Cco Utak Tik.xls

  • Uploaded by: Donny Umbu Piga
  • 0
  • 0
  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Cco Utak Tik.xls as PDF for free.

More details

  • Words: 28,342
  • Pages: 109
REKAPITULASI Program

: Lingkungan Sehat Perumahan

Kegiata

: Penyediaan Sarana Air Bersih dan Sanitasi Dasar Terutama Bagi Masyarakat Miskin

Pekerja

: Peningatan Jaringan Perpipaan SPAM Anakalang ( 800 SR )

Lokasi

: Anakalang - Kabupaten Sumba Tengah

Tahun A

: 2019

NO.

JUMLAH HARGA (Rp)

URAIAN PEKERJAAN

I

PEKERJAAN PERSIAPAN

II

PEK. PENGADAAN DAN PEMASANGAN PIPA TRANSMISI

III

PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA DISTRIBUSI

IV

PEKERJAAN PEMASANGAN UNIT LAYANAN

282,688,000.00

V

PEKERJAAN POMPA DAN PANEL SURYA

596,543,375.00

VI

PEKERJAAN PEMASANGAN POMPA HIDRAM

192,234,705.31

Terbilang :

34,062,460.00 473,964,230.18 3,555,116,661.60

BIAYA PEKERJAAN

5,134,609,432.08

PAJAK 10%

513,460,943.21

TOTAL HARGA PEKERJAAN

5,648,070,375.29

PEMBULATAN

5,648,070,000.00

LIMA MILYAR ENAM RATUS EMPAT PULUH DELAPAN JUTA TUJUH PULUH RIBU RUPIAH Makassar, 15 Pebruari 2019 PENAWAR PT. RAHMAT UTAMA MULIA

KHAEDYR TARJONO,ST DIREKTUR

DAFTAR KUANTITAS DAN HARGA

Program

: Lingkungan Sehat Perumahan

Kegiata

: Penyediaan Sarana Air Bersih dan Sanitasi Dasar Terutama Bagi Masyarakat Miskin

Pekerja

: Peningatan Jaringan Perpipaan SPAM Anakalang ( 800 SR )

Lokasi

: Anakalang - Kabupaten Sumba Tengah

Tahun A

: 2019

No.

JENIS PEKERJAAN

I.

PEKERJAAN PERSIAPAN

1

Pengukuran dan pemasangan Bouwplank

2

Pembersihan lapangan dan perataan

3 4

VOLUME

SATUAN

HARGA SATUAN (Rp)

JUMLAH HARGA SATUAN (Rp)

20.00

M'

460,823.00

9,216,460.00

1,400.00

M2

10,890.00

15,246,000.00

Biaya Mobilisasi Pipa ke lokasi pekerjaan

1.00

Ls

5,000,000.00

5,000,000.00

Direksi keet dan Gudang Penyimpanan 4 x 8

1.00

Ls

3,500,000.00

3,500,000.00

5

Pengadaan air kerja

1.00

Ls

500,000.00

500,000.00

6

Papan Nama Proyek

1.00

Ls

600,000.00

600,000.00

JUMLAH PEKERJAAN PERSIAPAN

34,062,460.00

II.

PEK. PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Ø 3" (75 mm)

1

Pemasangan pipa GIP Ø 3" (75 mm)

1,700.00

M'

248,217.00

2

Pengetesan pipa Ø 3" (75 mm)

1,700.00

M'

1,436.00

2,441,200.00

3

Penggalian tanah biasa

201.00

M3

50,875.00

10,225,875.00

4

Pengurugan kembali galian tanah

191.00

M3

18,425.00

3,519,175.00

5

Pembuatan Trust Block dari beton K 150

0.68

M3

1,407,941.00

950,360.18

6

Gate Valve 3"

4.00

Bh

1,830,000.00

7,320,000.00

7

Air Valve 3"

7,320,000.00

8

Flange 10K ns GI 3"

9

Pemasangan 1 buah bak kontrol pas. bata 60cm x60cm tinggi 65 cm

421,968,900.00

4.00

Bh

1,830,000.00

55.00

Bh

152,000.00

8,360,000.00

8.00

Unit

1,482,340.00

11,858,720.00

JUMLAH PEK. PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Ø 3" (75 mm)

473,964,230.18

III.

PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA DISTRIBUSI

III.1

PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PRIMER Ø 150 MM

1

Pemasangan pipa GIP Ø 6" (150 mm)

1,765.00

M'

511,161.00

2

Pengetesan pipa Ø 6" (150 mm)

1,765.00

M'

2,591.00

902,199,165.00 4,573,115.00

3

Penggalian tanah biasa

370.60

M3

50,875.00

18,854,275.00

4

Pengurugan kembali galian tanah

222.00

M3

18,425.00

4,090,350.00

5

Gate Valve 6"

1.00

Bh

4,150,000.00

4,150,000.00

6

Butterfly Valve 6"

1.00

Bh

4,670,000.00

4,670,000.00

7

Air Valve 6"

2.00

Bh

4,150,000.00

8,300,000.00

8

Reduser 6" x 3"

2.00

Bh

726,579.00

1,453,158.00

9

Flange 6"

2.00

Bh

255,000.00

510,000.00

10

Flange 10K ns GI 6"

48.00

Bh

290,000.00

13,920,000.00

11

Pembongkaran Trotoar dan Pengecoran Kembali

2.00

M3

1,326,266.00

2,652,532.00

12

Pemasangan 1 buah bak kontrol pas. bata 60cm x60cm tinggi 65 cm

4.00

Buah

1,482,340.00

5,929,360.00

JUMLAH PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PRIMER Ø 150 MM

971,301,955.00

DAFTAR KUANTITAS DAN HARGA

Program

: Lingkungan Sehat Perumahan

Kegiata

: Penyediaan Sarana Air Bersih dan Sanitasi Dasar Terutama Bagi Masyarakat Miskin

Pekerja

: Peningatan Jaringan Perpipaan SPAM Anakalang ( 800 SR )

Lokasi

: Anakalang - Kabupaten Sumba Tengah

Tahun A

: 2019

No. III2

JENIS PEKERJAAN

VOLUME

SATUAN

HARGA SATUAN (Rp)

JUMLAH HARGA SATUAN (Rp)

PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA SEKUNDER Ø 75 MM

1

Pemasangan pipa GIP Ø 3" (75 mm)

1,260.00

M'

248,217.00

312,753,420.00

2

Pengetesan pipa Ø 3" (75 mm)

1,260.00

M'

1,436.00

1,809,360.00

3

Penggalian tanah biasa

150.00

M3

50,875.00

7,631,250.00

4

Pengurugan kembali galian tanah

142.00

M3

18,425.00

2,616,350.00

5

Gate Valve 3"

2.00

Bh

1,830,000.00

3,660,000.00

6

Butterfly Valve 3"

2.00

Bh

2,300,000.00

4,600,000.00

7

Air Valve 3"

4.00

Bh

75,000.00

300,000.00

8

Flange 10K ns GI 3"

35.00

Bh

20,500.00

717,500.00

9

Flange 3 "

4.00

Bh

130,000.00

520,000.00

10

Pemasangan 1 buah bak kontrol pas. bata 60cm x60cm tinggi 65 cm

8.00

Buah

1,482,340.00

11,858,720.00

11

Tapingg Jalan

25.00

M'

III3

75,000.00

1,875,000.00

JUMLAH PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA SEKUNDER Ø 75 MM

348,341,600.00

PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA SEKUNDER Ø 2" (50 MM)

1

Pemasangan pipa GIP Ø 2" (50 mm)

3,025.00

M'

183,225.00

554,255,625.00

2

Pengetesan pipa Ø 2" (50 mm)

3,025.00

M'

1,271.00

3,844,775.00

3

Penggalian tanah biasa

136.00

M3

50,875.00

6,919,000.00

4

Pengurugan kembali galian tanah

132.00

M3

18,425.00

2,432,100.00

5

Gate Valve 2"

6.00

Bh

650,000.00

3,900,000.00

6

Air Valve 2"

6.00

Bh

650,000.00

3,900,000.00

7

Tapingg Jalan

20.00

M'

75,000.00

1,500,000.00

8

Pemasangan 1 buah bak kontrol pas. bata 60cm x60cm tinggi 65 cm

12.00

Buah

1,482,340.00

17,788,080.00

JUMLAH PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA SEKUNDER Ø 2" (50 MM)

594,539,580.00

III4

PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TERSIER Ø 1.1/2" (40 MM)

1

Pemasangan pipa GIP Ø 1.1/2" (40 mm)

11,650.00

M'

133,983.00

1,560,901,950.00

2

Pengetesan pipa Ø 1.1/2 (40 mm)

11,650.00

M'

1,271.00

14,807,150.00

3

Penggalian tanah biasa

525.00

M3

50,875.00

26,709,375.00

4

Pengurugan kembali galian tanah

262.00

M3

18,425.00

4,827,350.00

5

Gate Valve 1.1/2"

6.00

Bh

360,000.00

2,160,000.00

6

Air Valve 1.1/2"

6.00

Bh

360,000.00

2,160,000.00

7

Tapingg Jalan

20.00

M'

75,000.00

1,500,000.00

8

Pembongkaran Trotoar dan Pengecoran Kembali

7.60

M3

1,326,266.00

10,079,621.60

9

Pemasangan 1 buah bak kontrol pas. bata 60cm x60cm tinggi 65 cm

12.00

Buah

1,482,340.00

17,788,080.00

JUMLAH PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TERSIER Ø 1.1/2" (40 MM)

1,640,933,526.60

JUMLAH PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA DISTRIBUSI IV

PEKERJAAN PEMASANGAN UNIT LAYANAN

1

Pemasangan Sambungan Rumah (Pipa GI 3/4", Kran Air 3/4", Albow 3/4", Clamp Sadle )

3,555,116,661.60 800.00

SR

353,360.00

282,688,000.00

JUMLAH BANGUNAN PELENGKAP JARINGAN

282,688,000.00

DAFTAR KUANTITAS DAN HARGA

Program

: Lingkungan Sehat Perumahan

Kegiata

: Penyediaan Sarana Air Bersih dan Sanitasi Dasar Terutama Bagi Masyarakat Miskin

Pekerja

: Peningatan Jaringan Perpipaan SPAM Anakalang ( 800 SR )

Lokasi

: Anakalang - Kabupaten Sumba Tengah

Tahun A

: 2019

No. V

JENIS PEKERJAAN

VOLUME

SATUAN

HARGA SATUAN (Rp)

JUMLAH HARGA SATUAN (Rp)

PEKERJAAN POMPA DAN PANEL SURYA

A.

Material Utama

1

PV Module 200 Poly

85.00

pcs

3,100,000.00

263,500,000.00

2

Pompa Submersible PU15K2 C-SJ30-12, 3"

1.00

set

108,000,000.00

108,000,000.00

3

Controller PS15K2

1.00

set

85,000,000.00

85,000,000.00

4

PV Disconnect 1000-40-5

1.00

set

10,000,000.00

10,000,000.00

5

PV Combiner 1000-125-4

1.00

set

6,800,000.00

6,800,000.00

6

PV Protect 1000-125

1.00

set

8,700,000.00

8,700,000.00

7

Surge Protector

1.00

set

780,000.00

780,000.00

8

Well Probe Sensor air bawah

1.00

set

1,600,000.00

1,600,000.00

9

Kabel PV Array NYAF 6mm

100.00

meter

30,000.00

3,000,000.00

10

Kabel Pompa NYYHY 4x10mm

100.00

meter

101,000.00

10,100,000.00

11

Kabel Sensor NYYHY 2x0,75mm

100.00

meter

11,000.00

1,100,000.00

12

Panel Box

4,000,000.00

4,000,000.00

B

Material Pendukung

1 2 3

Kontruksi PV Module Support Galvanize

4

Monitoring Sysytem

1.00

unit

Kabel Splice Kit

1.00

set

600,000.00

600,000.00

Grounding System + penangkal Petir

2.00

set

8,000,000.00

16,000,000.00

28.00

set

1,420,000.00

39,760,000.00

- PS Communicator + Battery + SimCArd

1.00

set

12,500,000.00

12,500,000.00

- LC-20M PV

1.00

unit

2,866,500.00

2,866,500.00

- External Antena

1.00

unit

1,378,125.00

1,378,125.00

5

Accessories Installasi

1.00

ls

3,858,750.00

3,858,750.00

6

Biaya pengiriman ke lokasi pekerjaan dan pemasangan

1.00

ls

17,000,000.00 JUMLAH PEKERJAAN POMPA DAN PANEL SURYA

17,000,000.00

VI

PEKERJAAN PEMASANGAN POMPA HIDRAM

1

Biaya Pembuatan dan Perakitan Pompa Hidram

4.00

Buah

21,300,000.00

85,200,000.00

2

Pek.Bak Intake P=1 mtr, L=1 mtr, T=2 mtr

1.00

Unit

15,867,393.31

15,867,393.31

3

Pek. Bak Dudukan Pompa (P=2,4 mtr, L=1, mtr, T=3,5 mtr)

1.00

Unit

28,016,110.00

28,016,110.00

4

Pekerjaan Trust Block

1.00

Ls

500,000.00

500,000.00

5

Pemasangan 1 m pipa HDPE Ø 150 mm

18.00

M'

395,277.00

7,114,986.00

6

Pemasangan 1 m pipa HDPE Ø 100 mm

200.00

M'

127,060.00

25,412,000.00

7

Pemasangan 1 m pipa HDPE Ø 75 mm

80.00

M'

88,478.00

7,078,240.00

8

Pemasangan 1 m pipa HDPE Ø 50 mm

100.00

M'

43,478.00

4,347,800.00

9

Pemasangan 1 m pipa HDPE Ø 32 mm

180.00

M'

23,478.00

4,226,040.00

10

Flange 100 mm

4.00

Buah

160,000.00

640,000.00

11

Stub Flange 100 mm

8.00

Buah

155,000.00

1,240,000.00

12

Check Valve 75 mm

1.00

Buah

3,000,000.00

3,000,000.00

13

Check Valve 50 mm

2.00

Buah

2,500,000.00

5,000,000.00

14

Buterrfly valve 75 mm

1.00

Buah

2,400,000.00

2,400,000.00

15

Y Reducer 90°, 2 x 75 mm - 75 mm

2.00

Buah

330,000.00

660,000.00

16

Y Reducer 90°, 2 x 50 mm - 75 mm

1.00

Buah

325,000.00

325,000.00

17

Y Reducer 90°, 2 x 35 mm - 50 mm

2.00

Buah

310,000.00

620,000.00

18

Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm

1.00

Buah

587,136.00

587,136.00

JUMLAH PEKERJAAN POMPA DAN PANEL SURYA

192,234,705.31

-

596,543,375.00

USULAN PERUBAHAN VOLUME Program

: Lingkungan Sehat Perumahan

Kegiata

: Penyediaan Sarana Air Bersih dan Sanitasi Dasar Terutama Bagi Masyarakat Miskin

Pekerja

: Peningatan Jaringan Perpipaan SPAM Anakalang ( 800 SR )

Lokasi

: Anakalang - Kabupaten Sumba Tengah

Tahun A

: 2019 VOLUME

No.

JENIS PEKERJAAN

SATUAN

KONTRAK

HARGA SATUAN (Rp)

CCO

JUMLAH HARGA SATUAN (Rp) KONTRAK

BOBOT %

CCO

KONTRAK

TAMBAH (RP)

CCO

KURANG (RP)

I.

PEKERJAAN PERSIAPAN

1

Pengukuran dan pemasangan Bouwplank

M'

20.00

20.00

460,823.00

9,216,460.00

9,216,460.00

0.179

0.182

-

-

2

Pembersihan lapangan dan perataan

M2

1400.00

1,400.00

10,890.00

15,246,000.00

15,246,000.00

0.297

0.301

-

-

3

Biaya Mobilisasi Pipa ke lokasi pekerjaan

Ls

1.00

1.00

5,000,000.00

5,000,000.00

5,000,000.00

0.097

0.099

-

-

4

Direksi keet dan Gudang Penyimpanan 4 x 8

Ls

1.00

1.00

3,500,000.00

3,500,000.00

3,500,000.00

0.068

0.069

-

-

5

Pengadaan air kerja

Ls

1.00

1.00

500,000.00

500,000.00

500,000.00

0.010

0.010

-

-

6

Papan Nama Proyek

Ls

1.00

1.00

600,000.00

600,000.00

600,000.00

0.012

0.012

-

-

34,062,460.00

34,062,460.00

0.663

0.671

-

-

JUMLAH PEKERJAAN PERSIAPAN II.

PEK. PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Ø 3" (75 mm)

1

Pemasangan pipa GIP Ø 3" (75 mm)

M'

1,700.00

1,700.00

248,217.00

421,968,900.00

421,968,900.00

8.218

8.318

-

-

2

Pengetesan pipa Ø 3" (75 mm)

M'

1,700.00

1,700.00

1,436.00

2,441,200.00

2,441,200.00

0.048

0.048

-

-

3

Penggalian tanah biasa

M3

201.00

201.00

50,875.00

10,225,875.00

10,225,875.00

0.199

0.202

-

-

4

Pengurugan kembali galian tanah

M3

191.00

191.00

18,425.00

3,519,175.00

3,519,175.00

0.069

0.069

-

-

5

Pembuatan Trust Block dari beton K 150

M3

0.68

0.68

1,407,941.00

950,360.18

950,360.18

0.019

0.019

-

-

6

Gate Valve 3"

Bh

4.00

-

1,830,000.00

7,320,000.00

-

0.143

-

-

7,320,000.00

7

Air Valve 3"

Bh

4.00

2.00

1,830,000.00

7,320,000.00

3,660,000.00

0.143

0.072

-

3,660,000.00

8

Flange 10K ns GI 3"

Bh

55.00

2.00

152,000.00

8,360,000.00

304,000.00

0.163

0.006

-

8,056,000.00

9

Flange 10K 6"

Bh

1.00

290,000.00

-

290,000.00

-

0.006

290,000.00

-

10

Check valve all flange 3"

Bh

1.00

3,250,000.00

-

3,250,000.00

-

0.064

3,250,000.00

-

11

Flexible joint all flange 3"

Bh

1.00

2,000,000.00

-

2,000,000.00

-

0.039

2,000,000.00

-

12

Bend all flange 3"

Bh

1.00

425,000.00

-

425,000.00

-

0.008

425,000.00

-

13

Packing karet Ø 3"

Bh

4.00

20,000.00

-

80,000.00

-

0.002

80,000.00

-

14

Moor baut

Bh

32.00

12,500.00

-

400,000.00

-

0.008

400,000.00

-

15

Soket dia 3" (Ø 80mm)

Bh

198.00

150,000.00

29,700,000.00

-

0.585

29,700,000.00

-

16

Elbow 45°, 90°, 22.5° Ø 3"

Bh

85.00

285,000.00

-

24,225,000.00

-

0.478

24,225,000.00

-

17

Pemasangan 1 buah bak kontrol pas. bata 60cm x60cm tinggi 65 cm

2.00

1,482,340.00

11,858,720.00

2,964,680.00

0.231

0.058

-

8,894,040.00

473,964,230.18

506,404,190.18

Unit

8.00

JUMLAH PEK. PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Ø 3" (75 mm)

9.231

9.982

60,370,000.00

27,930,040.00

III.

PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA DISTRIBUSI

-

-

-

-

III.1

PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PRIMER Ø 150 MM

-

-

-

-

1

Pemasangan pipa GIP Ø 6" (150 mm)

M'

1,765.00

1,765.00

511,161.00

902,199,165.00

902,199,165.00

17.571

17.784

-

-

2

Pengetesan pipa Ø 6" (150 mm)

M'

1,765.00

1,765.00

2,591.00

4,573,115.00

4,573,115.00

0.089

0.090

-

-

3

Penggalian tanah biasa

M3

370.60

370.60

50,875.00

18,854,275.00

18,854,275.00

0.367

0.372

-

-

4

Pengurugan kembali galian tanah

M3

222.00

222.00

18,425.00

4,090,350.00

4,090,350.00

0.080

0.081

-

-

5

Gate Valve 6"

Bh

1.00

1.00

4,150,000.00

4,150,000.00

4,150,000.00

0.081

0.082

-

-

6

Butterfly Valve 6"

Bh

1.00

1.00

4,670,000.00

4,670,000.00

4,670,000.00

0.091

0.092

-

-

7

Air Valve 6"

Bh

2.00

1.00

4,150,000.00

8,300,000.00

4,150,000.00

0.162

0.082

-

4,150,000.00

8

Reduser 6" x 3"

Bh

2.00

1.00

726,579.00

1,453,158.00

726,579.00

0.028

0.014

-

726,579.00

USULAN PERUBAHAN VOLUME Program

: Lingkungan Sehat Perumahan

Kegiata

: Penyediaan Sarana Air Bersih dan Sanitasi Dasar Terutama Bagi Masyarakat Miskin

Pekerja

: Peningatan Jaringan Perpipaan SPAM Anakalang ( 800 SR )

Lokasi

: Anakalang - Kabupaten Sumba Tengah

Tahun A

: 2019 VOLUME

JUMLAH HARGA SATUAN (Rp)

BOBOT %

9

Flange 6"

Bh

KONTRAK 2.00

CCO 4.00

HARGA SATUAN (Rp) 255,000.00

10

Flange 10K ns GI 6"

Bh

48.00

-

290,000.00

13,920,000.00

-

11

Pekerjaan Wash Out 6"x6"x4" (Pengguras) 2 unit

No.

12

JENIS PEKERJAAN

SATUAN

KONTRAK 510,000.00

CCO 1,020,000.00

KONTRAK 0.010

CCO 0.020

0.271

-

TAMBAH (RP)

KURANG (RP) -

(510,000.00)

-

13,920,000.00

-

-

-

-

- Gate Valve 6"

Bh

2.00

4,150,000.00

-

8,300,000.00

-

0.164

8,300,000.00

-

- Gate Valve 4"

Bh

2.00

2,700,000.00

-

5,400,000.00

-

0.106

5,400,000.00

-

- Tee Ø 6" x 6" x 4"

Bh

2.00

520,000.00

-

1,040,000.00

-

0.020

1,040,000.00

-

- Moor baut

Bh

80.00

12,500.00

-

1,000,000.00

-

0.020

1,000,000.00

-

- Flange 6"

Bh

-

290,000.00

-

-

-

-

-

-

- Flange 4"

Bh

2.00

170,000.00

-

340,000.00

-

0.007

340,000.00

-

- Packing karet Ø 6"

Bh

6.00

25,000.00

-

150,000.00

-

0.003

150,000.00

-

- Packing karet Ø 4"

Bh

4.00

20,000.00

-

80,000.00

-

0.002

80,000.00

-

-

-

-

-

Pekerjaan Tapping 6"x6"x3" (suplay air ke pipa 3") 1 unit - Gate Valve 6"

Bh

1.00

4,150,000.00

-

4,150,000.00

-

0.082

4,150,000.00

-

- Gate Valve 3"

Bh

1.00

1,830,000.00

-

1,830,000.00

-

0.036

1,830,000.00

-

- Tee Ø 6" x 6" x 3"

Bh

1.00

500,000.00

-

500,000.00

-

0.010

500,000.00

-

- Tee Ø 3" x 3" x 3"

Bh

1.00

400,000.00

-

400,000.00

-

0.008

400,000.00

-

- Moor baut

Bh

64.00

12,500.00

-

800,000.00

-

0.016

800,000.00

-

- Flange 6"

Bh

4.00

290,000.00

-

1,160,000.00

-

0.023

1,160,000.00

-

- Flange 3"

Bh

2.00

152,000.00

-

304,000.00

-

0.006

304,000.00

-

- Packing karet Ø 6"

Bh

2.00

25,000.00

-

50,000.00

-

0.001

50,000.00

-

- Packing karet Ø 3"

Bh

1.00

20,000.00

-

20,000.00

-

0.000

20,000.00

-

16

Pembongkaran Trotoar dan Pengecoran Kembali

M3

2.00

2.00

1,326,266.00

2,652,532.00

2,652,532.00

0.052

0.052

-

-

17

Pemasangan 1 buah bak kontrol pas. bata 60cm x60cm tinggi 65 cm

Buah

4.00

5.00

1,482,340.00

5,929,360.00

7,411,700.00

0.115

0.146

1,482,340.00

-

971,301,955.00

980,021,716.00

18.917

19.318

27,006,340.00

18,286,579.00

JUMLAH PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PRIMER Ø 150 MM

USULAN PERUBAHAN VOLUME Program

: Lingkungan Sehat Perumahan

Kegiata

: Penyediaan Sarana Air Bersih dan Sanitasi Dasar Terutama Bagi Masyarakat Miskin

Pekerja

: Peningatan Jaringan Perpipaan SPAM Anakalang ( 800 SR )

Lokasi

: Anakalang - Kabupaten Sumba Tengah

Tahun A

: 2019 VOLUME

No.

JENIS PEKERJAAN

III2

PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA SEKUNDER Ø 75 MM

SATUAN

KONTRAK

HARGA SATUAN (Rp)

CCO

JUMLAH HARGA SATUAN (Rp) KONTRAK

BOBOT %

CCO

KONTRAK

TAMBAH (RP)

CCO

KURANG (RP)

-

-

-

-

1

Pemasangan pipa GIP Ø 3" (75 mm)

M'

1,260.00

1,260.00

248,217.00

312,753,420.00

312,753,420.00

6.091

6.165

-

-

2

Pengetesan pipa Ø 3" (75 mm)

M'

1,260.00

1,260.00

1,436.00

1,809,360.00

1,809,360.00

0.035

0.036

-

-

3

Penggalian tanah biasa

M3

150.00

150.00

50,875.00

7,631,250.00

7,631,250.00

0.149

0.150

-

-

4

Pengurugan kembali galian tanah

M3

142.00

142.00

18,425.00

2,616,350.00

2,616,350.00

0.051

0.052

-

-

5

Gate Valve 3"

Bh

2.00

-

1,830,000.00

3,660,000.00

-

0.071

-

-

3,660,000.00

6

Butterfly Valve 3"

Bh

2.00

-

2,300,000.00

4,600,000.00

-

0.090

-

-

4,600,000.00

7

Air Valve 3"

Bh

4.00

2.00

75,000.00

300,000.00

150,000.00

0.006

0.003

-

150,000.00

8

Flange 10K ns GI 3"

Bh

35.00

-

20,500.00

717,500.00

-

0.014

-

-

717,500.00

9

Flange 3 "

Bh

4.00

-

130,000.00

520,000.00

-

0.010

-

-

520,000.00

10

Elbow 45°, 90°, 22.5° Ø 3"

Bh

63.00

320,500.00

-

20,191,500.00

-

0.398

20,191,500.00

-

11

Soket dia 3" (Ø 80mm)

Bh

147.00

150,000.00

-

22,050,000.00

-

0.435

22,050,000.00

-

12

Pekerjaan Taping Pipa GIPØ 3" x 3" x 1,5" (7 unit)

-

-

-

-

-

-

13

- Gate Valve 3"

bh

7.00

1,830,000.00

-

12,810,000.00

-

0.253

12,810,000.00

-

- Gate Valve Ø 1,5" drat dalam

bh

7.00

360,000.00

-

2,520,000.00

-

0.050

2,520,000.00

-

- Tee Ø 3" x 3" x 1,5"

bh

7.00

227,000.00

-

1,589,000.00

-

0.031

1,589,000.00

-

- Moor baut

bh

126.00

12,500.00

-

1,575,000.00

-

0.031

1,575,000.00

-

- Flange 3"

bh

28.00

130,000.00

-

3,640,000.00

-

0.072

3,640,000.00

-

- Packing karet Ø 3"

bh

21.00

20,000.00

-

420,000.00

-

0.008

420,000.00

-

- Doble Niple Ø 1,5"

bh

14.00

36,000.00

-

504,000.00

-

0.010

504,000.00

-

- soket Ø 1,5"

bh

7.00

55,000.00

-

385,000.00

-

0.008

385,000.00

-

-

-

-

-

-

-

Pekerjaan Taping dari pipa HDPE 3" (ext.) ke Pipa Galvanis 1,5" (3 unit) - Gate Valve 3"

bh

3.00

1,830,000.00

-

5,490,000.00

-

0.108

5,490,000.00

-

- Gate Valve Ø 1,5" drat dalam

bh

3.00

360,000.00

-

1,080,000.00

-

0.021

1,080,000.00

-

- Tee Ø 3" x 3" x 1,5"

bh

3.00

227,000.00

-

681,000.00

-

0.013

681,000.00

-

- Moor baut

bh

54.00

12,500.00

-

675,000.00

-

0.013

675,000.00

-

- Stub Flange 3"

bh

6.00

260,000.00

-

1,560,000.00

-

0.031

1,560,000.00

-

- Flange 3"

bh

12.00

130,000.00

-

1,560,000.00

-

0.031

1,560,000.00

-

- Packing karet Ø 3"

bh

9.00

20,000.00

-

180,000.00

-

0.004

180,000.00

-

- Doble Niple Ø 1,5"

bh

6.00

36,000.00

-

216,000.00

-

0.004

216,000.00

-

- soket Ø 1,5"

bh

3.00

55,000.00

-

165,000.00

-

0.003

165,000.00

-

14

Pemasangan 1 buah bak kontrol pas. bata 60cm x60cm tinggi 65 cm

15

Tapingg Jalan

JUMLAH PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA SEKUNDER Ø 75 MM

Buah

8.00

12.00

1,482,340.00

11,858,720.00

17,788,080.00

0.231

0.351

5,929,360.00

M'

25.00

25.00

75,000.00

1,875,000.00

1,875,000.00

0.037

0.037

-

-

348,341,600.00

421,914,960.00

6.784

8.317

83,220,860.00

9,647,500.00

USULAN PERUBAHAN VOLUME Program

: Lingkungan Sehat Perumahan

Kegiata

: Penyediaan Sarana Air Bersih dan Sanitasi Dasar Terutama Bagi Masyarakat Miskin

Pekerja

: Peningatan Jaringan Perpipaan SPAM Anakalang ( 800 SR )

Lokasi

: Anakalang - Kabupaten Sumba Tengah

Tahun A

: 2019 VOLUME

No. III3

JENIS PEKERJAAN

SATUAN

KONTRAK

HARGA SATUAN (Rp)

CCO

JUMLAH HARGA SATUAN (Rp) KONTRAK

BOBOT %

CCO

KONTRAK

PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA SEKUNDER Ø 2" (50 MM)

TAMBAH (RP)

CCO

KURANG (RP)

