Build-Up Rates Road Furnitures - Guardrails

Heading

Removal, Dismantle and Replace of Damage Components

Desc.

Removal, dismantle and dispose the damaged guardrail beam.

Item No. Page No. (a)

29

= RM

150.00

per day

= RM

270.00

per day

250.00

per day

= RM

100.00

per day

= RM

770.00

per day

a) Machinery Cost i)

Pick-up truck (3.0T) for carring,materials, workers and tools :1

ii)

x

x

RM

150.00

per day

1 day

@

RM

270.00

per day

1 day

@

RM

250.00

per day

= RM

Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools) Allow a est. sum for

v)

@

Tipper truck (6-wheeler) operation, overhead cost incl. maintenance cost :1

iv)

1 day

Backhoe operation, overhead cost incl. maintenance cost :1

iii)

x

1 day

@

RM

100.00

per day

Sub - Total Overall Cost for Machinery

Productivity of Work

:

Machinery Cost per Metre :

91 RM

m

770.00

per day /

91

m

= RM

8.51 per

m

b) Workmen & Manpower Cost i)

Ganger daily basic salary :1

ii)

1 day

@

RM

65.00

per day

= RM

65.00

per day

@

RM

38.00

per day

= RM

190.00

per day

= RM

255.00

per day

General Worker daily basic salary :5

iii)

x

x

1 day

Sub - Total Overall Cost for Workmen & Manpower

Productivity of Work

:

Manpower Cost per Metre :

91 RM

m

255.00

per day /

91

c) Total Machinery + Workmen & Manpower Cost so,

ADD

Profit & Overhead

Total Rate per Unit

Maintenance Of Guardrail And Crush Cushion

:

15%

m

= RM

2.82 per

m

= RM

11.33

per

m

= RM

1.70

per

m

13.02 per

m

= RM

Guardrail - Page 1 / 31

Build-Up Rates Road Furnitures - Guardrails

PROPOSED RATE

Heading Desc.

RM

Removal, Dismantle and Replace of Damage Components

13.00 per

m

Item No. Page No.

Removal, dismantle & dispose the damaged End Wing or Fish Tail (Terminal end Type 1)

(bi)

29

150.00

per day

= RM

100.00

per day

= RM

250.00

per day

a) Machinery Cost i)

Pick-up truck (3.0T) for carring,materials, workers and tools : 1

ii)

x

1 day

@

RM

150.00

per day

Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools): Allow sum (per day)

iii)

= RM

Sub - Total Cost for Machinery

Productivity of Work

:

Machinery Cost per no.

:

RM

33

nos.

per day

250.00

/

33

nos.

= RM

@

RM

65.00

per day

= RM

65.00

per day

@

RM

38.00

per day

= RM

152.00

per day

= RM

217.00

per day

7.69 per no.

b) Workmen & Manpower Cost I)

Ganger daily basic salary :1

ii)

1 day

General Worker daily basic salary :4

iii)

x

x

1 day

Sub - Total Cost for Workmen & Manpower

Productivity of Work

:

Manpower Cost per no.

:

RM

33

nos.

per day

217.00

/

33

nos.

c) Total Machinery + Workmen & Manpower Cost so,

ADD

Profit & Overhead

:

15%

Total Rate per Unit

PROPOSED RATE

Maintenance Of Guardrail And Crush Cushion

= RM

6.68 per no.

= RM

14.37

per

m

= RM

2.16

per

m

= RM

16.52 per

m

RM

16.50 per

m

Guardrail - Page 2 / 31

Build-Up Rates Road Furnitures - Guardrails

Remove, Dismantle and Replace of Damaged Components

Item b ii, page 29

Removal, dismantle and dispose the damaged Terminal Anchorage Unit Type 2)

A) MACHINERY

I)

Pick-up truck (3.0T) for carring,materials, workers and tools : 1

x

1 Day

@

RM

150.00

per Day

= RM

150.00

per Day

= RM

100.00

per Day

Total= RM

250.00

per Day

= RM

14.71

per No.

ii) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools): Allow sum (per day)

Productivity Per Day

:

17

NO

Machinery Cost Per NO

:

250.00

/

17

1 Day

@

RM

65.00

per Day

= RM

65.00

per Day

1 Day

@

RM

38.00

per Day

= RM

152.00

per Day

RM

217.00

per Day

= RM

12.76

per No.

