Keu

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Keu as PDF for free.

More details

  • Words: 2,923
  • Pages: 25
DIPA ( Lembar I )

DAFTAR KEADAAN KREDIT ANGGARAN DAN KAS 1. 2. 3. 4.

Departemen Lembaga : Pekerjaan Umum Kode Unit Organisasi : Direktorat Jenderal Bina Marga (033) Provinsi : Sulawesi Selatan (19) Satuan Kerja : Perenc.& Pengws.Jln dan Jembt Metro Makassar (496199) Non Vertikal Tertentu 5. Tempat : Makassar 6. Alamat : Jl. Toddopuli Raya Timur Komp. Villa Surya Mas Blok H2

KODE SATKER/ KODE KEGIATAN/ NO SUB KEGIATAN/ MAK 1

I 1 2 3 II 1 2 III 1 2 3 4 IV 1 2 3 4 5 6 7 8 9 10

2

496199 01.90.19.0001 0001.0001.5121 0001.0001.5122 0001.0024.5111 01.90.19.0002 0002.0926.5211 0002.2007.5221 01.90.19.0004 0004.0256.5231 0004.1043.5231 0004.1138.5231 0004.2005.5231 04.08.02.4346 4346.0002.5121 4346.0002.5211 4346.0002.5212 4346.0002.5241 4346.0054.5221 4346.0121.5221 4346.0657.5211 4346.0657.5212 4346.0657.5221 4346.0657.5241 JUMLAH UYHD

SPP SAMPAI DENGAN BULAN YANG LALU (Rp.)

PAGU DALAM DIPA (Rp.) 3

4

152,712,000.00 86,760,000.00 13,152,000.00 52,800,000.00 23,078,000.00 10,700,000.00 12,378,000.00 10,500,000.00 500,000.00 1,000,000.00 8,000,000.00 1,000,000.00 1,909,110,000.00 49,700,000.00 12,860,000.00 8,000,000.00 35,500,000.00 200,000,000.00 1,434,050,000.00 7,500,000.00 45,800,000.00 52,000,000.00 63,700,000.00

###

(Rp.) 5

### -

JUMLAH SPP SAMPAI DENGAN BULAN INI (Rp.)

SISA DANA (Rp.)

6

55,609,000.00 10,849,000.00 34,169,000.00 6,833,000.00 5,980,000.00 1,196,000.00 15,460,000.00 2,820,000.00 8,837,182.00 1,342,712.00 5,527,500.00 3,309,682.00 1,342,712.00 5,612,370.00 500,000.00 880,000.00 3,742,370.00 490,000.00 ### 62,989,933.00 20,650,000.00 3,200,000.00 6,094,792.00 4,360,000.00 33,340,000.00 2,150,000.00 217,780,824.00 41,619,933.00 566,500.00 17,100,000.00 4,500,000.00 17,000,000.00 3,840,000.00 11,520,000.00

### -

SPP BULAN INI

NOMOR : 7. DIPA : 1102.0/033-04.0/-/2007 8. Tanggal : 31 Desember 2006 9.Tolok Ukur :10.Kode Tolak Ukur: 11.Jenis Pengeluaran :12.Tahun Anggaran: 2007 13.Bulan : Juli

7

66,458,000.00 86,254,000.00 41,002,000.00 45,758,000.00 7,176,000.00 5,976,000.00 18,280,000.00 34,520,000.00 10,179,894.00 12,898,106.00 5,527,500.00 5,172,500.00 4,652,394.00 7,725,606.00 5,612,370.00 4,887,630.00 500,000.00 880,000.00 120,000.00 3,742,370.00 4,257,630.00 490,000.00 510,000.00 ### 1,525,387,951.00 23,850,000.00 25,850,000.00 6,094,792.00 6,765,208.00 4,360,000.00 3,640,000.00 35,490,000.00 10,000.00 200,000,000.00 259,400,757.00 1,174,649,243.00 566,500.00 6,933,500.00 21,600,000.00 24,200,000.00 17,000,000.00 35,000,000.00 15,360,000.00 48,340,000.00