-

-

-

-

1

Pemasangan pipa GIP Ø 2" (50 mm)

M'

3,025.00

3,025.00

183,225.00

554,255,625.00

554,255,625.00

10.795

10.925

-

-

2

Pengetesan pipa Ø 2" (50 mm)

M'

3,025.00

3,025.00

1,271.00

3,844,775.00

3,844,775.00

0.075

0.076

-

-

3

Penggalian tanah biasa

M3

136.00

136.00

50,875.00

6,919,000.00

6,919,000.00

0.135

0.136

-

-

4

Pengurugan kembali galian tanah

M3

132.00

132.00

18,425.00

2,432,100.00

2,432,100.00

0.047

0.048

-

-

5

Gate Valve 2"

Bh

6.00

-

650,000.00

3,900,000.00

-

0.076

-

-

3,900,000.00

6

Air Valve 2"

Bh

6.00

2.00

650,000.00

3,900,000.00

1,300,000.00

0.076

0.026

-

2,600,000.00

7

Pekerjaan Taping Pipa GIPØ 2" x 2" x 1,5" (8 unit)

Bh

-

-

-

-

-

-

- Gate Valve all flange HQ CI Ø 2" PN10

Bh

8.00

650,000.00

-

5,200,000.00

-

0.102

5,200,000.00

-

- Gate Valve Ø 1,5" drat dalam

Bh

8.00

360,000.00

-

2,880,000.00

-

0.057

2,880,000.00

-

- Tee Ø 2" x 2" x 1,5"

Bh

8.00

227,000.00

-

1,816,000.00

-

0.036

1,816,000.00

-

- Moor baut

Bh

96.00

12,500.00

-

1,200,000.00

-

0.024

1,200,000.00

-

- Flange 2"

Bh

32.00

85,000.00

-

2,720,000.00

-

0.054

2,720,000.00

-

- Packing karet Ø 2"

Bh

16.00

20,000.00

-

320,000.00

-

0.006

320,000.00

-

- Doble Niple Ø 1,5"

Bh

16.00

36,000.00

-

576,000.00

-

0.011

576,000.00

-

- soket Ø 1,5"

Bh

8.00

55,000.00

-

440,000.00

-

0.009

440,000.00

-

7

Tapingg Jalan

M'

20.00

20.00

75,000.00

1,500,000.00

1,500,000.00

0.029

0.030

-

-

8

Pemasangan 1 buah bak kontrol pas. bata 60cm x60cm tinggi 65 cm

Buah

12.00

10.00

1,482,340.00

17,788,080.00

14,823,400.00

0.346

0.292

-

2,964,680.00

594,539,580.00

600,226,900.00

11.579

11.831

15,152,000.00

9,464,680.00

-

-

-

-

JUMLAH PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA SEKUNDER Ø 2" (50 MM) III4

PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TERSIER Ø 1.1/2" (40 MM)

1

Pemasangan pipa GIP Ø 1.1/2" (40 mm)

M'

11,650.00

11,650.00

133,983.00

1,560,901,950.00

1,560,901,950.00

30.400

30.768

-

-

2

Pengetesan pipa Ø 1.1/2 (40 mm)

M'

11,650.00

11,650.00

1,271.00

14,807,150.00

14,807,150.00

0.288

0.292

-

-

3

Penggalian tanah biasa

M3

525.00

525.00

50,875.00

26,709,375.00

26,709,375.00

0.520

0.526

-

-

4

Pengurugan kembali galian tanah

M3

262.00

262.00

18,425.00

4,827,350.00

4,827,350.00

0.094

0.095

-

-

5

Gate Valve 1.1/2"

Bh

6.00

-

360,000.00

2,160,000.00

-

0.042

-

-

2,160,000.00

6

Air Valve 1.1/2"

Bh

6.00

3.00

360,000.00

2,160,000.00

1,080,000.00

0.042

0.021

-

1,080,000.00

7

Pekerjaan Taping GIP Ø 1.1/2" (12 unit) - Tee Ø 1,5"x1,5"x1,5"

Bh

-

12.00

105,000.00

-

1,260,000.00

1,260,000.00

- Double Niple Ø 1,5"

Bh

-

48.00

21,000.00

-

1,008,000.00

1,008,000.00

- Gate Valve Ø 1,5"

Bh

24.00

360,000.00

8

Tapingg Jalan

M'

20.00

20.00

75,000.00

1,500,000.00

1,500,000.00

0.029

0.030

-

-

9

Pembongkaran Trotoar dan Pengecoran Kembali

M3

7.60

7.60

1,326,266.00

10,079,621.60

10,079,621.60

0.196

0.199

-

-

10

Pemasangan 1 buah bak kontrol pas. bata 60cm x60cm tinggi 65 cm

Buah

12.00

12.00

1,482,340.00

17,788,080.00

17,788,080.00

0.346

0.351

-

-

1,640,933,526.60

1,639,961,526.60

31.958

32.326

2,268,000.00

3,240,000.00

-

-

-

-

282,688,000.00

282,688,000.00

5.506

5.572

-

-

JUMLAH PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TERSIER Ø 1.1/2" (40 MM) IV

PEKERJAAN PEMASANGAN UNIT LAYANAN

1

Pemasangan Sambungan Rumah (Pipa GI 3/4", Kran Air 3/4", Albow 3/4", Clamp Sadle )

SR

800.00

800.00

353,360.00

USULAN PERUBAHAN VOLUME Program

: Lingkungan Sehat Perumahan

Kegiata

: Penyediaan Sarana Air Bersih dan Sanitasi Dasar Terutama Bagi Masyarakat Miskin

Pekerja

: Peningatan Jaringan Perpipaan SPAM Anakalang ( 800 SR )

Lokasi

: Anakalang - Kabupaten Sumba Tengah

Tahun A

: 2019 VOLUME

No.

JENIS PEKERJAAN

JUMLAH BANGUNAN PELENGKAP JARINGAN

SATUAN

KONTRAK

CCO

HARGA SATUAN (Rp)

JUMLAH HARGA SATUAN (Rp) KONTRAK 282,688,000.00

CCO 282,688,000.00

BOBOT % KONTRAK 5.506

CCO 5.572

TAMBAH (RP)

KURANG (RP) -

-

USULAN PERUBAHAN VOLUME Program

: Lingkungan Sehat Perumahan

Kegiata

: Penyediaan Sarana Air Bersih dan Sanitasi Dasar Terutama Bagi Masyarakat Miskin

Pekerja

: Peningatan Jaringan Perpipaan SPAM Anakalang ( 800 SR )

Lokasi

: Anakalang - Kabupaten Sumba Tengah

Tahun A

: 2019 VOLUME

No.

JENIS PEKERJAAN

SATUAN

KONTRAK

HARGA SATUAN (Rp)

CCO

JUMLAH HARGA SATUAN (Rp) KONTRAK

BOBOT %

CCO

KONTRAK

TAMBAH (RP)

CCO

KURANG (RP)

V

PEKERJAAN POMPA DAN PANEL SURYA

-

-

-

-

A.

Material Utama

-

-

-

-

1

PV Module 200 Poly

pcs

85.00

85.00

3,100,000.00

263,500,000.00

263,500,000.00

5.132

5.194

-

-

2

Pompa Submersible PU15K2 C-SJ30-12, 3"

set

1.00

1.00

108,000,000.00

108,000,000.00

108,000,000.00

2.103

2.129

-

-

3

Controller PS15K2

set

1.00

1.00

85,000,000.00

85,000,000.00

85,000,000.00

1.655

1.675

-

-

4

PV Disconnect 1000-40-5

set

1.00

1.00

10,000,000.00

10,000,000.00

10,000,000.00

0.195

0.197

-

-

5

PV Combiner 1000-125-4

set

1.00

1.00

6,800,000.00

6,800,000.00

6,800,000.00

0.132

0.134

-

-

6

PV Protect 1000-125

set

1.00

1.00

8,700,000.00

8,700,000.00

8,700,000.00

0.169

0.171

-

-

7

Surge Protector

set

1.00

1.00

780,000.00

780,000.00

780,000.00

0.015

0.015

-

-

8

Well Probe Sensor air bawah

set

1.00

1.00

1,600,000.00

1,600,000.00

1,600,000.00

0.031

0.032

-

-

9

Kabel PV Array NYAF 6mm

meter

100.00

100.00

30,000.00

3,000,000.00

3,000,000.00

0.058

0.059

-

-

10

Kabel Pompa NYYHY 4x10mm

meter

100.00

100.00

101,000.00

10,100,000.00

10,100,000.00

0.197

0.199

-

-

11

Kabel Sensor NYYHY 2x0,75mm

meter

100.00

100.00

11,000.00

1,100,000.00

1,100,000.00

0.021

0.022

-

-

12

Panel Box

1.00

1.00

4,000,000.00

4,000,000.00

4,000,000.00

0.078

0.079

-

-

B

Material Pendukung

-

-

-

-

1

Kabel Splice Kit

set

1.00

1.00

600,000.00

600,000.00

600,000.00

0.012

0.012

-

-

2

Grounding System + penangkal Petir

set

2.00

2.00

8,000,000.00

16,000,000.00

16,000,000.00

0.312

0.315

-

-

3

Kontruksi PV Module Support Galvanize

set

28.00

36.00

1,420,000.00

39,760,000.00

51,120,000.00

0.774

1.008

11,360,000.00

(11,360,000.00)

4

Monitoring Sysytem

-

-

-

-

- PS Communicator + Battery + SimCArd

set

1.00

1.00

12,500,000.00

12,500,000.00

12,500,000.00

0.243

0.246

-

-

- LC-20M PV

unit

1.00

1.00

2,866,500.00

2,866,500.00

2,866,500.00

0.056

0.057

-

-

- External Antena

unit

1.00

1.00

1,378,125.00

1,378,125.00

1,378,125.00

0.027

0.027

-

-

unit

-

5

Accessories Installasi

ls

1.00

1.00

3,858,750.00

3,858,750.00

3,858,750.00

0.075

0.076

-

6

Biaya pengiriman ke lokasi pekerjaan dan pemasangan

ls

1.00

1.00

17,000,000.00

17,000,000.00

17,000,000.00

0.331

0.335

-

-

596,543,375.00

607,903,375.00

11.618

11.983

11,360,000.00

(11,360,000.00)

JUMLA H VI PEKERJ 1 AAN POMPA 2 DAN 3 PANEL SURYA 4

PEKERJAAN PEMASANGAN POMPA HIDRAM

-

-

-

-

4.00

-

21,300,000.00

85,200,000.00

-

1.659

-

-

85,200,000.00

Unit

1.00

-

15,867,393.31

15,867,393.31

-

0.309

-

-

15,867,393.31

Unit

1.00

-

28,016,110.00

28,016,110.00

-

0.546

-

-

28,016,110.00

Pekerjaan Trust Block

Ls

1.00

-

500,000.00

500,000.00

-

0.010

-

-

500,000.00

5

Pemasangan 1 m pipa HDPE Ø 150 mm

M'

18.00

-

395,277.00

7,114,986.00

-

0.139

-

-

7,114,986.00

6

Pemasangan 1 m pipa HDPE Ø 100 mm

M'

200.00

-

127,060.00

25,412,000.00

-

0.495

-

-

25,412,000.00

7

Pemasangan 1 m pipa HDPE Ø 75 mm

M'

80.00

-

88,478.00

7,078,240.00

-

0.138

-

-

7,078,240.00

8

Pemasangan 1 m pipa HDPE Ø 50 mm

M'

100.00

-

43,478.00

4,347,800.00

-

0.085

-

-

4,347,800.00

9

Pemasangan 1 m pipa HDPE Ø 32 mm

M'

180.00

-

23,478.00

4,226,040.00

-

0.082

-

-

4,226,040.00

10

Flange 100 mm

Buah

4.00

-

160,000.00

640,000.00

-

0.012

-

-

640,000.00

11

Stub Flange 100 mm

Buah

8.00

-

155,000.00

1,240,000.00

-

0.024

-

-

1,240,000.00

Biaya Pembuatan dan Perakitan Pompa Hidram

Buah

Pek.Bak Intake P=1 mtr, L=1 mtr, T=2 mtr Pek. Bak Dudukan Pompa (P=2,4 mtr, L=1, mtr, T=3,5 mtr)

USULAN PERUBAHAN VOLUME Program

: Lingkungan Sehat Perumahan

Kegiata

: Penyediaan Sarana Air Bersih dan Sanitasi Dasar Terutama Bagi Masyarakat Miskin

Pekerja

: Peningatan Jaringan Perpipaan SPAM Anakalang ( 800 SR )

Lokasi

: Anakalang - Kabupaten Sumba Tengah

Tahun A

: 2019 VOLUME

No. 12

JENIS PEKERJAAN Check Valve 75 mm

SATUAN Buah

KONTRAK 1.00

CCO

-

HARGA SATUAN (Rp) 3,000,000.00

JUMLAH HARGA SATUAN (Rp) KONTRAK 3,000,000.00

CCO

BOBOT % -

KONTRAK 0.058

CCO

TAMBAH (RP) -

KURANG (RP) -

3,000,000.00

USULAN PERUBAHAN VOLUME Program

: Lingkungan Sehat Perumahan

Kegiata

: Penyediaan Sarana Air Bersih dan Sanitasi Dasar Terutama Bagi Masyarakat Miskin

Pekerja

: Peningatan Jaringan Perpipaan SPAM Anakalang ( 800 SR )

Lokasi

: Anakalang - Kabupaten Sumba Tengah

Tahun A

: 2019 VOLUME

No.

JENIS PEKERJAAN

SATUAN

KONTRAK

HARGA SATUAN (Rp)

CCO

JUMLAH HARGA SATUAN (Rp) KONTRAK

BOBOT %

CCO

KONTRAK

TAMBAH (RP)

CCO

KURANG (RP)

13

Check Valve 50 mm

Buah

2.00

-

2,500,000.00

5,000,000.00

-

0.097

-

-

5,000,000.00

14

Buterrfly valve 75 mm

Buah

1.00

-

2,400,000.00

2,400,000.00

-

0.047

-

-

2,400,000.00

15

Y Reducer 90°, 2 x 75 mm - 75 mm

Buah

2.00

-

330,000.00

660,000.00

-

0.013

-

-

660,000.00

16

Y Reducer 90°, 2 x 50 mm - 75 mm

Buah

1.00

-

325,000.00

325,000.00

-

0.006

-

-

325,000.00

17

Y Reducer 90°, 2 x 35 mm - 50 mm

Buah

2.00

-

310,000.00

620,000.00

-

0.012

-

-

620,000.00

18

Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm

Buah

1.00

-

587,136.00

587,136.00

-

0.011

-

-

587,136.00

192,234,705.31

-

3.744

-

-

192,234,705.31

REAL COST

5,134,609,432.08

5,073,183,127.78

PPN (10%)

513,460,943.21

507,318,312.78

TOTAL

5,648,070,375.29

5,580,501,440.55

PEMBULATAN

5,648,070,000.00

5,580,501,000.00

JUMLA H PEKERJ AAN POMPA DAN PANEL SURYA

(67,569,000.00)

BACK UP DATA Notasi Jalur 6" Transmisi (Mata Air ke Resevoir) Titik A - B (Res. Ke Pasunga) 1,765.00 Titik B - C (Pasunga ke Q Mart) Titik B - D (Pasunga ke Selatan) 1,260.00 Titik A - E Titik 3,4,5 Titik 6,7,9,11,10 1,570.00 Titik D-32 742.00 Titk 27-27'-sam D-32 300.00 Titik 35-36

4"

KIRI JALAN dia pipa 3"

2"

1.1/2" atau 1"

6"

4"

KANAN JALAN dia pipa 3" 2"

1.1/2" atau 1"

2,000.00 634.00 600.00 531.00

765.00

634.00 600.00 531.00

50.00 610.00 546.00 92.00 600.00 553.00 107.00 607.00 325.00 589.00 118.00 121.00 439.00 107.00 196.00 180.00 120.00 176.00

600.00 553.00 107.00 -

Titik D-40 Titik 41-43 TITIK 40-50

329.00 205.00 550.00 206.00 313.00 592.00 75.00 274.00 322.00 387.00 435.00 360.00 442.00 600.00 177.00 419.00 200.00 100.00 150.00 200.00 200.00 100.00

756.00 TITIK 39-37-38 TITIK 47-51 667.00 TITIK 45-46 TITIK 48-49 TITIK 54-56 TITIK 16-19 TITIK 57-58-59 TITIK 60-59-61 TITIK 59-62 TITIK 62-63 TITIK 53-51 TITIK 20-21-29-26 Pasunga - Utara 300.00 Samping kantr Pol 350.00 Titik 13 - Selatan 300.00 ### Dia Pipa Total Panjang Pipa Dia Pipa 6" Dia Pipa 4" Dia Pipa 3" Dia Pipa 2" Dia Pipa 1.1/2"

6"

4" 1,765.00 1,260.00 3,025.00 11,677.00

1,260.00 3" M' M' M' M' M'

2"

11,677.00 1.1/2" atau 1"

6"

4"

3"

### 2"

1.1/2" atau 1"

Galian Pipa Transmis 3" Dia Pipa 6" Dia Pipa 4" Dia Pipa 3" Dia Pipa 2" Dia Pipa 1.1/2" Urugan Pasir Bruto Transmis 3" Dia Pipa 6" Dia Pipa 4" Dia Pipa 3" Dia Pipa 2" Dia Pipa 1.1/2" Volume Pipa d Transmis 3" Dia Pipa 6" Dia Pipa 4" Dia Pipa 3" Dia Pipa 2" Dia Pipa 1.1/2" Netto = Brutto - Vol. Pipa Transmis 3" Dia Pipa 6" Dia Pipa 4" Dia Pipa 3" Dia Pipa 2" Dia Pipa 1.1/2"

L 2,000.00 1,765.00 1,260.00 3,025.00 11,677.00

H

2,000.00 1,765.00 1,260.00 3,025.00 11,677.00 r 0.08 0.15 0.10 0.08 0.03 0.04

W 0.48 0.60 0.48 0.48 0.30 0.30

0.25 0.35 0.25 0.25 0.15 0.15

Volume M3 237.50 370.65 149.63 136.13 525.47

0.30 0.35 0.30 0.30 0.15 0.15

0.25 0.35 0.25 0.25 0.15 0.15

150.00 216.21 94.50 68.06 262.73

0.0044 0.0177 0.0079 0.0044 0.0005 0.0013

8.83 97.89 17.47 4.66 46.05

Pi 0.04 0.08 0.05 0.04 0.01 0.02

2,000.00 1,765.00 1,260.00 3,025.00 11,677.00

Luas 3.14 3.14 3.14 3.14 3.14 3.14

141.17 118.33 77.03 63.40 216.68

Urugan Tanah Kembali Transmis 3" Dia Pipa 6" Dia Pipa 4" Dia Pipa 3" Dia Pipa 2" Dia Pipa 1.1/2"

L 2,000.00 1,765.00 1,260.00 3,025.00 11,677.00

Berat Pipa Transmis 3" Dia Pipa 6" Dia Pipa 4" Dia Pipa 3" Dia Pipa 2" Dia Pipa 1.1/2" Dia Pipa 3/4"

L 2,000.00 1,765.00 1,260.00 3,025.00 11,677.00 4,800.00

H

W 0.18 0.25 0.18 0.18 0.15 0.15

0.25 0.35 0.25 0.25 0.15 0.15

Berat Pipa/m' Total Berat Jumlah Pipa Batang Shok 8.47 16,940.00 333.33 334.00 1.18 2,091.03 294.17 295.00 12.10 8.47 10,672.20 210.00 210.00 5.10 15,427.50 504.17 505.00 3.61 42,153.97 1,946.17 1,972.00 1.58 7,584.00 800.00 800.00 94,868.70 Acc. 33,204.05 128,072.75 42.69 43.00 128.07 500,000.00 166,666.67

BRONKAPTERING DINDING LANTAI ATAP PEMISAH

P

besi beton

m

L

T

V

4.00 1.00 1.00 0.50

2.00 1.00 1.00 1.00

0.12 0.15 0.08 0.12

96.00 60.00

0.62 0.62

59.20 37.00 96.20

Vol. M3 87.50 154.44 55.13 68.06 262.73

0.96 0.15 0.08 0.06 1.25

Pembuatan Bak DINDING LANTAI ATAP PEMISAH besi beton

Bekisting

5.60 2.40 -

8.40 1.60 -

0.15 0.15 0.10

112.80 154.80 192.00

0.62 0.62 0.62

69.56 95.46 118.40 283.42

5.60 8.40 4.00

2.00 2.00 1.00

11.20 16.80 4.00 32.00

m

7.06 0.58 7.63

DAFTAR KUANTITAS DAN HARGA Progra Kegiata Pekerja Lokasi Tahun No. A 1 2 3 4 B B.1 1 2 3 4 5 6 7 8 9 10

: Lingkungan Sehat Perumahan : Penyediaan Sarana Air Bersih dan Sanitasi Dasar Terutama Bagi Masyarakat Miskin : Peningatan Jaringan Perpipaan SPAM Anakalang : Anakalang - Kabupaten Sumba Tengah : 2019 JENIS PEKERJAAN PEKERJAAN PERSIAPAN Pengukuran dan pemasangan Bouwplank Pembersihan lapangan dan perataan Pengadaan air kerja Papan Nama Proyek

VOLUME

SATUAN

HARGA SATUAN (Rp)

36.00 M' 460,823.00 1,500.00 M2 10,890.00 1.00 Ls 500,000.00 1.00 Ls 500,000.00 JUMLAH PEKERJAAN PERSIAPAN

PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PEK. PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Ø 3" (75 mm) Pemasangan pipa GIP Ø 3" (75 mm) 2,000.00 M' Pengetesan pipa Ø 3" (75 mm) 2,000.00 M' Penggalian tanah biasa 201.88 M3 Pengurugan kembali galian tanah 74.38 M3 Pengurugan dengan pasir urug 119.99 M3 Pembuatan Trust Block dari beton K 150 0.68 M3 Gate Valve 3" 4.00 Bh Air Valve 3" 4.00 Bh Flange 10K ns GI 3" 55.00 Bh Pemasangan 1 buah bak kontrol pas. bata 60cm x60cm 8.00 tinggi 65 cm

JUMLAH HARGA SATUAN (Rp) 16,589,628.00 16,335,000.00 500,000.00 500,000.00 33,924,628.00

248,217.00 1,271.00 50,875.00 18,425.00 191,950.00 1,407,941.00 1,830,000.00 1,830,000.00 152,000.00 1,482,340.00

496,434,000.00 2,542,000.00 10,270,390.63 1,370,359.38 23,032,740.33 950,360.18 7,320,000.00 7,320,000.00 8,360,000.00 11,858,720.00

JUMLAH PEK. PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Ø 3" (75 mm) PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA DISTRIBUSI PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PRIMER Ø 6" (150 MM) Pemasangan pipa GIP Ø 6" (150 mm) 18.00 M' 511,161.00 Pengetesan pipa Ø 6" (150 mm) 18.00 M' 2,591.00 Penggalian tanah biasa 3.78 M3 50,875.00 Pengurugan kembali galian tanah 1.58 M3 18,425.00 Pengurugan dengan pasir urug 1.21 M3 191,950.00 Gate Valve 6" Bh 4,150,000.00 Air Valve 6" 1.00 Bh 4,150,000.00 Reduser 6" x 3" 1.00 Bh 726,579.00 Pengelasan Pipa 2 x 3" ke Pipa 6" 1.00 Ls 2,000,000.00 Flange 10K ns GI 6" Ls 290,000.00 1.00 Buah 1,482,340.00 Pemasangan 1 buah bak kontrol pas. bata 60cm x60cm tinggi 65 cm

569,458,570.50

B.2 B.2.1 1 2 3 4 5 6 7 8 9 10 11

JUMLAH PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PRIMER Ø 6" (150 MM) PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PRIMER Ø 4" (100 MM) Pemasangan pipa GIP Ø 4" (100 mm) 1,747.00 M' 335,057.00 Pengetesan pipa Ø 4 (100 mm) 1,747.00 M' 1,766.00 Penggalian tanah biasa 207.46 m3 50,875.00 Pengurugan kembali galian tanah 76.43 M3 18,425.00 Pengurugan dengan pasir urug 87.96 M3 191,950.00 Gate Valve 4" 2.00 Buah 75,000.00 Air Valve 4" 2.00 Buah 75,000.00 Flange 10K ns GI 4" 48.00 Buah 20,500.00 Tapingg Jalan 25.00 M' 75,000.00 Pemasangan 1 buah bak kontrol pas. bata 60cm x60cm 4.00 Buah 1,482,340.00 tinggi 65 cm

18,059,410.92

B.2.2 1 2 3 4 5 6 7 8 9 10

JUMLAH PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PRIMER Ø 4" (100 MM)

626,365,259.16

9,200,898.00 46,638.00 192,307.50 29,019.38 231,629.04 4,150,000.00 726,579.00 2,000,000.00 1,482,340.00

585,344,579.00 3,085,202.00 10,554,336.72 1,408,245.78 16,884,535.66 150,000.00 150,000.00 984,000.00 1,875,000.00 5,929,360.00

B.2.3 1 2 3 4 5 6 7 8 9 10

B.2.4 1 2 3 4 5 6 7 8 9 10

B.2.5 1 2 3 4 5

C 1

D a 1 2 3 4 5 6 7 8 9 10 11 12 13 14 b 1 2 3 4

PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PRIMER Ø 3" (75 MM) Pemasangan pipa GIP Ø 3" (75 mm) 1,260.00 M3 Pengetesan pipa Ø 3" (75 mm) 1,260.00 M3 Penggalian tanah biasa 149.63 Bh Pengurugan kembali galian tanah 55.13 Bh Pengurugan dengan pasir urug 77.03 Bh Gate Valve 3" 4.00 Bh Air Valve 3" 4.00 Bh Flange 10K ns GI 3" 35.00 Bh Tapingg Jalan 25.00 M' Pemasangan 1 buah bak kontrol pas. bata 60cm x60cm 8.00 Buah tinggi 65 cm

248,217.00 1,766.00 50,875.00 18,425.00 191,950.00 75,000.00 75,000.00 20,500.00 75,000.00 1,482,340.00

312,753,420.00 2,225,160.00 7,612,171.88 1,015,678.13 14,785,912.58 300,000.00 300,000.00 717,500.00 1,875,000.00 11,858,720.00

JUMLAH PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PRIMER Ø 3" (75 MM) PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PRIMER Ø 2" (50 MM) Pemasangan pipa GIP Ø 2" (50 mm) 8,473.00 M' 183,225.00 Pengetesan pipa Ø 2" (50 mm) 8,473.00 M' 1,766.00 Penggalian tanah biasa 381.29 M3 50,875.00 Pengurugan kembali galian tanah 190.64 M3 18,425.00 Pengurugan dengan pasir urug 177.59 M3 191,950.00 Gate Valve 2" 8.00 Buah 650,000.00 Air Valve 2" 9.00 Buah 650,000.00 Tapingg Jalan 50.00 M' 75,000.00 Pembongkaran Trotoar dan Pengecoran Kembali 2.00 M3 1,326,266.00 Pemasangan 1 buah bak kontrol pas. bata 60cm x60cm 17.00 Buah 1,482,340.00 tinggi 65 cm

353,443,562.58

JUMLAH PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PRIMER Ø 2" (50 MM) PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PRIMER Ø 1" (25 MM) Pemasangan pipa GIP Ø 1.1/2" (40 mm) 11,059.00 M' 89,247.00 Pengetesan pipa Ø 1.1/2 (40 mm) 11,059.00 M' 1,766.00 Penggalian tanah biasa 497.66 M3 50,875.00 Pengurugan kembali galian tanah 248.83 M3 18,425.00 Pengurugan dengan pasir urug 205.21 M3 191,950.00 JUMLAH PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PRIMER Ø 1" (25 MM) JUMAH PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA BANGUNAN PELENGKAP JARINGAN Sambungan Rumah 800.00 Unit 353,360.00 (Pipa GI 3/4", Kran Air 3/4", Albow 3/4", Clamp Sadle Pas. 50x40x30 cm) JUMLAH BANGUNAN PELENGKAP JARINGAN PEKERJAAN POMPA DAN PANEL SURYA Material Utama Modul surya 200 WP 100.00 Buah 3,000,000.00 Pompa Submersible PS2 15K SJ 42-6 1.00 Buah 187,775,000.00 Kabel Power solar cell 1.00 Lot 3,045,000.00 Kabel Pompa 4x2,5 x 100 Meter 1.00 Lot 3,552,500.00 Kabel Sensor 2x0,75 mm x 100 mtr 1.00 Lot 2,537,500.00 Box Panel Outdoor 1.00 Buah 1,015,000.00 Sensor Air dan Sensor tandon 1.00 Set 2,537,500.00 Lem Kabel 1.00 Set 507,500.00 Aksesoris (mur,baut,kabel tist) 1.00 Set 2,030,000.00 PV Disconnect 1.00 Set 7,105,000.00 Surge Protector 1.00 Set 6,090,000.00 RAK Modul Surya - Gavanis 1.00 Set 15,225,000.00 Kawat Seling 6mm 50.00 Meter 20,300.00 Sun Switch 1.00 Set 5,075,000.00 Material Pendukung Grounding System + Anti Petir 2.00 unit 6,500,000.00 PS Communicator + battery 1.00 Set 6,000,000.00 Instalasi dan setting pompa 1.00 Ls 22,330,000.00 Biaya Kirim Ke Sumba tengah 1.00 Ls 7,105,000.00

1,552,465,425.00 14,963,318.00 19,397,874.38 3,512,588.06 34,088,268.81 5,200,000.00 5,850,000.00 3,750,000.00 2,652,532.00 25,199,780.00 1,667,079,786.25 986,982,573.00 19,530,194.00 25,318,198.13 4,584,646.69 39,390,553.47 1,075,806,165.28 3,740,754,184.19 282,688,000.00 282,688,000.00

300,000,000.00 187,775,000.00 3,045,000.00 3,552,500.00 2,537,500.00 1,015,000.00 2,537,500.00 507,500.00 2,030,000.00 7,105,000.00 6,090,000.00 15,225,000.00 1,015,000.00 5,075,000.00 13,000,000.00 6,000,000.00 22,330,000.00 7,105,000.00

5

Akomodasi tim

1.00 Ls 4,060,000.00 JUMLAH PEKERJAAN POMPA DAN PANEL SURYA

4,060,000.00 590,005,000.00

REKAPITULASI Progra Kegiata Pekerja Lokasi Tahun NO. A B B.1 B.2 B.2.1 B.2.2 B.2.3 B.2.4 B.2.5

