Page 1 of 13 CURRICULUM VITAE

Name : Passport No. : Marital Status : Permanent Address : Mobile phone Home E- mail Address

: : :

Current Position

:

ASIKIN EFFENDI B 9412849 Expired date: 01 March 2023 Married Graha Raya Bintaro GR 24 No.26 Parigi Baru, Pd. Aren Tangerang Selatan, Indonesia – 15228, Indonesia +6282281888880, +6281381888880, +622173442718 [email protected] [email protected] Lead Project Engineer

Education and Training :  Education Bachelor (S1) Degree in Physics Engineering for Instrument & Control System Specialist, NASIONAL UNIVERSITY, Jakarta INDONESIA  Computer Skill Familiars with Instrument Calculation Software, INSTRUCAL/PLUS Version 5.1 FIRSTVUE Fisher Product and Ms. office (Word and Excel)  Training - Tropical Basic Offshore safety induction & Emergency Training (T-BOESIET) by PT. Samson Tiara, Merak - Indonesia 2004. - Safety Training Certificates from STAR SAFETY, for Basic Fire & Safety And Health & Safety Mana-gement for Manager, Balikpapan – Indonesia 2004 - The Tropical Basic Offshore safety induction & Emergency Training (T-BOSIET) including TravelSafely by Boat Course Course Coding / Cert. No. OFF - 36345 / 2005 OPITO Approve OPITO Reg. No. 225322 Conducted by MEGAMAS Training Company SDN BHD - BRUNEI DARUS-SALAM, 2005 - HSE Familiarization for SSS / TAS Course Course Coding / Cert. No. IMS - 20676 / 2005 OPITO Approved Conducted by MEGAMAS Training Company SDN BHD – BRUNEI DARUSSALAM, 2005 Affiliations : Member of PII (The Institution of Engineers, Indonesia) Reg. No. 0905.03.007685 Member of PIPI (Indonesian Professional Engineer Association) Reg. No. EI 12 Member of SKA (Main Expert Constuction Management) Reg. No. 096/I-2011/BSAPP F00008 Member of SKA (Main Expert Project Management) Reg. No. 097/I-2011/BSA-PP F00008 Summary Experience : I have more than 29 years working experience especially in Project Engineer, Instrument Control & Automation Engineer for the OPERATION MAINTENANCE, CONCEPTUAL, DESIGN ENGINEERING, PURCHASE REQUISITION, CONSTRUCTION, TEST (FAT) & (SAT), Operation Maintenance and Pre-commissioning (EPCC Project) for the OFFSHORE, ONSHORE, FPSO, REFINERY, LNG, Fertilizer and Petrochemical, Facilities for Greenfield and Brownfield the Oil and Gas industry. My experience are cover prepare

Page 2 of 13 Conceptual Design or Pre-Project Study, FEED document, Detailed Engineering and Site Construction Supervision, and also I am involving development of shutdown and control philosophy, P&IDs, Cause & Effect diagrams, HAZOP study, logic diagrams, configurations DCS, PLC (Allen Bradley, Siemens), FGS (Fire & Gas Systems), and also configurations for PCS, HIPPS, SIL, SIS, and also selection of Analyzers, field instruments, Specification, Datasheet, TBE and estimate MTO for purchased or bid document. I am familiar to use InstruCalc program for some instrument documents & drawings. I am also familiar with various agency, industry code and international standards (ISA, API, ISO, IEC, UL, ATEX, ANSI, ASME, ASTM, MESC, NACE, NEMA, BS, IEEE, MSS, NEC, NFPA etc).

Relevant Experiences :  Feb, 2017 - Feb, 2018 PT. Mottmac Donald Indonesia Assignment : Project Engineer / Sr. Instrument Engineer Project : SPV Floating Water Intake Pontoon Engineering Client : SOUTH PACIFIC VISCOSE Purwakarta - Indonesia Responsibilities : - Check & Review daily fabrication report, Project control report and Material control report - Prepare detail design engineering related to the Instrumentation & Control System, Site Visit Report, Fire & Emergency Shutdown System and Instrument Specification & Control Philosophy . - Ensure and Supervision Installation & Construction for all Instruments Devices such as SDV, Pressure Switch, Pressure Indicating Transmitter, Temperature Gauge, Temperature Indicating Transmitter and Thermowell, Flow Indicating Transmitter, Local Control Panel & Monitoring System, Pressure Gauges, Level Gauges, Level Control Valve, Level Transmitter, Control Panel, and Selection Instrument Requirement. - Set up and prepare Master Deliverable Register (MDR), Project Change Request (PCR), Cost, Time & Resources (CTR) of Instrumentation work and Schedule. - Prepare document of Sizing / Calculation Sheets and material selection for emergency Shutdown Valve, Safety Valves, Orifice Plate & Flange, Restriction Orifice - Review & ensure documents of Alarm Management Specification and Shutdown Philosophy, Cause & Effect Matrix for ESD, Installation Cabling system from existing to new Connection Package & Safety Requirement Specification (SRS) for all Instrument safety loop, Analyzer, Safety & Relief Valves, Central Control Specification, Automation System Architecture, Flare Ignition System.  Aug, 2015 - Dec, 2016 PT. Shaftindo Energi Assignment : Lead Project Engineer Project : Suban-15 Flow Line and Well Site Facility Client

