

16,585.86

18,573.30

0.00

-

1.020

331.72

347.62

Jul - 2018

66,896.68

85,469.98

4,727.93

4,727.93

1.022

1,471.73

1,819.35

Agos - 2018

119,639.03

205,109.00

0.00

4,727.93

1.000

0.00

1,819.35

AL 31 SEPT 18

Sept - 2018

230,845.98

435,954.98

0.00

4,727.93

1.000

0.00

1,819.35

6

AL 30 OCT 18

Oct - 2018

862,592.38

1,298,547.36

0.00

4,727.93

1.000

0.00

1,819.35

7

AL 31 NOV 18

Nov- 2018

573,039.28

1,871,586.64

0.00

4,727.93

1.000

0.00

1,819.35

8

AL 31 DIC 18

Dic - 2018

251,195.29

2,122,781.93

0.00

4,727.93

1.000

0.00

1,819.35

Reintegro por Reajuste de Pre (*) CUADRO DE COEFICIENTE DE REAJUSTE : K (Conocido a la Fecha de la Valorización)

CALCULO DE REAJUSTE JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRIVADA : COMPAÑÍA MINERA ANTAPACCAY SA CONTRATISTA

: JERGO SAC

RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR

: BISONTE INGENIEROS CONTRATISTAS

JEFE DE SUPERVISI : ING. JUAN ROGER QUINTANILLA ANYAIPOMA MESES

Abril-18

Mayo-18

Jun - 2018

"K"

1.008

1.020

1.022

Jul - 2018

Agos - 2018

Sept - 2018

Oct - 2018

Nov- 2018

CALCULO DE REAJUSTE JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRIVADA : COMPAÑÍA MINERA ANTAPACCAY SA CONTRATISTA

: JERGO SAC

RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR

: BISONTE INGENIEROS CONTRATISTAS

JEFE DE SUPERVISI : ING. JUAN ROGER QUINTANILLA ANYAIPOMA Componente 02 : ADECUADO EQUIPAMIENTO Y MAQUINARIA PARA EL BENEFICIO DEL CAMAL ###

MONTO CONTRATADO COMPONENTE 02

S/. 0.00

ADELANTO DIRECTO

VALORIZACIÓN Nº

Periodo

1

AL 31 MAYO 18

2

AL 30 JUNI 18

3

AL 31 JUL 18

4

AL 30 AGOS 18

5

AL 31 SEPT 18

6

SIIGV

AVANCE MENSUAL

Fecha de reajuste (*)

Mayo- 2018

Programado Mensual (A)

FACTOR REAJUSTE

Ejecutado

Acumulado

Mensual (B)

Acumulado

K

REAJUSTE PROGRAMADO Programado F = A *(K-1)

Acumulado

8,671.38

8,671.38

0.00

-

1.005

43.36

43.36

Jun - 2018

147,120.11

155,791.49

0.00

-

1.018

2,648.16

2,691.52

Jul - 2018

11,272.80

167,064.29

0.00

-

1.021

236.73

2,928.25

Agos - 2018

11,272.80

178,337.09

0.00

-

1.000

0.00

2,928.25

Sept - 2018

11,272.80

189,609.89

0.00

-

1.000

0.00

2,928.25

AL 30 OCT 18

Oct - 2018

859,587.75

1,049,197.64

0.00

-

1.000

0.00

2,928.25

7

AL 31 NOV 18

Nov- 2018

1,066,342.31

2,115,539.95

0.00

-

1.000

0.00

2,928.25

8

AL 31 DIC 18

Dic - 2018

143,460.81

2,259,000.76

0.00

-

1.000

0.00

2,928.25

Reintegro por Reajuste de Pre (*) CUADRO DE COEFICIENTE DE REAJUSTE : K (Conocido a la Fecha de la Valorizacion) MESES

Abril-18

Mayo-18

Jun - 2018

"K"

1.005

1.018

1.021

Jul - 2018

Agos - 2018

Sept - 2018

Oct - 2018

Nov- 2018

CALCULO DE REAJUSTE JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRIVADA : COMPAÑÍA MINERA ANTAPACCAY SA CONTRATISTA

: JERGO SAC

RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR

: BISONTE INGENIEROS CONTRATISTAS

JEFE DE SUPERVISI : ING. JUAN ROGER QUINTANILLA ANYAIPOMA

Componente 03 : ADECUADA CAPACITACION EN EL MANEJO DEL EQUIPO E INFRAESTRUCTURA

MONTO CONTRATADO COMPONENTE 02

S/. 108,000.00 S/. 0.00

ADELANTO DIRECTO

VALORIZACIÓN Nº

Periodo

SIIGV

Fecha de reajuste (*)

AVANCE MENSUAL Programado

Ejecutado

FACTOR REAJUSTE

REAJUSTE PROGRAMADO Programado

Acumulado

CALCULO DE REAJUSTE JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRIVADA : COMPAÑÍA MINERA ANTAPACCAY SA CONTRATISTA

: JERGO SAC

RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR

: BISONTE INGENIEROS CONTRATISTAS

JUANde ROGER QUINTANILLA ANYAIPOMA JEFE DE SUPERVISI : ING. Fecha Nº Periodo reajuste (*) Mensual (A) Acumulado

1

AL 31 MAYO 18

2

Mensual (B)

Acumulado

K

F = A *(K-1)

Acumulado

Mayo- 2018

0.00

-

0.00

-

1.005

0.00

0.00

AL 30 JUNI 18

Jun - 2018

0.00

-

0.00

-

1.020

0.00

0.00

3

AL 31 JUL 18

Jul - 2018

0.00

-

0.00

-

1.023

0.00

0.00

4

AL 30 AGOS 18

Agos - 2018

0.00

-

0.00

-

1.000

0.00

0.00

5

AL 31 SEPT 18

Sept - 2018

0.00

-

0.00

-

1.000

0.00

0.00

6

AL 30 OCT 18

Oct - 2018

36,000.00

36,000.00

0.00

-

1.000

0.00

0.00

7

AL 31 NOV 18

Nov- 2018

36,000.00

72,000.00

0.00

-

1.000

0.00

0.00

8

AL 31 DIC 18

Dic - 2018

36,000.00

108,000.00

0.00

-

1.000

0.00

0.00

Reintegro por Reajuste de Pre (*) CUADRO DE COEFICIENTE DE REAJUSTE : K (Conocido a la Fecha de la Valorizacion) MESES

Abril-18

Mayo-18

Jun - 2018

"K"

1.005

1.020

1.023

Jul - 2018

Agos - 2018

Sept - 2018

Oct - 2018

Nov- 2018

CUADRO RESUMEN DE REAJUSTES ITEM

FORMULA POLINÓMICA

ACUMULADO ANTERIOR

REAJUSTE ACTUAL

1

F.P. 01 - COMPONENTE 1

23,582.23

19,664.49

2

F.P. 01 - COMPONENTE 2

0.00

0.00

CALCULO DE REAJUSTE JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRIVADA : COMPAÑÍA MINERA ANTAPACCAY SA CONTRATISTA

: JERGO SAC

RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR

: BISONTE INGENIEROS CONTRATISTAS

JEFE DE SUPERVISI : ING. JUAN ROGER QUINTANILLA ANYAIPOMA 3

F.P. 02 - COMPONENTE 3

0.00

0.00

TOTAL REAJUSTE ACUMULADO

Nota: Este mes el monto del reajuste es la suma de los reajustes de las especialidades de estructuras, arquitectura, sanitarias y electricas, con los indices al mes de junio, que so

CALCULO DE REAJUSTE JULIO 2018

REAJUSTE VALORIZADO Valorizado G = B *(K-1)

Acumulado

REAJUSTE RECONOCIDO Del Mes

Acumulado

2,554.47

2,554.47

2,554.47

2,554.47

21,027.76

23,582.23

21,027.76

23,582.23

14,950.56

38,532.79

14,950.56

38,532.79

0.00

38,532.79

-

38,532.79

0.00

38,532.79

-

38,532.79

0.00

38,532.79

-

38,532.79

0.00

38,532.79

-

38,532.79

0.00

38,532.79

-

38,532.79

Reintegro por Reajuste de Precios - Componente 01

###

CALCULO DE REAJUSTE JULIO 2018

REAJUSTE VALORIZADO Valorizado G = B *(K-1)

Acumulado

REAJUSTE RECONOCIDO Del Mes

Acumulado

CALCULO DE REAJUSTE JULIO 2018

0.00

-

-

-

0.00

-

-

-

4,462.38

4,462.38

4,462.38

0.00

4,462.38

0.00

4,462.38

-

4,462.38

0.00

4,462.38

-

4,462.38

0.00

4,462.38

-

4,462.38

0.00

4,462.38

-

4,462.38

Reintegro por Reajuste de Precios - Componente 01

4,462.38 4,462.38

S/. 4,462.38

CALCULO DE REAJUSTE JULIO 2018

REAJUSTE VALORIZADO Valorizado G = B *(K-1)

Acumulado

REAJUSTE RECONOCIDO Del Mes

Acumulado

0.00

-

-

-

0.00

-

-

-

147.54

147.54

147.54

147.54

0.00

147.54

0.00

147.54

-

147.54

0.00

147.54

-

147.54

CALCULO DE REAJUSTE JULIO 2018

0.00

147.54

-

147.54

0.00

147.54

-

147.54

Reintegro por Reajuste de Precios - Componente 01

S/.

