Build-Up Rates Road Furnitures - Guardrails
Heading
Removal, Dismantle and Replace of Damage Components
Desc.
Removal, dismantle and dispose the damaged guardrail beam.
Item No. Page No. (a)
29
= RM
150.00
per day
= RM
270.00
per day
250.00
per day
= RM
100.00
per day
= RM
770.00
per day
a) Machinery Cost i)
Pick-up truck (3.0T) for carring,materials, workers and tools :1
ii)
x
x
RM
150.00
per day
1 day
@
RM
270.00
per day
1 day
@
RM
250.00
per day
= RM
Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools) Allow a est. sum for
v)
@
Tipper truck (6-wheeler) operation, overhead cost incl. maintenance cost :1
iv)
1 day
Backhoe operation, overhead cost incl. maintenance cost :1
iii)
x
1 day
@
RM
100.00
per day
Sub - Total Overall Cost for Machinery
Productivity of Work
:
Machinery Cost per Metre :
91 RM
m
770.00
per day /
91
m
= RM
8.51 per
m
b) Workmen & Manpower Cost i)
Ganger daily basic salary :1
ii)
1 day
@
RM
65.00
per day
= RM
65.00
per day
@
RM
38.00
per day
= RM
190.00
per day
= RM
255.00
per day
General Worker daily basic salary :5
iii)
x
x
1 day
Sub - Total Overall Cost for Workmen & Manpower
Productivity of Work
:
Manpower Cost per Metre :
91 RM
m
255.00
per day /
91
c) Total Machinery + Workmen & Manpower Cost so,
ADD
Profit & Overhead
Total Rate per Unit
Maintenance Of Guardrail And Crush Cushion
:
15%
m
= RM
2.82 per
m
= RM
11.33
per
m
= RM
1.70
per
m
13.02 per
m
= RM
Guardrail - Page 1 / 31
Build-Up Rates Road Furnitures - Guardrails
PROPOSED RATE
Heading Desc.
RM
Removal, Dismantle and Replace of Damage Components
13.00 per
m
Item No. Page No.
Removal, dismantle & dispose the damaged End Wing or Fish Tail (Terminal end Type 1)
(bi)
29
150.00
per day
= RM
100.00
per day
= RM
250.00
per day
a) Machinery Cost i)
Pick-up truck (3.0T) for carring,materials, workers and tools : 1
ii)
x
1 day
@
RM
150.00
per day
Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools): Allow sum (per day)
iii)
= RM
Sub - Total Cost for Machinery
Productivity of Work
:
Machinery Cost per no.
:
RM
33
nos.
per day
250.00
/
33
nos.
= RM
@
RM
65.00
per day
= RM
65.00
per day
@
RM
38.00
per day
= RM
152.00
per day
= RM
217.00
per day
7.69 per no.
b) Workmen & Manpower Cost I)
Ganger daily basic salary :1
ii)
1 day
General Worker daily basic salary :4
iii)
x
x
1 day
Sub - Total Cost for Workmen & Manpower
Productivity of Work
:
Manpower Cost per no.
:
RM
33
nos.
per day
217.00
/
33
nos.
c) Total Machinery + Workmen & Manpower Cost so,
ADD
Profit & Overhead
:
15%
Total Rate per Unit
PROPOSED RATE
Maintenance Of Guardrail And Crush Cushion
= RM
6.68 per no.
= RM
14.37
per
m
= RM
2.16
per
m
= RM
16.52 per
m
RM
16.50 per
m
Guardrail - Page 2 / 31
Build-Up Rates Road Furnitures - Guardrails
Remove, Dismantle and Replace of Damaged Components
Item b ii, page 29
Removal, dismantle and dispose the damaged Terminal Anchorage Unit Type 2)
A) MACHINERY
I)
Pick-up truck (3.0T) for carring,materials, workers and tools : 1
x
1 Day
@
RM
150.00
per Day
= RM
150.00
per Day
= RM
100.00
per Day
Total= RM
250.00
per Day
= RM
14.71
per No.
ii) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools): Allow sum (per day)
Productivity Per Day
:
17
NO
Machinery Cost Per NO
:
250.00
/
17
1 Day
@
RM
65.00
per Day
= RM
65.00
per Day
1 Day
@
RM
38.00
per Day
= RM
152.00
per Day
RM
217.00
per Day
= RM
12.76
per No.