: Lingkungan Sehat Perumahan : Penyediaan Sarana Air Bersih dan Sanitasi Dasar Terutama Bagi Masyarakat Miskin : Peningatan Jaringan Perpipaan SPAM Anakalang : Anakalang - Kabupaten Sumba Tengah : 2019 URAIAN PEKERJAAN

VOLUME

PEKERJAAN PERSIAPAN

1.00

33,924,628.00

2,000.00

569,458,570.50

18.00 1,747.00 1,260.00 8,473.00 11,059.00

18,059,410.92 626,365,259.16 353,443,562.58 1,667,079,786.25 1,075,806,165.28

800.00

282,688,000.00

1.00

590,005,000.00

BIAYA PEKERJAAN PAJAK 10% TOTAL HARGA PEKERJAAN PEMBULATAN

5,216,830,382.69 521,683,038.27 5,738,513,420.96 5,738,510,000.00

PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PEK. PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Ø 3" (75 mm) PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA DISTRIBUSI PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PRIMER Ø 6" (150 MM) PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PRIMER Ø 4" (100 MM) PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PRIMER Ø 3" (75 MM) PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PRIMER Ø 2" (50 MM) PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PRIMER Ø 1" (25 MM)

C

BANGUNAN PELENGKAP JARINGAN

D

PEKERJAAN POMPA DAN PANEL SURYA

JUMLAH HARGA (Rp)

Terbila ng :

Menyetuji : Pejabat Pembuat Komitmen

Waibakul, Januari 2019 Konsultan Perencana CV. Bina Cipta Utama

DONNY UMBU PIGA, ST NIP. 19781029 201001 1 004

ABRAHAM R. BAPA, A.Md. Kepala Perwakilan

Mengetahui : Kepala Dinas Perumahan Rakyat dan Pertanahan Kabupaten Sumba Tengah

MELKIANUS UMBU DANGU, ST. NIP. 19640313 199803 1 003

BACK UP DATA Notasi Jalur 6" Transmisi (Mata Air ke Resevoir) Titik A - B (Res. Ke Pasunga) 1,747.00 Titik B - C (Pasunga ke Q Mart) 1,298.00 Titik B - D (Pasunga ke Selatan) 1,260.00 Titik A - E 932.00 Titik 3,4,5 1,460.00 Titik 6,7,9,11,10 1,570.00 Titik D-32 742.00 Titk 27-27'-sam D-32 300.00 Titik 35-36

4"

KIRI JALAN dia pipa 3"

2"

1.1/2" atau 1"

6"

4"

KANAN JALAN dia pipa 3" 2"

1.1/2" atau 1"

2,000.00 18.00

616.00 600.00 531.00

747.00

616.00 600.00 531.00

50.00 610.00 546.00 92.00

50.00 610.00 546.00 92.00

600.00 553.00 107.00

600.00 553.00 107.00 607.00 325.00

607.00 325.00 547.00 592.00 321.00 589.00 118.00 121.00 439.00 107.00 196.00 180.00 120.00 176.00

Titik D-40 Titik 41-43 TITIK 40-50

329.00 205.00 550.00 206.00

756.00 TITIK 39-37-38 TITIK 47-51

313.00 592.00 75.00 274.00 322.00 387.00 435.00 360.00

667.00 TITIK 45-46 TITIK 48-49 TITIK 54-56 TITIK 16-19 TITIK 57-58-59 TITIK 60-59-61 TITIK 59-62 TITIK 62-63 TITIK 53-51

442.00 566.00 460.00 600.00 177.00

777.00 TITIK 20-21-29-26 Pasunga - Utara 300.00 Samping kantr Pol 350.00 Titik 13 - Selatan 450.00

Dia Pipa Total Panjang Pipa Dia Pipa 6" Dia Pipa 4" Dia Pipa 3" Dia Pipa 2" Dia Pipa 1.1/2"

419.00 200.00 100.00 150.00 200.00 250.00 200.00 18.00 6"

1,747.00 4" 18.00 1,747.00 1,260.00 8,473.00 11,059.00

1,260.00 3" M' M' M' M' M'

4,534.00 9,761.00 2" 1.1/2" atau 1"

6"

4"

3"

### 2"

1,298.00 1.1/2" atau 1"

Galian Pipa Transmis 3" Dia Pipa 6" Dia Pipa 4" Dia Pipa 3" Dia Pipa 2" Dia Pipa 1.1/2" Urugan Pasir Bruto Transmis 3" Dia Pipa 6" Dia Pipa 4" Dia Pipa 3" Dia Pipa 2" Dia Pipa 1.1/2" Volume Pipa d Transmis 3" Dia Pipa 6" Dia Pipa 4" Dia Pipa 3" Dia Pipa 2" Dia Pipa 1.1/2" Netto = Brutto - Vol. Pipa Transmis 3" Dia Pipa 6" Dia Pipa 4" Dia Pipa 3" Dia Pipa 2" Dia Pipa 1.1/2"

L 1,700.00 18.00 1,747.00 1,260.00 8,473.00 11,059.00

H

1,700.00 18.00 1,747.00 1,260.00 8,473.00 11,059.00 r 0.08 0.15 0.10 0.08 0.03 0.04

W 0.48 0.60 0.48 0.48 0.30 0.30

0.25 0.35 0.25 0.25 0.15 0.15

Volume M3 201.88 3.78 207.46 149.63 381.29 497.66

0.30 0.35 0.30 0.30 0.15 0.15

0.25 0.35 0.25 0.25 0.15 0.15

127.50 2.21 131.03 94.50 190.64 248.83

0.0044 0.0177 0.0079 0.0044 0.0005 0.0013

7.51 1.00 43.06 17.47 13.05 43.61

Pi 0.04 0.08 0.05 0.04 0.01 0.02

1,700.00 18.00 1,747.00 1,260.00 8,473.00 11,059.00

Luas 3.14 3.14 3.14 3.14 3.14 3.14

119.99 1.21 87.96 77.03 177.59 205.21

Urugan Tanah Kembali Transmis 3" Dia Pipa 6" Dia Pipa 4" Dia Pipa 3" Dia Pipa 2" Dia Pipa 1.1/2"

L 1,700.00 18.00 1,747.00 1,260.00 8,473.00 11,059.00

H

W 0.18 0.25 0.18 0.18 0.15 0.15

0.25 0.35 0.25 0.25 0.15 0.15

Vol. M3 74.38 1.58 76.43 55.13 190.64 248.83

HARGA SATUAN BAHAN DAN ALAT NO.

U R A I A N

SAT

HARGA SATUAN ( RP )

A.

BAHAN

1 2 3 4 5

Pipa GIP 1/2" SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 3/4" SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP. 1" SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 1 1/2" SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP. 2" SNI.0039-87/BS. 1387-85 Medium Class

m' m' m' m' m'

27,000.00 34,122.86 53,867.66 79,237.89 113,976.78

6 7 8 9

Pipa GIP. 3" SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP. 4" SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP. 6" SNI.0039-87/BS. 1387-85 Medium Class Over shock 6 - 4 "

m' m' m' Bh

193,854.76 270,902.46 427,029.30 118,000.00

10 11

Over shock 4 - 3 " Over shock 3 - 2 "

Bh Bh

100,000.00 70,000.00

12 13 14

Over shock 2 - 1,5 " Over shock 1 - 3/4 " Over shock 1 - 1/2 "

Bh Bh Bh

33,000.00 23,000.00 15,600.00

15 16 17 18

Soket 6 diem (Ø150 mm) Soket 5 diem (Ø125 mm) Soket 4 diem (Ø100 mm) Soket 3 diem (Ø 80 mm)

Bh Bh

390,000.00 302,000.00 190,000.00 150,000.00

19 20

Soket 2,1/2 diem (Ø 65 mm) Soket 2 diem (Ø 50 mm)

22 21 22 23

Soket 1 1/2 diem (Ø40 mm) Soket 3/4 diem (Ø 20 mm) Flange drat dalam 6 diem (Ø150 mm) Flange drat dalam 4 diem (Ø100 mm)

Buah Buah

55,000.00 30,000.00 255,000.00 160,000.00

24 25 26 27 28

Flange drat dalam 3 diem (Ø75 mm) Tee all flange 6"x 4" Tee all flange 4"x 3" Tee all flange 3"x 2" Tee all flange 2"x 1,5"

Buah Bh Bh Bh Bh

130,000.00 520,000.00 440,000.00 390,000.00 227,000.00

29 30 31 32 33

Tee all flange 2"x 1" Tee all flange 1"x 3/4" Tee all flange 1"x 1/2" Dop 6" Dop 4"

Bh Bh Bh Bh Bh

130,000.00 105,000.00 90,000.00 95,000.00 90,000.00

34 35 36 37 38 39

Dop 3" Dop 2" Dop 1,5" Dop 1" Dop 1/2" Kran Air 3/4"

Bh Bh Bh Bh Bh

60,000.00 45,000.00 40,000.00 30,000.00 20,000.00 30,000.00

Bh Bh Bh Bh Bh Bh

Bh

135,000.00 78,000.00

KET.

HARGA SATUAN BAHAN DAN ALAT NO.

U R A I A N

SAT

HARGA SATUAN ( RP )

40

Kran Air 1/2"

Bh

23,000.00

41 42 43 44 45

Gate Valve 8" Gate Valve 6" Gate Valve 4" Gate Valve 3" Gate Valve 2"

Bh Bh Bh Bh Bh

4,800,000.00 4,150,000.00 2,700,000.00 1,830,000.00 1,300,000.00

46 47 48 49

Gate Valve 1,5" Gate Valve 1" Gate Valve 1/2" Butterfly Valve 6"

Bh Bh Bh Bh

360,000.00 220,000.00 109,000.00 4,670,000.00

50 51

Butterfly Valve 4" Butterfly Valve 3"

Bh Bh

3,700,000.00 2,300,000.00

52 53 54

Air Valve 6" Air Valve 4" Air Valve 3"

Bh Bh Bh

4,150,000.00 2,700,000.00 1,800,000.00

55 56 57 58

AIr Valve 2" Reducer 160 x 90 mm Reducer 160 x 75 mm Reducer 160 x 63 mm

Bh Bh

59 60

Watermour dia 8 Watermour dia 6

Bh Bh Bh Bh

1,300,000.00 720,000.00 230,000.00 230,000.00

61 62 63 64

Watermour dia 4 Watermour dia 3 Watermour dia 2 Watermour dia 1,5

Bh Bh Bh Bh

250,000.00 200,000.00 150,000.00 125,000.00

65 66 67 68 69

Watermour dia 1 Watermour dia 1/2 Gilbout Joint 8" Gilbout Joint 6" Gilbout Joint 4"

Bh Bh Bh Bh Bh

75,000.00 45,000.00 245,000.00 210,000.00 180,000.00

70 71 72 73 74

Gilbout Joint 3" Gilbout Joint 2" Gilbout Joint 11/2" Gilbout Joint 1" Elbow 45 dia 3"

Bh Bh Bh Bh Bh

160,000.00 135,000.00 100,000.00 57,000.00 320,500.00

75 76 77 78 79 80

Elbow 45 dia 6" Elbow 45 dia 8" Elbow 90 dia 3" Elbow 90 dia 6" Elbow 90 dia 8" Elbow 90 dia 3/4"

Bh Bh Bh Bh Bh

535,000.00 650,000.00 335,000.00 565,000.00 685,000.00 50,000.00

Bh

300,000.00 275,000.00

KET.

HARGA SATUAN BAHAN DAN ALAT NO.

U R A I A N

SAT

HARGA SATUAN ( RP )

81

Pipa HDPE PE (PN 10) Ø 160 mm SNI 06-4829-2005

M1

389,000.00

82 83 84 85 86

Pipa HDPE PE (PN 10) Ø 90 mm SNI 06-4829-2005 Pipa HDPE PE (PN 10) Ø 75 mm SNI 06-4829-2005 Pipa HDPE PE (PN 10) Ø 63 mm SNI 06-4829-2005 Pipa HDPE PE (PN 10) Ø 50 mm SNI 06-4829-2005 Pipa HDPE PE (PN 10) Ø 40 mm SNI 06-4829-2005

M1 M1 M1 M1 M1

123,000.00 85,000.00 60,000.00 40,000.00 29,000.00

87 88 89 90

Pipa HDPE PE (PN 10) Ø 32 mm SNI 06-4829-2005 Pipa HDPE PE (PN 10) Ø 25 mm SNI 06-4829-2005 Reducer 90 x 75 mm SNI 06-4829-2005 & ISO 4427 Reducer 90 x 63 mm SNI 06-4829-2005 & ISO 4427

M1 M1 Buah Buah

20,000.00 12,000.00 200,000.00 210,000.00

91 92

Reducer 75 x 63 mm SNI 06-4829-2005 & ISO 4427 Reducer 75 x 50 mm SNI 06-4829-2005 & ISO 4427

Buah Buah

44,000.00 115,000.00

93 94 95

Y Reducer 90°, 2 x 75 mm - 75 mm Y Reducer 90°, 2 x 50 mm - 75 mm Y Reducer 90°, 2 x 35 mm - 50 mm

Buah Buah Buah

330,000.00 325,000.00 310,000.00

96 97 98 99

Stub Flange Stub Flange Stub Flange Stub Flange

Buah Buah Buah Buah

710,000.00 305,000.00 260,000.00 190,000.00

100 101

Stub Flange Ø 50 mm Reducer 63 x 50 mm SNI 06-4829-2005 & ISO 4427

155,000.00 32,000.00

102 103 104 105

Pasir Batu Pecah 3-5 Batu Kali Kawat Ikat

Buah Buah m3 m3 m3 Kg

106 107 108 109 110

Kabel Seling Kawat Las Penggantung Ø 10 mm (BJ-32 Polos) Clamp Sadle 1/2" Elbow 90 1/2 "GI

m' Kg Kg Buah Buah

63,000.00 41,000.00 12,000.00 102,000.00 22,000.00

111 112 113 114 115

Pipa service GI 1/2" Shock Drat 1/2" GI Double nipple 1/2" GI Meter air 1/2" Tee 1/2" GI

m Buah Buah Buah Buah

27,000.00 15,000.00 36,000.00 330,000.00 30,000.00

116 117 118 119 120 121 122

Tee 3/4" GI Kran 1/2 Seal tape Stop Kran 1/2" End Cap 3" Flange 10K ns GI 3" Flange 10K ns GI 4"

Buah Buah roll Buah Buah

36,000.00 13,000.00 12,300.00 26,800.00 387,000.00 152,000.00 170,000.00

Ø160 mm Ø 90 mm Ø 75 mm Ø 63 mm

Buah Buah

120,000.00 255,000.00 120,000.00 25,000.00

KET.

HARGA SATUAN BAHAN DAN ALAT NO.

U R A I A N

SAT

HARGA SATUAN ( RP )

Buah

290,000.00

123

Flange 10K ns GI 6"

124 125 126 127 128

Batu Gunung/Karang Kerikil (maksimum 30 mm) Koral Beton Pasir Beton Pasir Pasang

m3 m3 m3 m3 m3

130,000.00 410,000.00 415,000.00 270,000.00 270,000.00

129 130

Pasir Urug Besi Beton Polos

m3 kg

130,000.00 13,000.00

KET.

HARGA SATUAN BAHAN DAN ALAT NO.

U R A I A N

SAT

HARGA SATUAN ( RP )

131

Besi Beton Ulir

kg

13,650.00

132 133 134 135 136

Kawat ikat Paku Paku 5 - 10 cm Paku 5 - 12 cm Paku Biasa 2" - 5"

kg kg kg kg kg

20,000.00 20,500.00 20,500.00 20,000.00 20,500.00

137 138 139 140

Air Balok Kayu Kelas II Dolken Kayu Kayu Usuk 5/7 Kelas II

m3 m3 btg m3

75.00 3,125,000.00 8,200.00 3,100,000.00

141 142

Kayu Begesting Kelas III Kayu Papan 3/25/400 Kelas II

m3 m3

1,545,000.00 3,100,000.00

143 144 145

Plywood 9 mm PC (1 zak = 50 kg) Besi Strip

Lbr kg kg

150,000.00 1,650.00 15,000.00

146 147 148 149

Besi Plat 3 mm Minyak Bekesting Cat Besi Tiner

Lbr kg

1,100,000.00 15,000.00 25,000.00 25,000.00

149 B.

Kuas ALAT

1 2 3 4

Dump Truck Mesin Las Tripot/Tackel & handle crane 2 T Genset

kg kg buah Hari Hari Hari Hari

5,000.00 600,000.00 200,000.00 200,000.00 150,000.00

KET.

JADWAL KEBUTUHAN TENAGA No.

1

2.

Uraian Pekerjaan

Satuan

A. PEKERJAAN PERSIAPAN 1. Pengukuran dan pemasangan Bouwplank Pekerja 0.10 Tukang Kayu 0.10 Kepala Tukang 0.01 Mandor 0.01 2. Pembersihan lapangan dan perataan Pekerja 0.10 Mandor 0.05 3. Biaya Mobilisasi Pipa ke lokasi pekerjaan 4. Direksi keet dan Gudang Penyimpanan 4 x 8 5. Pengadaan air kerja 6. Papan Nama Proyek

Volume

0.01 0.00

3 Penggalian tanah biasa Pekerja Mandor

0.75 0.03

4 Pengurugan kembali galian tanah Pekerja Mandor

0.25 0.03

5 Pembuatan Trust Block dari beton K 150 Pekerja Tukang Batu Kepala Tukang Mandor

1.65 0.28 0.03 0.08

Jumlah Harga ( Rp. )

Bobot (%)

M'

20.00

460,823.00

9,216,460.00

0.18

M2

1,400.00

10,890.00

15,246,000.00

0.30

Ls Ls Ls Ls

1.00 1.00 1.00 1.00

5,000,000.00 3,500,000.00 500,000.00 600,000.00

5,000,000.00 3,500,000.00 500,000.00 600,000.00

0.10 0.07 0.01 0.01

248,217.00

421,968,900.00

8.23

B. PEK. PENGADAAN DAN PEMASANGAN PIPA TRANSMISI 3 (75MM) 1 Pemasangan pipa GIP Ø 3" (75 mm) M' 1,700.00 Pekerja 0.35 Tukang pipa 0.17 Mandor 0.03 2 Pengetesan pipa Ø 3" (75 mm) Pekerja Mandor

Harga Satuan ( Rp. )

M'

1,700.00

1,436.00

2,441,200.00

0.05

M3

201.00

50,875.00

10,225,875.00

0.20

M3

191.00

18,425.00

3,519,175.00

0.07

M3

0.68

1,407,941.00

950,360.18

0.02

I 7

7

7

7

7

7

Jadwal Waktu Pelaksanaan Pekerjaan :120 (Seratus D II III 7 7 7

0.30 140.00 70.00 0.03 0.07 0.005 0.01

0.02 18.84 0.63

0.02 18.84 0.63

0.02 18.84 0.63

0.02 18.84 0.63

0.02 18.84 0.63

0.02 18.84 0.63

0.02 18.84 0.63

0.02 18.84 0.63

6 7 8 9

3

Gate Valve 3" Air Valve 3" Flange 10K ns GI 3" Pemasangan 1 buah bak kontrol pas. bata 60cm x60cm tinggi 65 cm Pekerja 3.20 Tukang 1.15 batu Kepala 0.01 tukang Mandor 0.02

Bh Bh Bh

4.00 4.00 55.00

1,830,000.00 1,830,000.00 152,000.00

Unit

8.00

1,482,340.00

C. PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA DISTRIBUSI C1. PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PRIMER Ø 150 MM 1,765.00 1 Pemasangan pipa GIP Ø 6" (150 mm) M' Pekerja 0.51 Tukang pipa 0.25 Mandor 0.05 2 Pengetesan pipa Ø 6" (150 mm) Pekerja Mandor

0.01 0.00

3 Penggalian tanah biasa Pekerja Mandor

0.75 0.03

4 Pengurugan kembali galian tanah Pekerja Mandor

0.25 0.03

5 6 7 8 9 10 11

Gate Valve 6" Butterfly Valve 6" Air Valve 6" Reduser 6" x 3" Flange 6" Flange 10K ns GI 6" Pembongkaran Trotoar Kembali Pekerja Tukang Batu Kepala Tukang Mandor

dan

0.14 0.14 0.16

11,858,720.00

0.23

511,161.00

902,199,165.00

17.60

M'

1,765.00

2,591.00

4,573,115.00

0.09

M3

370.60

50,875.00

18,854,275.00

0.37

M3

222.00

18,425.00

4,090,350.00

0.08

Bh Bh Bh Bh Bh Bh

1.00 1.00 2.00 2.00 2.00 48.00

4,150,000.00 4,670,000.00 4,150,000.00 726,579.00 255,000.00 290,000.00

4,150,000.00 4,670,000.00 8,300,000.00 1,453,158.00 510,000.00 13,920,000.00

0.08 0.09 0.16 0.03 0.01 0.27

2.00

1,326,266.00

2,652,532.00

0.05

Pengecoran M3

0.05 34.74 1.16

0.05 34.74 1.16

0.05 34.74 1.16

0.05 34.74 1.16

0.05 34.74 1.16

0.05 34.74 1.16

0.05 34.74 1.16

0.05 34.74 1.16

0.03

1.65

1.65

0.28

0.55

0.03

0.06

0.08

0.17

12 Pemasangan 1 buah bak kontrol pas. bata 60cm x60cm tinggi 65 cm Pekerja Tukang batu Kepala tukang Mandor

7,320,000.00 7,320,000.00 8,360,000.00

Buah 3.20 1.15 0.01 0.02

4.00

1,482,340.00

5,929,360.00 -

0.12 -

C2 PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA SEKUNDER Ø 75 MM 1,260.00 1 Pemasangan pipa GIP Ø 3" (75 mm) M' Pekerja 0.35 Tukang pipa 0.17 Mandor 0.03 2 Pengetesan pipa Ø 3" (75 mm) Pekerja Mandor

0.75 0.03

4 Pengurugan kembali galian tanah Pekerja Mandor

0.25 0.03

Gate Valve 3" Butterfly Valve 3" Air Valve 3" Flange 10K ns GI 3" Flange 3 " Pemasangan 1 buah bak kontrol pas. bata 60cm x60cm tinggi 65 cm Pekerja Tukang batu Kepala tukang Mandor

312,753,420.00

6.10

M'

1,260.00

1,436.00

1,809,360.00

0.04

M3

150.00

50,875.00

7,631,250.00

0.15

M3

142.00

18,425.00

2,616,350.00

0.05

Bh Bh Bh Bh Bh

2.00 2.00 4.00 35.00 4.00

1,830,000.00 2,300,000.00 75,000.00 20,500.00 130,000.00

3,660,000.00 4,600,000.00 300,000.00 717,500.00 520,000.00

0.07 0.09 0.006 0.01 0.01

8.00

1,482,340.00

11,858,720.00

0.23

25.00

75,000.00

1,875,000.00 554,255,625.00

0.04 10.81

0.01 0.001

3 Penggalian tanah biasa Pekerja Mandor

5 6 7 8 9 10

248,217.00

Buah

0.03 22.50 0.75

0.03 22.50 0.75

0.03 22.50 0.75

0.03 22.50 0.75

0.03 22.50 0.75

0.03 20.40 0.68

0.03 20.40 0.68

3.20 1.15 0.01 0.02

11 Tapingg Jalan

M'

C3 PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA SEKUNDER Ø 2" (50 MM) 3,025.00 183,225.00 1 Pemasangan pipa GIP Ø 2" (50 mm) M' Pekerja 0.11 Tukang batu 0.18 Kepala tukang 0.02 Mandor 0.01 2 Pengetesan pipa Ø 2" (50 mm) Pekerja Mandor

0.01 0.00

3 Penggalian tanah biasa Pekerja Mandor

0.75 0.03

4 Pengurugan kembali galian tanah Pekerja

0.25

M'

3,025.00

1,271.00

3,844,775.00

0.07

M3

136.00

50,875.00

6,919,000.00

0.13

M3

132.00

18,425.00

2,432,100.00

0.05

0.04

0.03 20.40 0.68

0.03 20.40 0.68

0.03 20.40 0.68

Mandor

0.03

5 Gate Valve 2" 6 Air Valve 2" 7 Tapingg Jalan Pemasangan 1 buah bak kontrol pas. bata 60cm

650,000.00 650,000.00 75,000.00

3,900,000.00 3,900,000.00 1,500,000.00

0.08 0.08 0.03

12.00 1,482,340.00 8 x60cm tinggi 65 cm Buah Pekerja 3.20 Tukang 1.15 batu Kepala 0.01 tukang Mandor 0.02 #REF! C4 PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TERSIER Ø 1.1/2" (40 MM) 11,650.00 133,983.00 1 Pemasangan pipa GIP Ø 1.1/2" (40 mm) M' Pekerja 0.11 Tukang batu 0.18 Kepala tukang 0.02 Mandor 0.01

17,788,080.00

0.35

1,560,901,950.00

30.44

2 Pengetesan pipa Ø 1.1/2 (40 mm) Pekerja Mandor

0.75 0.03

4 Pengurugan kembali galian tanah Pekerja Mandor

0.25 0.03

Trotoar

dan

0.03

M'

11,650.00

1,271.00

14,807,150.00

0.29

M3

525.00

50,875.00

26,709,375.00

0.52

M3

262.00

18,425.00

4,827,350.00

0.09

Bh Bh M'

6.00 6.00 20.00

360,000.00 360,000.00 75,000.00

2,160,000.00 2,160,000.00 1,500,000.00

0.04 0.04 0.03

0.03

7.60

1,326,266.00

10,079,621.60

0.20

0.10

Pengecoran M3 1.65 0.28 0.03 0.08

Pemasangan 1 buah bak kontrol pas. bata 60cm 9 x60cm tinggi 65 cm Pekerja 3.20 Tukang 1.15 batu Kepala 0.01 tukang Mandor 0.02 D.

