Nuevo Formato De Entregas P6 V1.xlsx

  • Uploaded by: Danilo Quintero
  • 0
  • 0
  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Nuevo Formato De Entregas P6 V1.xlsx as PDF for free.

More details

  • Words: 5,948
  • Pages: 32
CONSULTORÍA ESPECIALIZADA PARA LA ESTRUCTURACIÓN DE CONCESIONES VIALES POR GRUPOS D CARRETERAS. GRUPO 3 CENTRO ORIENTE, CORREDORES: (3) VILLAVICENCIO – ARAUCA INCLUYE EL SECTOR TRANSVERSAL DEL SISGA – (CHOCONTÁ – AGUACLAR

CORREDOR 3

LISTADO DE PRECIOS UNITARIOS ESPECIFICACIÓN

ITEM DE PAGO

200.1 200.2 201.15 201.7 201.7.1 201.8 210.1 210.2.1 210.2.2 211.1 220.1 220.1.1 220.1.2 221.1 221.2 230.03 231.1

235.01

235.02

235.04

235.05

235.06

235.10 320.1 330.1 330.2 420.1 420.2 421.1 450.1 450.2 450.9 460.1 461.1 464.1 466.2 467.1 500.1 511.1 511.10 511.2 600.1 600.2 600.4 600.5 610.1 610.2 621.1.1

621.1.2 621.1.3 621.1.4 621.1.5 621.1.6 621.7.7 623.01 623.1 630.1 630.2 630.3 630.4 630.4.1 630.4.2 630.5 630.6 640.1 641.1 642.05 642.3 642.4 650.02 650.4 650.5 661.1.1 661.1.2 661.1.3 661.1.4 661.2.1 661.2.2 661.2.3 661.2.4 661.2.5 671.1 671.2 671.3

671.4 671.5 672.1 672.2 672.3 673.1 673.2 674.1 674.1.1 674.2 674.3 674.4 674.5 674.5.1 674.5.2 674.6 674.7 674.8 674.9 675.1 680.01 680.02 680.03 681.1 684.1 685.1 686.1 686.2 686.3 687.1

687.2 687.3 687.4 688.1 688.2

688.3 688.4 688.5 688.6 688.7 688.8 688.9 691.03 691.10 691.11 691.12 692.13 700.1 700.3 701.1 701.1.a 710.1.1 710.1.2 710.1.3 710.1.4 710.1.5 710.1.6 720.1 730.1 731.1 740.07 740.1 810.3 812.01 815.01 817.1 900.1

ULTORÍA ESPECIALIZADA PARA LA ESTRUCTURACIÓN DE CONCESIONES VIALES POR GRUPOS DE CARRETERAS. GRUPO 3 CENTRO ORIENTE, CORREDORES: AVICENCIO – ARAUCA INCLUYE EL SECTOR TRANSVERSAL DEL SISGA – (CHOCONTÁ – AGUACLARA)

CORREDOR 3

Fecha: Director Proyecto: Elaboró: Revisó: Interventor: Tramo: Longitud Total (Km): Nùmero de Meses (promedio):

LISTADO DE PRECIOS UNITARIOS DESCRIPCIÓN

UND

Desmonte y limpieza en Bosque Desmonte y limpieza en zonas no boscosas Remoción de alcantarillas Demolición de estructuras Demolición de estructuras Reforzadas Demolición de pavimentos rígidos Descapote Excavación en roca de la explanación y canales Excavación en material común de la explanación y canales Remocion de Derrumbes Terraplenes Material seleccionado para terraplen Material seleccionado para Perraplen Pedraplen Compacto o Escollera Rajón para mejoramiento de la subrasante

Ha Ha ML M3 M3 M2 M3 M3 M3 M3 M3 M3 M3 M3 M3

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $

1,405,333 702,667 17,222 46,054 52,101 10,374 3,887 34,337 4,306 4,300 5,048 74 7,760 4,602

MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO SUELO EXISTENTE CON CAL E= 0,30 al 6%

M2

$

1,335

GEOTEXTIL PARA SEPARACIÓN DE SUELO DE SUBRASANTE Y CAPAS GRANULARES

M2

$

50

INSTALACIÓN DE MALLA DE TRIPLE TORSIÓN COLGADA, DE ALAMBRE GALVANIZADO DE (8 x 10 - 16) Y Ø 2,7 mm, FIJADA EN CORONACIÓN A UN CABLE DE ACERO DE DIÁMETRO 12 mm ANCLADO CON PIQUETES DE ACERO CORRUGADO DIÁMETRO ≥ 16 mm, OPCIONALMENTE ELEVADA DEL SUELO M2 EN CORONACIÓN 1,00 m A MODO DE VALLA, TERMINADA EN LA BASE CON UNA BARRA O CABLE DE ACERO SIN ANCLAR. INCLUIDOS TODOS LOS ELEMENTOS AUXILIARES PARA EL MONTAJE

$

3,315

INSTALACIÓN DE UNA RED DE ANILLOS DE ACERO GALVANIZADO TIPO 6:1, DE 350 mm DE DIÁMETRO FORMADOS POR 7 ALAMBRES DE 2 mm, CON DIMENSIONES DE PANELES VARIABLES, ANCLADA CON BULONES DE ANCLAJE TIPO GEWI DE Ø 25 mm, Y DE 2 A 3 m DE LONGITUD, CABLE DE UNIÓN ENTRE PANELES DE 12 mm.