:

CONOCOPHILIPS, Palembang – Indonesia

Responsibilities : - The main responsibilities are project coordination during Design Engineering drawings/documents, plant construction activities, plant procurement and Installation for

Page 3 of 13

-

-

-

-

-

-

-

Civil / Piping / electrical / Instrumentation and Engineering deliverable List, Construction Schedule and Site progress Report, Manpower assignment, Fabrication workshop/material deliverable to Site schedule and Readiness. Set up and prepare Master Deliverable Register (MDR), Project Change Request (PCR), Cost, Time & Resources (CTR) of Instrumentation work and Schedule, Analysis Emergency Shutdown System, Sizing / Selection and Calculation Sheets Control Valve, Safety Valves, Orifice Plate & Flange, Restriction Orifice, etc. Set up coordination meeting with multidiscipline for problem solving Ensure and Review Technical Query, Civil / Piping / Electrical / Instruments Tag Item or Field Devices for SDV/BDV, Regulator Valve, Pressure Switch, Pressure Indicating Transmitter, Temperature Gauge, Temperature Indicating Transmitter and Thermowell, Flow Indicating Transmitter, Pressure Gauges, Level Control Valve & Control Panel, and Selection Instrument Requirement. Shop drawing Detail related to the Instrumentation Construction Weekly report and develop documentation of Alarm Management Specification and Shutdown Philosophy, Cause & Effect Matrix for ESD, Installation Cabling system from existing to new Connection Package & Safety Requirement Specification (SRS) for all Instrument safety loop, Analyzer, Safety & Relief Valves, Central Control Specification, Automation System Architecture, Flare Ignition System. Prepare Requisition for Quotation / Field Material Request and Technical Bid Evaluation for Instrument tag items Testing & Commissioning for function test, leakage test, Loop Test and trouble shooting etc. I have knowledge of Calibration (Service for Pressure, Vacuum, Flow, Level & Temperature) Transmitters, Converters, Controllers, Switches, Gauges, Valves (Control Valve, On-Off valves, Solenoid valve) Commissioning and Servicing of all field Instrumentation device. Testing and commissioning all measuring Instruments, Such as Thermocouples, RTD, Transmitters. Calibration, Servicing and maintenance of all types Pneumatic & Electronic Pressure, Flow, Level, Temperature Transmitters, Records & Controllers (I/P, P/I, R/I, Regulators). Worked at Various PLC are Allen Bradley, Siemens, Honeywell and trouble shooting. Worked at Ultrasonic Radiation & Capacitance type level measurement’s and Votex, Flow meter, Turbine type, Mass flow meter, Magnetic flow meter etc. Calibration and Checking in Yokogawa & Knick-PH meter and Yokogawa-Conductivity meter. I have hand Operation experience of operate Hart Communicator and Honeywell

 June, 2012 - March, 2015 PT. RekindworleyParsons Assignment : Lead Instrument & Automation Engineer Project

