PEMERINTAH KOTA KEDIRI DINAS PEKERJAAN UMUM HARGA SATUAN POKOK BARANG DAN JASA

DAU TAHUN ANGGARAN 2014 A. HARGA SATUAN BAHAN No.

URAIAN

SAT.

HARGA SATUAN

1

Pasir urug

m3

65,000.00

2

Pasir pasang/Pasir beton

m3

130,000.00

3

Pasir batu

m3

68,800.00

4

Tanah urug

m3

55,000.00

5

Tanah katel

m3

56,100.00

6

Tanah sirtu

m3

76,300.00

7

Batu bata merah kelas I

bh

600.00

8

Kapur pasang

m3

440,000.00

9

Ijuk

kg

27,500.00

10

Semen PC (Gresik) @ 40 kg.

KG

1,750.00

11

Semen putih

kg

2,000.00

12

Semen berwarna

kg

13,600.00

13

Semen merah

m3

66,000.00

14

Batu pecah 20/20 cm.

m3

148,500.00

15

Batu belah 15/20 cm.

m3

180,000.00

16

Batu pecah 5/7 cm.

m3

179,700.00

17

Batu pecah 4/6 cm.

m3

167,800.00

18

Batu kali pecah 3/5 cm.

m3

209,200.00

19

Batu cor/koral beton 2/3 cm.

m3

250,000.00

20

Batu pecah 1/2 cm.

m3

244,800.00

21

Batu pecah 0,5/1 cm.

m3

253,000.00

22

Marmer bakar

m2

100,900.00

23

Batu ampyang kemas

kg

3,000.00

24

Batu kupang warna

kg

3,000.00

25

Batu palimanan

m2

115,800.00

26

Besi beton ulir

kg

13,400.00

27

Besi beton polos

kg

11,700.00

28

Kawat ikat beton

kg

25,000.00

29

Besi beugel/baut 25 cm. f 12 mm.

bj

6,600.00

30

Besi profil WF

kg

12,500.00

31

Besi plat strip

kg

32

Besi plat bordes 2,3 mm.

lbr

33

Besi profil WF <= 200 mm.

kg

12,500.00

34

Besi profil WF <= 200 mm. s/d 400 mm.

kg

12,500.00

35

Besi siku L 30,30,3 mm.

ljr

18,700.00

36

Besi siku L 40,40,4 mm.

ljr

48,000.00

37

Besi siku L 60,60,6 mm.

ljr

53,000.00

38

Elektroda baja/kawat las baja (RB)

kg

33,000.00

39

Kawat nyamuk kasa aluminium

m2

50,500.00

40

Kawat duri pagar

roll

41

Tiang pagar BRC 2" tinggi 1,5 m.

btg

-

42

Pagar BRC 1,2x2,4 m.

unit

-

43

Pintu dorong BRC 1,2x3,0 m.

unit

-

44

Pintu swing ganda BRC 1,2x3,0 m.

unit

-

45

Pagar besi komplit aksesoris

m2

517,000.00

46

Pintu pagar besi komplit aksesoris

m2

550,000.00

47

Pintu rolling door alumunium (Alexindo)/setara

m2

522,500.00

48

Pintu harmonika

m2

750,000.00

49

Kosen jendela polos aluminium (Alexindo)/setara

m'

99,000.00

50

Kosen jendela alur aluminium (Alexindo)/setara

m'

99,000.00

51

Kosen pintu polos aluminium (Alexindo)/setara

m'

99,000.00

52

Kosen pintu alur aluminium (Alexindo)/setara

m'

99,000.00

19,400.00 -

83,600.00

53

Karet kusen alumunium/profil kaca

m'

5,500.00

HSPBJ 2014/Dinas PU Kota Kediri/Hal. 1#6

No.

URAIAN

SAT.

HARGA SATUAN

54

Pintu kaca rangka aluminium

unit

1,540,000.00

55

Jendela kaca rangka aluminium

unit

770,000.00

56

Aluminium strip

m'

-

57

Pipa hollow aluminium (1 x 3) cm

m'

-

58

Besi hollow (2x4) cm

m

59

Besi hollow (4x4) cm

m

60

Besi hollow (5x5) cm

m

-

61

Besi hollow (6x6) cm

m

-

62

Sealant

63

Fixer skrup

bh

600.00

64

Atap polycarbonat rangka stainless steel

m2

715,000.00

65

Atap polycarbonat rangka hollow

m2

66

Atap zincalum t.0,40 (terpasang)

m2

67

Kayu dolken f 8-10 cm.

bt

169,200.00

68

Kayu jati balok 8/12 cm.

m3

18,700,000.00

69

Kayu jati usuk 5/7 cm.

m3

16,115,000.00

70

Kayu jati reng 3/5 cm.

m3

16,104,000.00

71

Kayu jati papan

m3

19,250,000.00

72

Kayu kamper balok 8/12 cm.

m3

7,500,000.00

73

Kayu kamper usuk 5/7 cm.

m3

7,500,000.00

74

Kayu kamper reng 3/5 cm.

m3

7,500,000.00

75

Kayu kamper papan

m3

7,500,000.00

76

Kayu kruing balok 8/12 cm.

m3

6,500,000.00

77

Kayu kruing usuk 5/7 cm.

m3

6,500,000.00

78

Kayu kruing reng 3/5 cm.

m3

6,500,000.00

79

Kayu kruing papan

m3

6,500,000.00

80

Kayu meranti balok 8/12 cm.

m3

5,225,000.00

81

Kayu meranti usuk 5/7 cm.

m3

4,620,000.00

82

Kayu meranti reng 3/5 cm.

m3

5,280,000.00

83

Kayu meranti papan

m3

5,021,500.00

84

Kayu meranti bekisting

m3

4,400,000.00

85

List kayu profil

m'

6,100.00

86

Kayu bakar

m3

1,246,700.00

87

Gedek guling

m2

16,500.00

88

Bambu f 10-12 cm. pj. 6 m.

bt

21,200.00

89

Teakwood 110x210x4 mm.

lbr

71,500.00

90

Teakwood 122x244x4 mm.

lbr

99,000.00

91

Plywood 122x244x4 mm.

lbr

60,700.00

92

Woodplank (20 x 400 x 1) cm

lbr

68,200.00

93

Woodplank (30 x 400 x 1) cm

lbr

78,300.00

94

Triplek 122x244x9 mm.

lbr

125,200.00

95

Triplek 90x200x4 mm.

lbr

53,900.00

96

Triplek 110x210x4 mm.

lbr

71,500.00

97

Triplek 120x240x4 mm.

lbr

71,700.00

98

Triplek 122x244x4 mm.

lbr

72,800.00

99

Eternit gresik

m2

16,200.00

100

Asbes gelombang bsr. (3,05x1,05) tb. 5 mm setara Gresik

lbr

123,800.00

101

Asbes gelombang kcl. (3,05x1,05) tb. 4 mm setara Gresik

lbr

96,300.00

102

Asbes wuwung gelombang bsr. 5 mm.

psg

79,400.00

103

Asbes wuwung gelombang kcl. 4 mm.

psg

37,400.00

104

Seng gelombang BJLS 30 (1,8x0,9) m.

lbr

79,600.00

105

Seng datar BJLS 30 (0,9x1,0) m.

lbr

29,700.00

106

Genteng kodok (ex. Trenggalek)

bj

2,800.00

107

Genteng wuwung kodok (ex. Trenggalek )

bj

5,500.00

108

Genteng mantili

bj

3,300.00

11,000.00 15,400.00

tube

24,200.00

660,000.00 -

109

Genteng wuwung mantili

bj

7,200.00

110

Genteng beton

bj

3,300.00

111

Genteng wuwung beton

bj

5,900.00

112

Paku biasa

kg

17,000.00

113

Paku pancing

kg

25,300.00

114

Paku asbes/ulir

bh

319.00

115

Paku seng payung

bj

125.00

HSPBJ 2014/Dinas PU Kota Kediri/Hal. 2#6

No.

URAIAN

SAT.

