Analisa Harga Satuan Pekerjaan Persiapan No.

A-01

URAIAN

Dolken Kayu Ø 8-10 / 400 cm Semen Portland Pasir beton Koral Beton 2/3 Kayu balok terentang Paku Biasa 2" - 5" Residu Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah Dibulatkan

Btg

1.25

28,000

Kg M3 M3 M3 Kg Kg Oh Oh Oh Oh

2.5 0.005 0.009 0.072 0.06 0.4 0.4 0.2 0.02 0.02

1,406 255,400 211,100 2,640,000 23,400 8,100 42,000 65,000 75,000 80,000

Btg

1.25

28,000

Kg Lbr M3 M3 M3 Kg Kg Oh Oh Oh Oh

2.5 1.2 0.005 0.009 0.072 0.06 0.45 0.4 0.2 0.02 0.02

1,406 62,900 255,400 211,100 2,640,000 23,400 30,400 42,000 65,000 75,000 80,000

1 M' Pagar Sementara Seng Gelombang Tinggi 2 m Dolken Kayu Ø 8-10 / 400 cm Semen Portland Seng Gelombang BJLS-30 Pasir beton Koral Beton 2/3 Kayu balok terentang Paku Biasa 2" - 5" Meni Besi Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah Dibulatkan -

A-03

HARGA SATUAN (Rp)

1 M' Pagar Sementara Dari Kayu Tinggi 2 m -

A-02

VOLUME

SATUAN

1 M' Pagar SementaraKawat Duri Tinggi 1,80 m

Dolken Kayu Ø 8-10 / 400 cm Semen Portland Kawat Duri Pasir beton Koral Beton 2/3 Paku Biasa 2" - 5" Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah Dibulatkan -

A-04

1

28,000

Kg Kg M3 M3 Kg Oh Oh Oh Oh

2 2.5 0.005 0.009 0.06 0.3 0.2 0.02 0.02

1,406 63,500 255,400 211,100 23,400 42,000 65,000 75,000 80,000

M3 Kg M3 Oh Oh Oh Oh

0.012 0.02 0.007 0.1 0.1 0.01 0.005

1,870,500 23,400 2,071,700 42,000 65,000 75,000 80,000

Btg

1.25

28,000

M3 Kg Kg Kg M3 M3 M3 Bh m' M2 M2 Bh Lbr

0.18 0.85 1.1 35 0.15 0.1 0.15 30 0.25 2 0.08 0.15 0.06

2,640,000 23,400 26,800 1,406 233,400 255,400 211,100 775 15,815 35,900 87,400 94,500 140,000

1 M2 Pengukuran Dan Pasang Bouwplank -

Kayu kaso 5/7 Paku Biasa 2" - 5" Kayu papan albasia Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah Dibulatkan A-05

Btg

1 M2 Pembuatan Kantor Sementara dgn Lantai Diplester -

Dolken Kayu Ø 8-10 / 400 cm Kayu Balok terentang Paku Biasa Besi Strip Semen Portland Pasir Pasang Pasir beton Koral Beton2/3 Bata Merah Seng Plat Kawat harmonika Kaca Polos 3mm Kunci Tanam Plywood 120 x 240 x 0,4 cm

-

Pekerja Tukang Kayu Tukang Batu Kepala Tukang Mandor Jumlah Dibulatkan A-06

Dolken Kayu Ø 8-10 / 400 cm Kayu balok terentang Paku Biasa Semen Portland Pasir Beton Koral Beton 2/3 Seng Gelombang BJLS 30 Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah Dibulatkan

42,000 65,000 65,000 75,000 80,000

Btg

1.7

28,000

M3 Kg Kg M3 M3 Lbr Oh Oh Oh Oh

0.21 0.3 10.5 0.03 0.05 1.5 1 2 0.2 0.05

2,640,000 23,400 1,406 255,400 211,100 62,900 42,000 65,000 75,000 80,000

Btg

1.25

28,000

M3 Kg Kg M3 M3 Lbr Oh Oh Oh Oh

0.186 0.3 18 0.03 0.05 1.5 1 2 0.2 0.05

2,640,000 23,400 1,406 255,400 211,100 62,900 42,000 65,000 75,000 80,000

0.1

42,000

1 M2 Pembuatan Bedeng Buruh Dolken Kayu Ø 8-10 / 400 cm Kayu balok terentang Paku Biasa Semen Portland Pasir Beton Koral Beton 2/3 Seng Gelombang BJLS 30 Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah Dibulatkan -

A-08

2 2 1 0.3 0.05

1 M2 Pembuatan Gudang Semen dan Alat-alat -

A-07

Oh Oh Oh Oh Oh

1 M2 Membersihkan Lapangan dan Perataan -

Pekerja

Oh

-

Mandor Jumlah Dibulatkan A-09

0.05

80,000

M3 M3 M3 Oh Oh

0.15 0.09 0.01 1 0.05

205,500 196,000 233,400 42,000 80,000

Oh Oh

6.667 0.333

42,000 80,000

6.667 0.033

42,000 80,000

0.986 0.525 0.074 0.146 45 0.375 0.125 0.012 0.019

199,200 264,000 255,400 211,100 1,406 42,000 65,000 75,000 80,000

0.434 6.786 0.0424 4

14,900 18,300 18,300 600

1M2 Pembuatan Jalan Sementara -

Batu Belah 15/20 Batu Pecah 5/7 Pasir Pasang Pekerja Mandor Jumlah Dibulatkan A-10

Oh

1 M3 Bongkaran Beton Bertulang -

Pekerja Mandor Jumlah

Dibulatk an A-11

1 M3 Bongkaran Dinding Tembok Bata Merah -

Pekerja Mandor Jumlah Dibulatkan A-12

1 M¹ Pagar beton Pracetak ( 5 x 50 x 213 ) cm -

Panel Beton Pracetak Kolom Beton Pracetak Pasir Beton Koral 2/3 Semen abu - abu Pekerja Tukang Batu Kepala Tukang Mandor Jumlah Dibulatkan A-13

Oh Oh

Lbr Btg M3 M3 Kg Oh Oh Oh Oh

1 M¹ Pagar kawat ayam tiang besi L50.50.5, tinggi 1 m' -

Kawat ram ayam Besi siku L 50.50.5 Besi pelat (1,2 x 3) mm Baut

Lbr Kg Kg bh

-

Semen Portland Pasir beton Koral Beton 2/3 Pekerja Tukang Batu Kepala Tukang Mandor Jumlah Dibulatkan A-14

BRC lengkap dengan tiang Semen Portland Kawat Duri Pasir beton Koral Beton 2/3 Pekerja Tukang Batu Kepala Tukang Mandor Jumlah Dibulatkan

1,406 255,400 211,100 42,000 65,000 75,000 80,000

Lbr Kg Kg M3 M3 Oh Oh Oh Oh

0.434 2 2.5 0.005 0.009 0.375 0.125 0.012 0.019

171,300 1,406 63,500 255,400 211,100 42,000 65,000 75,000 80,000

btng kg org org org org

1 0.25 0.25 0.017 0.002 0.013

25,000 23,400 42,000 65,000 75,000 80,000

btng org org

1.25 0.5 0.025

25,000 42,000 80,000

1 M2 Steiger Werk / perancah dari Bambu -

Bambu Ø 6 - 10 (600) cm Tali ijuk Pekerja Tukang kayu Kepala tukang Mandor Jumlah Dibulatkan A-16

2.5 0.005 0.009 0.375 0.125 0.012 0.019

1 M2 Pagar BRC lengkap dengan tiang -

A-15

Kg M3 M3 Oh Oh Oh Oh

1 M' Cerucuk Bambu -

Bambu Ø 7 -10 (400) cm Pekerja Mandor Jumlah Dibulatkan

siapan HARGA (Rp)

35,000 3,515 1,277 1,900 190,080 1,404 3,240 16,800 13,000 1,500 1,600 269,316 269,316

35,000 3,515 75,480 1,277 1,900 190,080 1,404 13,680 16,800 13,000 1,500 1,600 355,236 355,236

28,000 2,812 158,750 1,277 1,900 1,404 12,600 13,000 1,500 1,600 222,843 222,843

22,446 468 14,502 4,200 6,500 750 400 49,266 49,266

35,000 475,200 19,890 29,480 49,210 35,010 25,540 31,665 23,250 3,954 71,800 6,992 14,175 8,400

84,000 130,000 65,000 22,500 4,000 1,135,066 1,135,066

47,600 554,400 7,020 14,763 7,662 10,555 94,350 42,000 130,000 15,000 4,000 927,350 927,350

35,000 491,040 7,020 25,308 7,662 10,555 94,350 42,000 130,000 15,000 4,000 861,935 861,935

4,200

4,000 8,200 8,200

30,825 17,640 2,334 42,000 4,000 96,799 96,799

280,014 26,640 306,654 306,654

280,014 2,640 282,654 282,654

196,411 138,600 18,900 30,821 63,270 15,750 8,125 900 1,520 474,296 474,296

6,467 124,184 776 2,400

3,515 1,277 1,900 15,750 8,125 900 1,520 166,813 166,813

74,344 2,812 158,750 1,277 1,900 15,750 8,125 900 1,520 265,378 265,378

25,000 5,850 10,500 1,105 150 1,040 43,645 43,645

31,250 21,000 2,000 54,250 54,250

Analisa Harga Satuan Pekerjaan Tanah

No.

B-01

URAIAN SATUAN VOLUME

HARGA SATUAN (Rp)

Pekerja Mandor Jumlah

Oh Oh

0.4 0.04

42,000 80,000

16,800 3,200 20,000 20,000

Pekerja Mandor Jumlah

Oh Oh

0.526 0.052

42,000 80,000

22,092 4,160 26,252 26,252

Pekerja Mandor Jumlah

Oh Oh

0.735 0.073

42,000 80,000

30,870 5,840 36,710 36,710

Pekerja Mandor Jumlah

Oh Oh

0.625 0.062

42,000 80,000

26,250 4,960 31,210 31,210

Pekerja Mandor Jumlah

Oh Oh

0.823 0.083

42,000 80,000

34,566 6,640 41,206 41,206

Dibulatkan 1 M3 Galian Tanah Biasa Sedalam 2 m Dibulatkan B-03

1 M3 Galian Tanah Biasa Sedalam 3 m Dibulatkan

B-04

1 M3 Galian Tanah Keras Sedalam 1 m -

B-05

(Rp)

1 M3 Galian Tanah Biasa sedalam 1 m -

B-02

HARGA

Dibulatkan 1 M3 Galian Tanah Lumpur Sedalam 1 m Dibulatkan

Analisa Harga Satuan Pekerjaan Pondasi (AHS SNI 2011)

No.

C-01

C-02

C-03

URAIAN

SATUAN

VOLUME

HARGA SATUAN (Rp)

1 M3 Pasanag Pondasi batu Kali adk 1pc : 3 ps -

Batu Belah

M3

1.1

205,500

-

Semen Portland

Kg

202

1,406

-

Pasir Pasang Pekerja Tukang Batu

M3 Oh Oh

0.485 1.5 0.6

233,400 42,000 65,000

-

Kepala Tukang

Oh

0.06

75,000

-

Mandor Jumlah

Oh

0.075

80,000

Dibulatkan 1 M3 Pasang Pondasi Batu kali adk 1pc : 4ps Batu Belah

M3

1.1

205,500

-

Semen Portland

Kg

163

1,406

-

Pasir Pasang Pekerja Tukang Batu

M3 Oh Oh

0.52 1.5 0.6

233,400 42,000 65,000

-

Kepala Tukang

Oh

0.06

75,000

-

Mandor Jumlah

Oh

0.075

80,000

Dibulatkan 1 M3 Pasang Pondasi Batu kali adk 1pc : 5ps Batu Belah

M3

1.1

205,500

-

Semen Portland

Kg

136

1,406

-

Pasir Pasang Pekerja

M3 Oh

0.544 1.5

233,400 42,000

C-04

-

Tukang Batu

Oh

0.6

65,000

-

Kepala Tukang

Oh

0.06

75,000

-

Mandor Jumlah

Oh

0.075

80,000

-

Batu Belah Pasir Urug Pekerja Tukang Batu

M3 M3 Oh Oh

1.2 0.3 0.78 0.39

205,500 175,300 42,000 65,000

-

Kepala Tukang

Oh

0.039

75,000

-

Mandor Jumlah

Oh

0.039

80,000

Dibulatkan 1 M3 Pasang Pondasi Batu Kosong (aanstamping)

Dibulatkan

AHS SNI 2011)

HARGA (Rp)

226,050 284,012 113,199 63,000 39,000 4,500 6,000 735,761 735,761

226,050 229,178 121,368 63,000 39,000 4,500 6,000 689,096 689,096

226,050 191,216 126,970 63,000

39,000 4,500 6,000 656,736 656,736

246,600 52,590 32,760 25,350 2,925 3,120 363,345 363,345

Analisa Harga Satuan Pekerjaan Beton NO

D-17r2

URAIAN

SAT

VOLUME HRG.SAT JUMLAH

1 M3 Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12 ring 8-15 Kayu papan terentang

M3

0.27

2,850,000

769,500

Paku Biasa 2" - 5"

Kg

2

23,400

46,800

Besi Beton

Kg

180

16,500

2,970,000

Kawat Beton

Kg

3

27,700

83,100

Semen Portland

Kg

323

1,200

387,600

Pasir Beton

M3

0.52

225,000

117,000

Koral Beton 2/3

M3

0.78

200,000

156,000

Pekerja

Oh

4.85

55,000

266,750

Tukang Batu

Oh

0.35

70,000

24,500

Tukang Kayu

Oh

1.56

70,000

109,200

Tukang Besi

Oh

1.4

70,000

98,000

Kepala Tukang

Oh

0.331

80,000

26,480

Mandor Jumlah

Oh

0.17

85,000

14,450 5,069,380

Dibulatkan

5,069,380

1 M3 Kolom Beton Tulang 15/20 (180 kg besi + bekisting) 4dia.12 8-15

Kayu papan terentang

M3

0.4

2,850,000

1,140,000

Paku Biasa 2" - 5"

Kg

4

23,400

93,600

Minyak Bekisting

Ltr

40,500

-

Besi Beton

Kg

180

16,500

2,970,000

Kawat Beton

Kg

1.8

27,700

49,860

Semen Portland

Kg

323

1,200

387,600

Pasir Beton

M3

0.52

225,000

117,000

Koral Beton 2/3

M3

0.78

200,000

156,000

Kayu Balok Terentang

M3

0.15

2,640,000

396,000

Dolken Ø-8-10/4m

Btg

20

15,000

300,000

Pekerja

Oh

7.3

55,000

401,500

Tukang Batu

Oh

0.35

70,000

24,500

Tukang Kayu

Oh

3.3

70,000

231,000

Tukang Besi

Oh

2.1

70,000

147,000

Kepala Tukang

Oh

0.57

80,000

45,600

Mandor

Oh

0.25

85,000

21,250

Jumlah

6.480.910

Dibulatkan

6.481.000

1 M3 Balok Beton Tulang 15/20 sofi-sofi, ring balk + balok poratl (180 kg besi + bekisting) 4dia. 12, 8-15

Kayu papan terentang

M3

0.32

2,850,000

912,000

Paku Biasa 2" - 5"

Kg

3.2

23,400

74,880

Besi Beton

Kg

180

16,500

2,970,000

Kawat Beton

Kg

2.25

27,700

62,325

Semen Portland

Kg

323

1,200

387,600

Pasir Beton

M3

0.52

225,000

117,000

Koral Beton 2/3

M3

0.78

200,000

156,000

Kayu Balok Terentang

M3

0.14

2,640,000

369,600

D-29

Dolken Ø-8-10/4m

Btg

16

15,000

240,000

Pekerja

Oh

5.96

55,000

327,800

Tukang Batu

Oh

0.35

70,000

24,500

Tukang Kayu

Oh

2.8

70,000

196,000

Tukang Besi

Oh

1.4

70,000

98,000

Kepala Tukang

Oh

0.455

80,000

36,400

Mandor

Oh

0.208

85,000

17,680

Jumlah

6.412.865

Dibulatkan

6,413,000

1 M3 Tangga Beton Tulang (90 kg besi + bekisting)

Kayu papan terentang

M3

0.25

2,850,000

712,500

Paku Biasa 2" - 5"

Kg

3

23,400

70,200

Minyak Bekisting

Ltr

1.2

40,500

48,600

Besi Beton

Kg

90

16,500

1,485,000

Kawat Beton

Kg

3

27,700

83,100

Semen Portland

Kg

323

1,200

387,600

Pasir Beton

M3

0.52

225,000

117,000

Koral Beton 2/3

M3

0.78

200,000

156,000

Kayu Balok Terentang

M3

0.105

2,640,000

277,200

Dolken Ø-8-10/4m

Btg

14

15,000

210,000

Pekerja

Oh

5.6

55,000

308,000

Tukang Batu

Oh

0.35

70,000

24,500

Tukang Kayu

Oh

2.3

70,000

161,000

Tukang Besi

Oh

1.4

70,000

98,000

Kepala Tukang

Oh

0.405

80,000

32,400

Mandor Jumlah

Oh

0.202

85,000

17,170 4,188,720

Dibulatkan

4,189,000

1 M3 Membuat Plat Lantai Tb. 10 Cm Beton 3 Bertulang ( 90 Kg Besi + Bekisting )

Kayu Terentang

M3

0.4

2,850,000

1,140,000

Paku Biasa 2" - 5"

Kg

4

23,400

93,600

Minyak Bekisting

Ltr

2

40,500

81,000

Besi Beton Polos

Kg

90

16,500

1,485,000

Kawat Beton

Kg

3

27,700

83,100

Kayu Balok Terentang

M3

0.105

151,100

15,866

Plywood Tebal 9 mm

Lbr

3.5

151,100

528,850

Dolken kayu Galam o 8-10/4 m

Btg

60

15,000

900,000

Semen Portland

Kg

323

1,200

387,600

Pasir Beton

M3

0.52

225,000

117,000

Koral Beton 2/3

M3

0.78

200,000

156,000

Pekerja

Oh

5.2

55,000

286,000

Tukang Batu

Oh

0.35

70,000

24,500

Tukang Kayu

Oh

3.3

70,000

231,000

Kepala Tukang

Oh

0.365

80,000

29,200

Mandor Jumlah

Oh

1.06

85,000

90,100 5,648,816

Dibulatkan Materi Terkait :

5,649,000

Analisa Harga Satuan Pekerjaan Dinding (AHS-SNI 2011)

Berikut adalah penggalan analisa harga satuan (AHS-SNI 2011) untuk pekerjaan dinding yang biasa digunakan untuk E. ANALISA HARGA SATUAN PEKERJAAN DINDING No.