TOTAL MACHINERY +WORKMEN & MANPOWER COST

= RM

27.47

per No.

:- ADD

= RM

4.12

per No.

= RM

31.59

per No.

RM

31.60

per No.

RM

B) WORKMEN & MANPOWER

I)

Ganger : 1

x

ii) General Worker : 4

x

Productivity Per Day

:

Workmen Cost Per NO

:

RM

P&O

17

NO

217.00

/

:

17

15%

TOTAL RATE PER UNIT Say;

Remove, Dismantle and Replace of Damaged Components

Item b iii, page 29

Removal, dismantle and dispose the damaged 90 degrees Twist Unit Type 3

A) MACHINERY

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 3 / 31

Build-Up Rates Road Furnitures - Guardrails

I)

Pick-up truck (3.0T) for carring,materials, workers and tools : 1

x

1 Day

@

RM

150.00

per Day

= RM

150.00

per Day

= RM

100.00

per Day

Total= RM

250.00

per Day

= RM

14.71

per No.

ii) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools): Allow sum (per day)

Productivity Per Day

:

17

NO

Machinery Cost Per NO

:

250.00

/

17

1 Day

@

RM

65.00

per Day

= RM

65.00

per Day

1 Day

@

RM

38.00

per Day

= RM

152.00

per Day

= RM

217.00

per Day

= RM

12.76

per No.

TOTAL MACHINERY +WORKMEN & MANPOWER COST

= RM

27.47

per No.

:- ADD

= RM

4.12

per No.

= RM

31.59

per No.

RM

31.60

per No.

RM

B) WORKMEN & MANPOWER

I)

Ganger : 1

x

ii) General Worker : 4

x

Productivity Per Day

:

Workmen Cost Per NO

:

RM

P&O

17

NO

217.00

/

:

17

15%

TOTAL RATE PER UNIT Say;

Remove, Dismantle and Replace of Damaged Components

Item b iv, page 29

Removal, dismantle and dispose the damaged Terminal 1 : 6 / Sloping End Unit Type 4

A) MACHINERY

I)

Pick-up truck (3.0T) for carring,materials, workers and tools : 1

x

1 Day

@

RM

150.00

Per day

RM

150.00

ii) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools): Allow sum (per day)

RM

100.00

RM

250.00

= RM

14.71

Total

Productivity Per Day

:

Machinery Cost Per NO

:

RM

Maintenance Of Guardrail And Crush Cushion

17

NO

250.00

/

17

per No.

Guardrail - Page 4 / 31

Build-Up Rates Road Furnitures - Guardrails

B) Workmen

I)

Ganger : 1

x

1 Day

@

RM

65.00

Per day

RM

65.00

1 Day

@

RM

38.00

Per day

RM

152.00

RM

217.00

ii) General Worker : 4

x

Productivity Per Day

:

Workmen Cost Per NO

:

RM

17

NO

217.00

/

17

= RM ###

Row cost Per NO

ADD:

P& O

:

15%

= RM ###

Rate Per NO.

= RM ### Take

Maintenance Of Guardrail And Crush Cushion

= RM ###

RM ###

Guardrail - Page 5 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURES MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Remove, Dismantle and Replace of Damaged Components

Item c, page 29

Removal, dismantle and dispose the damaged guardrail post

A) MACHINERY

I)

Pick-up truck (3.0T) for carring,materials, workers and tools : 1

x

1 Day

@

RM

150.00

Per day

RM

150.00

x

1 Day

@

RM

270.00

Per day

RM

270.00

ii) Backhoe : 1

iii) Miscellaneous items (e.g. oxy-cutter,crowbar, hammer and hardware tools): Allow sum (per day) Total

Productivity Per Day

:

Machinery Cost Per NO

:

RM

100.00

RM

520.00

27

NO

520.00

/

27

1 Day

@

RM

65.00

Per day

RM

65.00

1 Day

@

RM

38.00

Per day

RM

114.00

RM

179.00

RM

= RM ###

B) Workmen

I)

Ganger : 1

x

ii) General Worker : 3

x

Productivity Per Day

:

Workmen Cost Per NO

:

RM

27

NO

179.00

/

27

= RM ###

Row cost Per NO =

ADD:

P& O

Rate Per NO.