: Engineering and Construction Management

Client

: CHEVRON PACIFIC INDONESIA, Pekan Baru, Riau - Indonesia

Page 4 of 13

Responsibilities : -

-

-

-

-

-

-

Design & Review Front End Engineering Design and Detail Engineering Design related to the Instrumentation, Analysis Study, Site Visit Report, Emergency Shutdown System. Set up and prepare Master Deliverable Register (MDR), Project Change Request (PCR), Cost, Time & Resources (CTR) of Instrumentation work and Schedule, Sizing / Calculation Sheets Control Valve, Safety Valves, Orifice Plate & Flange, Restriction Orifice Ensure Technical Query, Datasheet for all Instruments Devices such as SDV/BDV, Regulator Valve, Pressure Switch, Pressure Indicating Transmitter, Temperature Gauge, Temperature Indicating Transmitter and Thermowell, Flow Indicating Transmitter, Sand Monitoring System, Pressure Gauges, Level Control Valve & Wellhead Control Panel, and Selection Instrument Requirement. Review & ensure documents of Alarm Management Specification and Shutdown Philosophy, Cause & Effect Matrix for ESD, Installation Cabling system from existing to new Connection Package & Safety Requirement Specification (SRS) for all Instrument safety loop, Analyzer, Safety & Relief Valves, Central Control Specification, Automation System Architecture, Flare Ignition System. Prepare Requisition for Quotation and Technical Bid Evaluation for Instrument Vendor Packages & Skid I have work in Preventive Maintenance, Shutdown Jobs, Emergency Shutdown and Trouble shooting jobs I have knowledge of Calibration (Service for Pressure, Vacuum, Flow, Level & Temperature) Transmitters, Converters, Controllers, Switches, Gauges, Valves (Control Valve, On-Off valves, Solenoid valve) Commissioning and Servicing of all types of gauges, Switches, Control valves, Solenoid valves and On-Off valves. Testing and commissioning all measuring Instruments, Such as Thermocouples, RTD, Brix transmitters. Calibration, Servicing and maintenance of all types Pneumatic & Electronic Pressure, Flow, Level, Temperature Transmitters, Records & Controllers (I/P, P/I, R/I, Regulators). Worked at Various PLC are Allen Bradley, Siemens, Honeywell. Worked at Ultrasonic Radiation & Capacitance type level measurement’s and Votex, Flow meter, Turbine type, Mass flow meter, Magnetic flow meter etc. Calibration and Checking in Yokogawa O2 Analyzers, Melter Tolerdo and Knick-PH meter & Yokogawa-Conductivity meter. I have hand Operation experience of operate Hart Communicator Model 275, 375, 475 and Honeywell

 Sept, 2010 - June, 2012 PT. Amec Berca Indonesia Assignment : Lead Instrument & Control Engineer Project

:

Ruby Tie in project and Eastern Hub Mercury Removal – Water Project

Client Philips

:

TOTAL E & P Indonesie on behalf PEARL OIL Ltd and Conoco

Page 5 of 13

Responsibilities : - Prepare Instrument Basic Design Philosophy, Metering System, Fire & Gas Detector System, WHCP Analysis Study, Site Visit Report, Weekly Report Montly Report, Emergency Shutdown System, Instrument Loop Diagram, Instrument Block diagram, Prepare Deliverable List Estimate and Schedule, Sizing / Calculation Sheets Control Valve, Safety Valves, Orifice Plate & Flange, Restriction Orifice - Prepare Datasheet for all Instruments Tag Item or Field Devices for SDV/BDV, Choke Valve, Pressure Switch, Pressure Indicating Transmitter, Temperature Gauge, Temperature Indicating Transmitter and Thermowell, Flow Indicating Transmitter, Sand Monitoring System, Pressure Gauges, Level Control Valve & Wellhead Control Panel, and Selection Instrument Requirement. - Prepare document for Alarm Management and Shutdown Philosophy, Cause & Effect Matrix for ESD, Installation Cabling system from existing to new Connection Package & Instrument Specification for Earthing System, Analyzer, Safety & Relief Valves, Central Control Specification, Automation System Architecture, Flare Ignition System, Instrument Air Utility, Instrument Field Devices, GPA System and Ultrasonic Flow Meter etc. - Prepare Instrument Power consumption, Instrument O/I list and Instrument index. - Prepare Requisition document for tag items such as Choke Valve, Pressure Safety Valve, Pressure Indicating Transmitter and Flow Indicating Transmitter, Temperature Indicating Transmitter and Thermowell, Sand Monitoring System, Orifice Plate & Flange, Instrument Wellhead Control Panel, Pressure Gauges, Level Control Valve, Instrument Control System (PCS & SSS), Instrument Tubing, and Instrument Cables.  February, 2008 - June, 2010 ENI Oil Company Limited ( Mellitah Oil & Gas BV ) Tripoli, Libya Assignment : Snr. Instrument & Control Engineer Project : - A/100 Low Pressure Facilities and Arrival Manifold Modification, Bu Attifel Project - DCS, ESD troll System integration between new centralized control room & Produced water re-injection plant project - R/82 - A/100, 12” Crude Oil Pipeline Replacement EPIC Project - Feasibility study for hydrocarbon metering replacement or modernization ( Rimal, OO, UU, KK, Bu-Attifel, Zuetina A103 and Bouri field )