### -

### -

Makassar, 31 Juli 2007 Mengetahui , Kepala SNVT Perencanaan & Pengawasan Jalan dan Jembatan Metro Makassar

Bendaharawan,

Vici Hartawan Tjaja,ST.,MT. NIP. 110055263

Drs. Rachmat Djafar NIP. 110033054

Keuangan/Keu.07_Lapkeu

-

4.0/-/2007

###

7,992,712.00

5,350,000.00

###

1,189,907.00 9,010,000.00 ### ### ###

SKPA ( Lembar I )

DAFTAR KEADAAN KREDIT ANGGARAN DAN KAS 1. 2. 3. 4.

Departemen Lembaga : Pekerjaan Umum Kode NOMOR : Unit Organisasi : Direktorat Jenderal Bina Marga (033) 7. SKPA : SKPA-340/WPB.11/PK.02/2007 Provinsi : Sulawesi Selatan (19) 8. Tanggal : 07 Juni 2007 Satuan Kerja : Perenc.& Pengws.Jln dan Jembt Metro Makassar (496199) 9.Tolok Ukur :Non Vertikal 10.Kode Tolak Ukur :Tertentu 5. Tempat : Makassar 11.Jenis Pengeluaran :6. Alamat : Jl. Toddopuli Raya Timur Komp. Villa Surya Mas Blok H2 12.Tahun Anggaran : 2007 13.Bulan : Juli KODE SATKER/ KODE KEGIATAN/ NO SUB KEGIATAN/ MAK 1

2

PAGU DALAM SKPA (Rp.)

SPP SAMPAI JUMLAH SPP SPP BULAN INI DENGAN BULAN SAMPAI DENGAN YANG LALU BULAN INI (Rp.) (Rp.) (Rp.)

3

4

5

SISA DANA (Rp.)

6

7

496199

I

04.08.02.4346

450,000,000.00

-

###

###

326,206,000.00

4346.0054.5221

450,000,000.00

-

###

###

326,206,000.00

JUMLAH

450,000,000.00

-

###

###

326,206,000.00

Makassar, 31 Juli 2007 Mengetahui , Kepala SNVT Perencanaan & Pengawasan Jalan dan Jembatan Metro Makassar

Bendaharawan,

Vici Hartawan Tjaja,ST.,MT. NIP. 110055263

Drs. Rachmat Djafar NIP. 110033054

Keuangan/Keu.07_Lapkeu

PB.11/PK.02/2007

1,189,907.00 ### #REF! #REF!

DIPA (Lembar 2)

LAPORAN KEADAAN KREDIT ANGGARAN KAS 1 Departemen Lembaga : Pekerjaan Umum Nomor : 2 Unit Organsasi : Direktorat Jenderal Bina Marga 7. DIPA 3 Satuan Kerja Non Vertikal : Perenc.& Pengws. Jalan dan Jembatan Metro Makassar 8. Tanggal Tertentu 9. Tolok Ukur 4 Provinsi : Sulawesi Selatan 10. Tahun Anggaran 5 Tempat : Makassar 11. B u l a n 12. Nomor NPLN 6 Alamat : Jl. Toddopuli Raya Timur Komp. Villa Surya Mas Blok H2 NO.

I

URAIAN

KETERANGAN

JUMLAH (Rp)

2,037,288.00

1.5.

Terdiri dari :

1.2. Tambahan bulan ini

19,512,712.00

a.

Uang Tunai

Rp.

1,077.00

1.3. Jumlah

21,550,000.00

b.

Saldo pada Bank

Rp.

59,656.00

1.4. Setoran bulan ini

21,489,267.00

1.5. Keadaan pada akhir bulan ini (1.3 - 1.4)

60,733.00

PAJAK 2.1. Penerimaan s/d bulan yang yl 2.2. Penerimaan bulan ini

Rp.

c

SPPG blm di SPM GU-kan

Rp.