$

19,976

M2

EQUIPOS

INSTALACIÓN DE PERNO ACTIVO TIPO DYWIDAG , DE Ø 26,5 mm Y 12 m DE LONGITUD, INCLUSO PERFORACIÓN, PLACA DE REPARTO, TUERCA DE PROTECCIÓN ANTICORROSIÓN, COLOCACIÓN E INYECCIÓN DE LECHADA DE CEMENTO

ML

$

108,996

PANTALLA DINÁMICA CON CAPACIDAD DE ABSORCIÓN DE HASTA 400 KJ, EN PAÑOS DE 10 m DE LONGITUD Y 3 m DE ALTURA . INCLUSO PARTE ML PROPORCIONAL DE DISIPADORES, CABLES, ANCLAJES, CIMENTACIONES Y PAÑOS DE RED

$

226,206

INSTALACIÓN DE PERNO PASIVO GEWI, DE Ø 32 mm Y LONGITUD VARIABLE, INCLUSO PERFORACIÓN, PLACA DE REPARTO, TUERCA DE PROTECCIÓN ML ANTICORROSIÓN, COLOCACIÓN E INYECCIÓN DE LECHADA DE CEMENTO

$

123,436

ZANJA DRENANTE DE 1 METRO DE ESPESOR Y 20 A 30 METROS DE PROFUNDIDAD

M2

$

68,700

Sub-Base Granular Base granular Base granular para bacheo Riego de imprimación con Emulsion Asfaltica. Riego de imprimación con asfalto líquido. Riego de liga con emulsión asfáltica CRR-1 Mezcla densa en caliente tipo MDC-1 - Base asfaltica Mezcla densa en caliente tipo MDC-2 - Rodadura asfáltica Mezcla densa en caliente tipo MDC-1 - Para Bacheo FRESADO DE PAVIMENTO ASFÁLTICO EN ESPESOR DE 10 cm.

M3 M3 M3 M2 M2 M2 M3 M3 M3 M2

$ $ $ $ $ $ $ $ $ $

7,243 6,721 24,036 251 251 253 22,852 22,710 70,308 1,568

PAVIMENTO ASFÁLTICO RECICLADO EN FRÍO EN EL LUGAR CON EMULSIÓN ASFÁLTICA

M3

$

31,405

GEOMALLA PARA REHABILITACION DE PAVIMENTOS ASFÁLTICOS, (GEOMALLA EN FIBRA DE VIDRIO)

M2

$

82

Sello de grietas en pavimento asfáltico con ruteo CONSTRUCCION DE CICLORUTA PAVIMENTO DE CONCRETO HIDRÁULICO MR-45

ML M3 M3

$ $ $

333 4,265 38,576

ACCESO VEHICULAR A VIAS a=5 Mt L= 4.5 Mt y e= 0,1 Mt CONCRETO HIDRÁULICO MR-45

UN

$

223,904

Contenedor de Raíces (Materas) Tipo B1 de 1,20 x 1,20 m, Incluso Marco o Borde

ML

$

370

ACCESO VEHICULAR A PREDIO PAVIMENTADO A=5 Mt L= 4.5 Mt y e= 0,1 Mt UN CONCRETO HIDRÁULICO MR-45

$

223,904

Excavaciones varias sin clasificar Excavaciones varias en roca en seco Excavaciones varias en material comun en seco Excavaciones varias en material común bajo agua Rellenos para estructuras Relleno de estructuras sin suministro de material

M3 M3 M3 M3 M3 M3

$ $ $ $ $ $

22,885 60,736 17,222 13,644 5,278 13,283

Pilote de concreto fundido in situ, de diámetro f 1.30 metros (No incluye Acero de Refuerzo)

ML

$

520,831

Pilote de concreto fundido in situ, de diámetro f 1.50 metros (No incluye Acero de Refuerzo)

ML

$

596,606

Pilote de concreto fundido in situ, de diámetro f 1.80 metros (No incluye Acero de Refuerzo)

ML

$

604,007

Pilote de concreto fundido in situ, de diámetro f 2.00 metros (No incluye Acero de Refuerzo)

ML

$

786,617

Pilote de concreto fundido in situ, de diámetro f 0,80 metros (No incluye Acero de Refuerzo)

ML

$

493,098

Pilote de concreto fundido in situ, de diámetro f 1,00 metros (No incluye Acero de Refuerzo)

ML

$

514,663

Pilote de concreto fundido in situ, de diámetro ø 0.4 metros (No incluye Acero de Refuerzo)

ML

$

399,942

ANCLAJE DE CUATRO TORONES ( L=20 m ) Pernos de anclaje Ø 1" para taludes de vía Concreto Clase A - fc = 35.0 Mpa Concreto Clase B - fc = 28.0 Mpa Concreto Clase C - fc = 28.0 Mpa Concreto Clase D - fc = 21.0 Mpa - box vehiculares

ML ML M3 M3 M3 M3

$ $ $ $ $ $

196,802 87,162 207,067 116,248 66,011 55,038

Concreto clase D - Concreto lanzado f'c = 21 Mpa para estabilización de taludes E=0,5 m

M2

$

19,789

Anden en Concreto Concreto Clase D - fc 21 Mpa E= 0,10 Mt Concreto Clase E - fc = 17.5 Mpa Concreto Clase F - fc = 14.0 Mpa Acero de Refuerzo fy 420 MPa Acero de preesfuerzo - fy=1.890 Mpa (Incluye fijaciones) Juntas metálicas Apoyo Elastomerico 400*500*54 mm 4 laminas refuerzo de 4 mm

M2 M3 M3 Kg Tn - M ml UN

$ $ $ $ $ $ $

4,403 16,385 15,205 39 657 15,035 46,620

APOYO ELÁSTOMERICO 500x600x99mm, INCLUSO 7 LÁMINAS DE REFUERZO UN DE 4 mm

$

46,620

Fabricacion de Estructura Metalica Acero estructural ASTM A-588 Acero estructural ASTM A-36 Tubería de concreto reforzado de 900 mm diámetro interior Tubería de concreto reforzado de 1200 mm diámetro interior Tubería de concreto reforzado de 1800 mm diámetro interior Tubería de concreto reforzado de 1500 mm diámetro interior Mortero de sellado de juntas (tipo grouting) Impermeabilización bituminosa / imprimacion asfaltica Lámina drenante