TOTAL MACHINERY +WORKMEN & MANPOWER COST
= RM
27.47
per No.
:- ADD
= RM
4.12
per No.
= RM
31.59
per No.
RM
31.60
per No.
RM
B) WORKMEN & MANPOWER
I)
Ganger : 1
x
ii) General Worker : 4
x
Productivity Per Day
:
Workmen Cost Per NO
:
RM
P&O
17
NO
217.00
/
:
17
15%
TOTAL RATE PER UNIT Say;
Remove, Dismantle and Replace of Damaged Components
Item b iii, page 29
Removal, dismantle and dispose the damaged 90 degrees Twist Unit Type 3
A) MACHINERY
Maintenance Of Guardrail And Crush Cushion
Guardrail - Page 3 / 31
Build-Up Rates Road Furnitures - Guardrails
I)
Pick-up truck (3.0T) for carring,materials, workers and tools : 1
x
1 Day
@
RM
150.00
per Day
= RM
150.00
per Day
= RM
100.00
per Day
Total= RM
250.00
per Day
= RM
14.71
per No.
ii) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools): Allow sum (per day)
Productivity Per Day
:
17
NO
Machinery Cost Per NO
:
250.00
/
17
1 Day
@
RM
65.00
per Day
= RM
65.00
per Day
1 Day
@
RM
38.00
per Day
= RM
152.00
per Day
= RM
217.00
per Day
= RM
12.76
per No.
TOTAL MACHINERY +WORKMEN & MANPOWER COST
= RM
27.47
per No.
:- ADD
= RM
4.12
per No.
= RM
31.59
per No.
RM
31.60
per No.
RM
B) WORKMEN & MANPOWER
I)
Ganger : 1
x
ii) General Worker : 4
x
Productivity Per Day
:
Workmen Cost Per NO
:
RM
P&O
17
NO
217.00
/
:
17
15%
TOTAL RATE PER UNIT Say;
Remove, Dismantle and Replace of Damaged Components
Item b iv, page 29
Removal, dismantle and dispose the damaged Terminal 1 : 6 / Sloping End Unit Type 4
A) MACHINERY
I)
Pick-up truck (3.0T) for carring,materials, workers and tools : 1
x
1 Day
@
RM
150.00
Per day
RM
150.00
ii) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools): Allow sum (per day)
RM
100.00
RM
250.00
= RM
14.71
Total
Productivity Per Day
:
Machinery Cost Per NO
:
RM
Maintenance Of Guardrail And Crush Cushion
17
NO
250.00
/
17
per No.
Guardrail - Page 4 / 31
Build-Up Rates Road Furnitures - Guardrails
B) Workmen
I)
Ganger : 1
x
1 Day
@
RM
65.00
Per day
RM
65.00
1 Day
@
RM
38.00
Per day
RM
152.00
RM
217.00
ii) General Worker : 4
x
Productivity Per Day
:
Workmen Cost Per NO
:
RM
17
NO
217.00
/
17
= RM ###
Row cost Per NO
ADD:
P& O
:
15%
= RM ###
Rate Per NO.
= RM ### Take
Maintenance Of Guardrail And Crush Cushion
= RM ###
RM ###
Guardrail - Page 5 / 31
Build-Up Rates Road Furnitures - Guardrails
ROAD FURNITURES MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Remove, Dismantle and Replace of Damaged Components
Item c, page 29
Removal, dismantle and dispose the damaged guardrail post
A) MACHINERY
I)
Pick-up truck (3.0T) for carring,materials, workers and tools : 1
x
1 Day
@
RM
150.00
Per day
RM
150.00
x
1 Day
@
RM
270.00
Per day
RM
270.00
ii) Backhoe : 1
iii) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools): Allow sum (per day) Total
Productivity Per Day
:
Machinery Cost Per NO
:
RM
100.00
RM
520.00
27
NO
520.00
/
27
1 Day
@
RM
65.00
Per day
RM
65.00
1 Day
@
RM
38.00
Per day
RM
114.00
RM
179.00
RM
= RM ###
B) Workmen
I)
Ganger : 1
x
ii) General Worker : 3
x
Productivity Per Day
:
Workmen Cost Per NO
:
RM
27
NO
179.00
/
27
= RM ###
Row cost Per NO =
ADD:
P& O
Rate Per NO.
