estim A
B
C
1
COST ANALYSIS
2
GREEN AT FARIDABAD SECTOR 77
3
TOTAL NO. OF UNIT OF 2BRHK IN THIS TOWER
4 TOTAL 5
7
ITEM
8
11 12 13 14 15 16
FOR SINGLE TOWER OF 2BRHK IN KLJ ( TOWER NO. A1) = 54
BASEMENT AREA = 9059.0sqft , Stilt area = 2113.0sqft NORMAL FINISHING
10
E
AREA OF TOWER = 54 X 1279 SQFT = 69066.0SQFT
6
9
D
QUANTITY 69066.0sqft
UNIT COST TOTAL BUDGET 25/sqft
1726650
1) PROFESSIONAL FEES FOR CONSULTANTS I.E ARCHITECTS, ENGINEER LANDSCAPE ARCHITECT , ENVIRONMENTAL ENGINEER, GEOTECH SURVEY AND ANALYSIS, TRAFFIC CONSULTANCY, DEVELOPMENT CODE SUFFICIENCY , Seite 1
REMARKS
F
estim A
B
C
D
69066.0sqft
54/sqft
3729564
E
17 18
2)PROJECT
19 MANAGEMENT CONSULTANCY
(PMC)
5456214
20
3)COST OF BLDG.CONS.
21
1)Earth work
4071CUM
105/CUM
427455
22
2)LCC( 1:4:8)
135.7CUM
2100/CUM
284970
23
712425
24
4)RCC Work
25
CONCRETEING
26
a)raft
530 CUM
3800
2014000
27
b)retaining wall
230 CUM
3800
874000
28
c)lintels
38 CUM
4100
155800
29
d)columns
1400 CUM
4400
6160000
30
e)beams
725 CUM
4400
3190000
31
f)slab
860 CUM
4400
3784000
32
g)stair
71 CUM
4400
312400
33
h)misc.
65 CUM
4400
286000
Seite 2
F
estim A
B
C
D
34
E 16776200
35
REINFORCEMENT
36
a)raft
65TON
36000
2340000
37
b)retaining wall
25 TON
36000
900000
38
c)lintels
5.7 TON
36000
205200
39
d)columns
180 TON
36000
6480000
40
e)beams
110 TON
36000
3960000
41
f)slab
130 TON
36000
4680000
42
g)stair
10 TON
36000
360000
43
h)misc.
10 TON
36000
360000
44
19285200
45
SHUTTERING
46
a)raft
47
b)retaining wall
48 49
1095. 9 SQ. MTR
110 SQ.MTR
120549
c)lintels
247.5 SQ.MTR
110 SQ.MTR
27225
d)columns
4416 SQ.MTR
110 SQ.MTR
485760
Seite 3
F
estim A
B
C
D
E
50
e)beams
6800 SQ.MTR
120 SQ.MTR
816000
51
f)slab
6961 SQ.MTR
120 SQ.MTR
835320
52
g)stair
385 SQ.MTR
150 SQ.MTR
57750
53
h)misc.
200 SQ.MTR
150 SQ.MTR
30000
54
4)BRICK WORK
1918 SQ.MTR
2300/- SQ.MTR
4411400
55
5)plaster & Painting
56
a) plaster (internal)
15123.6 SQ.MTR
120/- SQ.MTR
1814760
57
b) plaster (ext)
9710.5 SQ.MTR
160/- SQ.MTR
1553680
58
c) plaster (ceiling)
5894.2 SQ.MTR
130/- SQ.MTR
766246
59
d) painting (ext)
9710.5 SQ.MTR
50/- SQ.MTR
485525
60
e) painting (internal)obd
21017 SQ.MTR
120/- SQ.MTR
2522040
(INCLUDES POP)
61
6)Door & Window 2184 SQ.MTR
3500/- SQ.MTR
7644000
Including glazing ,frame,hardware
62 f) doors & windows
Seite 4
2372604
F
estim A 63
7) toilets (including tiles)
64
8) elevators
B
C
D
E
108 NOS.
28000 /NOS.
3024000
CP , SANITARY, TILES
2 NOS.
2500000 /NOS.
5000000
Including emergency
65 66
Supply and anc. Work
9)Flooring
a) flooring ( vitrified tiles) b) cement conc. 68 Floor 67
69
10) Kitchen
5306 SQ.MTR
650/- SQ.MTR
3448900
1115.56 SQ.MTR
200/- SQ.MTR
223000
54 NOS.
16000/ NOS.
864000
70
Total 4 to
10 =
Plumbing ,granite ,tile, ss sink 31757551
71
11)Stair & balcony railing
5600sqft
110/sqft
616000
72
12)Water proofing
5200sqft
60/sqft
312000
73
Terrace
74
13)Electrical work
3900points
550/point
2145000
75
Including TV ,telephone
Seite 5
F
estim A 76
Internet , cabling ,
77
Switches , points ,
78
Mcb etc , but excluding
79
Power supply
B
C
D
E
80 Transformer etc 81 82 83
3073000
RS-1151/ SQFT OF SALE AREA . EXCLUDING , EXTERNAL AMENITIES , FIRE SAFETY PROVISONS ETC.
Seite 6
F