URAIAN

SATUAN VOLUME

HARGA SATUAN (Rp)

E-01

E-02

E-03

-

M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 3ps Bata Merah Bh 140

-

Semen Portland

Kg

32.95

1,406.00

-

Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor Jumlah Dibulatkan

M3 Oh Oh Oh Oh

0.091 0.65 0.2 0.02 0.03

233,400.00 42,000.00 65,000.00 75,000.00 80,000.00

1

775.00

1

M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 4ps

-

Bata Merah

Bh

140

775.00

-

Semen Portland

Kg

26.55

1,406.00

-

Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor Jumlah Dibulatkan

M3 Oh Oh Oh Oh

0.093 0.65 0.2 0.02 0.03

233,400.00 42,000.00 65,000.00 75,000.00 80,000.00

1

M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 5ps

-

Bata Merah

Bh

140

775.00

-

Semen Portland

Kg

22.2

1,406.00

-

Pasir Pasang

M3

0.102

233,400.00

-

E-04

E-05

E-06

-

Pekerja Oh 0.65 Tukang Batu Oh 0.2 Kepala Tukang Oh 0.02 Mandor Oh 0.03 Jumlah Dibulatkan M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 3ps Bata Merah Bh 70

-

Semen Portland

14.37

1,406.00

-

233,400.00 42,000.00 65,000.00 75,000.00 80,000.00

-

Pasir Pasang M3 0.04 Pekerja Oh 0.32 Tukang Batu Oh 0.1 Kepala Tukang Oh 0.01 Mandor Oh 0.015 Jumlah Dibulatkan M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 4ps Bata Merah Bh 70

-

Semen Portland

11.5

1,406.00

-

233,400.00 42,000.00 65,000.00 75,000.00 80,000.00

-

Pasir Pasang M3 0.043 Pekerja Oh 0.32 Tukang Batu Oh 0.1 Kepala Tukang Oh 0.01 Mandor Oh 0.015 Jumlah Dibulatkan M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 5ps Bata Merah Bh 70

-

Semen Portland

Kg

9.68

1,406.00

-

Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor Jumlah Dibulatkan

M3 Oh Oh Oh Oh

0.045 0.32 0.1 0.01 0.015

233,400.00 42,000.00 65,000.00 75,000.00 80,000.00

1

1

1

Kg

Kg

42,000.00 65,000.00 75,000.00 80,000.00

775.00

775.00

775.00

-SNI 2011)

kerjaan dinding yang biasa digunakan untuk menghitung biaya pekerjaan dinding pada rumah tinggal. Keseluruhan analisa peke

HARGA (Rp)

108,500.00 46,327.70 21,239.40 27,300.00 13,000.00 1,500.00 2,400.00 220,267.10 220,267.00

108,500.00 37,329.30 21,706.20 27,300.00 13,000.00 1,500.00 2,400.00 211,735.50 211,736.00

108,500.00 31,213.20 23,806.80

27,300.00 13,000.00 1,500.00 2,400.00 207,720.00 207,720.00

54,250.00 20,204.22 9,336.00 13,440.00 6,500.00 750.00 1,200.00 105,680.22 105,680.00

54,250.00 16,169.00 10,036.20 13,440.00 6,500.00 750.00 1,200.00 102,345.20 102,345.00

54,250.00 13,610.08 10,503.00 13,440.00 6,500.00 750.00 1,200.00 100,253.08 100,253.00

eluruhan analisa pekerjaan dinding untuk berbagai ukuran ketebalan dinding dan komposisi adukan pada AHS-SNI ada sekitar 4

AHS-SNI ada sekitar 40 analisa.

Analisa Harga Satuan Pekerjaan Plesteran (AHS SNI 2011)

Inilah penggalan analisa pekerjaan plesteran yang paling banyak digunakan untuk menghitung biaya bangunan rumah F. ANALISA HARGA SATUAN PEKERJAAN PLESTERAN No.

URAIAN

SATUAN VOLUME

HARGA SATUAN (Rp)

1 M2 Plesteran adk. 1pc : 2ps Tebal 15 mm

F-01 -

Semen Portland

Kg

8.52

1,406.00

-

Pasir Pasang

M3

0.017

233,400.00

-

Pekerja

Oh

0.2

42,000.00

-

Tukang Batu

Oh

0.15

65,000.00

-

Kepala Tukang

Oh

0.015

75,000.00

Oh

0.01

80,000.00

-

Mandor Jumlah Dibulatkan 1 M2 Plesteran adk. 1pc : 3ps Tebal 15 mm

F-02

-

Semen Portland

Kg

6.48

1,406.00

-

Pasir Pasang

M3

0.019

233,400.00

-

Pekerja

Oh

0.2

42,000.00

-

Tukang Batu

Oh

0.15

65,000.00

-

Kepala Tukang

Oh

0.015

75,000.00

Oh

0.01

80,000.00

-

Mandor Jumlah Dibulatkan

1 M2 Plesteran adk. 1pc : 4ps Tebal 15 mm

F-03

-

Semen Portland

Kg

5.2

1,406.00

-

Pasir Pasang

M3

0.02

233,400.00

-

Pekerja

Oh

0.2

42,000.00

-

Tukang Batu

Oh

0.15

65,000.00

-

Kepala Tukang

Oh

0.015

75,000.00

Oh

0.01

80,000.00

-

Mandor Jumlah Dibulatkan 1 M2 Plesteran adk. 1pc : 3ps Tebal 20 mm

F-04

-

Semen Portland

Kg

10.8

1,406.00

-

Pasir Pasang

M3

0.026

233,400.00

-

Pekerja

Oh

0.25

42,000.00

-

Tukang Batu

Oh

0.2

65,000.00

-

Kepala Tukang

Oh

0.02

75,000.00

Oh

0.0125

80,000.00

-

Mandor Jumlah Dibulatkan

F-05

1 M2 Plesteran adk. 1pc : 4ps Tebal 20 mm

-

Semen Portland

Kg

8.68

1,406.00

-

Pasir Pasang

M3

0.028

233,400.00

-

Pekerja

Oh

0.25

42,000.00

-

Tukang Batu

Oh

0.2

65,000.00

-

Kepala Tukang

Oh

0.02

75,000.00

Oh

0.0125

80,000.00

-

Mandor Jumlah Dibulatkan

1 M2 Plesteran adk. 1pc:5ps tebal 20 mm

F-06

-

Semen Portland

Kg

7.29

1,406.00

-

Pasir Pasang

M3

0.026

233,400.00

-

Pekerja

Oh

0.25

42,000.00

-

Tukang Batu

Oh

0.2

65,000.00

-

Kepala Tukang

Oh

0.02

75,000.00

Oh

0.0125

80,000.00

-

Mandor Jumlah Dibulatkan F-11

1 M2 Acian Plesteran -

Semen Portland

Kg

4

1,406.00

-

Pekerja

Oh

0.143

42,000.00

-

Tukang batu

Oh

0.107

65,000.00

-

Kepala Tukang

Oh

0.0105

75,000.00

Oh

0.0105

80,000.00

-

Mandor Jumlah Dibulatkan

Materi Terkait :

AHS SNI 2011)

enghitung biaya bangunan rumah tinggal.

HARGA (Rp)

11,979.12 3,967.80 8,400.00 9,750.00 1,125.00 800.00 36,021.92 36,022.00

9,110.88 4,434.60 8,400.00 9,750.00 1,125.00 800.00 33,620.48 33,620.00

7,311.20 4,668.00 8,400.00 9,750.00 1,125.00 800.00 32,054.20 32,054.00

15,184.80 6,068.40 10,500.00 13,000.00 1,500.00 1,000.00 47,253.20 47,253.00

12,204.08 6,535.20 10,500.00 13,000.00 1,500.00 1,000.00 44,739.28 44,739.00

10,249.74 6,068.40 10,500.00 13,000.00 1,500.00 1,000.00 42,318.14 42,318.00

5,624.00 6,006.00 6,955.00 787.50 840.00 20,212.50 20,213.00

Penggalan Analisa Harga Satuan Penutup Atap (AHS SNI 2011)

Untuk menghitung pekerjaan penutup atap seperti genting plentong, genting morando, genting keramik, genting beton G. ANALISA HARGA SATUAN PEKERJAAN PENUTUP ATAP No.

URAIAN

G-01

1 -

G-02

Bh Oh Oh Oh Oh

HARGA SATUAN

HARGA

(Rp)

(Rp)

25.00 0.15 0.08 0.01 0.01

1,900.00 42,000.00 65,000.00 75,000.00 80,000.00

47,500.00 6,300.00 4,875.00 600.00 640.00 59,915.00 59,915.00

5.00

6,000.00

30,000.00

8.00 0.03 0.40 0.20 0.02 0.00

1,406.00 233,400.00 42,000.00 65,000.00 75,000.00 80,000.00

11,248.00 7,468.80 16,800.00 13,000.00 1,500.00 160.00 80,176.80 80,177.00

0.60 0.05 0.14 0.07 0.01 0.01

100,000.00 23,800.00 42,000.00 65,000.00 75,000.00 80,000.00

60,000.00 1,190.00 5,880.00 4,355.00 525.00 560.00 72,510.00 72,510.00

1 M2 Pasang Genteng Bubung Palentong Genteng bubung Bh palentong Semen Portland Kg Pasir pasang M3 Pekerja Oh Tukang kayu Oh Kepala tukang Oh Mandor Oh Jumlah Dibulatkan 1 M2 Pasang Roof Light Fibreglass ( 180 x 90 ) cm Roof light fibreglass Lbr Paku biasa ½" - 1" Kg Pekerja Oh Tukang kayu Oh Kepala tukang Oh Mandor Oh Jumlah Dibulatkan -

G-03

M2 Pasang Atap Genteng Palentong Genteng palentong Pekerja Tukang kayu Kepala tukang Mandor Jumlah Dibulatkan

SATUAN VOLUM E

G-04

1 M2 Pasang Atap Asbes Gelombang ( 3,00 x 1,05 m ) x 4 mm -

Asbes gelombang Paku seng Pekerja Tukang kayu Kepala tukang Mandor Jumlah Dibulatkan G-05

0.35 0.12 0.14 0.07 0.01 0.01

80,000.00 23,800.00 42,000.00 65,000.00 75,000.00 80,000.00

28,000.00 2,856.00 5,880.00 4,550.00 525.00 560.00 42,371.00 42,371.00

1 M2 Pasang Atap Asbes Gelombang ( 2,70 x 1,05 m ) x 4 mm -

G-06

Lbr Kg Oh Oh Oh Oh

Asbes gelombang Paku seng Pekerja Tukang kayu Kepala tukang Mandor Jumlah Dibulatkan

Lbr Kg Oh Oh Oh Oh

0.42 0.12 0.14 0.07 0.01 0.01

73,300.00 23,800.00 42,000.00 65,000.00 75,000.00 80,000.00

30,786.00 2,856.00 5,880.00 4,550.00 525.00 560.00 45,157.00 45,157.00

Lbr Kg Oh Oh Oh Oh

0.44 0.12 0.14 0.07 0.01 0.01

65,900.00 23,800.00 42,000.00 65,000.00 75,000.00 80,000.00

28,996.00 2,856.00 5,880.00 4,355.00 525.00 560.00 43,172.00 43,172.00

Lbr Kg Oh Oh Oh

0.51 0.12 0.14 0.07 0.01

58,500.00 23,800.00 42,000.00 65,000.00 75,000.00

29,835.00 2,856.00 5,880.00 4,355.00 525.00

1 M2 Pasang Atap Asbes Gelombang ( 2,40 x 1,05 m ) x 4 mm -

Asbes gelombang Paku seng Pekerja Tukang kayu Kepala tukang Mandor Jumlah Dibulatkan M2 Pasang Atap Asbes Gelombang 1 ( 2,10 x 1,05 m ) x 4 mm

G-07 -

Asbes gelombang Paku seng Pekerja Tukang kayu Kepala tukang

-

G-08

Asbes gelombang Paku seng Pekerja Tukang kayu Kepala tukang Mandor Jumlah Dibulatkan

G-11

0.01

80,000.00

560.00 44,011.00 44,011.00

Lbr Kg Oh Oh Oh Oh

0.80 0.12 0.14 0.07 0.01 0.01

42,300.00 23,800.00 42,000.00 65,000.00 75,000.00 80,000.00

33,840.00 2,856.00 5,880.00 4,355.00 525.00 560.00 48,016.00 48,016.00

Lbr Bh Oh Oh Oh Oh

2.10 6.00 0.08 0.13 0.01 0.00

38,100.00 800.00 42,000.00 65,000.00 75,000.00 80,000.00

80,010.00 4,800.00 3,528.00 8,125.00 975.00 320.00 97,758.00 97,758.00

bh Kg Oh Oh Oh Oh

11.00 0.03 0.20 0.10 0.01 0.01

8,500.00 23,400.00 42,000.00 65,000.00 75,000.00 80,000.00

93,500.00 702.00 8,400.00 6,500.00 750.00 800.00 110,652.00 110,652.00

bh

18.00

2,700.00

48,600.00

Oh Oh Oh

0.15 0.08 0.01

42,000.00 65,000.00 75,000.00

6,300.00 4,875.00 600.00

1 M¹ Pasang Nok Stel Gelombang 1,05 m -

G-10

Oh

1 M2 Pasang Atap Asbes Gelombang ( 1,50 x 1,05 m ) x 4 mm -

G-09

Mandor Jumlah Dibulatkan

Nok stel gelombang Paku sekrup 3,5" Pekerja Tukang kayu Kepala tukang Mandor Jumlah Dibulatkan 1 M2 Pasang Atap Genteng Beton Genteng beton Paku biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Jumlah Dibulatkan 1 M2 Pasang Atap Genteng Murando Natural -

Genteng murando natural Pekerja Tukang kayu Kepala tukang

-

G-12

Mandor Jumlah Dibulatkan

Oh

0.01

80,000.00

640.00 61,015.00 61,015.00

bh

18.00

4,000.00

72,000.00

Oh Oh Oh Oh

0.15 0.08 0.01 0.01

42,000.00 65,000.00 75,000.00 80,000.00

6,300.00 4,875.00 600.00 640.00 84,415.00 84,415.00

1 M2 Pasang Atap Genteng Murando Glazur -

Materi Terkait :

Genteng murando glazur Pekerja Tukang kayu Kepala tukang Mandor Jumlah Dibulatkan

ting keramik, genting beton dll. diperlukan analisa harga satuan penutup atap. Berikut adalah penggalan AHS SNI 2011 penutup

AHS SNI 2011 penutup atap yang biasa digunakan untuk menghitung RAB Rumah tinggal.

rjaan Penutup Langit-langit (AHS SNI 2011)

Berikut ini adalah penggalan Analisa Harga Satuan Pekerjaan untuk menghitung biaya pekerjaan langit-langit: asbes, akustik, te H. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANGIT-LANGIT No.

H-01

URAIAN

VOLUME

HARGA SATUAN

HARGA

(Rp) (Rp)

(Rp) (Rp)

1 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 5 mm

-

Pelat asbes tebal 4 mm

m2

-

Paku seng

Kg

0.01 23,800.00

-

Pekerja

Oh

0.03 42,000.00 1,260.00

-

Tukang kayu

Oh

0.07 65,000.00 4,550.00

-

Kepala tukang

Oh

0.007 75,000.00

525

Oh

0.0015 80,000.00

120 31,443.00 31,443.00

-

Mandor Jumlah Dibulatkan H-02

SATUAN

1.1 22,500.00 24,750.00

238

1 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 3,5 mm

-

Pelat asbes tebal 3,5 mm

Lbr

-

Paku seng

Kg

0.01 23,800.00

-

Pekerja

Oh

0.03 42,000.00 1,260.00

-

Tukang kayu

Oh

0.07 65,000.00 4,550.00

-

Kepala tukang

Oh

0.007 75,000.00

525

Oh

0.0015 80,000.00

120 28,143.00 28,143.00

-

Mandor Jumlah Dibulatkan

1.1 19,500.00 21,450.00

238

H-03

1 M2 Langit-langit Akustik ( 60 x 120 ) cm -

Akustik 600 x 1200

Lbr

-

Paku Pekerja

Kg Oh

0.05 23,800.00 1,190.00 0.06 42,000.00 2,520.00

-

Tukang kayu

Oh

0.1 65,000.00 6,500.00

-

Kepala tukang

Oh

0.01 75,000.00

750

Oh

0.003 80,000.00

240 ### ###

-

Mandor Jumlah Dibulatkan H-04

###

###

1 M2 Langit-langit Akustik ( 60 x 120 ) cm + Rangka Alluminium -

Profil Alluminiu m "T"



3.6 12,200.00 43,920.00

-

Kawat f 4 mm

Kg

0.15 28,200.00 4,230.00

-

Ramset / dina bolt

Bh

1.05 7,200.00 7,560.00

-

Akustik 600 x 1200

Lbr

-

Pekerja

Oh

0.15 42,000.00 6,300.00

-

Tukang kayu

Oh

0.5 65,000.00 32,500.00

-

Kepala tukang

Oh

0.05 75,000.00 3,750.00

-

Mandor Jumlah Dibulatkan H-05

1.5

Oh

1.5

###

0.0075 80,000.00

###

600 ### ###

1 M2 Langit-langit teakwood (60 x 120) cm, t = 4 mm + rangka kayu borneo super -

Kayu Balok Borneo Super

M3

-

Paku biasa 2" 5"

Kg

0.023

### 60,720.00

0.06 23,400.00 1,404.00

-

Teakwoo d 120 cm x 240 cm x 0,4 cm

Lbr

0.39

-

Pekerja

Oh

0.27 42,000.00 11,340.00

-

Tukang kayu

Oh

0.4 65,000.00 26,000.00

-

Kepala tukang

Oh

0.04 75,000.00 3,000.00

Oh

0.0135 80,000.00 1,080.00 ### ###

-

Mandor Jumlah Dibulatkan H-06

1 M2 Langit-langit Teakwood 3 mm + Rangka Kayu Borneo Super -

Kayu Balok Borneo Super

M3

-

Paku biasa 2" 5"

Kg

0.06 23,400.00 1,404.00

-

Teakwoo d (120 x 240x 0,3) cm

Lbr

0.39

-

Pekerja

Oh

0.27 42,000.00 11,340.00

-

Tukang kayu

Oh

0.4 65,000.00 26,000.00

-

Kepala tukang

Oh

0.04 75,000.00 3,000.00

Oh

0.0135 80,000.00 1,080.00 ### ###

-

Mandor Jumlah Dibulatkan H-07

### 51,363.00

0.023

### 60,720.00

### 50,349.00

1 M2 Langit-langit Triplek 4 mm + Rangka Kayu Borneo Super -

Kayu Balok Borneo Super

M3

-

Paku biasa 2" 5"

Kg

0.023

### 60,720.00

0.06 23,800.00 1,428.00

-

Triplek 120 cm x 240 cm x 0,4 cm

Lbr

0.39 64,400.00 25,116.00

-

Pekerja

Oh

0.27 42,000.00 11,340.00

-

Tukang kayu

Oh

0.4 65,000.00 26,000.00

-

Kepala tukang

Oh

0.04 75,000.00 3,000.00

Oh

0.0135 80,000.00 1,080.00 ### ###

-

Mandor Jumlah Dibulatkan H-08

1 M2 Langit-langit Gypsum Board, tebal 9 mm + rangka besi hollow -

Hollow 4/4 Zincromat e

Btg

0.415 29,200.00 12,118.00

-

Hollow 2/4 Zincromat e

Btg

0.15 22,600.00 3,390.00

-

Gypsum board ( 120 x 240 x 9 ) mm

Lbr

0.364 79,800.00 29,047.20

-

Paku gypsum

kg

0.11 17,500.00 1,925.00

-

Ramset / dina bolt

Bh

4 7,200.00 28,800.00

-

Cotton plaster

Bh

0.072 15,000.00 1,080.00

-

Compoun

Zak

0.125 75,000.00 9,375.00

-

Pekerja

Oh

0.1 42,000.00 4,200.00

-

Tukang kayu

Oh

0.05 65,000.00 3,250.00

-

Kepala tukang

Oh

0.005 75,000.00

375

Oh

0.005 80,000.00

400 93,960.20 93,960.00

-

Mandor Jumlah Dibulatkan H-09

1 M2 Langit-langit GRC t = 4 mm + rangka besi hollow

-

Hollow 4/4 Zincromat e

Btg

0.415 29,200.00 12,118.00

-

Hollow 2/4 Zincromat e

Btg

0.15 22,600.00 3,390.00

-

GRC ( 120 x 240 x 4 ) mm

Lbr

0.364 67,500.00 24,570.00

-

Paku GRC

kg

0.11 35,000.00 3,850.00

-

Ramset / dina bolt

Bh

4 7,200.00 28,800.00

-

Cotton plaster

Bh

0.072 15,000.00 1,080.00

-

Compoun

Zak

0.125 75,000.00 9,375.00

-

Pekerja

Oh

0.1 42,000.00 4,200.00

-

Tukang kayu

Oh

0.05 65,000.00 3,250.00

-

Kepala tukang

Oh

0.005 75,000.00

375

Oh

0.005 80,000.00

400 91,408.00 91,408.00

-

Mandor Jumlah Dibulatkan H-10

1 M2 Langit-langit gypsum t = 9 mm + Rangka Kayu Borneo Super -

Kayu Balok Borneo Super

M3

-

Paku biasa 2" 5"