HARGA SATUAN

116

Paku sumbat

bj

117

Paku skrup

bh

400.00

118

Glass blok

bh

20,300.00

119

Roster merah

bh

7,300.00

120

Paving stone abu-abu persegi

m2

47,000.00

121

Paving stone abu-abu segi enam tebal 6 cm.

m2

41,100.00

122

Paving stone merah segi enam tebal 6 cm.

m2

44,000.00

123

Paving stone abu-abu persegi K.300

m2

66,300.00

124

Tegel keramik uk. 20 x 20 cm.

m2

50,000.00

125

Tegel keramik uk. 30 x 30 cm.

m2

60,000.00

126

Tegel keramik uk. 40 x 40 cm.

m2

70,000.00

127

Tegel keramik uk. 20 x 25 cm.

m2

55,000.00

128

Uskup K-300

bj

55,000.00

129

Uskup K-200

bj

49,500.00

130

Buis beton f 15 cm.

bh

55,000.00

131

Buis beton f 25 cm.

bh

65,000.00

132

Buis beton f 30 cm.

bh

75,000.00

133

Buis beton f 40 cm.

bh

85,000.00

134

Buis beton f 50 cm.

bh

95,000.00

135

Buis beton f 60 cm.

bh

105,000.00

136

Buis beton f 80 cm.

bh

125,000.00

137

Buis beton f 100 cm.

bh

140,000.00

138

Buis beton U 40 cm.

bh

32,600.00

139

Buis beton U 50 cm.

bh

39,600.00

140

Pipa PVC 1/2" Maspion AW

m'

6,000.00

141

Pipa PVC 3/4" Maspion AW

m'

7,150.00

142

Pipa PVC 1" Maspion AW

m'

8,950.00

143

Pipa PVC 1,5" Maspion AW

m'

15,600.00

144

Pipa PVC 2" Maspion D

m'

12,250.00

145

Pipa PVC 3" Maspion D

m'

23,625.00

146

Pipa PVC 4" Maspion D

m'

32,800.00

147

Pipa PVC 5" Maspion D

m'

68,200.00

148

Keni PVC 1/2"

bh

1,200.00

149

Keni PVC 3/4"

bh

1,800.00

150

Keni PVC 2"

bh

5,500.00

151

Keni PVC 3"

bh

9,400.00

152

Keni PVC 4"

bh

15,800.00

153

Keni PVC 5"

bh

30,800.00

154

Klem pipa PVC

bh

11,500.00

155

Tandon air fiberglass kap. 1100 ltr. (Pinguin)

bh

1,650,000.00

156

Kaca polos tb. 3 mm.

m2

89,900.00

157

Kaca polos tb. 5 mm.

m2

100,900.00

158

Kaca ray band tb. 5 mm.

m2

119,900.00

159

Kaca nako krepyak dan kerangka

m2

71,500.00

160

Cat besi emco

kg

70,000.00

161

Cat kayu emco

kg

70,000.00

162

Cat meni cap pedang

kg

40,000.00

163

Cat tembok (Decolith)/sejenis

kg

20,000.00

164

Cat plincute (Avian)/sejenis

kg

59,400.00

165

Plamir tembok

kg

18,800.00

166

Plamir kayu

kg

25,000.00

167

Thinner B (minyak cat)

lt

18,000.00

168

Politur

lt

58,800.00

169

Lem (Rajawali)

bks

13,000.00

170

Lem kayu (Fox)

kg

39,100.00

171

Kertas gosok

lbr

3,800.00

172

Engsel H

stl

8,700.00

173

Engsel kuningan (Arch)

stl

32,900.00

174

Grendel

bh

27,500.00

175

Grendel kuningan/krom

bh

36,900.00

176

Grendel tanam

bh

37,200.00

177

Kunci gembok besar

bh

48,100.00

HSPBJ 2014/Dinas PU Kota Kediri/Hal. 3#6

No.

URAIAN

SAT.

HARGA SATUAN

178

Kunci gembok sedang

bh

21,600.00

179

Kunci tanam 808

bh

13,200.00

180

Kunci tanam km/wc

bh

41,800.00

181

Kunci tanam (Kuda Terbang)

bh

63,800.00

182

Kunci selot

bh

115,500.00

183

Handle Pintu stainless steel

bh

143,000.00

184

Hak angin

bj

13,600.00

185

Hak angin sikutan

stl

24,000.00

186

Hak angin lurus (stel maju/mundur)

stl

22,600.00

187

Selang spiral saluran kran

set

55,000.00

188

Closet duduk porselin (monoblock)

bh

1,306,300.00

189

Closet jongkok porselin (INA)

bh

139,800.00

190

Kran air

bh

24,800.00

191

TBA/isolasi

rol

5,200.00

192

Wastafel besar

bh

209,000.00

193

Watermur

bh

19,000.00

194

Sifon wasser

set

138,600.00

195

Floor drain

bh

38,500.00

196

Septictank Bio Filter Kapasitas 0,75 M3

bh

2,750,000.00

197

Septictank Bio Filter Kapasitas 1 M3

bh

3,531,000.00

198

Septictank Bio Filter Kapasitas 1,5 M3

bh

4,400,000.00

199

Septictank Bio Filter Kapasitas 2 M3

bh

5,335,000.00

200

Septictank Bio Filter Kapasitas 3 M3

bh

8,382,000.00

201

Septictank Bio Filter Kapasitas 4 M3

bh

23,793,000.00

202

Sumur peresap

bh

29,425.00

203

Fitting plafon

set

32,300.00

204

T dos PVC

set

1,300.00

205

Isolator

bh

16,500.00

206

Stop kontak (Broco)

bh

16,300.00

207

Skakelar tunggal (Broco)

bh

13,700.00

208

Zekering SPA 60 A

bh

33,000.00

209

Panel box 290 x 30 cm

bh

220,000.00

210

Lampu TL 20 W komplit (Philips)

bh

70,600.00

211

Lampu Tl 40 W komplit (Philips)

bh

87,100.00

212

Lampu pijar

bh

22,000.00

213

Kabel NYA 500 V 1x2,5 mm.

m'

6,600.00

214

Kabel NYA 450-750 V 1x1,5 mm.

m'

7,200.00

215

Kabel NYA 450-750 V 1x2,5 mm.

m'

9,900.00

216

Pompa air Nasional GP 125 JB l/dt

bh

1,595,000.00

217

Pompa air Gold Star 10 KPOa 185 l/dt

bh

1,760,000.00

218

Pompa tangan

bh

220,000.00

219

Premium (industri)

ltr

13,800.00

220

Minyak solar (industri)

ltr

13,750.00

221

Minyak tanah (industri)

ltr

14,300.00

222

Minyak bakar (industri)

ltr

12,700.00

223

Olie (Meditran SX 15W/40)/setara

ltr

36,300.00

224

Olie (Mesran Super)/setara

ltr

36,300.00

225

Residu

ltr

2,200.00

226

Minyak bekisting

ltr

7,300.00

227

Thermoplast

kg

69,740.00

228

Glass beads

kg

20,900.00

229

Rumput taman

m2

33,000.00

230

Rumput gebal

m2

35,200.00

231

Bak mandi fiberglass

bh

425,400.00

232

Bak cuci piring stainles steel

bh

220,000.00

233

Sabun cream

kg

8,300.00

234

Kuas 4" eterna

bh

21,500.00

235

Pasang pintu KM/WC PVC

unit

260,500.00

236

Pipa galvanis 1/2" (BSA)

ljr

153,750.00

237

Pipa galvanis 3/4" (BSA)

ljr

199,400.00

238

Pipa galvanis 1" (BSA)

ljr

286,000.00

239

Pipa galvanis 1 1/4" (BSA)

ljr

367,700.00

HSPBJ 2014/Dinas PU Kota Kediri/Hal. 4#6

No.

URAIAN

SAT.

HARGA SATUAN

240

Pipa galvanis 1 1/2" (BSA)

ljr

405,900.00

241

Pipa galvanis 2" (BSA)

ljr

589,600.00

242

Pipa galvanis 2.5" (BSA)

ljr

765,050.00

243

Pipa galvanis 3" (BSA)

ljr

244

Pipa galvanis 4" (BSA)

ljr

245

Batu candi

m2

113,700.00

246

Roof light fiberglass 0.85 x 2.50 m.

lbr

132,000.00

247

Skakelar ganda (Broco)

bh

16,800.00

248

Soda api

kg

13,700.00

249

Cerlak

ltr

46,800.00

250

Gypsum board (120 x 240) cm tbl. 9 mm setara Elephant

lbr

71,500.00

251

List gypsum profil 10 cm.

m'

9,900.00

252

Urinoir

bh

751,300.00

253

Door holder

stel

58,300.00

254

Door stop

bh

27,500.00

255

Kunci silinder

bh

56,900.00

256

Nok genteng beton

bh

10,560.00

257

Wallpaper lbr. 50 cm. (Contract Paper)

m'

66,000.00

258

Porselin dinding 11 x 11 cm.

m2

3,300.00

259

Karpet

m2

260

Ubin PC abu-abu 20 x 20 cm.

bh

261

Ubin PC warna 20 x 20 cm.

bh

3,410.00

262

Plint ubin PC abu-abu 10 x 20 cm.

bh

1,760.00

263

Plint ubin PC warna 10 x 20 cm.

bh

2,090.00

264

Baja ringan mutu tinggi profil C 75.100

m'

34,375.00

265

Baja ringan mutu tinggi profil C 75.75

m'

26,125.00

266

Reng (batten)

m'

16,500.00

267

Screw

bh

500.00

268

Dynabolt

bh

1,700.00

269

Plat bracing

m'

7,500.00

270

Aspal curah (AC 60-70)

kg

11,200.00

271

Aspal drum kemas

kg

12,300.00

272

Grease

kg

65,000.00

273

Kawat galvanis

kg

17,600.00

274

Tang pemotong kawat

bh

32,900.00

275

Palu besar/bodem

bh

47,700.00

276

Pisau besar

bh

31,400.00

277

Keranjang

bh

14,500.00

278

Gergaji

bh

59,200.00

279

Ganco

bh

53,200.00

960,300.00 -

79,200.00 -

280

Sabit besar

bh

281

Kansteen 10.20.40 K-225 (terpasang)

m'

-

82,500.00

282

Kansteen 15.25.40 K-225 (terpasang)

m'

-

283

Kansteen 15.30.50 K-225 (terpasang)

m'

-

284

Kansteen 18.30.60 K-225 (terpasang)

m'

-

285

Keramik trotoar uk. 33,3 x 33,3 cm.

m2

-

286

Keramik mozaik 80 x 80 cm. (terpasang)

unit

-

287

Main Hole (cast iron) 70 x 70 cm. (terpasang)

unit

-

288

Box Culvert U 150.150.120.15 cm. dan

pcs

15,884,000.00

CU 150.20.120 cm. (terpasang) 289

Selang Pemadam

bh

-

290

Nozzle

bh

-

291

Fire man Shirt

bh

292

Sepatu Safeti

bh

-

293

Helm Pemadam

bh

-

294

"x" Conection

bh

-

295

Lampu SL 20 watt (phillips)

bh

-

296

Lampu SL 23 watt (phillips)

bh

82,500.00

50,800.00

HSPBJ 2014/Dinas PU Kota Kediri/Hal. 5#6

B. HARGA SATUAN UPAH TENAGA KERJA No.

URAIAN

SAT.