-

d

Kwitansi blmdi SPPGU-kan

Rp.

-

36,094,058.00

2.4. Setoran s/d bulan yang yl

36,094,058.00

Uang Muka Kerja Jumlah ( c + d + e )

6,596,232.00 42,690,290.00

2.6. Jumlah Setoran

Jumlah (a + b )

e

2.3. Jumlah Penerimaan 2.5. Setoran bulan ini

Jumlah (a + b ) - (c+d+e) 2.7

60,733.00

Rp.

-

Rp.

-

Rp.

60,733.00

Terdiri dari :

-

6,596,232.00

a.

Uang Tunai

-

42,690,290.00

b.

Saldo pada Bank

2.7. Sisa pada akhir bulan ini ( 2.3 + 2.5 ) III

1102.0/033-04.0/-/2007 31 Desember 2006 Sebanyak …. Jenis 2007 Juli -

UYHD 1.1. Keadaan pada akhir bulan ini yang lalu

II

JUMLAH (Rp)

: : : : : :

-

-

Jumlah (a + b)

-

LAIN - LAIN 3.1. Penerimaan s/d bulan yl

-

3.7

3.2. Penerimaan bulan ini

-

a.

Uang Tunai

3.3. Jumlah Penerimaan

-

b.

Saldo pada Bank

3.5. Setoran bulan ini

-

3.6. Jumlah Setoran

-

3.7. Sisa pada akhir bulan ini ( 3.3 - 3.5 )

-

KEADAAN KAS PADA AKHIR BULAN INI ( 1.5 a dan b + 2.7 + 3.7 )

-

Terdiri dari : -

Jumlah (a + b)

-

Terbilang : Enam Puluh Ribu Tujuh Ratus Tiga Puluh Tiga Rupiah

Makassar, 31 Juli 2007 Mengetahui , Kepala SNVT Perencanaan & Pengawasan Jalan dan Jembatan Metro Makassar

Bendaharawan,

Vici Hartawan Tjaja,ST.,MT. NIP. 110055263

Drs. Rachmat Djafar NIP. 110033054

SKPA (Lembar 2)

LAPORAN KEADAAN KREDIT ANGGARAN KAS 1 Departemen Lembaga : Pekerjaan Umum Nomor : 2 Unit Organsasi : Direktorat Jenderal Bina Marga 7. SKPA 3 Satuan Kerja Non Vertikal : Perenc.& Pengws. Jalan dan Jembatan Metro Makassar 8. Tanggal Tertentu 9. Tolok Ukur 4 Provinsi : Sulawesi Selatan 10. Tahun Anggaran 5 Tempat : Makassar 11. B u l a n 12. Nomor NPLN 6 Alamat : Jl. Toddopuli Raya Timur Komp. Villa Surya Mas Blok H2 NO.

I

II

URAIAN

JUMLAH (Rp)

SKPA-340/WPB.11/PK.02/2007 07 Juni 2007 Sebanyak …. Jenis 2007 Juli -

KETERANGAN

JUMLAH (Rp)

UYHD 1.1. Keadaan pada akhir bulan ini yang lalu

-

1.2. Tambahan bulan ini

-

a.

Uang Tunai

Rp.

-

1.3. Jumlah

-

b.

Saldo pada Bank

Rp.

-

1.4. Setoran bulan ini

-

1.5. Keadaan pada akhir bulan ini (1.3 - 1.4)

-

PAJAK

1.5.

Jumlah (a + b )

Rp.

-

SPPG blm di SPM GU-kan

Rp.

-

d

Kwitansi blmdi SPPGU-kan

Rp.

-

Rp.

-

Rp.

-

Rp.

