Eksesoris Air Bersih 2018-03.pdf

  • Uploaded by: Herman Gallegos
  • 0
  • 0
  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Eksesoris Air Bersih 2018-03.pdf as PDF for free.

More details

  • Words: 1,920
  • Pages: 15
Bak Penenang II Penyaringan I Bak Penenang II Air Bersih

Bak penenang I

Penyaringan II

Air Bersih

Rabat Beton 1 : 3 : 5

Penyaringan II

BAK SISTEM PASIR LAMBAT (SPL) Skala 1 : 100

203

230

230 18

9

945

203

9

18

A SUMARTIN

MERCU

B C

C

A 18 203

9

945

18

9 230

230

DENAH BENDUNG Skala 1 : 100

203

915

GALERI

700

B

400

700

915

Direktris

20 20

50

100

31

90

350

412

199

20

10

20

20

20

10

100

50

31

199

350

90

412

Pintu Penguras Pas. Batu Gunung 1 : 3 + 2.80

265

200

MAT

Galeri 70 70

40

70 70

100

Galeri De-Sedimentation

Talud

100

280

265

MAT

+ 2.80

Talud

Talud

As Mercu Bendung + 1.65

200

Talud

Plat Pijakan

100

100

Plat Pijakan

Beton Bertulang 1 : 2 : 3

90 40

292 30

60 31

100

70

100

70

110

70

165

20

Kerikil Sungai

165 20

35

35

20

70

110

70

100

70

100 20

60

292 31

90 30

40

Pas. Batu Gunung 1 : 3 Arang Aktif

POTONGAN B - B Skala 1 : 120

POTONGAN C - C Skala 1 : 120

SUMARTIN Direktris 400 35

72

30

298

35

30

50

Plat Injak 1 : 2 : 3 Pintu Penguras 85

Pas. Batu Gunung 1 : 3 15

MAN 100

MAT

275

90

85

80

80

115

400

POTONGAN A - A Skala 1 : 120

115

71

71

71

71

71

71

71

Kerikil Sungai Arang Aktif

50

20

40

300

Kerikil Sungai

X

Potongan X Skala 1 : 50

600

Detail Pipa Perporasi Skala 1 : 50

30

72

35

SUMARTIN

15

40

100

85

Plat Injak 1 : 2 : 3

Direktris

30

100

100

Pas. Batu Gunung 1 : 3

10

100

275

75

Pas. Batu Gunung 1 : 3 Pas. Batu Kosong

15

80

40 30

20

20

40 30

70

20

75

90

276

275

Tanah Urug

Pasir Urug T, 100 mm 40

25

70

65

65

120

115

DETAIL B

DETAIL A

Skala 1 : 50

Skala 1 : 50

90

Handle L. 5.5.3 50

L. 7.7.3

35

L. 7.7.3

15

Plat Injak 1 : 2 : 3 Pas Batu Gunung 1:3

Plat Besi

SUMARTIN Direktris

30

90

320

100

Z

L. 7.7.3

Potongan Z Potongan Y Y Detail Pintu Penguras Skala 1 : 40

Skala 1 : 40

75

Skala 1 : 40

50 50

600

50

600

Tangga Kontrol

157

Penyaringan I

Penyaringan II

Pasir

Pasir

Kerikil

Kerikil

Air Bersih 58

10

30

15

15

15

15

15

11

30 10 30

85

50

Kerikil 20

Rabat Beton

Air Bersih

Pasir

260

Bak Penenang II

15 20

Penyaringan I

205

160

Bak Penenang I

125 245 50 40 40

Menhole Plat Besi + Rang

Bak Penenang I

Menhole Plat Besi + Rang

Pas. Beton Bertulang 1 : 2 : 3

15

15

15

50

15

150

15

200

125

50 15

15

150

POTONGAN A

15

Skala 1 : 80 15

15 50

15 50

15

15 150

50

150

Rabat Beton 1 : 3 : 5

54

SUMARTIN

Pasir

Direktris

Kerikil

30

Penyaringan II

15

65

135

16

25

20

45

Air Bersih

15

132

146

B

Bak Penenang II

Penyaringan II

48 10

Bak penenang II

A

Bak Penenang II Penyaringan I

Bak penenang II

Kerikil

Pasir

150

30

POTONGAN E

15

15

Skala 1 : 100

C

50

15 108 15

Penyaringan II

445

Bak penenang I

15 50 50

200

15

15

Air Bersih

Penyaringan II

150

108

15

25

15

125

15

POTONGAN B

Skala 1 : 80

15

200

15

Penyaringan I

Penyaringan II

Sumber Air

D 50

50 15

15

150