HARGA SATUAN (Rp.)

1

Mandor

org/hr

75,000.00

2

Kepala Tukang Batu

org/hr

70,000.00

3

Kepala Tukang Kayu

org/hr

70,000.00

4

Kepala Tukang Cat

org/hr

70,000.00

5

Kepala Tukang Besi

org/hr

70,000.00

6

Kepala Tukang Gali

org/hr

65,000.00

7

Kepala Tukang Listrik

org/hr

70,000.00

8

Kepala Tukang Pipa

org/hr

70,000.00

9

Kepala Tukang Taman

org/hr

70,000.00

10

Tukang Batu

org/hr

65,000.00

11

Tukang Kayu

org/hr

65,000.00

12

Tukang Cat

org/hr

65,000.00

13

Tukang Gali

org/hr

60,000.00

14

Tukang Besi

org/hr

65,000.00

15

Tukang Politur

org/hr

65,000.00

16

Tukang Aspal

org/hr

65,000.00

17

Tukang Pipa

org/hr

65,000.00

18

Tukang Listrik

org/hr

65,000.00

19

Tukang Taman

org/hr

65,000.00

20

Pembantu Tukang Batu

org/hr

50,000.00

21

Pembantu Tukang Kayu

org/hr

50,000.00

22

Pembantu Tukang Cat

org/hr

50,000.00

23

Pembantu Tukang Besi

org/hr

50,000.00

24

Pembantu Tukang Listrik

org/hr

50,000.00

25

Pembantu Tukang Pipa

org/hr

50,000.00

26

Tukang Bongkar

org/hr

50,000.00

27

Pekerja/Buruh tak terampil

org/hr

50,000.00

28

Buruh terampil

org/hr

50,000.00

29

Pengemudi/Sopir

org/hr

65,000.00

30

Pembantu Sopir

org/hr

45,000.00

31

Masinis

org/hr

45,000.00

32

Pembantu Masinis

org/hr

45,000.00

33

Mekanik

org/hr

45,000.00

34

Pembantu Mekanik

org/hr

45,000.00

35

Operator

org/hr

65,000.00

36

Pembantu Operator

org/hr

45,000.00

37

Penjaga malam

org/hr

60,000.00

38

Penjaga api

org/hr

45,000.00

Kediri, 2014 KEPALA DINAS PEKERJAAN UMUM KOTA KEDIRI

Ir. HADI WAHJONO, MM. Pembina Utama Muda NIP. 19630513 199202 1 002

HSPBJ 2014/Dinas PU Kota Kediri/Hal. 6#6

KOSONG

? ? ?

KOSONG KOSONG KOSONG KOSONG

?

Pasir urug

m3

50,400.00

Pasir pasang/Pasir beton

m3

116,500.00

Pasir batu

m3

111,500.00

Tanah urug

m3

45,000.00

Tanah katel

m3

49,350.00

Tanah sirtu

m3

59,000.00

Batu bata merah kelas I

bh

500.00

Kapur pasang

m3

561,750.00

Ijuk

kg

34,650.00

Semen PC (Gresik) @ 40 kg.

zak

56,400.00

Semen putih

kg

1,900.00

Semen berwarna

kg

5,500.00

Semen merah

m3

202,000.00

Batu pecah 20/20 cm.

m3

162,750.00

Batu belah 15/20 cm.

m3

168,000.00

Batu pecah 5/7 cm.

m3

-

Batu pecah 4/6 cm.

m3

143,500.00

Batu kali pecah 3/5 cm.

m3

176,400.00

Batu cor/koral beton 2/3 cm.

m3

202,000.00

Batu pecah 1/2 cm.

m3

217,500.00

Batu pecah 0,5/1 cm.

m3

250,740.00

Marmer bakar

m2

111,900.00

Batu ampyang kemas

kg

21,000.00

Batu kupang warna

kg

7,500.00

Batu palimanan

m2

93,000.00

Besi beton ulir

kg

12,800.00

Besi beton polos

kg

12,800.00

Kawat ikat beton

kg

21,500.00

Besi beugel/baut 25 cm. f 12 mm.

bj

12,810.00

Besi profil WF

kg

12,300.00

Besi plat strip

kg

13,850.00

Besi plat bordes 2,3 mm.

lbr

1,050,000.00

Besi profil WF <= 200 mm.

kg

17,000.00

Besi profil WF <= 200 mm. s/

kg

17,000.00

Besi siku L 30,30,3 mm.

ljr

99,000.00

Besi siku L 40,40,4 mm.

ljr

152,000.00

Besi siku L 60,60,6 mm.

ljr

200,000.00

Elektroda baja/kawat las baja

kg

31,000.00

Kawat nyamuk kasa aluminium

m2

25,000.00

Kawat duri pagar

roll

177,000.00

Tiang pagar BRC 2" tinggi 1,5

btg

128,850.00

Pagar BRC 1,2x2,4 m.

unit

365,000.00

Pintu dorong BRC 1,2x3,0 m.

unit

1,350,000.00

Pintu swing ganda BRC 1,2x3,

unit

1,250,000.00

Pagar besi komplit aksesoris

m2

450,000.00

Pintu pagar besi komplit akseso

m2

530,000.00

Pintu rolling door alumunium (

m2

530,000.00

Pintu harmonika

m2

1,250,000.00

Kosen jendela polos aluminium

m'

60,000.00

Kosen jendela alur aluminium (

m'

63,000.00

Kosen pintu polos aluminium (

m'

74,550.00

Kosen pintu alur aluminium (Al

m'

78,750.00

KOSONG KOSONG

Karet kusen alumunium/profil

m'

2,100.00

Aluminium strip

m'

8,500.00

60,000 100000 150000 275000

KOSONG KOSONG Sealant

tube

Fixer skrup

bh

36,750.00 400.00

Atap polycarbonat rangka stain

m2

785,000.00

KOSONG Kayu dolken f 8-10 cm.

bt

33,000.00

Kayu jati balok 8/12 cm.

m3

28,000,000.00

Kayu jati usuk 5/7 cm.

m3

17,500,000.00

Kayu jati reng 3/5 cm.

m3

17,500,000.00

Kayu jati papan

m3

28,000,000.00

Kayu kamper balok 8/12 cm.

m3

9,900,000.00

Kayu kamper usuk 5/7 cm.

m3

9,900,000.00

Kayu kamper reng 3/5 cm.

m3

9,900,000.00

Kayu kamper papan

m3

9,900,000.00

Kayu kruing balok 8/12 cm.

m3

7,000,000.00

Kayu kruing usuk 5/7 cm.

m3

7,000,000.00

Kayu kruing reng 3/5 cm.

m3

7,000,000.00

Kayu kruing papan

m3

7,000,000.00

Kayu meranti balok 8/12 cm.

m3

4,900,000.00

Kayu meranti usuk 5/7 cm.

m3

4,900,000.00

Kayu meranti reng 3/5 cm.

m3

4,900,000.00

Kayu meranti papan

m3

4,900,000.00

Kayu meranti bekisting

m3

4,100,000.00

List kayu profil

m'

3,300.00

Kayu bakar

m3

115,000.00

Gedek guling

m2

13,850.00

Bambu f 10-12 cm. pj. 6 m.

bt

17,000.00

Teakwood 110x210x4 mm.

lbr

93,000.00

Teakwood 122x244x4 mm.

lbr

135,250.00

Plywood 122x244x3 mm.

lbr

81,500.00

Triplek 122x244x9 mm.

lbr

155,400.00

Triplek 90x200x2,7 mm.

lbr

49,650.00

Triplek 110x210x4 mm.

lbr

Triplek 120x240x4 mm.

lbr

72,150.00

Triplek 122x244x4mm.

