BUILT-UP RATE FOR SCREEDING TENDER FILE NO : PROJECT :
LOCATION : SUPPLIER :
SUB-CONTRACTOR : QUOTATION DATE : Material Cost Cement Sand (ex-mining)
10.35 per bags 50kg ( Including Rm 0.25 for unloading ) 250.00 per loads ( 14 cu. yard ) or 23.48 per m3
Cement & Sand ( 1:3 ) Mixed
Material Cost
Cement ( 1440kg/50 ) @ 1 m3 White Lime ( 1 bag / 100 ft2 ) Sand Total cost For 4 m3
29 bags 0 bags 3 m3
@ @ @
Net volume after shrinkage @ 33 1/3%
3.23 per m2 2.20 per m2
Screeding Material cost Wastage @ Total material cost / m2 Labour Cost Plant Cost ( Inclusived ) Tender Cost / m2
5%
300.15 70.45 370.60 2.67 m3
Material cost per m3 Plant cost ( Concrete mixer @ 3.00/m3 ) Total Cost : Labour Cost Base screed Labour Cost
10.35 0.00 23.48
138.90 3.00 141.90
( 0.30 per ft2 ) ( 0.20 per ft2 )
Cost / m2 20mm thk 25mm thk 2.84 3.55 0.14 0.18 2.98 3.72 2.20 2.20 5.18 5.92