URAIAN PEKERJAAN

1 2 1 PEK. GALIAN TANAH PONDASI

PANJANG 3 55.5 3 8

LEBAR 1/ LEBAR 2/ PENAMPANG PENAMPANG TINGGI/TEBAL ATAS BAWAH 4 5 6 0.7 0.7 0.55 0.5 0.6 0.7

2 PEK. URUGAN TANAH KEMBALI 3 PEK. URUGAN TANAH BAWAH LANTAI

4 PEK. URUGAN PASIR BAWAH LANTAI

5 PEK. URUGAN PASIR ALAS PONDASI

6 PAS. PONDASI BATU GUNUNG 1:5

7.5 7.5 3 1.25

7.5 7.5 3 1.25

55.5 3 8

55.5 3 8

6 3 1.25 0.5

0.35 0.35 0.35 0.35

6 3 1.25 0.5

0.05 0.05 0.05 0.05

0.7 0.55 0.6

0.22 0.22 0.22

0.05 0.05 0.05

0.6 0.45 0.5

0.7 0.5 0.7

BANYAK

LUBANG

7

8

VOLUME 9 27.20 0.83 3.36 31.38

M3

10.46

M3

15.75 7.88 1.31 0.22 25.16

M3

2.25 1.13 0.19 0.03 3.59

M3

1.94 0.08 0.24 2.27

M3

15.93 0.50 2.02

18.45

M3

7 PAS. DINDING 1/2 BATA TRASRAAM 1:2

8 PAS. DINDING 1/2 BATA 1:5

8 PAS. DINDING 1 BATA 1:2

8 PAS. DINDING 1 BATA 1:5

9 PAS. BATU KOSONG

42 13

0.4 1.2

13.5 19.35 7.5 6 2.9 8.1 7 3

3.75 2.95 2.6 2.15 8.65 2.8 2.15 0.6

3 3

3.05 2.4

0.7 0.55 0.6

0.2 0.2 0.2

10 PLESTERAN DINDING TRASRAAM 1:2 7.5 8.1

7.09 12.12 2.07 0.98 2 0.56

0.4 0.4

3 3

55.5 3 8

1.8 0.56

3.5 2.8

2.21 2.38

15.00 15.04 30.04

M2

43.53 44.97 17.43 11.92 25.09 11.34 14.49 1.80 170.57

M2

1.20 1.20 2.40

M2

6.95 4.82 11.77

M2

7.77 0.33 0.96 9.06

M3

30.00 26.25 11.34

11.5

1.2

1.68

12.12 79.71

M2

11 PLESTERAN DINDING 1:5 12 PEK. SLOOF 12/20 & 12/15

61 5.5

0.12 0.12

0.2 0.15

13 PEK. RINGBALK 11/15 14 PEK. BALOK BETON 11/20 15 PEK. KOLOM PRAKTIS 11/11

28.75

0.11

0.2 3.7

31

328.24

M2

1.46 0.10 1.56

M3

77.00

M1

0.63

M3

114.70

M1

16 PEK. KOLOM TERAS 20/30

2.65

0.15

0.3

17 PEK. BALOK LATEY 11/11 18 PEK. PLAT ATAP T=10 CM

19 PEK. PLAT LUIFEL

20 RABAT BETON

21 PAS. LANTAI TEGEL KERAMIK 400 MM/400 MM

22 PAS. LANTAI TEGEL KERAMIK 200 MM/200 MM WC

3 1.5 1.75 1.25 3

26.3 3

7.5 7.5 3 1.25

7.5 7.5 3 1.25

2 1.5

3 1.5 1.5 0.5 0.75

0.25 0.2

6 3 1.25 0.5

6 3 1.25 0.5

1.5 1.5

0.1 0.1 0.1 0.1 0.1

0.9 0.9

0.05 0.05 0.05 0.05

3 2.25

0.12

M3

18.75

M1

0.90 0.23 0.26 0.06 0.23 1.68

M3

5.92 0.54 6.46

M3

2.25 1.13 0.19 0.03 3.59

M3

42.00 20.25 3.75 0.63 66.63

M2

3.00 2.25 5.25

M2

23 PAS. TEGEL PLINT 200 MM/400 MM 24 PAS. DINDING TEGEL KERAMIK 200 MM/250 MM 27 PEK. ATAP

71.6 13 5.5 4.95 4.55

28 PEK. RANGKA ATAP

1.6 4.15 2.85 1.425 2.78

3.7

2.78

2 2 2

4.5

67.10

M1

1.12

19.68

M2

45.65 28.22 14.25 6.32 94.44

M2

94.44

M2

29 PEK. KUSEN PINTU, JENDELA DAN VENTILASI

5 12.75 2.5 4.05 4.9 3.25 2 3.6 10.5 3.8 1.9 4.9

