Gambar Spam Waipidi Sumba Tengah.pdf

  • Uploaded by: Donny Umbu Piga
  • 0
  • 0
  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Gambar Spam Waipidi Sumba Tengah.pdf as PDF for free.

More details

  • Words: 4,393
  • Pages: 18
Nama Kegiatan :

Jenis Pekerjaan :

Lokasi :

Tahun Anggaran :

Gambar Rencana PEMERINTAH KABUPATEN SUMBA TENGAH DINAS PERUMAHAN RAKYAT, KAWASAN PERMUKIMAN DAN PERTANAHAN BIDANG KAWASAN PERMUKIMAN

PEMERINTAH KABUPATEN SUMBA TENGAH DINAS PERUMAHAN RAKYAT, KAWASAN PERMUKIMAN DAN PERTANAHAN

PROGRAM PENGEMBANGAN PENGELOLAAN AIR MINUM

KEGIATAN PEMBANGUNAN SARANA PRASARANA AIR MINUM

PEKERJAAN PEMBANGUNAN SPAM WAIPIDI

LOKASI DESA WAIRASA- KEC.UMBU RATU NGGAY KAB. SUMBA TENGAH

CATATAN

PARAF

DIPERIKSA

TANGGAL

KEPALA SEKSI PERMUKIMAN,

DONNY UMBU PIGA, ST

DISETUJUI

TANGGAL

KEPALA BIDANG PERMUKIMAN,

AHMAD ZAILANI, S.Pt

MENGETAHUI

TANGGAL

KEPALA DINAS,

MELKIANUS UMBU DANGU,ST

PERENCANA KONSULTAN : CV. SARANA BANGUN NUSA,

F.M.HUBERTUS B. TUKAN, ST Kepala Perwakilan

NAMA GAMBAR

CODE

CK'16

SKALA

NO.LBR

JLH. LBR

11

518

Hm 4

517,42

15,0

480,0

RSV

515,62

15,0

465,0

450,0

P20

513,42

25,0

510,82

25,0

P19

425,0

400,0

25,0

P18

507,62

25,0

P17

375,0

P16

503,42

25,0

350,0

P15

498,32

490,52

25,0

325,0

P14

494,82

300,0

P12

25,0

487,02

483,22

25,0

275,0

250,0

225,0

25,0

479,12

25,0

P11

P9

P13

P10

Hm 3

474,82

25,0

466,72

25,0

Hm 2

200,0

P8 175,0

P7

25,0

462,02

455,22

25,0

150,0

P6 125,0

P5

P4

25,0

452,72

448,62

25,0

75,0

50,0

P2

25,0

445,22

25,0 442,12

ELEVASI TANAH ASLI PADA AS SALURAN GROUND LEVEL IN CENTER LINE

25,0

0,0

JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE ACCUMULATED DISTANCE

P3

Hm 1

BRONC

Hm 0

NOMOR PROFIL PROFILE NUMBER

456,72

+ 0,00 meter

PATOK HEKTOMETER HECTOMETER STONE

100,0

bidang persamaan / reference level

515 510 505 500 495 490 485 480 475 470 465 460 455 450 445 440 435

PIPA TRANSMISI PIPA GIP 2"

518

P18 458,6

P17 501,83

10,6

499,70

448,0

P16 399,3

48,7

501,78

44,8

505,05

63,8

354,5

P15

Hm 4

P14 290,7

35,8

505,31

P13 254,9

28,5

505,57

P12 226,4

18,6

505,83

15,1

207,8

P11

Hm 3

506,87

P10 508,46

28,3

192,7

P9 164,4

24,8

509,05

139,6

23,0

511,61

P7 116,6

14,6

514,17

28,1

P8

Hm 2

P6

P5 74,0

48,2

25,7

513,82

P3

P4

39,6

8,6

514,62

16,7

515,42

22,9

22,9

P2

Hm 1

516,32

RSV

ELEVASI TANAH ASLI PADA AS SALURAN GROUND LEVEL IN CENTER LINE

517,12

JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE ACCUMULATED DISTANCE

0,0

Hm 0

NOMOR PROFIL PROFILE NUMBER

102,0

+ 0,00 meter PATOK HEKTOMETER HECTOMETER STONE

516,73

bidang persamaan / reference level

515 510 505 500 495 490

PIPA DISTRIBUSI PIPA GIP 1.5"

DRAFTER :

PROGRAM : PENINGKATAN SARANA DAN PRASARANA

Dibuat oleh : Kepala Seksi Permukiman,

Disetujui oleh : Kepala Bidang Permukiman Dan Pertamanan,

Mengetahui : Kepala Dinas Perumahan Rakyat Kawasan Permukiman Dan Pertanahan,

DONNY UMBU PIGA, ST NIP. 19762910 201001 1 004

AHMAD ZAILANI, S.Pt NIP. 19651003 199801 1 006

MELKIANUS UMBU DANGU, ST NIP. 19640313 199803 1 003

KET :

SURVEYOR :

E:\LOGO ST.jpg

KEGIATAN : PENINGKATAN SARANA AIR BERSIH PEMERINTAH KABUPATEN SUMBA TENGAH DINAS PERUMAHAN RAKYAT, KAWASAN PERMUKIMAN DAN PERTANAHAN Kompleks Perkantoran Makatul - Waibakul

PEKERJAAN : PEMBANGUNAN SPAM WAIPIDI

NO. HALAMAN :

