Design of precast prestressed concrete beam Design of precast prestressed concrete for hollow plate Design of prestressed composite beam phase 1 phase 2 Design of cylindrical hollow pier Design of segmentally precast prestressed concrete beam Corrosion on steel truss bridges Cathodic protection of steel bridges The influence of enviromental conditions on steel corrosion Design of partially prestressed concrete beams Reinforced earth for retaining walls Design of reinforced concrete/wood composite bridge Design of wood beam bridge Bridge strengthening using post tensioning Segmentally precast prestressed concrete for steel truss bridge de Investigation of Kali Comal bridge failure Behaviour of steel truss bridges due to vibration Kali Krasak bridge failure The influence of heat radiation on the strength of steel truss bridge Feasibility estimation strength of structure of aeromovel system The study of chicken claw construction failure on Highway Toll Ro Vibration criteria for steel truss bridge in Indonesia Design for rigid pavement construction Parit tujuh bridge failure

1979 1979 1978 1983 1983 1982 1981 1981 1983 1984 1983 1979 1980 1986 1990 1989 1986 1991 1991 1990 1987 1989 1986 1991

The use of ALWA as leightweight concrete The use of plastic and steel fibre for improving concrete quality The study of fly ash cement The study of rubber bearings for bridge beam support The use of Sho-Bond as crack injection repair material for bridge d High strength bolts The use of admixture in concrete The use of epoxy resin A01 as crack injection repair material

1985 1986 1985 1984 1982 1980 1989 1991

The study of the decreasing structural value of bridges 1991 The influence of dynamic loading on structural concrete The study of pedestrian bridges The study of concrete pipe culverts The use of lime pozzolan cement for bridge and highway construction The influence of riverbed degradation on the stability of bridge foundation Development of the Indonesian Bridge Management System ( in conjuction with SMEC-Kinhill) The effect of fibre mesh polypropylene of the impact resistance of concrete The corrosion rate of galvanised steel bridges in a coastal enviroment

1984 1988

1987

1992

The study of prestressed composite beam with artifical reaction sy 1992 1993 Steel / wood composite beams Air entrainment to reduce the effects of shrinkage on rigid pavement Aggregate recycling for concrete The effect of double axle loads on the residual life of bridges Protection of bridge foundation against the effects of riverbed degradation Investigation of alternative bridge expansion joints Identification methods for old bridge foundations The study of the effects of heat radiation on the strength of steel bridge members The effect of coconut fibre on the tensile strength of concrete The corrosion rate of galvanised steel bridges in a coastal enviroment (continuation) The effect of a corrosive enviroment on steel bridge components Study of concrete quality in deteriorated bridge deck slab

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 1982

No.

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

1 Penelitian pengaruh getaran terhadap jembatan rangka baja 2 Observasi kasus jembatan 3 Penelitian balok beton parsial prestress 4 Penelitian jembatan pre-compression composite 5 Penelitian pondasi cakar ayam 6 Penelitian pengawetan kayu 7 Penelitian bahan sub standard dalam beton 8 Penelitian perkuatan jembatan beton bertulangan dengan ikatan epoxy 9 Penelitian korosi dan penanggulangannya pada jembatan baja 10 Penyelidikan geoteknik untuk perencanaan pondasi jembatan 11 Pengendalian pelaksanaan pondasi jembatan 12 Pengendalian mutu jembatan 13 Penyelidikan bahan jalan (quarry survey) 14 Pengendalian mutu korosi jembatan 15 Penilaian kondisi jembatan Total nilai penelitian BJBJ per tahun

=

0

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 1983

No.

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

1 Penelitian perilaku bangunan atas jembatan untuk jembatan rangka baja 2 Penelitian balok pratekan partial untuk jembatan 3 Penelitian observasi dan evaluasi perilaku bangunan bawah jembatan 4 Penelitian lingkungan korosif terhadap struktur jembatan 5 Penelitian jembatan komposit pra kompresi 6 Penelitian penyebaran tegangan dalam balok kayu akibat beban lalu-lintas 7 Penelitian penggunaan steel fiber pada beton bertulang 8 Pengendalian mutu jembatan 9 Penyelidikan bahan jalan (quarry survey) 10 Pengendalian korosi jembatan 11 Penilaian kondisi jembatan 12 Pemanfaatan kekuatan sisa umur jembatan Total nilai penelitian BJBJ per tahun

=

0

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 1984

No.