lbr

73,700.00

Eternit gresik

m2

17,850.00

Asbes gelombang bsr. (3,05x1,

lbr

115,500.00

Asbes gelombang kcl. (3,05x1,

lbr

89,250.00

Asbes wuwung gelombang bsr

psg

30,450.00

Asbes wuwung gelombang kcl.

psg

42,700.00

Seng gelombang BJLS 30 (1,8x

lbr

79,400.00

Seng datar BJLS 30 (0,9x1,0)

lbr

47,350.00

Genteng kodok (ex. Trenggale

bj

1,500.00

Genteng wuwung kodok (ex. Tr

bj

5,000.00

Genteng beton

bj

2,200.00

-

Genteng wuwung beton

bj

4,300.00

Paku biasa

kg

15,800.00

6,000 10,000 15,000 27,500

KOSONG

Paku pancing

kg

23,000.00

Paku asbes/ulir

bh

315.00

Paku seng payung

bj

125.00

Paku sumbat

bj

80.00

Paku skrup

bh

350.00

Glass blok

bh

20,000.00

Roster merah 20 x 20

bh

4,200.00

Paving stone abu-abu persegi

m2

34,125.00

367.5 Paving stone abu-abu segi ena

m2

38,325.00

Paving stone merah segi enam

m2

42,300.00

Paving stone K.300

m2

60,450.00

Tegel keramik uk. 20 x 20 cm.

m2

40,950.00

Tegel keramik uk. 30 x 30 cm.

m2

43,000.00

Tegel keramik uk. 40 x 40 cm.

m2

55,650.00

Tegel keramik uk. 20 x 25 cm.

m2

52,500.00

Buis beton f 15 cm.

bh

50,027.00

Buis beton f 20 cm.

bh

34,000.00

Buis beton f 30 cm.

bh

50,000.00

550 460

Buis beton f 40 cm.

bh

60,000.00

Buis beton f 50 cm.

bh

70,000.00

Buis beton U 15 cm.

bh

13,000.00

Buis beton U 20 cm.

bh

17,000.00

Buis beton U 30 cm.

bh

25,000.00

Buis beton U 40 cm.

bh

30,000.00

Buis beton U 50 cm.

bh

35,000.00

Pipa PVC 1/2" Maspion AW

m'

6,600.00

Pipa PVC 3/4" Maspion AW

m'

7,500.00

Pipa PVC 1" Maspion AW

m'

38,000.00

15585 Pipa PVC 1,5" Maspion AW

?

m'

39,000.00

Pipa PVC 2" Maspion D

m'

45,465.00

Pipa PVC 3" Maspion D

m'

77,000.00

Pipa PVC 4" Maspion D

m'

107,000.00

Pipa PVC 5" Maspion D

m'

150,000.00

Keni PVC 1/2"

bh

1,200.00

Keni PVC 3/4"

bh

2,100.00

Keni PVC 2"

bh

3,500.00

Keni PVC 3"

bh

7,980.00

Keni PVC 4"

bh

13,000.00

Keni PVC 5"

bh

30,000.00

Klem pipa PVC

bh

14,910.00

Tandon air fiberglass kap. 1100

bh

1,618,260.00

Kaca polos tb. 3 mm.

m2

78,750.00

Kaca polos tb. 5 mm.

m2

96,600.00

Kaca ray band tb. 5 mm.

m2

125,000.00

Kaca nako krepyak dan kerang

m2

350,000.00

Cat besi emco

kg

59,000.00

Cat kayu emco

kg

59,000.00

Cat meni cap pedang

kg

18,250.00

kg

15,000.00

Cat plincute (Avian)/sejenis

kg

40,000.00

Plamir tembok

kg

14,500.00

92680 Cat tembok (Decolith)/sejenis

3300 2760

?

Plamir kayu

kg

Thinner B (minyak cat)

lt

18,500.00 8,300.00

Politur

lt

45,000.00

Lem (Rajawali)

bks

12,500.00

Lem kayu (Fox)

kg

15,000.00

Kertas gosok

lbr

4,900.00

Engsel H

stl

9,000.00

Engsel kuningan (Arch)

stl

19,950.00

Grendel

bh

6,200.00

Grendel kuningan/krom

bh

11,500.00

Grendel tanam

bh

28,650.00

Kunci gembok besar

bh

31,800.00

Kunci gembok sedang

bh

16,600.00

Kunci tanam 808

bh

10,800.00

Kunci tanam km/wc

bh

37,550.00

Kunci tanam (Kuda Terbang)

bh

71,000.00

Kunci selot

bh

170,000.00

Hak angin

bj

5,000.00

Hak angin sikutan

stl

21,000.00

Hak angin lurus (stel maju/mu

stl

36,950.00

Selang spiral saluran kran

set

46,400.00

Closet duduk porselin (monobl

bh

1,280,000.00

Closet jongkok porselin (INA)

bh

125,000.00

Kran air

bh

25,000.00

TBA/isolasi

rol

2,500.00

Wastafel besar

bh

175,000.00

Watermur

bh

15,750.00

Sifon wasser

set

120,000.00

Floor drain

bh

21,000.00

Septictank Bio Filter Kapasitas

bh

1,690,000.00

Septictank Bio Filter Kapasitas

bh

3,050,000.00

Septictank Bio Filter Kapasitas

bh

3,750,000.00

Septictank Bio Filter Kapasitas

bh

4,600,000.00

Septictank Bio Filter Kapasitas

bh

7,250,000.00

Septictank Bio Filter Kapasitas

bh

20,600,000.00

Sumur peresap

bh

Fitting plafon

set

8,000.00

T dos PVC

set

8,100.00

Isolator

bh

5,000.00

Stop kontak (Broco)

bh

14,000.00

Skakelar tunggal (Broco)

bh

16,500.00

Zekering SPA 60 A

bh

7,250.00

Panel box 290 x 30 cm

bh

390,000.00

Lampu TL 20 W komplit (Philip

bh

56,000.00

Lampu Tl 40 W komplit (Philips

bh

100,800.00

Lampu pijar

bh

4,300.00

Kabel NYA 500 V 1x2,5 mm.

m'

3,200.00

Kabel NYA 450-750 V 1x1,5 m

m'

3,500.00

Kabel NYA 450-750 V 1x2,5 m

m'

3,750.00

Pompa air Nasional GP 125 JB l

bh

438,375.00

Pompa air Gold Star 10 KPOa 1

bh

1,190,000.00

Pompa tangan

bh

330,225.00

Premium (industri)

ltr

9,300.00

ltr

12,000.00

Minyak tanah (industri)

ltr

12,250.00

Minyak bakar (industri)

ltr

6,900.00

13750 Minyak solar (industri)

-

9,300.00 12,000.00 12,250.00 6,900.00

KOSONG

KOSONG

Olie (Meditran SX 15W/40)/set

ltr

39,000.00

Olie (Mesran Super)/setara

ltr

30,975.00

Residu

ltr

1,400.00

Minyak bekisting

ltr

6,300.00

Thermoplast

kg

60,350.00

Glass beads

kg

22,100.00

Rumput taman

m2

24,350.00

Rumput gebal

m2

9,600.00

Bak mandi fiberglass

bh

275,000.00

Bak cuci piring stainles steel

bh

175,000.00

Sabun cream

kg

7,500.00

Kuas 4"

bh

15,500.00

Pasang pintu KM/WC PVC

unit

383,250.00

Pipa galvanis 1/2" (BSA)

ljr

120,000.00

Pipa galvanis 3/4" (BSA)

ljr

163,900.00

Pipa galvanis 1" (BSA)

ljr

199,600.00

Pipa galvanis 1 1/4" (BSA)

ljr

257,150.00

Pipa galvanis 1 1/2" (BSA)

ljr

321,400.00

Pipa galvanis 2" (BSA)

ljr

702,500.00

Pipa galvanis 2.5" (BSA)

ljr

960,900.00

Pipa galvanis 3" (BSA)

ljr

1,031,625.00

Pipa galvanis 4" (BSA)

ljr

1,389,875.00

Batu candi

m2

101,220.00

Roof light fiberglass 0.85 x 2.

lbr

113,000.00

Skakelar ganda (Broco)

bh

19,550.00

Soda api

kg

19,000.00

Cerlak

ltr

24,500.00

Gypsum board (120 x 240) cm

lbr

70,000.00

List gypsum profil 10 cm.

m'

20,000.00

Urinoir

bh

290,000.00

Door holder

stel

245,000.00

Door stop

bh

16,500.00

Kunci silinder

bh

220,000.00

Nok genteng beton

bh

9,000.00

Wallpaper lbr. 50 cm. (Contrac

m'

22,000.00

Porselin dinding 11 x 11 cm.

m2

65,000.00

Karpet

m2

31,000.00

Ubin PC abu-abu 20 x 20 cm.

bh

2,950.00

Ubin PC warna 20 x 20 cm.

bh

3,250.00

Plint ubin PC abu-abu 10 x 20

bh

1,500.00

Plint ubin PC warna 10 x 20 cm

bh

1,750.00

Baja ringan mutu tinggi profil

m'

33,700.00

Baja ringan mutu tinggi profil

m'

25,500.00

Reng (batten)

m'