Bak penenang I

E 15

200

DENAH Skala 1 : 80

15

125

Bak penenang II

Air bersih

50 15

SKEMA PENYARINGAN

Ke konsumen

15

15

15

200

123

15

123

200

123

25

123

157

125

Tangga Kontrol

Penyaringan I

15

19

15

10 15

Pipa Penguras

200

15

235

30

Kerikil 26

50

Pasir

26

15 45

20

58

Bak Penenang I

15

POTONGAN C

200

POTONGAN D

Skala 1 : 60

Skala 1 : 60 15

15 150

15 200

15 125

108

15

15

15 50

15

108 15

230

370

RENC. PENULANGAN PLAT LANTAI Skala 1 : 60

475

445

200

Direktris

15

230

15

SUMARTIN

30

Balok utama

275

Dinding beton t=10 cm Plesteran 1: 3

20

Sloef X 15

DETAIL PENULANGAN DIINDING

POT X Skala 1 : 40

Skala 1 : 40

20

150

20

20

20

20

20

20

20

20

20

SUMARTIN

20

20

200

Lobang saringan II T. plat = 10 cm

4 cm

20

20 15

20

20

20

20

152

20

20

T. plat = 10 cm

20

4 cm

20

Lobang saringan I

20

20

20

15

20

Direktris

15

20

20

20

20

20

20 15

200

DETAIL PLAT BETON BERTULANG SARINGAN I

DETAIL PLAT BETON BERTULANG SARINGAN II

Skala 1 : 40

Skala 1 : 40

15 15 10

B Tyipical Gate Valve No.

40

1. 2. 3. 4. 5. 6.

10 15 15

A

10 15 15

60

Pipa (mm) A (mm) B (mm) C (mm)

250 200 150 100 75 50

800 800 750 750 400 400

1200 1200 1150 1150 800 800

1150 1100 950 750 600 600

15 15 10

DENAH BOX GATE VALVE Skala 1 : 20

15 Plat Beton 1 : 2 : 3

6

40

6

15

SUMARTIN

Pas. Batu Gunung 1 : 3

Direktris

70

70

Tanah Urug Gate Valve

10

30

10 20 10

30

10

POTONGAN B - B Skala 1 : 20

5 15

5 15

Flang Spigot

Pasir Urug

50

40

50

POTONGAN A - A Skala 1 : 20

60

Plat Beton T. 7 cm 1 : 2 : 3

15

60

15

90

60 5

15

20

65

30

Pas. Batu Gunung 1 : 3

10

30

10

40

10

30

10 15

15

60

POTONGAN A - A Skala 1 : 20

DET. PEMBESIAN Skala 1 : 20

60

B

60

15

60

Pipa Pembuang

5

15

A

10

30

10

40

10

30

10

Pasir Urug

10 15 15 10

40

10 15 15 10

POTONGAN B - B Skala 1 : 20

DENAH WASH OUT Skala 1 : 20

SUMARTIN Direktris

50

15

Pas. Batu Gunung 1 : 3 Plesteran 1 : 3

Angkur/Baut

01

Saluran Irigasi

Mur/Baut Thrust Block

DETAIL 01 Not Scale

PERLINTASAN PIPA TYPE I

SUMARTIN Direktris

Angkur/Baut

Saluran Irigasi

02 Mur/Baut Thrust Block

PERLINTASAN PIPA TYPE II

DETAIL 02 Not Scale

Box Meteran

B

40

15 15 10

Meteran Air (SNI)

Beton Tumbuk 1 : 3 : 5

10 15 15

A

10 15 15

15 15 10

60

DETAIL SAMBUNGAN RUMAH (SR) Not Scale

DENAH BOX AIR VALVE Skala 1 : 20

15

6

Plat Beton 1 : 2 : 3

40

6

15

SUMARTIN Direktris

Pas. Batu Gunung 1 : 3

70

70

Tanah Urug Air Valve Double Nipple

5 15

Clamp Saddle

5 15

Pipa Induk

Pasir Urug

50

40

50

POTONGAN A - A Skala 1 : 20

10

30

10 20 10

30

POTONGAN B - B Skala 1 : 20

10

Angkur Baut 12

Angkur Baut 12

150

150

150

150

150

150

C

200 - 450

A

POTONGAN C - C

B

Not Scale

THRUST BLOCK TEE PIPA PVC

0 15 0 15

150

150

150

150

D

POTONGAN D - D

200 - 450

Not Scale

300 - 450

B

A

150

SUMARTIN Direktris

THRUST BLOCK DOP PIPA PVC

150

Tyipical Angker Bolck 150

150

150

E

P 150

300 - 450

150

L

L

POTONGAN A - A

POTONGAN B - B

POTONGAN E - E

Not Scale

Not Scale

Not Scale

THRUST BLOCK BEND PIPA PVC

THRUST BLOCK BEND PIPA GIP

No.

Pipa (mm)

(mm)

1. 2. 3. 4. 5.