-

-

2.2. Penerimaan bulan ini

15,755,600.00

2.3. Jumlah Penerimaan

15,755,600.00

2.4. Setoran s/d bulan yang yl

-

Terdiri dari :

c e

2.1. Penerimaan s/d bulan yang yl

Uang Muka Kerja Jumlah ( c + d + e ) Jumlah (a + b ) - (c+d+e)

2.7

Terdiri dari :

-

2.5. Setoran bulan ini

15,755,600.00

a.

Uang Tunai

-

2.6. Jumlah Setoran

15,755,600.00

b.

Saldo pada Bank

-

2.7. Sisa pada akhir bulan ini ( 2.3 + 2.5 ) III

: : : : : :

-

Jumlah (a + b)

-

LAIN - LAIN 3.1. Penerimaan s/d bulan yl

-

3.2. Penerimaan bulan ini

-

a.

Uang Tunai

-

3.3. Jumlah Penerimaan

-

b.

Saldo pada Bank

-

3.5. Setoran bulan ini

-

3.6. Jumlah Setoran

-

3.7. Sisa pada akhir bulan ini ( 3.3 - 3.5 )

-

KEADAAN KAS PADA AKHIR BULAN INI ( 1.5 a dan b + 2.7 + 3.7 )

-

3.7

Terdiri dari :

Jumlah (a + b)

Terbilang : -

Makassar, 31 Juli 2007 Mengetahui , Kepala SNVT Perencanaan & Pengawasan Jalan dan Jembatan Metro Makassar

Bendaharawan,

Vici Hartawan Tjaja,ST.,MT. NIP. 110055263

Drs. Rachmat Djafar NIP. 110033054

-

11/PK.02/2007

DIPA

(Lembar 3)

Satuan Kerja Non Vertikal Tertentu

Kode KPPN : 054 Lokasi KPPN : Makassar : Perencanaan & Pengawasan Jalan dan Jembatan Metro Makassar

LAPORAN REALISASI BELANJA - RUPIAH MURNI

Kode Satker : 496199 Tahun Anggaran: 2007 Bulan : Juli

Nomor DIPA Tanggal DIPA

MAK

Jenis Pekerjaan

1

2

PENGELOLAAN GAJI, HONORARIUM DAN A 01.90.19.0001 TUNJANGAN Pembayaran Gaji, Lembur, Honorarium dan 1. 0001.0001 Tunjangan 5121 Belanja Honorarium 5122 Belanja Lembur Pengadaan Makanan/Minuman Penambah 2. 0001.0024 Daya Tahan Tubuh/Uang Makan PNS 5111 Belanja Gaji dan Tunjangan PNS

Realisasi SPM

%

3

4

Anggaran 5

###

43.52

48,178,000.00 41,002,000.00 7,176,000.00

48.22 47.26 54.56

99,912,000.00 86,760,000.00 13,152,000.00

18,280,000.00

34.62

52,800,000.00

18,280,000.00

34.62

52,800,000.00

44.11

23,078,000.00

B 01.90.19.0002 PENYELENGGARAAN OPERASIONAL PERKANTORAN ### Pengadaan Perlengkapan Kantor (ATK, Barang Cetak. Alat, RT, Langganan Majalah) 5211 Balanja Sehari-hari Perkantoran 0002.2007 Langganan Daya dan Jasa 5221 Belanja Jasa PERAWATAN SARANA DAN PRASARANA 01.90.19.0004 KANTOR 0004.0256 Perbaikan Peralatan Kantor 5231 Belanja Pemeliharaan Pemeliharaan dan Peremajaan 0004.1043 Software/Hardware Komputer 5231 Belanja Pemeliharaan 0004.1138 Perawatan Kendaraan Bermotor Roda 4/6/10 5231 Belanja Pemeliharaan 0004.2005 Perawatan Kendaraan Bermotor Roda 2 5231 Belanja Pemeliharaan PERENCANAAN DAN PENGAWASAN 04.08.02.4346 TEKNIS JALAN DAN JEMBATAN 4346 Administrasi Kegiatan 5121 Belanja Honorarium 5211 Belanja Barang Operasional 5212 Belanja Barang Non Operasional 5241 Belanja Perjalanan 4346.01 Penyusunan Detail Desain 5221 Belanja Jasa 4346.01 Pengawasan/Supervisi Konstruksi 5221 Belanja Jasa 4346.07 Pemantauan dan Evaluasi 5211 Belanja Barang Operasional 5212 Belanja Barang Non Operasional 5221 Belanja Jasa 5241 Belanja Perjalanan

