DAFTAR KUANTITAS DAN HARGA KEGIATAN PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) SUNGAI WANGGA ATAS, DESA PADIRATANA, KEC. U. RATU NGGAY, KABUPATEN SUMBA TENGAH - NTT

No

RINCIAN PEKERJAAN

1

2

Volume

Satuan

3

4

Harga Satuan

Jumlah Harga

(Rp)

(Rp)

5

6

A DETAIL DISAIN SISTEM PLTMH Biaya langsung 1

Team Leader

1 ls

5,000,000

5,000,000

2

Tenaga Ahli

3 ls

3,500,000

10,500,000

3

Tenaga Pendukung

4 ls

2,000,000

8,000,000

4

Transportasi

1 ls

40,000,000

40,000,000

5

Sewa Peralatan

1 ls

10,000,000

10,000,000

6

Pelaporan Shop Drawing

2 ls

3,000,000

6,000,000 79,500,000

Biaya tak langsung 1

ATK

1 ls

2

Komunikasi

3 bln

3

Managemen fee

1 ls

1,500,000

1,500,000

700,000

2,100,000

2,000,000

2,000,000 5,600,000

Persiapan 1

Mobilisasi/Demobilisasi

1 Ls

36,000,000

36,000,000

2

Jalan akses (orang Material)

500 m

5,000

2,500,000

3

Pembersihan dan Perataan

750 m2

5,000

3,750,000

4

Setting out

375 m2

7,500

2,812,500

5

Dokumentasi

1 Ls

5,000,000

5,000,000

6

P3k

1 Ls

1,500,000

Jumlah

1,500,000 51,562,500

B PEKERJAAN TANAH 1

Pek. Galian tanah berbatu bendungan

1.8 m3

55,000

99,000

2

Pek. Galian tanah berbatu saluran/talud

220.8 m3

55,000

12,144,000

3

Pek. timbunan tanah kembali

149.5 m3

9,250

1,382,991

4

Pek. Galian tanah berbatu bak penenang

12 m3

55,000

660,000

5

Pek. Galian tanah pondasi saluran, bendungan, bak penenang, penstok

377.25 m3

55,000

20,748,750

6

Pek. timbunan tanah pasir di bawah saluran/talud

112 m3

55,000

6,160,000 35,034,741

Jumlah C PEKERJAAN PASANG BATU 1

Pek. Pas. Batu belah bendungan adk. 1 : 4

2

Pek. Pas. Batu belah Saluran adk. 1 : 4

3

Pek. Pas. Batu belah bak penenang adk. 1 : 4

4

Pek. Pas. Batu belah dudukan penstok adk. 1 : 4

5

Pek. Pas. Plesteran Bendungan, Saluran dan bak penenang

6

Pek. Besi bertulang dudukan turbin adk. 1:2:3

4.8 m3

887,550

4,260,240

397.44 m3

887,550

352,747,872

12.52 m3

887,550

11,112,126

6 m3

887,550

5,325,300

333.90 m2

46,780

15,619,842

0.8 m3

3,397,750.00

Jumlah

2,718,200 391,783,580

D PEKERJAAN RUMAH TURBIN 1

Pek. Rumah Turbin ukuran 3 x 6 m2

2

Pek. Saluran pembuang

24 m2

4,000,000

2 m3

1,424,050

Jumlah

96,000,000 2,848,100 98,848,100

E PEKERJAAN PINTU AIR, SARINGAN, DAN PIPA PESAT 1

Pek. Pengadaan dan Pemasangan Pintu air

2 unit

5,000,000

2

Pek. Pengadaan dan Pemasangan saringan

2 unit

3,500,000

7,000,000

3

Pek. Pengadaan pipa pesat dari plat yang dirol

1 set

78,994,938

78,994,938

4

Pek. Fabrikasi, pemasangan Pipa pesat dan asesoris

1 set

11,225,000

Jumlah

10,000,000

11,225,000 107,219,938

F PEKERJAAN TURBIN, MESIN PEMBANGKIT & PANEL 1

Pek. Pengadaan Turbin crossflow

1 unit

165,000,000

165,000,000

2

Pek. Pengadaan Generator kap. 10 kW

1 unit

80,500,000

80,500,000

3

Pek. Transmisi mekanik

1 set

22,500,000

22,500,000

4

Pek. Pengadaan Kontrol panel

1 set

73,500,000

73,500,000

5

Pek. Instalasi di Rumah Daya

1 set

26,800,000

Jumlah G PEKERJAAN TIANG LISTRIK/JARINGAN DAN TERMIS

26,800,000 368,300,000

No

RINCIAN PEKERJAAN

1

2 1

Pek. Pengadaan dan Pemasangan Tiang Listrik

2 3 4

Volume

Satuan

3

4

Harga Satuan

Jumlah Harga

(Rp)

(Rp)

5

6

75 bh

3,000,000

225,000,000

Pek. Pengadaan dan PemasanganJ aringan Kabel Twis 4x 70

3000 m'

75,000

225,000,000

Pek. Pengadaan dan PemasanganJ aringan Kabel Twis 4x 35

3000 m'

55,000

165,000,000

Pek. Pengadaan dan Pemasangan Kabel Twis 2 x 10 sqmm

500 m'

25,000

12,500,000

5

Pek. Pas. Konektor

500 bh

15,000

7,500,000

6

Pek. Pas. Termis

750 set

20,000

15,000,000

7

Pek. Pas. Klem Tiang

750 set

15,000

11,250,000

8

Pek. Pas. Klem Twis

750 set

25,000

18,750,000

Jumlah

680,000,000

Total

1,817,848,859

REKAPITULISASI BIAYA KEGIATAN PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) SUNGAI WANGGA ATAS, DESA PADIRATANA, KEC. U. RATU NGGAY, KABUPATEN SUMBA TENGAH - NTT

NO

JUMLAH HARGA

URAIAN KEGIAT AN

[Rp]

A DETAIL DISAIN SISTEM PLTMH

136,662,500

B PEKERJAAN TANAH

Prosen % 7.52%

35,034,741

1.93%

C PEKERJAAN PASANG BATU

391,783,580

21.55%

E PEKERJAAN PINTU AIR, SARINGAN, DAN PIPA PESAT

107,219,938

5.90%

D PEKERJAAN RUMAH TURBIN F PEKERJAAN TURBIN, MESIN PEMBANGKIT & PANEL G PEKERJAAN TIANG LISTRIK/JARINGAN DAN TERMIS

98,848,100

5.44%

368,300,000

20.26%

680,000,000

37.41%

JUMLAH

1,817,848,859

PPN 10%

181,784,886

JUMLAH HARGA

1,999,633,745

PEMBULATAN

1,999,634,000

100%

Related Documents

Rab
June 2020 33
Rab Mess.xlsx
November 2019 44
Rab Material.xlsx
October 2019 47
Contoh Rab
May 2020 30
Rab Gizi.doc
November 2019 30
Rab Gpura.docx
December 2019 24

More Documents from "Nanang Sulistiyanto"

Rab Wangga.pdf
December 2019 24
Cco Utak Tik.xls
November 2019 7
December 2019 22
Kewirausahaan.doc
July 2020 3
Doc1.docx
July 2020 4