Maintenance Of Guardrail And Crush Cushion

:

15%

RM ###

= RM ###

= RM ###

Guardrail - Page 6 / 31

Build-Up Rates Road Furnitures - Guardrails

Take

Maintenance Of Guardrail And Crush Cushion

RM ###

Guardrail - Page 7 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Remove, Dismantle and Replace of Damaged Components

Item d, page 29

Dismantle and removed existing damaged nose yellow

A) MACHINERY

I)

Backhoe 1

x

1 Day

@

RM

270.00

Per day

RM

270.00

RM

150.00

RM

280.00

RM

700.00

ii) Miscellaneous Allow sum (per day)

iii) Pick-up truck (3.0T) for carrying, materials, workers and tools : 1

x

1 Day

@

RM

280.00

Per day Total

Productivity Per Day

:

6

NO

Machinery Cost Per NO

:

700.00

/

6

1 Day

@

RM

65.00

Per day

RM

65.00

1 Day

@

RM

38.00

Per day

RM

114.00

RM

179.00

RM

= RM ###

B) Workmen

I)

Ganger : 1

x

ii) General Worker : 3

x

Productivity Per Day

:

Workmen Cost Per NO

:

RM

6

NO

179.00

/

6

= RM ###

Row cost Per NO

ADD:

P& O

Rate Per NO.

Maintenance Of Guardrail And Crush Cushion

:

15%

= RM ###

= RM ###

= RM ###

Guardrail - Page 8 / 31

Build-Up Rates Road Furnitures - Guardrails

Take

Maintenance Of Guardrail And Crush Cushion

RM ###

Guardrail - Page 9 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Remove, Dismantle and Replace of Damaged Components

Item e, page 29

Dismantle and removed existing damaged cartridge

A) MACHINERY

I)

Backhoe 1

x

1 Day

@

RM

270.00

Per day

RM

270.00

RM

150.00

RM

150.00

RM

570.00

ii) Miscellaneous Allow sum (per day)

iii) Pick-up truck (3.0T) for carrying, materials, workers and tools : 1

x

1 Day

@

RM

150.00

Per day Total

Productivity Per Day

:

3

NO

Machinery Cost Per NO

:

570.00

/

3

1 Day

@

RM

65.00

Per day

RM

65.00

1 Day

@

RM

38.00

Per day

RM

114.00

RM

179.00

RM

=

RM ###

B) Workmen

I)

Ganger : 1

x

ii) General Worker : 3

x

Productivity Per Day

:

Workmen Cost Per NO

:

ADD:

RM

3

NO

179.00

/

P& O

Rate Per NO.

Maintenance Of Guardrail And Crush Cushion

:

3

15%

=

RM ###

Row cost Per NO =

RM ###

=

RM ###

=

RM ###

Guardrail - Page 10 / 31

Build-Up Rates Road Furnitures - Guardrails

Take

Maintenance Of Guardrail And Crush Cushion

RM ###

Guardrail - Page 11 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Remove, Dismantle and Replace of Damaged Components

Item f, page 29

Dismantle and removed existing beam panel

A) MACHINERY

I)

Backhoe 1

x

1 Day

@

RM

270.00

Per day

RM

270.00

RM

150.00

RM

150.00

RM

570.00

ii) Miscellaneous Allow sum (per day)

iii) Pick-up truck (3.0T) for carrying, materials, workers and tools : 1

x

1 Day

@

RM

150.00

Per day Total

Productivity Per Day

:

5

NO

Machinery Cost Per NO

:

570.00

/

5

1 Day

@

RM

65.00

Per day

RM

65.00

1 Day

@

RM

38.00

Per day

RM

114.00

RM

179.00

RM

= RM ###

B)

I)

Ganger : 1

x

ii) General Worker : 3

x

Productivity Per Day

:

Workmen Cost Per NO

:

RM

5

NO

179.00

/

5

= RM ###

Row cost Per NO

ADD:

P& O

Rate Per NO.