: 1102.0/033-04.0/-/2007 : 31 Desember 2006

152,712,000.00

1. 0002.0926

5,527,500.00

51.66

10,700,000.00

2.

5,527,500.00 4,652,394.00 4,652,394.00

51.66 37.59 37.59

10,700,000.00 12,378,000.00 12,378,000.00

53.45

10,500,000.00

100.00 100.00 88.00 88.00 46.78 46.78 49.00 49.00

500,000.00 500,000.00 1,000,000.00 1,000,000.00 8,000,000.00 8,000,000.00 1,000,000.00 1,000,000.00

###

20.10

1,909,110,000.00

69,794,792.00 23,850,000.00 6,094,792.00 4,360,000.00 35,490,000.00 ### ### 54,526,500.00 566,500.00 21,600,000.00 17,000,000.00 15,360,000.00

65.81 47.99 47.39 54.50 99.97 0.00 0.00 18.09 18.09 32.26 7.55 47.16 32.69 24.11

106,060,000.00 49,700,000.00 12,860,000.00 8,000,000.00 35,500,000.00 200,000,000.00 200,000,000.00 1,434,050,000.00 1,434,050,000.00 169,000,000.00 7,500,000.00 45,800,000.00 52,000,000.00 63,700,000.00

JUMLAH

###

22.24

UYHD

-

C 1. 2. 3. 4. D 1.

2. 3. 4.

### 500,000.00 500,000.00 880,000.00 880,000.00 3,742,370.00 3,742,370.00 490,000.00 490,000.00

-

### Makassar, 31 Juli 2007

Mengetahui , Kepala SNVT Perencanaan & Pengawasan Jalan dan Jembatan Metro Makassar

Bendaharawan,

Vici Hartawan Tjaja,ST.,MT. NIP. 110055263

Drs. Rachmat Djafar NIP. 110033054

Makassar

90,308,000.00

59.14

42,130,000.00

Mengikat Tidak Mengikat

15,792,264.00

47.03

33,578,000.00

100,471,292.00

44.58

225,360,000.00

Belanja Barang 116,263,556.00 202,412,000.00 ### 90,308,000.00 465,972,313.00 91.51 45.75

1,892,988,000.00

21.74

33.75

375,664,313.00 44.62 19.85

44.90 258,938,000.00

SKPA

(Lembar 3)

Satuan Kerja Non Vertikal Tertentu

Kode KPPN : 054 Lokasi KPPN : Makassar : Perencanaan & Pengawasan Jalan dan Jembatan Metro Makassar

LAPORAN REALISASI BELANJA - RUPIAH MURNI Nomor SKPA : SKPA-340/WPB.11/PK.02/2007 Tanggal SKPA : 07 Juni 2007

Kode Satker : 496199 Tahun Anggaran: 2007 Bulan : Juli MAK

Jenis Pekerjaan

1

2

Realisasi SPM

%

3

4

Anggaran 5

PERENCANAAN DAN PENGAWASAN 04.08.02.4346 TEKNIS JALAN DAN JEMBATAN

###

27.51

450,000,000.00

4346.01

Penyusunan Detail Desain

###

27.51

450,000,000.00

5221

Belanja Jasa

###

27.51

450,000,000.00

###

27.51

JUMLAH

###

Makassar, 31 Juli 2007 Mengetahui , Kepala SNVT Perencanaan & Pengawasan Jalan dan Jembatan Metro Makassar

