Integral Sco General D2&jp54 08nov09

  • Uploaded by: ENRIQUE BERNAL SOLANO
  • 0
  • 0
  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Integral Sco General D2&jp54 08nov09 as PDF for free.

More details

  • Words: 311
  • Pages: 1
LIBERTY FOR TRADING AGENCIES INC. (LFTA) P.O. Box 833 Hazel Park, MI. 48030 Tel. 586-939-2554 Cell: 313-412-8254 www.libertyFTA.com To: END BUYER (Via. Mr.Fareed Adil) SOFT CORPORATE OFFER

November 8, 2009

I, as legal Mandate for Title holder OOO Integral Russian Federation Oil Co., indicate the following: Item #1 Product: AVIATION KEROSENE COLONIAL GRADE 54 JET FUEL Quantity: 1.000.000 BBLS to 20.000.000 BBLS SPOT or CONTRACT with Rolls & Extensions SPOT Price: USD $45.00 gross / $39.00 net per Barrel CONTRACT Price: USD $40.00 gross / $34.00 net per Barrel C&F ASWP or FOB: Rotterdam (5% liftable immediately) Item #1 Product: DIESEL GAS D2 OIL GOST 305-82 Quantity: 1.000.000 MTS to 10.000.000 MTS SPOT or CONTRACT with Rolls & Extensions SPOT Price: USD $440.00 gross / $420.00 net per METRIC TON CONTRACT Price: USD $400.00 gross / $380.00 net per METRIC TON C&F ASWP or FOB: Rotterdam (5% liftable immediately)

Procedures: 1. Buyer confirms soft offer and issues ICPO and BCL with right for soft probe. 2. “OOO INTEGRAL” issues FCO of which buyer endorses and returns. 3. “OOO INTEGRAL” issues draft contract open for amendments. 4. Both parties confirm draft Contract by endorsing it. 5. “OOO INTEGRAL” appoints and signs charter party agreement with shipping company. 6. Buyer contacts shipping company and summerizes shipping schedule. 7. “OOO INTEGRAL” issues Proof of Product to Buyer. 8. Both parties exchange hard copy contracts via courier. Each party lodges contract in their respective bank. 9. Buyer’s bank and seller’s bank finalize the bank to bank process. 10. Buyer’s bank makes payment as per the signed contract. 11. Delivery commences as scheduled. If the terms & conditions above are acceptable, please provide an ICPO with banking coordinates and soft probe authorization addressed to: OOO INTEGRAL Attn: Mr. Tahrir Kalasho (LFTA, Inc.) Via Mr. Martin Mueller Sr.

Thank you, GOD Bless.

Yours truly,

Tahrir Kalasho, CEO/President

Related Documents

Causas Sco
November 2019 25
Integral
April 2020 31
Integral
November 2019 42
Integral
April 2020 24

More Documents from ""