Project Coordinator - Amr Kamal El Din Hussein

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Project Coordinator - Amr Kamal El Din Hussein as PDF for free.

More details

  • Words: 1,192
  • Pages: 5
CURRICULUM VITAE Amr Kamal ElDin Hussein Projects Coordinator Personal Details: B.Sc. of Civil Engineering, Cairo University, Egypt, November 1994

Educational Qualifications

:

Nationality

: Egyptian

Date of Birth

: 1971

Total Experience

: 15 years of Professional Experience

Experience Summary: Company Position Period Responsibility

: : : :

Al Ghurair Arabian Foundation Engineering LLC Projects Coordinator Manager January 2006 to date Handling the following sequence of work for all projects as follows:

1) Dubai Municipality (DM) – Sewage, irrigation and drainage NOCs, Discussion with structure engineer regarding our designs, Fencing, shoring and piling permits, Dewatering permits, Excavation NOCs, Excavated materials shifting NOCs, Non hazard disposals NOCs, Permission to use any adjacent plot belongs to the authority, Demarcation Certificates, Shoring inspections, Reimbursement of the refundable payments.

2)

Road and Transportations Authority (RTA) – New projects excavation NOCs, NOCs for using anchors in the road side, NOCs from the Metro authority for any project near the metro course, The usage of any part of the road, Permission to use cars parking.

3) Dubai Electricity and water authority (DEWA) – The water and electricity construction NOCs, Shifting of any facilities such as cables, pipelines, etc..

4) TECOM – Fencing and mobilization permits, Demarcation certificates, Shoring and piling permits, Discussion with structure engineer regarding our designs, Coordination with infra structure consultants.

5) Jebel Ali Free Zone Authority (JAFZA) – Gate passes for our employees and subcontractor working in the Free Zone Area, Coordinate with Civil Engineering department to get all required approvals and permissions, Notice of Intent (NOI), Coordinate with accounting department in order to reimburse our refundable payments.

Page 1 of 5

CURRICULUM VITAE Amr Kamal ElDin Hussein Projects Coordinator 6) Environment, Health and Safety (EHS) – Gate passes for heavy vehicles and equipments, certificate of conformity (COC), Safety inspection after handing over the project.

7) Other Activities – Coordinate with the consultants in the post-contract stage, Financial dealings with all authorities, Following up with the authorities regarding all fines, Following up the submittals of permits and approved drawings from the main office to any project, Attend the coordination meetings with the owners and the consultants, Supporting the projects managers to get the permits required through the mobilization and demobilization stages, Following up the filing of all official documents sharing the document controller Company Position Period Duties

: : : :

STROMEK EMIRATES FOUNDATIONS LLC Site Manager November 2003 to December 2005 Responsible for all the foundations operations in different types of Projects. Tasks include full supervision and responsibility of site preparation, surveying, drilling, steel cage installation, concrete casting and testing work for the following:

 Board Piles – Diameters varying from 0.6m to 1.20m depths from 12m to 37m using bentonite, water, full casing (including projects containing secant and contiguous piles 

CFA Piles – diameters varying from 05m to 0.8m & depths from 12m to 22m

 15m to 38m

Diaphragm Walls – Widths are varying from 0.6m to 0.8m & depths from



Shoring Works – installation of I Beams & C Beams with different sizes.

 Responsible also for all testing works such as: Static Load, Dynamic Load, Integrity & Sonic Logging Tests. Projects

:

:

:

Company

:

The Palm Island, Jumeirah Dubai (October 2004 to December 2004) – Offshore Residential Buildings where 1073 bored piles were executed. More than 6 High Rise Residential & Commercial Buildings in Dubai, Sharjah, Ajman, amongst is the highest towers in Sharjah and Residential and commercial building for Dubai Ruler Office. Executed around 3000 bored piles, 600 CFA piles, 2 projects for shoring work with different consultant offices (Turner, Ace, Adnan Safarini, Al Hashemi…)