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

1 Penelitian observasi perilaku bangunan atas jembatan 2 Penelitian pengaruh lingkungan korosif terhadap struktur baja jembatan 3 Penelitian model perkerasan beton 4 Penelitian metode perbaikan galagar beton pratekan 5 Penelitian pengaruh getaran pada perbaikan lantai beton 6 Penelitian rubber bearing jembatan 7 Penelitian jembatan komposit prakompresi gaya baru 8 Penelitian observasi dan evaluasi bangunan bawah jembatan akibat oprit 9 Penelitian penggunaan balok kayu laminasi untuk jembatan 10 Pengendalian pelaksanaan pondasi jembatan 11 Penyelidikan bahan jalan (quarry survey) 12 Pengendalian mutu beton jembatan 13 Pengendalian korosi jembatan 14 Penilaian kondisi jembatan 15 Pengendalian kerusakan bangunan bawah jembatan Total nilai penelitian BJBJ per tahun

=

0

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 1985

No.

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

1 Penelitian perkerasan beton semen konvensional skala penuh 2 Observasi dan evaluasi perilaku bangunan atas jembatan non standar 3 Pengaruh gempa pada pangkal jembatan 4 Perbaikan balok beton pratekan dengan sistem unbonded 5 Penelitian gelagar beton agregat ringan 6 Penelitian gelagar baja pratekan 7 Pengaruh lingkungan terhadap bahan konstruksi baja 8 Perletakan sendi rol jembatan rangka baja 9 Pedoman evaluasi geoteknik dalam perencanaan pondasi jembatan 10 Konsep petunjuk teknologi beton 11 Buku petunjuk perencanaan perkerasan beton semen 12 Buku petunjuk pelaksanaan perkerasan beton semen 13 Penyelidikan tanah jembatan Total nilai penelitian BJBJ per tahun

=

0

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 1988

No.

1 2 3 4

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

Kekuatan gelagar baja pratekan Petunjuk penangan retakan lantai beton pada jembatan baja Penyelidikan korosi pada Jembatan Kasunean Penyelidikan korosi pada Jembatan Kali Jaga, Kanci I, Sigranella, Karang Sembung

5 Percobaan fibermesh poly propylene sebagai bahan tambah pada campuran beton semen mutu tinggi 6 Penerapan beton prategang parsial pada jembatan 7 Penyelidikan Geoteknik untuk perencanaan pondasi jembatan Kali Progo Kranggan 8 Penyelidikan Geoteknik untuk perencanaan pondasi jembatan Kali Tanjang 9 Pengendalian korosi komponen baja jembatan di Propinsi Jawa Barat 10 Pengendalian korosi komponen baja jembatan di Propinsi Jawa Tengah 11 Pengendalian korosi komponen baja jembatan di Propinsi Sumatra Barat 12 Pengendalian korosi komponen baja jembatan di Propinsi Jambi 13 Pengendalian korosi komponen baja jembatan di Propinsi Sumatera Selatan 14 Pengumpulan data dan evaluasi mutu beton jembatan di DKI Jaya 15 Pengumpulan data dan evaluasi mutu beton jembatan di Propinsi Jawa Barat 16 Pengumpulan data dan evaluasi mutu beton jembatan di Propinsi Jawa Tengah 17 Pengumpulan data dan evaluasi mutu beton jembatan di Propinsi Jawa Timur 18 Penilaian kondisi jembatan di Propinsi Jawa Barat 19 Penilaian kondisi jembatan di Propinsi Jawa Tengah 20 Penilaian kondisi jembatan di Propinsi Jawa Timur 21 Penilaian kondisi jembatan di Propinsi D.I.Y Total nilai penelitian BJBJ per tahun

=

0

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 1989

No.