UN Kg Kg ML ML ML ML M3 M2 M2

$ $ $ $ $ $ $ $ $ $

1,757 1,858 1,858 59,850 42,486 59,665 42,486 592 62 462

Tubo dren ranurado de PVC Ø 100 mm, incluso geotextil y material granular ML

$

194

Enrocado con piedra D50 = 0.35m Cunetas revestidas en concreto Caz colector en concreto Cunetas revestidas en Concreto Clase E (17,5 Mpa )

$ $ $ $

971 46,553 36,691 6,376

M3 M3 M3 ML

Zanja en concreto h = 0,5 Mt con Talud 1:2 Concreto Clase E (17,5 Mpa )

ML

$

6,986

Zanja triangular de 1,50 m de ancho y 0,38 m de calado, ejecutada en concreto Clase F in situ en el pie del talud, para la captación de la escorrentía ML superficial del terreno natural hacia el relleno

$

8,002

Bordillo 800x100x350 mm Bajante talud con piezas prefabricadas de 43 x 50 cm Estructura de caída escalonada Material granular filtrante Geotextil no tejido 1600 Tubería perforada de 100 mm para filtro Drenes horizontales con tubería perforada PVC de 2 ½" Tubería de 200 mm para drenaje en espinas de pescado Tubería Novafort 400 mm Tubería Novafort 250 mm TUBERIA PVC U.M. NORMA NTC 382 D=4`` RDE 21 TUBERIA PVC U.M. NORMA NTC 382 D=6`` RDE 21 TUBERIA PVC U.M. NORMA NTC 382 D=10`` RDE 21 Union por Termofusion Tuberias de 4" suministro e instalaciónde tubería de 4"GAS NATURAL POLIETILENO suministro e instalaciónde tubería de 6"GAS NATURAL METALICA

ML ML ML M3 M2 ML ML ML ML ML ML ML ML ML ML ML

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

296 6,376 8,002 5,485 28 194 94,257 200 1,388 111 1,562 2,603 370 2,877 4,112

suministro e instalaciónde tubería de 4"GAS NATURAL METALICA PRES MAX 60 PSI

ML

$

4,112

ESTRUCTURAS DE PASO SOBRE ALCANTARILLAS L = 10 M ESCAMAS EN CONCRETO DE TIERRA ARMADA ARMADURA GALVANIZADA PARA TIERRA ARMADA RELLENO GRANULAR PARA TIERRA ARMADA Gavion Acometida Acueducto Nivelacion de Pozos de Alcantarilla Traslado de postes de Telefono Traslado de redes telefonicas nivelación cámara de inspección telefónica

UN M² KG M³ M3 UN UN UN ML UN

$ $ $ $ $ $ $ $ $ $

347,895 4,851 88 7,663 5,147 26,781 43,862 218,310 129 51,515

Suministro e instalación de torre eléctrica de alta tensión incluye apoyos metálicos galvanizados, excavación en cualquier tipo de terreno, cimentación, acero de refuerzo, aislamiento, puesta a tierra armado e izaje

UN

$

traslado de postes de media tensión h= 14m incluye tasrlado de herrajes crucetas aisladores

UN

$

386,750

traslados de redes Media tensión traslados de trasformadores existentes

ML UN

$ $

578,000

traslado de postes de media tensión h= 14m incluye tasrlado de herrajes crucetas aisladores

UN

$

320,310

traslados de redes baja tensión incluye redes entorchadas y redes abiertas

ML

$

172

-

Luminaria de sodio de 400w incluye suministro instalación, fotocelda incluye UN base no incluye brazo de soporte

$

poste metálico ap. h= 10m incluye suministro, izaje , aplomado instalación, brazo SENCILLO según norma ap. 802

UN

$

68,457

poste metálico ap. h= 10m incluye suministro, izaje , aplomado instalación, brazo Doble según norma ap. 802

UN

$

68,457

suministro e instalacion cable de cobre encauchetado suministro e instalacion de tablero de distribución general

ML UN

$ $

38 60,140

tramsformador para ap incluye portacaja, diagonales en V, collarines, pararayos, cajas primarias , conectores, manta termoencogiblepra los bornes UN , sistemas de pueta a tierra completo.

$

378,890

cable de media tensión de cobre ENROCADO CON PIEDRA DE PESO MAYOR DE 3 TONELADAS LIMPIEZA CON CHORRO DE AGUA LIMPIEZA CON CHORRO DE ARENA SANEADO DE SUPERFICIES Y RESTITUCIÓN CON MORTERO REFUERZO CON LÁMINAS DE FIBRA DE CARBONO Línea de demarcación con pintura en frío Marca vial con pintura en frío Tacha reflectiva Estoperol

ML M3 M² M² M² ML Ml M2 UN UN

$ $ $ $ $ $ $ $ $ $

601 13,918 8,052 8,007 49,796 3,167 278 4,057 2,253 598

Señal vertical de tránsito Grupo I (tipo SP, SR, SI excepto las de otros grupos) UN

$

35,327

Señal vertical de tránsito Grupo II (tipo SI elevadas) Señal vertical de tránsito Grupo III (Delineadores de curvas) SEÑAL ELEVADA TIPO BANDERA (INFORMATIVA) SEÑAL ELEVADA TIPO BANDERA DOBLE (INFORMATIVA) SEÑAL ELEVADA TIPO BANDERA PASAVIA (INFORMATIVA) Postes de referencia (Kilometraje) y SOS Defensa metálica Defensa de concreto Plan de manejo de transito Captafaro Protección de taludes con hidrosiembra controlada

UN UN UN UN UN UN ML ML UN UN M2

$ $ $ $ $ $ $ $ $ $ $

89,425 39,072 216,308 367,723 367,723 30,048 3,462 49,197 663,235 1,893 3,150

RECUBRIMIENTO DE TALUDES CON MALLA Y MORTERO 1:4 DE ESPESOR e=0,25m

M2

$

13,035

ILUMINACION DE INTERSECCION Puente Peatonal de Estructura Metálica

un UN

$ $

12,646,948 -

Transporte de materiales provenientes de la excavación de la explanación, canales y préstamos, entre cien metros (100 m) y mil metros (1.000 m) de distancia