147.54

CALCULO DE REAJUSTE JULIO 2018

REAJUSTE VALORIZADO Valorizado G = B *(K-1)

Acumulado

REAJUSTE RECONOCIDO Del Mes

Acumulado

0.00

-

-

-

0.00

-

-

-

104.01

104.01

104.01

0.00

104.01

0.00

104.01

-

104.01

0.00

104.01

-

104.01

0.00

104.01

-

104.01

0.00

104.01

-

104.01

Reintegro por Reajuste de Precios - Componente 01

104.01

S/.

104.01

CALCULO DE REAJUSTE JULIO 2018

REAJUSTE VALORIZADO Valorizado G = B *(K-1)

Acumulado

REAJUSTE RECONOCIDO Del Mes

Acumulado

0.00

-

-

-

0.00

-

-

-

0.00

-

-

-

0.00

-

-

-

0.00

-

-

-

0.00

-

-

-

0.00

-

-

-

0.00

-

-

-

Reintegro por Reajuste de Precios - Componente 02

S/.

-

CALCULO DE REAJUSTE JULIO 2018

REAJUSTE VALORIZADO Valorizado

Acumulado

REAJUSTE RECONOCIDO Del Mes

Acumulado

CALCULO DE REAJUSTE JULIO 2018

G = B *(K-1)

Acumulado

Del Mes

Acumulado

0.00

-

-

-

0.00

-

-

-

0.00

-

-

-

0.00

-

-

-

0.00

-

-

-

0.00

-

-

-

0.00

-

-

-

0.00

-

-

-

Reintegro por Reajuste de Precios - Componente 02

CUADRO RESUMEN DE REAJUSTES REAJUSTE ACTUAL

ACUMULADO ACTUAL

19,664.49

43,246.72

0.00

0.00

S/.

-

CALCULO DE REAJUSTE JULIO 2018

0.00 TOTAL REAJUSTE ACUMULADO

0.00 43,246.72

ucturas, arquitectura, sanitarias y electricas, con los indices al mes de junio, que son los conocidos a la fecha del reajuste

CALCULO DE COEFICIENTE DE REAJUSTE "K" JULIO 2018 OBRA

: “MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I.E TENIENTE CORONEL PEDRO RUIZ GALLO NIVEL SECUNDARIO DEL DISTRITO DE ESPINAR, PROVINCIA DE ESPI

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRI : COMPAÑÍA MINERA ANTAPACCAY SA CONTRATISTA: JERGO SAC RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR : BISONTE INGENIEROS CONTRATISTAS JEFE DE SUPE : ING. JUAN ROGER QUINTANILLA ANYAIPOMA

F. POLINOMICA 1:

Componente 01 : ADECUADA INFRAESTRUCTURA PARA BENEFICO Y MANEJO DEL CAMAL

1.1.-ESTRUCTURAS

:K = 0.061*(ACr/ACo) + 0.084*(AGr/AGo) + 0.070*(CPr/CPo) + 0.251*(DOr/DOo) + 0.278*(MOr/MOo) + 0.089*(MEr/MEo) + F. P. Nº 01

Monomio

I.U. SIMBOLO

DESCRIPCION ÍNDICE UNIFICADO

Indice Pto. Base

Ir (Mayo 2018)*

COEF.

% INCID.

Oct-17

Io

Ir

Ir/Io

1

2

3

4=(3x2)

5

6=(2*5/4)

Ir (Junio 2018) Kr

Ir

Ir/Io

5

6=(2*5/4)

1

3

AC

ACERO DE CONSTRUCCION CORRUGADO

0.061

100.00%

469.92

469.920

501.98

1.068

0.065

513.58

1.093

2

05

AG

AGREGADO GRUESO

0.084

100.00%

632.37

632.370

628.08

0.993

0.083

617.54

0.977

3

21

CP

CEMENTO PORTLAND TIPO I

0.070

100.00%

410.96

410.960

410.96

1.000

0.070

410.96

1.000

4

30

DO

DOLAR (GENERAL PONDERADO)

0.251

100.00%

467.61

467.610

469.88

1.005

0.252

478.04

1.022

5

47

MO

MANO DE OBRA INC. LEYES SOCIALES

0.278

100.00%

580.90

580.900

582.52

1.003

0.279

582.52

1.003

6

49

ME

MAQUINARIA Y EQUIPO IMPORTADO

0.089

100.00%

293.18

293.180

294.12

1.003

0.089

298.68

1.019

7

39

GGU

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

0.167

100.00%

442.48

442.480

445.52

1.007

0.168

445.61

1.007

K (Mayo 18)=

*Indices 30,34,39,47,49,53 aprobados mediante Resolucion Jefatural N° 198-2018-INEI - Abril

1.006

K (Junio 18)=

CALCULO DE COEFICIENTE DE REAJUSTE "K" JULIO 2018 OBRA

: “MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I.E TENIENTE CORONEL PEDRO RUIZ GALLO NIVEL SECUNDARIO DEL DISTRITO DE ESPINAR, PROVINCIA DE ESPI

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRI : COMPAÑÍA MINERA ANTAPACCAY SA CONTRATISTA: JERGO SAC RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR : BISONTE INGENIEROS CONTRATISTAS JEFE DE SUPE : ING. JUAN ROGER QUINTANILLA ANYAIPOMA * El indice de junio es el de mayo, pues es el conocido a la fecha, y se usaran los del mes en la liquidacion

F. POLINOMICA 1:

1.2.-ARQUITECTURA

:K = 0.089*(BLr/BLo) + 0.051*(CEr/CEo) + 0.191*(DOr/DOo) + 0.218*(MOr/MOo) + 0.168*(PALr/PALo) + 0.116*(TAr/TAo) + 0

F. P. Nº 01 Monomio

I.U. SIMBOLO

DESCRIPCION ÍNDICE UNIFICADO

Indice Pto. Base

Ir (Mayo 2018)*

COEF.

% INCID.

Oct-17

Io

Ir

Ir/Io

1

2

3

4=(3x2)

5

6=(2*5/4)

Ir (Junio 2018) Kr

Ir

Ir/Io

5

6=(2*5/4)

1

17

BL

BLOQUE Y LADRILLO

0.089

100.00%

859.67

859.670

868.72

1.011

0.090

865.43

1.007

2

24

CE

CERAMICA ESMALTADA Y SIN ESMALTAR

0.051

100.00%

240.78

240.780

243.19

1.010

0.052

242.45

1.007

3

30

DO

DOLAR (GENERAL PONDERADO)

0.191

100.00%

467.61

467.610

469.88

1.005

0.192

478.04

1.022

4

47

MO

MANO DE OBRA INC. LEYES SOCIALES

0.218

100.00%

580.90

580.900

582.52

1.003

0.219

582.52

1.003

5

57

PAL

PLANCHA DE ACERO LAF

0.168

100.00%

385.56

385.560

381.93

0.991

0.166

389.94

1.011

6

65

TA

TUBERIA DE ACERO NEGRO

0.116

100.00%

235.92

235.920

247.66

1.050

0.122

250.41

1.061

7

39

GGU

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

0.167

100.00%

442.48

442.480

445.52

1.007

0.168

445.61

1.007

K (Mayo 18)=

*Indices 30,34,39,47,49,53 aprobados mediante Resolucion Jefatural N° 198-2018-INEI - Abril

1.009

K (Junio 18)=

CALCULO DE COEFICIENTE DE REAJUSTE "K" JULIO 2018 OBRA

: “MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I.E TENIENTE CORONEL PEDRO RUIZ GALLO NIVEL SECUNDARIO DEL DISTRITO DE ESPINAR, PROVINCIA DE ESPI

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRI : COMPAÑÍA MINERA ANTAPACCAY SA CONTRATISTA: JERGO SAC RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR : BISONTE INGENIEROS CONTRATISTAS JEFE DE SUPE : ING. JUAN ROGER QUINTANILLA ANYAIPOMA * El indice de julio es el de junio, pues es el conocido a la fecha, y se usaran los del mes en la liquidacion

F. POLINOMICA 1:

1.3.-INSTALACIONES SANITARIAS

:K = 0.473*(DOr/DOo) + 0.218*(MOr/MOo) + 0.070*(ACr/ACo) + 0.072*(TPr/TPo) + 0.167*(GGUr/GGUo)

F. P. Nº 01 Monomio

I.U. SIMBOLO

DESCRIPCION ÍNDICE UNIFICADO

Indice Pto. Base

Ir (Mayo 2018)*

COEF.