SKALA : 0

10

20

30

40

50

60

70

0

10

20

30

40

50

60

70

80

90

100

SV = 1 : 1000 80

90

SH = 1 : 1000

100

500

S24

447,0 456,81

15,0

459,18

432,0

S23

S22

16,0

460,34

461,92

14,0

416,0

S21

402,0

S20

13,0

462,73

389,0

S19

19,0

462,63

370,0

S18

20,0

461,92

350,0

S17

22,0

460,73

16,0

458,63

19,0

328,0

S16

Hm 4

312,0

S15

293,0

16,0

459,92

460,73

277,0

S14

S13

27,0

461,81

14,0

250,0

S12

236,0 462,18

17,0

463,34

476,73

27,0

219,0

S11

Hm 3

S10

192,0

S9

26,0

477,81

28,0

166,0

S8

21,0

478,18

12,0

138,0

S7

117,0

16,0

483,63

17,0

Hm 2

S6

S5

S4

12,0

89,0

18,0

484,92

15,0

72,0

27,0

485,73

ELEVASI TANAH ASLI PADA AS SALURAN GROUND LEVEL IN CENTER LINE

S3

P18

Hm 1

499,70

JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE ACCUMULATED DISTANCE

0,0

Hm 0

NOMOR PROFIL PROFILE NUMBER

479,34

PATOK HEKTOMETER HECTOMETER STONE

105,0

bidang persamaan

60,0

30

486,81

20

S2

10

42,0

0

487,18

30

S1

20

27,0

10

488,34

0

495 490 485 480 40 50 60 70 80 90 100 475 470 SV = 1 : 1000 465 40 50 60 70 80 90 100 460 SH = 1 : 1000 455 450 / reference level 445 + 0,00 meter 440

460

Dibuat oleh : Kepala Seksi Permukiman,

Disetujui oleh : Kepala Bidang Permukiman Dan Pertamanan,

Mengetahui : Kepala Dinas Perumahan Rakyat Kawasan Permukiman Dan Pertanahan,

DONNY UMBU PIGA, ST NIP. 19762910 201001 1 004

AHMAD ZAILANI, S.Pt NIP. 19651003 199801 1 006

MELKIANUS UMBU DANGU, ST NIP. 19640313 199803 1 003

S46

452,66

490,6

S45

16,0

453,63

474,6

S44

456,0

S43

454,92

18,6

DRAFTER :

PROGRAM : PENINGKATAN SARANA DAN PRASARANA

21,2

455,73

24,3

434,8

S42

24,0

410,5

S41

17,5

456,81

24,2

386,5

28,4

S40

S39

S38

26,1

456,92

29,7

369,1

23,6

457,73

13,6

344,9

30,8

457,29

25,2

316,4

31,9

Hm 4

456,78

34,0

290,3

10,9

Hm 3 S37

Hm 2

454,66

S29

90,5

13,6

457,18

S28

76,9

13,4

458,34

12,0

453,63

ELEVASI TANAH ASLI PADA AS SALURAN GROUND LEVEL IN CENTER LINE

63,5

S26

19,3

454,92

0,0

JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE ACCUMULATED DISTANCE

51,4

S25

Hm 1 S27

Hm 0

NOMOR PROFIL PROFILE NUMBER

S36

+ 0,00 meter PATOK HEKTOMETER HECTOMETER STONE

260,6

SH = 1 : 1000

bidang persamaan / reference level

455 450 445 440 435 430 425 420

454,63

90

S35

80

237,0

SV = 1 : 1000

455,92

70

S34

60

223,4

50

456,73

40

S33

30

192,6

20

457,81

10

90

S32

0

80

167,4

70

458,08

60

S31

50

135,5

40

456,27

30

S30

20

101,4

10

456,81

0

KET :

SURVEYOR :

E:\LOGO ST.jpg

KEGIATAN : PENINGKATAN SARANA AIR BERSIH PEMERINTAH KABUPATEN SUMBA TENGAH DINAS PERUMAHAN RAKYAT, KAWASAN PERMUKIMAN DAN PERTANAHAN Kompleks Perkantoran Makatul - Waibakul

PEKERJAAN : PEMBANGUNAN SPAM WAIPIDI

NO. HALAMAN :

SKALA : 0

10

20

30

40

50

60

70

0

10

20

30

40

50

60

70

80

90

100

SV = 1 : 1000 80

90

SH = 1 : 1000

100

355,4

22,6

502,20

24,9

P15

502,13

332,8

P14

502,28

20,2

307,9

P13

502,35

22,4

287,6

P12

502,43

30,0

265,3

235,3

20,7

P11

500,51

14,1

214,6

P9

P10

499,21

200,5

23,4

497,91

25,2

177,1

26,8

Hm 3

P8

498,00

28,2

P7

151,8

P6

498,08

96,8

29,9

P5

513,72

66,9

21,3

Hm 2

P4

514,79

24,6

45,6

21,0

21,0

P3

515,86

ELEVASI TANAH ASLI PADA AS SALURAN GROUND LEVEL IN CENTER LINE

P2

516,93

RSV

Hm 1

P1

518,00

JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE ACCUMULATED DISTANCE

0,0

Hm 0

NOMOR PROFIL PROFILE NUMBER

125,0

+ 0,00 meter PATOK HEKTOMETER HECTOMETER STONE

512,65

bidang persamaan / reference level

515 510 505 500 495 490

503

P30 27,6

485,27

490,05

29,7

458,1

P29 430,5

400,8

P28 29,8

488,77

36,5

487,49

31,7

371,0

P27

334,5

P26

302,8

P25 29,8

487,54

273,0

P24 28,4

487,59

490,93

244,6

P23 25,5

489,26

219,0

184,5

P22 34,5

492,60

32,5

Hm 4

483,09

Hm 3

P21

152,1

P20 31,2

491,14

32,6

493,30

35,4

Hm 2

P19

88,3

P18

52,8

P17 26,9

493,21

ELEVASI TANAH ASLI PADA AS SALURAN GROUND LEVEL IN CENTER LINE

25,9

P16 25,9

493,12

P15

Hm 1

502,13

JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE ACCUMULATED DISTANCE

0,0

Hm 0

NOMOR PROFIL PROFILE NUMBER

488,99

+ 0,00 meter PATOK HEKTOMETER HECTOMETER STONE

120,9

bidang persamaan / reference level

500 495 490 485 480 475 470

PROFIL MELINTANG JALUR PIPA DISTRIBUSI PIPA GIP 1.5" (KP. DEWA KAWORUNG)