Responsibilities : - Review & Approve all related Instrument and Main Control system for PSD or ESD/FGS, PCS or DCS and included interface package for Electrical and Instrument, Mechanical. - Prepare and Comment documents Consumption List, Instrument Field Devices, Fire & Gas Field Devices, GPA System and data Communication, Ultrasonic Flow Meter, Instrument Design Criteria, Instrument Philosophy, Alarm Management Philosophy, Safety Instrument System Function Design, Network IP Address allocations and - Review and Prepare Comment the Complete Basic & Detail Design Engineering, Alarm Set Point as per Alarm Management philosophy and All Package item included Hard

Page 6 of 13

-

-

-

-

-

Wire Cable from Another Connection Packages & Field, ESD/FGS Data Base (with Input / Output Count). Review and Approved Instrument Data Sheets and drawings in liaison with the Agip Standard-based, Operations and maintenance requirement, database and construction procedures, including, DCS control schemes, Instrument functional diagrams, loop diagrams, I/O assignments, etc. The systems integration development, ensure safe, and technically sound decisions related to area of responsibility during EPC phase.. Check and Review Design, Instrument Air Capacity Verification, Instrument Earthing System Requirement, Intrinsic Safety Calculation, DCS/ESD/FGS System Interlock Logic Diagram, Instrument Loop Diagram, Trip & Alarm Schedule, Pneumatic Instrument Layout, Electronic Instrument Layout, Calculation Sheets for Control Valve, Orifice Plates, RO. Hydraulic. Review and Prepare Data Sheet and Selection All of Instrument Equipments such as Electronic Instrument Transmitter (PT/PDT/LT/FT), Choke Valves, Self Regulating Heater Cable, Fire Water System, Pressure Gauges, Pressure Switch, Temperature Transmitter (TW & Wells), SDV/BDV Pneumatic Local Controllers, Filter Regulators, Analyzer, and WHCP with PLC, HPU with PLC, HIPPS, SIL, Flow Computer, Flow Meter System, etc. Review & Ensuring EPC Contractor’s Instrument & Control Engineering meets Project Requirements, Standard, Specifications and performance Guarantees ESD/FGS Inspection & Test Plans Document and Performing Cause & Effect Matrix Test of Control, ESD/FGS Cause & Effect Diagram for Vendor Packages. Perform Cost Estimate & Schedule etc. To Development of Basic Design Criteria and Operating Safety Requirement, Procedure Field Instrument Installation Related to the Construction Standard Requirement, Pre-Commissioning & Commissioning procedure, Requisition for Quotation Documents, and Material Requisition, Vendor Equipment Evaluation, Vendor Package Schedule and Technical Bid Analysis

 January, 2006 - January, 2008 Nippon Steel Engineering Corporation, Ltd Assignment : Lead Instrument & Control Engineer Client

:

HESS (Indonesia-Pangkah) Limited British Petroleum West Java Ltd

Project : WHP-B and Ujung Pangkah CPP & AUP EPCC Contract Bidding Work and BP West Java Rehabilitation Project Bidding Work and Engineering preparation Responsibilities : - Prepare Technical bidding work Document of General Instrument Scope of Work and Safety for Engineering and Construction. Fire & Gas Detector System, Telecommunication System Philosophy, Instrument and Shutdown System, Wellhead Control System, Instrument Loop Diagram, Material Takeoff, Instrument Block diagram and Instrument List.

Page 7 of 13 -

-

-

-

Prepare Weekly Report, Monthly Report, Deliverable List and Schedule, Sizing / Calculation Sheets for Control Valve, Safety Valves, Orifice Plates, RO, SDV/BDV & Panel, and Selection Instrument Requirement. Project specification and Datasheet for All Instruments Tag Item or Field Devices, (LG/LT/LS, PG/PT/PS, TG/TT/TS and FE/FT/FS, Control Valve & on/off pneumatic Valve ), Alarm Management and Shutdown Philosophy, Cause & Effect Matrix for ESD and Fire & Gas System, Drawings Detail Design Cable from Another Connection Package & Field Junction Boxes System Arrangement., Instrument Specification for Earthing System, Analyzer, Safety & Relief Valves, P&I Vendor Packages, Instrument and Central Control Specification, Automation System Architecture, Flare Ignition System, Instrument Air Utility, Instrument Field Devices, Fire & Gas Field Devices, GPA System and, Ultrasonic Flow Meter etc. Prepare Automation Scope of Work, Automation Alarm Management & Shutdown Philosophy, Instrument Basic Design, Instrument Function Design Spec, Instrument Control Network Spec, Safety Instrument System Function Design, Automation Alarm Management Project All Related with Automation System Cabinet, e.g. PSD or ESD, PCS or DCS and FGS Specification, Wellhead Fabrication Drawings and Shop Drawings, Shutdown System, Control System, Detail Design Instrument Engineering Drawings, Instrument Loop Diagram, Material Take-off, Instrument Block Diagram, I/O List & I/O Assignment for module, Interface Cable Between RTU to SCADA Master or HMI, Segregate Signal (IS & Non IS) from Field Devices & Package Item. Vendor Equipment Evaluation and Technical Bid Evaluation.