Kg

0.06 23,800.00 1,428.00

-

Gypsum board ( 120 x 240 x 9 ) mm

Lbr

0.39 79,800.00 31,122.00

-

Paku sekrup

kg

0.11 17,500.00 1,925.00

-

Pekerja

Oh

0.27 42,000.00 11,340.00

-

Tukang kayu

Oh

0.4 65,000.00 26,000.00

0.023

### 60,720.00

-

Kepala tukang

-

Mandor Jumlah Dibulatkan H-11

Oh

0.0135 80,000.00 1,080.00 ### ###

-

Kayu Balok Borneo Super

M3

-

Paku biasa 2" 5"

Kg

0.06 23,800.00 1,428.00

-

GRC ( 120 x 240 x 4 ) mm

Lbr

0.39 67,500.00 26,325.00

-

Paku GRC

kg

0.11 35,000.00 3,850.00

-

Pekerja

Oh

0.27 42,000.00 11,340.00

-

Tukang kayu

Oh

0.4 65,000.00 26,000.00

-

Kepala tukang

Oh

0.04 75,000.00 3,000.00

Oh

0.0135 80,000.00 1,080.00 ### ###

Mandor Jumlah Dibulatkan

0.023

### 60,720.00

1 M¹ List Langitlangit Kayu Profil 10 cm -

List Kayu profil



1.05 29,400.00 30,870.00

-

Paku Pekerja

Kg Oh

0.01 23,800.00 238 0.05 42,000.00 2,100.00

-

Tukang kayu

Oh

0.05 65,000.00 3,250.00

-

Kepala tukang

Oh

0.005 75,000.00

375

Oh

0.003 80,000.00

240 37,073.00 37,073.00

-

Mandor Jumlah Dibulatkan H-13

0.04 75,000.00 3,000.00

1 M2 Langit-langit GRC t = 4 mm + Rangka Kayu Borneo Super

-

H-12

Oh

1 M¹ List Langitlangit Gypsum 10 cm

-

List gypsum



1.05 8,500.00 8,925.00

-

Tepung gypsum

Kg

0.15 12,500.00 1,875.00

-

Pekerja

Oh

0.05 42,000.00 2,100.00

-

Tukang kayu

Oh

0.05 65,000.00 3,250.00

-

Kepala tukang

Oh

0.005 75,000.00

375

Oh

0.003 80,000.00

240 16,765.00 16,765.00

-

Mandor Jumlah Dibulatkan Materi Terkait :

n langit-langit: asbes, akustik, tekwood, gypsum, dan GRC.

n Penutup Lantai dan Dinding (AHS SNI 2011)

Berikut adalah analisa harga satuan pekerjaan penutup landat dan dinding untuk menghitung biaaya penutup lantai per meter No.

I-01

URAIAN

VOLUME

HARGA SATUAN

HARGA

(Rp)

(Rp)

###

###

1 M2 Lantai Ubin Granito ukuran 40 x 40 cm Setara Essenza -

Granito 40 x 40 cm

m2

-

Semen portland

Kg

-

Pasir pasang

M3

-

Semen warna

Kg

1.3 15,700.00 20,410.00

-

Pekerja

Oh

0.25 42,000.00 10,500.00

-

Tukang batu

Oh

0.12 65,000.00 7,800.00

-

Kepala tukang

Oh

-

Mandor Jumlah Dibulatkan I-02

SATUAN

Oh

1.05

9.8 1,406.00 13,778.80 0.0215

### 5,018.10

0.012 75,000.00

900

0.0125 80,000.00 1,000.00 ### ###

1 M2 Lantai Ubin Granito ukuran 30 x 30 cm Setara Essenza -

Granito 30 x 30 cm

m2

-

Semen portland

Kg

-

Pasir pasang

M3

-

Semen warna

Kg

1.5 15,700.00 23,550.00

-

Pekerja

Oh

0.26 42,000.00 10,920.00

1.05

###

###

10 1,406.00 14,060.00 0.0215

### 5,018.10

-

Tukang batu

Oh

-

Kepala tukang

Oh

-

Mandor Jumlah Dibulatkan I-03

0.0125 75,000.00

937.5

Oh

0.013 80,000.00 1,040.00 ### ###

-

Plint granito 10 x 40 cm

Bh

2.65 27,600.00 73,140.00

-

Semen portland

Kg

1.2 1,406.00 1,687.20

-

Pasir pasang

M3

-

Semen warna

Kg

0.1 15,700.00 1,570.00

-

Pekerja

Oh

0.06 42,000.00 2,520.00

-

Tukang batu

Oh

0.03 65,000.00 1,950.00

-

Kepala tukang

Oh

0.003 75,000.00

225

Oh

0.003 80,000.00

240 82,032.40 82,032.00

1 M¹ Plint Ubin Granito ukuran 10 x 40 cm Setara Essenza

-

Mandor Jumlah Dibulatkan I-04

0.125 65,000.00 8,125.00

0.003

###

700.2

1 M¹ Plint Ubin Granito ukuran 10 x 30 cm Setara Essenza

-

Plint granito 10 x 30 cm

Bh

3.33 25,900.00 86,247.00

-

Semen portland

Kg

1.65 1,406.00 2,319.90

-

Pasir pasang

M3

-

Semen warna

Kg

0.1 15,700.00 1,570.00

-

Pekerja

Oh

0.09 42,000.00 3,780.00

0.0032

###

746.88

-

Tukang batu

Oh

-

Kepala tukang

Oh

0.009 75,000.00

675

Oh

0.0045 80,000.00

360 ### ###

-

Mandor Jumlah Dibulatkan I-05

1 M2 Lantai Keramik Corak 10 x 20 cm setara Mulia -

Keramik corak 10 x 20 cm

m2

1 56,000.00 56,000.00

-

Semen portland

Kg

8 1,406.00 11,248.00

-

Pasir pasang

M3

-

Semen warna

Kg

-

Pekerja

Oh

0.25 42,000.00 10,500.00

-

Tukang batu

Oh

0.12 65,000.00 7,800.00

-

Kepala tukang

Oh

-

Mandor Jumlah Dibulatkan I-06

0.09 65,000.00 5,850.00

0.0215

### 5,018.10

0.013 15,700.00

0.012 75,000.00

204.1

900

Oh

0.0125 80,000.00 1,000.00 92,670.20 92,670.00

1 M2 Lantai Keramik corak 20 x 20 cm setara Mulia -

Keramik corak 20 x 20 cm

m2

1 62,500.00 62,500.00

-

Semen portland

Kg

8 1,406.00 11,248.00

-

Pasir pasang

M3

-

Semen warna

Kg

-

Pekerja

Oh

0.25 42,000.00 10,500.00

-

Tukang batu

Oh

0.12 65,000.00 7,800.00

-

Kepala tukang

Oh

-

Mandor Jumlah

Oh

0.0215

### 5,018.10

0.013 15,700.00

0.012 75,000.00

204.1

900

0.0125 80,000.00 1,000.00 99,170.20

Dibulatkan I-07

1 M2 Lantai Keramik polos 30 x 30 cm setara Mulia -

Keramik polos 30 x 30 cm

m2

1 53,000.00 53,000.00

-

Semen portland

Kg

8 1,406.00 11,248.00

-

Pasir pasang

M3

-

Semen warna

Kg

-

Pekerja

Oh

0.25 42,000.00 10,500.00

-

Tukang batu

Oh

0.12 65,000.00 7,800.00

-

Kepala tukang

Oh

-

Mandor Jumlah Dibulatkan I-08

0.0215

### 5,018.10

0.013 15,700.00

0.012 75,000.00

204.1

900

Oh

0.0125 80,000.00 1,000.00 89,670.20 89,670.00

1 M2 Lantai Keramik corak 30 x 30 cm Setara Mulia -

Keramik corak 30 x 30 cm

m2

1 58,000.00 58,000.00

-

Semen portland

Kg

8 1,406.00 11,248.00

-

Pasir pasang

M3

-

Semen warna

Kg

-

Pekerja

Oh

0.25 42,000.00 10,500.00

-

Tukang batu

Oh

0.12 65,000.00 7,800.00

-

Kepala tukang

Oh

-

Mandor Jumlah Dibulatkan I-09

99,170.00

1 M2 Lantai Keramik polos 40 x 40 cm Setara Mulia

Oh

0.0215

### 5,018.10

0.013 15,700.00

0.012 75,000.00

204.1

900

0.0125 80,000.00 1,000.00 94,670.20 94,670.00

-

Keramik polos 40 x 40 cm

m2

1 56,800.00 56,800.00

-

Semen portland

Kg

8 1,406.00 11,248.00

-

Pasir pasang

M3

-

Semen warna

Kg

-

Pekerja

Oh

0.25 42,000.00 10,500.00

-

Tukang batu

Oh

0.12 65,000.00 7,800.00

-

Kepala tukang

Oh

-

Mandor Jumlah Dibulatkan I-10

### 5,018.10

0.013 15,700.00

0.012 75,000.00

204.1

900

Oh

0.0125 80,000.00 1,000.00 93,470.20 93,470.00

1 M2 Lantai Keramik corak 40 x 40 cm Setara Mulia -

Keramik corak 40 x 40 cm

m2

1 65,500.00 65,500.00

-

Semen portland

Kg

8 1,406.00 11,248.00

-

Pasir pasang

M3

-

Semen warna

Kg

-

Pekerja

Oh

0.25 42,000.00 10,500.00

-

Tukang batu

Oh

0.12 65,000.00 7,800.00

-

Kepala tukang

Oh

-

Mandor Jumlah Dibulatkan I-11

0.0215

Oh

0.0215

### 5,018.10

0.013 15,700.00

0.012 75,000.00

204.1

900

0.0125 80,000.00 1,000.00 ### ###

1 M2 Lantai Keramik Corak 10 x 20 cm setara Roman -

Keramik corak 10 x 20 cm

m2

1 72,200.00 72,200.00

-

Semen portland

Kg

8 1,406.00 11,248.00

-

Pasir pasang

M3

-

Semen warna

Kg

-

Pekerja

Oh

0.25 42,000.00 10,500.00

-

Tukang batu

Oh

0.12 65,000.00 7,800.00

-

Kepala tukang

Oh

-

Mandor Jumlah Dibulatkan I-12

### 5,018.10

0.013 15,700.00

0.012 75,000.00

204.1

900

Oh

0.0125 80,000.00 1,000.00 ### ###

1 M2 Lantai Keramik corak 20 x 20 cm setara Roman -

Keramik corak 20 x 20 cm

m2

1 75,200.00 75,200.00

-

Semen portland

Kg

8 1,406.00 11,248.00

-

Pasir pasang

M3

-

Semen warna

Kg

-

Pekerja

Oh

0.25 42,000.00 10,500.00

-

Tukang batu

Oh

0.12 65,000.00 7,800.00

-

Kepala tukang

Oh

-

Mandor Jumlah Dibulatkan I-13

0.0215

0.0215

### 5,018.10

0.013 15,700.00

0.012 75,000.00

204.1

900

Oh

0.0125 80,000.00 1,000.00 ### ###

1 M2 Lantai Keramik polos 30 x 30 cm setara Roman -

Keramik polos 30 x 30 cm

m2

1 68,900.00 68,900.00

-

Semen portland

Kg

8 1,406.00 11,248.00

-

Pasir pasang

M3

-

Semen warna

Kg

-

Pekerja

Oh

0.0215

### 5,018.10

0.013 15,700.00

204.1

0.25 42,000.00 10,500.00

-

Tukang batu

Oh

-

Kepala tukang

Oh

-

Mandor Jumlah Dibulatkan I-14

0.012 75,000.00

900

Oh

0.0125 80,000.00 1,000.00 ### ###

1 M2 Lantai Keramik corak 30 x 30 cm Setara Roman -

Keramik corak 30 x 30 cm

M2

1 76,600.00 76,600.00

-

Semen portland

Kg

8 1,406.00 11,248.00

-

Pasir pasang

M3

-

Semen warna

Kg

-

Pekerja

Oh

0.25 42,000.00 10,500.00

-

Tukang batu

Oh

0.12 65,000.00 7,800.00

-

Kepala tukang

Oh

-

Mandor Jumlah Dibulatkan I-15

0.12 65,000.00 7,800.00

0.0215

### 5,018.10

0.013 15,700.00

0.012 75,000.00

204.1

900

Oh

0.0125 80,000.00 1,000.00 ### ###

1 M2 Lantai Keramik polos 40 x 40 cm setara Roman -

Keramik polos 40 x 40 cm

m2

1 72,500.00 72,500.00

-

Semen portland

Kg

8 1,406.00 11,248.00

-

Pasir pasang

M3

-

Semen warna

Kg

-

Pekerja

Oh

0.25 42,000.00 10,500.00

-

Tukang batu

Oh

0.12 65,000.00 7,800.00

-

Kepala tukang

Oh

-

Mandor

Oh

0.0215

### 5,018.10

0.013 15,700.00

0.012 75,000.00

204.1

900

0.0125 80,000.00 1,000.00

Jumlah Dibulatkan I-16

1 M2 Lantai Keramik corak 40 x 40 cm Setara Roman -

Keramik corak 40 x 40 cm

m2

1 77,000.00 77,000.00

-

Semen portland

Kg

8 1,406.00 11,248.00

-

Pasir pasang

M3

-

Semen warna

Kg

-

Pekerja

Oh

0.25 42,000.00 10,500.00

-

Tukang batu

Oh

0.12 65,000.00 7,800.00

-

Kepala tukang

Oh

-

I-17

Mandor Jumlah Dibulatkan 1 M2 Lantai Marmer Marmer

Oh

0.0215

### 5,018.10

0.013 15,700.00

0.012 75,000.00

204.1

900

0.0125 80,000.00 1,000.00 ### ###

m2

1.06

###

###

8.19 1,406.00 11,515.14

-

Semen portland

Kg

-

Pasir pasang

M3

-

Semen warna

Kg

0.65 15,700.00 10,205.00

-

Pekerja

Oh

0.7 42,000.00 29,400.00

-

Tukang batu

Oh

0.35 65,000.00 22,750.00

-

Kepala tukang

Oh

0.035 75,000.00 2,625.00

Oh

0.035 80,000.00 2,800.00 ### ###

-

Mandor Jumlah Dibulatkan I-18

### ###

0.045

### 10,503.00

1 M2 Lantai Parquet Jati -

Parquet jati

M2

-

Lem vinyl

Kg

0.6 44,000.00 26,400.00

-

Pekerja

Oh

0.65 42,000.00 27,300.00

1.05

###

###

-

Tukang

Oh

0.35 65,000.00 22,750.00

-

Kepala tukang

Oh

0.035 75,000.00 2,625.00

Oh

0.0325 80,000.00 2,600.00 ### ###

-

Mandor Jumlah Dibulatkan Materi Terkait :

biaaya penutup lantai per meter persegi, seperti lantai keramik, lantai marmer dll.

an Pekerjaan Kayu - AHS SNI 2011

Berikut adalah penggalan analisa harga satuan pekerjaan kayu, untuk menghitung harga satuan pekerjaan kayu per m3, seperti J. ANALISA HARGA SATUAN PEKERJAAN KAYU No. J-01

URAIAN

SATUAN

VOLUME

HARGA SATUAN

HARGA

1.2

###

###

1 M3 Kusen Pintu & jendela kayu Kamper Samarinda

-

Kayu Balok Kamper Samarind a

m3

-

Pekerja

Oh

6 42,000.00

###

-

Tukang Kayu

Oh

18 65,000.00

###

-

Kepala Tukang

Oh

2 75,000.00

###

-

Mandor Jumlah Dibulatkan

Oh

0.3 80,000.00 24,000.00 ### ###

-

Kayu Balok Kamper Medan

M3

1.2

-

Pekerja

-

M3 Kusen Pintu & jendela 1 kayu Kamper Medan/K ruing

J-02

-

###

###

Oh

6 42,000.00

###

Tukang Kayu

Oh

18 65,000.00

###

Kepala Tukang

Oh

2 75,000.00

###

Mandor Jumlah Dibulatkan

Oh

0.3 80,000.00 24,000.00 ### ###

M3 Kusen Pintu & 1 jendela kayu Borneo Super

J-03

-

Kayu Borneo Balok Super

M3

-

Pekerja

-

###

###

Oh

6 42,000.00

###

Tukang Kayu

Oh

18 65,000.00

###

Kepala Tukang

Oh

2 75,000.00

###

-

Mandor Jumlah Dibulatkan J-04

0.3 80,000.00 24,000.00 ### ###

1 M2 Pintu Panel Kayu Kamper Samarinda

-

Kayu Papan Kamper Samarind a

M3

0.04

-

Paku Biasa 2" 5"

Kg

0.05 23,400.00 1,170.00

-

Pekerja

Oh

1 42,000.00 42,000.00

-

Tukang Kayu

Oh

-

Kepala Tukang

Oh

0.25 75,000.00 18,750.00

Oh

0.05 80,000.00 4,000.00 ### ###

-

Mandor Jumlah Dibulatkan J-05

Oh

1.2

###

2.5 65,000.00

###

###

1 M2 Pintu Panel Kayu Kamper Medan/Kruing -

Kayu Papan Kamper Medan

M3

0.04

###

###

-

Paku Biasa 2" 5"

Kg

0.05 23,400.00 1,170.00

-

Pekerja

Oh

1 42,000.00 42,000.00

-

Tukang Kayu

Oh

-

Kepala Tukang

Oh

0.25 75,000.00 18,750.00

Oh

0.05 80,000.00 4,000.00 ### ###

-

Mandor Jumlah Dibulatkan J-06

2.5 65,000.00

###

1 M2 Pintu & Jendela Kaca Kayu Kamper Medan -

Kayu Papan Kamper Medan

M3

-

Pekerja

Oh

-

Tukang Kayu

Oh

-

Kepala Tukang

Oh

0.2 75,000.00 15,000.00

Oh

0.04 80,000.00 3,200.00 ### ###

-

Mandor Jumlah Dibulatkan

0.035

###

###

0.8 42,000.00 33,600.00 2 65,000.00

###

M2 Pintu Jendela 1& Kaca Kayu Borneo

J-07

-

Kayu Papan Borneo Super

M3

-

Pekerja

Oh

-

Tukang Kayu

Oh

-

Kepala Tukang

Oh

0.2 75,000.00 15,000.00

Oh

0.04 80,000.00 3,200.00 ### ###

-

Mandor Jumlah Dibulatkan

0.035

###

###

0.8 42,000.00 33,600.00 2 65,000.00

###

M2 Pintu & Jendela 1 Jalusi Kayu Kamper Medan

J-08

-

Kayu Papan Kamper Medan

M3

-

Pekerja

Oh

1 42,000.00 42,000.00

-

Tukang Kayu

Oh

3 65,000.00

-

Kepala Tukang

Oh

0.3 75,000.00 22,500.00

Oh

0.5 80,000.00 40,000.00 ### ###

-

Mandor Jumlah Dibulatkan

0.064

###

###

###

M2 Pintu Triplek Rangkap, 1 Rangka Tertutup Kayu Kamper Medan

J-09

-

Kayu Papan Kamper Medan

M3

-

Paku Biasa ½" 1"