491

Hm 3

15,2

352,1

P45

459,23

21,8

336,9

21,6

P44

459,80

P43 315,1

23,3

293,6

P42

467,64

31,5

270,3

P41

472,91

25,5

238,8

P40

476,17

22,2

213,3

P39

478,44

21,6

191,1

P38

481,61

20,8

169,5

P37

483,78

20,2

148,7

P36

485,95

24,3

128,5

19,4

P35

464,07

Hm 2

P34

488,12

21,1

84,8

P33

489,21

32,6

63,7

31,1

31,1

P32

485,12

ELEVASI TANAH ASLI PADA AS SALURAN GROUND LEVEL IN CENTER LINE

480,91

P30

Hm 1

P31

483,09

JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE ACCUMULATED DISTANCE

0,0

Hm 0

NOMOR PROFIL PROFILE NUMBER

104,2

+ 0,00 meter PATOK HEKTOMETER HECTOMETER STONE

490,29

bidang persamaan / reference level

490 485 480 475 470 465 460 455 450

PROFIL MELINTANG JALUR PIPA DISTRIBUSI PIPA GIP 1.5" (KP. DEWA KAWORUNG)

DRAFTER :

PROGRAM : PENINGKATAN SARANA DAN PRASARANA

Dibuat oleh : Kepala Seksi Permukiman,

Disetujui oleh : Kepala Bidang Permukiman Dan Pertamanan,

Mengetahui : Kepala Dinas Perumahan Rakyat Kawasan Permukiman Dan Pertanahan,

DONNY UMBU PIGA, ST NIP. 19762910 201001 1 004

AHMAD ZAILANI, S.Pt NIP. 19651003 199801 1 006

MELKIANUS UMBU DANGU, ST NIP. 19640313 199803 1 003

KET :

SURVEYOR :

E:\LOGO ST.jpg

KEGIATAN : PENINGKATAN SARANA AIR BERSIH PEMERINTAH KABUPATEN SUMBA TENGAH DINAS PERUMAHAN RAKYAT, KAWASAN PERMUKIMAN DAN PERTANAHAN Kompleks Perkantoran Makatul - Waibakul

PEKERJAAN : PEMBANGUNAN SPAM WAIPIDI

NO. HALAMAN :

SKALA : 0

10

20

30

40

50

60

70

0

10

20

30

40

50

60

70

80

90

100

SV = 1 : 1000 80

90

SH = 1 : 1000

100

Hm 4

483,2

P16

457,0

P15

469,82

26,3

471,92

25,4

472,27

477,42

478,42

P14 20,5

431,6

P13 36,8

411,1

374,3

P12 37,9

480,42

478,98

P11 33,0

336,4

303,3

P10 35,6

478,42

267,7

235,1

P9 32,6

482,17

36,8

490,65

32,6

490,93

491,86

P8

198,2

P7

165,7

131,5

P6 34,2

P37

446,10

445,82

25,9

532,5

P36 31,9

444,79

29,1

506,6

P35 474,7

P34 28,9

445,7

416,8

P33 35,2

446,17

447,92

34,6

Hm 5

446,82

P32 381,6

346,9

P31 19,2

448,73

327,8

P30 25,9

445,58

301,9

P28

273,9

P29 28,0

448,58

11,8

Hm 4

446,58

P27

449,54

20,0

450,10

448,17

444,65

P26 18,1

242,1

P25 22,4

224,1

P24 20,2

201,7

P23 26,0

181,5

29,0

444,93

465,83

P22 155,6

P21 21,0

445,86

P20 23,4

Hm 3

262,1

Hm 2

126,6

82,2

59,3

P19 22,9

466,15

ELEVASI TANAH ASLI PADA AS SALURAN GROUND LEVEL IN CENTER LINE

P18 20,3

467,15

39,0

P17 39,0

468,13

P16

Hm 1

469,82

JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE ACCUMULATED DISTANCE

0,0

Hm 0

455 450 445 440 435 430

369,3

379,0

9,7

21,9

451,84

P53

452,22

24,0

347,4

30,9

P52

453,22

P51 323,4

23,2

292,5

P50

453,82

17,2

269,3

P49

454,22

24,7

252,2

P48

451,22

227,5

25,5

451,62

202,0

24,5

P47

P54

Hm 3

P46

451,82

17,4

177,5

P45

451,21

33,6

160,1

P44

451,22

22,9

126,5

21,7

P43

453,62

Hm 2

P42

451,52

18,3

81,8

P41

450,82

20,4

63,5

P40

450,21

20,8

43,1

22,3

P39

449,11

ELEVASI TANAH ASLI PADA AS SALURAN GROUND LEVEL IN CENTER LINE

22,3

JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE ACCUMULATED DISTANCE

Hm 1

P38

446,38

P37

Hm 0

NOMOR PROFIL PROFILE NUMBER

0,0

PATOK HEKTOMETER HECTOMETER STONE

446,10

+ 0,00 meter

P5 20,5

497,43

498,17

33,6

Hm 3

470 465 460 455 450 445 440 435 430

NOMOR PROFIL PROFILE NUMBER

bidang persamaan / reference level

P4 111,0

77,4

42,1

P3 35,3

444,43

+ 0,00 meter PATOK HEKTOMETER HECTOMETER STONE

Hm 2

105,6

bidang persamaan / reference level

P2 17,8

500,15

ELEVASI TANAH ASLI PADA AS SALURAN GROUND LEVEL IN CENTER LINE

24,3

P1 24,3

508,15

RSV

Hm 1

518,00

JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE ACCUMULATED DISTANCE

0,0

Hm 0

NOMOR PROFIL PROFILE NUMBER

103,6

+ 0,00 meter PATOK HEKTOMETER HECTOMETER STONE

451,20

bidang persamaan / reference level

515 510 505 500 495 490 485 480 475 470 465 460 455 450

DRAFTER :