6.00 6.00 20.00

0.01 0.001

3 Penggalian tanah biasa Pekerja Mandor

5 Gate Valve 1.1/2" 6 Air Valve 1.1/2" 7 Tapingg Jalan Pembongkaran 8 Kembali Pekerja Tukang Batu Kepala Tukang Mandor

Bh Bh M'

PEKERJAAN PEMASANGAN UNIT LAYANAN

0.07 49.22 1.64

0.07 49.22 1.64

0.07 49.22 1.64

0.07 49.22 1.64

0.07 49.22 1.64

0.07 49.22 1.64

0.07 49.22 1.64

6.27 1.05 0.11 0.32

Buah

12.00

1,482,340.00

17,788,080.00

-

0.35

-

Pemasangan Sambungan Rumah (Pipa GI 3/4", Kran Air 3/4", Albow 3/4", Clamp Sadle ) E. E.1 1 2 3 4 5 6 7 8 9 10 11 12

PEKERJAAN POMPA DAN PANEL SURYA Material Utama PV Module 200 Poly Pompa Submersible PU15K2 C-SJ30-12, 3" Controller PS15K2 PV Disconnect 1000-40-5 PV Combiner 1000-125-4 PV Protect 1000-125 Surge Protector Well Probe Sensor air bawah Kabel PV Array NYAF 6mm Kabel Pompa NYYHY 4x10mm Kabel Sensor NYYHY 2x0,75mm Panel Box

Material Pendukung Kabel Splice Kit Grounding System + penangkal Petir Kontruksi PV Module Support Galvanize Monitoring Sysytem - PS Communicator + Battery + SimCArd - LC-20M PV - External Antena 5 Accessories Installasi Biaya pengiriman ke lokasi pekerjaan dan

E2 1 2 3 4

6 pemasangan

F

PEKERJAAN PEMASANGAN POMPA HIDRAM 1 Biaya Pembuatan dan Perakitan Pompa Hidram 2 Pek.Bak Intake P=1 mtr, L=1 mtr, T=2 mtr Pek. Galian tanah Pekerja 0.75 Mandor 0.03 Beton K225 Pekerja 1.65 Tukang Batu 0.28 Kepala Tukang 0.03 Mandor 0.08 Pembesian Pekerja 0.01 Tukang besi 0.01 Kepala tukang 0.00 Mandor 0.0004 Bekisting Pekerja 0.66 Tukang Kayu 0.33

SR

800.00

353,360.00

282,688,000.00

5.51 5.14 2.11 1.66 0.20 0.13 0.17 0.02 0.03 0.06 0.20 0.02 0.08 0.01 0.31 0.78 0.24 0.06 0.03 0.08

pcs set set set set set set set meter meter meter unit

85.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 100.00 100.00 100.00 1.00

3,100,000.00 108,000,000.00 85,000,000.00 10,000,000.00 6,800,000.00 8,700,000.00 780,000.00 1,600,000.00 30,000.00 101,000.00 11,000.00 4,000,000.00

set set set 0 set unit unit ls

1.00 2.00 28.00 1.00 1.00 1.00 1.00

600,000.00 8,000,000.00 1,420,000.00 12,500,000.00 2,866,500.00 1,378,125.00 3,858,750.00

263,500,000.00 108,000,000.00 85,000,000.00 10,000,000.00 6,800,000.00 8,700,000.00 780,000.00 1,600,000.00 3,000,000.00 10,100,000.00 1,100,000.00 4,000,000.00 600,000.00 16,000,000.00 39,760,000.00 12,500,000.00 2,866,500.00 1,378,125.00 3,858,750.00

1.00

17,000,000.00

17,000,000.00

0.33

21,300,000.00 15,867,393.31

85,200,000.00 15,867,393.31

1.66 0.31

ls

Buah Unit

4.00 1.00

0.42 0.15

0.15

0.75 0.03

0.75 0.03

0.83 0.14 0.01 0.04

0.83 0.14 0.01 0.04

0.01 0.01 0.00 0.0004

0.01 0.01 0.00 0.0004

0.33 0.17

0.33 0.17

0.42

0.42

Kepala Tukang Mandor Pek. Acian Pekerja Tukang Batu Kepala Tukang Mandor

0.03 0.03

0.02 0.02

0.02 0.02

0.20 0.10 0.01 0.01

0.20 0.10 0.01 0.01

0.20 0.10 0.01 0.01

0.18

0.18

0.18

0.25 0.01 0.55 0.09

0.25 0.01 0.55 0.09

0.25 0.01 0.55 0.09

0.01 0.03 0.00 0.00

0.01 0.03 0.00 0.00

0.01 0.03 0.00 0.00

0.00 0.00 0.22 0.11

0.00 0.00 0.22 0.11

0.00 0.00 0.22 0.11

0.01 0.01 0.07 0.03

0.01 0.01 0.07 0.03

0.01 0.01 0.07 0.03

0.00 0.00

0.00 0.00

0.00 0.00

Pek. Bak Dudukan Pompa (P=2,4 mtr, L=1, mtr, 3 T=3,5 mtr) Pek. Galian Pek. Galian tanah tanah 0.75 Pekerja 0.03 Mandor Beton K225 1.65 Pekerja 0.28 Tukang Batu 0.03 Kepala tukang 0.08 Mandor Pembesian 0.01 Pekerja Tukang besi Kepala tukang Mandor Bekisting Pekerja Tukang Kayu Kepala Tukang Mandor Pek. Acian Pekerja Tukang Batu Kepala Tukang Mandor

Unit

1.00

28,016,110.00

28,016,110.00

0.55

0.01 0.00 0.00 0.66 0.33 0.03 0.03 0.20 0.10 0.01 0.01

4 Pekerjaan Trust Block 5 Pemasangan 1 m pipa HDPE Ø 150 mm Pekerja Tukang pipa Mandor

0.06 0.03 0.01

6 Pemasangan 1 m pipa HDPE Ø 100 mm Pekerja Tukang pipa Mandor

0.04 0.02 0.00

7 Pemasangan 1 m pipa HDPE Ø 75 mm Pekerja Tukang pipa

0.04 0.02

Ls M'

1.00 18.00

500,000.00 395,277.00

500,000.00 7,114,986.00

0.01 0.14

0.01 0.07 0.56 0.28 0.05

0.07 0.56 0.28 0.05

M'

200.00

127,060.00

25,412,000.00

0.50

0.25 4.00 2.00 0.40

0.25 4.00 2.00 0.40

M'

80.00

88,478.00

7,078,240.00

0.14

0.07 1.40 0.68

0.07 1.40 0.68

Mandor

0.00

8 Pemasangan 1 m pipa HDPE Ø 50 mm Pekerja Tukang pipa Mandor

0.04 0.02 0.00

9 Pemasangan 1 m pipa HDPE Ø 32 mm Pekerja Tukang pipa Mandor

0.04 0.02 0.00

Flange 100 mm Stub Flange 100 mm Check Valve 75 mm Y Reducer 90°, 2 x 75 mm - 75 mm Y Reducer 90°, 2 x 50 mm - 75 mm Y Reducer 90°, 2 x 35 mm - 50 mm Pemasangan 1 buah bak kontrol pasangan bata 16 45cm x45cm tinggi 50 cm 10 11 12 13 14 15

Total

0.12

0.12

M'

100.00

43,478.00

4,347,800.00

0.08

0.04 1.75 1.70 0.30

0.04 1.75 1.70 0.30

M'

180.00

23,478.00

4,226,040.00

0.08

0.04 3.15 1.53 0.27

0.04 3.15 1.53 0.27

4.00 8.00 1.00 2.00 1.00 2.00

160,000.00 155,000.00 3,000,000.00 330,000.00 325,000.00 310,000.00

640,000.00 1,240,000.00 3,000,000.00 660,000.00 325,000.00 620,000.00

0.01 0.02 0.06 0.01 0.01 0.01

0.01 0.01 0.03 0.01 0.00 0.01

0.01 0.01 0.03 0.01 0.00 0.01

1.00

587,136.00

587,136.00

0.01

5,127,209,432.08

100.00

Buah Buah Buah Buah Buah Buah Buah

0.01

### #REF! #REF! #REF!

#REF! #REF!

laksanaan Pekerjaan :120 (Seratus Dua Puluh ) Hari Kalender III 7 7 7 7

IV 7

V 7

7

7

1

0.18 2.00 2.00 0.20 0.10

0.03

100%

0.03 0.005

1.37 97.75 48.73 9.63

1.37 97.75 48.73 9.63

1.37 97.75 48.73 9.63

1.37 97.75 48.73 9.63

1.37 97.75 48.73 9.63

1.37 97.75 48.73 9.63 0.05 13.60 1.36

0.03 23.88 2.39 0.02 1.11 0.19 0.02 0.06

0.03 23.88 2.39

0.05 0.05 0.05

2.93 148.85 74.42 15.00

2.93 148.85 74.42 15.00

2.93 148.85 74.42 15.00

2.93 148.85 74.42 15.00

0.05 0.05 0.05

0.05 0.05 0.05

0.12

0.12

12.80 4.60 0.04 0.06

12.80 4.60 0.04 0.06

2.93 148.85 74.42 15.00

2.93 148.85 74.42 15.00 0.09 14.12 1.41

0.03 0.03 0.05 0.01 0.09

0.03 0.03 0.05 0.01 0.005 0.09

0.04 27.75 2.78

0.04 27.75 2.78

-

0.03

0.03 0.03 0.05 0.01 0.005 0.09

1.65 0.55 0.06 0.17

0.06

0.06

6.40 2.30 0.02 0.03 -

6.40 2.30 0.02 0.03 -

1.02 72.45 36.12 7.14

1.02 72.45 36.12 7.14

1.02 72.45 36.12 7.14

1.02 72.45 36.12 7.14

1.02 72.45 36.12 7.14

1.02 72.45 36.12 7.14 0.04 10.08 1.01

0.03 17.75 1.78

1.80 54.45 90.75 9.08 2.52

1.80 54.45 90.75 9.08 2.52

1.80 54.45 90.75 9.08 2.52

1.80 54.45 90.75 9.08 2.52

0.04 0.04 0.003 0.01 0.005

0.04 0.04 0.003 0.01 0.005

0.12

0.12

12.80 4.60 0.04 0.06

12.80 4.60 0.04 0.06

1.80 54.45 90.75 9.08 2.52

1.80 54.45 90.75 9.08 2.52

0.03 17.75 1.78

0.07 24.20 2.42

0.02 16.50

0.02 16.50

1.65

5.07 1,258.20 2,097.00 209.70 58.25

5.07 1,258.20 2,097.00 209.70 58.25

5.07 1,258.20 2,097.00 209.70 58.25

5.07 1,258.20 2,097.00 209.70 58.25

0.04 0.04

0.04 0.04

0.17

0.17

19.20 6.90 0.07 0.10

19.20 6.90 0.07 0.10

5.07 1,258.20 2,097.00 209.70 58.25

5.07 1,258.20 2,097.00 209.70 58.25

1.65

0.29 93.20 9.32 0.07 49.22 1.64 0.05 32.75 3.28 0.02 0.02

0.02 0.02 0.10 6.27 1.05 0.11 0.32

0.17

0.17

19.20 6.90 0.07 0.10

19.20 6.90 0.07 0.10

0.05 32.75 3.28

1.84

2.57

1.84

2.57 2.11 1.66 0.20 0.13 0.17 0.02 0.03 0.06 0.20 0.02 0.08 0.01 0.31

0.39

0.39 0.24 0.06 0.03 0.08

0.08

0.42

0.08

0.08

0.08

1.84

JADWAL PENGGUNAAN ALAT Harga Satuan ( Rp. )

Jumlah Harga ( Rp. )

20.00 1,400.00 1.00 1.00 1.00 1.00

460,823.00 10,890.00 5,000,000.00 3,500,000.00 500,000.00 600,000.00

9,216,460.00 15,246,000.00 5,000,000.00 3,500,000.00 500,000.00 600,000.00

0.18 0.30 0.10 0.07 0.01 0.01

B. PEK. PENGADAAN DAN PEMASANGAN PIPA TRANSMISI 3 (75MM) 1 Pemasangan pipa GIP Ø 3" (75 mm) M' 1,700.00 Sewa Tripot/Tackel & ha 0.04

248,217.00

421,968,900.00

8.23

2,441,200.00 10,225,875.00 3,519,175.00 950,360.18 7,320,000.00 7,320,000.00 8,360,000.00

0.05 0.20 0.07 0.02 0.14 0.14 0.16

11,858,720.00

0.23

511,161.00

902,199,165.00

17.60

2,591.00 50,875.00 18,425.00 4,150,000.00 4,670,000.00 4,150,000.00 726,579.00 255,000.00

4,573,115.00 18,854,275.00 4,090,350.00 4,150,000.00 4,670,000.00 8,300,000.00 1,453,158.00 510,000.00

0.09 0.37 0.08 0.08 0.09 0.16 0.03 0.01

Uraian Pekerjaan

No.

1

2.

A. PEKERJAAN PERSIAPAN 1. Pengukuran dan pemasangan Bouwplank 2. Pembersihan lapangan dan perataan 3. Biaya Mobilisasi Pipa ke lokasi pekerjaan 4. Direksi keet dan Gudang Penyimpanan 4 x 8 5. Pengadaan air kerja 6. Papan Nama Proyek

2 3 4 5 6 7 8 9

3

Pengetesan pipa Ø 3" (75 mm) Penggalian tanah biasa Pengurugan kembali galian tanah Pembuatan Trust Block dari beton K 150 Gate Valve 3" Air Valve 3" Flange 10K ns GI 3" Pemasangan 1 buah bak kontrol pas. bata 60cm x60cm tinggi 65 cm Mesin Las 1.10 Genset 1.10

Satuan

M' M2 Ls Ls Ls Ls

Volume

M' M3 M3 M3 Bh Bh Bh

1,700.00 201.00 191.00 0.68 4.00 4.00 55.00

1,436.00 50,875.00 18,425.00 1,407,941.00 1,830,000.00 1,830,000.00 152,000.00

Unit Unit Unit

8.00

1,482,340.00

C. PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA DISTRIBUSI C1. PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PRIMER Ø 150 MM 1,765.00 1 Pemasangan pipa GIP Ø 6" (150 mm) M' Sewa Tripot/Tackel & ha 0.04 Unit 2 3 4 5 6 7 8 9

Pengetesan pipa Ø 6" (150 mm) Penggalian tanah biasa Pengurugan kembali galian tanah Gate Valve 6" Butterfly Valve 6" Air Valve 6" Reduser 6" x 3" Flange 6"

M' M3 M3 Bh Bh Bh Bh Bh

1,765.00 370.60 222.00 1.00 1.00 2.00 2.00 2.00

Bobot (%)

I 7

7

II 7

7

7

7

Jadwal Waktu Pelaksanaan Pekerjaan :120 (Seratu III 7 7 7

0.30 0.03 0.07 0.005 0.01

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.05

0.05

0.05

0.05

0.05

0.05

0.05

0.05

10 Flange 10K ns GI 6" 11 Pembongkaran Trotoar

Bh dan

Pengecoran

Kembali 12 Pemasangan 1 buah bak kontrol pas. bata 60cm x60cm tinggi 65 cm Mesin Las Genset

1.10 1.10

M3 Buah unit unit

48.00

290,000.00

13,920,000.00

0.27

2.00

1,326,266.00

2,652,532.00

0.05

4.00

1,482,340.00

5,929,360.00

0.12

-

C2 PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA SEKUNDER Ø 75 MM 1,260.00 1 Pemasangan pipa GIP Ø 3" (75 mm) M' Sewa Tripot/Tackel & ha 0.04 2 3 4 5 6 7 8 9 10

Pengetesan pipa Ø 3" (75 mm) Penggalian tanah biasa Pengurugan kembali galian tanah Gate Valve 3" Butterfly Valve 3" Air Valve 3" Flange 10K ns GI 3" Flange 3 " Pemasangan 1 buah bak kontrol pas. bata 60cm x60cm tinggi 65 cm Mesin Las Genset

11 Tapingg Jalan C3 1 2 3 4 5 6 7 8

C4 1 2 3 4 5 6 7

1.10 1.10

M' M3 M3 Bh Bh Bh Bh Bh Buah unit unit M'

-

248,217.00

312,753,420.00

6.10

1,260.00 150.00 142.00 2.00 2.00 4.00 35.00 4.00

1,436.00 50,875.00 18,425.00 1,830,000.00 2,300,000.00 75,000.00 20,500.00 130,000.00

1,809,360.00 7,631,250.00 2,616,350.00 3,660,000.00 4,600,000.00 300,000.00 717,500.00 520,000.00

0.04 0.15 0.05 0.07 0.09 0.006 0.01 0.01

8.00

1,482,340.00

11,858,720.00

0.23

25.00

75,000.00

1,875,000.00 554,255,625.00 3,844,775.00 6,919,000.00 2,432,100.00 3,900,000.00 3,900,000.00 1,500,000.00

0.04 10.81 0.07 0.13 0.05 0.08 0.08 0.03

17,788,080.00

0.35

1,560,901,950.00 14,807,150.00 26,709,375.00 4,827,350.00 2,160,000.00 2,160,000.00 1,500,000.00

30.44 0.29 0.52 0.09 0.04 0.04 0.03

PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA SEKUNDER Ø 2" (50 MM) Pemasangan pipa GIP Ø 2" (50 mm) 3,025.00 183,225.00 M' Pengetesan pipa Ø 2" (50 mm) 3,025.00 1,271.00 M' Penggalian tanah biasa M3 136.00 50,875.00 Pengurugan kembali galian tanah 132.00 18,425.00 M3 Gate Valve 2" 6.00 650,000.00 Bh Air Valve 2" 6.00 650,000.00 Bh Tapingg Jalan 20.00 75,000.00 M' Pemasangan 1 buah bak kontrol pas. bata 60cm 12.00 1,482,340.00 x60cm tinggi 65 cm Buah unit Mesin Las 1.10 unit Genset 1.10 #REF! PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TERSIER Ø 1.1/2" (40 MM) Pemasangan pipa GIP Ø 1.1/2" (40 mm) 11,650.00 133,983.00 M' Pengetesan pipa Ø 1.1/2 (40 mm) 11,650.00 1,271.00 M' Penggalian tanah biasa 525.00 50,875.00 M3 Pengurugan kembali galian tanah 262.00 18,425.00 M3 Gate Valve 1.1/2" 6.00 360,000.00 Bh Air Valve 1.1/2" 6.00 360,000.00 Bh Tapingg Jalan 20.00 75,000.00 M'

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.04

0.03

0.03

0.03

0.03

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.03

Pembongkaran Trotoar dan Pengecoran 8 Kembali Pemasangan 1 buah bak kontrol pas. bata 60cm 9 x60cm tinggi 65 cm Mesin Las 1.10 Genset 1.10 PEKERJAAN PEMASANGAN UNIT LAYANAN Pemasangan Sambungan Rumah (Pipa GI 3/4",

D.

Kran Air 3/4", Albow 3/4", Clamp Sadle ) E. E.1 1 2 3 4 5 6 7 8 9 10 11 12

PEKERJAAN POMPA DAN PANEL SURYA Material Utama PV Module 200 Poly Pompa Submersible PU15K2 C-SJ30-12, 3" Controller PS15K2 PV Disconnect 1000-40-5 PV Combiner 1000-125-4 PV Protect 1000-125 Surge Protector Well Probe Sensor air bawah Kabel PV Array NYAF 6mm Kabel Pompa NYYHY 4x10mm Kabel Sensor NYYHY 2x0,75mm Panel Box

Material Pendukung Kabel Splice Kit Grounding System + penangkal Petir Kontruksi PV Module Support Galvanize Monitoring Sysytem - PS Communicator + Battery + SimCArd - LC-20M PV - External Antena 5 Accessories Installasi Biaya pengiriman ke lokasi pekerjaan dan

E2 1 2 3 4

6 pemasangan F

Buah unit unit

0.02

7.60

1,326,266.00

10,079,621.60

0.20

12.00

1,482,340.00

17,788,080.00

0.35

SR

800.00

353,360.00

282,688,000.00

5.51 5.14 2.11 1.66 0.20 0.13 0.17 0.02 0.03 0.06 0.20 0.02 0.08 0.01 0.31 0.78 0.24 0.06 0.03 0.08

pcs set set set set set set set meter meter meter unit

85.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 100.00 100.00 100.00 1.00

3,100,000.00 108,000,000.00 85,000,000.00 10,000,000.00 6,800,000.00 8,700,000.00 780,000.00 1,600,000.00 30,000.00 101,000.00 11,000.00 4,000,000.00

set set set 0 set unit unit ls

1.00 2.00 28.00 1.00 1.00 1.00 1.00

600,000.00 8,000,000.00 1,420,000.00 12,500,000.00 2,866,500.00 1,378,125.00 3,858,750.00

1.00

17,000,000.00

17,000,000.00

0.33

4.00 1.00

21,300,000.00 15,867,393.31

85,200,000.00 15,867,393.31

1.66 0.31

Buah Unit

0.10

-

263,500,000.00 108,000,000.00 85,000,000.00 10,000,000.00 6,800,000.00 8,700,000.00 780,000.00 1,600,000.00 3,000,000.00 10,100,000.00 1,100,000.00 4,000,000.00 600,000.00 16,000,000.00 39,760,000.00 12,500,000.00 2,866,500.00 1,378,125.00 3,858,750.00

ls

PEKERJAAN PEMASANGAN POMPA HIDRAM 1 Biaya Pembuatan dan Perakitan Pompa Hidram 2 Pek.Bak Intake P=1 mtr, L=1 mtr, T=2 mtr Pek. Bak Dudukan Pompa (P=2,4 mtr, L=1, mtr, 3 T=3,5 mtr) 4 Pekerjaan Trust Block 5 Pemasangan 1 m pipa HDPE Ø 150 mm Sewa Tripot/Tackel & ha 0.02 6 Pemasangan 1 m pipa HDPE Ø 100 mm Sewa Tripot/Tackel & ha

M3

0.42 0.18

0.15

0.15

0.18

0.18

Unit Ls M'

1.00

28,016,110.00

28,016,110.00

0.55

1.00 18.00

500,000.00 395,277.00

500,000.00 7,114,986.00

0.01 0.14

0.01 0.07 0.17

0.07 0.17

M'

200.00

127,060.00

25,412,000.00

0.50

0.25 1.90

0.25 1.90

0.42

0.42

7 Pemasangan 1 m pipa HDPE Ø 75 mm Sewa Tripot/Tackel & ha

0.02

8 Pemasangan 1 m pipa HDPE Ø 50 mm Sewa Tripot/Tackel & ha

0.02

9 Pemasangan 1 m pipa HDPE Ø 32 mm Sewa Tripot/Tackel & ha

0.02

Flange 100 mm Stub Flange 100 mm Check Valve 75 mm Y Reducer 90°, 2 x 75 mm - 75 mm Y Reducer 90°, 2 x 50 mm - 75 mm Y Reducer 90°, 2 x 35 mm - 50 mm Pemasangan 1 buah bak kontrol pasangan bata 16 45cm x45cm tinggi 50 cm 10 11 12 13 14 15

Total

M'

80.00

88,478.00

7,078,240.00

0.14

0.07 0.76

0.07 0.76

M'

100.00

43,478.00

4,347,800.00

0.08

0.04 0.95

0.04 0.95

M'

180.00

23,478.00

4,226,040.00

0.08

0.04 1.71

0.04 1.71

4.00 8.00 1.00 2.00 1.00 2.00

160,000.00 155,000.00 3,000,000.00 330,000.00 325,000.00 310,000.00

640,000.00 1,240,000.00 3,000,000.00 660,000.00 325,000.00 620,000.00

0.01 0.02 0.06 0.01 0.01 0.01

0.01 0.01 0.03 0.01 0.00 0.01

0.01 0.01 0.03 0.01 0.00 0.01

1.00

587,136.00

587,136.00

0.01

5,127,209,432.08

100.00

Buah Buah Buah Buah Buah Buah Buah

0.01

#REF! #REF! #REF!

#REF! #REF!

Pelaksanaan Pekerjaan :120 (Seratus Dua Puluh ) Hari Kalender III 7 7 7 7

IV 7

V 7

7

7

1

0.18 0.03

100%

0.03 0.005

1.37 10.77

1.37 10.77

1.37 10.77

1.37 10.77

1.37 10.77

1.37 10.77 0.05 0.03

0.03

0.02 0.05 0.05 0.05

2.93 12.36

2.93 12.36

2.93 12.36

2.93 12.36

0.05 0.05 0.05

0.05 0.05 0.05

0.12

0.12

8.80 4.40

8.80 4.40

2.93 12.36

2.93 12.36 0.09 0.04

0.03 0.03 0.05 0.01

0.03 0.03 0.05 0.01 0.005

0.03 0.03 0.05 0.01 0.005

0.04

0.09

0.09

0.09 -

1.02 7.98

1.02 7.98

1.02 7.98

1.02 7.98

0.06

0.06

2.20 2.20

2.20 2.20

1.02 7.98

1.02 7.98

0.03

0.04 0.03

1.80

1.80

1.80

1.80

0.04 0.04 0.003 0.01 0.005

0.04 0.04 0.003 0.01 0.005

0.12

0.12

4.40 4.40

4.40 4.40

1.80

1.80

0.03

0.07 0.02

5.07

5.07

5.07

5.07

0.04 0.04

0.04 0.04

0.17

0.17

6.60 6.60

6.60 6.60

5.07

5.07

0.02

0.29 0.07 0.05 0.02 0.02

0.02 0.02

0.05

0.10 0.17

0.17

6.60 6.60

6.60 6.60

1.84

2.57

1.84

2.57 2.11 1.66 0.20 0.13 0.17 0.02 0.03 0.06 0.20 0.02 0.08 0.01 0.31

0.39

0.39 0.24 0.06 0.03 0.08

0.08

0.42

0.08

0.08

0.08

1.84

JADWAL PENGGUNAAN MATERIAL BAHAN Uraian Pekerjaan

No.

1

2.

Satuan

Volume

Harga Satuan ( Rp. )

Jumlah Harga ( Rp. )

(%)

A. PEKERJAAN PERSIAPAN 1. Pengukuran dan pemasangan Bouwplank Kayu balok 5/7 0.12 Paku 2”-3” 0.02 Kayu papan 3/20 0.01

M' m3 Kg m3

20.00

460,823.00

9,216,460.00

0.18

2. 3. 4. 5. 6.

M2 Ls Ls Ls Ls

1,400.00 1.00 1.00 1.00 1.00

10,890.00 5,000,000.00 3,500,000.00 500,000.00 600,000.00

15,246,000.00 5,000,000.00 3,500,000.00 500,000.00 600,000.00

0.30 0.10 0.07 0.01 0.01

B. PEK. PENGADAAN DAN PEMASANGAN PIPA TRANSMISI 3 (75MM) 1 Pemasangan pipa GIP Ø 3" (75 mm) M' 1,700.00 Pipa GIP Ø 75 mm 1.00 M'

248,217.00

421,968,900.00

8.23

Pembersihan lapangan dan perataan Biaya Mobilisasi Pipa ke lokasi pekerjaan Direksi keet dan Gudang Penyimpanan 4 x 8 Pengadaan air kerja Papan Nama Proyek

2 Pengetesan pipa Ø 3" (75 mm) Air test (air bersih) Bahan bakar Oli

M' m3 liter liter

1,700.00

1,436.00

2,441,200.00

0.05

0.004 0.060 0.002

3 Penggalian tanah biasa 4 Pengurugan kembali galian tanah 5 Pembuatan Trust Block dari beton K 150 299.00 Semen portland 799.00 Pasir Beton 1,017.00 Kerikil (Maks 30 mm) 215.00 Air

M3 M3 M3 Kg Kg Kg Liter

201.00 191.00 0.68

50,875.00 18,425.00 1,407,941.00

10,225,875.00 3,519,175.00 950,360.18

0.20 0.07 0.02

Bh Bh Bh

4.00 4.00 55.00

1,830,000.00 1,830,000.00 152,000.00

7,320,000.00 7,320,000.00 8,360,000.00

0.14 0.14 0.16

Unit bh Kg M3

8.00

1,482,340.00

11,858,720.00

0.23

6 7 8 9

Gate Valve 3" Air Valve 3" Flange 10K ns GI 3" Pemasangan 1 buah bak kontrol pas. bata 60cm x60cm tinggi 65 cm Bata merah 24.00 Semen portland 114.00 Pasir pasang 0.18

Jadwal Waktu Pelaksanaan Pekerjaan :120

Bobot

I 7

7

II 7

7

7

7

7

7

0.30 0.07 0.005 0.01

0.02

0.02

0.02

0.02

0.02

0.02

0.02

Pasir beton Kerikil Baja tulangan Besi Plat tebal 3 mm Engsel Besar Globe Besar Besi Las 3

0.12 0.03 4.85 0.21 2.00 1.00 5.00

M3 M3 Kg Lbr Buah Buah Buah

C. PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA DISTRIBUSI C1. PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA PRIMER Ø 150 MM 1,765.00 1 Pemasangan pipa GIP Ø 6" (150 mm) M' Pipa GIP Ø 150 mm 1.00 M' 2 Pengetesan pipa Ø 6" (150 mm) Air test (air bersih) Bahan bakar Oli 3 4 5 6 7 8 9 10 11

Penggalian tanah biasa Pengurugan kembali galian tanah Gate Valve 6" Butterfly Valve 6" Air Valve 6" Reduser 6" x 3" Flange 6" Flange 10K ns GI 6" Pembongkaran Trotoar dan

0.004 0.060 0.002

1,765.00

2,591.00

4,573,115.00

0.09

M3 M3 Bh Bh Bh Bh Bh Bh

370.60 222.00 1.00 1.00 2.00 2.00 2.00 48.00

50,875.00 18,425.00 4,150,000.00 4,670,000.00 4,150,000.00 726,579.00 255,000.00 290,000.00

18,854,275.00 4,090,350.00 4,150,000.00 4,670,000.00 8,300,000.00 1,453,158.00 510,000.00 13,920,000.00

0.37 0.08 0.08 0.09 0.16 0.03 0.01 0.27

2.00

1,326,266.00

2,652,532.00

0.05

4.00

1,482,340.00

5,929,360.00

0.12

Pengecoran M3 247.00

kg

Pasir Beton

869.00

kg

Kerikil (Maks 30 mm)

999.00

kg

Air

215.00

Liter

12 Pemasangan 1 buah bak kontrol pas. bata 60cm 24.00 114.00 0.18 0.12 0.03 4.85 0.21 2.00 1.00 5.00

17.60

M' m3 liter liter

Kembali Semen portland

x60cm tinggi 65 cm Bata merah Semen portland Pasir pasang Pasir beton Kerikil Baja tulangan Besi Plat tebal 3 mm Engsel Besar Globe Besar Besi Las

511,161.00

902,199,165.00

Buah bh Kg M3 M3 M3 Kg Lbr Buah Buah Buah

C2 PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA SEKUNDER Ø 75 MM 1,260.00 1 Pemasangan pipa GIP Ø 3" (75 mm) M' Pipa GIP Ø 75 mm 1.00 m

-

248,217.00

312,753,420.00

-

6.10

0.05

0.05

0.05

0.05

0.05

0.05

0.05

2 Pengetesan pipa Ø 3" (75 mm) Air test (air bersih) Bahan bakar Oli 3 4 5 6 7 8 9 10

0.004 0.060 0.002

Penggalian tanah biasa Pengurugan kembali galian tanah Gate Valve 3" Butterfly Valve 3" Air Valve 3" Flange 10K ns GI 3" Flange 3 " Pemasangan 1 buah bak kontrol pas. bata 60cm

x60cm tinggi 65 cm Bata merah Semen portland Pasir pasang Pasir beton Kerikil Baja tulangan Besi Plat tebal 3 mm Engsel Besar Globe Besar Besi Las 11 Tapingg Jalan

24.00 114.00 0.18 0.12 0.03 4.85 0.21 2.00 1.00 5.00

M' m3 liter liter

1,260.00

1,436.00

1,809,360.00

0.04

M3 M3 Bh Bh Bh Bh Bh

150.00 142.00 2.00 2.00 4.00 35.00 4.00

50,875.00 18,425.00 1,830,000.00 2,300,000.00 75,000.00 20,500.00 130,000.00

7,631,250.00 2,616,350.00 3,660,000.00 4,600,000.00 300,000.00 717,500.00 520,000.00

0.15 0.05 0.07 0.09 0.006 0.01 0.01

8.00

1,482,340.00

11,858,720.00

0.23

25.00

75,000.00

1,875,000.00 554,255,625.00

0.04 10.81

Buah bh Kg M3 M3 M3 Kg Lbr Buah Buah Buah M'

C3 PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA SEKUNDER Ø 2" (50 MM) 3,025.00 183,225.00 1 Pemasangan pipa GIP Ø 2" (50 mm) M' Pipa galvanis 2” 1.00 M 2 Pengetesan pipa Ø 2" (50 mm) Air test (air bersih) Bahan bakar Oli 3 4 5 6 7

0.004 0.060 0.002

Penggalian tanah biasa Pengurugan kembali galian tanah Gate Valve 2" Air Valve 2" Tapingg Jalan Pemasangan 1 buah bak kontrol pas. bata 60cm

8 x60cm tinggi 65 cm Bata merah Semen portland Pasir pasang Pasir beton Kerikil Baja tulangan Besi Plat tebal 3 mm Engsel Besar

24.00 114.00 0.18 0.12 0.03 4.85 0.21 2.00

M' m3 liter liter

3,025.00

1,271.00

3,844,775.00

0.07

M3 M3 Bh Bh M'

136.00 132.00 6.00 6.00 20.00

50,875.00 18,425.00 650,000.00 650,000.00 75,000.00

6,919,000.00 2,432,100.00 3,900,000.00 3,900,000.00 1,500,000.00

0.13 0.05 0.08 0.08 0.03

12.00

1,482,340.00

17,788,080.00

0.35

Buah bh Kg M3 M3 M3 Kg Lbr Buah

0.03

0.03

0.03

0.03

0.04

0.03

0.03

0.03

0.03

Buah Globe Besar 1.00 Buah Besi Las 5.00 #REF! C4 PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TERSIER Ø 1.1/2" (40 MM) 11,650.00 133,983.00 1 Pemasangan pipa GIP Ø 1.1/2" (40 mm) M' Pipa galvanis 11/2” 1.00 M 2 Pengetesan pipa Ø 1.1/2 (40 mm) Air test (air bersih) Bahan bakar Oli Penggalian tanah biasa Pengurugan kembali galian tanah Gate Valve 1.1/2" Air Valve 1.1/2" Tapingg Jalan Pembongkaran Trotoar dan 8 Kembali Semen portland Pasir Beton Kerikil (Maks 30 Air mm)

0.004 0.060 0.002

3 4 5 6 7

Pemasangan 1 buah bak kontrol pas. bata 60cm 9 x60cm tinggi 65 cm 24.00 Bata merah 114.00 Semen portland Pasir pasang Pasir beton Kerikil Baja tulangan Besi Plat tebal 3 mm Engsel Besar Globe Besar Besi Las D.

