Kwitansi Pembayaran Ded Numana Ok.docx

  • Uploaded by: harun uddin
  • 0
  • 0
  • December 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Kwitansi Pembayaran Ded Numana Ok.docx as PDF for free.

More details

  • Words: 2,506
  • Pages: 21
01 / Honor / SDK / X / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Empat Belas Juta Lima Ratus Ribu Rupiah Honor Team Leader Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018

14500000

ZAPARMAN, ST

02 / Honor / SDK / X / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Dua Belas Juta Lima Ratus Ribu Rupiah Honor Ahli Arsitektur Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018 12500000

HERY MUSLIM, ST

03 / Honor / SDK / X / 2018

Bendahara CV. SENTRADESAIN KONSULTAN Dua Belas Juta Lima Ratus Ribu Rupiah Honor Ahli Sipil Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018 12500000

IRSAN RAKHMAN KALHI, ST

04 / Honor / SDK / X / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Empat Juta Lima Ratus Ribu Rupiah Honor Estimator Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018

4500000

JOHAN HALIK, ST

05 / Honor / SDK / X / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Empat Juta Lima Ratus Ribu Rupiah Honor Mekanikal/Elektrikal Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018 4500000

MUH. ASKAL BASIR, ST

06 / Honor / SDK / X / 2018

Bendahara CV. SENTRADESAIN KONSULTAN Empat Juta Rupiah Honor Juru Ukur Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018 4000000

HENDRAWAN, ST

07 / Honor / SDK / X / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Empat Juta Rupiah Honor Juru Ukur Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018

4000000

HAMRIN, ST

08 / Honor / SDK / X / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Empat Juta Rupiah Honor Juru Ukur Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018 4000000

MUH. RISKI RIZAL ADRI, ST

09 / Honor / SDK / X / 2018

Bendahara CV. SENTRADESAIN KONSULTAN Empat Juta Rupiah Honor Juru Ukur Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018 4000000

DADANG HUSNI M. IQBAL, ST

010 / Honor / SDK / X / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Empat Juta Rupiah Honor Drafter/Operator Komputer Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018

4000000

ARIF RAHMAN, ST

011 / Honor / SDK / X / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Dua Juta Lima Ratus Ribu Rupiah Honor Administrasi Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018 2500000

ALFIAN ASMARA

012 / Biaya / SDK / X / 2018

Bendahara CV. SENTRADESAIN KONSULTAN Dua Juta Lima Ratus Ribu Rupiah Biaya Operasional Kantor dan Lapangan Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018 2500000

ZAPARMAN, ST

013 / Biaya / SDK / X / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Satu Juta Dua Ratus Lima Puluh Ribu Rupiah Biaya ATK dan Suplay Bahan Komputer Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018

1250000

ZAPARMAN, ST

014 / Biaya / SDK / X / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Satu Juta Lima Ratus Ribu Rupiah Biaya Biaya Perjalanan Tim Ahli Surveyor Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018 1500000

ZAPARMAN, ST

015 / Biaya / SDK / X / 2018

Bendahara CV. SENTRADESAIN KONSULTAN Tujuh Ratus Lima Puluh Ribu Rupiah Biaya Biaya Pengambilan Data Lapangan Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018 750000

ZAPARMAN, ST

016 / Biaya / SDK / X / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Satu Juta Delapan Ratus Tujuh Puluh Lima Ribu Rupiah Biaya Sewa Kendaraan Operasional Tim Ahli (Roda 4) Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018

1875000

HAMID

017 / Biaya / SDK / X / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Enam Ratus Ribu Rupiah Biaya Sewa Kendaraan Operasional Survey (Roda 2) Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018 600000

HARUN UDDIN

018 / Biaya / SDK / X / 2018

Bendahara CV. SENTRADESAIN KONSULTAN Enam Ratus Ribu Rupiah Biaya Sewa Kendaraan Operasional Survey (Roda 2) Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018 600000

ZAPARMAN

019 / Biaya / SDK / X / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Seratus Dua Puluh Lima Ribu Rupiah Biaya Dokumentasi Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018

125000

ZAPARMAN, ST

020 / Biaya / SDK / X / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Tujuh Ratus Lima Puluh Ribu Rupiah Biaya Gambar DED (A3) Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018 750000

ZAPARMAN, ST

021 / Biaya / SDK / X / 2018

Bendahara CV. SENTRADESAIN KONSULTAN Dua Ratus Lima Puluh Ribu Rupiah Biaya Dokumen RAB (A4) Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018 250000

ZAPARMAN, ST

022 / Biaya / SDK / X / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Dua Ratus Lima Puluh Ribu Rupiah Biaya Dokumen RKS (A4) Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018