PROGRAM : PENINGKATAN SARANA DAN PRASARANA

Dibuat oleh : Kepala Seksi Permukiman,

Disetujui oleh : Kepala Bidang Permukiman Dan Pertamanan,

Mengetahui : Kepala Dinas Perumahan Rakyat Kawasan Permukiman Dan Pertanahan,

DONNY UMBU PIGA, ST NIP. 19762910 201001 1 004

AHMAD ZAILANI, S.Pt NIP. 19651003 199801 1 006

MELKIANUS UMBU DANGU, ST NIP. 19640313 199803 1 003

KET :

SURVEYOR :

E:\LOGO ST.jpg

KEGIATAN : PENINGKATAN SARANA AIR BERSIH PEMERINTAH KABUPATEN SUMBA TENGAH DINAS PERUMAHAN RAKYAT, KAWASAN PERMUKIMAN DAN PERTANAHAN Kompleks Perkantoran Makatul - Waibakul

PEKERJAAN : PEMBANGUNAN SPAM WAIPIDI

NO. HALAMAN :

SKALA : 0

10

20

30

40

50

60

70

0

10

20

30

40

50

60

70

80

90

100

SV = 1 : 1000 80

90

SH = 1 : 1000

100

457 455

447,88

501,6 Puj.23

479,6 Puj.22

22,0

448,10

28,3

447,65

21,4

445,88

453,86

23,8

451,4 Puj.21

430,0 Puj.20

Hm 5

406,2 Puj.19

383,7 Puj.18

22,5

454,09

360,2 Puj.17

23,5

454,32

339,4 Puj.16

20,8

454,18

321,6 Puj.15

17,8

454,40

17,9

454,54

16,2

Hm 4

303,7 Puj.14

287,5 Puj.13

16,6

454,63

271,0 Puj.12

25,6

455,09

245,4 Puj.11

21,3

455,72

456,09

16,9

445,88

446,06

17,7

224,1 Puj.10

Puj.9

Hm 3

207,2

Puj.8 189,6

Puj.7

22,2

446,20

27,9

167,4

Puj.6

24,3

444,22

21,3

139,5

Puj.5

Puj.4

Hm 2

444,66

23,9

444,89

24,0

93,8

Puj.3 69,9

Puj.2 45,9

Puj.1

22,0

445,11

ELEVASI TANAH ASLI PADA AS SALURAN GROUND LEVEL IN CENTER LINE

23,9

23,9

446,66

PHDE

Hm 1

447,10

JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE ACCUMULATED DISTANCE

0,0

Hm 0

NOMOR PROFIL PROFILE NUMBER

115,1

+ 0,00 meter PATOK HEKTOMETER HECTOMETER STONE

444,44

bidang persamaan / reference level

450 445 440 435 430 425 420

451 450

475,9 Puj.38

448,7 Puj.37 449,47

27,2

448,97

418,9 Puj.36

29,8

449,87

37,2

450,10

39,7

444,22

444,66

43,8

381,7 Puj.35

Hm 4 342,1 Puj.34

298,2 Puj.33

261,3 Puj.32

36,9

445,11

24,7

448,20

37,4

236,6 Puj.31

199,2 Puj.30

28,5

Hm 3

448,65

27,8

170,7 Puj.29

27,0

448,88

142,9 Puj.28

Hm 2

449,10

Puj.26

31,0

449,65

28,9

84,9

Puj.25 56,0

28,9

450,10

27,1

447,65

ELEVASI TANAH ASLI PADA AS SALURAN GROUND LEVEL IN CENTER LINE

27,1

Puj.24

Hm 1

447,88

Puj.23

JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE ACCUMULATED DISTANCE

0,0

Hm 0

NOMOR PROFIL PROFILE NUMBER

115,8 Puj.27

+ 0,00 meter PATOK HEKTOMETER HECTOMETER STONE

449,20

bidang persamaan / reference level

445 440 435 430 425 420

452 450

Hm 4

462,8 447,75

DRAFTER :

PROGRAM : PENINGKATAN SARANA DAN PRASARANA

Puj.51 36,6

448,20

31,8

426,3

Puj.50

394,5

Puj.49 31,8

448,65

362,7

Puj.48 40,5

449,10

Puj.47 38,6

450,19

283,5

Puj.46 36,8

451,10

246,7

Puj.45 35,1

449,10

211,6

Puj.44 36,0

450,19

175,6

Puj.43 34,3

450,64

Puj.42 40,5

141,2

Puj.41 39,5

Hm 3

322,2

Hm 2

451,64

61,3

Puj.40 33,3

447,88

28,0

Puj.39

448,10

ELEVASI TANAH ASLI PADA AS SALURAN GROUND LEVEL IN CENTER LINE

Hm 1

28,0 448,97

Puj.38

JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE ACCUMULATED DISTANCE

0,0

Hm 0

NOMOR PROFIL PROFILE NUMBER

450,87

+ 0,00 meter PATOK HEKTOMETER HECTOMETER STONE

100,7

bidang persamaan / reference level

445 440 435 430 425 420

Dibuat oleh : Kepala Seksi Permukiman,

Disetujui oleh : Kepala Bidang Permukiman Dan Pertamanan,

Mengetahui : Kepala Dinas Perumahan Rakyat Kawasan Permukiman Dan Pertanahan,

DONNY UMBU PIGA, ST NIP. 19762910 201001 1 004

AHMAD ZAILANI, S.Pt NIP. 19651003 199801 1 006

MELKIANUS UMBU DANGU, ST NIP. 19640313 199803 1 003

KET :