Kg

-

Lem Kayu

Ltr

0.3 23,900.00 7,170.00

-

Triplek 120 x 240 x 0,4 cm

Lbr

1 64,400.00 64,400.00

-

Pekerja

Oh

0.6 42,000.00 25,200.00

-

Tukang Kayu

Oh

-

Kepala Tukang

Oh

0.2 75,000.00 15,000.00

-

Mandor

Oh

0.03 80,000.00 2,400.00

0.0196

###

###

0.03 23,800.00

714

2 65,000.00

###

Jumlah Dibulatkan J-10

1 M2 Jalusi Mati Kusen Kayu kamper Medan -

Kayu Papan Kamper Medan

M3

0.06

-

Paku Biasa ½" 1"

Kg

0.15 23,800.00 3,570.00

-

Pekerja

Oh

0.5 42,000.00 21,000.00

-

Tukang Kayu

Oh

-

Kepala Tukang

Oh

0.2 75,000.00 15,000.00

Oh

0.025 80,000.00 2,000.00 ### ###

-

Mandor Jumlah Dibulatkan J-11

### ###

###

2 65,000.00

###

###

1 M2 Pintu Triplek Rangkap, Rangka Kayu Borneo Super -

Kayu Papan Borneo Super

M3

-

Paku Biasa ½" 1"

Kg

-

Lem Kayu

Ltr

0.3 23,900.00 7,170.00

-

Triplek 120 x 240 x 0,4 cm

Lbr

1 64,400.00 64,400.00

-

Pekerja

Oh

0.6 42,000.00 25,200.00

-

Tukang Kayu

Oh

-

Kepala Tukang

Oh

0.2 75,000.00 15,000.00

Oh

0.03 80,000.00 2,400.00 ### ###

-

Mandor Jumlah Dibulatkan

0.0196

###

###

0.03 23,800.00

714

2 65,000.00

###

M2 Pintu Teakwoo d 1 Rangkap, rangka Kayu Kamper Medan

J-12

-

Kayu Papan Kamper Medan

M3

-

Paku Biasa ½" 1"

Kg

0.3 23,800.00 7,140.00

-

Lem Kayu

Ltr

0.3 23,900.00 7,170.00

-

Teakwoo d 4 mm

Lbr

-

Pekerja

Oh

-

Tukang Kayu

Oh

-

Kepala Tukang

Oh

0.2 75,000.00 15,000.00

Oh

0.03 80,000.00 2,400.00 ### ###

-

Mandor Jumlah Dibulatkan

0.0196

1

###

###

###

###

0.6 42,000.00 25,200.00 2 65,000.00

###

M2 Pintu Triplek & Formika, 1 Rangka Kayu Kamper Medan

J-13

-

Kayu Papan Kamper Medan

M3

-

Paku Biasa ½" 1"

Kg

0.3 23,800.00 7,140.00

-

Lem Kayu

Ltr

0.8 23,900.00 19,120.00

0.0196

###

###

-

Triplek 120 x 240 x 0,4 cm

Lbr

-

Formica 3" x 6"

Lbr

0.5

-

Pekerja

Oh

0.8 42,000.00 33,600.00

-

Tukang Kayu

Oh

2.5 65,000.00

-

Kepala Tukang

Oh

0.25 75,000.00 18,750.00

Oh

0.04 80,000.00 3,200.00 ### ###

-

Mandor Jumlah Dibulatkan

1 64,400.00 64,400.00 ### 66,450.00

###

M2 Pintu Teakwoo d& Formika, 1 Rangka Kayu Kamper Medan (dipolitur)

J-14

-

Kayu Papan Kamper Medan

M3

-

Paku Biasa ½" 1"

Kg

0.3 23,800.00 7,140.00

-

Lem Kayu

Ltr

0.8 23,900.00 19,120.00

-

Teakwoo d 120 x 240 x 0,4 cm

Lbr

1

###

###

-

Formica 4" x 8"

Lbr

0.5

###

###

-

Pekerja

Oh

0.8 42,000.00 33,600.00

-

Tukang Kayu

Oh

2.5 65,000.00

-

Kepala Tukang

Oh

0.25 75,000.00 18,750.00

-

Mandor Jumlah

Oh

0.04 80,000.00 3,200.00 ###

0.0196

###

###

###

Dibulatkan J-15

###

1 M3 Kuda-kuda Kayu Kamper Medan -

Kayu Balok Kamper Medan

M3

1.1

###

###

-

Besi Strip

Kg

15 26,800.00

###

-

Paku Biasa 2" 5"

Kg

0.8 23,800.00 19,040.00

-

Pekerja

Oh

4 42,000.00

###

-

Tukang Kayu

Oh

12 65,000.00

###

-

Kepala Tukang

Oh

1.2 75,000.00 90,000.00

Oh

0.2 80,000.00 16,000.00 ### ###

-

Kayu balok Borneo super

M3

1.1

###

###

-

Besi Strip

Kg

15 26,800.00

###

-

Paku Biasa 2" 5"

Kg

0.8 23,800.00 19,040.00

-

Pekerja

Oh

4 42,000.00

###

-

Tukang Kayu

Oh

12 65,000.00

###

-

Kepala Tukang

Oh

1.2 75,000.00 90,000.00

Oh

0.2 80,000.00 16,000.00 ### ###

-

Mandor Jumlah Dibulatkan M3 Kudakuda 1 Kayu Borneo Super

J-16

-

Mandor Jumlah Dibulatkan

M2 Kaso + Reng Genteng 1 Plentong Kayu Borneo Super

J-17

-

Kayu balok Borneo super

m3

-

Paku Biasa 2" 5"

Kg

0.15 23,800.00 3,570.00

-

Pekerja

Oh

0.1 42,000.00 4,200.00

-

Tukang Kayu

Oh

0.1 65,000.00 6,500.00

-

Kepala Tukang

Oh

0.01 75,000.00

750

Oh

0.005 80,000.00

400 78,780.00 78,780.00

-

Kayu balok Borneo super

M3

0.014

-

Paku Biasa 2" 5"

Kg

0.15 23,800.00 3,570.00

-

Pekerja

Oh

0.1 42,000.00 4,200.00

-

Tukang Kayu

Oh

0.1 65,000.00 6,500.00

-

Kepala Tukang

Oh

0.01 75,000.00

750

Oh

0.005 80,000.00

400 89,340.00 89,340.00

-

Mandor Jumlah Dibulatkan

0.012

### 63,360.00

M2 Kaso + Reng Genteng 1 Beton Kayu Borneo Super

J-18

-

Mandor Jumlah Dibulatkan

### 73,920.00

M' Lisplang uk 1 (3x20)cm, Kayu Kamper Medan

J-19

-

Kayu Papan Kamper Medan

M3

-

Paku Biasa 2" 5"

Kg

0.05 23,800.00 1,190.00

-

Pekerja

Oh

0.1 42,000.00 4,200.00

-

Tukang Kayu

Oh

0.2 65,000.00 13,000.00

-

Kepala Tukang

Oh

0.02 75,000.00 1,500.00

-

Mandor Jumlah Dibulatkan J-20

### 41,928.48

0.005 80,000.00

400 62,218.48 62,218.00

1 M' Lisplang uk (3x30)cm, Kayu Kamper Medan -

Kayu Papan Kamper Medan

M3

-

Paku Biasa 2" 5"

Kg

0.05 23,800.00 1,190.00

-

Pekerja

Oh

0.11 42,000.00 4,620.00

-

Tukang Kayu

Oh

0.22 65,000.00 14,300.00

-

Kepala Tukang

Oh

0.022 75,000.00 1,650.00

Oh

0.005 80,000.00

-

Mandor Jumlah Dibulatkan J-21

Oh

0.0072

0.011

### 62,618.60

400 84,778.60 84,779.00

1 M¹ List Plafond + kayu Profil 10 cm -

Kayu Profil 10 cm

M'

-

Pekerja

Oh

1.05 29,400.00 30,870.00 0.021 42,000.00

882

-

Tukang Kayu

Oh

0.021 65,000.00 1,365.00

-

Kepala Tukang

Oh

0.002 75,000.00

150

Oh

0.001 80,000.00

80 33,347.00 33,347.00

-

Mandor Jumlah Dibulatkan Materi Terkait :

n pekerjaan kayu per m3, seperti pekerjaan kusen dan jendela, pekerjaan plapond, dan pekerjaan atap.

ekerjaan Penutup Besi dan Aluminium

Analisa Harga Satuan Pekerjaan Penutup Besi dan Alumin Diposkan : 01 Juni 2014 Oleh : Endang Kusman No.

K-01

URAIAN

HARGA

(Rp)

(Rp)

Besi profil

-

Besi profil WF

Kg

1.1 24,000.00 26,400.00

-

Meni besi

Kg

0.08 30,400.00 2,432.00

-

Pekerja

Oh

0.06 42,000.00 2,520.00

-

Tukang besi

Oh

0.006 65,000.00

390

-

Kepala tukang

Oh

0.006 75,000.00

450

Oh

0.0003 80,000.00

24 32,216.00 32,216.00

Mandor Jumlah Dibulatkan 1 Kg

Perakitan baja

-

Solar

m'

0.01 7,150.00

71.5

-

Minyak pelumas

m'

0.001 55,000.00

55

-

Sewa alat

jam

-

Pekerja

Oh

-

###

800

0.001 42,000.00

42

Tukang besi

Oh 0.00001 65,000.00

0.65

Kepala tukang

Oh 0.00001 75,000.00

0.75

Oh 0.00005 80,000.00

4 973.9 974

-

Mandor Jumlah Dibulatkan K-03

HARGA SAT

1 Kg

-

K-02

SAT VOLUME

0.008

1 Cm Pengelasan dengan las listrik -

kawat las

kg

0.04 23,600.00

944

-

Solar

ltr

0.03 7,150.00

214.5

-

Minyak pelumas

ltr

0.004 55,000.00

220

-

Sewa alat

jam

0.017

-

Pekerja Tukang

org org

0.004 42,000.00 0.002 65,000.00

168 130

-

Kepala Tukang

org

0.0002 75,000.00

15

org

0.0002 80,000.00

16 2,463.50 2,464.00

-

Mandor Jumlah Dibulatkan K-04

1 m2 Pintu Rolling Door -

Rolling door

M2

-

Pekerja

Oh

1.05 42,000.00 44,100.00

-

Tukang besi

Oh

1.5 65,000.00 97,500.00

-

Kepala tukang

Oh

0.105 75,000.00 7,875.00

-

Mandor Jumlah Dibulatkan K-05

Oh

1

###

0.0052 80,000.00

###

416 ### ###

1 m2 Pintu Alluminium Natural -

Pintu alluminiu m natural

m2

-

Pekerja

Oh

1.05 42,000.00 44,100.00

-

Tukang besi

Oh

1.05 65,000.00 68,250.00

-

Kepala tukang

Oh

0.105 75,000.00 7,875.00

-

K-06

### 1,700.00

Mandor Jumlah Dibulatkan 1 m2 Terali Besi

Oh

1

###

0.0052 80,000.00

###

416 ### ###

-

Besi strip 2x3

m'

11.5 5,500.00 63,250.00

-

Pekerja

Oh

1.2 42,000.00 50,400.00

-

Tukang las

Oh

1.2 65,000.00 78,000.00

-

Kepala tukang

-

Mandor Jumlah Dibulatkan K-07

0.012 75,000.00

900

Oh

0.0006 80,000.00

48 ### ###

1 m2 Kawat Harmonika 4 cm -

Kawat harmonik a

M2

-

Paku biasa ½" 1"

kg

-

Papan kayu kamper

M2

-

Pekerja

Oh

0.1 42,000.00 4,200.00

-

Tukang kayu

Oh

0.1 65,000.00 6,500.00

-

Kepala tukang

Oh

0.01 75,000.00

750

Oh

0.005 80,000.00

400 62,062.68 62,063.00

-

Mandor Jumlah Dibulatkan K-08

Oh

1.1 35,900.00 39,490.00

0.02 23,800.00

0.0018

476

### 10,246.68

1 m' Talang Datar, Seng BJLS 28 lebar 90 cm -

Seng plat 3' x 6' BJLS 30

m'

-

Paku biasa ½" 1"

Kg

-

Kayu papan borneo super

-

Flincote / meni besi

Kg

0.25 30,400.00 7,600.00

-

Pekerja

Oh

0.15 42,000.00 6,300.00

-

Tukang kayu

Oh

0.4 65,000.00 26,000.00

-

Kepala tukang

Oh

0.025 75,000.00 1,875.00

M3

1.05 20,801.00 21,841.05

0.015 23,800.00

0.0096

357

### 53,719.68

-

Mandor Jumlah Dibulatkan K-09

0.0013 80,000.00

104 ### ###

1 m' Talang Miring, Seng BJLS 28 lebar 90 cm -

Seng plat 3' x 6' BJLS 30

m'

-

Paku biasa ½" 1"

Kg

-

Kayu papan borneo super

-

Flincote / meni besi

Kg

0.3 30,400.00 9,120.00

-

Pekerja

Oh

0.2 42,000.00 8,400.00

-

Tukang kayu

Oh

0.4 65,000.00 26,000.00

-

Kepala tukang

Oh

0.025 75,000.00 1,875.00

-

Mandor Jumlah Dibulatkan K-10

Oh

M3

Oh

1.05 20,801.00 21,841.05

0.015 23,800.00

357

0.019

###

###

0.0013 80,000.00

100 ### ###

1 m' Talang 1/2 lingkaran D-15 cm, seng pelat BJLS 28 lebar 90 cm -

Seng plat 3' x 6' BJLS 30

m'

1.05 20,801.00 21,841.05

-

Paku biasa ½" 1"

Kg

0.1 23,800.00 2,380.00

-

Kayu papan borneo super

kg

-

Besi strip Pekerja

Kg Oh

0.5 26,800.00 13,400.00 0.15 42,000.00 6,300.00

-

Tukang kayu

Oh

0.3 65,000.00 19,500.00

0.019

###

###

-

Kepala tukang

-

Mandor Jumlah Dibulatkan K-11

Oh

0.03 75,000.00 2,250.00 0.008 80,000.00

640 ### ###

1 m' Pasang kusen pintu/jendela alluminium natural 4"

-

Alumuniu m profil natural 4"

m'

1.1

###

###

-

Skrup fixer

bh

2

250

500

-

Sealant Pekerja

m' Oh

1 7,500.00 7,500.00 0.043 42,000.00 1,806.00

-

Tukang kayu

Oh

0.043 65,000.00 2,795.00

-

Kepala tukang

Oh

0.0043 75,000.00

322.5

Oh

0.0021 80,000.00

168 ### ###

-

Mandor Jumlah Dibulatkan K-12

Oh

1 m' Pasang kusen pintu/jendela alluminium warna 4" -

Alumuniu m profil warna 4"

m'

1.1

###

###

-

Skrup fixer

bh

2

250

500

-

Sealant Pekerja

m' Oh

1 7,500.00 7,500.00 0.043 42,000.00 1,806.00

-

Tukang kayu

Oh

0.043 65,000.00 2,795.00

-

Kepala tukang

Oh

0.0043 75,000.00

322.5

Oh

0.0021 80,000.00

168 ### ###

-

Mandor Jumlah Dibulatkan

K-13

1 m' Pasang kusen pintu/jendela alluminium natural 3"

-

Alumuniu m profil natural 3"

m'

-

Skrup fixer

bh

-

Sealant Pekerja

m' Oh

1 7,500.00 7,500.00 0.043 42,000.00 1,806.00

-

Tukang kayu

Oh

0.043 65,000.00 2,795.00

-

Kepala tukang

Oh

0.0043 75,000.00

322.5

Oh

0.0021 80,000.00

168 ### ###

-

Mandor Jumlah Dibulatkan K-14

2

250

500

1 m' Pasang kusen pintu/jendela alluminium warna 3" -

Alumuniu m profil warna 3"

m'

1.1

###

###

-

Skrup fixer

bh

2

250

500

-

Sealant Pekerja

m' Oh

1 7,500.00 7,500.00 0.043 42,000.00 1,806.00

-

Tukang kayu

Oh

0.043 65,000.00 2,795.00

-

Kepala tukang

Oh

0.0043 75,000.00

322.5

Oh

0.0021 80,000.00

168 ### ###

-

Mandor Jumlah Dibulatkan K-15

1.1 81,000.00 89,100.00

1 m2 Pintu alluminium strip lebar 8 cm

-

Alumuniu m profil 4" natural

m'

4.4

###

###

-

Alumuniu m strip 6mm

m2

-

Pekerja

Oh

0.085 42,000.00 3,570.00

-

Tukang kayu

Oh

0.085 65,000.00 5,525.00

-

Kepala tukang

Oh

0.0085 75,000.00

637.5

Oh

0.0042 80,000.00

336 ### ###

-

Mandor Jumlah Dibulatkan K-16

###

###

1 m2 Pintu/jendela kaca rangka alluminium natural 4"

-

Alumuniu m profil natural 4"

m'

4.4

-

Profil alluminiu mT

m'

4.5 12,200.00 54,900.00

-

Sealant Pekerja

tube Oh

0.27 7,500.00 2,025.00 0.085 42,000.00 3,570.00

-

Tukang kayu

Oh

0.085 65,000.00 5,525.00

-

Kepala tukang

Oh

0.0085 75,000.00

637.5

Oh

0.005 80,000.00

400 ### ###

-

Mandor Jumlah Dibulatkan K-17

1.05

###

###

1 m2 Pintu/jendela kaca rangka alluminium warna 4" -

Alumuniu m profil warna 4"

m'

4.4

-

Profil alluminiu mT

m'

4.5 12,200.00 54,900.00

-

Sealant Pekerja

tube Oh

0.27 7,500.00 2,025.00 0.085 42,000.00 3,570.00

-

Tukang kayu

Oh

0.085 65,000.00 5,525.00

###

###

-

Kepala tukang

-

Mandor Jumlah Dibulatkan K-18

637.5

Oh

0.005 80,000.00

400 ### ###

-

Jendela nako (rangka + kaca 5 mm)

m2

1.1

###

-

Paku skrup 1cm 2,5cm

bh

10

250 2,500.00

-

Besi strip Pekerja

m' Oh

7 5,500.00 38,500.00 0.2 42,000.00 8,400.00

-

Tukang kayu

Oh

0.2 65,000.00 13,000.00

-

Kepala tukang

Oh

0.02 75,000.00 1,500.00

Mandor Jumlah Dibulatkan

Oh

0.001 80,000.00

###

80 ### ###

1 m2 Pintu pelat baja tebal 2mm rangkap, rangka baja siku -

Besi siku L 30.30.3

Kg

15 24,000.00

###

-

Baja pelat

Kg

32.8 24,000.00

###

-

kawat las Pekerja

Kg Oh

0.05 23,600.00 1,180.00 0.2 42,000.00 8,400.00

-

Tukang kayu

Oh

0.2 65,000.00 13,000.00

-

Kepala tukang

Oh

0.02 75,000.00 1,500.00

-

Mandor Jumlah Dibulatkan K-20

0.0085 75,000.00

1 m2 Jendela nako & teralis (10 klips)

-

K-19

Oh

1 m2 Rangka jendela besi square tube (5 x 5) cm

Oh

0.001 80,000.00

80 ### ###

-

Besi square tube

M

-

Besi lis kaca (1 x 1) cm

Kg

-

Pengelasa n

Cm

20 2,464.00 49,280.00

-

Pekerja

Oh

0.65 42,000.00 27,300.00

-

Tukang kayu

Oh

0.65 65,000.00 42,250.00

-

Kepala tukang

Oh

0.065 75,000.00 4,875.00

Oh

0.032 80,000.00 2,560.00 ### ###

-

Mandor Jumlah Dibulatkan K-21

4.522 24,000.00

###

1 m2 Pintu lipat (folding door) bahan besi -

Pintu lipat

M2

-

Pekerja

Oh

1.05 42,000.00 44,100.00

-

Tukang kayu

Oh

1.05 65,000.00 68,250.00

-

Kepala tukang

Oh

0.105 75,000.00 7,875.00

-

Mandor Jumlah Dibulatkan K-22

4.76 7,300.00 34,748.00

Oh

1

###

0.0052 80,000.00

###

416 ### ###

1 m2 Tirai (venetions blinds and vertical blinds) -

Tirai Pekerja

M2 Oh

1 ### ### 0.35 42,000.00 14,700.00

-

Tukang kayu

Oh

0.35 65,000.00 22,750.00

-

Kepala tukang

Oh

0.035 75,000.00 2,625.00

-

Mandor Jumlah Dibulatkan Kembali Ke Analisa AHS SNI

Oh

0.0018 80,000.00

144 ### ###

Besi dan Aluminium

ga Satuan Pekerjaan Sanitasi Diposkan : 04 Juni 2014 Oleh : Endang Kusman

No.