250000

ZAPARMAN, ST

023 / Biaya / SDK / X / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Dua Puluh Ribu Rupiah Biaya Back Up DVD Penyusunan DED SKPT Numana Periode 10 September 2018 s/d 09 Oktober 2018 Wangi-Wangi,09 Oktober 2018 20000

ZAPARMAN, ST

024 / Honor / SDK / XI / 2018

Bendahara CV. SENTRADESAIN KONSULTAN Empat Belas Juta Lima Ratus Ribu Rupiah Honor Team Leader Penyusunan DED SKPT Numana Periode 10 Oktober 2018 s/d 08 Nopember 2018 Wangi-Wangi,08 Nopember 2018 14500000

ZAPARMAN, ST

025 / Honor / SDK / XI / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Dua Belas Juta Lima Ratus Ribu Rupiah Honor Ahli Arsitektur Penyusunan DED SKPT Numana Periode 10 Oktober 2018 s/d 08 Nopember 2018 Wangi-Wangi,08 Nopember 2018

12500000

HERY MUSLIM, ST

026 / Honor / SDK / XI / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Dua Belas Juta Lima Ratus Ribu Rupiah Honor Ahli Sipil Penyusunan DED SKPT Numana Periode 10 Oktober 2018 s/d 08 Nopember 2018 Wangi-Wangi,08 Nopember 2018 12500000

IRSAN RAKHMAN KALHI, ST

027 / Honor / SDK / XI / 2018

Bendahara CV. SENTRADESAIN KONSULTAN Empat Juta Lima Ratus Ribu Rupiah Honor Estimator Penyusunan DED SKPT Numana Periode 10 Oktober 2018 s/d 08 Nopember 2018 Wangi-Wangi,08 Nopember 2018 4500000

JOHAN HALIK, ST

028 / Honor / SDK / XI / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Empat Juta Lima Ratus Ribu Rupiah Honor Mekanikal/Elektrikal Penyusunan DED SKPT Numana Periode 10 Oktober 2018 s/d 08 Nopember 2018 Wangi-Wangi,08 Nopember 2018

4500000

MUH. ASKAL BASIR, ST

029 / Honor / SDK / XI / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Empat Juta Rupiah Honor Drafter/Operator Komputer Penyusunan DED SKPT Numana Periode 10 Oktober 2018 s/d 08 Nopember 2018 Wangi-Wangi,08 Nopember 2018 4000000

ARIF RAHMAN, ST

030 / Honor / SDK / XI / 2018

Bendahara CV. SENTRADESAIN KONSULTAN Dua Juta Lima Ratus Ribu Rupiah Honor Administrasi Penyusunan DED SKPT Numana Periode 10 Oktober 2018 s/d 08 Nopember 2018 Wangi-Wangi,08 Nopember 2018 2500000

ALFIAN ASMARA

031 / Honor / SDK / XI / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Dua Juta Lima Ratus Ribu Rupiah Honor Operasional Kantor dan Lapangan Penyusunan DED SKPT Numana Periode 10 Oktober 2018 s/d 08 Nopember 2018 Wangi-Wangi,08 Nopember 2018

2500000

ZAPARMAN, ST

032 / Biaya / SDK / XI / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Satu Juta Dua Ratus Lima Puluh Ribu Rupiah Biaya ATK dan Suplay Bahan Komputer Penyusunan DED SKPT Numana Periode 10 Oktober 2018 s/d 08 Nopember 2018 Wangi-Wangi,08 Nopember 2018 1250000

ZAPARMAN, ST

033 / Biaya / SDK / XI / 2018

Bendahara CV. SENTRADESAIN KONSULTAN Satu Juta Lima Ratus Ribu Rupiah Biaya Biaya Perjalanan Tim Ahli Surveyor Penyusunan DED SKPT Numana Periode 10 Oktober 2018 s/d 08 Nopember 2018 Wangi-Wangi,08 Nopember 2018 1500000

ZAPARMAN, ST

034 / Biaya / SDK / XI / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Tujuh Ratus Lima Puluh Ribu Rupiah Biaya Biaya Pengambilan Data Lapangan Penyusunan DED SKPT Numana Periode 10 Oktober 2018 s/d 08 Nopember 2018 Wangi-Wangi,08 Nopember 2018

750000

ZAPARMAN, ST

035 / Biaya / SDK / XI / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Satu Juta Delapan Ratus Tujuh Puluh Lima Ribu Rupiah Biaya Sewa Kendaraan Operasional Tim Ahli (Roda 4) Penyusunan DED SKPT Numana Periode 10 Oktober 2018 s/d 08 Nopember 2018 Wangi-Wangi,08 Nopember 2018 1875000