2.00 1.00 5.00

PEKERJAAN PEMASANGAN UNIT LAYANAN Pemasangan Sambungan Rumah (Pipa GI 3/4", Kran Air 3/4", Albow 3/4", Clamp Sadle )

E. E.1 1 2 3 4 5 6 7

0.18 0.12 0.03 4.85 0.21

PEKERJAAN POMPA DAN PANEL SURYA Material Utama PV Module 200 Poly Pompa Submersible PU15K2 C-SJ30-12, 3" Controller PS15K2 PV Disconnect 1000-40-5 PV Combiner 1000-125-4 PV Protect 1000-125 Surge Protector

30.44

M' m3 liter liter

11,650.00

1,271.00

14,807,150.00

0.29

M3 M3 Bh Bh M'

525.00 262.00 6.00 6.00 20.00

50,875.00 18,425.00 360,000.00 360,000.00 75,000.00

26,709,375.00 4,827,350.00 2,160,000.00 2,160,000.00 1,500,000.00

0.52 0.09 0.04 0.04 0.03

7.60

1,326,266.00

10,079,621.60

0.20

12.00

1,482,340.00

17,788,080.00

0.35

Pengecoran 247.00 869.00 999.00 215.00

1,560,901,950.00

M3 kg kg kg Liter

Buah bh Kg M3 M3 M3 Kg Lbr Buah Buah Buah

SR

pcs set set set set set set

800.00

85.00 1.00 1.00 1.00 1.00 1.00 1.00

-

353,360.00

282,688,000.00

5.51

3,100,000.00 108,000,000.00 85,000,000.00 10,000,000.00 6,800,000.00 8,700,000.00 780,000.00

263,500,000.00 108,000,000.00 85,000,000.00 10,000,000.00 6,800,000.00 8,700,000.00 780,000.00

5.14 2.11 1.66 0.20 0.13 0.17 0.02

0.07

0.07

0.07

0.07

0.07

0.07

8 9 10 11 12

Well Probe Sensor air bawah Kabel PV Array NYAF 6mm Kabel Pompa NYYHY 4x10mm Kabel Sensor NYYHY 2x0,75mm Panel Box

Material Pendukung Kabel Splice Kit Grounding System + penangkal Petir Kontruksi PV Module Support Galvanize Monitoring Sysytem - PS Communicator + Battery + SimCArd - LC-20M PV - External Antena 5 Accessories Installasi Biaya pengiriman ke lokasi pekerjaan dan

E2 1 2 3 4

6 pemasangan

F

PEKERJAAN PEMASANGAN POMPA HIDRAM 1 Biaya Pembuatan dan Perakitan Pompa Hidram 2 Pek.Bak Intake P=1 mtr, L=1 mtr, T=2 mtr Beton K225 Semen portland 371.00 Pasir Beton 698.00 Kerikil (Maks 30 mm) 1,047.00 Air 215.00 Pembesian Besi beton (polos/ulir) 10.50 Kawat beton 0.15 Bekisting 0.03 Kayu kelas III 0.40 Paku 5 - 12 cm 0.20 Minyak bekisting 0.02 Balok kayu kelas II Plywood 9 mm 0.35 3.00 Dolken kayu Ø 8-10/40 4.00 Penjaga jarak bekisting Pek. Acian Semen portland 3.25 Pek. Bak Dudukan Pompa (P=2,4 mtr, L=1, mtr, 3 T=3,5 mtr) Beton K225 371.00 Semen portland 698.00 Pasir Beton 1,047.00 Kerikil (Maks 30 mm) 215.00 Air Pembesian

set meter meter meter unit

1.00 100.00 100.00 100.00 1.00

1,600,000.00 30,000.00 101,000.00 11,000.00 4,000,000.00

set set set 0 set unit unit ls

1.00 2.00 28.00

ls

Buah Unit

1.00 1.00 1.00 1.00

600,000.00 8,000,000.00 1,420,000.00 12,500,000.00 2,866,500.00 1,378,125.00 3,858,750.00

1,600,000.00 3,000,000.00 10,100,000.00 1,100,000.00 4,000,000.00 600,000.00 16,000,000.00 39,760,000.00 12,500,000.00 2,866,500.00 1,378,125.00 3,858,750.00

0.03 0.06 0.20 0.02 0.08 0.01 0.31 0.78 0.24 0.06 0.03 0.08

1.00

17,000,000.00

17,000,000.00

0.33

21,300,000.00 15,867,393.31

85,200,000.00 15,867,393.31

1.66 0.31

4.00 1.00

0.42 0.15

0.15

kg kg kg Liter

185.50 349.00 523.50 107.50

185.50 349.00 523.50 107.50

kg kg

10.50 0.15

10.50 0.15

m3 kg Liter m3 Lbr Batang Buah

0.02 0.20 0.10 0.01 0.18 1.50 2.00

0.02 0.20 0.10 0.01 0.18 1.50 2.00

kg

3.25

3.25

0.18

0.18

0.18

123.67 232.67 349.00 71.67

123.67 232.67 349.00 71.67

123.67 232.67 349.00 71.67

Unit kg kg kg Liter

1.00

28,016,110.00

28,016,110.00

0.55

0.42

Besi beton (polos/ulir)

10.50 0.15

kg

3.50

3.50

3.50

kg

0.05 -

0.05 -

0.05 -

m3

0.01 0.13 0.07 0.01 0.12

0.01 0.13 0.07 0.01 0.12

0.01 0.13 0.07 0.01 0.12

Buah

1.00 1.33

1.00 1.33

1.00 1.33

3.25

kg

1.08

1.08

1.08

4 Pekerjaan Trust Block 5 Pemasangan 1 m pipa HDPE Ø 150 mm Pipa HDPE Ø 150 mm

1.00 18.00

500,000.00 395,277.00

500,000.00 7,114,986.00

0.01 0.14

1.00

Ls M' M'

0.01 0.07 9.00

0.07 9.00

6 Pemasangan 1 m pipa HDPE Ø 100 mm Pipa HDPE Ø 100 mm

M' M'

200.00

127,060.00

25,412,000.00

0.50

1.00

0.25 100.00

0.25 100.00

7 Pemasangan 1 m pipa HDPE Ø 75 mm Pipa HDPE Ø 75 mm

M' Buah

80.00

88,478.00

7,078,240.00

0.14

1.00

0.07 40.00

0.07 40.00

8 Pemasangan 1 m pipa HDPE Ø 50 mm Pipa HDPE Ø 50 mm

M' Buah

100.00

43,478.00

4,347,800.00

0.08

1.00

0.04 50.00

0.04 50.00

9 Pemasangan 1 m pipa HDPE Ø 32 mm Pipa HDPE Ø 32 mm

M' M'

180.00

23,478.00

4,226,040.00

0.08

1.00

0.04 90.00

0.04 90.00

4.00 8.00 1.00 2.00 1.00 2.00

160,000.00 155,000.00 3,000,000.00 330,000.00 325,000.00 310,000.00

640,000.00 1,240,000.00 3,000,000.00 660,000.00 325,000.00 620,000.00

0.01 0.02 0.06 0.01 0.01 0.01

0.01 0.01 0.03 0.01 0.00 0.01

0.01 0.01 0.03 0.01 0.00 0.01

1.00

587,136.00

587,136.00

0.01

5,127,209,432.08

100.00

Kawat beton Bekisting Kayu kelas III Paku 5 - 12 cm Minyak bekisting Balok kayu kelas II Plywood 9 mm Dolken kayu Ø 8-10/40 Penjaga jarak bekisting Pek. Acian Semen portland

0.03 0.40 0.20 0.02 0.35 3.00 4.00

Flange 100 mm Stub Flange 100 mm Check Valve 75 mm Y Reducer 90°, 2 x 75 mm - 75 mm Y Reducer 90°, 2 x 50 mm - 75 mm Y Reducer 90°, 2 x 35 mm - 50 mm Pemasangan 1 buah bak kontrol pasangan bata 16 45cm x45cm tinggi 50 cm 10 11 12 13 14 15

Total

kg Liter m3 Lbr Batang

Buah Buah Buah Buah Buah Buah Buah

0.01

#REF! #REF! #REF!

#REF! #REF!

BAHAN

Jadwal Waktu Pelaksanaan Pekerjaan :120 (Seratus Dua Puluh ) Hari Kalender III 7 7 7 7 7

IV 7

V 7

7

7

1

0.18 2.40 0.40 0.14

0.03

0.03

100%

0.03 0.005

1.37 283.33

1.37 283.33

1.37 283.33

1.37 283.33

1.37 283.33

1.37 283.33 0.05 6.80 102.00 3.40

0.02 0.03 0.02 201.83 539.33 686.48 145.13 145.13 0.05 0.05 0.05

0.05 0.05 0.05

0.05 0.05 0.05

0.12

0.12

96.00 456.00 0.74

96.00 456.00 0.74

0.03

2.93 294.17

2.93 294.17

2.93 294.17

2.93 294.17

0.48 0.13 19.40 0.85 8.00 4.00 20.00

0.48 0.13 19.40 0.85 8.00 4.00 20.00

2.93 294.17

2.93 294.17 0.09 7.06 105.90 3.53

0.05 0.03 0.03 0.05 0.01 0.09

0.03 0.03 0.05 0.01 0.005 0.09

0.04

0.04

-

0.03

0.03 0.03 0.05 0.01 0.005 0.09

0.03 247.00

247.00

1,738.00

1,738.00

1,998.00

1,998.00

430.00

430.00

1.02 210.00

1.02 210.00

1.02 210.00

1.02 210.00

0.06

0.06

48.00 228.00 0.37 0.24 0.07 9.70 0.43 4.00 2.00 10.00 -

48.00 228.00 0.37 0.24 0.07 9.70 0.43 4.00 2.00 10.00 -

1.02 210.00

1.02 210.00

0.04 5.04 75.60 2.52 0.03 0.03

1.80 504.17

1.80 504.17

1.80 504.17

1.80 504.17

0.04 0.04 0.003 0.01 0.005

0.04 0.04 0.003 0.01 0.005

0.12

0.12

96.00 456.00 0.74 0.48 0.13 19.40 0.85 8.00 4.00 20.00

96.00 456.00 0.74 0.48 0.13 19.40 0.85 8.00 4.00 20.00

1.80 504.17

1.80 504.17

0.03

0.07 12.10 181.50 6.05 0.03 0.02 0.04 0.04

0.04 0.04

0.17

0.17

144.00 684.00 1.10 0.72 0.20 29.10 1.28 12.00

144.00 684.00 1.10 0.72 0.20 29.10 1.28 12.00

0.03

0.02

6.00 30.00 -

6.00 30.00 -

5.07

5.07

5.07

5.07

5.07

5.07

11,650.00

11,650.00

11,650.00

11,650.00

11,650.00

11,650.00

-

-

-

-

-

0.29 46.60 699.00 23.30

0.07

0.07 0.05 0.02 0.02

0.02 0.02

0.03 0.10

0.10

938.60 3,302.20 3,796.20 817.00

938.60 3,302.20 3,796.20 817.00 0.17

0.17

144.00 684.00 1.10 0.72 0.20 29.10 1.28 12.00

144.00 684.00 1.10 0.72 0.20 29.10 1.28 12.00

6.00 30.00 -

6.00 30.00 1.84

2.57

1.84

2.57 2.11 1.66 0.20 0.13 0.17 0.02

1.84

0.05

0.03 0.06 0.20 0.02 0.08 0.01 0.31 0.39

0.39 0.24 0.06 0.03 0.08

0.08

0.42

0.42

0.08

0.08

0.08

ANALISA HARGA SATUAN HARGA SATUAN PEKERJAAN PERSIAPAN Pengukuran dan pemasangan 1 m’ Bouwplank No Uraian I TENAGA 1 Pekerja 2 Tukang Kayu 3 Kepala Tukang 4 Mandor II

Kode L.01.01 L.02.04 L.03.01 L.04.01

BAHAN 1 Kayu balok 5/7 2 Paku 2”-3” 3 Kayu papan 3/20

III

PERALATAN

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Satuan

Koefisien

OH 0.1000 OH 0.1000 OH 0.0100 OH 0.0050 JUMLAH TENAGA KERJA m3 0.1200 Kg 0.0200 m3 0.0070 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT 10%

(K3) Pembersihan 1 m2 lapangan dan perataan No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Mandor L.04.01 II

BAHAN

III

PERALATAN

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Penggalian 1 m3 tanah biasa sedalam 1 m No Uraian I TENAGA 1 Pekerja 2 Mandor II

BAHAN

III

PERALATAN

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Kode L.01.01 L.04.01

Satuan

Koefisien

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.) 59,000.00 5,900.00 69,000.00 6,900.00 69,000.00 690.00 80,000.00 400.00 13,890.00 0.00 3,100,000.00 372,000.00 20,000.00 400.00 3,100,000.00 21,700.00 415,980.00 418,930.00 41,893.00 460,823.00

Harga Satuan (Rp.) Jumlah Harga (Rp.) 0.00 OH 0.1000 59,000.00 5,900.00 OH 0.0500 80,000.00 4,000.00 JUMLAH TENAGA KERJA 9,900.00 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT 9,900.00 10% 990.00 10,890.00

Harga Satuan (Rp.) Jumlah Harga (Rp.) 0.00 OH 0.7500 59,000.00 44,250.00 OH 0.0250 80,000.00 2,000.00 JUMLAH TENAGA KERJA 46,250.00 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT 46,250.00 10% 4,625.00 50,875.00

ANALISA HARGA SATUAN Penggalian 1 m3 tanah biasa sedalam 2 m No Uraian I TENAGA 1 Pekerja 2 Mandor II

BAHAN

III

PERALATAN

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Menggali 1 m3 tanah keras sedalam 1 m No Uraian I TENAGA 1 Pekerja 2 Mandor II

BAHAN

III

PERALATAN

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Menggali 1 m3 tanah cadas sedalam 1 m No Uraian I TENAGA 1 Pekerja 2 Mandor II

BAHAN

III

PERALATAN

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Menggali 1 m3 tanah lumpur sedalam 1 m No Uraian I TENAGA 1 Pekerja 2 Mandor II

BAHAN

III

PERALATAN

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Kode L.01.01 L.04.01

Kode L.01.01 L.04.01

Kode L.01.01 L.04.01

Kode L.01.01 L.04.01

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.) 0.00 OH 0.9000 59,000.00 53,100.00 OH 0.0450 80,000.00 3,600.00 JUMLAH TENAGA KERJA 56,700.00 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT 56,700.00 10% 5,670.00 62,370.00

Satuan

Koefisien

Satuan

Koefisien

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.) 0.00 OH 1.0000 59,000.00 59,000.00 OH 0.0320 80,000.00 2,560.00 JUMLAH TENAGA KERJA 61,560.00 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT 61,560.00 10% 6,156.00 67,716.00

Harga Satuan (Rp.) Jumlah Harga (Rp.) 0.00 OH 1.5000 59,000.00 88,500.00 OH 0.0600 80,000.00 4,800.00 JUMLAH TENAGA KERJA 93,300.00 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT 93,300.00 10% 9,330.00 102,630.00

Harga Satuan (Rp.) Jumlah Harga (Rp.) 0.00 OH 1.2000 59,000.00 70,800.00 OH 0.0450 80,000.00 3,600.00 JUMLAH TENAGA KERJA 74,400.00 0.00 JUMLAH HARGA BAHAN 0.00 JUMLAH HARGA ALAT 0.00 74,400.00 10% 7,440.00 0.00 81,840.00

ANALISA HARGA SATUAN Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Mandor L.04.01 II

BAHAN

III

PERALATAN

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

(K3) Pembuangan 1 m3 tanah sejauh 30 meter No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Mandor L.04.01 II

BAHAN

III

PERALATAN

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.) 0.00 OH 0.0500 59,000.00 2,950.00 OH 0.0050 80,000.00 400.00 JUMLAH TENAGA KERJA 3,350.00 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT 3,350.00 10% 335.00 3,685.00

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.) 0.00 OH 0.3300 59,000.00 19,470.00 OH 0.0100 80,000.00 800.00 JUMLAH TENAGA KERJA 20,270.00 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT 20,270.00 10% 2,027.00 22,297.00

Pengurugan kembali 1 m3 galian tanah Tanah Biasa Sedalam 1 M Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 0.00 1 Pekerja L.01.01 OH 0.2500 59,000.00 14,750.00 2 Mandor L.04.01 OH 0.0250 80,000.00 2,000.00 JUMLAH TENAGA KERJA 16,750.00 II BAHAN JUMLAH HARGA BAHAN III PERALATAN JUMLAH HARGA ALAT IV Jumlah (A+B+C) 16,750.00 V Overhead & Profit 10% 10% 1,675.00 VI Harga Satuan Pekerjaan (D+E) 18,425.00 (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm) No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Mandor L.04.01 II

BAHAN

III

PERALATAN

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.) 0.00 OH 0.5000 59,000.00 29,500.00 OH 0.0500 80,000.00 4,000.00 JUMLAH TENAGA KERJA 33,500.00 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT 33,500.00 10% 3,350.00 36,850.00

ANALISA HARGA SATUAN Pengurugan 1 m3 dengan pasir urug No Uraian I TENAGA 1 Pekerja 2 Mandor II

Kode L.01.01 L.04.01

BAHAN Pasir urug

III

PERALATAN

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.) 0.00 OH 0.3000 59,000.00 17,700.00 OH 0.0100 80,000.00 800.00 JUMLAH TENAGA KERJA 18,500.00 M3 1.2000 JUMLAH HARGA BAHAN

130,000.00

JUMLAH HARGA ALAT

Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang Batu L.02.03 3 Kepala Tukang L.03.01 4 Mandor L.04.01 II

BAHAN 1 Batu belah 2 Semen portland 3 Pasir Pasang

III

PERALATAN

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

10% -

Satuan

Koefisien

OH 1.5000 OH 0.7500 OH 0.0750 OH 0.0750 JUMLAH TENAGA KERJA m3 1.2000 Kg 202.0000 m3 0.4850 JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang Batu L.02.03 3 Kepala Tukang L.03.01 4 Mandor L.04.01 II

III

BAHAN 1 Batu belah 2 Semen portland 3 Pasir Pasang

10%

Satuan

Koefisien

OH 1.5000 OH 0.7500 OH 0.0750 OH 0.0750 JUMLAH TENAGA KERJA m3 1.2000 Kg 163.0000 m3 0.5200 JUMLAH HARGA BAHAN

PERALATAN Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

174,500.00 17,450.00 191,950.00

Harga Satuan (Rp.) Jumlah Harga (Rp.) 0.00 59,000.00 88,500.00 69,000.00 51,750.00 80,000.00 6,000.00 80,000.00 6,000.00 152,250.00 0.00 130,000.00 156,000.00 1,650.00 333,300.00 270,000.00 130,950.00 620,250.00 772,500.00 77,250.00 849,750.00

Harga Satuan (Rp.) Jumlah Harga (Rp.) 59,000.00 69,000.00 80,000.00 80,000.00 130,000.00 1,650.00 270,000.00 -

JUMLAH HARGA ALAT IV V VI

156,000.00 156,000.00

10% -

88,500.00 51,750.00 6,000.00 6,000.00 152,250.00 156,000.00 268,950.00 140,400.00 565,350.00 717,600.00 71,760.00 789,360.00

ANALISA HARGA SATUAN Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang Batu L.02.03 3 Kepala Tukang L.03.01 4 Mandor L.04.01 II

III

BAHAN 1 Batu belah 2 Semen portland 3 Pasir Pasang

Satuan

Koefisien

OH 1.5000 OH 0.7500 OH 0.0750 OH 0.0750 JUMLAH TENAGA KERJA m3 1.2000 Kg 136.0000 m3 0.5440 JUMLAH HARGA BAHAN

PERALATAN

Harga Satuan (Rp.) Jumlah Harga (Rp.) 59,000.00 69,000.00 80,000.00 80,000.00 0.00 130,000.00 1,650.00 270,000.00 -

JUMLAH HARGA ALAT IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m3 batu kosong (anstamping) No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang Batu L.02.03 3 Kepala Tukang L.03.01 4 Mandor L.04.01 II

III

BAHAN 1 Batu belah 2 Pasir urug

10% -

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.7800 OH 0.3900 OH 0.0390 OH 0.0390 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

46,020.00 26,910.00 3,120.00 3,120.00 79,170.00

m3 1.2000 m3 0.4320 JUMLAH HARGA BAHAN

130,000.00 130,000.00

156,000.00 56,160.00 212,160.00 291,330.00 29,133.00 320,463.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

88,500.00 51,750.00 6,000.00 6,000.00 152,250.00 156,000.00 224,400.00 146,880.00 527,280.00 679,530.00 67,953.00 747,483.00

0.00 10% 0.00

(K3) Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 3.4000 59,000.00 200,600.00 2 Tukang Batu L.02.03 OH 0.8500 69,000.00 58,650.00 3 Kepala Tukang L.03.01 OH 0.0850 80,000.00 6,800.00 4 Mandor L.04.01 OH 0.1700 80,000.00 13,600.00 JUMLAH TENAGA KERJA 279,650.00 II BAHAN 1 Batu belah m3 0.4800 130,000.00 62,400.00 2 Semen portland Kg 194.0000 1,650.00 320,100.00 3 Pasir Beton m3 0.3120 270,000.00 84,240.00 4 Kerikil m3 0.4680 415,000.00 194,220.00 5 Besi beton (polos/ulir) Kg 126.0000 13,000.00 1,638,000.00 6 Kawat beton Kg 1.8000 20,000.00 36,000.00 JUMLAH HARGA BAHAN 2,334,960.00 III PERALATAN 0.00 JUMLAH HARGA ALAT IV Jumlah (A+B+C) 0.00 2,614,610.00 V Overhead & Profit 10% 10% 261,461.00

ANALISA HARGA SATUAN VI

Harga Satuan Pekerjaan (D+E)

0.00

Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100) No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang Batu L.02.03 3 Kepala Tukang L.03.01 4 Mandor L.04.01 II 1 2 3 4 III

BAHAN Semen portland Pasir Beton Kerikil (Maks 30 mm) Air

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 1.6500 OH 0.2750 OH 0.0280 OH 0.0830 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

97,350.00 18,975.00 2,240.00 6,640.00 125,205.00

kg 247.0000 kg 869.0000 kg 999.0000 Liter 215.0000 JUMLAH HARGA BAHAN

1,650.00 273.00 420.00 75.00

407,550.00 237,237.00 419,580.00 16,125.00 1,080,492.00 1,205,697.00 120,569.70 1,326,266.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Membuat 1 m3 beton mutu f’= 9,8 MPa (K 125) No Uraian I TENAGA Pekerja Tukang Batu Kepala Tukang Mandor II

III

BAHAN Semen portland Pasir Beton Kerikil (Maks 30 mm) Air

0.00 10% 0.00

Kode L.01.01 L.02.03 L.03.01 L.04.01

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 1.6500 OH 0.2750 OH 0.0280 OH 0.0830 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

97,350.00 18,975.00 2,240.00 6,640.00 125,205.00

kg 276.0000 kg 828.0000 kg 1012.0000 Liter 215.0000 JUMLAH HARGA BAHAN

1,650.00 273.00 420.00 75.00

455,400.00 226,044.00 425,040.00 16,125.00 1,122,609.00 1,247,814.00 124,781.40 1,372,595.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

2,876,071.00

0.00 10% 0.00

ANALISA HARGA SATUAN Membuat 1 m3 beton mutu f’= 12,2 MPa (K 150) No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang Batu L.02.03 3 Kepala Tukang L.03.01 4 Mandor L.04.01 II

III

BAHAN 1 Semen portland 2 Pasir Beton 3 Kerikil (Maks 30 mm) Air

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 1.6500 OH 0.2750 OH 0.0280 OH 0.0830 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

97,350.00 18,975.00 2,240.00 6,640.00 125,205.00

kg 299.0000 kg 799.0000 kg 1017.0000 Liter 215.0000 JUMLAH HARGA BAHAN

1,650.00 273.00 420.00 75.00

493,350.00 218,127.00 427,140.00 16,125.00 1,154,742.00 1,279,947.00 127,994.70 1,407,941.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

0.00 10% 0.00

Keterangan Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 % Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 1.2000 59,000.00 70,800.00 2 Tukang Batu L.02.03 OH 0.2000 69,000.00 13,800.00 3 Kepala Tukang L.03.01 OH 0.0200 80,000.00 1,600.00 4 Mandor L.04.01 OH 0.0600 80,000.00 4,800.00 JUMLAH TENAGA KERJA 91,000.00 II BAHAN 1 Semen portland kg 230.0000 1,650.00 379,500.00 2 Pasir Beton kg 893.0000 273.00 243,789.00 3 Kerikil (Maks 30 mm) kg 1027.0000 420.00 431,340.00 4 Air Liter 200.0000 75.00 15,000.00 JUMLAH HARGA BAHAN 1,069,629.00 III PERALATAN 0.00 JUMLAH HARGA ALAT IV Jumlah (A+B+C) 0.00 1,160,629.00 V Overhead & Profit 10% 10% 116,062.90 VI Harga Satuan Pekerjaan (D+E) 0.00 1,276,691.00

ANALISA HARGA SATUAN Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66 No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 1.6500 59,000.00 97,350.00 2 Tukang Batu L.02.03 OH 0.2750 69,000.00 18,975.00 3 Kepala Tukang L.03.01 OH 0.0280 80,000.00 2,240.00 4 Mandor L.04.01 OH 0.0830 80,000.00 6,640.00 JUMLAH TENAGA KERJA 125,205.00 II BAHAN 1 Semen portland kg 326.0000 1,650.00 537,900.00 2 Pasir Beton kg 760.0000 273.00 207,480.00 3 Kerikil (Maks 30 mm) kg 1029.0000 420.00 432,180.00 4 Air Liter 215.0000 75.00 16,125.00 JUMLAH HARGA BAHAN 1,193,685.00 III PERALATAN 0.00 JUMLAH HARGA ALAT IV Jumlah (A+B+C) 0.00 1,318,890.00 V Overhead & Profit 10% 10% 131,889.00 VI Harga Satuan Pekerjaan (D+E) 0.00 1,450,779.00 Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61 No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 1.6500 59,000.00 97,350.00 2 Tukang Batu L.02.03 OH 0.2750 69,000.00 18,975.00 3 Kepala Tukang L.03.01 OH 0.0280 80,000.00 2,240.00 4 Mandor L.04.01 OH 0.0830 80,000.00 6,640.00 JUMLAH TENAGA KERJA 125,205.00 II BAHAN 1 Semen portland kg 352.0000 1,650.00 580,800.00 2 Pasir Beton kg 731.0000 273.00 199,563.00 3 Kerikil (Maks 30 mm) kg 1031.0000 420.00 433,020.00 4 Air Liter 215.0000 75.00 16,125.00 JUMLAH HARGA BAHAN 1,229,508.00 III PERALATAN 0.00 JUMLAH HARGA ALAT IV Jumlah (A+B+C) 0.00 1,354,713.00 V Overhead & Profit 10% 10% 135,471.30 VI Harga Satuan Pekerjaan (D+E) 0.00 1,490,184.00 Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58 No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 1.6500 59,000.00 97,350.00 2 Tukang Batu L.02.03 OH 0.2750 69,000.00 18,975.00 3 Kepala Tukang L.03.01 OH 0.0280 80,000.00 2,240.00 4 Mandor L.04.01 OH 0.0830 80,000.00 6,640.00 JUMLAH TENAGA KERJA 125,205.00 II BAHAN 1 Semen portland kg 371.0000 1,650.00 612,150.00 2 Pasir Beton kg 698.0000 273.00 190,554.00 3 Kerikil (Maks 30 mm) kg 1047.0000 420.00 439,740.00 4 Air Liter 215.0000 75.00 16,125.00 JUMLAH HARGA BAHAN 1,258,569.00 III PERALATAN 0.00 JUMLAH HARGA ALAT IV Jumlah (A+B+C) 0.00 1,383,774.00

ANALISA HARGA SATUAN V VI

Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

10% 0.00

138,377.40 1,522,151.00

Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56 No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 1.6500 59,000.00 97,350.00 2 Tukang Batu L.02.03 OH 0.2750 69,000.00 18,975.00 3 Kepala Tukang L.03.01 OH 0.0280 80,000.00 2,240.00 4 Mandor L.04.01 OH 0.0830 80,000.00 6,640.00 JUMLAH TENAGA KERJA 125,205.00 II BAHAN 1 Semen portland kg 384.0000 1,650.00 633,600.00 2 Pasir Beton kg 692.0000 273.00 188,916.00 3 Kerikil (Maks 30 mm) kg 1039.0000 420.00 436,380.00 4 Air Liter 215.0000 75.00 16,125.00 JUMLAH HARGA BAHAN 1,275,021.00 III PERALATAN 0.00 JUMLAH HARGA ALAT IV Jumlah (A+B+C) 0.00 1,400,226.00 V Overhead & Profit 10% 10% 140,022.60 VI Harga Satuan Pekerjaan (D+E) 0.00 1,540,248.00 Pembesian 10 kg dengan besi polos atau besi ulir No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang Besi L.02.05 3 Kepala Tukang L.03.01 4 Mandor L.04.01 II

III

BAHAN 1 Besi beton (polos/ulir) 2 Kawat beton

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.0700 OH 0.0700 OH 0.0070 OH 0.0040 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

4,130.00 4,830.00 560.00 320.00 9,840.00

kg 10.5000 kg 0.1500 JUMLAH HARGA BAHAN

13,000.00 20,000.00

136,500.00 3,000.00 139,500.00 149,340.00 14,934.00 164,274.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

(K3) Pemasangan 1 m2 bekisting untuk pondasi No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang Kayu L.02.04 3 Kepala Tukang L.03.01 4 Mandor L.04.01 II

III

BAHAN 1 Kayu kelas III 2 Paku 5 - 10 cm 3 Minyak bekisting

0.00 10% 0.00

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.5200 OH 0.2600 OH 0.0260 OH 0.0260 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

30,680.00 17,940.00 2,080.00 2,080.00 52,780.00

m3 0.0400 kg 0.3000 Liter 0.1000 JUMLAH HARGA BAHAN

1,545,000.00 20,500.00 15,000.00

61,800.00 6,150.00 1,500.00 69,450.00 122,230.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV

Jumlah (A+B+C)

0.00

ANALISA HARGA SATUAN V VI

Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

10% 0.00

12,223.00 134,453.00

ANALISA HARGA SATUAN (K3) Pemasangan 1 m2 bekisting untuk sloof No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang Kayu L.02.04 3 Kepala Tukang L.03.01 4 Mandor L.04.01 II

BAHAN 1 Kayu kelas III 2 Paku 5 - 10 cm 3 Minyak bekisting

III

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.5200 OH 0.2600 OH 0.0260 OH 0.0260 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

30,680.00 17,940.00 2,080.00 2,080.00 52,780.00

m3 0.0450 kg 0.3000 Liter 0.1000 JUMLAH HARGA BAHAN

1,545,000.00 20,500.00 15,000.00

69,525.00 6,150.00 1,500.00 77,175.00 129,955.00 12,995.50 142,950.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

(K3) Pemasangan 1 m2 bekisting untuk kolom No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang Kayu L.02.04 3 Kepala Tukang L.03.01 4 Mandor L.04.01 II 1 2 3 4 5 6 III

BAHAN Kayu kelas III Paku 5 - 12 cm Minyak bekisting Balok kayu kelas II Plywood 9 mm Dolken kayu Ø 8-10/400 cm

0.00 10% 0.00

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.6600 OH 0.3300 OH 0.0330 OH 0.0330 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

38,940.00 22,770.00 2,640.00 2,640.00 66,990.00

m3 0.0400 kg 0.4000 Liter 0.2000 m3 0.0150 Lbr 0.3500 Batang 2.0000 JUMLAH HARGA BAHAN

1,545,000.00 20,500.00 15,000.00 3,100,000.00 150,000.00 8,200.00

61,800.00 8,200.00 3,000.00 46,500.00 52,500.00 16,400.00 188,400.00 255,390.00 25,539.00 280,929.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

0.00 10% 0.00

ANALISA HARGA SATUAN (K3) Pemasangan 1 m2 bekisting untuk balok No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang Kayu L.02.04 3 Kepala Tukang L.03.01 4 Mandor L.04.01 II 1 2 3 4 5 6 III

BAHAN Kayu kelas III Paku 5 - 12 cm Minyak bekisting Balok kayu kelas II Plywood 9 mm Dolken kayu Ø 8-10/400 cm

Satuan

Koefisien Harga Satuan (Rp.)