 November, 2003 - December, 2005 RAMUNIA OIL & GAS SDN BHD, Malaysia Assignment : Lead Instrument and Control Engineer Project

-

-

: East Belumut – A, Tinggi-A and Chermingat Platform of Newfield Peninsula Malaysia Inc. Lot 437. Telok Ramunia 81620 Pengerang, Johor Darul Tak’zim - Malaysia

Responsibilities : Review & Prepare Perform the Technical Evaluation (TBE) or Any Tender Document Submitted by Vendor. Clarify Vendor Quotation Technically and Kick of Meeting under Procurement Section Coordination. Monitoring and Control Instrument Material Status to Verify, Review and Approve the Vendor Data / Drawings. Check of Other Discipline Document Which Relating to Instrument Standard Requirement. Raise Purchase Requisition (PR) for New Material Request or Shortage Check and Review for Detail Design Instrument Engineering Drawing, Instrument Loop Diagram, Material Take-off, Instrument Block Diagram, Deliverable List Estimate and Schedule, Sizing / Calculation and Selection Instrument Requirement. Review and Prepare All Related with Instrument Control System for PSD or ESD, SIS, PCS or DCS and FGS Included interface with all Package for Piping, Mechanical, Electrical and Instrument such as Gas Turbine, Fire Water Pump, HVAC with DCS, PLC, LCP Pumps, Multiphase Flow meter, Flare Ignition System, Instrument Air Utility,

Page 8 of 13

-

-

-

-

-

MCC, Switchgear, Emergency Diesel Generator, Instrument Field Devices, Fire & Gas Field Devices, GPA System and Telecommunication, Ultrasonic Flow Meter etc. Review & Verify the Incoming I/O from Field Devices & Package item to be Connected to Control System Cabinet / Marshaling Cabinet for PSD, PCS and FGS Cabinet for Design Capacity the Size of the Cabinets. Prepare Instrument & Control Scope of Work, Automation Alarm management philosophy, Instrument & Control Basic Design, Automation Network Spec, Alarm Set Point as per Alarm Management philosophy and MODBUS Address for Ethernet Cable & RS485/232 Cable All Package item included Hard Wire Cable from Another Connection Packages & Field, Automation Package Interface Spec, Safety Instrument System Function Design, Automation Alarm Management Project Execution Plan, Automation Database Guidelines, Automation I/O List, Automation Architecture, System PCS, PSD & SCS Block Diagram, System F&G Block Diagram, Overall Interface Diagrams, Network IP Address Allocations and Automation data Review All the Instrument Documents, Data, Drawings from Contractor for the Project and ensure that the Project Document is Done as per the Project Specification Requirement. Responsible for updating/developing fire & gas detectors schedule, datasheets, wiring diagrams, I/O Schedule, cause & effect drawings, loop diagram, narratives, etc. Supervising the correct selection of materials and equipment, and quantifying, procuring and monitoring the progress of materials and equipment through all stages of projects. Ensuring that materials requirements are identified and procured effectively and efficiently within the given project time scale. Responsibility includes preparation of material/ purchase requisition for RFQ, Technical Requisition Package (TRP) for FGS System, technical bid evaluation (TBE), vendor drawing review/approval (VDR) and technical support. Analyse problems, determine critical factors for investigation and provide expert advice on design processes and construction methods.