HAMID

036 / Biaya / SDK / XI / 2018

Bendahara CV. SENTRADESAIN KONSULTAN Enam Ratus Ribu Rupiah Biaya Sewa Kendaraan Operasional Survey (Roda 2) Penyusunan DED SKPT Numana Periode 10 Oktober 2018 s/d 08 Nopember 2018 Wangi-Wangi,08 Nopember 2018 600000

HARUN UDDIN

037 / Biaya / SDK / XI / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Enam Ratus Ribu Rupiah Biaya Sewa Kendaraan Operasional Survey (Roda 2) Penyusunan DED SKPT Numana Periode 10 Oktober 2018 s/d 08 Nopember 2018 Wangi-Wangi,08 Nopember 2018

600000

ZAPARMAN

038 / Biaya / SDK / XI / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Seratus Dua Puluh Lima Ribu Rupiah Biaya Dokumentasi Penyusunan DED SKPT Numana Periode 10 Oktober 2018 s/d 08 Nopember 2018 Wangi-Wangi,08 Nopember 2018 125000

ZAPARMAN, ST

039 / Biaya / SDK / XI / 2018

Bendahara CV. SENTRADESAIN KONSULTAN Tujuh Ratus Lima Puluh Ribu Rupiah Biaya Gambar DED (A3) Penyusunan DED SKPT Numana Periode 10 Oktober 2018 s/d 08 Nopember 2018 Wangi-Wangi,08 Nopember 2018 750000

ZAPARMAN, ST

040 / Biaya / SDK / XI / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Dua Ratus Lima Puluh Ribu Rupiah Biaya Dokumen RAB (A4) Penyusunan DED SKPT Numana Periode 10 Oktober 2018 s/d 08 Nopember 2018 Wangi-Wangi,08 Nopember 2018

250000

ZAPARMAN, ST

041 / Biaya / SDK / XI / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Dua Ratus Lima Puluh Ribu Rupiah Biaya Dokumen RKS (A4) Penyusunan DED SKPT Numana Periode 10 Oktober 2018 s/d 08 Nopember 2018 Wangi-Wangi,08 Nopember 2018 250000

ZAPARMAN, ST

042 / Biaya / SDK / XI / 2018

Bendahara CV. SENTRADESAIN KONSULTAN Dua Puluh Ribu Rupiah Biaya Back Up DVD Penyusunan DED SKPT Numana Periode 10 Oktober 2018 s/d 08 Nopember 2018 Wangi-Wangi,08 Nopember 2018 20000

ZAPARMAN, ST

043 / Honor / SDK / XII / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Empat Belas Juta Lima Ratus Ribu Rupiah Honor Team Leader Penyusunan DED SKPT Numana Periode 09 Nopember 2018 s/d 08 Desember 2018 Wangi-Wangi,08 Desember 2018

14500000

ZAPARMAN, ST

044 / Honor / SDK / XII / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Dua Belas Juta Lima Ratus Ribu Rupiah Honor Ahli Arsitektur Penyusunan DED SKPT Numana Periode 09 Nopember 2018 s/d 08 Desember 2018 Wangi-Wangi,08 Desember 2018 12500000

HERY MUSLIM, ST

045 / Honor / SDK / XII / 2018

Bendahara CV. SENTRADESAIN KONSULTAN Dua Belas Juta Lima Ratus Ribu Rupiah Honor Ahli Sipil Penyusunan DED SKPT Numana Periode 09 Nopember 2018 s/d 08 Desember 2018 Wangi-Wangi,08 Desember 2018 12500000

IRSAN RAKHMAN KALHI, ST

046 / Honor / SDK / XII / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Empat Juta Lima Ratus Ribu Rupiah Honor Estimator Penyusunan DED SKPT Numana Periode 09 Nopember 2018 s/d 08 Desember 2018 Wangi-Wangi,08 Desember 2018

4500000

JOHAN HALIK, ST

047 / Honor / SDK / XII / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Empat Juta Lima Ratus Ribu Rupiah Honor Mekanikal/Elektrikal Penyusunan DED SKPT Numana Periode 09 Nopember 2018 s/d 08 Desember 2018 Wangi-Wangi,08 Desember 2018 4500000

MUH. ASKAL BASIR, ST

048 / Honor / SDK / XII / 2018

Bendahara CV. SENTRADESAIN KONSULTAN Empat Juta Rupiah Honor Drafter/Operator Komputer Penyusunan DED SKPT Numana Periode 09 Nopember 2018 s/d 08 Desember 2018 Wangi-Wangi,08 Desember 2018 4000000

ARIF RAHMAN, ST

049 / Honor / SDK / XII / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Dua Juta Lima Ratus Ribu Rupiah Honor Administrasi Penyusunan DED SKPT Numana Periode 09 Nopember 2018 s/d 08 Desember 2018 Wangi-Wangi,08 Desember 2018