SURVEYOR :

E:\LOGO ST.jpg

KEGIATAN : PENINGKATAN SARANA AIR BERSIH PEMERINTAH KABUPATEN SUMBA TENGAH DINAS PERUMAHAN RAKYAT, KAWASAN PERMUKIMAN DAN PERTANAHAN Kompleks Perkantoran Makatul - Waibakul

PEKERJAAN : PEMBANGUNAN SPAM WAIPIDI

NO. HALAMAN :

SKALA : 0

10

20

30

40

50

60

70

0

10

20

30

40

50

60

70

80

90

100

SV = 1 : 1000 80

90

SH = 1 : 1000

100

500 500

S62

473,22

473,88

28,4

344,9

316,4

S61 26,1

475,16

29,7

290,3

S60

260,6

S58

237,0

S59 23,6

473,82

13,6

474,84

S57

474,17

30,8

223,4

192,6

167,4

S56 25,2

471,82

135,5

S55 31,9

472,84

34,0

Hm 3

474,03

S53

S52

Hm 2

S54

10,9

475,17

13,6

494,17

13,4

496,82

12,0

90,5

S51

S50

63,5

76,9

S49 51,4

19,3

497,84

32,1

S48 17,0

498,03

ELEVASI TANAH ASLI PADA AS SALURAN GROUND LEVEL IN CENTER LINE

15,1

S47 15,1

498,17

P18

Hm 1

499,70

JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE ACCUMULATED DISTANCE

0,0

Hm 0

NOMOR PROFIL PROFILE NUMBER

101,4

+ 0,00 meter PATOK HEKTOMETER HECTOMETER STONE

474,03

bidang persamaan / reference level

495 490 485 480 475 470 465

477 475

20,7

S77 18,9

S78 25,2

461,97 334,2

21,4

S76 470,83 290,2

19,2

S75 472,82 269,5

19,8

S74 473,84 248,1

20,1

S73 474,03 228,8

19,3

Hm 3

S72 474,17 209,1

20,5

S71 474,88 189,0

S70 476,16 169,6

28,3

475,84 149,1

29,2

S69

465,17 309,0

Hm 2

S68 474,82 120,8

23,4

91,7

S67

473,03

19,9

68,2

S66

470,82

16,6

48,3

S65

471,84

15,3

31,7

16,4

S64

473,03

ELEVASI TANAH ASLI PADA AS SALURAN GROUND LEVEL IN CENTER LINE

Hm 1

S63 16,4

S62

JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE ACCUMULATED DISTANCE

0,0

Hm 0

NOMOR PROFIL PROFILE NUMBER

473,17

+ 0,00 meter PATOK HEKTOMETER HECTOMETER STONE

470 465 460 455

473,82

bidang persamaan / reference level

DRAFTER :

PROGRAM : PENINGKATAN SARANA DAN PRASARANA

Dibuat oleh : Kepala Seksi Permukiman,

Disetujui oleh : Kepala Bidang Permukiman Dan Pertamanan,

Mengetahui : Kepala Dinas Perumahan Rakyat Kawasan Permukiman Dan Pertanahan,

DONNY UMBU PIGA, ST NIP. 19762910 201001 1 004

AHMAD ZAILANI, S.Pt NIP. 19651003 199801 1 006

MELKIANUS UMBU DANGU, ST NIP. 19640313 199803 1 003

KET :

SURVEYOR :

E:\LOGO ST.jpg

KEGIATAN : PENINGKATAN SARANA AIR BERSIH PEMERINTAH KABUPATEN SUMBA TENGAH DINAS PERUMAHAN RAKYAT, KAWASAN PERMUKIMAN DAN PERTANAHAN Kompleks Perkantoran Makatul - Waibakul

PEKERJAAN : PEMBANGUNAN SPAM WAIPIDI

NO. HALAMAN :