 August, 2001 - October, 2003 MEDCOENERGI EXPLORATION & PRODUCTION Assignment : Snr. Instrument Design Engineer Project

: Singa Gas Plant Development and Kaji Satellite / Matra Receiving, Kaji Semoga, Kaji Station, Kaji Waste Treatment Centre and Kaji Pilot Enhanced Oil Recovery (EOR) Instrument Air Compressor of Gunung Megang Station

Responsibilities : - Prepare General Instrument Specification, Fire & Gas Detector Specification, Telecommunication & System Philosophy, Telecommunication and Scada System Specification, Instrument and Design Criteria, Shutdown System Specification, Instrument and Control Specification, Instrument Data sheet, Check and Review for the Complete & Detail Design Instrument Engineering Drawing, Instrument Index, Cause and Effect. -

Prepare Demolition procedure for Control System, Instrument loop Diagram, Material Take-off, and Vendor Package Equipment Evaluation and Technical Bid Evaluation

Page 9 of 13 Deliverable List Estimate and Schedule, Sizing / Calculation and Selection Instrument as per Company Specification Requirement. -

Ensure best practices associated with Fire & Gas Detection System Projects including planning, coordinating, supervising, and evaluating technical work. Responsible for updating/developing fire & gas detectors schedule, datasheets, wiring diagrams, I/O Schedule, cause & effect drawings, loop diagram, narratives, etc. Supervising the correct selection of materials and equipment, and quantifying, procuring

 April, 1999 - June, 2001 PT. PetroChina International JABUNG Ltd. Assignment : Snr. Instrument Design Engineer Project

: NG ( North GERAGAI ) Separation Facilities De-bottlenecking ( AFE1401) Removal & Replacement First Stage Separator V-3400 to Second Stage Production Separator V-3410 EPC & E of Skim / Surge Tank –126 ( AFE-1733 )

Responsibilities : - Prepare the Complete Detail Design Engineering for Instrumentation, Technical Specification, Review P & ID, Instrument Equipment Data sheets, Perform Cost Estimate and Schedule. Design, Calculation and Sizing of Instrument equipment such as Control Valves, Flow Elements, RO, SDV/BDV valves, Regulators, PSV, etc WHCP, HPU with PLC, HIPPS, SIL, Flow Computer, Flow meter System, etc. - Development of Control System Philosophy and Operating Safety Requirement. Sizing Calculation and Selection Instrument Requirement. Prepare Requisition for Quotation Documents. Check and Review Detail Design Instrument Drawing and Material Requisition . - Check or review Project specification for package item & field devices. - Check or review Datasheet for all instruments tag item or field devices. - Check or review Alarm management and Shutdown philosophy. - Check or review Cause & Effect Matrix for ESD and Fire & Gas System. - Clarify detail design documents or drawing with other discipline engineers. - Check drawings detail design before issued for client review and approval. - Check or review Automation specification and total I/O requirement. - Check or review of IO list, IO assignment and Module Assignment. - Check alarm set point as per alarm management philosophy. - Check MODBUS address for Ethernet cable & RS485 cable for packages - Check or review interface cable between RTU to SCADA Master or HMI - Prepare cable from another connection package & field Junction Boxes. - To segregate Signal (I.S & Non I.S) from field devices & package item and sizing of Control valves, Pressure relief valves and Orifice plates (RO, FE). - Review of Marshalling and System Cabinet Technical Specification. - Check and review design & sizing Marshaling cabinet for PSD/ESD, PCS/SCADA and Fire & Gas. - To assist weekly Progress meeting with Project Team & Project Management Team.  April, 1997 - March, 1999

Page 10 of 13 CHEVRON PACIFIC INDONESIA (Assignment by PT. Istech Resources Asia) Assignment : Sr. Instrument Maintenance Engineer Project

: Maintain & Supervise field instrument and Up dated / Verify Instrument data collection and P & ID as built drawing According to site condition for 32 ( thirty two ) Gathering stations and 10 ( ten ) Gas Plant in SLN Area.

Responsibilities : - Coordinate, maintain, improve and develop documentation and procedures for items such as instrument procedures, instrument configuration changes and checkout, common instrument troubleshooting procedures, instrument preventive maintenance procedures, and instrument spare parts inventory to assure appropriate documentation is maintained and available when needed. For new instruments, review support needs imposed in terms of standard reconfigurations, preventive maintenance schedules, required interfaces, and troubleshooting; review existing and planned documentation and engineering drawings, especially from a support and maintenance perspective; and assist with commissioning activities and integration of new instruments into observatory systems to support operation of facility and visiting instruments. - Review & Verify All of Instrument Field Devices and Incoming I/O from Field Devices Item to be Connected to Control System Cabinet / Marshalling Cabinet for PSD, PCS and FGS Cabinet in Control Room. - To Follow and Assist the PSD, PCS and FGS during FAT, SAT & Commissioning Included Package Equipments. -