(M3-E)

$

909

-

Jun-13 Ing. Diego Gonzalez Ing. William Alzate Tecnoconsulta S.A.S 762.33 36

MATERIALES

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $

5,200 28,600 37,050

MANO DE OBRA

TRANSPORTE

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $

198,000 49,500 9,900 12,870 12,870 2,574 -

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $

INDIRECTOS

27,750 1,156 3,083 4,625 463 93 2,313 289 925 51 740 292 308

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $

1,631,083 188,041 7,070 15,501 17,399 3,354 995 9,164 1,149 1,306 1,275 1,504 7,150 2,014 10,490

COSTO TOTAL

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $

2,038,853 940,208 35,348 77,508 86,995 16,765 4,975 45,814 5,744 6,531 6,374 7,518 35,750 10,066 52,450

$

8,400 $

-

$

19 $

2,439 $

12,193

$

5,460 $

-

$

412 $

1,480 $

7,402

$

7,412 $

900 $

1,647 $

3,319 $

16,593

$

58,005 $

900 $

11,933 $

22,704 $

113,518

$

55,676 $

-

$

8,286 $

43,240 $

216,198

$

242,976 $

-

$

164,650 $

158,459 $

792,291

$

62,848 $

-

$

13,721 $

50,001 $

250,006

$

39,168 $

10,800 $

9,685 $

32,089 $

160,442

46,800 46,800 46,800 69,750 69,750 69,750 1,170

598 555 2,313 59 59 75 2,504 2,504 5,000 617

$ $ $ $ $ $ $ $ $ $

55,650 64,100 63,050 1,125 1,180 1,027 403,125 415,000 403,125 -

$ $ $ $ $ $ $ $ $ $

137,865 147,720 170,249 1,794 1,864 1,694 622,790 637,455 685,228 4,194

$

117,233 $

32,175 $

7,606 $

47,105 $

235,524

$

15,956 $

90 $

823 $

4,239 $

21,190

$ $ $

1,791 $ 20,156 $ 404,425 $

- $ 3,488 $ 61,200 $

113 $ 3,338 $ 79,666 $

560 $ 7,811 $ 145,966 $

2,797 39,058 729,833

$

1,098,956 $

137,700 $

341,325 $

450,471 $

2,252,356

$

245,000 $

$

7,400 $

63,194 $

315,964

$

1,991,502 $

137,700 $

341,325 $

673,609 $

3,368,040

$ $ $ $ $ $

12,875 525

$

$ $ $ $ $ $ $ $ $ $

$ $ $ $ $ $

513,413 $

-

46,800 -

$ $ $ $ $ $ $ $ $ $

$ $ $ $ $ $

81,396 $

771 1,028 1,156 17,344 2,313 231

$ $ $ $ $ $ $ $ $ $

$ $ $ $ $ $

51,389 $

27,574 29,544 34,050 359 374 339 124,559 127,491 137,045 839

5,914 15,441 4,595 7,746 16,816 3,510

$ $ $ $ $ $

29,570 77,205 22,973 38,734 84,082 17,549

291,756 $

1,458,785

$

683,264 $

108,324 $

61,667 $

362,465 $

1,812,326

$

1,017,514 $

156,060 $

61,667 $

459,811 $

2,299,059

$

1,212,119 $

192,168 $

89,241 $

570,036 $

2,850,181

$

193,013 $

30,600 $

48,684 $

191,349 $

956,744

$

304,960 $

48,348 $

51,389 $

229,840 $

1,149,200

$

48,253 $

7,650 $

37,000 $

123,211 $

616,056

$ $ $ $ $ $

49,385 26,916 428,425 408,925 386,025 342,100

$ $ $ $ $ $

$

171,050 $

$ $ $ $ $ $ $

34,210 308,950 282,925 3,176 615 1,200,000 363,703

$

1,900,000 $

$ $ $ $ $ $ $ $ $ $

3,395 3,376 3,294 651,717 1,068,453 1,952,925 1,559,050 1,510 1,125 9,960

$ $ $ $ $

$ $ $ $ $ $ $

$ $ $ $ $ $ $ $ $ $

41,939 $ 23,100 308,950 336,187 30,895

$ $ $ $

981 60,300 60,300 61,200 63,450

$ $ $ $ $ $

31,725 $ 6,345 63,000 66,150 252 9,000

$ $ $ $ $ $ $

9,000 $ 247 247 104,760 170,400 322,080 170,400 37,800 63,000 63,450 6,300

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $

9,944 37,000 269,091 148,000 77,083 69,375

$ $ $ $ $ $

9,250 $ 5,550 26,429 55,849 391 76 119,325 370,000

$ $ $ $ $ $ $

370,000 $ 1,610 370 370 11,100 5,286 9,250 5,286 5,920 604 4,533

$ $ $ $ $ $ $ $ $ $

1,850 $ 9,250 37,000 46,250 7,400

$ $ $ $

64,034 38,015 241,220 183,369 147,580 132,490

$ $ $ $ $ $

320,165 190,074 1,206,103 63,134 737,899 662,453

57,954 $

289,768

12,626 103,691 105,031 965 336 333,590 197,330

$ $ $ $ $ $ $

63,134 518,455 525,160 4,823 1,684 1,667,950 986,653

581,405 $

2,907,025

1,690 1,464 1,441 206,856 321,656 585,980 444,305 2,005 449 3,739

$ $ $ $ $ $ $ $ $ $

8,452 7,315 7,210 1,034,283 1,608,281 2,929,900 2,221,527 10,027 2,240 18,694

10,995 $

54,978

17,780 113,875 120,645 12,744

$ $ $ $

88,901 569,378 603,223 63,715

$

46,344 $

9,450 $

9,250 $

18,009 $

90,039

$

61,790 $

12,600 $

12,333 $

23,681 $

118,406

9,000 6,300 15,750 46,800 450 1,058 464 -

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

2,960 7,400 12,333 4,625 235 1,850 20,556 1,850 13,875 1,110 3,293 3,293 5,488 7,400 8,233 16,465

