CODE STANDARD: NEC 2011, CHAPTER 3 – Wiring Method and Materials ARTICLE 300 – Wiring Method SECTION 1. General Requirement 300.5 – Underground Installation

The requirements for direct-buried conductors are given in 300.5 :

Ketentuan Instalasi Konduit / Sparing / Sleeve Kabel Proyek Merak : 1. Menggunakan Pipa PVC 2. Ditanam Di Bawah Tanah dengan Kedalaman minimum 24 inch (600 mm) sesuai table 300.5 NEC 2011 3. Untuk Keperluan masa depan, setidaknya disediakan spare (optional, tergantung desain dan BoQ) 4. Untuk satu tarikan kabel, ukuran kabel yang mengisi sparing harus tidak lebih dari 53% 5. Disediakan pullbox (manhole) untuk akses tarikan kabel setiap max 150m (sebaiknya max 140m) 6. Diberikan tanda warning label/tape di atas timbunan kabel untuk tanda, agar tidak terkena garukan ekskavasi di masa mendatang 7. Diberikan penanda kabel concrete setiap Max 50 m 8. Perlu tarikan Kabel Grounding Bare Copper Conductor (BCC) ukuran 95 mm2 pada jalur kabel utama (NYFGbY 4C x 240 mm2) 9. Kabel NYFGbY 4C x 240 mm2 dari pabrikan umumnya disediakan dalam gulungan max 500m. Jika ada joint kabel, pastikan lokasinya ada di dalam manhole, bukan di dalam pipa sleeve. 10. Setiap melewati manhole, kabel diputar dengan minimum radius 7x diameter kabel. Kabel NYFGbY 4C x 240 mm2 mempunyai diameter 6,8 cm, sehingga radius putar kabelnya 6,8 x 7 = 47,6 cm

Diameter kabel = 68 mm

25m

Manhole/ pullbox

Max 50m

Detail A

Detail-A (Cross Section)

Max 50m

Concrete marker

Sleeve dan kabel NYFGbY4C x 240 mm2 (dia. 68 mm)

25m

25m

Manhole/ pullbox

Max 50m

Detail A

Detail Manhole : Double Click

Max 50m Concrete marker

25m

Sleeve dan kabel NYFGbY4C x 240 mm2 (dia. 68 mm)

NOTE: Manhole Mengacu Pada Desain Disamping, disesuaikan ukurannya dengan kedalaman kabel.

Detail Concrete Maker :

25m

Manhole/ pullbox

Max 50m

Detail A

Max 50m Concrete marker

Sleeve dan kabel NYFGbY4C x 240 mm2 (dia. 68 mm)

Detail Tarikan Kabel dalam manhole:

25m

25m

Manhole/ pullbox

Max 50m

Max 50m Concrete marker

Detail A

25m

Sleeve dan kabel NYFGbY4C x 240 mm2 (dia. 68 mm)

Perkiraan ukuran dan kedalaman manhole : 200 cm GL

MANHOLE

72,5 cm

172,5 cm

Support kabel, UNP Hot Dip Galvanized, di dinabolt ke dinding manhole

r = 7x diameter kabel r = 47,6 cm D = 2r D = 95,2 cm ~ 100 cm

100 cm