BUILT-UP RATE FOR WALL TILES TENDER FILE NO : PROJECT :

LOCATION : SUPPLIER : SUB-CONTRACTOR : QUOTATION DATE : Mateiral Cost (RM per m2)

Description

Based On Guocera Tiles : 250mm x 200mm Ceramic Wall Tiles Wall - std

Cost/piece 0.80

Cost/m2 Cost/m 16.00

250mm x 65mm Ceramic Wall Tiles Border tiles

Cost/piece 1.60

Cost/m2

16.00

Cost/m 6.40

Note: Based on White Horse Tiles

Labour Cost : Wall tiles

19.38 per m2

Wall tiles (in patterns) Border tiles (extra over)

21.50 per m2 2.62 per m

( 1.80 per ft2 including screed) ( 2.00 per ft2) ( 0.80 per ft)

Mateiral Cost (RM per m)

6.40

25mm Screed (@ 3.45/m2)

Wastages 7%

Labour Cost (RM per m2)

3.45

1.12

19.38

0.22

0.45

Labour Cost (RM per m)

Total Cost (RM per m2)

Total Cost (RM per m)

39.95

2.62

9.69

BUILT-UP RATE FOR FLOOR TILES TENDER FILE NO : PROJECT :

LOCATION : SUPPLIER : SUB-CONTRACTOR : QUOTATION DATE : Mateiral Cost (RM per m2)

Description

Based On Nilo Tiles : 200mm x 75mm Homogeneous Tiles Nosing tiles

Cost/piece 1.30

Cost/m2

Cost/m 6.50

400mm x 400mm Homogeneous Tiles Floor (non-slip) - group 0 100mm Skirting

Cost/piece 4.95

Cost/m2 Cost/m 30.94 3.09

200mm x 200mm Homogeneous Tiles Floor - medium 50mm Drop 12mm x 12mm rounded edge 150mm Edge of stooling/ counter

Cost/piece 1.03

Cost/m2 25.75

Cost/m 25.75 1.29 2.00 3.86

Note: Floor Tiles Based on MML Homogeneous Tiles

Labour Cost : Floor tiles Floor tiles (in patterns) Nosing tiles 50mm Drop 100mm Skirting 12mm x 12mm rounded edge 150mm Edge of stooling/ counter

19.40 19.40 3.00 3.28 3.28 3.28 6.56

per m2 per m2 per m per m per m per m per m

30.94

( 1.80 per ft2) ( 1.80 per ft2) ( 0.90 per ft) ( 1.00 per ft ) ( 1.00per ft ) ( 1.00 per ft ) ( 2.00 per ft)

Mateiral Cost (RM per m)

25mm Screed (@ 3.45/m2)

Wastages

6.50

0.17

0.46

3.45 0.35

2.17 -

19.40

3.09

3.45 0.17 0.17 0.52

1.80 0.09 0.14 0.27

19.40

1.29 2.00 3.86

7%

Labour Cost (RM per m2)

Labour Cost (RM per m)

Total Cost (RM per m2)

3.00

Total Cost (RM per m)

10.13

55.95 3.28

6.72

50.40 3.28 3.28 6.56

4.83 5.59 11.21