URAIAN

HARGA SAT

HARGA (Rp)

M-01

(Rp) 1 Buah Closet jongkok Porselen Standar Closet jongkok

bh

1

###

P.C (50 gk)

Kg

6 1,406.00 8,436.00

Pasir pasang

m3

Pekerja

org

1 42,000.00 42,000.00

Tukang batu

org

1.5 65,000.00 97,500.00

Kepala Tukang

org

1.5 75,000.00

Mandor Jumlah

org

SAT VOLUME

0.01

###

### 2,334.00

0.16 80,000.00 12,800.00 ###

Dibulatka n M-02

###

###

1 Buah Urinoir Urinoir

bh

1

P.C (50 gk)

Kg

6 1,406.00 8,436.00

Pasir pasang

m3

Pekerja

org

1 42,000.00 42,000.00

Tukang batu

org

1 65,000.00 65,000.00

Kepala Tukang

org

0.1 75,000.00 7,500.00

Mandor

org

Perlengka pan 30 % harga urinoir

lot

Jumlah

0.01

###

### 2,334.00

0.001 80,000.00 0.3

###

###

80 ### ###

Dibulatka n M-03

1 Buah Wastafel wastafel standar

M-04

M-05

###

unit

1

###

###

P.C (50 gk)

Kg

Pasir pasang

m3

Pekerja

org

1.2 42,000.00 50,400.00

Tukang batu

org

1.45 65,000.00 94,250.00

Kepala Tukang

org

0.15 75,000.00 11,250.00

Mandor

org

0.1 80,000.00 8,000.00

Perlengka pan 12 % harga wastafel

lot

6 1,406.00 8,436.00 0.01

0.12

### 2,334.00

###

###

Jumlah

###

Dibulatka n

###

1 Buah bak Mandi Fibreglass Volume 0,30 m3 Bak fibreglass 0.60m x 0.60m

bh

Pekerja

org

1.8 42,000.00 75,600.00

Tukang batu

org

2.7 65,000.00

Kepala Tukang

org

0.54 75,000.00 40,500.00

Mandor

org

0.11 80,000.00 8,800.00

Perlengka pan 18 % harga bak

lot

0.18

1

###

###

###

### 45,954.00

Jumlah

###

Dibulatka n

###

1 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cm

Buis beton Ø 30 cm

bh

1.1 61,700.00 67,870.00

Bata merah

bh

25

P.C (50 gk)

Kg

Pasir pasang

m3

0.061

### 14,237.40

Pasir urug

m3

0.069

### 12,095.70

Pekerja

org

0.38 42,000.00 15,960.00

Tukang batu

org

0.19 65,000.00 12,350.00

Kepala Tukang

org

0.019 75,000.00 1,425.00

Mandor Jumlah

org

0.019 80,000.00 1,520.00 ###

775 19,375.00

10.3 1,406.00 14,481.80

Dibulatka n M-06

###

1 Buah Bak Kontrol Pas Bata Merah Uk (60 x 60) cm Bata merah

bh

186

775

###

P.C (50 gk)

Kg

114 1,406.00

###

Pasir pasang

m3

0.184

### 42,945.60

Batu pecah 2/3

m3

0.033

### 6,966.30

Besi beton

m3

4.85 16,500.00 80,025.00

Pasir beton

m3

0.12

Pekerja

org

2.16 42,000.00 90,720.00

Tukang batu

org

0.72 65,000.00 46,800.00

Kepala Tukang

org

0.072 75,000.00 5,400.00

Mandor

org

0.108 80,000.00 8,640.00

Tukang gali

org

0.1 42,000.00 4,200.00

### 30,648.00

Jumlah

###

Dibulatka n

###

M-07

1 Buah Bak Kontrol Pas Bata Merah Uk (30 x 30) cm Bata merah

bh

53

P.C (50 gk)

Kg

44 1,406.00 61,864.00

Pasir pasang

m3

0.07

### 16,338.00

Batu pecah 2/3

m3

0.07

### 14,777.00

Besi beton

m3

Pasir beton

m3

Pekerja

org

Tukang batu

org

Kepala Tukang

org

Mandor Jumlah

org

775 41,075.00

1.6 16,500.00 26,400.00 0.06

### 15,324.00

3.2 42,000.00

1.015 65,000.00 65,975.00 0.0015 75,000.00

M-09

112.5

0.016 80,000.00 1,280.00 ###

Dibulatka n M-08

###

###

1 M' Pipa PVC Ø 1/2" (AW) Pipa pvc Ø 1/2"

m'

1.2 10,025.00 12,030.00

Pekerja

org

0.036 42,000.00 1,512.00

Tukang batu

org

0.06 65,000.00 3,900.00

Kepala Tukang

org

0.006 75,000.00

450

Mandor

org

0.0018 80,000.00

144

Perlengka pan 35 % harga pipa

lot

0.35 12,030.00 4,210.50

Jumlah

22,246.50

Dibulatka n

22,247.00

1 M' Pipa PVC Ø 1" (AW)

M-10

M-11

Pipa pvc Ø 1"

m'

1.2 15,800.00 18,960.00

Pekerja

org

0.036 42,000.00 1,512.00

Tukang batu

org

0.06 65,000.00 3,900.00

Kepala Tukang

org

0.006 75,000.00

450

Mandor

org

0.0018 80,000.00

144

Perlengka pan 35 % harga pipa

lot

0.35 18,960.00 6,636.00

Jumlah

31,602.00

Dibulatka n

31,602.00

1 M' Pipa PVC Ø 11/2" (AW) Pipa pvc Ø 11/2"

m'

1.2 26,475.00 31,770.00

Pekerja

org

0.036 42,000.00 1,512.00

Tukang batu

org

0.06 65,000.00 3,900.00

Kepala Tukang

org

0.006 75,000.00

450

Mandor

org

0.0018 80,000.00

144

Perlengka pan 35 % harga pipa

lot

0.35 31,770.00 11,119.50

Jumlah

48,895.50

Dibulatka n

48,896.00

1 M' Pipa PVC Ø 2" (AW) Pipa pvc Ø 2"

m'

1.2 27,675.00 33,210.00

Pekerja

org

0.036 42,000.00 1,512.00

Tukang batu

org

0.06 65,000.00 3,900.00

Kepala Tukang

org

0.006 75,000.00

450

Mandor

org

0.0018 80,000.00

144

Perlengka pan 35 % harga pipa

M-12

M-13

M-14

lot

0.35 31,770.00 11,119.50

Jumlah

50,335.50

Dibulatka n

50,336.00

1 M' Pipa PVC Ø 4" (AW) Pipa pvc Ø 4"

m'

Pekerja

org

0.081 42,000.00 3,402.00

Tukang batu

org

0.135 65,000.00 8,775.00

Kepala Tukang

org

0.0135 75,000.00 1,012.50

Mandor

org

0.0041 80,000.00

Perlengka pan 35 % harga pipa

lot

1.2 86,975.00

0.35

###

328

### 36,529.50

Jumlah

###

Dibulatka n

###

1 M' Pipa PVC Ø 3/4" (AW) Pipa pvc Ø 3/4"

m'

1.2 13,050.00 15,660.00

Pekerja

org

0.081 42,000.00 3,402.00

Tukang batu

org

0.135 65,000.00 8,775.00

Kepala Tukang

org

0.0135 75,000.00 1,012.50

Mandor

org

0.0041 80,000.00

Perlengka pan 35 % harga pipa

lot

328

0.35 15,660.00 5,481.00

Jumlah

34,658.50

Dibulatka n

34,659.00

1 Buah Bak Cuci piring Stainless steel

Bak cuci stainless steel + asesoris lengkap

bh

Pekerja

org

0.03 42,000.00 1,260.00

Tukang batu

org

0.3 65,000.00 19,500.00

Kepala Tukang

org

0.03 75,000.00 2,250.00

Mandor Jumlah

org

1

###

0.0015 80,000.00

Dibulatka n M-15

1 Buah Kran Ø 1/2" 3/4" Kran air Seal tape Pekerja

bh bh org

1 40,900.00 40,900.00 0.025 4,200.00 105 0.01 42,000.00 420

Tukang batu

org

0.1 65,000.00 6,500.00

Kepala Tukang

org

0.01 75,000.00

750

Mandor Jumlah

org

0.005 80,000.00

400 49,075.00 49,075.00

1 Buah Floor Drain Floor drain

bh

Pekerja

org

Tukang batu

org

Kepala Tukang

org

0.01 75,000.00

750

Mandor Jumlah

org

0.005 80,000.00

400 74,670.00

1 66,600.00 66,600.00 0.01 42,000.00

420

0.1 65,000.00 6,500.00

Dibulatka n M-17

120 ### ###

Dibulatka n M-16

###

1 M' Grafel beton U 20 cm -60 cm

74,670.00

Pipa beton U

bh

1.1 44,300.00 48,730.00

Bata merah

bh

12

P.C (50 gk)

zak

Pasir pasang

m3

0.0305

### 7,118.70

Pasir urug

m3

0.0345

### 6,047.85

Pekerja

org

Tukang batu

org

Kepala Tukang

org

0.01 75,000.00

750

org

0.005 80,000.00

400 79,411.37

Mandor Jumlah

775 9,300.00

0.103 1,406.00

0.01 42,000.00

79,411.00

1 M' Pasang Talang Plastik PVC U 15 cm (AW) Talang plastik PVC

m'

1.05 60,000.00 63,000.00

Perlengka pan 35 % harga talang

lot

0.35 63,000.00 22,050.00

Pekerja

org

0.15 42,000.00 6,300.00

Tukang batu

org

0.4 65,000.00 26,000.00

Kepala Tukang

org

0.025 75,000.00 1,875.00

Mandor Jumlah

org

0.0013 80,000.00

Dibulatka n M-19

420

0.1 65,000.00 6,500.00

Dibulatka n M-18

144.82

100 ### ###

1 M' Saluran Air Limbah Buis Beton Ø 60 cm Buis beton Ø 60 cm

bh

1.1

###

Bata merah

bh

25

775 19,375.00

P.C (50 gk)

zak

0.206 1,406.00

###

289.64

Pasir pasang

m3

0.061

### 14,237.40

Pasir urug

m3

0.069

### 12,095.70

Pekerja

org

0.38 42,000.00 15,960.00

Tukang batu

org

0.19 65,000.00 12,350.00

Kepala Tukang

org

0.019 75,000.00 1,425.00

Mandor Jumlah

org

0.019 80,000.00 1,520.00 ###

Dibulatka n

M-20

###

1 M' Pasang Talang Seng Datar Seng pelat 3" x 6"

lbr

Paku

kg

Kayu kelas II Meni besi

m3

0.5 20,801.00 10,400.50 0.015 23,400.00 0.0096

### 27,360.00

kg

0.25 30,400.00 7,600.00

Pekerja

org

0.15 42,000.00 6,300.00

Tukang batu

org

0.4 65,000.00 26,000.00

Kepala Tukang

org

0.025 75,000.00 1,875.00

Mandor Jumlah

org

0.0013 80,000.00

Dibulatka n M-21

351

100 79,986.50 79,987.00

1 Buah Closet Duduk Closet duduk

bh

Pekerja

1

###

###

org

3.3 42,000.00

###

Tukang batu

org

1.1 65,000.00 71,500.00

Kepala Tukang

org

0.001 75,000.00

75

M-22

M-23

Mandor

org

0.16 80,000.00 12,800.00

Perlengka pan 6 % harga closet

lot

0.06

###

###

Jumlah

###

Dibulatka n

###

1 Buah Tangki Air fibreglass Volume 1 m3 Bak fibreglass kapasitas 1 m3

bh

Pekerja

1

###

###

org

3.3 42,000.00

###

Tukang batu

org

1.1 65,000.00 71,500.00

Kepala Tukang

org

Mandor

org

0.16 80,000.00 12,800.00

Perlengka pan 6 % harga bak

lot

0.06

0.001 75,000.00

75

### 78,984.00

Jumlah

###

Dibulatka n

###

1 Unit Septictank 2x1,50x1,50 m + Rembesan Galian tanah

m3

Pasir urug

m3

0.214

lantai kerja

m3

2.25

###

###

Pas bata adk 1pc : 3ps

m2

15

###

###

Pelat beton K225

m3

0.3

###

###

Plesteran adk 1pc : 3ps

m2

15 41,301.82

###

4.5 26,252.00

###

### 37,514.20

Pipa PVC 4" jenis AW

m'

Pipa GIP 1 1/2"

m'

Galian tanah untuk rembesan

m3

Pas ijuk

M-24

kg

Urugan kerikil 3/5

m3

Pipa PVC 4" berluban g jenis AW

m'

Urugan dan perataan tanah

m3

5.4

###

###

5 46,750.00

###

3.375 20,000.00 67,500.00

5.4 23,400.00 1.05

###

###

###

9 36,700.00

###

1.125 34,584.00 38,907.00

Jumlah

###

Dibulatka n

###

1 Unit Septictank 1x1,50x1,50 m + Rembesan Galian tanah

m3

Pasir urug

m3

0.107

### 18,757.10

lantai kerja

m3

1.125

###

###

Pas bata adk 1pc : 3ps

m2

7.5

###

###

Pelat beton K225

m3

0.15

###

###

Plesteran adk 1pc : 3ps

m2

7.5 41,301.82

###

Pipa PVC 4" jenis AW

m'

2.25 20,000.00 45,000.00

9

###

###

Pipa GIP 1 1/2"

m'

Galian tanah untuk rembesan

m3

1.688 20,000.00 33,760.00

kg

2.7 23,400.00 63,180.00

Pas ijuk Urugan kerikil 3/5

m3

Pipa PVC 4" berluban g jenis AW

m'

Urugan dan perataan tanah

m3

2.5 46,750.00

0.525

###

###

###

9 36,700.00

###

0.563 34,584.00 19,470.79

Jumlah

###

Dibulatka n

###

Kembali ke Analisa SNI

Satuan Pekerjaan Pengecatan Diposkan : 05 Juni 2014 Oleh : Endang Kusman

No. N-01

N-02

URAIAN

SAT VOLUME

HARGA SAT

1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama Soda api Kg 0.05 35,600.00 1,780.00 Pekerja Oh 0.15 42,000.00 6,300.00 Mandor Oh 0.0025 80,000.00 200 Jumlah 8,280.00 Dibulatkan 8,280.00 1 M2 Mendempul Dan Menggosok Kayu Dempul Kg 0.08 35,800.00 2,864.00 -

Minyak cat

Kg

0.02 38,400.00

768

-

Batu apung

Kg

0.01 29,600.00

296

-

Pekerja

Oh

0.04 42,000.00 1,680.00

-

Tukang cat

Oh

0.04 65,000.00 2,600.00

-

Kepala tukang

Oh

0.004 75,000.00

300

Mandor Oh 0.0025 80,000.00 Jumlah Dibulatkan 1 M2 Pengecatan Bidang Kayu Lama Setara Sieve Plamir Kg 0.15 25,000.00 Cat dasar Kg 0.17 30,000.00

200 8,708.00 8,708.00

-

N-03

HARGA

3,750.00 5,100.00

-

Cat penutup setara sieve 2x

Kg

0.17 41,700.00 7,089.00

-

Pekerja

Oh

0.07 42,000.00 2,940.00

-

Tukang cat

Oh

0.075 65,000.00 4,875.00

-

Kepala tukang

Oh

0.0075 75,000.00

562.5

-

Mandor Jumlah

Oh

0.0025 80,000.00

200 24,516.50

N-04

Dibulatkan 24,517.00 1 M2 Pengecatan Bidang Kayu Baru Setara Sieve Cat meni Kg 0.2 30,400.00 6,080.00 Plamir Kg 0.15 25,000.00 3,750.00 Cat dasar Kg 0.17 30,000.00 5,100.00 -

Cat penutup 3x setara sieve

Kg

0.35 41,700.00 14,595.00

-

Pekerja

Oh

0.07 42,000.00 2,940.00

-

Tukang cat

Oh

0.105 65,000.00 6,825.00

-

Kepala tukang

Oh

0.004 75,000.00

300

Oh

0.0025 80,000.00

200 39,790.00 39,790.00

-

Mandor Jumlah Dibulatkan N-05

1 M2 Pelaburan Bidang Kayu dengan Politur -

Politur

Ltr

0.15 48,000.00 7,200.00

-

Politur jadi

Ltr

-

Ampelas

Lbr

2 5,000.00 10,000.00

-

Tukang cat

Oh

0.06 65,000.00 3,900.00

-

Kepala tukang

Oh

0.016 75,000.00 1,200.00

0.372

### 41,924.40

-

N-06

Mandor Oh 0.0025 80,000.00 200 Jumlah 64,424.40 Dibulatkan 64,424.00 1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter Residu atau ter

Ltr

0.35 8,100.00 2,835.00

Pekerja Mandor Jumlah Dibulatkan

Oh Oh

0.1 42,000.00 4,200.00 0.006 80,000.00 480 7,515.00 7,515.00

-

N-07

1 M2 Pengecatan Tembok Baru Setara ICI -

Plamir tembok

Kg

0.1 25,000.00 2,500.00

-

Cat dasar

Kg

0.1 30,000.00 3,000.00

-

Cat penutup 2x setara ICI

Kg

0.26 75,000.00 19,500.00

-

Pekerja

Oh

0.02 42,000.00

-

Tukang cat

Oh

-

Kepala tukang

Oh

840

0.063 65,000.00 4,095.00 0.0063 75,000.00

472.5

-

N-08

Mandor Oh 0.0025 80,000.00 200 Jumlah 30,607.50 Dibulatkan 30,608.00 1 M2 Pengecatan Tembok Lama Setara ICI Cat dasar Kg 0.12 30,000.00 3,600.00 -