Maintenance Of Guardrail And Crush Cushion
:
15%
RM ###
= RM ###
= RM ###
Guardrail - Page 6 / 31
Build-Up Rates Road Furnitures - Guardrails
Take
Maintenance Of Guardrail And Crush Cushion
RM ###
Guardrail - Page 7 / 31
Build-Up Rates Road Furnitures - Guardrails
ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Remove, Dismantle and Replace of Damaged Components
Item d, page 29
Dismantle and removed existing damaged nose yellow
A) MACHINERY
I)
Backhoe 1
x
1 Day
@
RM
270.00
Per day
RM
270.00
RM
150.00
RM
280.00
RM
700.00
ii) Miscellaneous Allow sum (per day)
iii) Pick-up truck (3.0T) for carrying, materials, workers and tools : 1
x
1 Day
@
RM
280.00
Per day Total
Productivity Per Day
:
6
NO
Machinery Cost Per NO
:
700.00
/
6
1 Day
@
RM
65.00
Per day
RM
65.00
1 Day
@
RM
38.00
Per day
RM
114.00
RM
179.00
RM
= RM ###
B) Workmen
I)
Ganger : 1
x
ii) General Worker : 3
x
Productivity Per Day
:
Workmen Cost Per NO
:
RM
6
NO
179.00
/
6
= RM ###
Row cost Per NO
ADD:
P& O
Rate Per NO.
Maintenance Of Guardrail And Crush Cushion
:
15%
= RM ###
= RM ###
= RM ###
Guardrail - Page 8 / 31
Build-Up Rates Road Furnitures - Guardrails
Take
Maintenance Of Guardrail And Crush Cushion
RM ###
Guardrail - Page 9 / 31
Build-Up Rates Road Furnitures - Guardrails
ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Remove, Dismantle and Replace of Damaged Components
Item e, page 29
Dismantle and removed existing damaged cartridge
A) MACHINERY
I)
Backhoe 1
x
1 Day
@
RM
270.00
Per day
RM
270.00
RM
150.00
RM
150.00
RM
570.00
ii) Miscellaneous Allow sum (per day)
iii) Pick-up truck (3.0T) for carrying, materials, workers and tools : 1
x
1 Day
@
RM
150.00
Per day Total
Productivity Per Day
:
3
NO
Machinery Cost Per NO
:
570.00
/
3
1 Day
@
RM
65.00
Per day
RM
65.00
1 Day
@
RM
38.00
Per day
RM
114.00
RM
179.00
RM
=
RM ###
B) Workmen
I)
Ganger : 1
x
ii) General Worker : 3
x
Productivity Per Day
:
Workmen Cost Per NO
:
ADD:
RM
3
NO
179.00
/
P& O
Rate Per NO.
Maintenance Of Guardrail And Crush Cushion
:
3
15%
=
RM ###
Row cost Per NO =
RM ###
=
RM ###
=
RM ###
Guardrail - Page 10 / 31
Build-Up Rates Road Furnitures - Guardrails
Take
Maintenance Of Guardrail And Crush Cushion
RM ###
Guardrail - Page 11 / 31
Build-Up Rates Road Furnitures - Guardrails
ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Remove, Dismantle and Replace of Damaged Components
Item f, page 29
Dismantle and removed existing beam panel
A) MACHINERY
I)
Backhoe 1
x
1 Day
@
RM
270.00
Per day
RM
270.00
RM
150.00
RM
150.00
RM
570.00
ii) Miscellaneous Allow sum (per day)
iii) Pick-up truck (3.0T) for carrying, materials, workers and tools : 1
x
1 Day
@
RM
150.00
Per day Total
Productivity Per Day
:
5
NO
Machinery Cost Per NO
:
570.00
/
5
1 Day
@
RM
65.00
Per day
RM
65.00
1 Day
@
RM
38.00
Per day
RM
114.00
RM
179.00
RM
= RM ###
B)
I)
Ganger : 1
x
ii) General Worker : 3
x
Productivity Per Day
:
Workmen Cost Per NO
:
RM
5
NO
179.00
/
5
= RM ###
Row cost Per NO
ADD:
P& O
Rate Per NO.