17,344 12,744 28,331 24,835 1,269 8,621 32,559 20,000 38,645 13,594 8,071 15,186 36,155 24,649 14,620 82,744

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

86,715 63,715 141,655 124,177 6,340 43,110 162,792 100,000 193,226 67,969 40,359 75,932 180,777 123,244 73,100 413,716

$

16,465 $

72,244 $

361,216

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

57,115 30,895 77,239 42,432 4,358 32,445 15,420 77,950 138,260 52,690 28,995 55,891 136,531 90,825 47,370 310,395

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

$

268,395 $

$ $ $ $ $ $ $ $ $ $

952,570 130,200 3,150 54,600 124,082 38,900 594,395 853,820

$

240,000,000 $

$ $ $ $ $ $ $ $ $ $

72,000 9,000 36,000 -

$ $ $ $ $ $ $ $ $ $

329,300 4,773 697 35,142 29,600 164,650 41,163 113,569 1,022 408,850

-

$

-

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

$ $ $ $ $ $ $ $ $ $ $

425,441 34,956 984 26,601 39,706 57,584 178,855 82,970 289 328,546

$ $ $ $ $ $ $ $ $ $

2,127,206 174,780 4,919 133,006 198,535 287,915 894,275 414,849 1,440 1,642,731

60,000,000 $ 300,000,000

$

-

$

-

$

82,325 $

117,269 $

586,344

$ $

-

$ $

-

$ $

3,293 $ 65,860 $

824 $ 160,965 $

4,117 804,825

$

-

$

-

$

113,569 $

108,470 $

542,349

$

-

$

-

$

1,363 $

384 $

1,919

$

1,315,925 $

-

$

-

$

328,981 $

1,644,906

$

1,789,246 $

-

$

23,865 $

470,391 $

2,351,959

$

1,950,500 $

-

$

23,865 $

510,705 $

2,553,527

$ $

9,640 $ 9,840,000 $

-

$ $

302 $ 477,300 $

2,495 $ 2,594,360 $

12,475 12,971,800

$

17,000,000 $

-

$

477,300 $

4,464,049 $

22,320,239

$ $ $ $ $ $ $ $ $ $

15,000 54,450 875 6,500 52,797 255,000 1,493 10,508 4,250 3,950

$ $ $ $ $ $ $ $ $ $

4,773 1,850 5,077 4,717 208,125 29,547 149 4,201 1,906 1,563

$

226,050 $

$ $ $ $ $ $ $ $ $ $ $

352,900 244,750 1,102,430 1,876,680 2,418,180 70,549 183,545 362,146 210,060,000 8,062 4,725

$ $ $ $ $ $ $ $ $ $

$ $ $ $ $ $ $ $ $ $ $

39,600 4,523 66,623 9,000 -

$ $ $ $ $ $ $ $ $ $ $ $

$ $ $ $ $ $ $ $ $ $

16,997 $ 56,656 16,573 208,805 354,969 354,969 17,151 1,133 53,818 5,272,265 283 925

$ $ $ $ $ $ $ $ $ $ $

$

105,097 $

9,900 $

10,571 $

$ $

84,734,552 $ 500,000,000 $

3,794,084 $ - $

25,293,896 $ - $

$

-

$

-

$

-

$

5,094 27,455 3,501 4,806 78,810 71,929 480 4,691 2,101 1,529

$ $ $ $ $ $ $ $ $ $

25,468 137,273 17,505 24,030 394,051 359,643 2,400 23,457 10,510 7,640

69,594 $

347,968

124,745 75,099 381,885 649,844 785,219 29,436 47,035 132,946 54,001,125 2,560 2,200

$ 623,726 $ 375,494 $ 1,909,428 $ 3,249,216 $ 3,926,091 $ 147,184 $ 235,175 $ 664,730 $ 270,005,625 $ 12,798 $ 11,000

34,650 $

173,253

31,617,370 $ 158,086,850 125,000,000 $ 625,000,000 226 $

1,135

Etiquetas de fila (en blanco) 200.1 200.2 201.15 201.7 201.7.1 201.8 210.1 210.2.1 210.2.2 211.1 220.1 220.1.1 220.1.2 221.1 221.2 230.03 231.1

235.01

235.02

235.04

235.05

235.06

235.10 320.1 330.1 330.2 420.1 420.2 421.1 450.1 450.2 450.9 460.1 461.1 464.1 466.2 467.1 500.1 511.1 511.10 511.2 600.1 600.2 600.4 600.5 610.1 610.2 621.1.1

621.1.2 621.1.3 621.1.4 621.1.5 621.1.6 621.7.7 623.01 623.1 630.1 630.2 630.3 630.4 630.4.1 630.4.2 630.5 630.6 640.1 641.1 642.05 642.3 642.4 650.02 650.4 650.5 661.1.1 661.1.2 661.1.3 661.1.4 661.2.1 661.2.2 661.2.3 661.2.4 661.2.5 671.1 671.2 671.3

671.4 671.5 672.1 672.2 672.3 673.1 673.2 674.1 674.1.1 674.2 674.3 674.4 674.5 674.5.1 674.5.2 674.6 674.7 674.8 674.9 675.1 680.01 680.02 680.03 681.1 684.1 685.1 686.1 686.2 686.3 687.1