RAYMONDFOUNDATIONS (EGYPT) Page 2 of 5

CURRICULUM VITAE Amr Kamal ElDin Hussein Projects Coordinator



(November 1994 to November 2003) : Site Manager : March 2003 to November 2003 : Port – Saed Liquefied Natural Gas (LNG Project) 600 Bored Piles (1.20m dia & 52.0m depth) Consultant : ENPPI

Project Period Position

: : :

Cairo North Power Station June 2003 to March 2003 Quality Control Engineer 400 Driven Piles (0.50m dia & 20.0m depth) Consultant : Egyptian Electric Ministry

Project Period

: :

Dumiatt Liquefied Natural Gas (LNG Project) October 2002 to January 2003

Project Period Position



: Dumiatt Liquefied Natural Gas (LNG Project) : February 2002 to October 2002 : Quality Control Engineer Location: Dumiatt Port Contractor : KJT-ORASCOM-MRF consortium Scope of work: Construction of 1500 bored piles (dia: 0.80m & length: 42.00m)

Project Period

: :

International Coastal Road Bridges August 2001 to February 2002

Project Period . Project Period Position

: :

International Coastal Bridges (Bridge No.8) May 2001 to August 2001

Project Period

: :

Position Period Project 

 

 

: Port-Saed Power Plant : January 2001 to May 2001 : Quality Control Engineer  Location: Port Saed  Contractor : SAE (France) – Orascom JV  Scope of Work : Construction of 700 bored piles (dia: 0.60m, 0.80m, 1.20m, 2.00m & length: 42.00m till 52.00m)

Suez Power Plant May 2000 to January 2001 Page 3 of 5

CURRICULUM VITAE Amr Kamal ElDin Hussein Projects Coordinator Project Period

: :

Project Period Position

: Giza Side Walk Bridge for the Metro : November 1999 to January 2000 : Site Engineer Location: Giza Contractor: C. Brenar Scope of Work : Construction of CFA piles

  

Project Period Position

International Coastal Road Bridges January 2000 to May 2000



: Nwaeba Port Platform : June 1999 to November 1999 : Site Engineer Location: Nwaeba EL-NIL Company Scope of work : Construction of Driven Piles

Project Period

: :

Project Period Position

: El-Dekhalia Steel Factory : August 1998 to February 1999 : Quality Control Engineer Location: Alexandria Contractor: Kajima Scope of Work: Construction of Secant piles

 

  

Project Period Position

Bacheteel Bridge in the Ring Road February 1999 to June 1999



: Metro Bridge for the Giza Station : June 1998 to August 1998 : Quality Control Engineer Location: Giza-upon pyramids tunnel Contractor: C. Brenar Scope of Work: Construction of Bored Piles

Project Period

: :

Mubark’s Bridge May 1998 to June 1998

Project Period

: :

Reached Bridge March 1998 to May 1998

 

Page 4 of 5

CURRICULUM VITAE Amr Kamal ElDin Hussein Projects Coordinator Project Period Position   

Project Period Position

: EL Dekhalia Bridge : December 1997 to May 1998 : Site Engineer Location: Alexandria – El Dekhalia Steel Factory Contractor: Kajima Scope of Work : Construction of Bored Piles



: Eyoun Mousa Power Plant : January 1997 to December 1997 : Site Engineer Location: Eyoun Mousa Contractor: ABB Scope of Work: Construction of Bored Piles

Project Period

: :

Project Period Position

: Bibliotheca Alexandria : December 1995 to August 1996 : Site Engineer Location: Alexandria Contractor: RTA Scope of Work: Soil Investigation and tests for the grout

 

  

Project Period Position   

Zefta Bridge August 1996 to January 1997

: El Kurimat Power Station : December 1994 to December 1995 : Quality Control Engineer Location: Beni-Suief Contractor : Dalim Scope of Work: Construction of Bored Piles

Page 5 of 5