1 2 3 4

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

Kekuatan gelagar baja pratekan Petunjuk penangan retakan lantai beton pada jembatan baja Penyelidikan korosi pada Jembatan Kasunean Penyelidikan korosi pada Jembatan Kali Jaga, Kanci I, Sigranella, Karang Sembung

5 Percobaan fibermesh poly propylene sebagai bahan tambah pada campuran beton semen mutu tinggi 6 Penerapan beton prategang parsial pada jembatan 7 Penyelidikan Geoteknik untuk perencanaan pondasi jembatan Kali Progo Kranggan 8 Penyelidikan Geoteknik untuk perencanaan pondasi jembatan Kali Tanjang 9 Pengendalian korosi komponen baja jembatan di Propinsi Jawa Barat 10 Pengendalian korosi komponen baja jembatan di Propinsi Jawa Tengah 11 Pengendalian korosi komponen baja jembatan di Propinsi Sumatra Barat 12 Pengendalian korosi komponen baja jembatan di Propinsi Jambi 13 Pengendalian korosi komponen baja jembatan di Propinsi Sumatera Selatan 14 Pengumpulan data dan evaluasi mutu beton jembatan di DKI Jaya 15 Pengumpulan data dan evaluasi mutu beton jembatan di Propinsi Jawa Barat 16 Pengumpulan data dan evaluasi mutu beton jembatan di Propinsi Jawa Tengah 17 Pengumpulan data dan evaluasi mutu beton jembatan di Propinsi Jawa Timur 18 Penilaian kondisi jembatan di Propinsi Jawa Barat 19 Penilaian kondisi jembatan di Propinsi Jawa Tengah 20 Penilaian kondisi jembatan di Propinsi Jawa Timur 20 Penilaian kondisi jembatan di Propinsi D.I.Y Total nilai penelitian BJBJ per tahun

=

0

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 1990

No.

Judul Penelitian

Sektor /

Alokasi

Sub

Anggaran (Juta Rp)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Pengaruh vibrasi terhadap perilaku pilar jembatan Tipe struktur permukaan jalan beton yang berdaya guna Pengaruh kondisi lingkungan terhadap komponen jembatan baja - laju korosi lelah akibat beban dinamis Struktur beton pracetak segmental untuk lantai jembatan rangka baja Pengaruh lingkungan korosif terhadap laju korosi lapis galvanis rangka baja jembatan Penelitian penggunaan fibermesh polypropylene sebagai bahan tambah dalam campuran beton semen Pondasi tiang sayap untuk meningkatkan daya dukung pada kasus tiang tunggal Pengkajian dalam rangka penanggulangan kerusakan jembatan Kondisi jembatan Penyelidikan geoteknik Jembatan Kali Serayu-Slarang Penyelidikan geoteknik Jembatan Kali Serayu-Banyumas Pemantauan standar pengujian kuat tekan beton dengan alat concrete hammer Pengendalian korosi komponen baja Jembatan Muara Biunangen di Serang, Propinsi Jawa Barat Pengendalian korosi komponen baja Jembatan Musi II di Palembang Propinsi Sumatra Selatan Pengendalian korosi komponen baja Jembatan Cisadane di Tangerang Propinsi Jawa Barat Pengendalian korosi komponen baja Jembatan Kedung Gede di Karawang Propinsi Jawa Barat Pengendalian korosi komponen baja Jembatan Kali Poncol di Propinsi Jawa Tengah Pengendalian korosi komponen baja Jembatan Sei Kapuas di Propinsi Kalimantan Barat Pengendalian korosi komponen baja Jembatan Brantas Baru di Propinsi Jawa Timur Hasil peninjauan ke lokasi Jembatan K. Boyo pada ruas jalan Pekalongan - Semarang, Propinsi Jawa Tengah Hasil peninjauan ke lokasi jembatan gantung antara Pajaresuk-Sukaharja, Kecamatan Pringsewu Lampung Pengujian kekuatan lantai Jembatan Ampera, Palembang Hasil peninjauan ke lokasi Jembatan Parit Tujuh pada ruas jalan Jambi-Kuala Tungkal Penyelidikan geoteknik Jembatan K. Serayu, Slarang Total nilai penelitian BJBJ per tahun

=

0

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 1991

No.

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

1 Penelitian bahan crushed dan kerikil untuk pembentuk tekstur tekstur permukaan jalan beton semen 2 Penelitian penurunan nilai struktur bangunan atas jembatan jembatan rangka baja 3 Studi kerusakan beton lantai jembatan ditinjau dari segi mutu beton 4 Penelitian fundasi tiang bersayap 5 Penelitian pelat beton pracetak untuk lantai jembatan rangka baja rangka baja 6 Penelitian bangunan pengaman pondasi jembatan terhadap pengaruh penggerusan dasar sungai 7 Penelitian pengaruh bahan tambah fibermesh polyproplene terhadap ketahanan kejut beton semen 8 Pengkajian pembakuan struktur gorong-gorong beton bulat 9 Pengkajian pembakuan struktur jembatan penyebrangan untuk pejalan kaki 10 Penelitian pengaruh lingkungan pantai terhadap laju korosi lapis galvanis Total nilai penelitian BJBJ per tahun

=

0

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 1992

No.