Maintenance Of Guardrail And Crush Cushion
:
15%
= RM ###
= RM ###
= RM ###
Guardrail - Page 12 / 31
Build-Up Rates Road Furnitures - Guardrails
Take RM ###
Maintenance Of Guardrail And Crush Cushion
Guardrail - Page 13 / 31
Build-Up Rates Road Furnitures - Guardrails
ROAD FURNITURES MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Realigning of existing (line & level)
Item g, page 29
Realign and straighten the line of existing guardrail including correct the level and verticality position of existing guardrail post.
A) MACHINERY
I)
Pick-up truck (3.0T) for carring,materials, workers and tools : 1
x
1 Day
@
RM
150.00
Per day
RM
150.00
x
1 Day
@
RM
100.00
Per day
RM
100.00
x
1 Day
@
RM
270.00
Per day
RM
270.00
RM
520.00
ii) Hydraulic jack 1
iii) Backhoe : 1
Total
Productivity Per Day
:
97
M
Machinery Cost Per M
:
520.00
/
97
1 Day
@
RM
65.00
Per day
RM
65.00
1 Day
@
RM
38.00
Per day
RM
190.00
RM
255.00
RM
= RM ###
B) Workmen
I)
Ganger : 1
x
ii) General Worker : 5
x
Productivity Per Day
:
Workmen Cost Per M
:
RM
97
M
255.00
/
97
= RM ###
Row cost Per M
ADD:
P& O
Maintenance Of Guardrail And Crush Cushion
:
15%
= RM ###
= RM ###
Guardrail - Page 14 / 31
Build-Up Rates Road Furnitures - Guardrails
Rate Per M
= RM ### Take
Maintenance Of Guardrail And Crush Cushion
RM ###
Guardrail - Page 15 / 31
Build-Up Rates Road Furnitures - Guardrails
ROAD FURNITURES MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Realigning of existing (line & level)
Item h, page 29
Supply and replace missing delinator piece on guardrail
A) MATERIAL
I)
G.I strip, c/w, clip, washer, bolt and nuts (supply price/Set)
= RM ###
B) MACHINERY
I)
Pick-up truck (3.0T) for carrying materials, workers , tools and equipments :
1
x
1 Day
@
RM
150.00
per day
RM
150.00
ii) Miscellaneous items (Temporary traffic signs, cleaning tools and equipments)
Allow sum :
RM
80.00
RM
114
RM
344.00
C) WORKMEN & MANPOWER
I)
General worker
3
x
1 Day
@
RM
38.00
per day Total
Productivity Per day
:
Workmen Cost Per No.
:
RM
43
NO
344.00
/
43
= RM ###
Raw cost per No.
ADD :
P&O
:
= RM ###
15%
= RM ###
Rate Per No.
= RM ### Take
Maintenance Of Guardrail And Crush Cushion
RM ###
Guardrail - Page 16 / 31
Build-Up Rates Road Furnitures - Guardrails
ROAD FURNITURES MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections
Item a, page 30
Supply and install galvanised new guardrail beams
A) MATERIAL
I)
Guardrail (supply price/M)
:
RM
35.00
ii) Transportation(per M)
:
RM
10.00
iii) Material cost (per M)
:
= RM ###
B) MACHINERY
I)
Pick-up truck (3.0T) for carrying, materials, workers and tools : 1
x
1 Day
@
RM
150.00
Per day
RM
150.00
ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total
Productivity Per Day
:
Machinery Cost Per M
:
RM
100.00
RM
250.00
71
M
250.00
/
71
1 Day
@
RM
65.00
Per day
RM
65.00
1 Day
@
RM
38.00
Per day
RM
190.00
RM
255.00
RM
= RM ###
C) WORKMEN & MANPOWER
I)
Ganger : 1
x
ii) General Worker : 5
x
Productivity Per Day
:
Workmen Cost Per M
:
RM
Maintenance Of Guardrail And Crush Cushion
71
M
255.00
/
71
= RM ###
Guardrail - Page 17 / 31
Build-Up Rates Road Furnitures - Guardrails
Row cost Per M
ADD:
P& O
:
= RM ###
15%
= RM ###
Rate Per M
= RM ### Take
Maintenance Of Guardrail And Crush Cushion