Cat penutup 2x

Kg

0.18 75,000.00 13,500.00

-

Pekerja

Oh

0.028 42,000.00 1,176.00

-

Tukang cat

Oh

0.042 65,000.00 2,730.00

-

Kepala tukang

Oh

0.0042 75,000.00

315

-

N-09

Mandor Oh 0.0025 80,000.00 200 Jumlah 21,521.00 Dibulatkan 21,521.00 1 M2 Pengecatan Plafond ( 3x ) Setara ICI -

Cat tembok setara ICI

Kg

0.2 75,000.00 15,000.00

-

Plamir tembok

Kg

0.16 25,000.00 4,000.00

-

Rol cat

Bh

0.01 32,500.00

-

Steger werk

Ls

1 1,000.00 1,000.00

-

Ampelas Pekerja

Lbr Oh

0.5 5,000.00 2,500.00 0.2 42,000.00 8,400.00

-

Tukang cat

Oh

0.3 65,000.00 19,500.00

-

Kepala tukang

Oh

0.03 75,000.00 2,250.00

-

N-10

325

Mandor Oh 0.01 80,000.00 800 Jumlah 53,775.00 Dibulatkan 53,775.00 1 M2 Pengecatan Plafond ( 3x ) Setara Vinilex

-

Cat tembok setara Vinilex

Kg

0.2 25,000.00 5,000.00

-

Plamir tembok

Kg

0.16 25,000.00 4,000.00

-

Rol cat

Bh

0.01 32,500.00

-

Steger werk

Ls

1 1,000.00 1,000.00

-

Ampelas Pekerja

Lbr Oh

0.5 5,000.00 2,500.00 0.2 42,000.00 8,400.00

-

Tukang cat

Oh

0.3 65,000.00 19,500.00

-

Kepala tukang

Oh

0.03 75,000.00 2,250.00

325

-

N-10-r'

Mandor Oh 0.01 80,000.00 800 Jumlah 43,775.00 Dibulatkan 43,775.00 1 M2 Pengecatan Plafond ( 2x ) Setara Vinilex -

Cat tembok setara Vinilex

Kg

0.13 25,000.00 3,250.00

-

Plamir tembok

Kg

0.11 25,000.00 2,750.00

-

Rol cat

Bh

0.1 32,500.00 3,250.00

-

Steger werk

Ls

-

Ampelas Pekerja

Lbr Oh

0.33 5,000.00 1,650.00 0.13 42,000.00 5,460.00

-

Tukang cat

Oh

0.2 65,000.00 13,000.00

-

Kepala tukang

Oh

0.02 75,000.00 1,500.00

-

N-11

Mandor Oh Jumlah Dibulatkan 1 M2 Memasang Wallpaper -

Wallpape r

-

0.67 1,000.00

0.01 80,000.00

670

800 32,330.00 32,330.00

m2

1.2 55,700.00 66,840.00

Lem Perekat

Kg

0.25 35,700.00 8,925.00

-

Pekerja

Oh

0.35 42,000.00 14,700.00

-

Tukang cat

Oh

0.175 65,000.00 11,375.00

-

Kepala tukang

Oh

0.017 75,000.00 1,275.00

-

N-12

Mandor Oh 0.0017 80,000.00 Jumlah Dibulatkan 1 M2 Pengecatan Permukaan Baja dengan Meni Besi -

Meni besi

Kg

-

Kuas 3" Pekerja

Bh Oh

-

Tukang cat

Oh

0.2 65,000.00 13,000.00

-

Kepala tukang

Oh

0.02 75,000.00 1,500.00

Oh

0.01 80,000.00

-

Mandor Jumlah Dibulatkan N-13

0.01 16,000.00 0.02 42,000.00

160 840

800 19,340.00 19,340.00

-

Meni besi

Kg

-

Kuas 3"

Bh

-

Kayu perancah

m3

-

Pekerja

Oh

0.25 42,000.00 10,500.00

-

Tukang cat

Oh

0.225 65,000.00 14,625.00

-

Kepala tukang

Oh

0.0225 75,000.00 1,687.50

Oh

0.0075 80,000.00

Mandor Jumlah Dibulatkan

0.1 30,400.00 3,040.00 0.01 16,000.00 0.002

160

### 4,139.60

600 34,752.10 34,752.00

1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara manual 1 lps cat 2 um -

Cat besi setara ICI

Kg

-

Pekerja

Oh

-

Tukang cat

Oh

-

Kepala tukang

Oh

-

N-15

0.1 30,400.00 3,040.00

1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah

-

N-14

136 ### ###

0.3 67,700.00 20,310.00 0.006 42,000.00

252

0.06 65,000.00 3,900.00 0.012 75,000.00

900

Mandor Oh 0.006 80,000.00 480 Jumlah 25,842.00 Dibulatkan 25,842.00 1 M2 Pengecatan Tembok Baru Setara Vinilex (2 x laburan)

-

Plamir tembok

Kg

0.1 25,000.00 2,500.00

-

Cat dasar

Kg

0.1 30,000.00 3,000.00

-

Cat penutup 2x setara vinilex

Kg

0.26 25,000.00 6,500.00

-

Pekerja

Oh

0.02 42,000.00

-

Tukang cat

Oh

-

Kepala tukang

Oh

840

0.063 65,000.00 4,095.00 0.0063 75,000.00

472.5

-

N-15r'

Mandor Oh 0.0025 80,000.00 200 Jumlah 17,607.50 Dibulatkan 17,608.00 1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan) -

Plamir tembok

Kg

0.1 25,000.00 2,500.00

-

Cat dasar

Kg

0.1 30,000.00 3,000.00

-

Cat penutup 3x setara vinilex

Kg

0.39 25,000.00 9,750.00

-

Pekerja

Oh

0.03 42,000.00 1,260.00

-

Tukang cat

Oh

0.0945 65,000.00 6,142.50

-

Kepala tukang

Oh

0.0095 75,000.00

712.5

-

N-16

Mandor Oh 0.0038 80,000.00 304 Jumlah 23,669.00 Dibulatkan 23,669.00 1 M2 Pengecatan Tembok Lama Setara Vinilex Cat dasar Kg 0.12 30,000.00 3,600.00 -

Cat penutup 2x

Kg

0.18 25,000.00 4,500.00

-

Pekerja

Oh

0.028 42,000.00 1,176.00

-

Tukang cat

Oh

0.042 65,000.00 2,730.00

-

Kepala tukang

Oh

0.0042 75,000.00

315

Oh

0.0025 80,000.00

200 12,521.00 12,521.00

-

Mandor Jumlah Dibulatkan

Kembali ke AHS-SNI

pah Kerja Bangunan - AHS 2011

UPAH (Rp.)

NO

URAIAN

SATUAN

1

Mandor

Rp Org/hr 80,000.00

2

Kepala Tukang Batu

Rp Org/hr 75,000.00

3

Kepala Tukang Kayu

Rp Org/hr 75,000.00

4

Kepala Tukang Besi

Rp Org/hr 75,000.00

5

Kepala Tukang Cat

Rp Org/hr 75,000.00

6

Kepala Tukang Listrik

Rp Org/hr 75,000.00

7

Kepala Tukang

Rp Org/hr 75,000.00

8

Tukang Batu

Rp Org/hr 65,000.00

9

Tukang Kayu

Rp Org/hr 65,000.00

10

Tukang Besi/Baja

Rp Org/hr 65,000.00

11

Tukang Cat

Rp Org/hr 65,000.00

12

Tukang Listrik

Rp Org/hr 65,000.00

13

Tukang Pipa

Rp Org/hr 65,000.00

14

Tukang Plitur

Rp Org/hr 65,000.00

15

Tukang Taman

Rp Org/hr 65,000.00

16

Tukang

Rp Org/hr 65,000.00

17

Pembant u Tukang

Rp Org/hr 42,000.00

18

Pekerja Biasa

Rp Org/hr 42,000.00

19

Penjaga Malam

Rp Org/hr 42,000.00

20

Sopir

Rp Org/hr 65,000.00

21

Operator

Rp Org/hr 75,000.00

22

Mekanik

Rp Org/hr 65,000.00

23

Pembant u Sopir

Rp Org/hr 42,000.00

24

Pembant u Operator

Rp Org/hr 50,000.00

25

Pembant u Mekanik

Rp Org/hr 42,000.00

harga sudah termasuk PPN dan keuntungan

Harga Satuan Bahan Bangunan - AHS 2011

NO

A.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

MATERIAL

SAT

HARGA (Rp)

AGREGAT KASAR,BAHAN PEREKAT & BAHAN JADINYA Pasir Urug Tanah Urug Pilihan Sirtu Pasir Teras Pasir Pasang Kali Pasir Beton Abu Batu Batu Gosok ( Apung ) Batu Pecah Mesin 1/2 Batu Pecah Mesin 2/3 Batu Pecah Mesin 3/5 Batu Pecah Mesin 5/7 Batu Belah Pondasi Batu Bronjol ( Untuk Bronjong ) Batu Koral Beton Kali Batu Tempel Hitam Batu Pinggir Beton 10 x 20 x 35 Batu Pinggir Beton 15 x 35 x 50 ( K-225 ) Batu Telor Batako Kecil 8 x 10 x 20 Batako Besar 8 x 20 x 30 Con Blok 8 x 20 x 40 Bata Merah Bakar kelas I Bata Merah Bakar kelas II Bata Merah Oven ( Klingker ) Roster Beton 20 x 20 Roster Beton 30 x 30 Grass Blok 20 x 20 Grass Blok 30 x 30 Paving Blok Natural 8 cm Paving Blok Warna 8 cm Paving Blok Natural 6 cm Paving Blok Warna 6 cm

m3 m3 m3 m3 m3 m3 m3 kg m3 m3 m3 m3 m3 m3 m3 m3 bh

175,300.00 89,200.00 203,500.00 174,200.00 233,400.00 255,400.00 259,000.00 29,600.00 223,600.00 211,100.00 205,000.00 196,000.00 205,500.00 180,800.00 172,600.00 96,600.00 14,100.00

bh

73,700.00

m3 bh bh bh bh bh bh bh bh bh bh m2 m2 m2 m2

97,800.00 2,000.00 2,400.00 5,400.00 775.00 675.00 1,800.00 14,800.00 15,500.00 9,700.00 22,500.00 81,100.00 108,600.00 76,000.00 86,000.00

34 35

Canstin Paving Blok Semen PC /50 kg

m1 zak

36

Semen Putih Kanstin Jalan Ukuran Besar ( Bina Marga ) 1bh =60cm

zak

34,900.00 70,300.00 1,406.00 92,700.00

bh

58,900.00

37 38

Readymix Beton K500, Tanpa Pompa ( Selang )

m3

1,105,000.00

39

Readymix Beton K400, Tanpa Pompa ( Selang )

m3

903,500.00

40

Readymix Beton K350, Tanpa Pompa ( Selang )

m3

877,500.00

41

Readymix Beton K300, Tanpa Pompa ( Selang )

m3

925,000.00

42

Readymix Beton K225, Tanpa Pompa ( Selang )

m3

850,000.00

m3

825,000.00

m3 kg kg m3 ltr bh bh bh bh

353,300.00 18,300.00 15,700.00 31,300.00 3.00 2,500.00 5,000.00 4,000.00 3,000.00

kg

25,000.00

lt

120,000.00

lt

75,000.00

kg

25,000.00

lt

75,000.00

kg kg lt

20,000.00 30,000.00 40,000.00

kg

90,000.00

43 44 45 46 47 48 49 50 51 52 B 1 2 3 4 5 6 7 8 9

Readymix Beton K175, Tanpa Pompa ( Selang ) Kapur Pasang / Kapur Tembok Kapur Sirih Semen Warna Tanah liat Air Formite/spacer Hollow/Con Blok 8 x 20 x 40 Hollow/Con Blok 8 x 15 x 40 Hollow/Con Blok 8 x 10 x 40 LABURAN,PENGISI DAN ALATNYA Plamir Tembok Cat Tembok ICI Eksterior ( Beton ) Cat Tembok ICI Interior ( Plafon Dan Dinding ) Cat Tembok Vinilex Cat Dasar ICI untuk Interior ( 2 Pelapis ) Cat Tembok Sanlek Cat Dasar Cat Tahan Asam Pelapis Alkali ICI ( Cat Dasar Beton Ekterior )

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

Cat Marka / Spotlight Water Profing Emulsion Water Profing Membrance Rool Cat Tembok Kape Tembok Kape Kayu Soligneum 1 Blek Plincote Penawetan Kayu Pegopenan Kayu Kwas 3" Oker Oyan Oten ( Pewarna Plitur ) Spirtus Bahan Pelitur Kripik ( Sirlak India ) Dempul Lilin Dempul Plitur Dempul Halus / Imfra ( Wood Filler ) Dempul Jadi Politur Politur Jadi Terpentin Tiner A Tiner B Kumpon Melamik Dempul Plastik Dempul Duco Ampelas Dempul Kayu Cap Kucing Meni Kayu / Besi Sincromat Cat Kayu Sieve Cat Besi Cat Besi Duco Danaglos / ICI Cat Bron Karet lis Minyak cat Glass beet Residu

kg ml bh bh bh 5 lt kg m3 m3 bh bh bks bks lt kg

185,000.00 70,000.00 62,500.00 32,500.00 8,500.00 10,000.00 25,000.00 29,000.00 382,600.00 370,000.00 16,000.00 22,000.00 5,200.00 5,500.00 15,000.00

kg

110,000.00

kg kg

34,200.00 37,700.00

lt

37,700.00

kg lt lt kg kg kg lbr kg kg kg lbr kg kg kg lt lt bh kg bh kg kg lt

35,800.00 48,000.00 112,700.00 19,500.00 23,900.00 21,400.00 30,800.00 52,500.00 39,200.00 35,800.00 5,000.00 24,400.00 30,400.00 40,900.00 41,700.00 44,000.00 76,300.00 67,700.00 3,300.00 38,400.00 50,100.00 8,100.00

C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

BAHAN KAYU BERIKUT BAHAN JADINYA Bambu 5 s.d 7 Bambu 7 s.d 10 Bambu Gombong Kayu Kamper Singkil / Kapur ( Kayu Samarinda kls II ) Kayu Balok Borneo Super Kayu Papan Borneo Super Kayu Balok Kamper Medan (Kruing ) Kayu Papan Kamper Medan (Kruing ) Kayu Balok Kamper Banjar Kayu Papan Kamper Banjar Kayu Balok Kamper Samarinda Kayu Papan Kamper Samarinda Kayu Balok Rasamala Kayu Jati Jatim Tua dia. 40 cm Kayu Jati Jateng Tua dia. 40 cm Kayu Jati Jabar Tua dia. 40 cm Kayu Jati Jabar Tua dia. 40 cm kebawah Kayu Hutan Kelas I ( Segeng,Mahoni, Laban ) Kayu Balok Albasia Kayu Papan Albasia Dolken 5 s/d 7 Dolken 7 s/d 10 List Profil Kamper 1 cm List Profil Kamper 2 cm List Profil Kamper 4 cm List Profil Kamper 5 cm List Profil Kamper 10 cm Pegangan Tangga Profil Jati Pegangan Tangga Profil Kamper Kayu Kaso 4/6 Kayu Kaso 5/7 Kamper Medan Kayu Reng 2/3 Borneo Super Kayu Reng 2/3 Kamper Banjar Kayu Reng 3/4 Kamper Medan Kayu Papan Terentang

bt bt bt

17,700.00 25,000.00 37,200.00

m3

7,094,450.00

m3 m3

5,280,000.00 5,595,800.00

m3

5,692,600.00

m3

5,823,400.00

m3 m3 m3 m3 m3 m3 m3 m3

6,363,600.00 6,645,300.00 8,633,700.00 8,724,300.00 2,658,000.00 20,772,000.00 22,188,400.00 13,625,400.00

m3

12,736,100.00

m3

2,069,800.00

m3 m3 bt bt m1 m1 m1 m1 m1 m1 m1 m3 m3 m1 m1 m3 m3

1,870,500.00 2,071,700.00 22,600.00 28,000.00 8,900.00 10,000.00 14,300.00 17,200.00 29,400.00 160,100.00 122,500.00 2,772,000.00 3,356,800.00 2,500.00 3,300.00 4,000.00 2,850,000.00

36 37 38 39 40 41 D 1 2 3 4 5

Kayu Balok Terentang Batang Kelapa Tali Ijuk lapisan Ijuk tebal 10 cm Venetion Blind Vertikal Blind BAHAN PENUTUP RANGKA PLAFOND Plafond Enternit 4 mm Plafond hardpleks 5 mm 120 x 240 Plafond Asbes Semen 5 mm Plafond Asbes Semen 3,5 mm Gypsum 120 x 240 t= 9 mm ex DN

m3 bt kg m2 m2 m2

2,640,000.00 139,500.00 23,400.00 22,000.00 537,300.00 351,200.00

m2

17,400.00

lbr

62,400.00

m2 m2

22,500.00 19,500.00

lbr

79,800.00

lbr

83,800.00

7 8 9 10 11 12

Gypsum 120 x 240 t= 9 mm ex Luar Tepung gypsum Acustik Amstrong 60 x 120 Cotton Plester GRC (120 x 240) cm, t = 4 mm Cornice Coumpound List gypsum

kg lbr bh lbr zak m'

12,500.00 132,800.00 15,000.00 67,500.00 75,000.00 8,500.00

E 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

BAHAN KAYU LAPIS Triplek 3 mm 120 x 240 Triplek 4 mm 120 x 240 Triplek 4 mm ukuran Pintu Triplek 6 mm 120 x 240 Triplek 9 mm 120 x 240 Jabar Wood 4 mm Bilik Bambu ( tanpa kulit ) Bilik Bambu ( dengan kulit ) Bilik Bambu Hitam Variasi Wall paper MultiPlek 9 mm 120 x 240 MultiPlek 12 mm 120 x 240 MultiPlek 18 mm 120 x 240 Ply Wood 18 mm 120 x 240 Ply Wood 9 mm 120 x 240 Ply Wood 4 mm 120 x 240 Teak Wood 3 mm 120 x 240

lbr lbr lbr lbr lbr lbr m2 m2 m2 m2 lbr lbr lbr lbr lbr lbr lbr

61,700.00 64,400.00 56,200.00 92,000.00 166,600.00 119,000.00 19,800.00 22,700.00 34,200.00 55,700.00 151,100.00 195,000.00 255,400.00 323,900.00 235,000.00 140,000.00 129,100.00

6

18

lbr

131,700.00

lbr

127,200.00

lbr m2 m2 lbr lbr lbr lbr lbr

114,700.00 128,200.00 57,900.00 89,200.00 133,400.00 170,000.00 132,900.00 238,100.00

1 2 3 4 5 6 7 8 9 10 11

BAHAN LANTAI DAN PELAPIS DINDING Tegel PC 20 x 20 Plin Tegel PC 10 x 20 Tegel PC 30 x 30 Plin Tegel PC 15 x 30 Tegel Warna 20 x 20 Plin Tegel Warna 10 x 20 Tegel Warna 30 x 30 Plin Tegel Warna 15 x 30 Tegel Wafel PC 20 x 20 Tegel Wafel Warna 20 x 20 Tegel Badak PC 30 x 30

bh bh bh bh bh bh bh bh bh bh bh

3,400.00 2,400.00 3,400.00 2,800.00 3,600.00 3,400.00 5,700.00 6,300.00 3,200.00 2,500.00 4,100.00