15,000.00

Screw

bh

500.00

Dynabolt

bh

2,000.00

Plat bracing

m'

7,500.00

Aspal curah (AC 60-70)

kg

2,000.00

Aspal drum kemas

kg

10,000.00

Grease

kg

65,000.00

Kawat galvanis

kg

15,000.00

Tang pemotong kawat

bh

19,000.00

Palu besar/bodem

bh

65,000.00

Pisau besar

bh

45,000.00

Keranjang

bh

16,000.00

Gergaji

bh

28,600.00

Ganco

bh

55,000.00

39,000.00 30,975.00

KOSONG KOSONG KOSONG KOSONG KOSONG KOSONG KOSONG

Sabit besar

bh

40,000.00

Kansteen 10.20.40 K-225 (ter

m'

47,500.00

Kansteen 15.25.40 K-225 (ter

m'

90,000.00

Kansteen 15.30.50 K-225 (ter

m'

88,000.00

Kansteen 18.30.60 K-225 (ter

m'

92,000.00

Keramik trotoar uk. 33,3 x 33,

m2

90,000.00

Keramik mozaik 80 x 80 cm. (t

unit

748,400.00

Main Hole (cast iron) 70 x 70

unit

1,316,700.00

Box Culvert U 150.150.120.15

pcs

8,334,000.00

CU 150.20.120 cm. (terpasang

KOSONG KOSONG KOSONG KOSONG KOSONG KOSONG

-

Woodplank (20 x 400 x 1) cm

lbr

60,000.00

Woodplank (30 x 400 x 1) cm

lbr

105,800.00

Handle Pintu stainless steel

bh

115,000.00

Selang Pemadam

bh

3,550,000.00

Nozzle

bh

9,000,000.00

Fire man Shirt

bh

9,000,000.00

Sepatu Safeti

bh

2,750,000.00

Helm Pemadam

bh

7,500,000.00

"x" Conection

bh

4,500,000.00

36000 5400

Mandor

org/hr

70,000.00

Kepala Tukang Batu

org/hr

70,000.00

Kepala Tukang Kayu

org/hr

70,000.00

Kepala Tukang Cat

org/hr

70,000.00

Kepala Tukang Besi

org/hr

70,000.00

Kepala Tukang Gali

org/hr

70,000.00

Kepala Tukang Listrik

org/hr

70,000.00

Kepala Tukang Pipa

org/hr

70,000.00

Kepala Tukang Taman

org/hr

70,000.00

Tukang Batu

org/hr

60,000.00

Tukang Kayu

org/hr

60,000.00

Tukang Cat

org/hr

60,000.00

Tukang Gali

org/hr

60,000.00

Tukang Besi

org/hr

60,000.00

Tukang Politur

org/hr

60,000.00

Tukang Aspal

org/hr

60,000.00

Tukang Pipa

org/hr

60,000.00

Tukang Listrik

org/hr

60,000.00

Tukang Taman

org/hr

60,000.00

Pembantu Tukang Batu

org/hr

40,000.00

Pembantu Tukang Kayu

org/hr

40,000.00

Pembantu Tukang Cat

org/hr

40,000.00

Pembantu Tukang Besi

org/hr

40,000.00

Pembantu Tukang Listrik

org/hr

40,000.00

Pembantu Tukang Pipa

org/hr

40,000.00

Tukang Bongkar

org/hr

35,000.00

Pekerja/Buruh tak terampil

org/hr

35,000.00

Buruh terampil

org/hr

45,000.00

Pengemudi/Sopir

org/hr

50,000.00

Pembantu Sopir

org/hr

35,000.00

Masinis

org/hr

50,000.00

0.00

Pembantu Masinis

org/hr

35,000.00

Mekanik

org/hr

50,000.00

Pembantu Mekanik

org/hr

35,000.00

Operator

org/hr

50,000.00

Pembantu Operator

org/hr

35,000.00

Penjaga malam

org/hr

50,000.00

Penjaga api

org/hr

35,000.00

112,200.00

1312500

95.24

1944000

6,000 10,000 15,000 27,500

72,000 120,000 180,000 330,000

12,000 20,000 30,000 55,000

BAAHAN 1.2 M2 4 BH 0.065 OH TENAGA 0.075 OH 0.1 OH 0.02 OH 0.0025 OH

95000 400 95400

95400

114000 1600 6201 121801

50,000.00 65,000.00 70,000.00 75,000.00

3,750.00 6,500.00 1,400.00 187.50 11,837.50 133638.5

1.0126984127 1

3.99 0.66

9,500.00 9,750.00 11,366.25 19,250.00 26,750.00 37,500.00

80000

16000

9.30 12.00 12.25 6.90

9,750.00 7,743.75

25,487.00 19,327.00 11,704.00 400.00 1,500.00 6,000.00 pertamina pertamina

2,548.70 1,932.70 1,170.40 40.00 150.00 600.00 524.00 674.91

509.74 1,019.48 386.54 773.08 234.08 468.16 8.00 16.00 30.00 60.00 120.00 240.00 8,780.00 4,600,720.00 8,780.00 5,925,709.80

2,548.70 1,932.70 1,170.40 40.00 150.00 600.00 5,842,914.40 7,525,651.45

32,113.62 24,352.02 14,747.04 504.00 1,890.00 7,560.00 5,842.91 7,525.65

6,315.91 7,998.65

8,334,000.00

0.00

A.6.

HARGA SATUAN PEKERJAAN PERSIAPAN

1 Mengukur dan memasang bouwplank per 1 m'/unit Uraian Bahan : Kayu 5/7 Paku Biasa 2 - 5" Kayu Meranti (papan) Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Indeks

m3 kg m3

0.0120 0.0200 0.0070

oh oh oh oh

0.1000 0.1000 0.0100 0.0050 0.2150

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 6,500,000.00 17,000.00 2,500,000.00 50,000.00 70,000.00 0.00 0.00

Harga per satuan pekerjaan

2 Membersihkan 1 m2 lapangan dan peralatan Uraian Tenaga Kerja : Pekerja Mandor

Satuan

Indeks

oh oh

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp)

0.1000 0.0050 0.1050

50,000.00 65,000.00

Harga per satuan pekerjaan 3 Membuat 1 m2 stegger dari bambu ukuran (40 x 50 x 20) cm Uraian Bahan : Bambu dia 06 - 10/600 cm Tali Ijuk Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Indeks

btg kg

1.0000 0.2500

oh oh oh oh

0.2500 0.0170 0.0020 0.0130 0.2820

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 21,200.00 27,500.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan 4 Membongkar 1 m3 beton bertulang Uraian Tenaga Kerja : Pekerja Mandor

Satuan oh oh

Indeks 6.6670 0.3330 7.0000

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 50,000.00 65,000.00

Harga per satuan pekerjaan 5 Membongkar 1 m3 dinding tembok bata merah Uraian Tenaga Kerja : Pekerja Mandor

Satuan oh oh

Indeks 6.6670 0.0330 6.7000

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 50,000.00 65,000.00

Harga per satuan pekerjaan

Jumlah Harga Satuan Bahan (Rp) Upah (Rp)

Total (Rp)

78,000.00 340.00 17,500.00

5,000.00 7,000.00 0.00 0.00 95,840.00 12,000.00 Harga per satuan pekerjaan dibulatkan

Jumlah Harga Satuan Bahan (Rp) Upah (Rp)

5,000.00 325.00 5,325.00 Harga per satuan pekerjaan dibulatkan

Jumlah Harga Satuan Bahan (Rp) Upah (Rp)

107,840.00 107,840.00

Total (Rp)

5,325.00 5,325.00

Total (Rp)

21,200.00 6,875.00

12,500.00 1,105.00 0.00 0.00 28,075.00 13,605.00 Harga per satuan pekerjaan dibulatkan

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) 333,350.00 21,645.00 354,995.00

41,680.00 41,680.00

Total (Rp)

354,995.00

Harga per satuan pekerjaan dibulatkan

Jumlah Harga Satuan Bahan (Rp) Upah (Rp)

333,350.00 2,145.00 335,495.00 Harga per satuan pekerjaan dibulatkan

354,995.00

Total (Rp)

335,495.00 335,495.00

B.6.