% INCID.

Oct-17

Io

Ir

Ir/Io

1

2

3

4=(3x2)

5

6=(2*5/4)

Ir (Junio 2018) Kr

Ir

Ir/Io

5

6=(2*5/4)

1

30

DO

DOLAR (GENERAL PONDERADO)

0.473

100.00%

467.61

467.610

469.88

1.005

0.475

478.04

1.022

2

47

MO

MANO DE OBRA INC. LEYES SOCIALES

0.218

100.00%

580.90

580.900

582.52

1.003

0.219

582.52

1.003

3

52

AC

ACERO GALVANIZADO

0.070

100.00%

300.40

300.400

304.25

1.013

0.071

309.75

1.031

4

72

TP

TUBERIA DE PVC PARA AGUA

0.072

100.00%

426.35

426.350

429.31

1.007

0.072

431.66

1.013

5

39

GGU

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

0.167

100.00%

442.48

442.480

445.52

1.007

0.168

445.61

1.007

K (Mayo 18)=

*Indices 30,34,39,47,49,53 aprobados mediante Resolucion Jefatural N° 198-2018-INEI - Abril * El indice de julio es el de junio, pues es el conocido a la fecha, y se usaran los del mes en la liquidacion

1.005

K (Junio 18)=

CALCULO DE COEFICIENTE DE REAJUSTE "K" JULIO 2018 OBRA

: “MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I.E TENIENTE CORONEL PEDRO RUIZ GALLO NIVEL SECUNDARIO DEL DISTRITO DE ESPINAR, PROVINCIA DE ESPI

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRI : COMPAÑÍA MINERA ANTAPACCAY SA CONTRATISTA: JERGO SAC RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR : BISONTE INGENIEROS CONTRATISTAS JEFE DE SUPE : ING. JUAN ROGER QUINTANILLA ANYAIPOMA

F. POLINOMICA 1:

1.4.-INSTALACIONES ELECTRICAS

:K = 0.161*(AAr/AAo) + 0.089*(PALr/PALo) + 0.313*(DOr/DOo) + 0.143*(MOr/MOo) + 0.127*(MEr/MEo) + 0.167*(GGUr/GGU

F. P. Nº 01 Monomio

I.U. SIMBOLO

DESCRIPCION ÍNDICE UNIFICADO

Indice Pto. Base

Ir (Mayo 2018)*

COEF.

% INCID.

Oct-17

Io

Ir

Ir/Io

1

2

3

4=(3x2)

5

6=(2*5/4)

Ir (Junio 2018) Kr

Ir

Ir/Io

5

6=(2*5/4)

1

12

AA

ARTEFACTO DE ALUMBRADO INTERIOR

0.161

100.00%

318.43

318.430

317.37

0.997

0.160

319.78

1.004

2

56

PAL

PLANCHA DE ACERO LAC

0.089

100.00%

488.10

488.100

523.71

1.073

0.095

539.72

1.106

3

30

DO

DOLAR (GENERAL PONDERADO)

0.313

100.00%

467.61

467.610

469.88

1.005

0.315

478.04

1.022

4

47

MO

MANO DE OBRA INC. LEYES SOCIALES

0.143

100.00%

580.90

580.900

582.52

1.003

0.143

582.52

1.003

5

49

ME

MAQUINARIA Y EQUIPO IMPORTADO

0.127

100.00%

293.18

293.180

294.12

1.003

0.127

298.68

1.019

6

39

GGU

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

0.167

100.00%

442.48

442.480

445.52

1.007

0.168

445.61

1.007

K (Mayo 18)=

*Indices 30,34,39,47,49,53 aprobados mediante Resolucion Jefatural N° 198-2018-INEI - Abril * El indice de julio es el de junio, pues es el conocido a la fecha, y se usaran los del mes en la liquidacion

1.008

K (Junio 18)=

CALCULO DE COEFICIENTE DE REAJUSTE "K" JULIO 2018 OBRA

: “MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I.E TENIENTE CORONEL PEDRO RUIZ GALLO NIVEL SECUNDARIO DEL DISTRITO DE ESPINAR, PROVINCIA DE ESPI

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRI : COMPAÑÍA MINERA ANTAPACCAY SA CONTRATISTA: JERGO SAC RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR : BISONTE INGENIEROS CONTRATISTAS JEFE DE SUPE : ING. JUAN ROGER QUINTANILLA ANYAIPOMA

F. POLINOMICA 2:

Componente 02 : ADECUADO EQUIPAMIENTO Y MAQUINARIA PARA EL BENEFICIO DEL CAMAL :K = 0.756*(DOr/DOo) + 0.077*(MOr/MOo) + 0.167*(GGUr/GGUo)

F. P. Nº 01 Monomio

I.U. SIMBOLO

DESCRIPCION ÍNDICE UNIFICADO

Indice Pto. Base

Ir (Mayo 2018)*

COEF.

% INCID.

Oct-17

Io

Ir

Ir/Io

1

2

3

4=(3x2)

5

6=(2*5/4)

Ir (Junio 2018) Kr

Ir

Ir/Io

5

6=(2*5/4)

1

30

DO

DOLAR (GENERAL PONDERADO)

0.756

100.00%

467.61

467.610

469.88

1.005

0.760

478.04

1.022

2

47

MO

MANO DE OBRA INC. LEYES SOCIALES

0.077

100.00%

580.90

580.900

582.52

1.003

0.077

582.52

1.003

3

39

GGU

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

0.167

100.00%

442.48

442.480

445.52

1.007

0.168

445.61

1.007

K (Mayo 18)=

1.005

K (Junio 18)=

*Indices 30,34,39,47,49,53 aprobados mediante Resolucion Jefatural N° 198-2018-INEI - Abril * El indice de julio es el de junio, pues es el conocido a la fecha, y se usaran los del mes en la liquidacion

F. POLINOMICA 3:

Componente 03 : ADECUADA CAPACITACION EN EL MANEJO DEL EQUIPO E INFRAESTRUCTURA :K = 0.756*(DOr/DOo) + 0.077*(MOr/MOo) + 0.167*(GGUr/GGUo) F. P. Nº 01

Monomio

I.U. SIMBOLO

DESCRIPCION ÍNDICE UNIFICADO

Indice Pto. Base

Ir (Mayo 2018)*

COEF.

% INCID.

Oct-17

Io

Ir

Ir/Io

1

2

3

4=(3x2)

5

6=(2*5/4)

Ir (Junio 2018) Kr

Ir

Ir/Io

5

6=(2*5/4)

CALCULO DE COEFICIENTE DE REAJUSTE "K" JULIO 2018 OBRA

: “MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I.E TENIENTE CORONEL PEDRO RUIZ GALLO NIVEL SECUNDARIO DEL DISTRITO DE ESPINAR, PROVINCIA DE ESPI

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRI : COMPAÑÍA MINERA ANTAPACCAY SA CONTRATISTA: JERGO SAC RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR : BISONTE INGENIEROS CONTRATISTAS JEFE DE SUPE : ING. JUAN ROGER QUINTANILLA ANYAIPOMA 1

30

DO

2

39

GGU

DOLAR (GENERAL PONDERADO)

0.833

100.00%

467.61

467.610

469.88

1.005

0.837

478.04

1.022

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

0.167

100.00%

442.48

442.480

445.52

1.007

0.168

445.61

1.007

K (Mayo 18)=

*Indices 30,34,39,47,49,53 aprobados mediante Resolucion Jefatural N° 198-2018-INEI - Abril * El indice de julio es el de junio, pues es el conocido a la fecha, y se usaran los del mes en la liquidacion

1.005

K (Junio 18)=

E COEFICIENTE DE REAJUSTE "K" JULIO 2018

DARIO DEL DISTRITO DE ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

+ 0.251*(DOr/DOo) + 0.278*(MOr/MOo) + 0.089*(MEr/MEo) + 0.167*(GGUr/GGUo) Ir (Junio 2018)

Ir (Julio 2018) Ir

Ir/Io

5

6=(2*5/4)

0.067

508.81

1.083

0.082

618.89

0.070

Ir (Agosto 2018) Ir

Ir/Io

5

6=(2*5/4)

0.066

0.00

0.000

0.979

0.082

0.00

410.96

1.000

0.070

0.257

479.58

1.026

0.279

582.52

0.091 0.168

Kr

1.014

Ir (Septiembre 2018) Ir

Ir/Io

6

6=(2*5/4)