0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05

0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15

5 1 5 1 2 2 2 2 2 1 3 3

30 PAS. PINTU PANIL

2.06

0.82

5

31 BINGKAI JENDELA

3.2 1.86

0.07 0.07

7 3

0.15

0.19 0.10 0.09 0.03 0.07 0.05 0.03 0.05 0.16 0.03 0.04 0.11 0.95

M3

8.30

M2

1.57 0.39 1.96

M2

32 KACA BENING 5 MM

0.15 0.11 2.87 1.12 0.33 1.11 0.47 1.52 0.25 0.40 0.24 0.98 2.35 1.64 13.53

M2

45.00 22.50 0.63 68.13

M2

35 RANGKA PLAFOND

68.13

M2

36 PENGECATAN DINDING

815.90

M2

37 PENGECATAN PLAFOND

68.13

M2

0.7 1.08 0.52 0.52 0.82 0.41 0.92 0.92 0.62 0.38 1.06 1.06 2.02

34 PAS. PLAFOND

7.5 7.5 1.25

0.15 0.38 0.27 0.32 0.27 0.38 0.55 0.27 0.32 0.32 0.46 0.37 0.27

6 3 0.5

1 7 8 2 5 3 3 1 2 2 2 6 3

38 PENGECATAN BIDANG KAYU BARU

4.9 2.3 1.7 4.54 1.2 2.8 0.25 1.8 6.5 4.5 3.3 0.3 5.05 5.43 3.6 2.2 4.7 3.2 1.68 1.87

0.25 0.25 4.18 0.25 0.4 0.25 0.4 0.25 0.25 0.4 0.25 0.4 0.25 0.4 0.25 0.25 0.25 0.2 0.2 0.2

5 5 5 2 2 2 3 2 1 1 1 1 2 2 1 3 3 7 2 3

6.13 2.88 35.53 2.27 0.96 1.40 0.30 0.90 1.63 1.80 0.83 0.12 2.53 4.34 0.90 1.65 3.53 4.48 0.67 0.37 73.20

M2

LISTPLANK 2/20

40.00

M1

PAS. KUNCI PINTU

5.00

BH

ENGSEL PINTU

10.00

BH

ENGSEL JENDELA

24.00

BH

TITIK LAMPU

10.00

BH

STOP KONTAK

6.00

BH

SAKLAR GANDA

3.00

BH

SAKLAR TUNGGAL

3.00

BH

9 1.5 12 11 3.5 3 2.75 0.8 10.75 3.25 10.75 2 3.45 10.75 3 6.25 3.25 97

1.5 1.75 3 1.5 0.625 0.625 1.75 6 0.375 17.125

3.5 4 6.5 7 3.5 6.5 3.55 10.75 0.8 5.75 1.45 10.75 6.5 70.55

3.5 16.5 3.25 3.25 3.25 2.75 1.45 1.05 3.75 38.75

0.9 1.1 1.55 1.05 1.55 1.05 1.35 1.55 1.05 1.35 1.1 0.6 2.1 1.35 0.35

2.1 2.1 1.8 1.8 1.3 1.3 1.3 0.3 0.3 0.3 0.3 0.6 1.75 2.1 0.35

5 1 1 1 1 5 1 2 6 1 5 3 1 1 3

9.45 2.31 2.79 1.89 2.015 6.825 1.755 0.93 1.89 0.405 1.65 1.08 3.675 2.835 0.3675 39.8675

0.7 0.35

1.05 0.35

3 2

2.205 0.245 2.45

5.5 1.25 0.55 0.3 1.5 1.75 1.75 0.55 0.55 1.25 1.5 16.45

5.27 5.27 3.23 9.35 2.4 2.4 27.92

3.15 5.23 2.4 4.7 15.48

6.85 2.35 1.65 1.65 12.5

3.7 2.2 3.45 1.64 10.99

1.45 1.45 1.8 1.8 0.95 0.95 1.8 1.8 12

1.45 1.45 1.3 1.3 5.5

0.95 0.95 1.3 1.3 4.5

10.75 3.25 1.75 1.35 5 5.45 2.8 7.9 5.65 9.75 4.35 8.375 4.125 10.5 28 109

1.2 3.6 1.77 1.77 8.34

1.07 1.83 1.72

2.76 1.75 1.75

4.62

6.26

0.66 2.3 3.94 5.58 7.22 8.85 6.5 7.32 8.15 8.96 6 3.1 1.46 0.36 4.49 5.31 6.5 86.7

7.32 3.7 2.88 2.07 1.25 12 0.35 1.44 3.07 3.25 3.25 0.35 1.46 3.1 24 18.5 12.7 100.69

5.53 3.53 7.6 7.6 6.18 5.83 3 2.29 5.83 3.53 2 3.53 3.53 59.98 247.37

1.45 1.45 1.2 1.2 1.2 0.7 0.7 7.9