Judul Penelitian

1 2 3 4

Penelitian pemanfaatan fly ash untuk campuran perkerasan kaku Penelitian gelagar baja komposit pratekan dengan sistem reaksi Penelitian gelagar komposit baja kayu Penelitian daur ulang agregat campuran beton

Sektor / Alokasi Sub Anggaran (Juta Rp)

5 Penelitian pengaruh beban gandar pada sisa umur jembatan 6 Penelitian struktur jembatan gantung untuk pejalan kaki pejalan kaki 7 Penelitian struktur balok kayu gabungan untuk gelagar jembatan gelagar jembatan 8 Penelitian pemanfaatan serat sabut kelapa sebagai bahan untuk mengurangi retak susut beton semen 9 Penelitian pengaruh lingkungan pantai terhadap baja korosi lapis galvanis baja jembatan 10 Pengkajian penurunan kekuatan komponen rangka baja akibat perubahan suhu 11 Pengkajian penggunaan bahan (beton air entrained) untuk penanggulangan retak susut pada perkerasan beton semen 12 Pengkajian kerusakan beton lantai jembatan ditinjau dari mutu beton 13 Pengkajian metode deteksi pondasi jembatan lama 14 Pengkajian tipe struktur siar muai untuk konstruksi jembatan Total nilai penelitian BJBJ per tahun

=

0

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 1993

No.

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

1 Penelitian bangunan atas jembatan type struktur kabel 2 Penelitian struktur pelat beton berlapis untuk lantai jembatan untuk lantai jembatan 3 Pengkajian kolom langsing untuk struktur bangunan bawah bawah jembatan 4 Pengkajian struktur sambungan tiang pancang beton pracetak pracetak sistem monolit 5 Pengkajian jembatan gantung sistem kabel pengaku untuk satu jalur lalu-lintas 6 Pengkajian penggunaan selimut beton untuk melindungi tiang pancang baja terhadap korosi 7 Pengkajian gelagar komposit menggunakan pelat beton segmental pracetak 8 Pengkajian gelagar beton menerus sistem prategang 9 Pengkajian penggunaan bambu sebagai komponen struktur jembatan pejalan kaki di pedesaan dan struktur penahan tanah 10 Pengkajian metode perbaikan struktur jembatan 11 Pengkajian pemanfaatan karet alam untuk perletakan jembatan Total nilai penelitian BJBJ per tahun

=

0

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 1994

No.

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

1 Pengkajian nilai sisa kekuatan struktur jembatan 2 Pengkajian penggunaan elemen beton pracetak segmental untuk struktur jembatan tipe komposit 3 Pengkajian perilaku lentur dan geser balok beton kuat tekan tinggi bertulang 4 Pengkajian penanggulangan kerusakan struktur jembatan

5 Pengkajian bangunan atas bentang panjang tipe statis tak tentu 6 Pengkajian struktur bangunan penahan tebing dan bangunan pengamanan jembatan 7 Pengkajian spesifikasi pembebanan untuk perencanaan jembatan 8 Pengkajian kayu dan bambu sebagai elemen struktur bangunan pelengkap jalan di pedesaan 9 Pengkajian batu apung di Flores sebagai bahan beton semen 10 Pengkajian kekencangan baut jembatan 11 Pengkajian tingkat korosi pada tiang pancang pipa baja jembatan 12 Penyelidikan bantalan karet jembatan Total nilai penelitian BJBJ per tahun

=

0

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 1995

No.