250 200 150 100 75

750 600 500 400 350

T

THRUST BLOCK REDUCER PIPA PVC

Tee/Dop

T P 800 650 600 500 400

L P 750 900 600 700 500 650 600 400 300 300

Reducer

L P 600 750 500 600 450 500 300 400 250 300

L 650 500 400 300 250

A Pagar

Trotoar

X H

100

Tanah Urug

X

Pasir Urug

100

H

100 100

150

Trotoar

Pagar

Pagar

Trotoar

Pagar

Pagar

150 B

POTONGAN Pemasangan Pipa Galian Tanah Normal A

H TanahUrug

X

Pasir Urug

100 Trotoar 100

150

150

SUMARTIN

B

Direktris

POTONGAN Pemasangan Pipa Galian Tanah Bawah Jalan/Trotoar 300 150 Plat Strip & Seal Karet

150 Pipa GIP Angkur Baut 12 Beton Tumbuk 50

Tyipical Galian Tanah 400

POTONGAN Pemasangan Pipa Diatas Batu

No. 1. 2. 3. 4. 5. 6. 7.

Pipa (mm) A (mm)

250 200 150 100 75 50 50

650 600 550 500 475 450 438

B (mm) 550 500 450 400 375 350 338

H (mm) 1000 1000 800 800 500 500 500

Keterangan - Semua Dimensi dalam Ukuran Milimeter (mm) - Pemasangan Pipa di atas Batu/Tanah Batu memakai Block Beton setiap 6 m

se

n Mu Ke

Pelabuhan Very

Langara Laut

Alun-alun

P1

P1

C1

C2 Desa Lantula

C1 C1 C1

P1

Rujab Bupati Keuangan

P1 Pasar

P1

P2

By P

as s

P2

C1

C1

tW aw on ii

SMAN Langara

Se la

Reservoir 1 Kapasitas 150 m3 Elevasi 30 mdpl

Desa Lanowatu

C1

n aha

Per

um

Desa Pasir Putih

Ke Matabaho

SMPN 3 Langara

SUMARTIN

Sistem Pasir Lambat (SPL)

Direktris

Pipa GIP 8" Bendung/Galeri

Desa Matabaho

KETERANGAN GAMBAR Kode

Typikal Pipa

C1 DPRD

Kantor Bupati/SKPD

Kantor Bupati Desa Bukit Mekar

Reservoir 2 Kapasitas 100 m3 Elevasi 30 mdpl

Panjang (m1) Keterangan 18 m

1 Titik

Ruas Lamoluo - Mata Langara

18 m

2 Titik

Ruas Rujab Bupati - By Pass

18 m

2 Titik

Ruas Bank Sultra - Pelabuhan

18 m

2 Titik

6m

1 Titik

C2

Ruas Rujab Bupati - Lantula

P1

Ruas Bank Sultra - Pelabuhan

12 m

2 Titik

Ruas Bank Sultra - Pelabuhan

6m

2 Titik

Ruas Rujab Bupati - By Pass

12 m

1 Titik

Ruas Lamoluo - Rujab Bupati

12 m

1 Titik

Ruas Bank Sultra - Pelabuhan

12 m

1 Titik

P2

Ke Lampeapi

Rumah Sakit

Jalur/Poros Ruas Pasir Putih - Pasar Langara

C = Crossing Jalan P = Perlintasan (Saluran)

PETA PERLETAKAN PIPA CROSSING JALAN DAN PERLINTASAN PIPA Skala 1 : 1.700

se

un

M Ke

D1 Pelabuhan Very

Langara Laut

D1

A1

W1

G2 T2 G1 T1

Alun-alun

G1

T1

W1 T1

D1 T3

D2

Desa Lantula

G1

Rujab Bupati Keuangan

D2 T2

Pasar

W1 T1

By P

as s

T2 D2

T1a T1

T2

SMAN Langara

tW aw on ii

D1

Reservoir 1 Kapasitas 150 m3 Elevasi 30 mdpl

Se la

A1

Desa Lanowatu

A1

Ke Matabaho

Per u

ma

Desa Pasir Putih

T1

han

D2

A1

SMPN 3 Langara Sistem Pasir Lambat (SPL)

Bendung/Galeri

Desa Matabaho

KETERANGAN GAMBAR Kode

DPRD

Rumah Sakit

A1

Kantor Bupati/SKPD

G1 T1

G1

T1

A1

D1

Jumlah

A1

6 Unit

D1

7 Buah

D2

4 Buah

G1

5 Unit

G2

1 Unit

T1a

1 Buah

T1

13 Buah

T2

5 Buah

T3

1 Buah

W1

Wash Out + Box

4 Unit

Kantor Bupati

Desa Bukit Mekar Ke Lampeapi

D1

Uraian

Reservoir 2 Kapasitas 100 m3 Elevasi 30 mdpl

PETA PERLETAKAN ASESORIS PIPA Skala 1 : 1.700

SUMARTIN Direktris

Pipa GIP 8"

Related Documents


More Documents from ""