Pekerjaan Peningkatan Jalan Panjang Lebar Tinggi

= = =

200 M¹ 2 M¹ 0.15 M¹ 60 M³

Analisa tenaga kerja yang dibutuhkan untuk membuat 1M³ Cor Beton Campuran 1 Pc : 3 Ps : 5 BP 1.6500 OH Pekerja 0.2500 OH Tukang 0.0250 OH Kepala Tukang 0.0800 OH Mandor Asumsi 1 Hari Kerja adalah 7 Jam Kerja Untuk Pembuatan Cor Beton : 11.5500 Jam Pekerja 1.7500 Jam Tukang 0.1750 Jam Kepala Tukang 0.5600 Jam Mandor Target Per Hari Coran adalah 3 M3, maka dibutuhkan tenaga : 34.65 Jam Pekerja = 34.65 Jam = 5 Orang 5.25 Jam Tukang 7 Jam 0.525 Jam Kepala Tukang 1.68 Jam Mandor Maka Artinya harus menambahkan pekerja sebanyak 5 orang untuk mendapatkan 3 M3 Perhari : Jadi pekerjaan akan dapat dilaksanakan dalam tempo waktu : 60 M3 = 20 Hari 3 M3/Hari

Related Documents

Hari
November 2019 58
Hari
July 2020 42
Hari
November 2019 54
Hari
December 2019 38
Hari
November 2019 53
Hari
October 2019 38

More Documents from "Myema Azimah"