12

Poslin 11 x 11 Warna Standar DN

m2

63,300.00

13

Poslin 11 x 11 Warna khusus DN

m2

67,300.00

14

Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Mulia

m2

54,500.00

15

Keramik 10 x 20 KW I DN Corak/Warna/Anti Slip Mulia

m2

56,000.00

16

Keramik 20 x 20 (KM) KW I DN Corak/Warna /Anti Slip Mulia

m2

62,500.00

17

Keramik 20 x 20 (KM) KW I DN Putih Polos Mulia

m2

54,500.00

18

Keramik 20 x 25 Dinding KM KW I DN Corak Mulia

m2

62,500.00

19

Keramik 30 x 30 KWI DN Putih Polos Mulia

m2

53,000.00

19 20 21 22 23 24 25 26 27 F

Teak Wood 4 mm 120 x 240 Teak Wood 3 mm 120 x 240 ukuran Pintu Teak Wood ukuran Pintu 4 mm Tacon ( Tahan Bakar ) Supercon Melamin 4 mm 120 x 240 Melamin TOK 4 mm Formika 120 x 240 Formika ukuran Pintu Formika Warna 4" x 8"

20

Keramik 30 x 30 KWI DN Warna/Corak (ANTI SLIP) Mulia

m2

58,000.00

21

Keramik 40 x 40 KWI DN Putih Polos Mulia

m2

56,800.00

22

Keramik 40 x 40 KWI DN Warna/Corak (ANTI SLIP) Mulia

m2

65,500.00

23

Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Roman

m2

64,400.00

24

Keramik 10 x 20 KW I DN Corak/Warna/Anti Slip Roman

m2

72,200.00

25

Keramik 20 x 20 (KM) KW I DN Corak/Warna/Anti Slip Roman

m2

75,200.00

26

Keramik 20 x 20 (KM) KW I DN Putih Polos Roman

m2

72,900.00

27

Keramik 20 x 25 Dinding KM KW I DN Corak Roman

m2

75,200.00

28

Keramik 20 x 25 KW I DN Putih Polos Roman

m2

72,900.00

29

Keramik 30 x 30 KW I DN Polos Roman

m2

68,900.00

30

Keramik 30 x 30 KW I DN Warna/Corak (ANTI SLIP) Roman

m2

76,600.00

31

Keramik 40 x 40 KW I DN Polos Roman

m2

72,500.00

32

Keramik 40 x 40 KW I DN Warna/Corak (ANTI SLIP) Roman

m2

77,000.00

33 34 35 36 37 38 39 40 41 42 43 44

Vinyl Lantai Standar Karpet Kelas Baik LN Karpet Kelas Sedang LN Parquet Jati Stairnosing Keramik 10/20 Stairnosing Fiber Taraso Kerang 30 x 30 Plin Taraso 10 x 30 Granit Alam LN Ukuran Besar Granit Alam LN Ukuran Kecil Granit Alam DN Ukuran Besar Granit Alam DN Ukuran Kecil

m2 m2 m2 m2 bh m m2 bh m2 m2 m2 m2

56,000.00 1,025,500.00 353,500.00 375,400.00 13,700.00 25,000.00 31,800.00 13,500.00 1,848,400.00 1,612,900.00 1,331,100.00 1,299,400.00

45

Granito Tile Essenza Ukuran 40 x 40 Polis

m2

345,000.00

46

Granito Tile Essenza Ukuran 30 x 30

m2

322,800.00

m2

204,900.00

m2

550,000.00

m2

550,200.00

47 48 49

Granito Tile Essenza Ukuran 40 x 40 UnPolis Marmer Marmer Alam Lampung Ukuran Besar

50

Marmer Alam Lampung Ukuran kecil

m2

345,700.00

51

Marmer Alam Citatah Ukuran Besar

m2

340,800.00

m2

237,600.00

m2

157,900.00

m2

358,100.00

m2

231,800.00

m2 bh

96,500.00 600.00

ltr

37,600.00

bh bh bh bh bh bh bh bh bh bh

3,000.00 3,250.00 3,500.00 4,000.00 4,500.00 5,250.00 25,900.00 27,600.00 31,100.00 41,300.00

m1 m1 m1 m1 m1 m1

44,300.00 56,400.00 74,200.00 49,200.00 61,700.00 80,900.00

52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 G 1 2 3 4 5 6

Marmer Alam Citatah Ukuran Kecil Marmer Sintetis Granito Tile Essenza 60 x 60 Polis Granito Tile Essenza 60 x 60 UnPolis Batu Tempel Hitam Bata Karawang Campuran untuk Kedap Air ( AM ) Plint keramik 10 x 20 Plint keramik 10 x 25 Plint keramik 10 x 30 Plint keramik 10 x 40 Plint keramik 15 x 30 Plint keramik 15 x 40 Plint granito 10 x 30 Plint granito 10 x 40 Plint granito 15 x 30 Plint granito 15 x 40 BAHAN SALURAN AIR KOTOR / BERSIH Grafel U 20 cm' Grafel U 30 cm' Grafel U 40 cm' Buis Beton 20 cm ( 1 M' ) Buis Beton 30 cm ( 1 M' ) Buis Beton 40 cm ( 1 M' )

7 8 9 10 11 12 13 14 15

Buis Beton 50 cm ( 1 M' ) Buis Beton 60 cm ( 1 M' ) Buis Beton 100 cm ( 0.50 M' ) Buis Beton 80 cm ( 0.50 M' ) BuisTanah 10 cm ( 0.50 M' ) BuisTanah 15 cm ( 0.50 M' ) BuisTanah 20 cm ( 0.50 M' ) BuisTanah 25 cm ( 0.50 M' ) Injuk

stk stk stk stk stk stk stk stk kg

94,300.00 130,900.00 299,800.00 298,500.00 9,600.00 12,700.00 16,800.00 22,800.00 17,400.00

1

BAHAN LOGAM DAN BAHAN JADINYA Besi Beton U-24 Rata-rata

kg

16,500.00

2

Besi Beton U-39 / U-32 Rata-rata

kg

20,700.00

m2

171,300.00

m2 kg kg kg kg kg kg kg kg m1 kg kg m2 m2 m2 m2 m2 m2 kg m2 m2 kg kg m2 bt bt

185,000.00 24,000.00 23,900.00 18,300.00 21,600.00 19,200.00 10,600.00 27,700.00 63,500.00 1,000.00 28,200.00 41,400.00 13,400.00 15,300.00 14,900.00 32,100.00 35,900.00 28,600.00 23,600.00 51,900.00 38,700.00 46,300.00 43,300.00 32,400.00 33,000.00 33,100.00

H

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

Pagar BRC lengkap tiang ( Tanpa Pondasi ) Bondek Besi WF Ex DN SII Besi WF Ex Jepang Besi Profil DN SII Besi Profil Ex LN Besi C Lip Chanel Ongkos Galfanis Besi Kawat Beton Kawat Duri Kawat Pengikat Kawat Bronjong 4 mm Kawat Tembaga Ram Nyamuk Hijau Ram Kawat 1 x 1 cm Ram Ayam Kawat Kasa 1 x 1 ( Putih ) Kawat Harmonika 4 cm Kawat Harmonika 2 cm Kawat Las Listrik Wiremesh M8 Wiremesh M6 Timah Timah Hitam Ram nyamuk Alumunium Plat Srip Ø 2 x 30 mm ( 6 m1 ) Plat Srip Ø 3 x 30 mm ( 6 m1 )

30 31 32 33 34 35 36 37 38

Plat Strip Besi Strip Plat Alumunium 0.2 mm Plat Alumunium 0.3 mm Plat Alumunium 0.4 mm Plat Alumunium 0.5 mm Plat Alumunium 0.6 mm Plat Alumunium 0.1 mm Kusen Alumunium Natural 1.3 mm t= 1,3 mm ( 4 " )

bt kg m2 m2 m2 m2 m2 m2

18,200.00 26,800.00 89,800.00 110,500.00 141,400.00 143,100.00 171,800.00 56,300.00

m1

151,100.00

39

Kusen Alumunium Warna 1.3 mm t= 1,3 mm ( 4 " )

m1

163,000.00

40

Kusen Alumunium Natural 1.3 mm t= 1,3 mm ( 3 " )

m1

81,000.00

41

Kusen Alumunium Warna 1.3 mm t= 1,3 mm ( 3 " )

m1

102,000.00

42

Daun Jendela Alumunium Natural ( tanpa kaca dan accessories )

m2

98,800.00

43

Daun Jendela Alumunium Warna ( tanpa kaca dan accessories )

m2

148,800.00

44

Daun Pintu Alumunium Natural ( tanpa kaca dan accessories )

m2

211,800.00

45

Daun Pintu Alumunium Warna ( tanpa kaca dan accessories )

m2

207,500.00

bh

345,200.00

ps

104,500.00

m1

7,500.00

m' m2

35,000.00 380,200.00

roll

1,581,500.00

roll

2,080,100.00

kg kg kg kg kg kg kg

16,800.00 17,700.00 14,100.00 14,100.00 14,700.00 26,700.00 28,900.00

46 47 48 49 50 51 52 53 54 55 56 57 58 59

Handle Alumunium ( Tarikan Pintu Alumunium ) Kait Angin Alumunium Karet Asisoris Kusen / Pintu Alumunium Jalusi Alluminium Sunscreen Almunium Seng Plat BJLS 30 60 cm ( 100 m1 ) Seng Plat BJLS 30 90 cm ( 100 m1 ) Plat Besi Tipis 1 mm Plat Besi Tipis 0.5 mm Plat Besi 2 mm s/d 5 mm Plat Besi 6 mms/d 10 mm Plat Besi 10 mm keatas Kabel presstressed polos Jaring Kawat Baja

60 61 62 63 64

Lem Kuning ( Aibond ) Lem Fox Lem Vinyl Besi Strip Kaca Nako Profil alumunium "T" Besi Hallow ( 2 x 4 x 4) cm (400cm)

kg kg kg kg m1

35,700.00 23,900.00 44,000.00 11,000.00 12,200.00

btg

22,600.00

66

Besi Hallow ( 4 x 4) cm (400 cm)

btg

29,200.00

67 68 69 70 71

Besi Rail Pengamanan Jendela Besi Jendela Besi tahan api Pintu gulung besi Pintu Roliing Door Jendela nako kaca ryben + tralis 6 klips

kg m2 m2 m2 m2

459,300.00 390,200.00 501,700.00 501,700.00 306,600.00

set

170,000.00

65

72 73

Jendela nako kaca ryben + tralis 7 klips

set

200,000.00

74

Jendela nako kaca ryben + tralis 8 klips

set

230,000.00

75

Jendela nako kaca ryben + tralis 10 klips

set

290,000.00

76

Jendela nako kaca bening + tralis 4 klips

set

120,000.00

77

Jendela nako kaca bening + tralis 5 klips

set

140,000.00

78

Jendela nako kaca bening + tralis 6 klips

set

170,000.00

79

Jendela nako kaca bening + tralis 7 klips

set

210,000.00

80

Jendela nako kaca bening + tralis 8 klips

set

230,000.00

81

Jendela nako kaca bening + tralis 10 klips

set

300,000.00

I 1 2 3 4 5 6

BAHAN KACA Kaca Polos 2 mm ( ASAHI ) Kaca Polos 3 mm ( ASAHI ) Kaca Polos 5 mm ( ASAHI ) Kaca Polos 8 mm ( ASAHI ) Kaca Rayband 5 mm ( ASAHI ) Kaca Rayband 8 mm ( ASAHI )

m2 m2 m2 m2 m2 m2

69,000.00 87,400.00 111,000.00 183,100.00 148,700.00 323,400.00

7

Kaca Rayband 12 mm ( ASAHI )

m2

627,000.00

8 9 10

Kaca cermin 5 mm Kaca cermin 6 mm Kaca cermin 8 mm Kaca Patri Lokal Terpasang ( ASAHI )

m2 m2 m2

150,500.00 186,400.00 234,300.00

m2

1,621,100.00

m2

3,425,700.00

m2

1,263,900.00

bh

22,000.00

bh kg bh

125,700.00 211,800.00 109,200.00

BAHAN PAKU DAN MUR BAUT Paku 1/2" s/d 2" Paku 2" s/d 5" Paku 8 cm s/d 15 cm Paku Beton 2 cm s/d 5 cm Paku Kait Lengkap Paku Cacing Besi Beugel Kuda - Kuda Duk Angker Angker Mur Baut dia. 19 / Panjang 60 cm

kg kg kg bh bh kg kg bh

23,800.00 23,400.00 20,000.00 1,600.00 900.00 57,100.00 21,700.00 7,500.00

bh

71,800.00

Mur Baut HTB dia. 19 s/d 16 ( 5 cm )

bh

15,900.00

bh

9,300.00

bh bh bh bh bh kg kg bh

5,300.00 800.00 7,200.00 600.00 300.00 35,000.00 17,500.00 250.00

bt

166,700.00

11 12 13 14 15 16 17 J 1 2 3 4 5 6 7 8 9 10

Kaca Patri Ex Luar Negeri Terpasang Kaca 6 mm Gravver Glass Block DN 20 x 20 ( Kedawung ) Glass Block DN 20 x 20 Ex LN Sealant Jendela Nako

12 13 14 15 16 17 18 19

Mur Baut Biasa dia. 19 s/d 16 ( 5 cm ) Piser dia.12 s/d 20 cm Paku skrup 3" Ramset / Dinabolt Baut Besar Baut Kecil Paku GRC Paku gypsum Sekrup fixer

K 1

BAHAN PERPIPAAN Besi Pipa Untuk Hydrant BSP 1"

11

2

Besi Pipa Untuk Hydrant BSP 1.25"

bt

210,200.00

bt

298,000.00

bt

351,800.00

bt

439,300.00

bt bt bt bt bt bt bt bt

595,000.00 869,600.00 1,423,400.00 172,300.00 227,900.00 365,800.00 573,100.00 772,400.00

6 7 8 9 10 11 12 13

Besi Pipa Untuk Hydrant BSP 1.5" Besi Pipa Untuk Hydrant BSP 2" Besi Pipa Untuk Hydrant BSP 2.5" Besi Pipa Untuk Hydrant BSP 3" Besi Pipa Untuk Hydrant BSP 4" Besi Pipa Untuk Hydrant BSP 6" Besi Pipa Hitam 1" t = 2 mm Besi Pipa Hitam 2" t = 2 mm Besi Pipa Hitam 3" t = 2mm Besi Pipa Hitam 4" t = 2 mm Besi Pipa Hitam 6" t = 2 mm

14

Pipa GIP Medium A 1/2" ( 6 m1 )

bt

109,100.00

15

Pipa GIP Medium A 3/4" ( 6 m1 )

bt

159,400.00

16

Pipa GIP Medium A 1" ( 6 m1 ) Pipa GIP Medium A 1 1/4" ( 6 m1 )

bt

181,500.00

bt

259,300.00

bt

280,500.00

bt

326,400.00

bt

467,400.00

bt

672,100.00

bt bt bh bh bh bh bh bh bh bh bh bh

849,900.00 920,300.00 6,300.00 8,600.00 16,700.00 19,800.00 20,700.00 22,700.00 51,200.00 60,400.00 75,900.00 118,600.00

bt

40,100.00

3 4 5

17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

Pipa GIP Medium A 1 1/2" ( 6 m1 ) Pipa GIP Medium A 1 3/4" ( 6 m1 ) Pipa GIP Medium A 2" ( 6 m1 ) Pipa GIP Medium A 2 1/2" ( 6 m1 ) Pipa GIP Medium A 3" ( 6 m1 ) Pipa GIP Medium A 4" ( 6 m1 ) Macam2 Sambungan GIP 1/2" Macam2 Sambungan GIP 3/4" Macam2 Sambungan GIP 1" Macam2 Sambungan GIP 1 1/4" Macam2 Sambungan GIP 1 1/2" Macam2 Sambungan GIP 1 3/4" Macam2 Sambungan GIP 2" Macam2 Sambungan GIP 2 1/2" Macam2 Sambungan GIP 3" Macam2 Sambungan GIP 4" Pipa PVC RUCIKA type AW 1/2"

35

Pipa PVC RUCIKA type AW 3/4"

bt

52,200.00

36

Pipa PVC RUCIKA type AW 1"

bt

63,200.00

37

Pipa PVC RUCIKA type AW 1 1/4"

bt

79,900.00

38

Pipa PVC RUCIKA type AW 1 1/2"

bt

105,900.00

39

Pipa PVC RUCIKA type AW 2"

bt

110,700.00

40

Pipa PVC RUCIKA type AW 2 1/2"

bt

167,100.00

41

Pipa PVC RUCIKA type AW 3"

bt

205,100.00

42

Pipa PVC RUCIKA type AW 4"

bt

347,900.00

43

Pipa PVC RUCIKA type AW 6"

bt

640,000.00

44

Pipa PVC RUCIKA type AW 8"

bt

818,300.00

45

Pipa PVC MASPION ABU ( AW ) 1/2"

bt

22,500.00

46

Pipa PVC MASPION ABU ( AW ) 3/4"

bt

27,800.00

47

Pipa PVC MASPION ABU ( AW ) 1"

bt

40,500.00

48

Pipa PVC MASPION ABU ( AW ) 1 1/4"

bt

58,500.00

49

Pipa PVC MASPION ABU ( AW ) 1 1/2"

bt

60,200.00

50

Pipa PVC MASPION ABU ( AW ) 2"

bt

75,800.00

51

Pipa PVC MASPION ABU ( AW ) 2 1/2"

bt

126,300.00

52

Pipa PVC MASPION ABU ( AW ) 3"

bt

145,700.00

53

Pipa PVC MASPION ABU ( AW ) 4"

bt

256,800.00

54

Macam2 Sambungan Paralon 1/2"

bh

4,400.00

bh

4,700.00

bh

4,900.00

55 56

Macam2 Sambungan Paralon 3/4" Macam2 Sambungan Paralon 1"

57

Macam2 Sambungan Paralon 1 1/4"

bh

7,200.00

58

Macam2 Sambungan Paralon 1 1/2"

bh

9,500.00

bh

13,500.00

bh

15,800.00

bh

26,400.00

bh bh

29,700.00 34,000.00

bh

89,900.00

tb gl

10,100.00 4,200.00

65 66

Macam2 Sambungan Paralon 1 3/4" Macam2 Sambungan Paralon 2" Macam2 Sambungan Paralon 2 1/2" Macam2 Sambungan Paralon 3" Macam2 Sambungan Paralon 4" Sambungan Pipa PVC Jenis AW 4" TY Lem Paralon Solatip Ledeng

67

Pipa PVC 4" Berlobang Jenis AW

m1

36,700.00

68 69 70 71 72 73

PVC Waterstop lebar 150 PVC Waterstop lebar 200 PVC Waterstop lebar 230 PVC Waterstop lebar 250 PVC Waterstop lebar 300 PVC Waterstop lebar 320

m1 m1 m1 m1 m1 m1

53,500.00 57,900.00 65,700.00 74,700.00 83,600.00 92,500.00

L 1 2 3 4 5 6 7 8 9 10

BAHAN SANITAIR Stop Kran 3/4" KIT Stop Kran 1" KIT Stop Kran 1 1/2" KIT Stop Kran 2" KIT Stop Kran 2 1/2" KIT Stop Kran 3" KIT Check Valve 1/2" Double Neple 1/2" Water Mur 1/2" Gate walve 1/2" Saringan Air Lt. KM Stainless Steel Apooer Bath Tube Kran Stainless Lokal Kait Shower Dengan Tiang Shower Tanpa Tiang Kran Tembok Sun Eui dia. 1/2" Kran Tembok ITAP dia. 1/2"

bh bh bh bh bh bh bh bh bh bh

103,900.00 124,200.00 208,000.00 267,900.00 713,200.00 830,300.00 86,400.00 32,400.00 40,200.00 55,500.00

bh

66,600.00

bh bh bh bh bh bh

267,800.00 46,100.00 221,000.00 134,800.00 86,900.00 40,900.00

59 60 61 62 63 64

11 12 13 14 15 16 17

18 19

21 22

Kran Bebek Sun Eui 1/2" Kran Bebek ITAP 1/2" Kran Panas Dingin San Eui Standard Bath Cape Washteren Tempat Sabun Poslin