OH 0.6600 OH 0.3300 OH 0.0330 OH 0.0330 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

38,940.00 22,770.00 2,640.00 2,640.00 66,990.00

m3 0.0400 kg 0.4000 Liter 0.2000 m3 0.0180 Lbr 0.3500 Batang 2.0000 JUMLAH HARGA BAHAN

1,545,000.00 20,500.00 15,000.00 3,100,000.00 150,000.00 8,200.00

61,800.00 8,200.00 3,000.00 55,800.00 52,500.00 16,400.00 197,700.00 264,690.00 26,469.00 291,159.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

(K3) Pemasangan 1 m2 bekisting untuk lantai No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang Kayu L.02.04 3 Kepala Tukang L.03.01 4 Mandor L.04.01 II 1 2 3 4 5 6 III

BAHAN Kayu kelas III Paku 5 - 12 cm Minyak bekisting Balok kayu kelas II Plywood 9 mm Dolken kayu Ø 8-10/400 cm

0.00 10% 0.00

Satuan

Koefisien Harga Satuan (Rp.) 59,000.00 69,000.00 80,000.00 80,000.00

38,940.00 22,770.00 2,640.00 2,640.00 66,990.00

m3 0.0400 kg 0.4000 Liter 0.2000 m3 0.0150 Lbr 0.3500 Batang 6.0000 JUMLAH HARGA BAHAN

1,545,000.00 20,500.00 15,000.00 3,100,000.00 150,000.00 8,200.00

61,800.00 8,200.00 3,000.00 46,500.00 52,500.00 49,200.00 221,200.00 288,190.00 28,819.00 317,009.00

PERALATAN Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Jumlah Harga (Rp.)

OH 0.6600 OH 0.3300 OH 0.0330 OH 0.0330 JUMLAH TENAGA KERJA

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah Harga (Rp.)

0.00 10% 0.00

ANALISA HARGA SATUAN (K3) Pemasangan 1 m2 bekisting untuk dinding No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang Kayu L.02.04 3 Kepala Tukang L.03.01 4 Mandor L.04.01 II 1 2 3 4 5 6 7 III

BAHAN Kayu kelas III Paku 5 - 12 cm Minyak bekisting Balok kayu kelas II Plywood 9 mm Dolken kayu Ø 8-10/400 cm Penjaga jarak bekisting / spacer

Satuan

Koefisien Harga Satuan (Rp.)

OH 0.6600 OH 0.3300 OH 0.0330 OH 0.0330 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

38,940.00 22,770.00 2,640.00 2,640.00 66,990.00

m3 0.0300 kg 0.4000 Liter 0.2000 m3 0.0200 Lbr 0.3500 Batang 3.0000 Buah 4.0000 JUMLAH HARGA BAHAN

1,545,000.00 20,500.00 15,000.00 3,100,000.00 150,000.00 8,200.00 500.00

46,350.00 8,200.00 3,000.00 62,000.00 52,500.00 24,600.00 2,000.00 198,650.00 265,640.00 26,564.00 292,204.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

(K3) Pemasangan 1 m2 bekisting untuk tangga No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang Kayu L.02.04 3 Kepala Tukang L.03.01 4 Mandor L.04.01 II 1 2 3 4 5 6 III

BAHAN Kayu kelas III Paku 5 - 12 cm Minyak bekisting Balok kayu kelas II Plywood 9 mm Dolken kayu Ø 8-10/400 cm

0.00 10% 0.00

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.6600 OH 0.3300 OH 0.0330 OH 0.0330 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

38,940.00 22,770.00 2,640.00 2,640.00 66,990.00

m3 0.0300 kg 0.4000 Liter 0.1500 m3 0.0150 Lbr 0.3500 Batang 2.0000 JUMLAH HARGA BAHAN

1,545,000.00 20,500.00 15,000.00 3,100,000.00 150,000.00 8,200.00

46,350.00 8,200.00 2,250.00 46,500.00 52,500.00 16,400.00 172,200.00 239,190.00 23,919.00 263,109.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Jumlah Harga (Rp.)

0.00 10% 0.00

ANALISA HARGA SATUAN Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 5.3000 59,000.00 312,700.00 2 Tukang batu L.02.03 OH 0.2750 69,000.00 18,975.00 3 Tukang kayu L.02.04 OH 1.3000 69,000.00 89,700.00 4 Tukang besi L.02.05 OH 1.0500 69,000.00 72,450.00 5 Kepala tukang L.03.01 OH 0.2620 80,000.00 20,960.00 6 Mandor L.04.01 OH 0.2650 80,000.00 21,200.00 JUMLAH TENAGA KERJA 535,985.00 II BAHAN 1 Kayu kelas III m3 0.2000 1,545,000.00 309,000.00 2 Paku Biasa kg 1.5000 20,500.00 30,750.00 3 Minyak bekisting Liter 0.4000 15,000.00 6,000.00 4 Besi beton (polos/ulir) kg 157.5000 3,100,000.00 488,250,000.00 5 Kawat beton kg 2.2500 150,000.00 337,500.00 6 Semen portland kg 336.0000 1,650.00 554,400.00 7 Pasir Beton m3 0.5400 270,000.00 145,800.00 8 Kerikil m3 0.8100 410,000.00 332,100.00 JUMLAH HARGA BAHAN 489,965,550.00 III PERALATAN 0.00 JUMLAH HARGA ALAT IV Jumlah (A+B+C) 0.00 490,501,535.00 V Overhead & Profit 10% 10% 49,050,153.50 VI Harga Satuan Pekerjaan (D+E) 0.00 539,551,688.00 Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting) No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 5.6500 59,000.00 333,350.00 2 Tukang batu L.02.03 OH 0.2750 69,000.00 18,975.00 3 Tukang kayu L.02.04 OH 1.5600 69,000.00 107,640.00 4 Tukang besi L.02.05 OH 1.4000 69,000.00 96,600.00 5 Kepala tukang L.03.01 OH 0.3230 80,000.00 25,840.00 6 Mandor L.04.01 OH 0.2830 80,000.00 22,640.00 JUMLAH TENAGA KERJA 605,045.00 II BAHAN 1 Kayu kelas III m3 0.2700 1,545,000.00 417,150.00 2 Paku Biasa kg 2.0000 20,500.00 41,000.00 3 Minyak bekisting Liter 0.6000 15,000.00 9,000.00 4 Besi beton (polos/ulir) kg 210.0000 3,100,000.00 651,000,000.00 5 Kawat beton kg 3.0000 150,000.00 450,000.00 6 Semen portland kg 336.0000 1,650.00 554,400.00 7 Pasir Beton m3 0.5400 270,000.00 145,800.00 8 Kerikil m3 0.8100 410,000.00 332,100.00 JUMLAH HARGA BAHAN 652,949,450.00 III PERALATAN 0.00 JUMLAH HARGA ALAT IV Jumlah (A+B+C) 0.00 653,554,495.00 V Overhead & Profit 10% 10% 65,355,449.50 VI Harga Satuan Pekerjaan (D+E) 0.00 718,909,944.00

ANALISA HARGA SATUAN Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 7.0500 59,000.00 415,950.00 2 Tukang batu L.02.03 OH 0.2750 69,000.00 18,975.00 3 Tukang kayu L.02.04 OH 1.6500 69,000.00 113,850.00 4 Tukang besi L.02.05 OH 2.1000 69,000.00 144,900.00 5 Kepala tukang L.03.01 OH 0.4030 80,000.00 32,240.00 6 Mandor L.04.01 OH 0.3530 80,000.00 28,240.00 JUMLAH TENAGA KERJA 754,155.00 II BAHAN 1 Kayu kelas III m3 0.4000 1,545,000.00 618,000.00 2 Paku Biasa kg 4.0000 20,500.00 82,000.00 3 Minyak bekisting Liter 2.0000 15,000.00 30,000.00 4 Besi beton (polos/ulir) kg 315.0000 13,000.00 4,095,000.00 5 Kawat beton kg 4.5000 20,000.00 90,000.00 6 Semen portland kg 336.0000 1,650.00 554,400.00 7 Pasir Beton m3 0.5400 270,000.00 145,800.00 8 Kerikil m3 0.8100 410,000.00 332,100.00 9 Kayu kelas II balok M3 0.1500 3,100,000.00 465,000.00 10 Plywood 9 mm Lbr 3.5000 150,000.00 525,000.00 11 Dolken kayu Ø 8-10/400 cm Batang 20.0000 8,000.00 160,000.00 JUMLAH HARGA BAHAN 7,097,300.00 III PERALATAN 0.00 JUMLAH HARGA ALAT IV Jumlah (A+B+C) 0.00 7,851,455.00 V Overhead & Profit 10% 10% 785,145.50 VI Harga Satuan Pekerjaan (D+E) 0.00 8,636,600.00 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 6.3500 59,000.00 374,650.00 2 Tukang batu L.02.03 OH 0.2750 69,000.00 18,975.00 3 Tukang kayu L.02.04 OH 1.6500 69,000.00 113,850.00 4 Tukang besi L.02.05 OH 1.4000 69,000.00 96,600.00 5 Kepala tukang L.03.01 OH 0.3330 80,000.00 26,640.00 6 Mandor L.04.01 OH 0.3180 80,000.00 25,440.00 JUMLAH TENAGA KERJA 656,155.00 II BAHAN 1 Kayu kelas III m3 0.3200 1,545,000.00 494,400.00 2 Paku Biasa kg 3.2000 20,500.00 65,600.00 3 Minyak bekisting Liter 1.6000 15,000.00 24,000.00 4 Besi beton (polos/ulir) kg 210.0000 13,000.00 2,730,000.00 5 Kawat beton kg 3.0000 20,000.00 60,000.00 6 Semen portland kg 336.0000 1,650.00 554,400.00 7 Pasir Beton m3 0.5400 270,000.00 145,800.00 8 Kerikil m3 0.8100 410,000.00 332,100.00 9 Kayu kelas II balok m3 0.1400 3,100,000.00 434,000.00 10 Plywood 9 mm Lembar 2.8000 150,000.00 420,000.00 11 Dolken kayu Ø 8-10/400 cm Batang 16.0000 8,000.00 128,000.00 JUMLAH HARGA BAHAN 5,388,300.00 C PERALATAN 0.00 JUMLAH HARGA ALAT D Jumlah (A+B+C) 0.00 6,044,455.00 E Overhead & Profit 10% 10% 604,445.50 F Harga Satuan Pekerjaan (D+E) 0.00 6,648,900.00

ANALISA HARGA SATUAN Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting) No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 5.3000 59,000.00 312,700.00 2 Tukang batu L.02.03 OH 0.2750 69,000.00 18,975.00 3 Tukang kayu L.02.04 OH 1.3000 69,000.00 89,700.00 4 Tukang besi L.02.05 OH 1.0500 69,000.00 72,450.00 5 Kepala tukang L.03.01 OH 0.2650 80,000.00 21,200.00 6 Mandor L.04.01 OH 0.2650 80,000.00 21,200.00 JUMLAH TENAGA KERJA 536,225.00 II BAHAN 1 Kayu kelas III m3 0.3200 1,545,000.00 494,400.00 2 Paku Biasa kg 3.2000 20,500.00 65,600.00 3 Minyak bekisting Liter 1.6000 15,000.00 24,000.00 4 Besi beton (polos/ulir) kg 157.5000 13,000.00 2,047,500.00 5 Kawat beton kg 2.2500 20,000.00 45,000.00 6 Semen portland kg 336.0000 1,650.00 554,400.00 7 Pasir Beton m3 0.5400 270,000.00 145,800.00 8 Kerikil m3 0.8100 410,000.00 332,100.00 9 Kayu kelas II balok m3 0.1200 3,100,000.00 372,000.00 10 Plywood 9 mm Lembar 2.8000 150,000.00 420,000.00 11 Dolken kayu Ø 8-10/400 cm Batang 32.0000 8,000.00 256,000.00 JUMLAH HARGA BAHAN 4,756,800.00 III PERALATAN 0.00 JUMLAH HARGA ALAT IV Jumlah (A+B+C) 0.00 5,293,025.00 V Overhead & Profit 10% 10% 529,302.50 VI Harga Satuan Pekerjaan (D+E) 0.00 5,822,327.00 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 0.5300 59,000.00 31,270.00 2 Tukang batu L.02.03 OH 0.2750 69,000.00 18,975.00 3 Tukang kayu L.02.04 OH 1.3000 69,000.00 89,700.00 4 Tukang besi L.02.05 OH 1.0500 69,000.00 72,450.00 5 Kepala tukang L.03.01 OH 0.2620 80,000.00 20,960.00 6 Mandor L.04.01 OH 0.2650 80,000.00 21,200.00 JUMLAH TENAGA KERJA 254,555.00 II BAHAN 1 Kayu kelas III m3 0.2400 1,545,000.00 370,800.00 2 Paku Biasa kg 3.2000 20,500.00 65,600.00 3 Minyak bekisting Liter 1.6000 15,000.00 24,000.00 4 Besi beton (polos/ulir) kg 157.5000 13,000.00 2,047,500.00 5 Kawat beton kg 2.2500 20,000.00 45,000.00 6 Semen portland kg 336.0000 1,650.00 554,400.00 7 Pasir Beton m3 0.5400 270,000.00 145,800.00 8 Kerikil m3 0.8100 410,000.00 332,100.00 9 Kayu kelas II balok m3 0.1600 3,100,000.00 496,000.00 10 Plywood 9 mm Lembar 2.8000 150,000.00 420,000.00 11 Dolken kayu Ø 8-10/400 cm Batang 24.0000 8,000.00 192,000.00 JUMLAH HARGA BAHAN 4,693,200.00 III PERALATAN 0.00 JUMLAH HARGA ALAT IV Jumlah (A+B+C) 0.00 4,947,755.00 V Overhead & Profit 10% 10% 494,775.50 VI Harga Satuan Pekerjaan (D+E) 0.00 5,442,530.00

ANALISA HARGA SATUAN Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 5.6500 59,000.00 333,350.00 2 Tukang batu L.02.03 OH 0.2750 69,000.00 18,975.00 3 Tukang kayu L.02.04 OH 1.5600 69,000.00 107,640.00 4 Tukang besi L.02.05 OH 1.4000 69,000.00 96,600.00 5 Kepala tukang L.03.01 OH 0.3230 80,000.00 25,840.00 6 Mandor L.04.01 OH 0.2830 80,000.00 22,640.00 JUMLAH TENAGA KERJA 605,045.00 II BAHAN 1 Kayu kelas III m3 0.2500 1,545,000.00 386,250.00 2 Paku Biasa kg 3.0000 20,500.00 61,500.00 3 Minyak bekisting Liter 1.2000 15,000.00 18,000.00 4 Besi beton (polos/ulir) kg 210.0000 13,000.00 2,730,000.00 5 Kawat beton kg 3.0000 20,000.00 60,000.00 6 Semen portland kg 336.0000 1,650.00 554,400.00 7 Pasir Beton m3 0.5400 270,000.00 145,800.00 8 Kerikil m3 0.8100 410,000.00 332,100.00 9 Kayu kelas II balok m3 0.1050 3,100,000.00 325,500.00 10 Plywood 9 mm Lembar 2.5000 150,000.00 375,000.00 11 Dolken kayu Ø 8-10/400 cm Batang 14.0000 8,000.00 112,000.00 JUMLAH HARGA BAHAN 5,100,550.00 III PERALATAN 0.00 JUMLAH HARGA ALAT IV Jumlah (A+B+C) 0.00 5,705,595.00 V Overhead & Profit 10% 10% 570,559.50 VI Harga Satuan Pekerjaan (D+E) 0.00 6,276,154.00 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang batu L.02.03 3 Tukang kayu L.02.04 4 Tukang besi L.02.05 5 Kepala tukang L.03.01 6 Mandor L.04.01 II 1 2 3 4 5 6 7 8 III

BAHAN Kayu kelas III Paku Biasa Minyak bekisting Besi beton (polos/ulir) Kawat beton Semen portland Pasir Beton Kerikil

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.1800 OH 0.0200 OH 0.0200 OH 0.0200 OH 0.0060 OH 0.0090 JUMLAH TENAGA KERJA

59,000.00 69,000.00 69,000.00 69,000.00 80,000.00 80,000.00

10,620.00 1,380.00 1,380.00 1,380.00 480.00 720.00 15,960.00

m3 0.0020 kg 0.0100 Liter 1.2000 kg 3.0000 kg 0.4500 kg 4.0000 m3 0.0060 m3 0.0090 JUMLAH HARGA BAHAN

1,545,000.00 20,500.00 15,000.00 13,000.00 20,000.00 1,650.00 270,000.00 410,000.00

3,090.00 205.00 18,000.00 39,000.00 9,000.00 6,600.00 1,620.00 3,690.00 81,205.00 97,165.00 9,716.50 106,881.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

0.00 10% 0.00

ANALISA HARGA SATUAN Membuat 1 m’ ring balok beton bertulang (10 x 15) cm No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang batu L.02.03 3 Tukang kayu L.02.04 4 Tukang besi L.02.05 5 Kepala tukang L.03.01 6 Mandor L.04.01 II 1 2 3 4 5 6 7 8 III

BAHAN Kayu kelas III Paku Biasa Minyak bekisting Besi beton (polos/ulir) Kawat beton Semen portland Pasir Beton Kerikil

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.2970 OH 0.0330 OH 0.0330 OH 0.0330 OH 0.0100 OH 0.0150 JUMLAH TENAGA KERJA

59,000.00 69,000.00 69,000.00 69,000.00 80,000.00 80,000.00

17,523.00 2,277.00 2,277.00 2,277.00 800.00 1,200.00 26,354.00

m3 0.0030 kg 0.0200 Liter 1.2000 kg 3.6000 kg 0.0500 kg 5.5000 m3 0.0090 m3 0.0150 JUMLAH HARGA BAHAN

1,545,000.00 20,500.00 15,000.00 13,000.00 20,000.00 1,650.00 270,000.00 410,000.00

4,635.00 410.00 18,000.00 46,800.00 1,000.00 9,075.00 2,430.00 6,150.00 88,500.00 114,854.00 11,485.40 126,339.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Pengerjaan 10 cm pengelasan dengan las listrik No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang Besi Konstruksi L.02.06 3 Kepala tukang L.03.01 4 Mandor L.04.01 II

III

IV V VI

BAHAN 1 Kawat las listrik 2 Solar 3 Minyak pelumas PERALATAN Sewa alat Las Listrik Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

HARGA SATUAN PEKERJAAN PASANGAN DINDING

0.00 10% 0.00

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.0400 OH 0.0200 OH 0.0020 OH 0.0020 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

2,360.00 1,380.00 160.00 160.00 4,060.00

Kg 0.4000 Liter 0.3000 Liter 0.0400 JUMLAH HARGA BAHAN

41,000.00 6,500.00 30,000.00

16,400.00 1,950.00 1,200.00 19,550.00

Jam 0.1700 JUMLAH HARGA ALAT

8,333.33

1,416.67 1,416.67 25,026.67 2,502.67 27,529.00

0.00 10% 0.00

ANALISA HARGA SATUAN Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 2 PP No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 0.6000 59,000.00 35,400.00 2 Tukang Batu L.02.03 OH 0.2000 69,000.00 13,800.00 3 Kepala Tukang L.03.01 OH 0.0200 80,000.00 1,600.00 4 Mandor L.04.01 OH 0.0300 80,000.00 2,400.00 JUMLAH TENAGA KERJA 53,200.00 II BAHAN 1 Bata merah m3 140.0000 500.00 70,000.00 2 Semen portland Kg 43.5000 1,650.00 71,775.00 3 Pasir Pasang m3 0.0800 270,000.00 21,600.00 JUMLAH HARGA BAHAN 163,375.00 III PERALATAN 0.00 JUMLAH HARGA ALAT IV Jumlah (A+B+C) 0.00 216,575.00 V Overhead & Profit 10% 10% 21,657.50 VI Harga Satuan Pekerjaan (D+E) 0.00 238,232.00 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 PP No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 0.6000 59,000.00 35,400.00 2 Tukang Batu L.02.03 OH 0.2000 69,000.00 13,800.00 3 Kepala Tukang L.03.01 OH 0.0200 80,000.00 1,600.00 4 Mandor L.04.01 OH 0.0300 80,000.00 2,400.00 JUMLAH TENAGA KERJA 53,200.00 II BAHAN 1 Bata merah m3 140.0000 500.00 70,000.00 2 Semen portland Kg 32.9500 1,650.00 54,367.50 3 Pasir Pasang m3 0.0910 270,000.00 24,570.00 JUMLAH HARGA BAHAN 148,937.50 III PERALATAN 0.00 JUMLAH HARGA ALAT IV Jumlah (A+B+C) 0.00 202,137.50 V Overhead & Profit 10% 10% 20,213.75 VI Harga Satuan Pekerjaan (D+E) 0.00 222,351.00 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 0.6000 59,000.00 35,400.00 2 Tukang Batu L.02.03 OH 0.2000 69,000.00 13,800.00 3 Kepala Tukang L.03.01 OH 0.0200 80,000.00 1,600.00 4 Mandor L.04.01 OH 0.0300 80,000.00 2,400.00 JUMLAH TENAGA KERJA 53,200.00 II BAHAN 1 Bata merah m3 140.0000 500.00 70,000.00 2 Semen portland Kg 26.5500 1,650.00 43,807.50 3 Pasir Pasang m3 0.0930 270,000.00 25,110.00 JUMLAH HARGA BAHAN 138,917.50 III PERALATAN 0.00 JUMLAH HARGA ALAT IV Jumlah (A+B+C) 0.00 192,117.50 V Overhead & Profit 10% 10% 19,211.75 VI Harga Satuan Pekerjaan (D+E) 0.00 211,329.00

ANALISA HARGA SATUAN Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm. No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang Batu L.02.03 3 Kepala Tukang L.03.01 4 Mandor L.04.01 II

III

BAHAN 1 Semen portland 2 Pasir Pasang

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.3000 OH 0.1500 OH 0.0150 OH 0.0150 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

17,700.00 10,350.00 1,200.00 1,200.00 30,450.00

Kg 15.5040 m3 0.0160 JUMLAH HARGA BAHAN

1,650.00 270,000.00

25,581.60 4,320.00 29,901.60 60,351.60 6,035.16 66,386.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm. No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang Batu L.02.03 3 Kepala Tukang L.03.01 4 Mandor L.04.01 II

III

BAHAN 1 Semen portland 2 Pasir Pasang

0.00 10% 0.00

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.3000 OH 0.1500 OH 0.0150 OH 0.0150 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

17,700.00 10,350.00 1,200.00 1,200.00 30,450.00

Kg 10.2240 m3 0.0200 JUMLAH HARGA BAHAN

1,650.00 270,000.00

16,869.60 5,400.00 22,269.60 52,719.60 5,271.96 57,991.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm. No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang Batu L.02.03 3 Kepala Tukang L.03.01 4 Mandor L.04.01 II

III

BAHAN 1 Semen portland 2 Pasir Pasang

0.00 10% 0.00

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.3000 OH 0.1500 OH 0.0150 OH 0.0150 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

17,700.00 10,350.00 1,200.00 1,200.00 30,450.00

Kg 7.7760 m3 0.0230 JUMLAH HARGA BAHAN

1,650.00 270,000.00

12,830.40 6,210.00 19,040.40 49,490.40 4,949.04 54,439.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

0.00 10% 0.00

ANALISA HARGA SATUAN Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang Batu L.02.03 3 Kepala Tukang L.03.01 4 Mandor L.04.01 II

III

BAHAN 1 Semen portland 2 Pasir Pasang

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.3000 OH 0.1500 OH 0.0150 OH 0.0150 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

17,700.00 10,350.00 1,200.00 1,200.00 30,450.00

Kg 6.2400 m3 0.0240 JUMLAH HARGA BAHAN

1,650.00 270,000.00

10,296.00 6,480.00 16,776.00 47,226.00 4,722.60 51,948.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang Batu L.02.03 3 Kepala Tukang L.03.01 4 Mandor L.04.01 II

III

BAHAN 1 Semen portland 2 Pasir Pasang

0.00 10% 0.00

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.4000 OH 0.2000 OH 0.0200 OH 0.0220 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

23,600.00 13,800.00 1,600.00 1,760.00 40,760.00

Kg 13.6320 m3 0.0270 JUMLAH HARGA BAHAN

1,650.00 270,000.00

22,492.80 7,290.00 29,782.80 70,542.80 7,054.28 77,597.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang Batu L.02.03 3 Kepala Tukang L.03.01 4 Mandor L.04.01 II

III

BAHAN 1 Semen portland 2 Pasir Pasang

0.00 10% 0.00

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.2600 OH 0.2000 OH 0.0200 OH 0.0130 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

15,340.00 13,800.00 1,600.00 1,040.00 31,780.00

Kg 10.3680 m3 0.0310 JUMLAH HARGA BAHAN

1,650.00 270,000.00

17,107.20 8,370.00 25,477.20 57,257.20 5,725.72 62,982.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

0.00 10% 0.00

ANALISA HARGA SATUAN Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm. No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang Batu L.02.03 3 Kepala Tukang L.03.01 4 Mandor L.04.01 II

III

BAHAN 1 Semen portland 2 Pasir Pasang

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.4000 OH 0.2000 OH 0.0200 OH 0.0220 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

23,600.00 13,800.00 1,600.00 1,760.00 40,760.00

Kg 8.3200 m3 0.0320 JUMLAH HARGA BAHAN

1,650.00 270,000.00

13,728.00 8,640.00 22,368.00 63,128.00 6,312.80 69,440.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m2 acian. No Uraian I TENAGA 1 Pekerja 2 Tukang Batu 3 Kepala Tukang 4 Mandor II

III

BAHAN 1 Semen portland

0.00 10% 0.00

Kode L.01.01 L.02.03 L.03.01 L.04.01

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.2000 OH 0.1000 OH 0.0100 OH 0.0100 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

11,800.00 6,900.00 800.00 800.00 20,300.00

Kg 3.2500 JUMLAH HARGA BAHAN

1,650.00

5,362.50 5,362.50 25,662.50 2,566.25 28,228.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

0.00 10% 0.00

Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 0.060 59,000.00 3,540.00 2 Tukang cat L.02.08 OH 0.060 69,000.00 4,140.00 3 Kepala tukang L.03.01 OH 0.012 80,000.00 960.00 4 Mandor L.04.01 OH 0.003 80,000.00 240.00 JUMLAH TENAGA KERJA 8,880.00 II BAHAN 1 Cat Besi Kg 0.300 25,000.00 7,500.00 2 Kuas Bh 0.010 5,000.00 50.00 3 Pengencer L 0.010 25,000.00 250.00 JUMLAH HARGA BAHAN 7,800.00 III PERALATAN 0.00 JUMLAH HARGA ALAT IV Jumlah (A+B+C) 0.00 16,680.00 V Overhead & Profit 10% 10% 1,668.00 VI Harga Satuan Pekerjaan (D+E) 0.00 18,348.00

ANALISA HARGA SATUAN Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 0.400 59,000.00 23,600.00 2 Tukang cat L.02.08 OH 0.800 69,000.00 55,200.00 3 Kepala tukang L.03.01 OH 0.080 80,000.00 6,400.00 4 Mandor L.04.01 OH 0.020 80,000.00 1,600.00 JUMLAH TENAGA KERJA 86,800.00 II BAHAN 1 Cat dasar Besi Kg 0.110 2 Cat antara Kg 0.170 3 Cat Besi Kg 0.080 4 Kuas Bh 0.010 5 Pengencer L 0.010 JUMLAH HARGA BAHAN III PERALATAN 0.00 JUMLAH HARGA ALAT IV Jumlah (A+B+C) 0.00 86,800.00 V Overhead & Profit 10% 10% 8,680.00 VI Harga Satuan Pekerjaan (D+E) 0.00 95,480.00 Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 0.400 59,000.00 23,600.00 2 Tukang cat L.02.08 OH 0.700 69,000.00 48,300.00 3 Kepala tukang L.03.01 OH 0.070 80,000.00 5,600.00 4 Mandor L.04.01 OH 0.020 80,000.00 1,600.00 JUMLAH TENAGA KERJA 79,100.00 II BAHAN 1 Cat Besi Kg 0.300 2 Pengencer L 0.010 JUMLAH HARGA BAHAN III PERALATAN 0.00 JUMLAH HARGA ALAT IV Jumlah (A+B+C) 0.00 79,100.00 V Overhead & Profit 10% 10% 7,910.00 VI Harga Satuan Pekerjaan (D+E) 0.00 87,010.00 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