Maintenance Of Guardrail And Crush Cushion

:

15%

= RM ###

= RM ###

= RM ###

Guardrail - Page 12 / 31

Build-Up Rates Road Furnitures - Guardrails

Take RM ###

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 13 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURES MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Realigning of existing (line & level)

Item g, page 29

Realign and straighten the line of existing guardrail including correct the level and verticality position of existing guardrail post.

A) MACHINERY

I)

Pick-up truck (3.0T) for carring,materials, workers and tools : 1

x

1 Day

@

RM

150.00

Per day

RM

150.00

x

1 Day

@

RM

100.00

Per day

RM

100.00

x

1 Day

@

RM

270.00

Per day

RM

270.00

RM

520.00

ii) Hydraulic jack 1

iii) Backhoe : 1

Total

Productivity Per Day

:

97

M

Machinery Cost Per M

:

520.00

/

97

1 Day

@

RM

65.00

Per day

RM

65.00

1 Day

@

RM

38.00

Per day

RM

190.00

RM

255.00

RM

= RM ###

B) Workmen

I)

Ganger : 1

x

ii) General Worker : 5

x

Productivity Per Day

:

Workmen Cost Per M

:

RM

97

M

255.00

/

97

= RM ###

Row cost Per M

ADD:

P& O

Maintenance Of Guardrail And Crush Cushion

:

15%

= RM ###

= RM ###

Guardrail - Page 14 / 31

Build-Up Rates Road Furnitures - Guardrails

Rate Per M

= RM ### Take

Maintenance Of Guardrail And Crush Cushion

RM ###

Guardrail - Page 15 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURES MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Realigning of existing (line & level)

Item h, page 29

Supply and replace missing delinator piece on guardrail

A) MATERIAL

I)

G.I strip, c/w, clip, washer, bolt and nuts (supply price/Set)

= RM ###

B) MACHINERY

I)

Pick-up truck (3.0T) for carrying materials, workers , tools and equipments :

1

x

1 Day

@

RM

150.00

per day

RM

150.00

ii) Miscellaneous items (Temporary traffic signs, cleaning tools and equipments)

Allow sum :

RM

80.00

RM

114

RM

344.00

C) WORKMEN & MANPOWER

I)

General worker

3

x

1 Day

@

RM

38.00

per day Total

Productivity Per day

:

Workmen Cost Per No.

:

RM

43

NO

344.00

/

43

= RM ###

Raw cost per No.

ADD :

P&O

:

= RM ###

15%

= RM ###

Rate Per No.

= RM ### Take

Maintenance Of Guardrail And Crush Cushion

RM ###

Guardrail - Page 16 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURES MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections

Item a, page 30

Supply and install galvanised new guardrail beams

A) MATERIAL

I)

Guardrail (supply price/M)

:

RM

35.00

ii) Transportation(per M)

:

RM

10.00

iii) Material cost (per M)

:

= RM ###

B) MACHINERY

I)

Pick-up truck (3.0T) for carrying, materials, workers and tools : 1

x

1 Day

@

RM

150.00

Per day

RM

150.00

ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total

Productivity Per Day

:

Machinery Cost Per M

:

RM

100.00

RM

250.00

71

M

250.00

/

71

1 Day

@

RM

65.00

Per day

RM

65.00

1 Day

@

RM

38.00

Per day

RM

190.00

RM

255.00

RM

= RM ###

C) WORKMEN & MANPOWER

I)

Ganger : 1

x

ii) General Worker : 5

x

Productivity Per Day

:

Workmen Cost Per M

:

RM

Maintenance Of Guardrail And Crush Cushion

71

M

255.00

/

71

= RM ###

Guardrail - Page 17 / 31

Build-Up Rates Road Furnitures - Guardrails

Row cost Per M

ADD:

P& O

:

= RM ###

15%

= RM ###

Rate Per M

= RM ### Take

Maintenance Of Guardrail And Crush Cushion

RM ###

Guardrail - Page 18 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections

Item b i, page 30

Supply and install galvanised End wing or Fish Tail (Terminal unitType 1)