23 24

20

25

bh bh

144,600.00 51,500.00

bh

228,400.00

unit bh

2,098,700.00 46,300.00

Wastafel Lengkap TOTO LW 230

unit

1,012,700.00

Wastafel Lengkap INA Closet Jongkok Poslin Warna TOTO

unit

699,900.00

unit

205,600.00

26

Closet Jongkok Standard Putih Poslin TOTO

unit

188,200.00

27

Closet Jongkok Lengkap Sistem Jet TOTO

unit

2,032,900.00

28

Closet Duduk Warna Standard TOTO C 240 Lengkap

unit

1,724,700.00

29

Wastafel Bulat Warna Standard Lengkap

unit

910,800.00

30

Closet Duduk Warna Standard INA Lengkap

bh

1,272,100.00

unit

1,773,400.00

lbr

495,900.00

bh

397,800.00

bh

1,272,300.00

bh

1,650,200.00

31 32 33 34

Urinoir Lengkap TOTO Warna Standard Lengkap Penyekat Poslin Urinoar TOTO Kitchen Zink Stainless Standard Lokal ( 1 Lubang ) Kitchen Zink Stainless Non Standard Franke ( 1 Lubang )

36

Kitchen Zink Stainless Non Standard Franke ( 2 Lubang ) Talang PVC U - 15 cm

M

BAHAN PENUTUP ATAP

1

35

btng

60,000.00

Atap Plastik Gelombang 80 x 180

lbr

33,100.00

2

Atap Fiber Glass Tipis 80 x 180 ( Gelombang )

lbr

47,100.00

3

Atap Fiber Glass Tebal 80 x 180 ( Gelombang )

lbr

100,000.00

4

Atap Alumunium Natural USR 26 ( JAINDO )

m2

140,600.00

5

Atap Alumunium Warna USR 26 ( JAINDO )

m2

164,700.00

6

Atap Asbes Gel. Kecil 80 x 180 x 4 mm

lbr

77,200.00

7

Atap Asbes Gel. Besar 80 x 180 x 5 mm

lbr

111,100.00

8

Atap Seng Gelombang 80 cm x 180 cm x 3 mm

lbr

62,900.00

9

Atap Seng Gelombang 80 cm x 180 cm x 5 mm

lbr

83,100.00

10

Atap Seng Gelombang 270 cm x 105 cm x 4mm

lbr

73,300.00

11

Atap Seng Gelombang 240 cm x 105 cm x 4mm

lbr

65,900.00

12

Atap Seng Gelombang 210 cm x 105 cm x 4mm

lbr

58,500.00

13

Atap Seng Gelombang 150 cm x 105 cm x 4mm

lbr

42,300.00

14

Atap Seng Gelombang 150 cm x 102 cm x 5mm

lbr

78,500.00

15

Atap Seng Gelombang 180 cm x 102 cm x 5mm

lbr

97,200.00

Atap Asbes Gelombang 300 cm x 105 cm x 4 mm Atap Tegola Kubota, lengkap Atap Tegola Kwalitas Sedang Alumunium Foile Atap Genteng Plentong pres Bakar KW I

lbr

80,000.00

m2 m2 m2

487,100.00 283,600.00 19,600.00

bh

1,900.00

21

Atap Genteng Plentong pres Molen Oven KW I

bh

2,700.00

22

Atap Genteng Flam pres Molen Oven Jatiwangi

bh

2,300.00

23

Bubung Genteng pres Bulat Ex Jatiwangi

bh

7,500.00

16 17 18 19 20

bh

4,800.00

25 26 27

Genteng Bubungan Ex Jatiwangi Segi Tiga Genteng Bubungan Beton Genteng Metal ( Rainbow Roof ) Genteng Metal Hana

bh m2 m2

10,500.00 203,100.00 172,700.00

28

Nok Atas Metal ( Rainbow Roof )

lbr

138,500.00

29

Nok Atas Metal Hana Nok Pingir Metal ( Rainbow Roof )

lbr

80,900.00

lbr

105,300.00

24

30

31 32 33 34 35 36 37

Nok Pingir Metal Hana Wall Flasing ( Rainbow Roof ) Wall Flasing Hana Atap Genteng Beton Warna 14.5/m2 Genteng Beton Natural Sirap Kelas I ( 80 / m2 ) Genteng Keramik Natural Intan 14.5 / m2

lbr lbr lbr

100,800.00 83,900.00 88,700.00

m2

96,700.00

bh m2

8,500.00 26,400.00

m2

112,400.00

38

Genteng Keramik Glasur Standard 14.5 /m2

m2

142,200.00

39

Genteng Keramik Glasur Special 14.5 /m2

m2

139,300.00

40

Genteng Keramik Glasur Premium 14.5 /m2

m2

145,100.00

41

Genteng Murando Natural 1m2 = 18 bh

bh

2,700.00

bh

4,000.00

43 44 45 46 47 48 49 50 51

Genteng Murando Glasur 1m2 = 18 bh Bubung Murando Natural Bubung Murando Glasur Bubungan Genteng Keramik Atap Genteng Kodok Bubungan Genteng Kodok Bubungan Genteng Plentong Bubungan Stel Gelombang Nok Stel Gelombang Nok Atap Seng

bh bh bh bh bh bh bh lbr lbr

7,500.00 10,700.00 10,000.00 3,000.00 4,500.00 6,000.00 7,500.00 38,100.00 37,500.00

52

Nok standar 40 cm 18, SWG 22

m2

75,000.00

53 54

Pelat Asbes tebal 4 mm Pelat Asbes tebal 3.5 mm Trusses ZAM-75 t=0.8 Rangka Utama

lbr lbr

21,000.00 16,400.00

m1

34,500.00

m1

22,000.00

m1

11,000.00

m1 bh m1 bh

7,200.00 2,200.00 1,700.00 7,200.00

42

55 56 57 58 59 60 61

Trusses ZAM-75 t=0.5 Rangka Utama Reng 16-DB Roof Battens t=0.48 mm Foot Plate t= 1.22 mm PLD - Diafragma Plate WIND Bracing Tensioner ( Pengaku Tali angin )

N 1

BAHAN MEKANIKAL Jockey Pump kap. 80 gln/menit 100 m1 ( 18.6 kW )

unit

71,396,400.00

2

Electrical Pump kap. 750 gln/menit 120 m1 ( 90 kW )

unit

216,358,900.00

3

Diesel Pump kap. 750 gln/menit 120 m1 ( 105 kW )

unit

591,647,100.00

4

Presure Tank kap. 500 liter lengkap

unit

36,997,300.00

unit

6,854,400.00

unit

4,866,100.00

6

Hydran Box dlm Gedung ( Lengkap ) Fire House 1.5 x 30 m + nose

7

Exhose Fan H 360 W 60 x 60 cm

unit

6,862,900.00

8

Exhose Fan H 380 W CFM 55 x 55 cm

unit

5,491,100.00

9

Exhose Fan H 100 W 40 x 40 cm

unit

1,092,600.00

10

AC Split 3 PK Setara TOSHIBA

unit

30,791,800.00

11

AC Split 2 PK Setara TOSHIBA

unit

21,926,500.00

12

AC Split 1 PK Setara TOSHIBA

unit

5,174,100.00

13

Mesin AC Split DAIKIN ( Indoor 1 BTU / Outdoor Unit )

5

O 1

BAHAN ELEKTRIKAL Kabel NYA 1 x 1.5 Prima ( 1 rol = 50 m' )

4,200,000.00

ROLL

102,700.00 151,700.00

2

Kabel NYA 1 x 2.5 Prima ( 1 rol = 50 m' )

ROLL

3

Kabel NYM 2 x 1.5 Prima ( 1 rol = 50 m' )

m'

6,600.00

4

Kabel NYM 3 x 1.5 Prima ( 1 rol = 50 m' )

m'

7,600.00

5

Kabel NYM 2 x 2.5 Prima ( 1 rol = 50 m' )

m'

4,900.00

6

Kabel NYM 3 x 2.5 Prima ( 1 rol = 50 m' )

m'

10,900.00

7

Kabel NYM 4 x 2.5 Prima ( 1 rol = 50 m' )

m'

7,600.00

8

Kabel NYM 2 x 4 Prima ( 1 rol = 50 m' )

m'

6,300.00

9

Kabel NYM 3 x 4 Prima ( 1 rol = 50 m' )

m'

15,400.00

10

Kabel NYM 4 x 4 Prima ( 1 rol = 50 m' )

m'

20,700.00

11

Kabel NYM 2 x 6 Supreme ( 1 rol = 50 m' )

m'

11,800.00

12

Kabel NYM 3 x 6 Supreme ( 1 rol = 50 m' )

m'

13,700.00

13

Kabel NYM 4 x 6 Supreme ( 1 rol = 50 m' )

m'

18,600.00

14

Kabel NYM 2 x 10 Supreme ( 1 rol = 50 m' )

m'

17,600.00

15

Kabel NYM 3 x 10 Supreme ( 1 rol = 50 m' )

m'

119,700.00

16

Kabel NYM 4 x 10 Supreme ( 1 rol = 50 m' )

m'

26,500.00

17

Kabel NYM 4 x 16 Supreme ( 1 rol = 50 m' )

m'

29,700.00

18

Kabel NYY 2 x 4 Supreme ( 1 rol = 50 m' )

m'

12,000.00

19

Kabel NYY 3 x 4 Supreme ( 1 rol = 50 m' )

m'

19,300.00

20

Kabel NYY 4 x 4 Supreme ( 1 rol = 50 m' )

m'

23,800.00

21

Kabel NYY 2 x 6 Supreme ( 1 rol = 50 m' )

m'

14,500.00

22

Kabel NYY 3 x 6 Supreme ( 1 rol = 50 m' )

m'

19,200.00

23

Kabel NYY 4 x 6 Supreme ( 1 rol = 50 m' )

m'

18,500.00

24

Kabel NYY 2 x 10 Supreme ( 1 rol = 50 m' )

m'

20,400.00

25

Kabel NYY 3 x 10 Supreme ( 1 rol = 50 m' )

m'

25,800.00

26

Kabel NYY 4 x 10 Supreme ( 1 rol = 50 m' )

m'

35,500.00

m'

41,900.00

bh bh

841,900.00 2,182,600.00

27 28 29

Kabel NYY 4 x 16 Supreme ( 1 rol = 50 m' ) NSFB FUJI EA - 100 A NSFB FUJI EA - 150 A

30 31 32 33 34 35 36 37

Rumah Panel 30 x 60 cm ( Kosong ) Skring Kas 2 grop Biasa Skring Kas 3 grop Biasa Skring Kas 5 grop Biasa MCB 1 PAS MCB 3 PAS Tahanan 50 A Merk Fuji Saklar Broko Tunggal Standard ( 1 Phase )

unt

153,500.00

unt unt unt bh bh bh

204,800.00 222,600.00 468,800.00 55,100.00 106,000.00 521,100.00

bh

23,800.00

38

Saklar Broko Seri Standard ( 1 Phase )

bh

26,300.00

39

Stop Kontak Broko Standard ( 1 Phase )

bh

23,800.00

40

Stop Kontak Broko 3 Phase (Out Bow)

bh

87,700.00

bh

144,900.00

bh

87,800.00

ttk

179,600.00

41 42 43

Stop Kontak Broko 3 Phase ( In Bow) Stop Kontak Handle 3 Phase Instalas Titik Lampu / Stop Kontak (Upah dan Alat)

44

Lampu pijar 25 Watt s/d 100 Watt

bh

61,200.00

45 46 47 48 49 50 51 52

Lampu Neon Phillips 20 Watt Lampu Neon Phillips 40 Watt Trapo TL 20 W (Phillips) Trapo TL 40 W (Phillips) Trapo TL 20 W (Sinar) Trapo TL 40 W (sinar) Stater Neon Phillips Stater Neon Biasa Rumah TL In Bow / Out Bow 2 x 20 W (kosongan) Down Light + SL 25 W Lampu SL Philip 25 W Lampu Sirkel TL 20 W Lengkap Lampu Mercuri 80 W Lampu Taman + Tiang + Lampu 1 Buah Lampu Baret 30 cm + Neon Lampu Neon Arcrilik 2 x 40 W Lengkap Jarum Penangkal Petir 16

bh bh bh bh bh bh bh bh

29,700.00 35,200.00 41,800.00 37,900.00 40,600.00 41,300.00 8,300.00 6,500.00

bh

144,000.00

bh bh bh bh

306,900.00 306,900.00 67,900.00 147,400.00

bh

307,600.00

bh

221,700.00

bh

738,000.00

bh

101,500.00

53 54 55 56 57 58 59 60 61

62 63 64

Kawat BC ( Tembaga ) Pentanahan Penangkal Petir Pentanahan Panel

P

BAHAN ALAT PENGANTUNG DAN KUNCI

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Kunci Silinder ALFA untuk Pintu Alumunium Tarikan Pintu Alumunium Kunci 2 Slaag ROYAL Rel Henderson Lengkap Rel maraton I Pintu Kunci 2 Slaag Silinder SEIS Asli type 210 s/d type 226 Kunci 2 Slaag Ancor Asli Kunci 2 Slaag ISO Kunci KM Bulat Kualitas Biasa Kunci kM Bulat ALFA Kunci 2 Slaag Silinder Utama Standard Kunci Gembok Besar Kunci 2 Slaag Kuda Terbang Kunci Lemari Espangolet Grendel 15 cm Grendel 5 cm Hak Angin Kait Jendela Biasa Hak Angin Jendela Antik Hak Angin Sendok Stainless / Kuningan Sloot Pintu Berikut Rantai Sloot Jendela Tunggal Engsel Pintu Unilon Standard Engsel Jendela Unilon Engsel Patrun Engsel Harmonika Door Closer Kelas Standard ( Kelas Sedang ) Door Closer Kelas Standard ( Kelas Baik ) Door Closer Kelas Rendah Door Holder Door Stoper

kg ttk ttk

65,100.00 423,700.00 296,100.00

bh

410,900.00

bh bh bh unt

408,600.00 126,500.00 864,300.00 193,100.00

bh

335,900.00

bh bh bh bh

165,300.00 207,300.00 54,400.00 102,700.00

bh

586,600.00

bh bh bh ps bh bh ps ps

85,200.00 94,500.00 46,800.00 51,600.00 49,800.00 5,500.00 7,100.00 29,000.00

bh

32,200.00

bh bh ps ps ps m1

31,500.00 33,000.00 21,000.00 15,000.00 13,700.00 9,100.00

unt

420,000.00

unt

597,500.00

unt unt unt

200,000.00 205,400.00 255,500.00

32

bh

19,500.00

m1

43,500.00

m1

53,500.00

lbr lbr m1

86,900.00 50,100.00 57,900.00

kg kg kg

12,459.00 12,459.00 10,890.00

ton

1,348,300.00

ton

1,200,200.00

ton

1,666,900.00

1 2 3

BAHAN PENGISAP AIR SUMUR DALAM Pompa Kodok Pompa Dragon Tegal Pompa Dragon Asli

unit unit unit

172,600.00 243,800.00 718,500.00

4

Mesin Pompa Air 100 W - Sanyo

unit

1,100,200.00

5

Mesin Pompa Air 150 W - Sanyo

unit

1,890,700.00

6

Pompa Zet Pump 250 W - Sanyo

unit

4,961,500.00

7

Pompa Zet Pump 450 W - Sanyo

unit

7,878,000.00

unit

27,151,200.00

unit

15,702,700.00

10

Deep Well dengan kelengkapannya kap. 150 liter / menit

unit

172,052,500.00

11

Hand Oil Pump

unit

5,195,300.00

S

BAHAN PENAMPUNG AIR

33 34 35 36 37 Q 1 2 3 4 5 6

R

8 9

Tarikan Almari Rata-rata Seng BJLS 30 Lebar 60 cm ( 1 rol 50 m' ) Seng BJLS 30 Lebar 90 cm ( 1 rol 50 m' ) Seng BJLS 30 / 3 x 0.3 mm Seng Plat Waterstop Lebar 200 mm BAHAN PENGIKAT UNTUK KONSTRUKSI JALAN Aspal Bitumen Aspal Emulsi Aspal Curah Aspal Concrete / Laston( AC -WC) Aspal Threated Base ( ATB ) Lataston /Hot Rolls Sheet ( HRS )

Pompa Submersible kap. 150 liter / menit 3 KW Gear Pump Kap. 60 liter / menit

1

Tangki Air Fiber Glass 0.5 m3 ( Excel )

bh

1,172,500.00

2

Tangki Air Fiber Glass 1 m3 ( Excel )

bh

1,316,400.00

bh

1,954,200.00

bh bh bh

255,300.00 118,500.00 161,100.00

bh bh bh bh bh bh

39,300.00 24,500.00 41,400.00 50,100.00 12,300.00 41,700.00

bh

101,000.00

bh

37,800.00

m

1,600.00

bh

88,200.00

lt m3 lt lt lt lt lt 15 kg 15.1 kg btl btl kg ltr Gln kg kg

18,000.00 151,100.00 28,435.00 7,150.00 7,800.00 3,300.00 55,000.00 104,600.00

3 4 5 6 T 1 2 3 4 5 6 7 8 9 10

Tangki Air Fiber Glass 2 m3 ( Excel ) Bak KM Fiber 60 x 60 Bak Taraso WC 40 x 40 Bak KM Taraso 60 x 60 ALAT TUKANG Palu 0.5 kg Cangkul Singkup Sekrop Pengki Linggis Rool Meter 30 meter ( Bahan Plastik ) Rool Meter 5 meter ( Bahan Besi ) Selang Plastik untuk Water Pas dia. 0.5 cm Water Pas Alumunium 60 cm

1 2 3 4 5 6 7 8

BAHAN BAKAR DAN PELUMAS Minyak Tanah Kayu Bakar dari Kayu Karet Bahan Bakar Residu Minyak Solar Bensin Premium Plus Oil Oil Mesran 40 SAE Elpiji / botol

9

Asitilin / Botol

10 11 12 13 14 15

Angin ( O2 ) / botol Karbit Minyak Bekisting Rapidrant Soda Api Sabun

U

88,900.00 66,400.00 19,400.00 40,500.00 15,700.00 35,600.00 2,400.00

16 17

Arang Kayu Kawat Las

kg bh

11,100.00 1,400.00

V 1 2

BAHAN PAGAR Panel Beton Pracetak Kolom Beton Pracetak

lbr btg

199,200.00 264,000.00

B. 1 2 3 4 5

BIDANG PERTAMANAN Aglonema Bambu krisik/jepang Furadan Kompos/pupuk kandang M atoa (2 m) Palm (botol, ekor tupai, putri, dll) tinggi 2 m Philo Pohon pelindung (angsana, mahoni, kamboja dll) tinggi 2m

batang batang kg karung batang

50,000.00 50,000.00 24,000.00 25,000.00 40,000.00

batang

100,000.00

batang

75,000.00

batang

25,000.00

6 7 8 9 10

Pohon perdu (kaca piring, puring, batang mawar, melati, dll) Rumput gajah mini m2

harga sudah termasuk PPN dan keuntungan

10,000.00 15,000.00

5,150 300,000 58.25