687.2 687.3 687.4 688.1 688.2

688.3 688.4 688.5 688.6 688.7 688.8 688.9 691.03 691.10 691.11 691.12 692.13 700.1 700.3 701.1 701.1.a 710.1.1 710.1.2 710.1.3 710.1.4 710.1.5 710.1.6 720.1 730.1 731.1 740.07 740.1 810.3 812.01 815.01 817.1 900.1 900.2 Total general

CONSULTORÍA ESPECIALIZADA PARA LA ESTRUCTURACIÓN DE CONCESIONES VIALES POR GRUPOS DE CARRETERAS. GRUPO 3 CENTRO ORIENTE, CORREDORES: (1) PERIMETRAL DE ORIENTE DE CUNDINAMARCA, (2) BOGOTÁ – VILLAVICENCIO (SECTORES 1 Y 3), (3) VILLAVICENCIO – ARAUCA INCLUYE EL SECTOR TRANSVERSAL DEL SISGA – (CHOCONTÁ – AGUACLARA), (4) MALLA VIAL DEL META, Y (5) PUENTA ARIMENA – PUERTO CARREÑO.

PROYECTO 6

LISTADO DE PRECIOS UNITARIOS

ITEM DE PAGO

DESCRIPCIÓN

UND

CANTIDAD TOTAL 41.04 17,525.91 8,300.01

200.1 200.2 201.15 201.7 201.7.1 600.1 600.2 600.4 600.5 610.1 610.2

Desmonte y limpieza en Bosque Desmonte y limpieza en zonas no boscosas Remoción de alcantarillas Demolición de estructuras Demolición de estructuras Reforzadas Excavaciones varias sin clasificar Excavaciones varias en roca en seco Excavaciones varias en material comun en seco Excavaciones varias en material común bajo agua Rellenos para estructuras Relleno de estructuras sin suministro de material

Ha Ha ML M3 M3 M3 M3 M3 M3 M3 M3

621.1.1

Pilote de concreto fundido in situ, de diámetro f 1.30 metros (No incluye Acero de Refuerzo)

ML

-

621.1.2

Pilote de concreto fundido in situ, de diámetro f 1.50 metros (No incluye Acero de Refuerzo)

ML

-

621.1.3

Pilote de concreto fundido in situ, de diámetro f 1.80 metros (No incluye Acero de Refuerzo)

ML

-

621.1.4

Pilote de concreto fundido in situ, de diámetro f 2.00 metros (No incluye Acero de Refuerzo)

ML

-

621.1.5

Pilote de concreto fundido in situ, de diámetro f 0,80 metros (No incluye Acero de Refuerzo)

ML

-

621.1.6

Pilote de concreto fundido in situ, de diámetro f 1,00 metros (No incluye Acero de Refuerzo)

ML

-

ML

-

ML ML M3 M3 M3

-

621.7.7 623.01 623.1 630.1 630.2 630.3

Pilote de concreto fundido in situ, de diámetro ø 0.4 metros (No incluye Acero de Refuerzo) ANCLAJE DE CUATRO TORONES ( L=20 m ) Pernos de anclaje Ø 1" para taludes de vía Concreto Clase A - fc = 35.0 Mpa Concreto Clase B - fc = 28.0 Mpa Concreto Clase C - fc = 28.0 Mpa

630.4

661.2.5 671.1 671.2 671.3

Concreto Clase D - fc = 21.0 Mpa - box vehiculares Concreto clase D - Concreto lanzado f'c = 21 Mpa para estabilización de taludes E=0,5 m Anden en Concreto Concreto Clase D - fc 21 Mpa E= 0,10 Mt Concreto Clase E - fc = 17.5 Mpa Concreto Clase F - fc = 14.0 Mpa Acero de Refuerzo fy 420 MPa Acero de preesfuerzo - fy=1.890 Mpa (Incluye fijaciones) Juntas metálicas Apoyo Elastomerico 400*500*54 mm 4 laminas refuerzo de 4 mm APOYO ELÁSTOMERICO 500x600x99mm, INCLUSO 7 LÁMINAS DE REFUERZO DE 4 mm Fabricacion de Estructura Metalica Acero estructural ASTM A-588 Acero estructural ASTM A-36 Tubería de concreto reforzado de 900 mm diámetro interior Tubería de concreto reforzado de 1200 mm diámetro interior Tubería de concreto reforzado de 1800 mm diámetro interior Tubería de concreto reforzado de 1500 mm diámetro interior Mortero de sellado de juntas (tipo grouting) Impermeabilización bituminosa / imprimacion asfaltica Lámina drenante Tubo dren ranurado de PVC Ø 100 mm, incluso geotextil y material granular Enrocado con piedra D50 = 0.35m Cunetas revestidas en concreto Caz colector en concreto Cunetas revestidas en Concreto Clase E (17,5 Mpa )

671.4

Zanja en concreto h = 0,5 Mt con Talud 1:2 Concreto Clase E (17,5 Mpa )

ML

-

671.5

Zanja triangular de 1,50 m de ancho y 0,38 m de calado, ejecutada en concreto Clase F in situ en el pie del talud, para la captación de la escorrentía superficial del terreno natural hacia el relleno

ML

-

672.1 672.2 672.3 673.1 673.2 674.1 674.1.1 674.2 674.3 674.4 674.5 674.6

Bordillo 800x100x350 mm Bajante talud con piezas prefabricadas de 43 x 50 cm Estructura de caída escalonada Material granular filtrante Geotextil no tejido 1600 Tubería perforada de 100 mm para filtro Drenes horizontales con tubería perforada PVC de 2 ½" Tubería de 200 mm para drenaje en espinas de pescado Tubería Novafort 400 mm Tubería Novafort 250 mm TUBERIA PVC U.M. NORMA NTC 382 D=4`` RDE 21 Union por Termofusion Tuberias de 4"

ML ML ML M3 M2 ML ML ML ML ML ML ML

4,161.76 2,925.00 22.00

674.7

suministro e instalaciónde tubería de 4"GAS NATURAL POLIETILENO

ML

275.00

681.1 684.1 685.1 686.1 686.2

Gavion Acometida Acueducto Nivelacion de Pozos de Alcantarilla Traslado de postes de Telefono Traslado de redes telefonicas