0.000

0.00

0.000

0.000

0.000

0.000

0.00

0.000

0.000

0.00

0.000

0.000

0.00

0.000

0.000

0.257

0.00

0.000

0.000

0.00

0.000

0.000

1.003

0.279

0.00

0.000

0.000

0.00

0.000

0.000

298.83

1.019

0.091

0.00

0.000

0.000

0.00

0.000

0.000

447.10

1.010

0.169

0.00

0.000

0.000

0.00

0.000

0.000

K (Julio 18)=

Kr

1.014

K (Agosto 18)=

Kr

-

K (Septiembre 18)=

Kr

-

E COEFICIENTE DE REAJUSTE "K" JULIO 2018

DARIO DEL DISTRITO DE ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

+ 0.218*(MOr/MOo) + 0.168*(PALr/PALo) + 0.116*(TAr/TAo) + 0.167*(GGUr/GGUo)

Ir (Junio 2018)

Ir (Julio 2018) Ir

Ir/Io

5

6=(2*5/4)

0.090

864.03

1.005

0.051

244.80

0.195

Ir (Agosto 2018) Ir

Ir/Io

5

6=(2*5/4)

0.089

0.00

0.000

1.017

0.052

0.00

479.58

1.026

0.196

0.219

582.52

1.003

0.170

389.58

0.123 0.168

Kr

1.016

Ir (Septiembre 2018) Ir

Ir/Io

6

6=(2*5/4)

0.000

0.00

0.000

0.000

0.000

0.000

0.00

0.000

0.000

0.00

0.000

0.000

0.00

0.000

0.000

0.219

0.00

0.000

0.000

0.00

0.000

0.000

1.010

0.170

0.00

0.000

0.000

0.00

0.000

0.000

250.53

1.062

0.123

0.00

0.000

0.000

0.00

0.000

0.000

447.10

1.010

0.169

0.00

0.000

0.000

0.00

0.000

0.000

K (Julio 18)=

Kr

1.018

K (Agosto 18)=

Kr

-

K (Septiembre 18)=

Kr

-

E COEFICIENTE DE REAJUSTE "K" JULIO 2018

DARIO DEL DISTRITO DE ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

Ir (Junio 2018)

Ir (Julio 2018) Ir

Ir/Io

5

6=(2*5/4)

0.484

479.58

1.026

0.219

582.52

0.072

Ir (Agosto 2018) Ir

Ir/Io

5

6=(2*5/4)

0.485

0.00

0.000

1.003

0.219

0.00

309.58

1.031

0.072

0.073

434.23

1.019

0.168

447.10

1.010

Kr

1.016

K (Julio 18)=

Ir (Septiembre 2018) Ir

Ir/Io

6

6=(2*5/4)

0.000

0.00

0.000

0.000

0.000

0.000

0.00

0.000

0.000

0.00

0.000

0.000

0.00

0.000

0.000

0.073

0.00

0.000

0.000

0.00

0.000

0.000

0.169

0.00

0.000

0.000

0.00

0.000

0.000

Kr

1.018

K (Agosto 18)=

Kr

-

K (Septiembre 18)=

Kr

-

E COEFICIENTE DE REAJUSTE "K" JULIO 2018

DARIO DEL DISTRITO DE ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

) + 0.143*(MOr/MOo) + 0.127*(MEr/MEo) + 0.167*(GGUr/GGUo)

Ir (Junio 2018)

Ir (Julio 2018) Ir

Ir/Io

5

6=(2*5/4)

0.162

319.59

1.004

0.098

539.22

0.320

Ir (Agosto 2018) Ir

Ir/Io

5

6=(2*5/4)

0.162

0.00

0.000

1.105

0.098

0.00

479.58

1.026

0.321

0.143

582.52

1.003

0.129

298.83

0.168

447.10

Kr

1.020

Ir (Septiembre 2018) Ir

Ir/Io

6

6=(2*5/4)

0.000

0.00

0.000

0.000

0.000

0.000

0.00

0.000

0.000

0.00

0.000

0.000

0.00

0.000

0.000

0.143

0.00

0.000

0.000

0.00

0.000

0.000

1.019

0.129

0.00

0.000

0.000

0.00

0.000

0.000

1.010

0.169

0.00

0.000

0.000

0.00

0.000

0.000

K (Julio 18)=

Kr

1.022

K (Agosto 18)=

Kr

-

K (Septiembre 18)=

Kr

-

E COEFICIENTE DE REAJUSTE "K" JULIO 2018

DARIO DEL DISTRITO DE ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

Ir (Junio 2018)

Ir (Julio 2018) Ir

Ir/Io

5

6=(2*5/4)

0.773

479.58

1.026

0.077

582.52

1.003

0.168

447.10

1.010

Kr

1.018

K (Julio 18)=

Ir (Junio 2018)

Ir (Agosto 2018) Ir

Ir/Io

5

6=(2*5/4)

0.775

0.00

0.000

0.077

0.00

0.000

0.169

0.00

0.000

Kr

1.021

Kr

Ir/Io

5

6=(2*5/4)

Ir

Ir/Io

6

6=(2*5/4)

0.000

0.00

0.000

0.000

0.000

0.00

0.000

0.000

0.000

0.00

0.000

0.000

Kr

K (Agosto 18)=

Ir (Julio 2018) Ir

Ir (Septiembre 2018)

-

K (Septiembre 18)=

Ir (Agosto 2018) Kr

Ir

Ir/Io

5

6=(2*5/4)

Kr

-

Ir (Septiembre 2018) Kr

Ir

Ir/Io

6

6=(2*5/4)

Kr

E COEFICIENTE DE REAJUSTE "K" JULIO 2018

DARIO DEL DISTRITO DE ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

0.852

479.58

1.026

0.854

0.00

0.000

0.000

0.00

0.000

0.000

0.168

447.10

1.010

0.169

0.00

0.000

0.000

0.00

0.000

0.000

1.020

K (Julio 18)=

1.023

K (Agosto 18)=

-

K (Septiembre 18)=

-

INDICE UNIFICADO DE PRECIOS OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA D

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRIVADA

: COMPAÑÍA MINERA ANTAPACCAY SA

CONTRATISTA

: JERGO SAC

RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR

: BISONTE INGENIEROS CONTRATISTAS

JEFE DE SUPERVISION

: ING. JUAN ROGER QUINTANILLA ANYAIPOMA

Fecha de presupuesto Base

: Octubre del 2017

Area Geografica

:6

Componente 01 : ADECUADA INFRAESTRUCTURA PARA BENEFICO Y MANEJO DEL CAMAL 1.1.-ESTRUCTURAS

ITEM

:K = 0.061*(ACr/ACo) + 0.084*(AGr/AGo) + 0.070*(CPr/CPo) + 0.251*(DOr/DOo)

Descripción

Indice Símbolo

Pto. Base

2017

Oct-17

NOVIEMBRE DICIEMBRE

1

ACERO DE CONSTRUCCION CORRUGADO

03

AC

469.92

464.75

472.49

2

AGREGADO GRUESO

05

AG

632.37

633.17

629.22

3

CEMENTO PORTLAND TIPO I

21

CP

410.96

410.96

410.96

4

DOLAR (GENERAL PONDERADO)

30

DO

467.61

465.87

466.75

5

MANO DE OBRA INC. LEYES SOCIALES

47

MO

580.90

580.90

580.90

6

MAQUINARIA Y EQUIPO IMPORTADO

49

ME

293.18

292.27

293.24

7

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

39

GGU

442.48

441.61

442.30

(*) Para el I.U. del Presupuesto base de Mano de obra (Código 47), se consideró segun la Resolucion Jefatural Nº 30

1.2.-ARQUITECTURA

ITEM

:K = 0.089*(BLr/BLo) + 0.051*(CEr/CEo) + 0.191*(DOr/DOo) + 0.218*(MOr/MOo)

Descripción

Indice Símbolo

Pto. Base

2017

Oct-17

NOVIEMBRE DICIEMBRE

1

BLOQUE Y LADRILLO

17

BL

859.67

856.42

861.38

2

CERAMICA ESMALTADA Y SIN ESMALTAR

24

CE

240.78

243.60

243.08

3

DOLAR (GENERAL PONDERADO)

30

DO

467.61

465.87

466.75

4

MANO DE OBRA INC. LEYES SOCIALES

47

MO

580.90

580.90

580.90

5

PLANCHA DE ACERO LAF

57

PAL

385.56

384.38

396.16

6

TUBERIA DE ACERO NEGRO

65

TA

235.92

233.92

244.12

7

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

39

GGU

442.48

441.61

442.30

(*) Para el I.U. del Presupuesto base de Mano de obra (Código 47), se consideró segun la Resolucion Jefatural Nº 30

INDICE UNIFICADO DE PRECIOS OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA D