ANALISA HARGA SATUAN Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 2.160 59,000.00 127,440.00 2 Tukang batu L.02.03 OH 0.720 69,000.00 49,680.00 3 Kepala tukang L.03.01 OH 0.072 80,000.00 5,760.00 4 Mandor L.04.01 OH 0.011 80,000.00 880.00 JUMLAH TENAGA KERJA 183,760.00 II BAHAN 1 Bata Putih Potong bh 8.000 2,500.00 20,000.00 2 Semen portland Kg 44.000 1,650.00 72,600.00 3 Pasir pasang M3 0.070 270,000.00 18,900.00 4 Pasir beton M3 0.060 270,000.00 16,200.00 5 Kerikil M3 0.070 410,000.00 28,700.00 6 Baja tulangan Kg 1.600 13,000.00 20,800.00 JUMLAH HARGA BAHAN 177,200.00 III PERALATAN 0.00 JUMLAH HARGA ALAT IV Jumlah (A+B+C) 0.00 360,960.00 V Overhead & Profit 10% 10% 36,096.00 VI Harga Satuan Pekerjaan (D+E) 0.00 397,056.00 Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 3.200 59,000.00 188,800.00 2 Tukang batu L.02.03 OH 1.150 69,000.00 79,350.00 3 Kepala tukang L.03.01 OH 0.011 80,000.00 880.00 4 Mandor L.04.01 OH 0.016 80,000.00 1,280.00 JUMLAH TENAGA KERJA 270,310.00 II BAHAN 1 Bata merah bh 14.000 2,500.00 35,000.00 2 Semen portland Kg 77.000 1,650.00 127,050.00 3 Pasir pasang M3 0.130 270,000.00 35,100.00 4 Pasir beton M3 0.090 270,000.00 24,300.00 5 Kerikil M3 0.020 410,000.00 8,200.00 6 Baja tulangan Kg 2.600 13,000.00 33,800.00 JUMLAH HARGA BAHAN 263,450.00 III PERALATAN 0.00 JUMLAH HARGA ALAT IV Jumlah (A+B+C) 0.00 533,760.00 V Overhead & Profit 10% 10% 53,376.00 VI Harga Satuan Pekerjaan (D+E) 0.00 587,136.00

ANALISA HARGA SATUAN Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 3.200 59,000.00 188,800.00 2 Tukang batu L.02.03 OH 1.150 69,000.00 79,350.00 3 Kepala tukang L.03.01 OH 0.011 80,000.00 880.00 4 Mandor L.04.01 OH 0.016 80,000.00 1,280.00 JUMLAH TENAGA KERJA 270,310.00 II BAHAN 1 Bata merah bh 24.000 2,500.00 60,000.00 2 Semen portland Kg 114.000 1,650.00 188,100.00 3 Pasir pasang M3 0.184 270,000.00 49,680.00 4 Pasir beton M3 0.120 270,000.00 32,400.00 5 Kerikil M3 0.033 410,000.00 13,530.00 6 Baja tulangan Kg 4.850 13,000.00 63,050.00 7 Besi Plat tebal 3 mm Lbr 0.213 1,100,000.00 234,722.22 8 Engsel Besar Buah 2.000 20,000.00 40,000.00 9 Globe Besar Buah 1.000 300,000.00 300,000.00 10 Besi Las Buah 5.000 6,000.00 30,000.00 JUMLAH HARGA BAHAN 406,760.00 III PERALATAN 1 Mesin Las Jam 28,571.43 1.10 31,428.57 2 Genset Jam 21,428.57 1.10 23,571.43 JUMLAH HARGA ALAT 681,302.22 IV Jumlah (A+B+C) 0.00 1,347,582.22 V Overhead & Profit 10% 10% 134,758.22 VI Harga Satuan Pekerjaan (D+E) 0.00 1,482,340.00 Pemasangan 1 m’ pipa galvanis diameter ½” No Uraian I TENAGA 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor II

III

BAHAN 1 Pipa galvanis ½” 2 Perlengkapan

Kode L.01.01 L.02.03 L.03.01 L.04.01

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.054 OH 0.090 OH 0.009 OH 0.027 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

3,186.00 6,210.00 720.00 2,160.00 12,276.00

M 1.000 % 35.000 JUMLAH HARGA BAHAN

27,000.00 270.00

27,000.00 9,450.00 36,450.00 48,726.00 2,436.30 51,162.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 5% Harga Satuan Pekerjaan (D+E)

0.00 5% 0.00

ANALISA HARGA SATUAN Pemasangan 1 buah kran diameter ½” atau 3/4” No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang batu L.02.03 3 Kepala tukang L.03.01 4 Mandor L.04.01 II

III

BAHAN 1 Kran air 2 Sealtape

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.010 OH 0.400 OH 0.040 OH 0.005 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

590.00 27,600.00 3,200.00 400.00 31,790.00

M 1.000 Buah 0.025 JUMLAH HARGA BAHAN

13,000.00 12,300.00

13,000.00 307.50 13,307.50 45,097.50 2,254.88 47,352.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 5% Harga Satuan Pekerjaan (D+E)

0.00 5% 0.00

Pemasangan 1 m’ pipa galvanis diameter 3/4” No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang batu L.02.03 3 Kepala tukang L.03.01 4 Mandor L.04.01 II

III

BAHAN 1 Pipa galvanis 3/4” 2 Perlengkapan

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.054 OH 0.090 OH 0.009 OH 0.027 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

3,186.00 6,210.00 720.00 2,160.00 12,276.00

M 1.000 % 35.000 JUMLAH HARGA BAHAN

34,122.86 341.23

34,122.86 11,943.00 46,065.87 58,341.87 2,917.09 61,258.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 5% Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ pipa galvanis diameter 1” No Uraian I TENAGA 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor II

III

BAHAN 1 Pipa galvanis 1” 2 Perlengkapan

0.00 5% 0.00

Kode L.01.01 L.02.03 L.03.01 L.04.01

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.054 OH 0.090 OH 0.009 OH 0.027 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

3,186.00 6,210.00 720.00 2,160.00 12,276.00

M 1.000 % 35.000 JUMLAH HARGA BAHAN

53,867.66 538.68

53,867.66 18,853.68 72,721.34 84,997.34 4,249.87 89,247.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 5% Harga Satuan Pekerjaan (D+E)

0.00 5% 0.00

ANALISA HARGA SATUAN Pemasangan 1 m’ pipa galvanis diameter 1 ½” No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang batu L.02.03 3 Kepala tukang L.03.01 4 Mandor L.04.01 II

III

BAHAN 1 Pipa galvanis 11/2” 2 Perlengkapan

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.108 OH 0.180 OH 0.018 OH 0.005 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

6,372.00 12,420.00 1,440.00 400.00 20,632.00

M 1.000 % 35.000 JUMLAH HARGA BAHAN

79,237.89 792.38

79,237.89 27,733.26 106,971.15 127,603.15 6,380.16 133,983.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 5% Harga Satuan Pekerjaan (D+E)

(K3) Pemasangan 1 m pipa GIP Ø 50 mm No Uraian I TENAGA 1 Pekerja 2 Tukang batu 3 Kepala tukang 4 Mandor II

III

BAHAN 1 Pipa galvanis 2” 2 Perlengkapan

0.00 5% 0.00

Kode L.01.01 L.02.03 L.03.01 L.04.01

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.108 OH 0.180 OH 0.018 OH 0.005 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00 80,000.00

6,372.00 12,420.00 1,440.00 400.00 20,632.00

M 1.000 % 35.000 JUMLAH HARGA BAHAN

113,976.78 1,139.77

113,976.78 39,891.87 153,868.66 174,500.66 8,725.03 183,225.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 5% Harga Satuan Pekerjaan (D+E)

HARGA SATUAN PEKERJAAN PEMASANGAN PIPA

0.00 5% 0.00

ANALISA HARGA SATUAN (K3) Pemasangan 1 m pipa HDPE Ø 32 mm No Uraian I TENAGA 1 Pekerja 2 Tukang pipa 3 Mandor II

III

IV V VI

III

IV V VI

L.01.01 L.02.13 L.04.01

BAHAN Pipa HDPE Ø 32 mm PERALATAN Sewa Tripot/Tackel & handle crane 2 T

Satuan

BAHAN Pipa HDPE Ø 50 mm PERALATAN Sewa Tripot/Tackel & handle crane 2 T Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.035 OH 0.017 OH 0.003 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00

2,065.00 1,173.00 240.00 3,478.00

m 1.000 JUMLAH HARGA BAHAN

20,000.00

20,000.00 20,000.00

hari 0.019 JUMLAH HARGA ALAT

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

(K3) Pemasangan 1 m pipa HDPE Ø 50 mm No Uraian I TENAGA 1 Pekerja 2 Tukang pipa 3 Mandor II

Kode

0.00 0% 0.00

Kode L.01.01 L.02.13 L.04.01

Satuan

Koefisien

23,478.00 23,478.00

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.035 OH 0.017 OH 0.003 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00

2,065.00 1,173.00 240.00 3,478.00

m 1.000 JUMLAH HARGA BAHAN

40,000.00

40,000.00 40,000.00

hari 0.019 JUMLAH HARGA ALAT 0.00 0% 0.00

43,478.00 43,478.00

ANALISA HARGA SATUAN (K3) Pemasangan 1 m pipa HDPE Ø 63 mm No Uraian I TENAGA 1 Pekerja 2 Tukang pipa 3 Mandor II

III

IV V VI

III

IV V VI

L.01.01 L.02.13 L.04.01

BAHAN Pipa HDPE Ø 63 mm

Satuan

OH 0.035 OH 0.017 OH 0.003 JUMLAH TENAGA KERJA

PERALATAN Sewa Tripot/Tackel & handle crane 2 T Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Harga Satuan (Rp.) Jumlah Harga (Rp.) 59,000.00 69,000.00 80,000.00

0.00 10% 0.00

Kode L.01.01 L.02.13 L.04.01

Satuan

Koefisien

2,065.00 1,173.00 240.00 3,478.00 -

hari 0.019 JUMLAH HARGA ALAT

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

BAHAN Pipa HDPE Ø 75 mm

Koefisien

m 1.000 JUMLAH HARGA BAHAN

PERALATAN Sewa Tripot/Tackel & handle crane 2 T

(K3) Pemasangan 1 m pipa HDPE Ø 75 mm No Uraian I TENAGA 1 Pekerja 2 Tukang pipa 3 Mandor II

Kode

3,478.00 347.80 3,825.00

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.035 OH 0.017 OH 0.003 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00

2,065.00 1,173.00 240.00 3,478.00

m 1.000 JUMLAH HARGA BAHAN

85,000.00

85,000.00 85,000.00

hari 0.019 JUMLAH HARGA ALAT 0.00 0% 0.00

88,478.00 88,478.00

ANALISA HARGA SATUAN (K3) Pemasangan 1 m pipa HDPE Ø 100 mm No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang pipa L.02.13 3 Mandor L.04.01 II

III

IV V VI

BAHAN Pipa HDPE Ø 100 mm PERALATAN Sewa Tripot/Tackel & handle crane 2 T

III

IV V VI

BAHAN Pipa HDPE Ø 125 mm PERALATAN Sewa Tripot/Tackel & handle crane 2 T Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.040 OH 0.020 OH 0.004 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00

2,360.00 1,380.00 320.00 4,060.00

m 1.000 JUMLAH HARGA BAHAN

123,000.00

123,000.00 123,000.00

hari 0.019 JUMLAH HARGA ALAT

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

(K3) Pemasangan 1 m pipa HDPE Ø 125 mm No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang pipa L.02.13 3 Mandor L.04.01 II

Satuan

0.00 0% 0.00

Satuan

Koefisien

OH 0.045 OH 0.023 OH 0.005 JUMLAH TENAGA KERJA

127,060.00 127,060.00

Harga Satuan (Rp.) Jumlah Harga (Rp.) 59,000.00 69,000.00 80,000.00

m 1.000 JUMLAH HARGA BAHAN

2,655.00 1,587.00 400.00 4,642.00 -

hari 0.019 JUMLAH HARGA ALAT 0.00 10% 0.00

4,642.00 464.20 5,106.00

ANALISA HARGA SATUAN (K3) Pemasangan 1 m pipa HDPE Ø 150 mm No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Tukang pipa L.02.13 3 Mandor L.04.01 II

III

IV V VI

BAHAN Pipa HDPE Ø 150 mm PERALATAN Sewa Tripot/Tackel & handle crane 2 T

III

IV V VI

II

III

IV V VI

59,000.00 69,000.00 80,000.00

3,658.00 2,139.00 480.00 6,277.00

m 1.000 JUMLAH HARGA BAHAN

389,000.00

389,000.00 389,000.00

0% -

Kode L.01.01 L.02.13 L.04.01

PERALATAN Sewa Tripot/Tackel & handle crane 2 T

Satuan

PERALATAN Sewa Tripot/Tackel & handle crane 2 T Jumlah (A+B+C) Overhead & Profit 5% Harga Satuan Pekerjaan (D+E)

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.) 59,000.00 69,000.00 80,000.00

20,355.00 11,868.00 2,720.00 34,943.00

m 1.000 JUMLAH HARGA BAHAN

193,854.76

193,854.76 193,854.76

hari 0.038 JUMLAH HARGA ALAT

200,000.00

7,600.00 7,600.00 236,397.76 11,819.89 248,217.00

5% -

Kode L.01.01 L.02.13 L.04.01

395,277.00 395,277.00

OH 0.345 OH 0.172 OH 0.034 JUMLAH TENAGA KERJA

Jumlah (A+B+C) Overhead & Profit 5% Harga Satuan Pekerjaan (D+E)

BAHAN Pipa GIP Ø 100 mm

Harga Satuan (Rp.) Jumlah Harga (Rp.)

hari 0.019 JUMLAH HARGA ALAT

BAHAN Pipa GIP Ø 75 mm

(K3) Pemasangan 1 m pipa GIP Ø 100 mm No Uraian I TENAGA 1 Pekerja 2 Tukang pipa 3 Mandor

Koefisien

OH 0.062 OH 0.031 OH 0.006 JUMLAH TENAGA KERJA

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

(K3) Pemasangan 1 m pipa GIP Ø 75 mm No Uraian I TENAGA 1 Pekerja 2 Tukang pipa 3 Mandor II

Satuan

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.400 OH 0.200 OH 0.040 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00

23,600.00 13,800.00 3,200.00 40,600.00

m 1.000 JUMLAH HARGA BAHAN

270,902.46

270,902.46 270,902.46

hari 0.038 JUMLAH HARGA ALAT

200,000.00

7,600.00 7,600.00 319,102.46 15,955.12 335,057.00

5% -

ANALISA HARGA SATUAN (K3) Pemasangan 1 m pipa GIP Ø 150 mm No Uraian I TENAGA 1 Pekerja 2 Tukang pipa 3 Mandor II

III

IV V VI

III

IV V VI

PERALATAN Sewa Tripot/Tackel & handle crane 2 T

III

Satuan

59,000.00 69,000.00 80,000.00

29,854.00 17,457.00 4,080.00 51,391.00

m 1.000 JUMLAH HARGA BAHAN

427,029.30

427,029.30 427,029.30

hari 0.042 JUMLAH HARGA ALAT

200,000.00

8,400.00 8,400.00 486,820.30 24,341.02 511,161.00

0.00 0.00

Kode L.01.01 L.02.13 L.04.01

PERALATAN Sewa Tripot/Tackel & handle crane 2 T

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 1.4290 OH 0.7150 OH 0.1430 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00

84,311.00 49,335.00 11,440.00 145,086.00

bh 1.0000 JUMLAH HARGA BAHAN

4,150,000.00

4,150,000.00 4,150,000.00

hari 0.1000 JUMLAH HARGA ALAT

200,000.00

20,000.00 20,000.00 4,315,086.00 431,508.60 4,746,594.00

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

PERALATAN Sewa Tripot/Tackel & handle crane 2 T

Harga Satuan (Rp.) Jumlah Harga (Rp.)

5%

BAHAN Valve Ø 150 mm

BAHAN Tee Ø 150 mm

Koefisien

OH 0.506 OH 0.253 OH 0.051 JUMLAH TENAGA KERJA

Jumlah (A+B+C) Overhead & Profit 5% Harga Satuan Pekerjaan (D+E)

(K3) Pemasangan 1 buah Tee Ø 150 mm No Uraian I TENAGA 1 Pekerja 2 Tukang pipa 3 Mandor II

L.01.01 L.02.13 L.04.01

BAHAN Pipa GIP Ø 150 mm

(K3) Pemasangan 1 buah Valve Ø 150 mm No Uraian I TENAGA 1 Pekerja 2 Tukang pipa 3 Mandor II

Kode

10% -

Kode L.01.01 L.02.13 L.04.01

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.1060 OH 0.0530 OH 0.0110 JUMLAH TENAGA KERJA

59,000.00 69,000.00 80,000.00

6,254.00 3,657.00 880.00 10,791.00

bh 1.0000 JUMLAH HARGA BAHAN

942,908.00

942,908.00 942,908.00

hari 0.0280 JUMLAH HARGA ALAT

200,000.00

5,600.00 5,600.00 959,299.00 95,929.90 1,055,228.00

IV Jumlah (A+B+C) V Overhead & Profit 10% VI Harga Satuan Pekerjaan (D+E) HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA

10% -

ANALISA HARGA SATUAN (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 80 mm No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 1.4660 59,000.00 86,494.00 2 Tukang pipa L.02.13 OH 0.7330 69,000.00 50,577.00 3 Mandor L.04.01 OH 0.1470 80,000.00 11,760.00 JUMLAH TENAGA KERJA 148,831.00 II BAHAN Pipa Ø 80 mm bh 1.0000 193,854.76 193,854.76 JUMLAH HARGA BAHAN 193,854.76 III PERALATAN 1 Peralatan potong pipa T2/mekanik / cilinder saw hari 0.6060 250,000.00 151,500.00 2 Sewa Genset 1500 watt hari 0.0750 150,000.00 11,250.00 3 Sewa Pompa Submersible 3m3/h hari 0.9680 200,000.00 193,600.00 4 Sewa Tripot/Tackel & handle crane 2 T hari 0.8650 200,000.00 173,000.00 JUMLAH HARGA ALAT 529,350.00 IV Jumlah (A+B+C) 872,035.76 V Overhead & Profit 10% 10% 87,203.58 VI Harga Satuan Pekerjaan (D+E) 959,239.00 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 1.6460 59,000.00 97,114.00 2 Tukang pipa L.02.13 OH 0.8230 69,000.00 56,787.00 3 Mandor L.04.01 OH 0.1650 80,000.00 13,200.00 JUMLAH TENAGA KERJA 167,101.00 II BAHAN Pipa Ø 100 mm bh 1.0000 270,902.46 270,902.46 JUMLAH HARGA BAHAN 270,902.46 III PERALATAN 1 Peralatan potong pipa T2/mekanik / cilinder saw hari 0.6500 250,000.00 162,500.00 2 Sewa Genset 1500 watt hari 0.1590 150,000.00 23,850.00 3 Sewa Pompa Submersible 3m3/h hari 1.0780 200,000.00 215,600.00 4 Sewa Tripot/Tackel & handle crane 2 T hari 0.9110 200,000.00 182,200.00 JUMLAH HARGA ALAT 584,150.00 IV Jumlah (A+B+C) 0.00 1,022,153.46 V Overhead & Profit 10% 10% 102,215.35 VI Harga Satuan Pekerjaan (D+E) 0.00 1,124,368.00 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 2.0960 59,000.00 123,664.00 2 Tukang pipa L.02.13 OH 1.0480 69,000.00 72,312.00 3 Mandor L.04.01 OH 0.2100 80,000.00 16,800.00 JUMLAH TENAGA KERJA 212,776.00 II BAHAN Pipa Ø 150 mm bh 1.0000 427,029.30 427,029.30 JUMLAH HARGA BAHAN 427,029.30 III PERALATAN 427,029.30 1 Peralatan potong pipa T2/mekanik / cilinder saw hari 0.7600 250,000.00 190,000.00 2 Sewa Genset 1500 watt hari 0.3690 150,000.00 190,000.00 3 Sewa Pompa Submersible 3m3/h hari 1.3530 200,000.00 190,000.00 4 Sewa Tripot/Tackel & handle crane 2 T hari 1.0260 200,000.00 190,000.00 JUMLAH HARGA ALAT 760,000.00 IV Jumlah (A+B+C) 1,613,319.95

ANALISA HARGA SATUAN V VI

Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

10% -

161,332.00 1,774,651.00

(K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.) I TENAGA 1 Pekerja L.01.01 OH 2.5460 59,000.00 150,214.00 2 Tukang pipa L.02.13 OH 1.2730 69,000.00 87,837.00 3 Mandor L.04.01 OH 0.2550 80,000.00 20,400.00 JUMLAH TENAGA KERJA 258,451.00 II BAHAN Pipa Ø 200 mm bh 1.0000 JUMLAH HARGA BAHAN III PERALATAN 1 Peralatan potong pipa T2/mekanik / cilinder saw hari 0.8700 250,000.00 217,500.00 2 Sewa Genset 1500 watt hari 0.5790 150,000.00 86,850.00 3 Sewa Pompa Submersible 3m3/h hari 1.6280 200,000.00 325,600.00 4 Sewa Tripot/Tackel & handle crane 2 T hari 1.1410 200,000.00 228,200.00 JUMLAH HARGA ALAT 858,150.00 IV Jumlah (A+B+C) 1,116,601.00 V Overhead & Profit 10% 10% 111,660.10 VI Harga Satuan Pekerjaan (D+E) 1,228,261.00 HARGA SATUAN PEKERJAAN PENGETESAN PIPA (K3) Pengetesan 1 m pipa Ø 50 mm & pipa Ø 40 mm No Uraian Kode I TENAGA 1 Pekerja L.01.01 2 Mandor L.04.01 II

III

BAHAN 1 Air test (air bersih) 2 Bahan bakar 3 Oli

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.0080 OH 0.0008 JUMLAH TENAGA KERJA

59,000.00 80,000.00

472.00 64.00 536.00

m3 0.0020 liter 0.0600 liter 0.0020 JUMLAH HARGA BAHAN

75,000.00 6,500.00 40,000.00

150.00 390.00 80.00 620.00 1,156.00 115.60 1,271.00

PERALATAN

JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

(K3) Pengetesan 1 m pipa Ø 75 mm No Uraian I TENAGA 1 Pekerja 2 Mandor II

III

BAHAN 1 Air test (air bersih) 2 Bahan bakar 3 Oli

10% -

Kode L.01.01 L.04.01

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.0080 OH 0.0008 JUMLAH TENAGA KERJA

59,000.00 80,000.00

472.00 64.00 536.00

m3 0.0040 liter 0.0600 liter 0.0020 JUMLAH HARGA BAHAN

75,000.00 6,500.00 40,000.00

300.00 390.00 80.00 770.00 1,306.00 130.60 1,436.00

PERALATAN

JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

10% -

ANALISA HARGA SATUAN (K3) Pengetesan 1 m pipa Ø 100 mm No Uraian I TENAGA 1 Pekerja 2 Mandor II

III

Kode L.01.01 L.04.01

BAHAN 1 Air test (air bersih) 2 Bahan bakar 3 Oli

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.0080 OH 0.0008 JUMLAH TENAGA KERJA

59,000.00 80,000.00

472.00 64.00 536.00

m3 0.0080 liter 0.0600 liter 0.0020 JUMLAH HARGA BAHAN

75,000.00 6,500.00 40,000.00

600.00 390.00 80.00 1,070.00 1,606.00 160.60 1,766.00

PERALATAN

JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

(K3) Pengetesan 1 m pipa Ø 150 mm No Uraian I TENAGA 1 Pekerja 2 Mandor II

III

10% -

Kode L.01.01 L.04.01

BAHAN 1 Air test (air bersih) 2 Bahan bakar 3 Oli

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.0080 OH 0.0008 JUMLAH TENAGA KERJA

59,000.00 80,000.00

472.00 64.00 536.00

m3 0.0180 liter 0.0600 liter 0.0020 JUMLAH HARGA BAHAN

75,000.00 6,500.00 40,000.00

1,350.00 390.00 80.00 1,820.00 2,356.00 235.60 2,591.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

(K3) Pengetesan 1 m pipa Ø 200 mm No Uraian I TENAGA 1 Pekerja 2 Mandor II

III

BAHAN 1 Air test (air bersih) 2 Bahan bakar 3 Oli

10% -

Kode L.01.01 L.04.01

Satuan

Koefisien

Harga Satuan (Rp.) Jumlah Harga (Rp.)

OH 0.0080 OH 0.0008 JUMLAH TENAGA KERJA

59,000.00 80,000.00

472.00 64.00 536.00

m3 0.0310 liter 0.0600 liter 0.0020 JUMLAH HARGA BAHAN

75,000.00 6,500.00 40,000.00

2,325.00 390.00 80.00 2,795.00 3,331.00 333.10 3,664.00

PERALATAN

0.00 JUMLAH HARGA ALAT

IV V VI

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

0.00 10% 0.00

ANALISA HARGA SATUAN (K3) Pemasangan Sambungan Rumah (SR) No Uraian 1 2 3 4 5 6 I II III

Galian Tanah 10cm x 10cm Pipa dia 3/4" Clamb saddle 1"x1"x3/4" Kran Air 3/4" Elbow 3/4" Isolasi Steep

Satuan M3 M' Buah Buah Buah Buah

Jumlah (A+B+C) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

1 2 3 4 5 6

Aksesories Pipa Gip 6" Pipa Gip 4" Flange 6" Flange 4" Stub Flange 6" Stub Flange 4"

III

PERALATAN

IV VI VI

Jumlah (Bahan + Peralatan) Overhead & Profit 10% Harga Satuan Pekerjaan (D+E)

6.00 1.00 1.00 1.00 0.02

Harga Satuan (Rp.) 50,875.00 34,122.86 36,000.00 30,000.00 50,000.00 25,000.00 -

10% -

(K3) Pembuatan Bak Intake P=1 mtr, L=1 mtr, T=2 mtr No Uraian Satuan I Item Pekerjaan 1 Menggali 1 m3 tanah lumpur sedalam 1 m m3 2 Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump m3 3 Pembesian 10 kg dengan besi polos atau besi ulir bh 4 (K3) Pemasangan 1 m2 bekisting untuk dinding bh 5 Pemasangan 1 m2 acian. bh II

Koefisien

Volume

204,737.18 36,000.00 30,000.00 50,000.00 500.00 321,237.18 32,123.72 353,360.00

Harga Satuan (Rp.) Jumlah Harga (Rp.) 50,875.00 1,522,151.00 16,427.40 292,204.00 28,228.00 Total I

73,260.00 1,902,688.75 1,744,589.88 2,746,717.60 530,686.40 6,997,942.63

427,029.30 270,902.46 255,000.00 160,000.00 710,000.00 305,000.00 Total II JUMLAH HARGA BAHAN (Total I + Total II) JUMLAH HARGA ALAT 0%

213,514.65 541,804.92 255,000.00 640,000.00 710,000.00 1,220,000.00 3,580,319.58 10,578,262.21 15,867,393.31 15,867,393.31

m1 m1 Bh Bh Bh bh

1.4400 1.2500 106.2000 9.4000 18.8000

Jumlah Harga (Rp.)