SKALA : 0

10

20

30

40

50

60

70

0

10

20

30

40

50

60

70

80

90

100

SV = 1 : 1000 80

90

SH = 1 : 1000

100

PEMERINTAH KABUPATEN SUMBA TENGAH DINAS PERUMAHAN RAKYAT, KAWASAN PERMUKIMAN DAN PERTANAHAN

PROGRAM PENGEMBANGAN PENGELOLAAN AIR MINUM

A

KEGIATAN PEMBANGUNAN SARANA PRASARANA AIR MINUM

PEKERJAAN PEMBANGUNAN SPAM WAIPIDI

LOKASI DESA WAIRASA, KEC.UMBU RATU NGGAY - KAB. SUMBA TENGAH

CATATAN

PARAF

DIPERIKSA

TANGGAL

KEPALA SEKSI PERMUKIMAN,

DONNY UMBU PIGA, ST

MAB + 4 M

MAB + 4 M

DISETUJUI

TANGGAL

KEPALA BIDANG PERMUKIMAN,

AHMAD ZAILANI, S.Pt

MENGETAHUI

A

TANGGAL

KEPALA DINAS,

B

MELKIANUS UMBU DANGU,ST

PERENCANA KONSULTAN : CV. SARANA BANGUN NUSA,

F.M.HUBERTUS B. TUKAN, ST Kepala Perwakilan

NAMA GAMBAR

SKALA

DENAH BRONKAPTERING

DENAH PENAMPANG GUA SKALA 1 : 50

CODE

CK'16

NO.LBR

02

1 : 50

JLH. LBR

11

PEMERINTAH KABUPATEN SUMBA TENGAH DINAS PERUMAHAN RAKYAT, KAWASAN PERMUKIMAN DAN PERTANAHAN

PROGRAM PENGEMBANGAN PENGELOLAAN AIR MINUM

KEGIATAN PEMBANGUNAN SARANA PRASARANA AIR MINUM

PEKERJAAN PEMBANGUNAN SPAM WAIPIDI

LOKASI DESA WAIRASA, KEC.UMBU RATU NGGAY - KAB. SUMBA TENGAH

CATATAN

PARAF

DIPERIKSA

TANGGAL

KEPALA SEKSI PERMUKIMAN,

DONNY UMBU PIGA, ST

DISETUJUI

TANGGAL

KEPALA BIDANG PERMUKIMAN,

A.DETAIL RUMAH POMPA

AHMAD ZAILANI, S.Pt

SKALA 1 : 50 MENGETAHUI

TANGGAL

KEPALA DINAS,

MELKIANUS UMBU DANGU,ST

PERENCANA KONSULTAN : CV. SARANA BANGUN NUSA,

F.M.HUBERTUS B. TUKAN, ST Kepala Perwakilan

NAMA GAMBAR

SKALA

POTONGAN BRONKAPTERING

1 : 50

B. DETAIL SAMBUNGAN SUB MERSIBLE PUMP CODE

CK'16

NO.LBR

03

JLH. LBR

11

PEMERINTAH KABUPATEN SUMBA TENGAH DINAS PERUMAHAN RAKYAT, KAWASAN PERMUKIMAN DAN PERTANAHAN

0.60

0.20 0.10

B

0.15

Manhole 60 x 60

0.60

A

PROGRAM PENGEMBANGAN PENGELOLAAN AIR MINUM

Pipa Inlet (GI dia. Ø 75 mm)

KEGIATAN PEMBANGUNAN SARANA AIR BERSIH

PEKERJAAN

Pipa Over Flow (GI dia. Ø 63 mm )

PEMBANGUNAN SPAM WAIPIDI

2.70

2.00

LOKASI

2.55

Manhole 60 x 60

KEC. UMBU RATU NGGAY - KAB. SUMBA TENGAH

5.00

A

Pipa Outlet (GI dia. Ø 63 mm )

5.40

CATATAN

PARAF

DIPERIKSA

TANGGAL

0.15

Pipa Penguras (GI dia. Ø 100 mm ) Pipa Outlet (GI dia. Ø 50 mm )