A) MATERIAL

I)

Terminal End Type l (supply price/No)

ii) Transportation(per No)

:

iii) Material cost (per No) :

:

RM

58.00

RM

5.00

= RM ###

B) MACHINERY

I)

Pick-up truck (3.0T) for carrying, materials, tools and equipments : 1

x

1 Day

@

RM

150.00

Per day

RM

150.00

ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total

Productivity Per Day

:

Machinery Cost Per No

:

RM

100.00

RM

250.00

29

NO

250.00

/

29

1 Day

@

RM

65.00

Per day

RM

65.00

1 Day

@

RM

38.00

Per day

RM

190.00

RM

255.00

RM

= RM ###

C) WORKMEN & MANPOWER

I)

Ganger : 1

x

ii) General Worker : 5

x

Productivity Per Day

:

Workmen Cost Per No

:

RM

Maintenance Of Guardrail And Crush Cushion

29

NO

190.00

/

29

= RM ###

Guardrail - Page 19 / 31

Build-Up Rates Road Furnitures - Guardrails

Row cost Per No

ADD:

P& O

:

15%

= RM ###

Rate Per NO.

= RM ### Take

Maintenance Of Guardrail And Crush Cushion

= RM ###

RM ###

Guardrail - Page 20 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections

Item b ii, page 30

Supply and install galvanised Terminal anchorage unit Type 2

A) MATERIAL

i)

Terminal anchorage unit Type 2 (supply price/No)

ii) Transportation(per No)

:

iii) Material cost (per No) :

:

RM

380.00

RM

5.00

= RM ###

B) MACHINERY

I)

Pick-up truck (3.0T) for carrying, materials, tools and equipments : 1

x

1 Day

@

RM

150.00

Per day

RM

150.00

ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total

Productivity Per Day

:

Machinery Cost Per No

:

RM

100.00

RM

250.00

80

NO

250.00

/

80

1 Day

@

RM

65.00

Per day

RM

65.00

1 Day

@

RM

38.00

Per day

RM

190.00

RM

255.00

RM

= RM ###

C) WORKMEN & MANPOWER

I)

Ganger : 1

x

ii) General Worker : 5

x

Productivity Per Day

:

Workmen Cost Per No

:

RM

Maintenance Of Guardrail And Crush Cushion

80

NO

255.00

/

80

= RM ###

Guardrail - Page 21 / 31

Build-Up Rates Road Furnitures - Guardrails

Row cost Per No

ADD:

P& O

:

15%

= RM ###

Rate Per NO.

= RM ### Take

Maintenance Of Guardrail And Crush Cushion

= RM ###

RM ###

Guardrail - Page 22 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections

Item b iii, page 30

Supply and install galvanised 90 degrees Twist Unit Type 3

A) MATERIAL

I)

Twist unit type 3 (supply price/No)

ii) Transportation(per No)

:

iii) Material cost (per No) :

:

RM

550.00

RM

5.00

= RM ###

B) MACHINERY

I)

Pick-up truck (3.0T) for carrying, materials, tools and equipments : 1

x

1 Day

@

RM

150.00

Per day

RM

150.00

ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total

Productivity Per Day

:

Machinery Cost Per No

:

RM

100.00

RM

250.00

9

NO

250.00

/

9

1 Day

@

RM

65.00

Per day

RM

65.00

1 Day

@

RM

38.00

Per day

RM

190.00

RM

255.00

RM

= RM ###

C) WORKMEN & MANPOWER

I)

Ganger : 1

x

ii) General Worker : 5

x

Productivity Per Day

:

Workmen Cost Per No

:

RM

Maintenance Of Guardrail And Crush Cushion

9

NO

255.00

/

9

= RM ###

Guardrail - Page 23 / 31

Build-Up Rates Road Furnitures - Guardrails

Row cost Per No

ADD:

P& O

:

15%

= RM ###

Rate Per NO.