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRIVADA

: COMPAÑÍA MINERA ANTAPACCAY SA

CONTRATISTA

: JERGO SAC

RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR

: BISONTE INGENIEROS CONTRATISTAS

JEFE DE SUPERVISION

: ING. JUAN ROGER QUINTANILLA ANYAIPOMA

Fecha de presupuesto Base

: Octubre del 2017

Area Geografica

:6

1.3.-INSTALACIONES SANITARIAS

ITEM

Descripción

:K = 0.473*(DOr/DOo) + 0.218*(MOr/MOo) + 0.070*(ACr/A

Indice Símbolo

Pto. Base

2017

Oct-17

NOVIEMBRE DICIEMBRE

1

DOLAR (GENERAL PONDERADO)

30

DO

467.61

465.87

466.75

2

MANO DE OBRA INC. LEYES SOCIALES

47

MO

580.90

580.90

580.90

3

ACERO GALVANIZADO

52

AC

300.40

303.79

304.07

4

TUBERIA DE PVC PARA AGUA

72

TP

426.35

425.95

426.06

5

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

39

GGU

442.48

441.61

442.30

(*) Para el I.U. del Presupuesto base de Mano de obra (Código 47), se consideró segun la Resolucion Jefatural Nº 30

1.4.-INSTALACIONES ELECTRICAS

ITEM

Descripción

:K = 0.161*(AAr/AAo) + 0.089*(PALr/PALo) + 0.313*(DOr/D

Indice Símbolo

Pto. Base

2017

Oct-17

NOVIEMBRE DICIEMBRE

1

ARTEFACTO DE ALUMBRADO INTERIOR

12

AA

318.43

317.93

318.27

2

PLANCHA DE ACERO LAC

56

PAL

488.10

493.55

510.72

3

DOLAR (GENERAL PONDERADO)

30

DO

467.61

465.87

466.75

4

MANO DE OBRA INC. LEYES SOCIALES

47

MO

580.90

580.90

580.90

5

MAQUINARIA Y EQUIPO IMPORTADO

49

ME

293.18

292.27

293.24

6

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

39

GGU

442.48

441.61

442.30

(*) Para el I.U. del Presupuesto base de Mano de obra (Código 47), se consideró segun la Resolucion Jefatural Nº 30

INDICE UNIFICADO DE PRECIOS OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA D

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRIVADA

: COMPAÑÍA MINERA ANTAPACCAY SA

CONTRATISTA

: JERGO SAC

RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR

: BISONTE INGENIEROS CONTRATISTAS

JEFE DE SUPERVISION

: ING. JUAN ROGER QUINTANILLA ANYAIPOMA

Fecha de presupuesto Base

: Octubre del 2017

Area Geografica

:6

Componente 02 : ADECUADO EQUIPAMIENTO Y MAQUINARIA PARA EL BENEFICIO DEL CAMAL F. POLINOMICA 2:

ITEM

:K = 0.756*(DOr/DOo) + 0.077*(MOr/MOo) + 0.167*(GGUr/GGUo)

Descripción

Indice Símbolo

Pto. Base

2017

Oct-17

NOVIEMBRE DICIEMBRE

1

DOLAR (GENERAL PONDERADO)

30

DO

467.61

465.87

466.75

2

MANO DE OBRA INC. LEYES SOCIALES

47

MO

580.90

580.90

580.90

3

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

39

GGU

442.48

441.61

442.30

(*) Para el I.U. del Presupuesto base de Mano de obra (Código 47), se consideró segun la Resolucion Jefatural Nº 30 Componente 03 : ADECUADA CAPACITACION EN EL MANEJO DEL EQUIPO E INFRAESTRUCTURA F. POLINOMICA 3:

ITEM

:K = 0.756*(DOr/DOo) + 0.077*(MOr/MOo) + 0.167*(GGUr/GGUo)

Descripción

Indice Símbolo

Pto. Base

2017

Oct-17

NOVIEMBRE DICIEMBRE

1

DOLAR (GENERAL PONDERADO)

30

DO

467.61

465.87

466.75

2

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

39

GGU

442.48

441.61

442.30

(*) Para el I.U. del Presupuesto base de Mano de obra (Código 47), se consideró segun la Resolucion Jefatural Nº 30

E UNIFICADO DE PRECIOS

CIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

0.070*(CPr/CPo) + 0.251*(DOr/DOo) + 0.278*(MOr/MOo) + 0.089*(MEr/MEo) + 0.167*(GGUr/GGUo) 2018 ENERO

FEBRERO

MARZO

ABRIL

MAYO

JUNIO

475.87

502.32

506.47

501.98

513.58

508.81

629.95

632.74

634.49

628.08

617.54

618.89

410.96

410.96

410.96

410.96

410.96

410.96

462.02

469.31

471.87

469.88

478.04

479.58

582.52

582.52

582.52

582.52

582.52

582.52

290.65

294.48

295.18

294.12

298.68

298.83

442.87

443.97

446.14

445.52

445.61

447.10

nsideró segun la Resolucion Jefatural Nº 305-2017-ENEI

.191*(DOr/DOo) + 0.218*(MOr/MOo) + 0.168*(PALr/PALo) + 0.116*(TAr/TAo) + 0.167*(GGUr/GGUo)

2018 ENERO

FEBRERO

MARZO

ABRIL

MAYO

JUNIO

878.12

873.71

866.46

868.72

865.43

864.03

244.83

243.92

243.60

243.19

242.45

244.80

462.02

469.31

471.87

469.88

478.04

479.58

582.52

582.52

582.52

582.52

582.52

582.52

397.60

401.68

399.44

381.93

389.94

389.58

245.62

246.90

243.56

247.66

250.41

250.53

442.87

443.97

446.14

445.52

445.61

447.10

nsideró segun la Resolucion Jefatural Nº 305-2017-ENEI

E UNIFICADO DE PRECIOS

CIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

o) + 0.218*(MOr/MOo) + 0.070*(ACr/ACo) + 0.072*(TPr/TPo) + 0.167*(GGUr/GGUo)

2018 ENERO

FEBRERO

MARZO

ABRIL

MAYO

JUNIO

462.02

469.31

471.87

469.88

478.04

479.58

582.52

582.52

582.52

582.52

582.52

582.52

302.47

305.19

305.35

304.25

309.75

309.58

424.54

424.19

427.74

429.31

431.66

434.23

442.87

443.97

446.14

445.52

445.61

447.10

nsideró segun la Resolucion Jefatural Nº 305-2017-ENEI

o) + 0.089*(PALr/PALo) + 0.313*(DOr/DOo) + 0.143*(MOr/MOo) + 0.127*(MEr/MEo) + 0.167*(GGUr/GGUo)

2018 ENERO

FEBRERO

MARZO

ABRIL

MAYO

JUNIO

316.53

318.38

318.55

317.37

319.78

319.59

513.52

518.79

519.26

523.71

539.72

539.22

462.02

469.31

471.87

469.88

478.04

479.58

582.52

582.52

582.52

582.52

582.52

582.52

290.65

294.48

295.18

294.12

298.68

298.83

442.87

443.97

446.14

445.52

445.61

447.10

nsideró segun la Resolucion Jefatural Nº 305-2017-ENEI

E UNIFICADO DE PRECIOS

CIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

2018 ENERO

FEBRERO

MARZO

ABRIL

MAYO

JUNIO

462.02

469.31

471.87

469.88

478.04

479.58

582.52

582.52

582.52

582.52

582.52

582.52

442.87

443.97

446.14

445.52

445.61

447.10

nsideró segun la Resolucion Jefatural Nº 305-2017-ENEI

2018 ENERO

FEBRERO

MARZO

ABRIL

MAYO

JUNIO

462.02

469.31

471.87

469.88

478.04

479.58

442.87

443.97

446.14

445.52

445.61

447.10

nsideró segun la Resolucion Jefatural Nº 305-2017-ENEI

CURVA "S " - AVANCE DE EJECUCIÓN DE OBRA JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRIVAD : COMPAÑÍA MINERA ANTAPACCAY SA CONTRATISTA

: JERGO SAC

RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR

: BISONTE INGENIEROS CONTRATISTAS

JEFE DE SUPERVIS: ING. JUAN ROGER QUINTANILLA ANYAIPOMA SEGÚN CALENDARIO AVANCE DE OBRA VALORIZADA (SIN IGV) DEL MES AVANCE FÍSICO PROGRAMADO

ACUMULADO DEL MES ACUMULADO DEL MES

AVANCE FÍSICO EJECUTADO (REAL)

(S/.) (S/.) (%) (%) (S/.)