Bendaharawan,

Vici Hartawan Tjaja,ST.,MT. NIP. 110055263

Drs. Rachmat Djafar NIP. 110033054

Makassar

DIPA (Lembar 4)

Kode KPPN : 054 Lokasi KPPN : Makassar Satuan Kerja : Perencanaan & Pengawasan Jalan dan Jembatan Metro Makassar Non Vertikal Tertentu

DAFTAR SPM DITERBITKAN BULAN INI - RUPIAH MURNI

Bulan : Juli Tahun DIPA : 2007

Pemberi PHLN: Nomor NPLN : -

KODE SATKER TANGGAL NO SPM 1

496199

2

MAK

SPM-UP

SPM-GU

SPM - LS

DIT.TUA/KPKN PEMBAYARAN

4

5

6

7

8

3

29/07/2007 00049P2JJM 512111

0.00

0.00 6,833,000.00

054

29/07/2007 00050P2JJM 512211

0.00

0.00 1,196,000.00

054

29/07/2007 00051P2JJM 511129

0.00

0.00 2,820,000.00

054

29/07/2007 00052P2JJM 522111

0.00 1,342,712.00

29/07/2007 00053P2JJM 512112

0.00

054

0.00

0.00 3,200,000.00

054

29/07/2007 00054P2JJM 524119

0.00

###

0.00

054

29/07/2007 00055P2JJM 521211

0.00 4,500,000.00

0.00

054

20/07/2007 00057P2JJM 522115

0.00

0.00

###

054

0.00

###

###

054

Jumlah

Makassar, 31 Juli 2007 Mengetahui , Kepala SNVT Perencanaan & Pengawasan Jalan dan Jembatan Metro Makassar

Bendaharawan,

Vici Hartawan Tjaja,ST.,MT. NIP. 110055263

Drs. Rachmat Djafar NIP. 110033054

75,181,645.00

SKPA (Lembar 4)

Kode KPPN : 054 Lokasi KPPN : Makassar Satuan Kerja : Perencanaan & Pengawasan Jalan dan Jembatan Metro Makassar Non Vertikal Tertentu

DAFTAR SPM DITERBITKAN BULAN INI - RUPIAH MURNI

Bulan : Juli Tahun SKPA : 2007

Pemberi PHLN: Nomor NPLN : -

KODE SATKER TANGGAL NO SPM 1

496199

2

MAK

SPM-UP

SPM-GU

SPM - LS

DIT.TUA/KPKN PEMBAYARAN

4

5

6

7

8

3

25/07/2007 00058P2JJM 522115

Jumlah

0.00

0.00

###

054

0.00

0.00

###

054

Makassar, 31 Juli 2007 Mengetahui , Kepala SNVT Perencanaan & Pengawasan Jalan dan Jembatan Metro Makassar

Bendaharawan,

Vici Hartawan Tjaja,ST.,MT. NIP. 110055263

Drs. Rachmat Djafar NIP. 110033054

123,794,000.00

DIPA (Lembar 5)

DAFTAR PAJAK DAN PENERIMAAN LAIN-LAIN YANG DIPUNGUT OLEH BENDAHARAWAN BULAN : JULI 2007 Departemen : Unit Organisasi : Satuan Kerja : Non Vertikal Tertentu Tahun DIPA : NO. URUT

Pekerjaan Umum Direktorat Jenderal Bina Marga Perencanaan & Pengawasan Jalan dan Jembatan Metro Makassar 2007 URAIAN

NOMOR KAS

1.

Penerimaan s/d bulan yang lalu -

2.