HARGA SATUAN PEKERJAAN TANAH 1. Menggali 1 m3 tanah biasa sedalam 1 m Uraian Tenaga Kerja : Pekerja Mandor

Satuan oh oh

Indeks

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp)

0.7500 0.0250 0.7750

50,000.00 0.00

Harga per satuan pekerjaan 2. Menggali 1 m3 tanah biasa sedalam 2 m Uraian Tenaga Kerja : Pekerja Mandor

Satuan oh oh

Indeks

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp)

0.9000 0.0450 0.9450

50,000.00 65,000.00

Harga per satuan pekerjaan 4. Menggali 1 m3 tanah keras sedalam 1 m Uraian Tenaga Kerja : Pekerja Mandor

Satuan oh oh

Indeks

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp)

1.0000 0.0320 1.0320

50,000.00 65,000.00

Harga per satuan pekerjaan

11. Mengurug 1 m3 pasir urug Uraian Bahan : Pasir Urug Tenaga Kerja : Pekerja Mandor

Satuan

Indeks

m3

1.2000

oh oh

0.3000 0.0100 0.3100

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 60,000.00 50,000.00 0.00

Harga per satuan pekerjaan

15.a. Mengurug 1 m3 tanah urug Uraian Bahan : Tanah Urug Tenaga Kerja : Pekerja Mandor

Satuan

Indeks

m3

1.2000

oh oh

0.2500 0.0250 0.2750

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 55,000.00 50,000.00 0.00

Harga per satuan pekerjaan

B.6.-1#2

Jumlah Harga Satuan Bahan (Rp) Upah (Rp)

37,500.00 0.00 37,500.00 Harga per satuan pekerjaan dibulatkan

Jumlah Harga Satuan Bahan (Rp) Upah (Rp)

45,000.00 2,925.00 47,925.00 Harga per satuan pekerjaan dibulatkan

Jumlah Harga Satuan Bahan (Rp) Upah (Rp)

50,000.00 2,080.00 52,080.00 Harga per satuan pekerjaan dibulatkan

Jumlah Harga Satuan Bahan (Rp) Upah (Rp)

Total (Rp)

37,500.00 37,500.00

Total (Rp)

47,925.00 47,925.00

Total (Rp)

52,080.00 52,080.00

Total (Rp)

72,000.00

15,000.00 0.00 72,000.00 15,000.00 Harga per satuan pekerjaan dibulatkan

Jumlah Harga Satuan Bahan (Rp) Upah (Rp)

87,000.00 87,000.00

Total (Rp)

66,000.00

12,500.00 0.00 66,000.00 12,500.00 Harga per satuan pekerjaan dibulatkan

78,500.00 78,500.00

C.6.

HARGA SATUAN PEKERJAAN PONDASI 1 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP Uraian Bahan : Batu Belah 15/20 cm PC Pasir Pasang Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Indeks

m3 kg m3

1.1000 163.0000 0.5200

oh oh oh oh

1.5000 0.7500 0.0750 0.0750 2.4000

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 180,000.00 1,750.00 130,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

2 Memasang 1 m3 batu kosong (aanstamping) Uraian Bahan : Batu Belah 15/20 cm Pasir Urug Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Indeks

m3 m3

1.2000 0.4320

oh oh oh oh

0.7800 0.3900 0.0390 0.0390 1.2480

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 180,000.00 65,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

Jumlah Harga Satuan Bahan (Rp) Upah (Rp)

Total (Rp)

198,000.00 285,250.00 67,600.00

75,000.00 48,750.00 0.00 0.00 550,850.00 123,750.00 Harga per satuan pekerjaan dibulatkan

Jumlah Harga Satuan Bahan (Rp) Upah (Rp)

40

674,600.00 674,600.00

Total (Rp)

216,000.00 28,080.00

39,000.00 25,350.00 0.00 0.00 244,080.00 64,350.00 Harga per satuan pekerjaan dibulatkan

308,430.00 308,430.00

4.075

D.6.

HARGA SATUAN PEKERJAAN DINDING 1 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP Uraian Bahan : Bata Merah PC Pasir Pasang Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Indeks

bh kg m3

140.0000 26.5500 0.0930

oh oh oh oh

0.6000 0.2000 0.0200 0.0300 0.8500

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 600.00 1,750.00 130,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan 2 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 4 PP Uraian Bahan : Bata Merah PC Pasir Pasang Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Indeks

bh kg m3

70.0000 11.5000 0.0430

oh oh oh oh

0.3000 0.1000 0.0100 0.0150 0.4250

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 600.00 1,750.00 130,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

D.6.-1#2

esi 1 PC : 4 PP Jumlah Harga Satuan Bahan (Rp) Upah (Rp)

Total (Rp)

84,000.00 46,462.50 12,090.00

30,000.00 13,000.00 0.00 0.00 142,552.50 43,000.00 Harga per satuan pekerjaan dibulatkan

185,552.50 185,552.00

spesi 1 PC : 4 PP Jumlah Harga Satuan Bahan (Rp) Upah (Rp)

Total (Rp)

42,000.00 20,125.00 5,590.00

15,000.00 6,500.00 0.00 0.00 67,715.00 21,500.00 Harga per satuan pekerjaan dibulatkan

89,215.00 89,215.00

E.6.

HARGA SATUAN PEKERJAAN PLESTERAN 1 Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm Uraian Bahan : PC Pasir Pasang Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Indeks

kg m3

7.7760 0.0230

oh oh oh oh

0.3000 0.1500 0.0150 0.0150 0.4800

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 1,750.00 130,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

2 Memasang 1 m2 finishing siar pasangan batu kali adukan 1 PC : 2 PP Uraian Bahan : PC Pasir Pasang Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Indeks

kg m3

6.3400 0.0120

oh oh oh oh

0.3000 0.1500 0.0150 0.0150 0.4800

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 1,750.00 130,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan 3 Memasang 1 m2 acian Uraian Bahan : PC Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Indeks

kg

3.2500

oh oh oh oh

0.2000 0.1000 0.0100 0.0100 0.3200

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 1,750.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

E.6.-1#2

Jumlah Harga Satuan Bahan (Rp) Upah (Rp)

Total (Rp)

13,608.00 2,990.00

15,000.00 9,750.00 0.00 0.00 16,598.00 24,750.00 Harga per satuan pekerjaan dibulatkan

Jumlah Harga Satuan Bahan (Rp) Upah (Rp)

41,348.00 41,348.00

Total (Rp)

11,095.00 1,560.00

15,000.00 9,750.00 0.00 0.00 12,655.00 24,750.00 Harga per satuan pekerjaan dibulatkan

Jumlah Harga Satuan Bahan (Rp) Upah (Rp)

37,405.00 37,405.00

Total (Rp)

5,687.50

10,000.00 6,500.00 0.00 0.00 5,687.50 16,500.00 Harga per satuan pekerjaan dibulatkan

22,187.50 22,187.00

8 6 8.1 7

6.

HARGA SATUAN PEKERJAAN BETON

1 Membuat 1 m3 beton mutu f'c = 14.5 MPa (K 175), slump (12 + 2) cm, w/c = 0,66 Uraian Bahan : PC Pasir Beton Koral (maks 30 mm) Air Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Indeks

kg m3 m3 ltr

326.0000 0.5429 0.7622 215.0000

oh oh oh oh

1.6500 0.2750 0.0280 0.0830 2.0360

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 1,750.00 130,000.00 250,000.00 25.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaa

2 Membuat 1 m3 beton bertulang (200 kg besi + bekisting) Uraian Bahan : Kayu Kelas III Paku 5 - 12 cm Minyak Bekisting Besi Beton polos Kawat Beton PC Pasir Beton Koral Tenaga Kerja : Pekerja Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor

Satuan

Indeks

m3 kg ltr kg kg kg m3 m3

0.2700 2.0000 0.6000 210.0000 3.0000 336.0000 0.5400 0.8100

oh oh oh oh oh oh

5.6500 0.2750 1.5600 1.4000 0.3230 0.2830 9.4910

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 2,500,000.00 17,000.00 0.00 13,000.00 25,000.00 1,750.00 130,000.00 250,000.00 50,000.00 65,000.00 0.00 0.00 0.00 0.00

Harga per satuan pekerjaa

Jumlah Harga Satuan Bahan (Rp) Upah (Rp)

Total (Rp)

570,500.00 70,571.43 190,555.56 5,375.00 82,500.00 17,875.00 0.00 0.00 837,001.98 100,375.00 Harga per satuan pekerjaan dibulatkan

Jumlah Harga Satuan Bahan (Rp) Upah (Rp)

937,376.98 937,376.00

Total (Rp)

675,000.00 34,000.00 0.00 2,730,000.00 75,000.00 588,000.00 70,200.00 202,500.00 282,500.00 17,875.00 0.00 0.00 0.00 0.00 4,374,700.00 300,375.00 Harga per satuan pekerjaan dibulatkan

4,675,075.00 4,675,075.00

F.6.