ACUMULADO (S/.) DEL MES ACUMULADO

(%) (%)

INICIO

MES 01

MES 02

MES 03

MES 04

MES 05

MES 06

MES 07

MES 08

INICIO

MAYO-18

JUN-18

JUL-18

AGOS-18

SEP-18

OCT-18

NOV-18

DIC-18

0.00

196,430.30 1,721,703.32 1,700,984.07 2,367,261.79 2,329,172.91 3,185,430.02 4,612,739.14

0.00

196,430.30 1,918,133.63 3,619,117.70 5,986,379.49 8,315,552.40

###

789,729.01

###

TOTAL 16,903,450.56

###

0.00%

1.16%

10.19%

10.06%

14.00%

13.78%

18.84%

27.29%

4.67%

0.00%

1.16%

11.35%

21.41%

35.42%

49.19%

68.04%

95.33%

100.00%

100.00%

0.00

0.00

0.00

0.00

5,968,429.62

0.00

425,744.28 1,501,982.87 1,328,731.78 2,711,970.69

0.00

425,744.28 1,927,727.15 3,256,458.93 5,968,429.62 5,968,429.62 5,968,429.62 5,968,429.62 5,968,429.62

0.00%

2.52%

8.89%

7.86%

16.04%

0.00%

0.00%

0.00%

0.00%

0.00%

2.52%

11.40%

19.27%

35.31%

35.31%

35.31%

35.31%

35.31%

35.31%

% DE AVANCE OBRA

AVANCE EJECUTADO ACUMULADO VS PROGRAMADO ACUMULADO 100.00%

100.00%

95.33%

90.00% 80.00%

% Avance Programado Acumulado

70.00%

% Avance Ejecutado Acumulado

68.04%

60.00% 49.19%

50.00% 40.00%

35.42% 35.31%

30.00% 21.41% 19.27%

20.00% 11.40% 10.00% 0.00% 0.00% 0.00% INICIO

2.52% 1.16%

11.35%

MAYO-18

JUN-18

JUL-18

AGOS-18

SEP-18

OCT-18

NOV-18

DIC-18

CONTROL DE VALORIZACIONES JULIO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRIVADA : COMPAÑÍA MINERA ANTAPACCAY SA CONTRATISTA RESIDENTE SUPERVISOR

: JERGO SAC : ING. CESAR YABAR VELAZCO : BISONTE INGENIEROS CONTRATISTAS

JEFE DE SUPERVISI : ING. JUAN ROGER QUINTANILLA ANYAIPOMA

VALORIZACION

MONTOS VALORIZADOS PROGRAMADOS PARCIAL MONTO

MONTOS VALORIZADOS EJEC

ACUMULADO %

MONTO

PARCIAL



PERIODO

INICIO

INICIO

VAL. N° 01

MAY-18

196,430.30

1.16%

196,430.30

1.16%

425,744.28

2.52%

VAL. N° 02

JUN-18

1,721,703.32

10.19%

1,918,133.63

11.35%

1,501,982.87

8.89%

VAL. N° 03

JUL-18

1,700,984.07

10.06%

3,619,117.70

21.41%

1,328,731.78

7.86%

VAL. N° 04

AGO-18

2,367,261.79

14.00%

5,986,379.49

35.42%

0.00

0.00%

VAL. N° 05

SET-18

2,329,172.91

13.78%

8,315,552.40

49.19%

0.00

0.00%

VAL. N° 06

OCT-18

3,185,430.02

18.84%

11,500,982.42

68.04%

0.00

0.00%

VAL. N° 07

NOV-18

4,612,739.14

27.29%

16,113,721.56

95.33%

0.00

0.00%

VAL. N° 08

DIC-18

789,729.01

4.67%

16,903,450.56 100.00%

0.00

0.00%

MONTO

%

0.00%

TOTAL

###

GRÁFICA: MONTOS DE AVANCES ACUMULADOS EN MILES DE SOLES

%

DIAGRAMA DE COLUMNAS - AVANCE DE OBRA

AVANCE PROGRAMADO ACUMULADO Vs REAL ACUMULADO

25,000,000 24,000,000 23,000,000 22,000,000

16,113,721.56

21,000,000

19,000,000 18,000,000

Programado Acumulado en (S/.)

17,000,000

Ejecutado Acumulado en (S/.)

16,000,000 15,000,000 14,000,000

12,000,000

10,000,000

9

11,000,000

5,552.40

13,000,000

11,500,982.42

20,000,000

16,1

16,000,000 15,000,000 14,000,000

12,000,000

10,000,000 9,000,000

3,000,000 2,000,000 1,000,000

3,256,458.93

4,000,000

425,744.28

5,000,000

1,927,727.15

6,000,000

1,918,133.63

7,000,000

3,619,117.70

8,000,000

5,986,379.49

11,000,000

8,315,552.40

13,000,000

11,500,982.42

Ejecutado Acumulado en (S/.)

196,430.30

M

(S/.) 17,000,000

0 INICIO

MAY-18

JUN-18

JUL-18

AGO-18

SET-18

OCT-18

VA LORIZACIONE S ( M E S E S )

NOV-1

NTROL DE VALORIZACIONES JULIO 2018 CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

MONTOS VALORIZADOS EJECUTADO ACUMULADO MONTO

ESTADO DE OBRA

%

425,744.28

2.52%

Adelantado en 1.36%

1,927,727.15

11.40%

Adelantado en 0.06%

3,256,458.93

19.27%

Atrasado en -2.15%

3,256,458.93

19.27%

Por ejecutar 16.15%

3,256,458.93

19.27%

Por ejecutar 29.93%

3,256,458.93

19.27%

Por ejecutar 48.77%

3,256,458.93

19.27%

Por ejecutar 76.06%

3,256,458.93

19.27%

Por ejecutar 80.73%

###

IAGRAMA DE COLUMNAS - AVANCE DE OBRA

11,500,982.42

5,552.40

9

/.)

16,903,450.56

16,113,721.56

CE PROGRAMADO ACUMULADO Vs REAL ACUMULADO

AGO-18

11,500,982.42

8,315,552.40 SET-18

1

16,1

JUL-18

5,986,379.49

3,619,117.70

3,256,458.93

/.)

OCT-18

V A LORIZACIONE S ( M E S E S )

NOV-18

DIC-18

CURVA "S " - AVANCE DE EJECUCIÓN DE OBRA MARZO 2018 OBRA

: “CREACION E IMPLEMENTACION DEL CAMAL MUNICIPAL DEL DISTRITO ESPINAR, PROVINCIA DE ESPINAR - CUSCO"

ENTIDAD

: MUNICIPALIDAD PROVINCIAL DE ESPINAR

EMPRESA PRIVAD : COMPAÑÍA MINERA ANTAPACCAY SA CONTRATISTA

: JERGO SAC

RESIDENTE

: ING. CESAR YABAR VELAZCO

SUPERVISOR

: BISONTE INGENIEROS CONTRATISTAS

JEFE DE SUPERVIS: ING. JUAN ROGER QUINTANILLA ANYAIPOMA SEGÚN CALENDARIO AVANCE DE OBRA VALORIZADA (SIN IGV) DEL MES AVANCE FÍSICO PROGRAMADO

ACUMULADO DEL MES ACUMULADO DEL MES

AVANCE FÍSICO EJECUTADO (REAL)

(S/.) (S/.) (%) (%) (S/.)

ACUMULADO (S/.) DEL MES ACUMULADO

(%) (%)

INICIO

MES 01

MES 02

MES 03

MES 04

MES 05

MES 06

MES 07

MES 08

INICIO

MAYO-18

JUN-18

JUL-18

AGOS-18

SEP-18

OCT-18

NOV-18

DIC-18

0.00

231,640.66 2,030,320.59 2,005,887.38 2,791,596.14 2,746,679.78 3,756,421.94 5,439,577.83

0.00

231,640.66 2,261,961.24 4,267,848.63 7,059,444.76 9,806,124.54

###

931,288.82

###

###

0.00%

1.16%

10.19%

10.06%

14.00%

13.78%

18.84%

27.29%

4.67%

0.00%

1.16%

11.35%

21.41%

35.42%

49.19%

68.04%

95.33%

100.00%

0.00

502,270.30

3,032,613.06

0.00

0.00

0.00

0.00

0.00

0.00

0.00

502,270.30 3,534,883.36 3,534,883.36 3,534,883.36 3,534,883.36 3,534,883.36 3,534,883.36 3,534,883.36

0.00%

2.52%

15.21%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

2.52%

17.73%

17.73%

17.73%

17.73%

17.73%

17.73%

17.73%

% DE AVANCE OBRA

AVANCE EJECUTADO ACUMULADO VS PROGRAMADO ACUMULADO 100.00%

100.00%

95.33%

90.00% 80.00%

% Avance Programado Acumulado

70.00%

% Avance Ejecutado Acumulado

68.04%

% DE AVANCE

90.00% 80.00%

% Avance Programado Acumulado

70.00%

% Avance Ejecutado Acumulado

68.04%

60.00% 49.19%

50.00% 40.00%

35.42%

30.00% 21.41%

17.73%

20.00%

11.35% 10.00% 0.00% 0.00% 0.00% INICIO

2.52% 1.16% MAYO-18

JUN-18

JUL-18

AGOS-18

SEP-18

OCT-18

NOV-18

DIC-18

VANCE DE EJECUCIÓN DE OBRA MARZO 2018

TOTAL 19,933,413.12

100.00% 3,534,883.36

17.73%

JECUTADO ACUMULADO VS PROGRAMADO ACUMULADO 100.00% 95.33%

Avance Programado cumulado

Avance Ejecutado cumulado

68.04%

Avance Programado cumulado 68.04%

Avance Ejecutado cumulado

49.19%

35.42%

21.41%

JUL-18

AGOS-18

SEP-18

OCT-18

NOV-18

DIC-18

Municipalidad Provincial de Espinar Gerencia de Infraestructura Publica y Desarrollo Territorial

FORMATO - 05

FICHA TECNICA DE OBRA Obra:

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA I. E. TENIENTE CORONEL PEDRO RUIZ GALLO DEL DISTRITO Y PROVINCIA DE ESPINAR, CUSCO

A.1 RESIDENTE

ING. AARON WILBER LINO LIPA

Ultimo Asiento del Cuaderno (a

la fecha informada): Nro.