2500000

ALFIAN ASMARA

050 / Biaya / SDK / XII / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Lima Juta Rupiah Biaya Operasional Kantor dan Lapangan Penyusunan DED SKPT Numana Periode 09 Nopember 2018 s/d 08 Desember 2018 Wangi-Wangi,08 Desember 2018 5000000

ZAPARMAN, ST

051 / Biaya / SDK / XII / 2018

Bendahara CV. SENTRADESAIN KONSULTAN Dua Juta Lima Ratus Ribu Rupiah Biaya ATK dan Suplay Bahan Komputer Penyusunan DED SKPT Numana Periode 09 Nopember 2018 s/d 08 Desember 2018 Wangi-Wangi,08 Desember 2018 2500000

ZAPARMAN, ST

052 / Biaya / SDK / XII / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Tiga Juta Rupiah Biaya Biaya Perjalanan Tim Ahli Surveyor Penyusunan DED SKPT Numana Periode 09 Nopember 2018 s/d 08 Desember 2018 Wangi-Wangi,08 Desember 2018

3000000

ZAPARMAN, ST

053 / Biaya / SDK / XII / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Satu Juta Lima Ratus Ribu Rupiah Biaya Biaya Pengambilan Data Lapangan Penyusunan DED SKPT Numana Periode 09 Nopember 2018 s/d 08 Desember 2018 Wangi-Wangi,08 Desember 2018 1500000

ZAPARMAN, ST

054 / Biaya / SDK / XII / 2018

Bendahara CV. SENTRADESAIN KONSULTAN Tiga Juta Tujuh Ratus Lima Puluh Ribu Rupiah Biaya Sewa Kendaraan Operasional Tim Ahli (Roda 4) Penyusunan DED SKPT Numana Periode 09 Nopember 2018 s/d 08 Desember 2018 Wangi-Wangi,08 Desember 2018 3750000

HAMID

055 / Biaya / SDK / XII / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Enam Ribu Rupiah Biaya Sewa Kendaraan Operasional Survey (Roda 2) Penyusunan DED SKPT Numana Periode 09 Nopember 2018 s/d 08 Desember 2018 Wangi-Wangi,08 Desember 2018

600000

HARUN UDDIN

056 / Biaya / SDK / XII / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Enam Ribu Rupiah Biaya Sewa Kendaraan Operasional Survey (Roda 2) Penyusunan DED SKPT Numana Periode 09 Nopember 2018 s/d 08 Desember 2018 Wangi-Wangi,08 Desember 2018 600000

ZAPARMAN

057 / Biaya / SDK / XII / 2018

Bendahara CV. SENTRADESAIN KONSULTAN Dua Ratus Lima Puluh Ribu Rupiah Biaya Dokumentasi Penyusunan DED SKPT Numana Periode 09 Nopember 2018 s/d 08 Desember 2018 Wangi-Wangi,08 Desember 2018 250000

ZAPARMAN, ST

058 / Biaya / SDK / XII / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Dua Juta Dua Ratus Lima Puluh Ribu Rupiah Biaya Gambar DED (A3) Penyusunan DED SKPT Numana Periode 09 Nopember 2018 s/d 08 Desember 2018 Wangi-Wangi,08 Desember 2018

2250000

ZAPARMAN, ST

059 / Biaya / SDK / XII / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Tujuh Ratus Lima Puluh Ribu Rupiah Biaya Dokumen RAB (A4) Penyusunan DED SKPT Numana Periode 09 Nopember 2018 s/d 08 Desember 2018 Wangi-Wangi,08 Desember 2018 750000

ZAPARMAN, ST

060 / Biaya / SDK / XII / 2018

Bendahara CV. SENTRADESAIN KONSULTAN Tujuh Ratus Lima Puluh Ribu Rupiah Biaya Dokumen RKS (A4) Penyusunan DED SKPT Numana Periode 09 Nopember 2018 s/d 08 Desember 2018 Wangi-Wangi,08 Desember 2018 750000

ZAPARMAN, ST

061 / Biaya / SDK / XII / 2018 Bendahara CV. SENTRADESAIN KONSULTAN Enam Puluh Ribu Rupiah Biaya Back Up DVD Penyusunan DED SKPT Numana Periode 09 Nopember 2018 s/d 08 Desember 2018 Wangi-Wangi,08 Desember 2018

60000

ZAPARMAN, ST

Related Documents

Ded
May 2020 15
Pembayaran
October 2019 40
Kwitansi Belanja.docx
May 2020 17
Ded Ipa.pdf
December 2019 13

More Documents from "Riki Adhe Putra"

Bulog Ereke.docx
April 2020 13
Agnes.docx
December 2019 14
Add Kontrak.xls
December 2019 20
Foto Pagar.pdf
April 2020 9