BUILT-UP RATE FOR PAVING TENDER FILE NO :

GS 2040

PROJECT :

CADANGAN PEMBANGUNAN KOLEJ KOMUNITI PARLIAMENT ROMPIN, PAHANG UNTUK KEMENTERIAN PENDIDIKAN MALAYSIA

LOCATION :

ROMPIN, PAHANG

SUPPLIER :

CMCM Sdn. Bhd. (cement) Cao (white lime) Kerisek Ind. Sdn. Bhd. (sand)

SUB-CONTRACTOR : QUOTATION DATE : Material Cost Cement Sand (ex-mining)

10.35 per bags 50kg ( Including Rm 0.25 for unloading ) 150.00 per loads ( 14 cu. yard ) or 14.09 per m3

Cement & Sand ( 1:3 ) Mixed

Material Cost

Cement ( 1440kg/50 ) @ 1 m3 White Lime ( 1 bag / 100 ft2 ) Sand Total cost For 4 m3

29 bags - bags 3 m3

@ @ @

Net volume after shrinkage @ 33 1/3%

Paving Cement & Sand (1:3) Material cost Wastage @ Total material cost / m2 Labour Cost Plant Cost ( Inclusived ) Tender Cost / m2

6.50 3.28 3.28 3.28 3.28

per m2 per m per m per m per m

6.56 per m

5%

300.15 42.27 342.42 2.67 m3

Material cost per m3 Plant cost ( Concrete mixer @ 3.00/m3 ) Total Cost : Labour Cost Paving 50mm Drop 100mm Drop 170mm Riser 250mm Tread 100mm x 100mm Scupper Drain

10.35 0.00 14.09

128.34 3.00 131.34

( 0.60 per ft2 ) ( 1.00 per ft ) ( 1.00 per ft ) ( 1.00 per ft ) ( 1.00 per ft ) ( 2.00 per ft ) Cost / m2 20mm thk 25mm thk 2.63 3.28 0.13 0.16 2.76 3.45 6.50 6.50 9.26 9.95

Paving - 50mm/100mm Drop Cement & Sand (1:3) Material cost Wastage @ Total material cost / m Labour Cost Plant Cost ( Inclusived ) Tender Cost / m

5%

Paving - 170mm Riser /250mm Tread Cement & Sand (1:3) Material cost Wastage @ Total material cost / m Labour Cost Plant Cost ( Inclusived ) Tender Cost / m

5%

Paving - 100mm x 100mm Scupper Drain Cement & Sand (1:3) Material cost Wastage @ Total material cost / m Labour Cost Plant Cost ( Inclusived ) Tender Cost / m

5%

Paving - Ramp with 15mm groovelive @ 50mm c/c Cement & Sand (1:3) Material cost Forming 15mm groove @ say 0.20/ft2 Wastage @ Total material cost / m2 Labour Cost Plant Cost ( Inclusived ) Tender Cost / m

5%

Cost / m 25mm thk 25mm thk 50mm high 100mm high 0.16 0.33 0.01 0.02 0.17 0.34 3.28 3.28 3.45 3.62 Cost / m 25mm thk 25mm thk 170mm high 250mm wide 0.56 0.82 0.03 0.04 0.59 0.86 3.28 3.28 3.87 4.14 Cost / m 25mm thk 25mm thk 200mm girth 300mm girth 0.66 0.99 0.03 0.05 0.69 1.03 6.56 6.56 7.25 7.59 Cost / m2 20mm thk 25mm thk 2.63 3.28 2.15 2.15 4.78 5.43 0.24 0.27 5.02 5.71 6.50 6.50 11.52 12.21

00mm high

50mm wide

00mm girth