A.2 SUPERVISOR

Antes:

181

ING. PABLO RODOLFO OLAGUIVEL RODRIGUEZ 12

Nro. Asientos de Supervisión en el mes informado:

A.3 DATOS DEL PROYECTO Código SNIP Unidad Ejecutora Meta del año en curso Meta Física (resumen)

: 200025 MUNICIPALIDAD PROVINCIAL DE ESPINAR 15.73% 26.13%

:

Después: EN EL PRESENTE MES DE MARZO SE TRABAJO EN EL VACIADO DE ELEMENTOS DE CONRETO ARMADO, COMO SON COLUMNAS, VIGAS Y LOSAS ALIGERADAS, EN SU MAYORIA EN SEGUNDO NIVEL. TAMBIEN SE REALIZARON TRABAJOS DE ARQUITECTURA COMO SON TARRAJEOS INTERIORES, COBERTURA CON TEJA ANDINA Y ACTIVIDADES COMO RELLENO Y COMPACTADO EN BLOQUES TODOS LOS BLOQUES. ASIMISMO SE CONTINUARON CON LOS VACIADOS DE MUROS DE CONTENCION Y MUROS EN CERCO PERIMETRICO.

Fuente de Financiamiento :

Estado Actual de la Obra: (*)

Inversion Privada

Modalidad de Ejecución de Obra :

EN EJECUCION

Obras por Impuesto

(*) Compatibilidad, En Ejecución, Paralizada, Concluída, Pre-Liquidación.

Ubicación: Localidad/Sector/Com./Urb./Av.: AV. CAYLLOMA S/N ESPINAR

Distrito :

ESPINAR

Provincia :

ESPINAR

Presupuesto : Ppto. Aprobado del Perfil Técnico SNIP :

S/.

4,540,897.00

Presupuesto Obra C/IGV :

Ppto. Aprobado del Expediente Técnico :

S/.

26,847,801.12

Presupuesto Obra S/IGV : S/.

Ampliación Presupuestal Nº 01:

S/.

0.00

Deductivo Nº 01 :

S/.

0.00

Variación Perfil / Presupuesto Modificado:

Costo Directo

S/.

25,256,351.40 21,403,687.63

S/.

17,905,979.77

16.91%

A.4 DOCUMENTACION ADMINISTRATIVA: DESCRIPCION

DOCUMENTO

NUMERO

De FECHA

Resolución

RESOLUCION DE ALCALDIA N° 342-2017-MPE-C

8/17/2017

Acta de entrega de terreno

Acta

S/N

8/15/2017

Acta de Inicio de Obra

Acta

S/N

8/18/2017

Designación de Residente

CONVENIO DE INVERSION

S/N

5/3/2017

Designación de Supervisor

CONVENIO DE INVERSION

S/N

5/12/2017

Cambio de Residente

Carta

N° 160-2017-CJVA-GM/OSLP-MPE-C

8/17/2017

Cambio de Supervisor

Carta

N° 233-2017-CJVA-GM/OSLP-MPE-C

11/10/2017

AVANCE FINANCIERO ACUMULADO

SALDO Financiero

Aprobación Expediente Convenio entre la Municipalidad y Gob. Reg.

Aprobación Adicionales Paralización de Obra Reinicio de Obra Conclusión de Obra Tiempo de Ampliacion 01 Tiempo de Ampliacion 02

A.5 AVANCE DE OBRA MENSUAL VALORIZADO: Nro.

AVANCE FISICO EJECUTADO

Meses

Presupuesto

Porcentaje c/r al C.D

Presupuesto

Porcentaje

01

AGOSTO

502,059.43

1.99%

369,539.61

1.38%

26,478,261.51

02

SEPTIEMBRE

1,799,024.37

7.12%

877,914.09

3.27%

25,600,347.42

03

OCTUBRE

3,055,802.41

12.10%

2,170,373.00

8.08%

23,429,974.42

04

NOVIEMBRE

0.00

0.00%

730,483.89

2.72%

22,699,490.53

05

DICIEMBRE

0.00

0.00%

1,258,695.95

4.69%

21,440,794.58

06

ENERO

0.00

0.00%

1,462,294.98

5.45%

19,978,499.60

07

FEBRERO

1,242,232.89

4.92%

1,242,232.89

4.63%

18,736,266.71

08

MARZO

0.00

0.00%

0.00

0.00%

18,736,266.71

09

ABRIL

10

MAYO

11

JUNIO

12

JULIO

13

AGOSTO

14

SEPTIEMBRE

15

OCTUBRE

16

NOVIEMBRE

TOTAL

6,599,119.10

26.13%

2,170,373.00

30.21%

Porcentaje de Avance Acumulado c/r al Ppto. Aprobado del Expediente Técnico:

26.13%

% Av. Físico Programado Acum. C.A.O. Informado:

15.73%

18,736,266.71 Proy. - OBRA

Región :

CUSCO

A.6 MODIFICACIONES AL EXPEDIENTE TECNICO: (Aprobado(s) mediante Resolución(es)). Aporte Gob. Regional

Aportes s/ Convenio

0.00

0.00

Mayores Metrados

Adicionales

Deductivos

0.00

0.00

TOTAL MODIF. 0.00

PARALIZADO

AMPLIACIÓN

TOTAL MODIF.

0.00%

0.00%

43.11%

0.00

A.7 AVANCE DEL PLAZO DE EJECUCION: Días

Fecha Inicio

450

8/18/2017

Fecha Conclusión

EJECUTADO

S/EXP. 10/11/2017

194

REAL: 10/11/2018

43.11%

194

A.8 LIMITACIONES, RECOMENDACIONES y/o COMENTARIOS: Limitaciones: Al reporte del presente mes, no se tienen limitaciones en la obra.

Recomendaciones:

Recomendaciones y/o Comentario:

El Contratista viene cumpliendo con lo programado

Municipalidad Provincial de Espinar Gerencia de Infraestructura Publica y Desarrollo Territorial Sub Gerencia de Ejecución de Proyectos

FORMATO - 10

GRÁFICOS REPRESENTATIVOS DE EJECUCIÓN AVANCE FISICO PROGRAMADO Vs. AVANCE FISICO EJECUTADO (MARZO DEL 2018) PROGRAMADO (INC IGV) ITEM

PERIODO MENSUAL

3 4 5 6 7 8 9 10 11 12 13 14 15 16

AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE

PORCENTAJE ACUMULADO

MENSUAL

(S/.)

ACUMULADO

MENSUAL

PORCENTAJE ACUMULADO

MENSUAL

217,715.22

0.86%

0.86%

502,059.43

502,059.43

1.99%

462,597.67

680,312.88

1.83%

2.69%

1,799,024.37

2,301,083.80

7.12%

9.11%

260,546.37

940,859.25

1.03%

3.73%

3,055,802.41

5,356,886.21

12.10%

21.21%

188,864.02

1,129,723.27

0.75%

4.47%

0.00

5,356,886.21

0.00%

21.21%

362,060.76

1,491,784.03

1.43%

5.91%

0.00

5,356,886.21

0.00%

21.21%

810,569.84

2,302,353.86

3.21%

9.12%

0.00

5,356,886.21

0.00%

21.21%

684,375.01

2,986,728.87

2.71%

11.83%

1,242,232.89

6,599,119.10

4.92%

26.13%

986,904.38

3,973,633.24

3.91%

15.73%

0.00

6,599,119.10

0.00%

26.13%

1,763,523.53

5,737,156.78

6.98%

22.72%

2,043,398.70

7,780,555.47

8.09%

30.81%

2,085,507.24

9,866,062.72

8.26%

39.06%

3,470,700.39

13,336,763.11

13.74%

52.81%

3,381,217.87

16,717,980.98

13.39%

66.19%

3,716,444.66

20,434,425.63

14.71%

80.91%

4,098,416.52

24,532,842.16

16.23%

97.14%

723,509.25

25,256,351.40

2.86%

100.00%

AVANCE FISICO PROGRAMADO VS AVANCE FISICO EJECUTADO 100.00% 80.00% 60.00% 40.00% 20.00% 0.00% TO OS AG

ACUMULADO

217,715.22

120.00%

Axis Title

1 2

EJECUTADO (INC IGV)

(S/.)