HARGA SATUAN PEKERJAAN KAYU 1 Membuat dan memasang 1 m2 daun pintu panel, kayu kelas III (Kruing) Uraian Bahan : Papan Kayu Lem Kayu Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Indeks

m3 kg

0.0400 0.5000

oh oh oh oh

1.0000 3.0000 0.3000 0.0500 4.3500

Harga Satuan Bahan (Rp)

Harga Satuan Upah (Rp)

6,500,000.00 40,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaa

2 Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kelas III (Kruing) Uraian Bahan : Balok Kayu Besi Strip tebal 5 mm Paku 12 cm Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Indeks

m3 kg kg

1.1000 15.0000 5.6000

oh oh oh oh

4.0000 12.0000 1.2000 0.2000 17.4000

Harga Satuan Bahan (Rp)

Harga Satuan Upah (Rp)

6,500,000.00 19,400.00 17,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaa

3 Memasang 1 m3 konstruksi gordeng, kayu kelas III (Kruing) Uraian Bahan : Balok Kayu Besi Strip tebal 5 mm Paku 12 cm Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Indeks

m3 kg kg

1.1000 15.0000 3.0000

oh oh oh oh

2.4000 7.2000 0.7200 0.1200 10.4400

Harga Satuan Bahan (Rp)

Harga Satuan Upah (Rp)

6,500,000.00 19,400.00 17,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaa 4 Memasang 1 m2 rangka atap genteng kodok, kayu kelas II (Kruing) Uraian Bahan : Kaso-kaso (5 x 7) cm Reng (3 x 4) cm Paku 5 dan 10 cm Tenaga Kerja :

Satuan m3 m3 kg

Indeks 0.0140 0.0036 0.2500

Harga Satuan Bahan (Rp) 6,500,000.00 6,500,000.00 17,000.00

Harga Satuan Upah (Rp)

Pekerja Tukang Kayu Kepala Tukang Mandor

oh oh oh oh

0.1000 0.1000 0.0100 0.0050 0.2150

50,000.00 65,000.00 70,000.00 75,000.00

Harga per satuan pekerjaa 5 Memasang 1 m2 rangka atap genteng kodok, kayu meranti Uraian Bahan : Kaso-kaso (5 x 7) cm Reng (3 x 4) cm Paku 5 dan 10 cm Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Indeks

m3 m3 kg

0.0140 0.0036 0.2500

oh oh oh oh

0.1000 0.1000 0.0100 0.0050 0.2150

Harga Satuan Bahan (Rp)

Harga Satuan Upah (Rp)

4,620,000.00 4,620,000.00 17,000.00 50,000.00 65,000.00 70,000.00 75,000.00

Harga per satuan pekerjaa

6 Memasang 1 m2 rangka langit-langit (100 x 100) cm, kayu kelas III (Kruing) Uraian Bahan : Kaso-kaso (4 x 6) cm Paku 7 sampai 10 cm Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Indeks

m3 kg

0.0108 0.2000

oh oh oh oh

0.1500 0.3000 0.0300 0.0750 0.5550

Harga Satuan Bahan (Rp)

Harga Satuan Upah (Rp)

6,500,000.00 17,000.00 50,000.00 65,000.00 70,000.00 75,000.00

Harga per satuan pekerjaa

7 Memasang 1 m' listplank woodplank ukuran lebar 30 tebal 1 cm Uraian Bahan : Papan wood plank Paku 5 dan 7 cm Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Indeks

m' kg

1.1000 0.0500

oh oh oh oh

0.1000 0.2000 0.0200 0.0050 0.3250

Harga Satuan Bahan (Rp)

Harga Satuan Upah (Rp)

27,000.00 17,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaa 8 Memasang 1 m' listplank woodplank ukuran lebar 20 tebal 1 cm Uraian Bahan : Papan wood plank

Satuan m'

Indeks 1.1000

Harga Satuan Bahan (Rp) 22,000.00

Harga Satuan Upah (Rp)

Paku 5 dan 7 cm Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

kg

0.0500

oh oh oh oh

0.1000 0.2000 0.0200 0.0050 0.3250

17,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaa

F.6.-1#8

Bahan (Rp)

Jumlah Harga Satuan Upah (Rp) Total (Rp)

260,000.00 20,000.00 50,000.00 195,000.00 0.00 0.00 280,000.00 245,000.00 Harga per satuan pekerjaan dibulatkan

Bahan (Rp)

525,000.00 525,000.00

Jumlah Harga Satuan Upah (Rp) Total (Rp)

7,150,000.00 291,000.00 95,200.00 200,000.00 780,000.00 0.00 0.00 7,536,200.00 980,000.00 Harga per satuan pekerjaan dibulatkan

Bahan (Rp)

8,516,200.00 8,516,200.00

Jumlah Harga Satuan Upah (Rp) Total (Rp)

7,150,000.00 291,000.00 51,000.00 120,000.00 468,000.00 0.00 0.00 7,492,000.00 588,000.00 Harga per satuan pekerjaan dibulatkan

Bahan (Rp)

8,080,000.00 8,080,000.00

Jumlah Harga Satuan Upah (Rp) Total (Rp)

91,000.00 23,400.00 4,250.00

5,000.00 6,500.00 700.00 375.00 118,650.00 12,575.00 Harga per satuan pekerjaan dibulatkan

Bahan (Rp)

131,225.00 131,225.00

Jumlah Harga Satuan Upah (Rp) Total (Rp)

64,680.00 16,632.00 4,250.00 5,000.00 6,500.00 700.00 375.00 85,562.00 12,575.00 Harga per satuan pekerjaan dibulatkan

Bahan (Rp)

98,137.00 98,137.00

Jumlah Harga Satuan Upah (Rp) Total (Rp)

70,200.00 3,400.00 7,500.00 19,500.00 2,100.00 5,625.00 73,600.00 34,725.00 Harga per satuan pekerjaan dibulatkan

108,325.00 108,325.00

F.6.-7#8

Bahan (Rp)

Jumlah Harga Satuan Upah (Rp) Total (Rp)

29,700.00 850.00 5,000.00 13,000.00 0.00 0.00 30,550.00 18,000.00 Harga per satuan pekerjaan dibulatkan

Bahan (Rp)

48,550.00 48,550.00

Jumlah Harga Satuan Upah (Rp) Total (Rp)

24,200.00

850.00 5,000.00 13,000.00 0.00 0.00 25,050.00 18,000.00 Harga per satuan pekerjaan dibulatkan

43,050.00 43,050.00

G.6.

HARGA SATUAN PEKERJAAN PENUTUP ATAP 1 Memasang 1 m2 genteng kodok/glazzur Uraian Bahan : Genteng Kodok Tenaga Kerja : Pekerja Tukang kayu Kepala Tukang Mandor

Satuan

Indeks

bh

25.0000

oh oh oh oh

0.1500 0.0750 0.0080 0.0080 0.2410

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 2,500.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

2 Memasang 1 m' genteng bubung kodok/glazzur Uraian Bahan : Genteng Bubung Kodok Semen Portland Pasir Pasang Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Indeks

bh kg m3

5.0000 10.8000 0.0320

oh oh oh oh

0.4000 0.2000 0.0200 0.0020 0.6220

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 6,000.00 1,750.00 130,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

3 Memasang 1 m2 atap asbes gelombang (3,0 x 1,05) m x 4 mm Uraian Bahan : Asbes Gelombang Paku Pancing Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Indeks

lbr kg

0.3500 0.1200

oh oh oh oh

0.1400 0.0670 0.0070 0.0070 0.2210

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 95,000.00 25,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

4 Memasang 1 m2 atap asbes gelombang (3,00 x 1,08) m x 6 mm Uraian Bahan : Asbes Gelombang Paku Pancing Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang

Satuan

Indeks

lbr kg

0.3400 0.1200

oh oh oh

0.1400 0.0700 0.0070

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 110,000.00 25,000.00 50,000.00 65,000.00 0.00

Mandor

oh

0.0070 0.2240

0.00

Harga per satuan pekerjaan 5 Memasang 1 m' bubung stel gelombang 1,05 m Uraian Bahan : Bubung Stel Gelombang Paku Sekrup Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Indeks

lbr bh

2.1000 4.0000

oh oh oh oh

0.0840 0.1250 0.0130 0.0040 0.2260

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 18,700.00 400.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

6 Memasang 1 m2 atap seng gelombang Uraian Bahan : Seng Gelombang bjls Paku Biasa Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Indeks

lbr kg

0.7000 0.0200

oh oh oh oh

0.1200 0.0600 0.0060 0.0060 0.1920

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 35,000.00 17,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan 7 Memasang 1 m2 atap nok seng Uraian Bahan : Seng Plat Kayu 5/7 Paku Biasa Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Indeks

lbr m3 kg

0.4000 0.0040 0.0600

oh oh oh oh

0.1250 0.2500 0.0250 0.0060 0.4060

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 47,520.00 6,500,000.00 17,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

G.6.-1#3

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 62,500.00

7,500.00 4,875.00 0.00 0.00 62,500.00 12,375.00 Harga per satuan pekerjaan dibulatkan

74,875.00 74,875.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 30,000.00 18,900.00 4,160.00

20,000.00 13,000.00 0.00 0.00 53,060.00 33,000.00 Harga per satuan pekerjaan dibulatkan

86,060.00 86,060.00

G.6.-2#3

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 33,250.00 3,000.00

7,000.00 4,355.00 0.00 0.00 36,250.00 11,355.00 Harga per satuan pekerjaan dibulatkan

47,605.00 47,605.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 37,400.00 3,000.00 7,000.00 4,550.00 0.00

12,375.00 12,375.00

0.00 40,400.00 11,550.00 Harga per satuan pekerjaan dibulatkan

51,950.00 51,950.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 39,270.00 1,600.00

4,200.00 8,125.00 0.00 0.00 40,870.00 12,325.00 Harga per satuan pekerjaan dibulatkan

53,195.00 53,195.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 24,500.00 340.00

6,000.00 3,900.00 0.00 0.00 24,840.00 9,900.00 Harga per satuan pekerjaan dibulatkan

34,740.00 34,740.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 19,008.00 26,000.00 1,020.00

6,250.00 16,250.00 0.00 0.00 46,028.00 22,500.00 Harga per satuan pekerjaan dibulatkan

68,528.00 68,528.00

H.6.