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

1 Pengembangan struktur kepala jembatan tipe tanah bertulang 2 Pengembangan Perangkat Lunak untuk analisis struktur bangunan pelengkap jalan 3 Pengkajian Penggunaan Bangunan Atas Bentang Statis Tak Tentu Tipe Kabel 4 Penelitian perilaku beton mutu tinggi pada balok prategang untuk gelagar jembatan 5 Pengkajian penggunaan elemen beton pracetak segmental untuk struktur bangunan bawah jembatan 6 Pengkajian nilai sisa kekuatan struktur jembatan 7 Pengkajian teknologi pelat beton untuk lantai jembatan rangka baja 8 Penelitian kekecangan baut jembatan rangka baja 9 Pengembangan metode penanggulangan kerusakan jembatan 10 Pengembangan jembatan murah untuk lalu -lintas ringan 11 Pengembangan teknologi perkuatan jembatan lama dengan sistem eksternal-prestressing Total nilai penelitian BJBJ per tahun

=

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 1996

No.

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

1 Penelitian perilaku beton mutu tinggi pada balok prategang untuk gelagar jembatan 2 Pengembangan Elemen beton pracetak segmetal untuk struktur jembatan 3 Pengembangan Metode Penentuan nilai sisa kekuatan struktur jembatan 4 Pengembangan Teknologi pelat beton untuk lantai jembatan rangka baja 5 Penelitian pengaruh lendutan berlebih pada jembatan rangka baja 6 Pengembangan metode penanggulangan kerusakan jembatan 7 Pengembangan perangkat lunak untuk analisis struktur bangunan pelengkap jalan 8 Pengembangan jembatan untuk lalu-lintas ringan/sedang 9 Pengembangan teknologi perkuatan jembatan lama dengan sistem eksternal prestressing 10 Pengembangan bangunan atas bentang panjang statis tipe kabel 11 Penanggulangan korosi tiang panjang 12 Pengembangan prototipe alat pengukur ketahanan abrasi permukaan horinzontal 13 Pengembangan prototipe alat bantu pemeriksaaan lantai jembatan rangka baja australia Total nilai penelitian BJBJ per tahun

=

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 1997

No.

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

1 Penelitian bangunan pengaman pondasi jembatan terhadap pengaruh degradasi sungai 2 Penelitian perilaku model jembatan beton mutu tinggi sistem pelat dengan kabel prategang 3 Pengembangan data sistem manajemen jembatan untuk menentukan model laju perkembangan kerusakan struktur jembatan 4 Penelitian nilai sisa kekuatan struktur bangunan bawah jembatan 5 Pengembangan data base kekuatan pelat lantai beton jembatan rangka baja, dan pengembangan pemeriksaan beton dengan cara tidak merusak 6 Pengembangan metode pengujian keutuhan pondasi jembatan setelah pemancangan 7 Pengembangan perangkat lunak untuk analisis standar bangunan pelengkap jalan 8 Pengembangan teknologi perletakan dan siar muai jembatan 9 Pengembangan teknologi perkuatan jembatan lama dengan sistem steel plate bonding 10 Pengembangan prototipe alat jack untuk pengangkatan jembatan Total nilai penelitian BJBJ per tahun

=

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 1998

No.

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

1 Pengembangan Penilaian Sisa Kekuatan bangunan bawah jembatan 2 Pengembangan pemeriksaan beton dengan cara tidak merusak 3 Pengembangan piranti lunak untuk analisis struktur bangunan pelengkap jalan, konsolidasi dan dinding penahan tanah 4 Studi penggunaan karet untuk perletakan dan siar muai jembatan 5 Pengembangan data sistem manajemen jembatan untuk menentukan model laju perkembangan kerusakan struktur jembatan komposit 6 Studi beban kendaraan untuk standar pembebanan jembatan 7 Teknologi penanggulangan korosi tiang pancang 8 Penelitian bangunan pengaman pondasi jembatan terhadap pengaruh degradasi sungai 9 Pengembangan perkuatan jembatan rangka baja 10 Pengembangan prototipe kendaraan gadengan untuk menunjang kegiatan di lapangan Total nilai penelitian BJBJ per tahun

=

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 1999

No.

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

1 Penyusunan Manual untuk nilai sisa kekuatan bangunan bawah jembatan : tiang pancang/ dalam dengan alat georadar dan geoseismik 2 Pengembangan teknologi perletakan dan siar muai jembatan 3 Penentuan laju perkembangan kerusakan struktur jembatan komposit dan beton bertulang 4 Pengembangan beban standar untuk jembatan 5 Penentuan perkuatan jembatan CH, Callender Hamilton 6 Pengkajian Falling Weight Deflectometer (FWD) untuk penilaian jembatan 7 Pengkajian kerusakan beton bertulang jembatan akibat lingkungan korosif

Total nilai penelitian BJBJ per tahun

=

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 2000

No.