RM ###
Guardrail - Page 18 / 31
Build-Up Rates Road Furnitures - Guardrails
ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections
Item b i, page 30
Supply and install galvanised End wing or Fish Tail (Terminal unitType 1)
A) MATERIAL
I)
Terminal End Type l (supply price/No)
ii) Transportation(per No)
:
iii) Material cost (per No) :
:
RM
58.00
RM
5.00
= RM ###
B) MACHINERY
I)
Pick-up truck (3.0T) for carrying, materials, tools and equipments : 1
x
1 Day
@
RM
150.00
Per day
RM
150.00
ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total
Productivity Per Day
:
Machinery Cost Per No
:
RM
100.00
RM
250.00
29
NO
250.00
/
29
1 Day
@
RM
65.00
Per day
RM
65.00
1 Day
@
RM
38.00
Per day
RM
190.00
RM
255.00
RM
= RM ###
C) WORKMEN & MANPOWER
I)
Ganger : 1
x
ii) General Worker : 5
x
Productivity Per Day
:
Workmen Cost Per No
:
RM
Maintenance Of Guardrail And Crush Cushion
29
NO
190.00
/
29
= RM ###
Guardrail - Page 19 / 31
Build-Up Rates Road Furnitures - Guardrails
Row cost Per No
ADD:
P& O
:
15%
= RM ###
Rate Per NO.
= RM ### Take
Maintenance Of Guardrail And Crush Cushion
= RM ###
RM ###
Guardrail - Page 20 / 31
Build-Up Rates Road Furnitures - Guardrails
ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections
Item b ii, page 30
Supply and install galvanised Terminal anchorage unit Type 2
A) MATERIAL
i)
Terminal anchorage unit Type 2 (supply price/No)
ii) Transportation(per No)
:
iii) Material cost (per No) :
:
RM
380.00
RM
5.00
= RM ###
B) MACHINERY
I)
Pick-up truck (3.0T) for carrying, materials, tools and equipments : 1
x
1 Day
@
RM
150.00
Per day
RM
150.00
ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total
Productivity Per Day
:
Machinery Cost Per No
:
RM
100.00
RM
250.00
80
NO
250.00
/
80
1 Day
@
RM
65.00
Per day
RM
65.00
1 Day
@
RM
38.00
Per day
RM
190.00
RM
255.00
RM
= RM ###
C) WORKMEN & MANPOWER
I)
Ganger : 1
x
ii) General Worker : 5
x
Productivity Per Day
:
Workmen Cost Per No
:
RM
Maintenance Of Guardrail And Crush Cushion
80
NO
255.00
/
80
= RM ###
Guardrail - Page 21 / 31
Build-Up Rates Road Furnitures - Guardrails
Row cost Per No
ADD:
P& O
:
15%
= RM ###
Rate Per NO.
= RM ### Take
Maintenance Of Guardrail And Crush Cushion
= RM ###
RM ###
Guardrail - Page 22 / 31
Build-Up Rates Road Furnitures - Guardrails
ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections
Item b iii, page 30
Supply and install galvanised 90 degrees Twist Unit Type 3
A) MATERIAL
I)
Twist unit type 3 (supply price/No)
ii) Transportation(per No)
:
iii) Material cost (per No) :
:
RM
550.00
RM
5.00
= RM ###
B) MACHINERY
I)
Pick-up truck (3.0T) for carrying, materials, tools and equipments : 1
x
1 Day
@
RM
150.00
Per day
RM
150.00
ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total
Productivity Per Day
:
Machinery Cost Per No
:
RM
100.00
RM
250.00
9
NO
250.00
/
9
1 Day
@
RM
65.00
Per day
RM
65.00
1 Day
@
RM
38.00
Per day
RM
190.00
RM
255.00
RM
= RM ###
C) WORKMEN & MANPOWER
I)
Ganger : 1
x
ii) General Worker : 5
x
Productivity Per Day
:
Workmen Cost Per No
:
RM
Maintenance Of Guardrail And Crush Cushion
9
NO
255.00
/
9
= RM ###
Guardrail - Page 23 / 31
Build-Up Rates Road Furnitures - Guardrails
Row cost Per No
ADD:
P& O
:
15%
= RM ###
Rate Per NO.