-

To Ensure that Instrument Documents and Drawings are Informed and Implemented on the Site and Checking, Loop Test and Performing Cause & Effect Matrix Test of Control Loops, Leakage test and Punch List Prepare & Verify Field Instrument Equipment and Turbine Gas Control System Package According to Site Condition was as Built. Collected Instrument Data Base on Worksheet from CPI Collected each Equipment List and Part List Based on Engineering Data and Instruction Manual Book. Tagging Instrument Equipment number on site as JDE data (based on JDE Numbering system). Develop and perform P & ID as built drawing according to Site Latest Condition Field Analysis & Evaluation Instrument and Control Systems

 January, 1995 - February, 1997 PT. TECHNIP COFLEXIP Assignment : Snr. Instrument Design Engineer Client : TOTAL INDONESIE, BALIK PAPAN EAST KALIMANTAN Project : HANDIL API Barge Replacement Project : CSU De-Bottlenecking Study Project : Compression / Pumping Facilities on Well Service Barge Project : TUNU South Oily Water Treatment Project : SENIPAH Fire Heater Up grade Responsibilities :

Page 11 of 13 -

-

Prepare for the Complete Basic & Detail Design Engineering, Technical Specification, Instrument Index, Instrument Equipment Data sheets, Perform Cost Estimate and Schedule. Develop of Instrument & Control System Philosophy and Operating Safety Requirement. Design, Calculation and Sizing of Instrument equipment such as, Control Valve, Flow Elements, RO, SDV/BDV valves, PSV, etc Develop and Design WHCP accordance to HPU, HIPPS, SIL Standard connected to Flow Computer, Flow meter System, etc Prepare Sequence of development document, Installation and Construction -Prepare Requisition for Quotation Documents. Project uniformity and Conformance to Contractual Requirements Related to Instrumentation and Process Control.

Client

:

Project Project Project Project

: : : :

UNOCAL INDONESIA COMPANY, BALIK PAPAN, EAST KALIMANTAN YAKIN CPP2 Supplement Compressor SERANG Flare Boom PASIR Ridge Station Diesel Day Tank Replacement ATTAKA Gas Lift Metering

Responsibilities : - Evaluation of Control System, Prepare Instrument Equipment Data Sheets, - Prepare MVT, I/O List, I/O. Module Document. Check Line List to Number of P & ID Drawing. - Prepare Instrument Equipment Calculation and Instrument Technical Specification Included Fire and Gas Detection, HPU with PLC, HIPPS, SIL, Flow Computer, Flow meter System, etc. - Prepare Sequence of development document and Installation and Construction Instrument and Control Cable Schedule, Wiring Block Diagram, Instrument Cable Routing, Loop - Diagram, Selection of Ignition Control System, Data Sheets, Site Visit for Implementation of Terminal Ignition Control System, Review Flare Package Data Vendor P & ID Drawing Study for Gas Lift Flow Metering - Prepare & Field Analysis Instrument and Turbine Gas Control System design included for Construction & Pre commissioning, Inspection & Punch List Project Report, Design & Analysis Existing Integrated DCS and PLC in Control Room; Instrument Sizing Calculation and Selection for Control Valves, Flow Elements, Pressure Relief Valves etc. - Develop P & ID to Existing Integrated and Implementation of Distribution Control System. - Detail Engineering Design Data for Instrumentation, Design Instrument Main Cable Way and Preparation Instrument Data Sheets & MTO. Loop Test and Supervision Flow Line of Oil from Wellhead through Separator, Development of the Process Control Philosophy And operating Safety ( Shutdown System ) Requirement.  September, 1992 - November, 1994 PT. KOKUSAI KEISO INTERNATIONAL Assignment : Instrument Design Engineer

Page 12 of 13

Project :

MEOG Project at Toyo Engineering Corporation 8 – 1 AKANEHAMA 2 – CHOME, NARASHINO – SHI Chiba 275 – 0024 Japan