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

1 Pengkajian aplikasi karet sintetis dan siar muai asphaltic plug joint 2 Pengkajian penentuan perkuatan rangka baja Australia 3 Pengkajian laju kerusakan / kelelahan rangka baja jembatan 4 Pengkajian kerusakan beton bertulang akibat lingkungan korosif 5 Beton Mutu Tinggi untuk jaringan prasarana jalan wilayah 6 Penilaian bangunan bawah jembatan dengan FWD pada jaringan prasarana jalan wilayah

Total nilai penelitian BJBJ per tahun

=

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 2001

No.

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

1 Pengkajian jembatan bentang pendek segmental dengan bahan lokal 2 Aplikasi perkuatan jembatan rangka baja Australia 3 Aplikasi penggantian perletakan karet dan siar muai yang rusak pada jembatan 4 Advis Teknik pengaruh degradasi dan penggerusan sungai pada bangunan bawah jembatan 5 Advis Teknik pengaruh lingkungan korosif pada jembatan beton bertulang 6 Beton Mutu Tinggi untuk jaringan prasarana jalan wilayah 7 Peninjauan ulang peraturan gempa untuk jembatan dan pembuatan perkuatan jembatan

Total nilai penelitian BJBJ per tahun

=

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 2002

No.

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

1 Pengkajian metode perencanaan struktur beton untuk jembatan

2 Pengkajian kerusakan lantai jembatan rangka baja sistem CSP

3 Metode pelaksanaan perkuatan jembatan voided slab 4 Beton mutu tinggi untuk jaringan prasarana jalan wilayah

5 Pengkajian Peraturan Gempa untuk Jembatan

6 Monitoring Jembatan-jembatan di Kab. Bandung

Total nilai penelitian BJBJ per tahun

=

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 2003

No.

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

1 Pengembangan Sistem Informasi Jembatan (SIJ)

2 Pengkajian Peraturan Pembebanan Jembatan

3 Pengkajian perencanaan struktur baja untuk jembatan

4 Pengkajian spesifikasi beton untuk struktur jembatan

5 Pengembangan Perencanaan Pondasi Jembatan

6 Pengkajian spesifikasi siar muai dan Landasan jembatan

Total nilai penelitian BJBJ per tahun

=

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 2004

No.

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

1 Pengembangan sistem informasi manajemen jembatan (lanjutan)

2 Pengembangan teknik perbaikan kerusakan beton pada struktur

3 Pengembangan kapasitas Pustrans menjadi pusat informasi

4 Pengembangan

pemeriksaan

dan

pemeliharaan

jembatan

5 Pengkajian perencanaan penilaian kapasitas jembatan beton bertulang Total nilai penelitian BJBJ per tahun

=

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 2005

No.

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

1 Pengembangan gelagar pracetak segmental beton mutu tinggi

2 Pengkajian teknologi pemeriksaan dan pemeliharaan jembatan

3 Pengembangan

sistem

manajemen

informasi

jembatan

4 Pengembangan pemeriksaan dan pemeliharaan jembatan (Kerjasama dengan JICA) 5 Pemanfaatan bio pozzolan reaktif untuk mengurangi pemakaian semen (PC)pada beton Total nilai penelitian BJBJ per tahun

=

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 2006

No.

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

1 Sosialisasi Manual Pemeriksaan dan Pemeliharaan Jembatan 2 Pengembangan Teknologi Beton untuk Jembatan (Sub judul: Gelagar Menerus Sistem Segmental dengan Beton Mutu Tinggi) 3 Pembentukan Ettringite yang Terlambat pada Beton yang Dirawat dengan Uap Panas 4 Pemanfaatan Bio Pozolan Reaktif untuk Mengurangi Pemakaian Semen (PC) pada Beton 5 Penyusunan Data Base Bidang Jembatan 6 Metoda Sistem Penentuan Harga Satuan Pekerjaan Jembatan 7 Pengkajian dan Penerapan Teknologi Material Polimer (Aplikasi Perkuatan Jembatan) 8 Pendidikan dan Pelatihan Teknis Pembuatan Modul Training Bidang Jembatan 9 Diseminasi dan Sosialisasi NSPM pada Skala Penuh Bidang Jembatan 10 Konsensus dan Kaji Ulang Spesifikasi Buku 3 / Kaji Ulang Bidang Jembatan 11 Audit Teknologi Bidang Jembatan 12 Peralatan Penunjang Data Base Bidang Jembatan Total nilai penelitian BJBJ per tahun

=

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 2007

No.