Bulan ini

-

MAK

-

-

PPN

PPH

-

PENERIMAAN LAIN-LAIN

-

-

-

JUMLAH

-

-

-

-

Jumlah Penerimaan Bulan ini

-

-

-

-

Jumlah Penerimaan s/d Bulan ini

-

-

-

-

Penyetor a. s/d bulan yang lalu

-

-

-

-

b. bulan ini

-

-

-

-

Jumlah setoran s/d bulan ini

-

-

-

-

Sisa yang belum disetor

-

-

-

-

Makassar, 31 Juli 2007 Mengetahui , Kepala SNVT Perencanaan & Pengawasan Jalan dan Jembatan Metro Makassar

Bendaharawan,

Vici Hartawan Tjaja,ST.,MT. NIP. 110055263

Drs. Rachmat Djafar NIP. 110033054

DAFTAR REKAPITULASI PAJAK TAHUN ANGGARAN 2002 NO. 1

Yang dipungut oleh K P K N PPN PPH 21 PPH 22 ### 3,542,233.00

URAIAN CV. Bumi Karsa

Tgl / No.BKU 30 / 05 / 2002 13 / 05 / Pn

2

CV. Bumi Karsa

20 / 05 / 2002 14 / 04 / Pn

3

CV. Multi Pratama

20 / 05 / 2002 1,181,818.00 15 / 05 / Pn

177,273.00

1,359,091.00

4

CV. Fadema Utama

30 / 05 / 2002 2,727,273.00 20 / 05 / Pn

1,636,364.00

4,363,637.00

5

PT. Makassar Indah

30 / 06 / 2002 31 / 06 / Pn

###

6

PT. Pembangunan Perumahan 13 / 06 / 2002 10 / 06 / Pn

###

###

###

###

7,171,284.00

JUMLAH 21,253,397.00

68,454,533.00

65,145,774.00

43,027,702.00

. Jumlah Mei + Juni

###

###

### -

594000 392046 986046

DIPA (Lembar 6)

DAFTAR PAJAK DAN PENERIMAAN LAIN-LAIN YANG DIPUNGUT OLEH KPPN BULAN : JULI 2007 Departemen : Pekerjaan Umum Unit Organisasi : Direktorat Jenderal Bina Marga Satuan Kerja : Perencanaan & Pengawasan Jalan dan Jembatan Metro Makassar Non Vertikal Tertentu Tahun DIPA : 2007 NO.URUT

URAIAN

NOMOR KAS

PPN

PPH

###

6,676,500.00 9,619,302.00 -

-

6,676,500.00 9,619,302.00 ###

1,299,150.00 1,513,452.00 3,783,630.00 -

-

1,299,150.00 1,513,452.00 3,783,630.00

1.

Penerimaan s/d bulan yang lalu -

411121 411124 411211

2.

Bulan ini

411121 411124 411211

-

PENERIMA AN LAIN-LAIN

MAK

Jumlah Penerimaan Bulan ini

JUMLAH

###

###

-

###

Jumlah Penerimaan s/d Bulan ini

###

###

-

###

Penyetor a. s/d bulan yang lalu

###

###

-

###

b. bulan ini

###

###

-

###

Jumlah setoran s/d bulan ini

###

###

-

###

-

-

-

-

Sisa yang belum disetor

Makassar, 31 Juli 2007 Mengetahui , Kepala SNVT Perencanaan & Pengawasan Jalan dan Jembatan Metro Makassar

Vici Hartawan Tjaja,ST.,MT. NIP. 110055263

Bendaharawan,

Drs. Rachmat Djafar NIP. 110033054

SKPA (Lembar 6)

DAFTAR PAJAK DAN PENERIMAAN LAIN-LAIN YANG DIPUNGUT OLEH KPPN BULAN : JULI 2007 Departemen : Pekerjaan Umum Unit Organisasi : Direktorat Jenderal Bina Marga Satuan Kerja : Perencanaan & Pengawasan Jalan dan Jembatan Metro Makassar Non Vertikal Tertentu Tahun SKPA : 2007 NO.URUT

URAIAN

NOMOR KAS

MAK

1.

Penerimaan s/d bulan yang lalu -

411121 411124 411211

2.

