Arch 516 Housing Development

  • Uploaded by: Shanne Nicole Hilapo
  • 0
  • 0
  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Arch 516 Housing Development as PDF for free.

More details

  • Words: 545
  • Pages: 4
MODULE REQUIREMENT Housing

ARCH 516, 1st Semester AY 2017-18 _____________________________________________________________________________ Professor: Arch. Juanito Y. Sy, uap, aacep, same Contact: +639 17 551 6675 E-mail: [email protected] _____________________________________________________________________________ Module Requirement Description This module requirement will provide a holistic housing design; physical planning; and marketing strategies approach in the development of subdivision projects in the Philippines based on the existing laws and legal parameters. In this exercise, the students will prepare a feasibility studies; develop conceptual development plan, and marketing plans and strategies. _____________________________________________________________________________ Project Case Study The housing site is located in Manila Gravel Pit Road, Bagong Silangan Capitol, Quezon City with a total lot area of 3.4225 hectares owned by the Quezon City Government and has a zoning classification of Residential. It is earmarked for the socialized housing program of the local government. It is an irregularly shaped corner-through lot with various existing vegetation on the whole site. The lot can be accessed through Payatas Road. It is bounded by Payatas Road on the north and residential lots on the east, south and west.

Within one (1) and three (3) kilometers radius are nearby medical institutions, schools, government buildings, churches and commercial development that may affect the condition of the project site.

The site is located in Manila Gravel Pit Road Bagong Silangan Capitol, Quezon City. It is located in a high low residential zone (R-2) which comprises of four adjacent lots that forms one inside lot directly accessible to a major road. The site has available utilities and is relatively flat. Site Technical Description

_______________________________________________________________________ Project Requirements 

Detailed Site Analysis and Inventory. Output shall be package in A3 size paper, digitally printed showing essential site description, analysis and inventory. A power point presentation of this requirement will be presented by respective groups on an agreed schedule. An e-copy shall be provided after presentation.



Feasibility Studies. The feasibility study shall contain design concepts and approach; physical planning model and ideas, conceptual development plan, and outline financial plan, digitally printed in letter size properly package. A power point presentation of this requirement will be presented by respective groups on an agreed schedule. An e-copy shall be provided after presentation.



Subdivision Master Plan. The master plan shall contain a detailed subdivision lot plan showing all saleable and non-saleable areas, housing plans (design development phase) with outline specification, and budgetary estimates to include but not limited to land development costs, land acquisition costs, and building development cost using standard construction indexes. All technical drawings shall be in CADD file with corresponding artist rendition to be printed in A3 paper while all textual report shall be in a letter size paper. A power point presentation of this requirement will be presented by respective groups on an agreed schedule. An e-copy shall be provided after presentation.



Financial Analysis and Marketing Plan. Output shall be package in letter size paper, digitally printed showing financial analysis, amortization models and proto-type marketing tools of the project development. An e-copy shall be provided after submittals.



Grading. The grading for Detailed Site Analysis and Inventory and Feasibility Studies will be equivalent to the 20 percent of the course’s term assessment. The Subdivision Master Plan will comprise the Final Term Examination while the Financial Analysis and Marketing Plan will be the ELGA.

Related Documents

516
May 2020 10
516
June 2020 14
Arch
November 2019 35
Sa-516
June 2020 12

More Documents from ""

Flan Casera
June 2020 25
Favorite House Offer
May 2020 27
1- Infracciones.pptx
April 2020 31
Heavenly Harmony
May 2020 34
Manual Primul Ajutor.pdf
December 2019 42