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

1 Penggunaan Bio_pozzolan Eks Limbah Ampas Penggilingan Tebu untuk Meningkatkan Keawetan Beton terhadap Serangan Korosi dan Kekuatan Struktur Beton 2 Penambahan Bahan Karet dalam Campuran beton untuk Mendapatkan Beton Karet (Flexible Concrete) 3 Penyusunan DED Perkuatan Gelagar Baja Komposit dengan Sistem Prategang 4 Penyusunan DED Struktur Pelat Pracetak untuk Penggantian Lantai Jembatan 5 Pengawasan dan Kajian Uji Coba Skala Penuh (Prototype) Jembatan Cable Stayed Sederhana 6 Kajian dan Monitoring uji Coba Jembatan Cijalu Pengembangan Data Base dan Upgrading Data Bidang 7 Jembatan 8 Pembuatan Modul Pelatihan Bidang Jembatan Modal Jembatan Gantung Total nilai penelitian BJBJ per tahun

=

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 2008

No.

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

1 PENGGUNAAN BIOPOZZOLAN EKS LIMBAH PENGGILINGAN TEBU UNTUK PENINGKATAN MUTU BETON

2 PENGUJIAN DAN MONITORING MODEL PERKERASAN BETON DENGAN BETON KARET 3 PENGAWASAN PEKERJAAN UJI SKALA PENUH PERKUATAN GELAGAR BAJA KOMPOSIT DENGAN SISTEM FLENS PRATEGANG BAJA 4 KAJIAN DAN PENGAWASAN UJI SKALA PENUH JEMBATAN GANTUNG SEDERHANA 5 STRUKTUR BETON PRA-TEKAN PASCA KEBAKARAN PENYUSUNAN BAHAN AJAR AUDIO VISUAL BIDANG 6 JEMBATAN PENGEMBANGAN DATA BASE DAN UP DATING DATA 7 BIDANG JEMBATAN

Kajian dan Pengawasan Uji Coba Skala Penuh Pelat Ortotropik 8 Baja untuk Penggantian Lantai Jembatan Rangka Baja 9 Modal Jembatan Gantung 10 Modal Jembatan Citarum (batal) Total nilai penelitian BJBJ per tahun

=

DAFTAR KEGIATAN LITBANG BALAI JEMBATAN DAN BANGUNAN PELENGKAP JALAN PUSLITBANG PRASARANA TRANSPORTASI T.A. 2009

No.

Judul Penelitian

Sektor / Alokasi Sub Anggaran (Juta Rp)

1 Pengembangan Pilar Beton Tinggi 2 Pengkajian Penerapan Jembatan Konstruksi Lantai Menerus dan jembatan Terintegrasi 3 Data Base Monitoring Jembatan Pasca Perkuatan 4 Kajian dan Pengawasan Uji Coba Skala Penuh Jembatan Cable Stayed untuk Pejalan Kaki Tahap III 5 Kajian dan Pengawasan Uji Coba Skala Penuh Gelagar Baja Komposit dengan Sistem Flens Prategang Baja 6 Kajian dan Pengawasan Uji Coba Skala Penuh Pelat Ortrotopik Baja Untuk Penggantian Lantai Jembatan Rangka 7 Baja 8 Uji Coba Skala Penuh Jembatan Cable Stayed untuk Pejalan Kaki Tahap III 9 Uji Coba Skala Penuh Gelagar Baja Komposit dengan Sistem Flens Prategang Baja 10 Uji Coba Skala Penuh Pelat Ortotropik Baja untuk Penggantian Lantai Jembatan Rangka Baja Total nilai penelitian BJBJ per tahun

=

Related Documents

Litbang 79 05-pdf
May 2020 18
05pdf Matisse
November 2019 24
79
November 2019 55
79
April 2020 31
79
November 2019 34
79
November 2019 30

More Documents from ""

Nspm-perencanaan
May 2020 24
Litbang 79 05-pdf
May 2020 18
Nspm-konstruksi
May 2020 25
Nspm-penanganan
May 2020 26
Notulen Roadmap
May 2020 13