= RM ### Take

Maintenance Of Guardrail And Crush Cushion

= RM ###

RM ###

Guardrail - Page 24 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections

Item b iv, page 30

Supply and install galvanised Terminal section 1:6 / Sloping End Type 4

A) Material

I)

Terminal Anchorage Type 4 (supply price/No)

ii) Transportation(per No)

:

iii) Material cost (per No) :

:

RM

158.00

RM

5.00

= RM ###

B) Machinery.

I)

Pick-up truck (3.0T) for carrying, materials, tools and equipments : 1

x

1 Day

@

RM

150.00

Per day

RM

150.00

ii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total

Productivity Per Day

:

Machinery Cost Per No

:

RM

100.00

RM

250.00

14

NO

250.00

/

14

1 Day

@

RM

65.00

Per day

RM

65.00

1 Day

@

RM

38.00

Per day

RM

190.00

RM

255.00

RM

= RM ###

C) WORKMEN & MANPOWER

I)

Ganger : 1

x

ii) General Worker : 5

x

Productivity Per Day

:

Workmen Cost Per No

:

RM

Maintenance Of Guardrail And Crush Cushion

14

NO

255.00

/

14

= RM ###

Guardrail - Page 25 / 31

Build-Up Rates Road Furnitures - Guardrails

Row cost Per No

ADD:

P& O

:

15%

= RM ###

Rate Per NO.

= RM ### Take

Maintenance Of Guardrail And Crush Cushion

= RM ###

RM ###

Guardrail - Page 26 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections

Item c, page 30

Supply and install galvanised guadrail post complete with packer

A) MATERIAL

I)

Guardrail post (supply price / No)

ii) Transportation(per No)

:

iii) Material cost (per No) :

:

RM

87.00

RM

2.00

= RM ###

B) MACHINERY

I)

Pick-up truck (3.0T) for carrying, materials, tools and equipments : 1

x

1 Day

@

RM

150.00

Per day

RM

150.00

1 Day

@

RM

300.00

Per day

RM

300.00

ii) Arrow Rammer : 1

x

iii) Miscellaneous items (e.g. oxy-cutter, crowbar, hammer and hardware tools): Allow sum (per day) Total

Productivity Per Day

:

Machinery Cost Per No

:

RM

100.00

RM

550.00

52

NO

550.00

/

52

1 Day

@

RM

65.00

Per day

RM

65.00

1 Day

@

RM

38.00

Per day

RM

190.00

RM

255.00

RM

= RM ###

C) WORKMEN & MANPOWER

I)

Ganger : 1

x

ii) General Worker : 5

x

Maintenance Of Guardrail And Crush Cushion

Guardrail - Page 27 / 31

Build-Up Rates Road Furnitures - Guardrails

Productivity Per Day

:

Workmen Cost Per No

:

RM

52

NO

255.00

/

52

= RM ###

Row cost Per No

ADD:

P& O

:

15%

= RM ###

Rate Per NO.

= RM ### Take

Maintenance Of Guardrail And Crush Cushion

= RM ###

RM ###

Guardrail - Page 28 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections

Item d, page 30

Supply and replace new yellow nose for the crash cushion inclusive of all necessary preparatory work.

A) MATERIAL

I)

Nose Yellow

ADD:

= RM ###

P& O

:

15%

Rate Per NO. Take

Maintenance Of Guardrail And Crush Cushion

=

RM ###

=

RM ### RM ###

Guardrail - Page 29 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections

Item e, page 30

Supply and replace new cartridge for the crash cushion inclusive of all necessary preparatory work.

A) MATERIAL

I)

Cartridge

ADD:

= RM ###

P& O

:

15%

= RM ###

Rate Per NO.

= RM ### Take

Maintenance Of Guardrail And Crush Cushion

RM ###

Guardrail - Page 30 / 31

Build-Up Rates Road Furnitures - Guardrails

ROAD FURNITURE MAINTENANCE OF GUARDRAIL AND CRASH CUSHION Installation of New Sections

Item g, page 30

Supply and replace new beam panel.

A) MATERIAL

I)

Cartridge

ADD:

= RM ###

P& O

Rate Per NO.

:

15%

= RM ###

= RM ### Take

Maintenance Of Guardrail And Crush Cushion

RM ###

Guardrail - Page 31 / 31