0.5000 2.0000 1.0000 4.0000 1.0000 4.0000

(K3) Pembuatan Bak Dudukan Pompa (P=2,4 mtr, L=1,6 mtr, T=3,5 mtr) No Uraian Satuan Volume Harga Satuan (Rp.) Jumlah Harga (Rp.) I Item Pekerjaan 1 Menggali 1 m3 tanah lumpur sedalam 1 m m3 11.5200 50,875.00 586,080.00 2 Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump m3 7.6320 1,522,151.00 11,617,056.43 3 Pembesian 10 kg dengan besi polos atau besi ulir bh 283.4200 16,427.40 4,655,853.71 4 (K3) Pemasangan 1 m2 bekisting untuk dinding bh 32.0000 292,204.00 9,350,528.00 5 Pemasangan 1 m2 acian. bh 64.0000 28,228.00 1,806,592.00 JUMLAH HARGA BAHAN 28,016,110.14 II PERALATAN JUMLAH HARGA ALAT III Jumlah (A+B+C) 28,016,110.14 IV Overhead & Profit 10% 0% V Harga Satuan Pekerjaan (D+E) 28,016,110.00

HARGA SATUAN UPAH Kode L.01.01 L.02.01 L.02.02 L.02.03 L.02.04 L.02.05 L.02.06 L.02.07 L.02.08 L.02.09 L.02.10 L.02.11 L.02.12 L.02.13 L.02.14 L.03.01 L.04.01 L.08.01 L.08.02 L.09.01 L.09.02 L.10.01 L.10.02 L.11.01 L.11.02 L.13

Uraian Pekerja Tukang Tukang Alumunium Tukang Batu Tukang Kayu Tukang Besi Tukang Besi Konstruksi Tukang Besi Profil Tukang Cat Tukang Ereksi Tukang Las Konstruksi Tukang Las Tukang Listrik Tukang Pipa Tukang Vibrator Kepala Tukang Mandor Operator Alat Berat Supir Truk Pembantu Operator Alat Berat Kenek Truk Operator Crane Pembantu Operator Crane Operator Alat Pipa Pembantu Operator Alat Pipa Operator Alat Elektronik Penjaga Malam

Satuan OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH

Harga (Rp.) 59,000 69,000 69,000 69,000 69,000 69,000 69,000 69,000 69,000 69,000 69,000 69,000 69,000 69,000 69,000 80,000 80,000 400,000 78,000 135,000 59,000 400,000 135,000 400,000 135,000 400,000 69,000

ANALISA BIAYA ANGKUTAN PIPA PERHITUNGAN BIAYA KAPAL DENGAN MENGGUNAKAN CONTAINER DARI SURABAYA KE PELABUHAN WAINGAPU No 1 2 3 4 5 6 7

Item Barang Pipa GIP 3/4 diem (Ø20 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 1 diem (Ø25 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 1 1/2 diem (Ø40 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 2 diem (Ø50 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 3 diem (Ø80 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 4 diem (Ø100 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 6 diem (Ø150 mm) SNI.0039-87/BS. 1387-85 Medium Class

Tebal 1,8 mm 2,0 mm 2,6mm 2,8mm 3,2mm 4,1mm 4,5mm

Harga ( Rp. ) 169,000.00 270,000.00 400,000.00 580,000.00 725,000.00 1,380,000.00 2,120,000.00

Berat Pipa kg/m' 1.58 2.44 3.61 5.10 8.47 12.10 28.60

PERHITUNGAN VOLUME BERAT (Kg) Vol Vol. 1 Berat Pipa Daya muat contener 20 jumlah batang Biaya kontener Biaya kontener Contene batang 6 m' feet dlm kontener 20ft 20ft 20ft/batang r m3 pipa m3 9.48 27,000.00 2,848.10 9,900,000.00 3,476.00 30.68 0.00 14.64 27,000.00 1,844.26 9,900,000.00 5,368.00 30.68 0.00 21.66 27,000.00 1,246.54 9,900,000.00 7,942.00 30.68 0.01 30.60 27,000.00 882.35 9,900,000.00 11,220.00 30.68 0.02 50.82 27,000.00 531.29 9,900,000.00 18,634.00 30.68 0.04 72.60 27,000.00 371.90 9,900,000.00 26,620.00 30.68 0.06 171.60 27,000.00 157.34 9,900,000.00 62,920.00 30.68 0.14

Biaya PERHITUNGAN VOLUME M3 kontener jumlah batang dlm Biaya kontener 20ft/batan kontener 20ft 20ft g 12,784.17 9,900,000.00 774.40 8,181.87 9,900,000.00 1,209.99 3,196.04 9,900,000.00 3,097.58 2,045.47 9,900,000.00 4,839.97 799.01 9,900,000.00 12,390.33 511.37 9,900,000.00 19,359.89 227.27 9,900,000.00 43,559.74

Biaya Rata2 /batang 2,512.40 3,893.99 7,068.58 10,449.97 21,707.33 32,669.89 75,019.74

/m' 418.73 649.00 1,178.10 1,741.66 3,617.89 5,444.98 12,503.29

PERHITUNGAN BIAYA TRONTON 30 TON DENGAN MENGGUNAKAN CONTAINER DARI PELABUHAN WAINGAPU KE ANAKALANG No 1 2 3 4 5 6 7

Item Barang Pipa GIP 3/4 diem (Ø20 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 1 diem (Ø25 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 1 1/2 diem (Ø40 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 2 diem (Ø50 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 3 diem (Ø80 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 4 diem (Ø100 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 6 diem (Ø150 mm) SNI.0039-87/BS. 1387-85 Medium Class

Tebal 1,8 mm 2,0 mm 2,6mm 2,8mm 3,2mm 4,1mm 4,5mm

Harga ( Rp. ) 169,000.00 270,000.00 400,000.00 580,000.00 990,000.00 1,380,000.00 2,120,000.00

Berat Pipa kg/m' 1.58 2.44 3.61 5.10 8.47 12.10 28.60

PERHITUNGAN VOLUME BERAT (Kg) Vol Vol. 1 Berat Pipa Daya muat contener 20 jumlah batang Biaya Contene batang 6 m' Biaya Tronton feet dlm kontener 20ft Tronton/batang r m3 pipa m3 9.48 27,000.00 2,848.10 4,950,000.00 1,738.00 30.68 0.00 14.64 27,000.00 1,844.26 4,950,000.00 2,684.00 30.68 0.00 21.66 27,000.00 1,246.54 4,950,000.00 3,971.00 30.68 0.01 30.60 27,000.00 882.35 4,950,000.00 5,610.00 30.68 0.02 50.82 27,000.00 531.29 4,950,000.00 9,317.00 30.68 0.04 72.60 27,000.00 371.90 4,950,000.00 13,310.00 30.68 0.06 171.60 27,000.00 157.34 4,950,000.00 31,460.00 30.68 0.14

PERHITUNGAN VOLUME M3 jumlah batang dlm kontener 20ft 12,784.17 8,181.87 3,196.04 2,045.47 799.01 511.37 227.27

Biaya Biaya Tronton Tronton/ba tang 4,950,000.00 387.20 4,950,000.00 605.00 4,950,000.00 1,548.79 4,950,000.00 2,419.99 4,950,000.00 6,195.16 4,950,000.00 9,679.94 4,950,000.00 21,779.87

Biaya Rata2 /batang

/m'

1,256.20 1,947.00 3,534.29 5,224.99 10,853.66 16,334.94 37,509.87

209.37 324.50 589.05 870.83 1,808.94 2,722.49 6,251.65

PERHITUNGAN BIAYA DUMP TRUK 4 TON DARI KE ANAKALANG/GUDANG KE LOKASI No 1 2 3 4 5 6 7

Item Barang Pipa GIP 3/4 diem (Ø20 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 1 diem (Ø25 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 1 1/2 diem (Ø40 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 2 diem (Ø50 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 3 diem (Ø80 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 4 diem (Ø100 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 6 diem (Ø150 mm) SNI.0039-87/BS. 1387-85 Medium Class

Tebal

Harga ( Rp. )

1,8 mm 2,0 mm 2,6mm 2,8mm 3,2mm 4,1mm 4,5mm

169,000.00 270,000.00 400,000.00 580,000.00 990,000.00 1,380,000.00 2,120,000.00

Tebal

Harga Dasar ( Rp. )

1,8 mm 2,0 mm 2,6mm 2,8mm 3,2mm 4,1mm 4,5mm

169,000.00 270,000.00 400,000.00 580,000.00 990,000.00 1,380,000.00 2,120,000.00

Berat Pipa kg/m' 1.58 2.44 3.61 5.10 8.47 12.10 28.60

Berat Pipa Daya Dump 6 m' Truk 9.48 14.64 21.66 30.60 50.82 72.60 171.60

3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00

PERHITUNGAN VOLUME BERAT (Kg)

950,000.00 950,000.00 950,000.00 950,000.00 950,000.00 950,000.00 950,000.00

Vol. Biaya Jumlah Pipa/ba Tronton/batang Orang tang 3,002.00 1.00 1.00 4,636.00 1.00 1.00 6,859.00 1.00 1.00 9,690.00 1.00 1.00 16,093.00 1.00 1.00 22,990.00 1.00 1.00 54,340.00 1.00 1.00

Harga Satuan /Batang /M' 204,737.18 34,122.86 323,205.95 53,867.66 475,427.31 79,237.89 683,860.70 113,976.78 1,163,128.55 193,854.76 1,625,414.77 270,902.46 2,562,175.81 427,029.30

###

jumlah batang dlm truk 316.46 204.92 138.50 98.04 59.03 41.32 17.48

Biaya Truk

TOTAL JUMLAH HARGA SATUAN No 1 2 3 4 5 6 7

Item Barang Pipa GIP 3/4 diem (Ø20 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 1 diem (Ø25 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 1 1/2 diem (Ø40 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 2 diem (Ø50 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 3 diem (Ø80 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 4 diem (Ø100 mm) SNI.0039-87/BS. 1387-85 Medium Class Pipa GIP 6 diem (Ø150 mm) SNI.0039-87/BS. 1387-85 Medium Class

Biaya/ Batang 14,270.59 19,852.99 26,838.87 34,742.96 56,157.99 81,374.83 174,375.61

Acc. 2,854.12 3,970.60 5,367.77 6,948.59 11,231.60 16,274.97 34,875.12

Jasa (10%) 18,612.47 29,382.36 43,220.66 62,169.15 105,738.96 147,764.98 232,925.07

PERHITUNGAN PEKERJA Biaya pekerja 7,500.00 9,375.00 9,375.00 9,375.00 7,500.00 9,375.00 7,500.00

Total Biaya pekerja 7,500.00 9,375.00 9,375.00 9,375.00 7,500.00 9,375.00 7,500.00

Alat bantu Katrol 3 kaki 1.00 2.00 3.00 4.00 5.00 6.00

Total Biaya /batang 10,502.00 14,012.00 16,236.00 19,068.00 23,597.00 32,370.00 61,846.00

/m' 1,750.33 2,335.33 2,706.00 3,178.00 3,932.83 5,395.00 10,307.67

VII. PIPA DAN PERALATAN LAINNYA NO

NAMA BARANG

MERK/TYPE

SATUAN

1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

2

3 -

4 Batang unit unit Buah unit unit unit unit Batang Batang Batang Batang Batang Batang Batang Batang Batang Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah

Pipa Galvanis Spiral 12 dim Was Out ND 300 mm End Cap ND 300 mm Flange PN 10 300 mm Bend 45,225 N 300 75 mm Air Valve ND 600-300 mm Blow Off 300-75 mm Giboult Joint c/ 300 mm Pipa GIP 6 diem (Ø150 mm) SNI.0039-87/BS. 1387-85 MEDIUM CLASS Pipa GIP 4 diem (Ø100 mm) ( SNI.0039-87/BS. 1387-85 MEDIUM CLASS Pipa GIP 3 diem (Ø 80 mm) SNI.0039-87/BS. 1387-85 MEDIUM CLASS Pipa GIP 2,1/2 diem (Ø 65 mm)SNI.0039-87/BS. 1387-85 MEDIUM CLASS Pipa GIP 2 diem (Ø 50 mm)SNI.0039-87/BS. 1387-85 MEDIUM CLASS Pipa GIP 1,1/2 diem (Ø 40 mm) SNI.0039-87/BS. 1387-85 MEDIUM CLASS Pipa GIP 1 diem (Ø 25 mm) SNI.0039-87/BS. 1387-85 MEDIUM CLASS Pipa GIP 3/4 diem(Ø 20 mm) SNI.0039-87/BS. 1387-85 MEDIUM CLASS Pipa GIP 1/2 (Ø 15 mm)SNI.0039-87/BS. 1387-85 MEDIUM CLASS Soket 6 diem (Ø150 mm) Soket 5 diem (Ø125 mm) Soket 4 diem (Ø100 mm) Soket 3 diem (Ø 80 mm) Soket 2,1/2 diem (Ø 65 mm) Soket 2 diem (Ø 50 mm) Soket 1 diem (Ø 25 mm) Soket 1 1/2 diem (Ø40 mm) Soket 3/4 diem (Ø 20 mm) Soket 1/2 diem (Ø 15 mm) Water mur 6 diem (Ø150 mm) Water mur 5 diem (Ø125 mm) Water mur 4 diem (Ø100 mm) Water mur 3 diem (Ø80 mm) Water mur 2 1/2 diem (Ø65 mm) Water mur 2 diem (Ø50 mm) Water mur 1 1/2 diem (Ø40 mm) Water mur 1 diem (Ø25 mm) Water mur 3/4 diem (Ø20 mm) Water mur 1/2 diem (Ø15 mm) Stop kran 2 diem (Ø50mm) Stop kran 1 1/2 diem (Ø40 mm) Stop kran 1 diem (Ø25 mm) Stop kran 3/4 diem (Ø20 mm) Stop kran 20 ml 1/2 diem (Ø15 mm) Stop kran 1/2 diem (Ø15 mm) Kran 1/2 diem(Ø15 mm) Unci 2 diem (Ø50 mm) Unci 1 1/2 diem (Ø40 mm) Unci 1 diem (Ø25mm) Unci 3/4 diem (Ø20 mm) Standarisasi Harga Satuan Barang dan Jasa TA. 2018

-

HARGA SATUAN (Rp) 5 7,382,946.00 8,102,952.00 750,273.00 412,650.00 1,050,616.00 5,251,913.00 5,251,913.00 975,355.00 2,497,593.42 1,592,690.40 1,111,176.36 838,746.72 670,647.60 473,917.50 323,405.46 207,401.04 160,052.76 319,041.00 246,001.00 104,594.00 63,925.00 29,150.00 39,150.00 24,775.00 28,500.00 20,000.00 15,000.00 499,968.00 378,000.00 116,825.63 113,400.00 100,800.00 83,558.00 57,498.00 30,969.00 25,710.00 20,802.00 115,112.00 105,412.00 38,799.00 28,048.00 71,872.00 24,542.00 12,855.00 19,283.00 12,037.00 10,518.00 6,428.00 27

NO 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99

NAMA BARANG Unci 1/2 diem (Ø15 mm) double Nople 6 diem (Ø150 mm) double Nople 5 diem (Ø125 mm) double Nople 4 diem (Ø100 mm) double Nople 3 diem (Ø80mm) double Nople 2 1/2 diem (Ø65 mm) double Nople 2 diem (Ø50 mm) double Nople 1 1/2 diem (Ø40 mm) double Nople 1 diem (Ø25mm) double Nople 3/4 diem (Ø20 mm) double Nople 1/2 diem (Ø15 mm) Dop 6 diem (Ø150mm) Dop 5 diem (Ø125 mm) Dop 4 diem (Ø100 mm) Dop 3 diem (Ø80 mm) Dop 2 1/2 diem (Ø65 mm) Dop 2 diem (Ø50 mm) Dop 1 1/2 diem (Ø40 mm) Dop 1 diem (Ø25 mm) Dop 3/4 diem (Ø 20 mm) Dop 1/2 diem (Ø15 mm) Tee All Flange 150 x 150x100 Tee All Flange 150 x 150x75 Tee All Flange 150 x 150x50 Rechuser 1 x 3/4 diem Rechuser 1 x 1/2 diem Rechuser 3/4 x 1/2 diem Seal Tape Lem Clamp sadel 6 diem (Ø150 mm) Clamp sadel 4 diem (Ø100 mm) Clamp sadel 3 diem (Ø80mm) Clamp sadel 2 diem (Ø50 mm) Clamp sadel 1 1/2 diem (Ø40 mm) Clamp sadel 1/2 diem (Ø15 mm) Mata Gergaji Waja Knie 6 Diem (Ø150 mm) Knie 5 Diem (Ø125 mm) Knie 4 Diem (Ø100 mm) Knie 3 Diem (Ø80mm) Knie 2 Diem (Ø50 mm) Knie 2 1/2 Diem (Ø 65 mm) Knie 1 1/2 Diem (Ø40 mm) Knie 1 Diem (Ø25 mm) Knie 3/4 Diem (Ø 20 mm) Knie 1/2 Diem (Ø15 mm) Knie 45 Derajat 6 Diem (Ø150 mm) Knie 45 Derajat 5 Diem (Ø125 mm) Knie 45 Derajat 4 Diem (Ø100 mm) Knie 45 Derajat 3 Diem (Ø80mm) Knie 45 Derajat 2 1/2Diem

MERK/TYPE

SATUAN

PVC -

Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Rol Tube Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah

Standarisasi Harga Satuan Barang dan Jasa TA. 2018

HARGA SATUAN (Rp) 6,428.00 376,188.00 216,551.00 101,556.00 582,689.00 29,099.00 22,789.00 17,296.00 8,765.00 8,765.00 7,012.00 290,059.00 202,995.00 87,064.00 51,888.00 37,981.00 18,698.00 8,765.00 5,259.00 5,259.00 4,324.00 758,337.00 721,408.00 709,721.00 8,181.00 10,518.00 7,246.00 2,337.00 10,518.00 313,549.00 191,659.00 174,129.00 127,617.00 104,594.00 81,806.00 22,050.00 667,299.00 463,954.00 172,960.00 92,908.00 32,138.00 63,107.00 17,530.00 8,765.00 7,012.00 4,675.00 639,252.00 551,603.00 188,737.00 100,504.00 72,807.00 27

NO 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150

NAMA BARANG

MERK/TYPE

SATUAN

-

Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah

Knie 45 Derajat 2 Diem (Ø50 mm) Knie 45 Derajat 1 1/2 Diem (Ø40 mm) T-Stucken 6 diem (Ø150 mm) T-Stucken 5 diem (Ø125 mm) T-Stucken 4diem (Ø100 mm) T-Stucken 3 diem (Ø80mm) T-Stucken 2 1/2 diem (Ø 65 mm) T-Stucken 2 diem (Ø50 mm) T-Stucken 1 1/2 diem (Ø40 mm) T-Stucken 1 diem (Ø25 mm) T-Stucken 3/4 diem (Ø 20 mm) T-Stucken 1/2 diem (Ø15 mm) Bochten 6 diem (Ø150 mm) Bochten 5 diem (Ø125 mm) Bochten 4 diem (Ø100 mm) Bochten 3 diem (Ø80mm) Bochten 2 1/2diem (Ø 65 mm) Bochten 2 diem (Ø50 mm) Bochten 1 1/2 diem (Ø40 mm) Bochten 1 diem (Ø25 mm) Bochten 3/4 diem (Ø 20 mm) Bochten 1/2 diem (Ø15 mm) Plugen 6 diem (Ø150 mm) Plugen 5 diem (Ø125 mm) Plugen 4 diem (Ø100 mm) Plugen 3 diem (Ø80mm) Plugen 2 1/2diem (Ø 65 mm) Plugen 2 diem (Ø50 mm) Plugen 1 1/2 diem (Ø40 mm) Plugen 1 diem (Ø25 mm) Plugen 3/4 diem (Ø 20 mm) Plugen 1/2 diem (Ø15 mm) B.A Socket 90 derajat 6 diem (Ø150 mm) B.A Socket 90 derajat 4 diem (Ø100 mm) B.A Socket 90 derajat 3 diem (Ø80mm) B.A Socket 90 derajat 2 diem (Ø50 mm) B.A Socket 45 derajat 6 diem (Ø150 mm) B.A Socket 45 derajat 4 diem (Ø100 mm) B.A Socket 45 derajat 3 diem (Ø80mm) B.A Socket 45 derajat 2 diem (Ø50 mm) B.A Socket 22,5 derajat 6 diem (Ø150 mm) B.A Socket 22,5derajat 4 diem (Ø100 mm) B.A Socket 22,5derajat 3 diem (Ø80mm) B.A Socket 22,5derajat 2 diem (Ø50 mm) B.A Socket 11,25derajat 6 diem (Ø150 mm) B.A Socket 11,25derajat 4 diem (Ø100 mm) B.A Socket 11,25derajat 3 diem (Ø80mm) B.A Socket 11,25derajat 2 diem (Ø50 mm) Verlop DN 1 diem (Ø25 mm) Verlop DN 3/4 diem (Ø 20 mm) Seltip Standarisasi Harga Satuan Barang dan Jasa TA. 2018

HARGA SATUAN (Rp) 35,060.00 23,373.00 782,996.00 580,001.00 220,524.00 121,890.00 92,908.00 40,903.00 27,463.00 32,138.00 9,934.00 1,450,295.00 870,060.00 406,106.00 196,918.00 136,148.00 66,847.00 43,591.00 19,867.00 13,439.00 10,518.00 456,942.00 188,737.00 73,041.00 36,228.00 29,216.00 14,608.00 10,518.00 6,428.00 4,791.00 4,791.00 4,090.00 290,994.00 146,432.00 128,552.00 54,576.00 290,994.00 146,432.00 128,552.00 54,927.00 290,994.00 146,432.00 128,552.00 54,576.00 291,812.00 146,432.00 128,552.00 54,576.00 11,219.00 7,362.00 2,688.00 27

NO 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201

NAMA BARANG

MERK/TYPE

SATUAN

-

Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah M1

Flend UI 6 diem (Ø150 mm) Flend UI 4 diem (Ø100 mm) Flend UI 3 diem (Ø80mm) Flend UI 2 diem (Ø50 mm) Flange drat dalam 6 diem (Ø150 mm) Flange drat dalam 4 diem (Ø100 mm) Flange drat dalam 3 diem (Ø80mm) Flange drat dalam 2 diem (Ø50 mm) Flange Spigot 6 diem (Ø150 mm) Flange Spigot 4 diem (Ø100 mm) Flange Spigot 3 diem (Ø80mm) Flange Spigot 2 diem (Ø50 mm) Flange Soket 6 diem (Ø150 mm) Flange Soket 4 diem (Ø100 mm) Flange Soket 3 diem (Ø80mm) Flange Soket 2 diem (Ø50 mm) Giboult Join 6 diem (Ø150 mm) Giboult Join 4 diem (Ø100 mm) Giboult Join 3 diem (Ø80mm) Flange PN 10 6 diem (Ø150 mm) Flange PN 10 4 diem (Ø100 mm) Flange PN 10 3 diem (Ø80mm) Flange PN 10 2 diem (Ø50 mm) Air Valve Drat 2 diem (Ø50 mm) Air Valve Drat 1 1/2 diem (Ø40 mm) Air Valve Drat 1 diem (Ø25 mm) Air Valve Drat 3/4 diem (Ø 20 mm) Air Valve Drat 1/2 diem (Ø15 mm) Air Valve Drat 4 diem (Ø100 mm) Air Valve Drat 3 diem (Ø80mm) Air Valve Drat 2diem (Ø50 mm) Gate Valve All Flange 4 diem (Ø100 mm) Gate Valve All Flange 3 diem (Ø80mm) Gate Valve All Flange 2 diem Meter air 4 diem (Ø100 mm) Meter air 3 diem (Ø80mm) Meter air 2 diem (Ø50 mm) Meter air 1/2 diem (Ø15 mm) Gate Valve All Flange 2 diem (Ø50 mm) Meter air 6 diem (Ø150 mm) Meter air 4 diem (Ø100 mm) Meter air 2 diem (Ø50 mm) Coupling Ø 90 mm Elbow Welding Ø 90 mm - 450 Elbow Welding Ø 90 mm - 900 Gate valve All Flange CI. Ø 160 mm Gate valve All Flange CI. Ø 90 mm Mur - Bout Paking Ø 160 mm Elbow Welding Ø 160 mm - 450 Pipa HDPE PE (PN 10) Ø 160 mm SNI 06-4829-2005/ISO 4427 - 2007 Standarisasi Harga Satuan Barang dan Jasa TA. 2018

HARGA SATUAN (Rp) 87,064.00 43,824.00 26,061.00 23,957.00 250,675.00 167,117.00 125,279.00 54,927.00 250,675.00 167,117.00 125,279.00 54,927.00 280,710.00 185,815.00 139,420.00 6,428.00 577,313.00 423,285.00 317,288.00 182,543.00 130,304.00 98,985.00 45,577.00 382,850.00 188,737.00 188,737.00 188,737.00 188,737.00 81,221.00 742,443.00 565,627.00 2,783,958.00 580,001.00 580,001.00 3,498,938.00 3,131,982.00 1,392,096.00 315,536.00 527,295.00 8,934,914.00 2,760,936.00 1,150,536.00 128,993.00 217,303.00 313,551.00 2,428,234.00 1,341,742.00 6,450.00 15,215.00 545,539.00 391,684.00 27

NO 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252

NAMA BARANG

MERK/TYPE

Pipa HDPE PE (PN 10) Ø 90 mm SNI 06-4829-2005/ISO 4427 - 2007 Pipa HDPE PE (PN 10) Ø 75 mm SNI 06-4829-2005/ISO 4427 - 2007 Pipa HDPE PE (PN 10) Ø 63 mm SNI 06-4829-2005/ISO 4427 - 2007 Pipa HDPE PE (PN 10) Ø 50 mm SNI 06-4829-2005/ISO 4427 - 2007 Pipa HDPE PE (PN 10) Ø 40 mm SNI 06-4829-2005/ISO 4427 - 2007 Pipa HDPE PE (PN 10) Ø 32 mm SNI 06-4829-2005/ISO 4427 - 2007 Pipa HDPE PE (PN 10) Ø 25 mm SNI 06-4829-2005/ISO 4427 - 2007 Long Elbow 90⁰ (Bend 90⁰) Ø 160 mm SNI 06-4829-2005 & ISO 4427 Long Elbow 90⁰ (Bend 90⁰) Ø 90 mm SNI 06-4829-2005 & ISO 4427 Long Elbow 90⁰ (Bend 90⁰) Ø 75 mm SNI 06-4829-2005 & ISO 4427 Long Elbow 90⁰ (Bend 90⁰) Ø 63 mm SNI 06-4829-2005 & ISO 4427 Long Elbow 90⁰ (Bend 90⁰) Ø 50 mm SNI 06-4829-2005 & ISO 4427 Long Elbow 45⁰ (Bend 45⁰) Ø 160 mm SNI 06-4829-2005 & ISO 4427 Long Elbow 45⁰ (Bend 45⁰) Ø 90 mm SNI 06-4829-2005 & ISO 4427 Long Elbow 45⁰ (Bend 45⁰) Ø 75 mm SNI 06-4829-2005 & ISO 4427 Long Elbow 45⁰ (Bend 45⁰) Ø 63 mm SNI 06-4829-2005 & ISO 4427 Long Elbow 45⁰ (Bend 45⁰) Ø 50 mm SNI 06-4829-2005 & ISO 4427 TEE Ø160 mm SNI 06-4829-2005 & ISO 4427 TEE Ø 90 mm SNI 06-4829-2005 & ISO 4427 TEE Ø 75 mm SNI 06-4829-2005 & ISO 4427 TEE Ø 63 mm SNI 06-4829-2005 & ISO 4427 TEE Ø 50 mm SNI 06-4829-2005 & ISO 4427 Stub Flange Ø160 mm SNI 06-4829-2005 & ISO 4427 Stub Flange Ø 90 mm SNI 06-4829-2005 & ISO 4427 Stub Flange Ø 75 mm SNI 06-4829-2005 & ISO 4427 Stub Flange Ø 63 mm SNI 06-4829-2005 & ISO 4427 Reducer 160 x 90 mm SNI 06-4829-2005 & ISO 4427 Reducer 160 x 75 mm SNI 06-4829-2005 & ISO 4427 Reducer 160 x 63 mm SNI 06-4829-2005 & ISO 4427 Reducer 90 x 75 mm SNI 06-4829-2005 & ISO 4427 Reducer 90 x 63 mm SNI 06-4829-2005 & ISO 4427 Reducer 75 x 63 mm SNI 06-4829-2005 & ISO 4427 Reducer 75 x 50 mm SNI 06-4829-2005 & ISO 4427 Reducer 63 x 50 mm SNI 06-4829-2005 & ISO 4427 End Cap 160 mm SNI 06-4829-2005 & ISO 4427 End Cap 90 mm SNI 06-4829-2005 & ISO 4427 End Cap 75 mm SNI 06-4829-2005 & ISO 4427 End Cap 63 mm SNI 06-4829-2005 & ISO 4427 End Cap 50 mm SNI 06-4829-2005 & ISO 4427 Elbow Welding Ø 160 mm - 900 Stub Flange Ø 160 mm Tee All Flange CI Ø 160 x 160 x 160 mm Tee All Flange CI Ø 160 x 160 x 50 mm Tee All Flange CI Ø 315 x 315 x 160 mm Reducer 6" x 4" Reducer 4" x 3" Tee All Flange CI Ø 110 x 110 x 110 mm Stub Flange Ø 110 mm Paking Ø 110 mm Paking Ø 90 mm Tee All Flange CI Ø 110 x 110 x 50 mm Standarisasi Harga Satuan Barang dan Jasa TA. 2018

SATUAN M1 M1 M1 M1 M1 M1 M1 Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Btg

HARGA SATUAN (Rp) 125,597.00 87,381.00 62,425.00 39,228.00 26,536.00 18,138.00 11,113.00 940,029.00 314,962.00 233,226.00 167,013.00 32,848.00 658,407.00 216,140.00 151,811.00 116,178.00 23,449.00 942,908.00 359,604.00 284,092.00 226,315.00 38,336.00 1,049,290.00 312,619.00 264,461.00 200,668.00 726,579.00 227,619.00 227,619.00 205,015.00 205,015.00 46,746.00 116,934.00 33,390.00 626,195.00 199,584.00 138,713.00 97,801.00 61,702.00 712,245.00 452,807.00 479,588.00 425,234.00 1,058,400.00 347,288.00 137,813.00 325,238.00 16,538.00 14,333.00 303,188.00 1,599.00 27

NO 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297

NAMA BARANG

MERK/TYPE

Gate valve All Flange CI. Ø 100 mm Water Meter All Flange Ø 100 mm Tee All Flange CI Ø 90 x 90 x 90 mm Wall Pipa GIP Ø 50 - 200 mm Water Meter All Flange Ø 110 mm Water Meter All Flange Ø 90 mm Pipa PVC Ø 2" Pipa PVC Ø 3" Pipa PVC Ø 4" Pipa PVC Ø 1/2" Pipa PVC Ø 3/4" Pipa PVC Ø 1" Sock PVC Ø 1/2" Sock PVC Ø 3/4" Sock PVC Ø 1" Sock PVC Ø 2" Sock PVC Ø 3" Sock PVC Ø 4" Knie PVC Ø 1/2" Knie PVC Ø 3/4" Knie PVC Ø 1" Knie PVC Ø 2" Knie PVC Ø 3" Knie PVC Ø 4" Oversock 1/2" - 3/4" Oversock 1" - 3/4" Saringan Kamar Mandi Talang PVC Ø 8" Lem Pipa PVC Seal Tape Kran Kuningan 1/2" Kran Kuningan 3/4" Kran Sock PVC 3/4" Stop Kran 1/2" Stop Kran 3/4" Stop Kran 1" Lem besi CloSet Duduk Keramik CloSet Jongkok (KIA) CloSet Duduk dan Tutupan (KIA) CloSet Jongkok (INA) CloSet Duduk dan Tutupan (INA) CloSet jongkok Keramik Standard Urinoir Keramik Standard Washtafel Gantung Keramik

SATUAN Buah Buah Buah Buah Buah Buah Batang Batang Batang Batang Batang Batang Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Buah Batang Tube Roll Buah Buah Buah Buah Buah Buah Tube Buah Buah Buah Buah Buah Buah Buah Buah

Standarisasi Harga Satuan Barang dan Jasa TA. 2018

HARGA SATUAN (Rp) 16,537,500.00 12,127,500.00 323,033.00 327,610.00 15,435,000.00 13,781,250.00 144,000.00 270,000.00 390,000.00 33,000.00 42,000.00 54,000.00 4,800.00 7,200.00 8,400.00 12,000.00 19,800.00 36,000.00 4,200.00 7,200.00 8,400.00 18,000.00 30,000.00 32,400.00 5,400.00 6,000.00 16,500.00 192,500.00 22,000.00 5,500.00 27,500.00 33,000.00 27,500.00 22,000.00 27,500.00 33,000.00 22,000.00 550,000.00 385,000.00 605,000.00 385,000.00 275,000.00 220,000.00 440,000.00 1,100,000.00

27

Related Documents

Cco Utak Tik.xls
November 2019 7
Calculo De Una Cco
July 2020 7
Mdpl Cco 1
July 2020 7
Utak Atik Registry
April 2020 19
Ba Cco Lembeyan Wetan.doc
December 2019 19

More Documents from "Adi Arch"

Rab Wangga.pdf
December 2019 24
Cco Utak Tik.xls
November 2019 7
December 2019 22
Kewirausahaan.doc
July 2020 3
Doc1.docx
July 2020 4