Responsibilities : - Prepared & Field Analysis Instrument and Control System for Construction & Pre commissioning, Inspection & Punch List Project Report, Design & Analysis Existing Integrated DCS and PLC in Control Room, Instrument Sizing Calculation and Selection for Control Valves, Flow Elements, Pressure Relief Valves etc. - Develop of P & ID to Existing Integrated and Implementation of Distribution Control System. - Detail Engineering Design Data for Instrumentation, Design Instrument Main Cable Way and Preparation Instrument Data Sheets & MTO. - Loop Test and Supervision Flow Line of Oil from Wellhead through Separator,- Develop of the Process Control Philosophy And operating Safety (Shutdown System ) Requirement. - Check and modified Motor Control System, Wiring Diagram, Schematic Diagram, - Cable Tray Layout; Interconnection Diagram; Cable Routing and Cable List, MTO, Main Cable Way, Control Panel Enclosure, Electrical Power/Control Cabling layout, Distribution Control Panel Arrangement, Standard Support Detail and Power/Control Cable Schedule. Detail Engineering Design Data for Instrumentation, Design Instrument Main Cable Way and Preparation Instrument Data Sheets & Material take-off . - Develop of the Process Control Philosophy and Operating Safety (Shutdown System ) Requirement.  February, 1986 – June, 1992 PT. INDOKOMAS BUANA PERKASA ( Licensee of CEGELEC ) Assignment : Instrument / Electrical Engineer Client Project

: :

UNOCAL INDONESIA COMPANY EPCC Project and Contract Bidding Work

Responsibilities : - Prepare Bidding documents and Detail Design Engineering Drawing and Estimation, Basic Design Control System, Instrument Material Take-off, Instrument Location Plan, Instrument Main Cable Way, Man days and Man hours Estimation, Instrument tools & Field Instrument Equipment arrangement, Engineering Planning and Scheduling Client Project

: TOTAL INDONESIE, East KALIMANTAN : TNOR-105 & TNOR –107 PECIKO Field Development Project Phase-1 for Revamping of SENIPAH Camp

Responsibilities : - Prepare Documents and Engineering Design Instrumentation such as Installation and Construction Termination Distributed Control System (DCS), Instrument Technical Specification; Design Control Panel enclosure including MTO Equipment Gas Dehydration Unit TOTAL Thailand,

Page 13 of 13 Calculate MTO of Instrument & Electrical Equipment; Trouble Shooting Loop Diagram for TOTAL INDONESIE TNOR-107’ For GTS-1, L, M,N, NPU and BADAK Field, Instrument Technical Specification Instrument Loop Test, Instrument equipment Calibration, etc.

Client Project

: :

PT. PERUSAHAAN LISTRIK NEGARA ( PERSERO ) AP3 project, JDCC / DCC project, HITACHI / GRESIK Project, TANJUNG PRIOK Project, Protocol ’89, Protocol ’90, Power Plant Paiton, Protocol ’92 and Protocol ’95

Responsibilities : - Prepare and Calculate MTO of Instrument & Electrical Equipment for - Petrochemical GRESIK Surabaya, Single Line diagram, Interconnection Diagram, Electrical Power / Control Cabling Layout, Design & Modify Schematic Diagram for OHL 150 KV & 500 KV, Transformer 150/70 KV - Prepare Design for Power Plant Control System and Communication (DCS & SCADA) - Review & analysis Perform the Technical Evaluation Gas/Steam Turbine  September, 1983 – December, 1985 PT. PERTAFENIKKI ENGINEERING ( JAPANESE GASOLINE CORPORATION / JGC – JOINT OPERATION ) Assignment : Sr. Instrument Designer Client Project

: :

PERTAMINA ARUN LNG Expansion Project and MUSI Refinery Project Phase-1

Responsibilities : - Checking and Review Drawing According to as Built on Site, Piping and Instrument Diagram, Instrument Installation Detail, Cable Routing, Instrument Installation Air Supply, Instrument Loop Diagram, Hook-up & Section Detail, Cable Ladder & Trench layout, Instrument Material Take-off, Instrument Support Detail, Instrument & Control Pre-Commissioning & Commissioning, Instrument and Control Calibration.  March, 1981 – June, 1983 BECHTEL INTERNATIONAL INCORPORATED (Assignment by PT. Purna Bina Indonesia) Assignment : Instrument / Electrical Designer Project : Train “C” and “D” BONTANG LNG Expansion Project, East - KALIMANTAN Responsibilities : - Modification and as Built Drawing including Checking for Electrical Installation, - Distribution Panel, Cable Tray Layout, Lightning Protection, Schematic Diagram, - Electrical Cable Schedule, Connection cable, Wiring Diagram, Instrument - Location Plan; round Well, Detail Drawing and Electrical / Instrument Material - Take off, Instrument Loop Diagram, Hook-up & Section detail, Cable Ladder & Trench - Layout, MTO and Instrument Cable Schedule