M3 UN UN UN ML

19.00 17.00 145.00 3,630.00

630.4.1 630.4.2 630.5 630.6 640.1 641.1 642.05 642.3 642.4 650.02 650.4 650.5 661.1.1 661.1.2 661.1.3 661.1.4 661.2.1 661.2.2 661.2.3 661.2.4

M3

-

M2

-

M2 M3 M3 Kg Tn - M ml UN

-

UN

-

UN Kg Kg ML ML ML ML M3 M2 M2

-

ML

-

M3 M3 M3 ML

-

686.3

nivelación cámara de inspección telefónica

UN

687.1

Suministro e instalación de torre eléctrica de alta tensión incluye apoyos metálicos galvanizados, excavación en cualquier tipo de terreno, cimentación, acero de refuerzo, aislamiento, puesta a tierra armado e izaje

UN

10.00 -

UN

29.00

ML UN

940.00 3.00

688.1

traslado de postes de media tensión h= 14m incluye tasrlado de herrajes crucetas aisladores traslados de redes Media tensión traslados de trasformadores existentes traslado de postes de media tensión h= 14m incluye tasrlado de herrajes crucetas aisladores

688.2

traslados de redes baja tensión incluye redes entorchadas y redes abiertas

ML

3,635.00

688.3

Luminaria de sodio de 400w incluye suministro instalación, fotocelda incluye base no incluye brazo de soporte

UN

40.00

688.4

poste metálico ap. h= 10m incluye suministro, izaje , aplomado instalación, brazo SENCILLO según norma ap. 802

UN

40.00

687.2 687.3 687.4

688.5 688.6 688.7

poste metálico ap. h= 10m incluye suministro, izaje , aplomado instalación, brazo Doble según norma ap. 802 suministro e instalacion cable de cobre encauchetado suministro e instalacion de tablero de distribución general

UN

UN

-

-

ML UN

4,000.00 2.00

688.8

tramsformador para ap incluye portacaja, diagonales en V, collarines, pararayos, cajas primarias , conectores, manta termoencogiblepra los bornes , sistemas de pueta a tierra completo.

UN

2.00

688.9 691.03 0 0

cable de media tensión de cobre ENROCADO CON PIEDRA DE PESO MAYOR DE 3 TONELADAS TUBERIA PVC U.M. NORMA NTC 382 D=16`` RDE 21 TUBERIA PVC U.M. NORMA NTC 382 D=8`` RDE 21

ML M3 ML ML

14.00 375.00 250.00

0

suministro e instalacion de arena de peña para cimentacion de tuberias

m3

377.10

0 0 0

suministro e instalacion de union universal acueducto de 16" suministro e instalacion de union universal acueducto de 8" suministro e instalacion de union universal acueducto de 4"

m3 ML ML

2.00 2.00 10.00

0

suministro e instalacion de tuberia de concreto reforzado de 2m

ML

400.00

0

suministro e instalacion de tubos de inspeccion de concreto reforzado de 2m

ML

5.00

0

traslado de semaforos existentes

un

6.00

0

construcción de cajas de inspección eléctricas de 1,5m*1,5m

un

3.00

0

traslados de redes media tensión subterránea

un

520.00

0

suministro e instalaciones tubería tdp de 6"

un

2,080.00

0

suministro e instalación de tubería de 4" tdp pvc

un

17,368.00

0

cambio de red de teléfonos existente subterraneo

un

3,460.00

0

construcción cajas de inspección de 1m*1m

un

5.00

0

construcción cámara de inspección de teléfonos

un

2.00

INTERVENCION Y RENOVACION REDES DE ACUEDUCTO. LONGITUD AFECTADA POR TRAMO Excavaciones en material común de la Explanación y Canales Relleno con material de excavación suministro e instalación de tubería de 16" pvc rde 21 suministro e instalación de tubería de 8" pvc rde 21 suministro e instalación de tubería de 4" pvc rde 21 suministro e instalación de arena de peña suministro e instalación de union universal 16" suministro e instalación de union universal 8" suministro e instalación de union universal 4" suministro e instalación acometida

INTERVENCION Y RENOVACION REDES DE ALCANTARILLADO. LONGITUD AFECTADA POR TRAMO Excavaciones en material común de la Explanación y Canales Relleno con material de excavación suministro e instalación de tubería de 2M en concreto suministro e instalación de arena de peña Material filtrante Demolición pozos AN y ALL h =0,50m para nivelación contruccion de pozos nuevos en tuberia de 2m SUMINISRO Y COLOCACION CONO EXCENTRICO/CONC. D=120*60(POZO DE INSPECCION)

INTERVENCION Y RENOVACION REDES DE GAS. LONGITUD AFECTADA POR TRAMO Excavaciones en material común de la Explanación y Canales Relleno con material de excavación suministro e instalación de arena de peña unión por termofusión tuberías de GAS" suministro e instalación de tubería de 4"GAS NATURAL POLIETILENO

INTERVENCIÓN Y TRASLADO REDES ALUMBRADO PÚBLICO . LONGITUD AFECTADA POR TRAMO traslado de postes de telefonos h entre 6m y 7 m traslados de redes baja tensión incluye redes entorchadas y redes abiertas

2,840.00 2,205.07 1,590.21 375.00 250.00 2,925.00 200.61 2.00 2.00 10.00 19.00

1,900.00 14,548.16 6,138.40 400.00 0.00 4,161.76 32.04 5.00 17.00

220.00 189.08 154.65 9.64 22.00 275.00

5,175.00 64.00 3,175.00

Luminaria de sodio de 400w incluye suministro instalación, fotocelda incluye base no incluye brazo de soporte

40.00

poste metálico ap. h= 10m incluye suministro, izaje , aplomado instalación, brazo doble según norma ap. 802

0.00

poste metálico ap. h= 10m incluye suministro, izaje , aplomado instalación, brazo sencillo según norma ap. 802 suministro e instalación cable de cobre encauchetado suministro e instalación de tablero de distribución general

40.00 4,000.00 2.00

transformador para ap incluye portacaja, diagonales en V, collarines, pararrayos, cajas primarias , conectores, manta termoencogible para los bornes , sistemas de puerta a tierra completo.