Bulan ini

411121 411124 411211

-

Jumlah Penerimaan Bulan ini

PPN

PENERIMA AN LAIN-LAIN

PPH

-

-

###

4,501,600.00 -

JUMLAH

-

-

-

4,501,600.00 ###

###

###

-

###

###

###

-

###

-

-

-

-

b. bulan ini

###

###

-

###

Jumlah setoran s/d bulan ini

###

###

-

###

-

-

-

-

Jumlah Penerimaan s/d Bulan ini Penyetor a. s/d bulan yang lalu

Sisa yang belum disetor

Makassar, 31 Juli 2007 Mengetahui , Kepala SNVT Perencanaan & Pengawasan Jalan dan Jembatan Metro Makassar

Vici Hartawan Tjaja,ST.,MT. NIP. 110055263

Bendaharawan,

Drs. Rachmat Djafar NIP. 110033054

DIPA (Lembar 7)

Satuan Kerja Non : Perencanaan dan Pengawasan Jalan dan Jembatan Metro Makassar Vertikal Tertentu

KODE KPPN : 054 LOKASI KPPN : MKS

LAPORAN REALISASI PENERIMAAN NEGARA BUKAN PAJAK Tahun Anggaran : 2007 Bulan : Juli MAP

Nomor DIPA Tanggal DIPA JENIS PENERIMAAN

1

2

: 1102.0/033-04.0/-/2007 : 31 Desember 2006

REALISASI (Rp) 3

PENDAPATAN PENJUALAN HASIL PRODUKSI Penjualan penerbitan, film dan hasil cetak lainnya Penjualan dokumen-dokumen pelelangan Penjualan lainnya

-

0516 0517 0519

PENDAPATAN PENJUALAN ASET Penjualan rumah, gedung-gedung, bangunan dan tanah Penjualan kendaran bermotor Penjualan sewa beli Penjualan aset lainnya yang berlebih/rusak/dihapuskan

-

0519 0522 0523 0529

PENDAPATAN SEWA Sewa rumah dinas/rumah negeri Sewa gedung, bangunan, gudang Sewa benda-benda bergerak Sewa benda-benda tak bergerak

-

0531 0532 0533 0539

PENDAPATAN JASA Pendapatan hak dan perijinan Pendapatan jasa tenaga/jasa pekerjaan Pendapatan jasa lembaga keuangan (jasa Giro Bendaharawan) Pendapatan jasa lainnya

-

0545 0547 0551 0559

PENDAPATAN PENJUALAN. SEWA DAN JASA SWADAYA Pendapatan Penjualan Swadana Pendapatan Sewa Swadana Pendapatan Jasa Swadana

-

0581 0582 0583

-

0811 0583

PENDAPATAN DARI PENERIMAAN KEMBALI BELANJA TAHUN ANGGARAN BERJALAN Penerimaan kembali belanja Pegawai Pusat Penerimaan kembali belanja rutin lainnya

-

0821 0824

PENDAPATAN DARI PENERIMAAN KEMBALI BELANJA TAHUN ANGGARAN YANG LALU Penerimaan kembali belanja Pegawai Pusat Penerimaan kembali belanja rutin lainnya PENDAPATAN LAIN - LAIN Pendapatan denda keterlambatan penyelesaian pekerjaan Penerimaan ganti rugi atas kerugian yang diderita negara Pendapatan anggaran lainnya

-

0892 0893 0899

Makassar, 31 Juli 2007 Mengetahui, Kepala SNVT Perencanaan & Pengawasan Jalan dan Jembatan Metro Makassar

Bendaharawan,

Vici Hartawan Tjaja,ST.,MT. NIP. 110055263

Drs. Rachmat Djafar NIP. 110033054

04.0/-/2007

Related Documents

Keu
November 2019 24
Keu
November 2019 35
Keu
November 2019 26
Keu Inter.docx
April 2020 15
Keu Inter.docx
November 2019 28
Laporan Pokja Keu. Blud
August 2019 24