= RM ### Take
Maintenance Of Guardrail And Crush Cushion
= RM ###
RM ###
Guardrail - Page 24 / 31
Build-Up Rates Road Furnitures - Guardrails
ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections
Item b iv, page 30
Supply and install galvanised Terminal section 1:6 / Sloping End Type 4
A) Material
I)
Terminal Anchorage Type 4 (supply price/No)
ii) Transportation(per No)
:
iii) Material cost (per No) :
:
RM
158.00
RM
5.00
= RM ###
B) Machinery.
I)
Pick-up truck (3.0T) for carrying, materials, tools and equipments : 1
x
1 Day
@
RM
150.00
Per day
RM
150.00
ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total
Productivity Per Day
:
Machinery Cost Per No
:
RM
100.00
RM
250.00
14
NO
250.00
/
14
1 Day
@
RM
65.00
Per day
RM
65.00
1 Day
@
RM
38.00
Per day
RM
190.00
RM
255.00
RM
= RM ###
C) WORKMEN & MANPOWER
I)
Ganger : 1
x
ii) General Worker : 5
x
Productivity Per Day
:
Workmen Cost Per No
:
RM
Maintenance Of Guardrail And Crush Cushion
14
NO
255.00
/
14
= RM ###
Guardrail - Page 25 / 31
Build-Up Rates Road Furnitures - Guardrails
Row cost Per No
ADD:
P& O
:
15%
= RM ###
Rate Per NO.
= RM ### Take
Maintenance Of Guardrail And Crush Cushion
= RM ###
RM ###
Guardrail - Page 26 / 31
Build-Up Rates Road Furnitures - Guardrails
ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections
Item c, page 30
Supply and install galvanised guadrail post complete with packer
A) MATERIAL
I)
Guardrail post (supply price / No)
ii) Transportation(per No)
:
iii) Material cost (per No) :
:
RM
87.00
RM
2.00
= RM ###
B) MACHINERY
I)
Pick-up truck (3.0T) for carrying, materials, tools and equipments : 1
x
1 Day
@
RM
150.00
Per day
RM
150.00
1 Day
@
RM
300.00
Per day
RM
300.00
ii) Arrow Rammer : 1
x
iii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total
Productivity Per Day
:
Machinery Cost Per No
:
RM
100.00
RM
550.00
52
NO
550.00
/
52
1 Day
@
RM
65.00
Per day
RM
65.00
1 Day
@
RM
38.00
Per day
RM
190.00
RM
255.00
RM
= RM ###
C) WORKMEN & MANPOWER
I)
Ganger : 1
x
ii) General Worker : 5
x
Maintenance Of Guardrail And Crush Cushion
Guardrail - Page 27 / 31
Build-Up Rates Road Furnitures - Guardrails
Productivity Per Day
:
Workmen Cost Per No
:
RM
52
NO
255.00
/
52
= RM ###
Row cost Per No
ADD:
P& O
:
15%
= RM ###
Rate Per NO.
= RM ### Take
Maintenance Of Guardrail And Crush Cushion
= RM ###
RM ###
Guardrail - Page 28 / 31
Build-Up Rates Road Furnitures - Guardrails
ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections
Item d, page 30
Supply and replace new yellow nose for the crash cushion inclusive of all necessary preparatory work.
A) MATERIAL
I)
Nose Yellow
ADD:
= RM ###
P& O
:
15%
Rate Per NO. Take
Maintenance Of Guardrail And Crush Cushion
=
RM ###
=
RM ### RM ###
Guardrail - Page 29 / 31
Build-Up Rates Road Furnitures - Guardrails
ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections
Item e, page 30
Supply and replace new cartridge for the crash cushion inclusive of all necessary preparatory work.
A) MATERIAL
I)
Cartridge
ADD:
= RM ###
P& O
:
15%
= RM ###
Rate Per NO.
= RM ### Take
Maintenance Of Guardrail And Crush Cushion
RM ###
Guardrail - Page 30 / 31
Build-Up Rates Road Furnitures - Guardrails
ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections
Item g, page 30
Supply and replace new beam panel.
A) MATERIAL
I)
Cartridge
ADD:
= RM ###
P& O
Rate Per NO.
:
15%
= RM ###
= RM ### Take
Maintenance Of Guardrail And Crush Cushion
RM ###
Guardrail - Page 31 / 31