BUILT-UP RATE FOR HARDCORE / DPM TENDER FILE NO : PROJECT :
LOCATION : SUPPLIER : SUB-CONTRACTOR : QUOTATION DATE : Hardcore Crusher run Labour cost Plant cost
36.79 per m3 2.00 per m2 0.50 per m2
Sand Blinding Sand (ex-mining) Labour cost Plant cost
19.73 per m3 2.00 per m2 - per m2
Damp Proof Membrane Gauge 200 polythene sheet Labour cost
0.11 per ft2 0.05 per ft2
Harcore Material cost / m2 Compaction & Wastage @
100mm
35%
Labour cost Plant cost Tender Cost / m2 Cost/m3 :
Sand Blinding Material cost / m2 Compaction & Wastage @
50mm
39%
Labour cost Plant cost Tender Cost / m2 Cost/m3 : Damp Proof Membrane
3.68 1.29 4.97 2.00 0.50 7.47 74.66
0.99 0.35 1.33 2.00 3.33 66.63
125mm 4.60 1.61 6.21 2.00 0.50 8.71 69.66
100mm 1.97 0.69 2.66 2.00 4.66 46.63
Factor : 1.635 22.50 per ton. (Inclusive) Factor : 1.595 15.00 per cu. yard (Inclusive)
(12' x 100' @ 135.00 per roll)
Cost/m2 150mm 5.52 1.93 7.45 2.00 0.50 9.95 66.33 Cost/m2 125mm 2.47 0.86 3.33 2.00 5.33 42.63
175mm 6.44 2.25 8.69 2.00 0.50 11.19 63.95
150mm 2.96 1.04 3.99 2.00 5.99 39.96
200mm 7.36 2.58 9.93 21.53 5.38 36.84 184.21
175mm 3.45 1.21 4.66 2.00 6.66 38.06 Cost/m2
Material cost / m2 Laps & Wastage @ Labour cost Tender Cost / m2
15%
1.21 0.18 1.39 0.54 1.93