E E E E BR BR BR BR M TU EM EM C IT E I I V C O P DI NO SE

O ER EN

O ER BR E F

ZO AR M

L RI AB

O AY M

O NI JU

LI O JU

TO OS AG

E E E BR BR BR TU EM EM C I I V O PT NO SE

1.99%

AVANCE FINANCIERO PROGRAMADO Vs. AVANCE FINANCIERO EJECUTADO (MARZO DEL 2018) PROGRAMADO (INC IGV) ITEM

PERIODO MENSUAL

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

EJECUTADO (INC IGV)

(S/.)

AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE

PORCENTAJE ACUMULADO

(S/.)

MENSUAL

ACUMULADO

MENSUAL

PORCENTAJE ACUMULADO

MENSUAL

ACUMULADO 1.99%

217,715.22

217,715.22

0.86%

0.86%

502,059.43

502,059.43

1.99%

462,597.67

680,312.88

1.83%

2.69%

1,799,024.37

1,799,024.37

7.12%

9.11%

260,546.37

940,859.25

1.03%

3.73%

3,055,802.41

3,055,802.41

12.10%

21.21%

188,864.02

1,129,723.27

0.75%

4.47%

0.00

0.00

0.00%

21.21%

362,060.76

1,491,784.03

1.43%

5.91%

0.00

0.00

0.00%

21.21%

810,569.84

2,302,353.86

3.21%

9.12%

0.00

0.00

0.00%

21.21%

684,375.01

2,986,728.87

2.71%

11.83%

1,242,232.89

1,242,232.89

4.92%

26.13%

986,904.38

3,973,633.24

3.91%

15.73%

0.00

0.00

0.00%

26.13%

1,763,523.53

5,737,156.78

6.98%

22.72%

2,043,398.70

7,780,555.47

8.09%

30.81%

2,085,507.24

9,866,062.72

8.26%

39.06%

3,470,700.39

13,336,763.11

13.74%

52.81%

3,381,217.87

16,717,980.98

13.39%

66.19%

3,716,444.66

20,434,425.63

14.71%

80.91%

4,098,416.52

24,532,842.16

16.23%

97.14%

723,509.25

25,256,351.40

2.86%

100.00%

120.00%

100.00%

% AVANCE

80.00%

60.00%

40.00%

20.00%

0.00% TO OS AG

E E E RE BR BR BR UB M M M CT IE IE IE T V C O P DI NO SE

O ER EN

O ER BR FE

ZO AR M

L RI AB

O AY M

O NI JU

LI O JU

Nota: El presente formato tiene carácter de Declaración Jurada (Ley 27444 - Ley del Procedimiento Administrativo).

TO OS AG

E E RE BR BR UB M M CT IE IE T V O P NO SE

FICHA DE OBRA ANTECEDENTES:

NOMBRE DE LA OBRA MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA I. E. TENIENTE CORONEL CODIGO SNIP

200025

FECHA DE VERIFICACION MONTO DE VERIFICACION

CODIGO SIAF TIPO DE EJECUCIONOBRA POR IMPUESTOS CODIGO DE NACIONES UNIDAS CATALOGO DE OBRAS 22 EDUCACION GENERICA 1

¿LA OBRA TIENE FINANCIAMIENTO (TRANSFERENCIA) DE OTRA ENTIDAD? ENTIDAD TELEFONICA DEL PERU TIPO DE MONEDA SOLES MONTO TRANSFERIDO EXPEDIENTE TECNICO DE LA OBRA NOMBRE DE LA OBRA

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA I. E. TENIENTE CORONEL PEDRO RUIZ GALLO D DOCUMENTO DE APROBACION DE EXPEDIENTE

RESOLUCION DE ALCALDIA N° 342-2017-MPE-C ARCHIVO DE APROBACION DE EXPEDIENTE

AVANCE: BLOQUE I - FOTOS DE OBRA CARPETA FOTOS

FOTO INICIO ADJUNTA

FOTO ACTUAL

BLOQUE II - DATOS DE OBRA DIRECCION DEPARTAMENTO PROVINCIA DISTRITO

AV. CAYLLOMA S/N - ESPINAR CUSCO ESPINAR ESPINAR

PUNTO DE INICIO LATITUD

NOMBRE RESIDENTE FECHA DE INICIO

ING. AARON WILBER LINO LIPA 8/17/2017 42047706 DD/MM/AA

NOMBRE SUPERVISOR FECHA DE INICIO

LONGITUD

DNI

ING. JUAN ROGER QUINTANILLA A. 8/15/2017

23879245

DD/MM/AA

DNI

NOMBRE SUPERVISOR ING. PABLO RODOLFO OLAGUIVEL RODRIGUEZ FECHA DE INICIO

11/10/2017

01288640

DD/MM/AA

DNI

BLOQUE III - AVANCES DE OBRA ZONA I - INFORMACION DE AVANCE DE EJECUCION MES MARZO PROGRAMADO

AVANCE FISICO OBRA ACUMULADO - CON IGV (%)

15.73% PROGRAMADO

AVANCE VALORIZADO OBRA ACUMULADO CON IGV (S/.)

S/. 3,973,633.24

ZONA II - COMENTARIOS Y RECOMENDACIONES COMENTARIOS: PROBLEMAS PRESENTADOS DURANTE EL PERIODO

Al reporte del presente mes, no se tienen limitaciones en la obra.

RECOMENDACIONES:

Se recomienda celeridad en los documentos que se tramiten ante la MP

ADJUNTAR DOCUMENTOS:

ADJUNTAR IMÁGENES: ARCHIVOS EN (*.DOC; *.DOCX; *.XLS; *.XLSX; *.PDF; *.PPT; *.PPT

ARCHIVOS EN (*.JGP; *.BMP; *.GIF; *.PNG)

NOTA: LA INFORMACION REGISTRADA DEBE SER ENTREGADA EN DIGITAL (EXCEL - WORD "para formatos"; FOTOS "*.jpg" - "*.gif") Y

V°B° SUPERVISOR DEL PROYECTO

FICHA DE OBRA

OS EDUCATIVOS EN LA I. E. TENIENTE CORONEL PEDRO RUIZ GALLO DEL DISTRITO Y PROVINCIA DE ESPINAR, CUSCO 9/15/2016 S/. 20,693,423.00

FECHA DE APROBACION MONTO DE APROBACION

6/8/2012 S/. 4,540,897.00

047 EDUCACION BASICA

0105 EDUCACION SECUNDARIA

134

GENERICA 2

ESPECIFICA 1

ESPECIFICA 2

OTRA ENTIDAD?

. E. TENIENTE CORONEL PEDRO RUIZ GALLO DEL DISTRITO Y PROVINCIA DE ESPINAR, CUSCO FECHA DE APROBACION

MONTO DE APROBACION

8/17/2017

S/. 26,847,801.12

CARPETA FOTOS ADJUNTA

CARPETA FOTOS

UBICACIÓN GEOGRAFICA ADJUNTA

PUNTO FINAL LATITUD

CIP FECHA DE FIN

85842 11/10/2018 DD/MM/AA

CIP

35698

FECHA DE FIN

11/9/2017 DD/MM/AA

CIP

68707

FECHA DE FIN

11/10/2018 DD/MM/AA

E DE EJECUCION AÑO

2018

REAL

26.13% REAL

S/. 6,599,119.10

presente mes, no se tienen limitaciones en la obra.

da celeridad en los documentos que se tramiten ante la MPE

EN (*.DOC; *.DOCX; *.XLS; *.XLSX; *.PDF; *.PPT; *.PPTX)

EN (*.JGP; *.BMP; *.GIF; *.PNG)

AL (EXCEL - WORD "para formatos"; FOTOS "*.jpg" - "*.gif") Y FISICO (INFORME N° __)

RESIDENTE DE OBRA

FORMATO - 03

TO Y PROVINCIA DE ESPINAR, CUSCO

LONGITUD

Related Documents

Proyeccion Agosto Ot1.xlsx
December 2019 12
Proyeccion
June 2020 8
Proyeccion Poblacional.docx
December 2019 17
Sistemas Proyeccion
June 2020 5
Agosto
November 2019 60