0.50

0.25

0.60

KEPALA SEKSI PERMUKIMAN,

2.25

0.20 0.10

0.60

2.15

Manhole 60 x 60

DONNY UMBU PIGA, ST

1.90

DISETUJUI

5.00

0.10 0.20

0.20 0.10

TANGGAL

KEPALA BIDANG PERMUKIMAN,

5.60

Denah Reservoir 50 M3 Skala 1 : 50

AHMAD ZAILANI, S.Pt

MENGETAHUI Pipa Ventilasi Ø 50 mm

TANGGAL

KEPALA DINAS,

2.23

MELKIANUS UMBU DANGU,ST

PERENCANA 1.50 1.80

KONSULTAN : CV. SARANA BANGUN NUSA,

F.M.HUBERTUS B. TUKAN, ST Kepala Perwakilan 2.85

NAMA GAMBAR

SKALA

0.98 0.15

2.55

DENAH RESERVOIR

1 : 50

0.15

2.70 5.40

Potongan B-B Skala 1 : 50

CODE

CK'16

NO.LBR

04

JLH. LBR

11

PEMERINTAH KABUPATEN SUMBA TENGAH DINAS PERUMAHAN RAKYAT, KAWASAN PERMUKIMAN DAN PERTANAHAN

PROGRAM 0.30 0.10

PENGEMBANGAN PENGELOLAAN AIR MINUM Pipa Ventilasi Ø 50 mm

0.30

0.15

0.15

KEGIATAN PEMBANGUNAN SARANA AIR BERSIH

Balok uk. 20 x 20 cm

PEKERJAAN PEMBANGUNAN SPAM WAIPIDI

2.00

Tangga Monyet

2.40

0.60

LOKASI KEC. UMBU RATU NGGAY - KAB. SUMBA TENGAH

PARAF

DIPERIKSA

TANGGAL

0.40

0.20

0.40

CATATAN

Lantai Kerja; t=10 cm Gate Valve Ø 100 mm

0.50

0.25

KEPALA SEKSI PERMUKIMAN,

2.00 0.15

Urugan Tanah

Urugan Pasir; t=10 cm

5.00

0.15

0.20

0.20 5.70

DONNY UMBU PIGA, ST 5.40

DISETUJUI

TANGGAL

KEPALA BIDANG PERMUKIMAN,

Potongan A-A Skala 1 : 50

AHMAD ZAILANI, S.Pt Ø 10-150

0.10

Ø 10-150

0.15

MENGETAHUI

TANGGAL

0.10

KEPALA DINAS,

0.15 0.10

Balok uk. 20 x 20 cm

2.20

2.65

Ø10-150

Ø 12-150

Ø 12-150

MELKIANUS UMBU DANGU,ST

1.50

PERENCANA Ø 12-150

KONSULTAN : CV. SARANA BANGUN NUSA,

0.25

Ø 12-150

0.15 0.20

2.00

Kepala Perwakilan 0.50

0.10 0.05 0.15

F.M.HUBERTUS B. TUKAN, ST 0.25

0.20

5.00

0.20 0.15

NAMA GAMBAR

SKALA

0.50 2.15

POTONGAN RESERVOIR

1 : 50

PENULANGAN PLAT DINDING

1 : 50

Penulangan Plat Dinding Skala 1 : 50

CODE

CK'16

NO.LBR

05

JLH. LBR

11

PEMERINTAH KABUPATEN SUMBA TENGAH DINAS PERUMAHAN RAKYAT, KAWASAN PERMUKIMAN DAN PERTANAHAN

PROGRAM PENGEMBANGAN PENGELOLAAN AIR MINUM

KEGIATAN PEMBANGUNAN SARANA AIR BERSIH

PEKERJAAN 5.70

PEMBANGUNAN SPAM WAIPIDI 0.15 0.20

0.15

0.15 0.20

2.00

LOKASI

5.00 0.15 0.20

KEC. UMBU RATU NGGAY - KAB. SUMBA TENGAH

CATATAN

PARAF

DIPERIKSA

TANGGAL

Ø 12-150

0.15

Ø 12-150

KEPALA SEKSI PERMUKIMAN,

Ø 12-150 Ø 12-150

5.70

Ø 12-150

5.00

2.55

2.85

DONNY UMBU PIGA, ST Ø 12-150

DISETUJUI

TANGGAL

0.15

KEPALA BIDANG PERMUKIMAN,

AHMAD ZAILANI, S.Pt

MENGETAHUI 2.00

TANGGAL

0.15 0.20

KEPALA DINAS,

MELKIANUS UMBU DANGU,ST

Penulangan Plat Lantai

PERENCANA KONSULTAN : CV. SARANA BANGUN NUSA,

Skala 1 : 50

F.M.HUBERTUS B. TUKAN, ST Kepala Perwakilan

NAMA GAMBAR

SKALA

PENULANGAN PLAT LANTAI

CODE

CK'16

NO.LBR

06

1 : 50

JLH. LBR

11

PEMERINTAH KABUPATEN SUMBA TENGAH DINAS PERUMAHAN RAKYAT, KAWASAN PERMUKIMAN DAN PERTANAHAN

PROGRAM PENGEMBANGAN PENGELOLAAN AIR MINUM

KEGIATAN PEMBANGUNAN SARANA AIR BERSIH

PEKERJAAN PEMBANGUNAN SPAM WAIPIDI

0.15 0.20

0.15 0.20

0.15 1.85

5.00

LOKASI

Ø 10-150

Ø 10-150

0.15

Ø 10-150

Ø 10-150

CATATAN

PARAF

DIPERIKSA

TANGGAL

0.15

0.20

KEC. UMBU RATU NGGAY - KAB. SUMBA TENGAH

KEPALA SEKSI PERMUKIMAN,

Ø 10-150

5.70

5.00

Ø 10-150

DONNY UMBU PIGA, ST

Ø 10-150

2.55

2.85

Ø 10-150

DISETUJUI

TANGGAL

0.15

KEPALA BIDANG PERMUKIMAN,

AHMAD ZAILANI, S.Pt

MENGETAHUI 0.15

0.20

2.00

TANGGAL

KEPALA DINAS,

MELKIANUS UMBU DANGU,ST

Penulangan Plat Atap

PERENCANA KONSULTAN : CV. SARANA BANGUN NUSA,

Skala 1 : 50

F.M.HUBERTUS B. TUKAN, ST Kepala Perwakilan

NAMA GAMBAR

SKALA

PENULANGAN PLAT ATAP

CODE

CK'16

NO.LBR

07

1 : 50

JLH. LBR

11

PEMERINTAH KABUPATEN SUMBA TENGAH DINAS PERUMAHAN RAKYAT, KAWASAN PERMUKIMAN DAN PERTANAHAN

25.0

PROGRAM

04 15.0

02

PENGEMBANGAN PENGELOLAAN AIR MINUM

25.0

KEGIATAN 03

PEMBANGUNAN SARANA AIR BERSIH

08

PEKERJAAN cor beton tak bertulang 1:2:3

03

80.0

PEMBANGUNAN SPAM WAIPIDI

LOKASI KEC. UMBU RATU NGGAY - KAB. SUMBA TENGAH

CATATAN

PARAF

DIPERIKSA

TANGGAL

cor beton tak bertulang 1:3:5 100.0

Detail Kran Umum Skala 1 : 10

5

10.0

5

5

KEPALA SEKSI PERMUKIMAN,

10.0

NOTASI :

07 06 07 05

20.0

25.0

01. 02. 03. 04. 05. 06. 07. 08.

55.0 100.0

02

Clamp Sadle PVC dia. 63 mm x 3/4" Knee 3/4 Pipa GI dia. 20 mm Kran dia. 20 mm Stop Kran dia. 20 mm Watermoor dia. 20 mm Neple dia. 20 mm Socket dia. 3/4