2.00

cable de media tensión de cobre

14.00

CAMBIO DE RED DE TELEFONOS EXISTENTE SUBTERRANEO TRASLADO DE SEMAFOROS EXISTENTES

120.00 6.00 CANTIDAD

INTERVENCION Y TRASLADO REDES ELECTRICAS BAJA TENSIÓN . LONGITUD AFECTADA POR TRAMO

460.00

traslado de postes de media tensión h= 14m incluye tasrlado de herrajes crucetas aisladores

10.00

traslados de redes baja tensión incluye redes entorchadas y redes abiertas

460.00

INTERVENCION Y TRASLADO REDES ELECTRICAS MEDIA TENSIÓN . LONGITUD AFECTADA POR TRAMO traslado de postes de media tensión h= 14m incluye tasrlado de herrajes crucetas aisladores traslados de redes media tensión aérea construcción de cajas de inspección eléctricas de 1,5m*1,5m traslado de transformadores existentes traslados de redes media tensión subterránea excavación relleno en arena relleno con material proveniente de la excavación suministro e instalaciones tubería tdp de 6"

INTERVENCION Y RENOVACION REDES DE TELEFONO AEREA . LONGITUD AFECTADA POR TRAMO traslado de postes de telefonos h entre 6m y 7 m traslados de redes aéreas de teléfonos

INTERVENCION Y RENOVACION REDES DE TELEFONO SUBTERRANEA . LONGITUD AFECTADA POR TRAMO demolición de placa superior cámaras telefónicas nivelación cámara de inspección telefónica suministro e instalación de tubería de 4" tdp pvc cambio de red de teléfonos existente subterraneo construcción cajas de inspección de 1m*1m construcción cámara de inspección de teléfonos excavación

1460 19 940 3 3 520 249.6 41.6 208 2080

1,910.00 81.00 3,630.00

3340 9 10 17368 3340 5 2 334

relleno en arena relleno con material proveniente de la excavación

125.25 208.75

Fecha: Jun-13 Director Ing. Diego Gonzalez Proyecto: Elaboró: Ing. William Alzate Revisó: Interventor: Tecnoconsulta S.A.S Tramo: CORREDOR 6 Longitud Total (Km): Nùmero de Meses (promedio):

T2. ACCESO NORTE BOGOTA

T3. BOGOTA PATIOS

T4. BOGOTA LIM. CHOACHI

41.04

4

1

17,017.96

253.97

253.97

1

1

1

6

7

7,948.53

175.74

175.74

2

2

2

8

9

4,161.76

1,675.00 22.00 275.00 9.00 17.00 145.00 3,630.00

-

625.00 -

-

625.00 -

5

5

-

-

4

5.00 -

5.00 -

7 1

1 2

10.00

-

-

-

-

29.00

-

-

940.00 3.00

-

-

-

-

-

-

-

3,635.00

2

1

2 4

2

-

20.00

20.00

3

-

20.00

20.00

4

-

-

2

-

-

2,000.00 1.00

2,000.00 1.00

5 6

-

1.00

1.00

7

-

7.00

7.00

8

-

-

375.00 250.00

1

333.29

21.90

21.90

3

2.00 2.00 6.00

2.00

2.00

400.00

-

-

3

5.00

-

-

6

6.00

-

-

2

3.00

-

-

3

520.00

-

-

5

2,080.00

-

-

9

17,368.00

-

-

3

3,460.00

-

-

1

5.00

-

-

5

2.00

-

-

6

3

4

7

8

T2. ACCESO NORTE BOGOTA

T4. BOGOTA LIM. CHOACHI

T3. BOGOTA PATIOS

1,840.00

500.00

500.00

1,697.12 1,238.72 375.00 250.00 1,675.00 156.80 2.00 2.00 6.00 9.00

253.97 175.74 625.00 21.90 2.00 5.00

253.97 175.74 625.00 21.90 2.00 5.00

1 2

3

1,900.00

0

0

14,548.16 6,138.40 400.00 0.00 4,161.76 32.04 5.00

0 0 0 0 0 0

0 0 0 0 0 0

1 2 3

17.00

0

0

7

220.00

-

-

189.08 154.65 9.64 22.00 275.00

-

-

5 4 6

1 2 3 5 4

3,175.00

1000

1000

64.00

0.00

0.00

1

3,175.00

0

0.00

2

0.00

20.00

20.00

3

0.00

0.00

0.00

0.00

20.00

20.00

4

0.00 0

2,000.00 1.00

2,000.00 1

5 6

0.00

1.00

1.00

7

0

7

7

8

120 6

0 0

0 0

1 2

TRAMO 2

TRAMO 3

TRAMO 4

460

0

0

10.00

0.00

0.00

1

460

0

0

2

1460

0

0

19.00

0

0

1

940 3 3.00 520 249.6 41.6 208 2080

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

2 3 4 5 6 7 8 9

3630

0

0

81 3,630.00

0 0.00

0 0.00

1 2

3340

0

0

9 10.00 17,368.00 3,340.00 5.00 2.00 334.00

0 0 0 0 0 0 0

0 0 0 0 0 0 0

1 2 3 4 5 6 7

125.25 208.75

0 0

0 0

8 9

Related Documents


More Documents from ""

May 2020 5
Di470fieldservice-.pdf
December 2019 16
Ejercicios-123.docx
December 2019 23
Laboratorio 4.docx
May 2020 16