DONNY UMBU PIGA, ST

DISETUJUI

TANGGAL

KEPALA BIDANG PERMUKIMAN,

03

15

01

5

AHMAD ZAILANI, S.Pt

5

MENGETAHUI

TANGGAL

KEPALA DINAS,

25.0

PERENCANA

25.0

100.0

MELKIANUS UMBU DANGU,ST

KONSULTAN : CV. SARANA BANGUN NUSA,

Denah Kran Umum Skala 1 : 10

F.M.HUBERTUS B. TUKAN, ST Kepala Perwakilan

NAMA GAMBAR

SKALA

DENAH KRAN UMUM

1 : 10

DETAIL KRAN UMUM

1 : 10

100.0

CODE

CK'16

NO.LBR

08

JLH. LBR

11

PEMERINTAH KABUPATEN SUMBA TENGAH DINAS PERUMAHAN RAKYAT, KAWASAN PERMUKIMAN DAN PERTANAHAN 10.0

80

10

PROGRAM PENGEMBANGAN PENGELOLAAN AIR MINUM

10

KEGIATAN PEMBANGUNAN SARANA AIR BERSIH

PEKERJAAN PEMBANGUNAN SPAM WAIPIDI

Pipa Muka Tanah

Single Air Valve f 25 mm

LOKASI

CATATAN

PARAF

DIPERIKSA

TANGGAL

60

60

KEC. UMBU RATU NGGAY - KAB. SUMBA TENGAH

10

KEPALA SEKSI PERMUKIMAN,

DONNY UMBU PIGA, ST

100.0

DISETUJUI

Denah Bak Air Valve

Tampak Bak Air Valve

TANGGAL

KEPALA BIDANG PERMUKIMAN,

Skala 1 : 10

Skala 1 : 10

AHMAD ZAILANI, S.Pt Muka Tanah

MENGETAHUI

TANGGAL

KEPALA DINAS,

Single Air Valve f 25 mm

70

60

f 10 - 15

MELKIANUS UMBU DANGU,ST

Pipa Tee All Flange

PERENCANA

10

KONSULTAN : CV. SARANA BANGUN NUSA,

F.M.HUBERTUS B. TUKAN, ST Kepala Perwakilan

10

10

10

80.0

10

NAMA GAMBAR

SKALA

120.0

Potongan Bak Air Valve

DENAH BAK AIR VALVE TAMPAK AIR VALVE POTONGAN AIR VALVE

1 : 10 1 : 10 1 : 10

Skala 1 : 10

CODE

CK'16

NO.LBR

09

JLH. LBR

11

PEMERINTAH KABUPATEN SUMBA TENGAH DINAS PERUMAHAN RAKYAT, KAWASAN PERMUKIMAN DAN PERTANAHAN

PROGRAM 10.0

80

10 PENGEMBANGAN PENGELOLAAN AIR MINUM

KEGIATAN PEMBANGUNAN SARANA AIR BERSIH

PEKERJAAN Gate Valve

PEMBANGUNAN SPAM WAIPIDI

LOKASI

Muka Tanah Gate Valve

KEC. UMBU RATU NGGAY - KAB. SUMBA TENGAH

Plat Beton Plat Beton Cat Biru Benhur

CATATAN

PARAF

DIPERIKSA

TANGGAL

60

60

80

Cat Biru Benhur

Tee All Flange

KEPALA SEKSI PERMUKIMAN,

Pipa

DONNY UMBU PIGA, ST

100.0

DISETUJUI

Denah Bak Wash Out

Tampak Bak Wash Out

TANGGAL

KEPALA BIDANG PERMUKIMAN,

Skala 1 : 10

Skala 1 : 10 AHMAD ZAILANI, S.Pt Muka Tanah

MENGETAHUI

TANGGAL

KEPALA DINAS,

Gate Valve

60

f 10 - 15

MELKIANUS UMBU DANGU,ST

70

Tee All Flange

PERENCANA

10

KONSULTAN : CV. SARANA BANGUN NUSA,

F.M.HUBERTUS B. TUKAN, ST

10

10

80 120

10

Kepala Perwakilan

10 NAMA GAMBAR

Potongan Bak Wash Out

SKALA

DENAH BAK WASH OUT TAMPAK BAK WASH OUT POTONGAN BAK WASH OUT

1 : 10 1 : 10 1 : 10

Skala 1 : 10

CODE

CK'16

NO.LBR

10

JLH. LBR

11

PEMERINTAH KABUPATEN SUMBA TENGAH DINAS PERUMAHAN RAKYAT, KAWASAN PERMUKIMAN DAN PERTANAHAN

PROGRAM PENGEMBANGAN PENGELOLAAN AIR MINUM

KEGIATAN PEMBANGUNAN SARANA AIR BERSIH

PEKERJAAN PEMBANGUNAN SPAM WAIPIDI

LOKASI KEC. UMBU RATU NGGAY - KAB. SUMBA TENGAH

CATATAN

PARAF

DIPERIKSA

TANGGAL

KEPALA SEKSI PERMUKIMAN,

Tanah Urug

Tanah Urug

Tanah Urug

DONNY UMBU PIGA, ST

DISETUJUI 50.00

50.00

50.00

TANGGAL

KEPALA BIDANG PERMUKIMAN,

AHMAD ZAILANI, S.Pt

30.00

30.00

MENGETAHUI

30.00

TANGGAL

KEPALA DINAS,

Pipa HDPE ∅ 110 mm

Pipa HDPE ∅ 90 mm

Pipa HDPE ∅ 63 mm

MELKIANUS UMBU DANGU,ST

Typical Galian Pipa Skala 1 : 10

PERENCANA KONSULTAN : CV. SARANA BANGUN NUSA,

F.M.HUBERTUS B. TUKAN, ST Kepala Perwakilan

NAMA GAMBAR

SKALA

TYPICAL GALIAN PIPA

CODE

CK'16

1 : 10

NO.LBR

11

JLH. LBR

11

Related Documents

Spam
May 2020 19
Spam
December 2019 34
Spam
April 2020 15
Sumba Barat.docx
November 2019 5
Sumba Barat.docx
November 2019 4

More Documents from "medelina bees"

Rab Wangga.pdf
December 2019 24
Cco Utak Tik.xls
November 2019 7
December 2019 22
Kewirausahaan.doc
July 2020 3
Doc1.docx
July 2020 4