HARGA SATUAN PEKERJAAN LANGIT-LANGIT

1 Memasang 1 m2 langit-langit asbes semen, tebal 4 mm rangka kayu meranti Uraian Bahan : Kaso-kaso (4 x 6) cm Paku 7 sampai 10 cm Asbes Semen Paku Tripleks Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Indeks

m3 kg m2 kg

0.0108 0.2000 1.1000 0.0100

oh oh oh oh

0.1800 0.3200 0.0320 0.0790 0.6110

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 6,500,000.00 17,000.00 20,000.00 17,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

2 Memasang 1 m' list langit-langit kayu profil Uraian Bahan : List Kayu Profil Paku Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Indeks

m' kg

1.0500 0.0100

oh oh oh oh

0.0500 0.0500 0.0050 0.0030 0.1080

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 6,000.00 17,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

H.6.-1#2

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 70,200.00 3,400.00 22,000.00 170.00

9,000.00 20,800.00 0.00 0.00 95,770.00 29,800.00 Harga per satuan pekerjaan dibulatkan

125,570.00 125,570.00

H.6.-2#2

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 6,300.00 170.00

2,500.00 3,250.00 0.00 0.00 6,470.00 5,750.00 Harga per satuan pekerjaan dibulatkan

12,220.00 12,220.00

I.6.

HARGA SATUAN PEKERJAAN PIPA DAN SANITASI 1. Memasang 1 bh kloset duduk/monoblok Uraian Bahan : Kloset Duduk/Monoblok Perlengkapan 6 % Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Indeks

bh set

1.0000 0.0600

oh oh oh oh

3.3000 1.1000 0.0110 0.1600 4.5710

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 1,000,000.00 60,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan 2. Memasang 1 bh kloset jongkok porselen Uraian Bahan : Kloset Jongkok Porselen Semen Portland Pasir Pasang Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Indeks

bh kg m3

1.0000 6.0000 0.0100

oh oh oh oh

1.0000 1.5000 0.1500 0.1600 2.8100

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 125,000.00 1,750.00 130,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan 3 Memasang 1 bh bak mandi fibreglass vol. 0,30 m3 Uraian Bahan : Bak fibreglass Perlengkapan Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Indeks

bh set

1.0000 0.1800

oh oh oh oh

1.8000 2.7000 0.5400 0.1100 5.1500

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 425,000.00 76,500.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan 4 Memasang 1 m' pipa beton F 20 cm Uraian Bahan : Pipa Beton dia 20 cm Batu Bata Semen Potland Pasir Pasang Pasir Urug Tenaga Kerja : Pekerja Tukang Batu

Satuan

Indeks

bh bh kg m3 m3

1.1000 10.0000 3.9200 0.0560 0.0240

oh oh

0.1400 0.0700

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 55,000.00 600.00 1,750.00 130,000.00 65,000.00 50,000.00 65,000.00

Kepala Tukang Mandor

oh oh

0.0070 0.0070 0.2240

0.00 0.00

Harga per satuan pekerjaan 5 Memasang 1 m' pipa beton F 30 cm Uraian Bahan : Pipa Beton dia 30 cm Batu Bata Semen Potland Pasir Pasang Pasir Urug Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Indeks

bh bh kg m3 m3

1.1000 12.0000 10.3000 0.0610 0.0690

oh oh oh oh

0.3800 0.1900 0.0190 0.0190 0.6080

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 75,000.00 600.00 1,750.00 130,000.00 65,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan 6 Memasang 1 m' pipa beton F 40 cm Uraian Bahan : Pipa Beton dia 40 cm Batu Bata Semen Potland Pasir Pasang Pasir Urug Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Indeks

bh bh kg m3 m3

1.1000 17.0000 10.3000 0.0610 0.0690

oh oh oh oh

0.3800 0.1900 0.0190 0.0190 0.6080

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 85,000.00 600.00 1,750.00 130,000.00 65,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan 7 Memasang 1 m' pipa beton F 50 cm Uraian Bahan : Pipa Beton dia 50 cm Batu Bata Semen Potland Pasir Pasang Pasir Urug Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Indeks

bh bh kg m3 m3

2.1000 20.0000 10.3000 0.0610 0.0690

oh oh oh oh

0.3800 0.1900 0.0190 0.0190 0.6080

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 95,000.00 600.00 1,750.00 130,000.00 65,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan 8 Memasang 1 bh bak kontrol pasangan batu bata (30 x 30) cm t 35 cm Uraian

Satuan

Indeks

Harga Satuan Harga Satuan

Uraian Bahan : Batu Bata Semen Potland Pasir Pasang Batu Kerikil Besi Beton Pasir Beton Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Indeks

bh kg m3 m3 kg m3

108.7500 44.0000 0.0700 0.0700 1.6000 0.0600

oh oh oh oh

3.2000 1.0150 0.0015 0.0160 4.2325

Bahan (Rp)

Upah (Rp)

600.00 1,750.00 130,000.00 250,000.00 11,700.00 130,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

9 Memasang 1 bh bak kontrol pasangan batu bata (45 x 45) cm t 50 cm Uraian Bahan : Batu Bata Semen Potland Pasir Pasang Batu Kerikil Besi Beton Pasir Beton Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Indeks

bh kg m3 m3 kg m3

187.5000 77.0000 0.1300 0.0200 2.6000 0.0900

oh oh oh oh

3.2000 1.0150 0.0015 0.0160 4.2325

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 600.00 1,750.00 130,000.00 250,000.00 11,700.00 130,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

9 Memasang 1 m' pipa galvanis dia 2" Uraian Bahan : Pipa Galvanis Perlengkapan Tenaga Kerja : Pekerja Tukang Besi Kepala Tukang Mandor

Satuan

Indeks

m' set

1.2000 0.3500

oh oh oh oh

0.1080 0.1800 0.0180 0.0054 0.3114

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 100,000.00 35,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

10 Memasang 1 m' pipa galvanis dia 3" Uraian Bahan : Pipa Galvanis Perlengkapan Tenaga Kerja : Pekerja Tukang Besi Kepala Tukang Mandor

Satuan

Indeks

m' set

1.2000 0.3500

oh oh oh oh

0.1080 0.1800 0.0180 0.0054 0.3114

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 150,000.00 52,500.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

11 Memasang 1 m' pipa PVC tipe D dia 3" Uraian Bahan : Pipa PVC Perlengkapan Tenaga Kerja : Pekerja Tukang Pipa Kepala Tukang Mandor

Satuan

Indeks

m' set

1.2000 0.3500

oh oh oh oh

0.0810 0.1350 0.0135 0.0041 0.2336

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 26,250.00 9,187.50 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

12 Memasang 1 m' pipa PVC tipe D dia 4" Uraian Bahan : Pipa PVC Perlengkapan Tenaga Kerja : Pekerja Tukang Pipa Kepala Tukang Mandor

Satuan

Indeks

m' set

1.2000 0.3500

oh oh oh oh

0.0810 0.1350 0.0135 0.0041 0.2336

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 37,500.00 13,125.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan 13 Memasang 1 m' pipa PVC tipe D dia 5" Uraian Bahan : Pipa PVC Perlengkapan Tenaga Kerja : Pekerja Tukang Pipa Kepala Tukang Mandor

Satuan

Indeks

m' set

1.2000 0.3500

oh oh oh oh

0.0810 0.1350 0.0135 0.0041 0.2336

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 62,500.00 21,875.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

`

I.6.-1#7

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 1,000,000.00 3,600.00

165,000.00 71,500.00 0.00 0.00 1,003,600.00 236,500.00 Harga per satuan pekerjaan dibulatkan

1,240,100.00 1,240,100.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 125,000.00 10,500.00 1,300.00

50,000.00 97,500.00 0.00 0.00 136,800.00 147,500.00 Harga per satuan pekerjaan dibulatkan

284,300.00 284,300.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 425,000.00 13,770.00

90,000.00 175,500.00 0.00 0.00 438,770.00 265,500.00 Harga per satuan pekerjaan dibulatkan

704,270.00 704,270.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 60,500.00 6,000.00 6,860.00 7,280.00 1,560.00 7,000.00 4,550.00

0.00 0.00 82,200.00 11,550.00 Harga per satuan pekerjaan dibulatkan

93,750.00 93,750.00 I.6.-3#7

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 82,500.00 7,200.00 18,025.00 7,930.00 4,485.00

19,000.00 12,350.00 0.00 0.00 120,140.00 31,350.00 Harga per satuan pekerjaan dibulatkan

151,490.00 151,490.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 93,500.00 10,200.00 18,025.00 7,930.00 4,485.00

19,000.00 12,350.00 0.00 0.00 134,140.00 31,350.00 Harga per satuan pekerjaan dibulatkan

165,490.00 165,490.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 199,500.00 12,000.00 18,025.00 7,930.00 4,485.00

19,000.00 12,350.00 0.00 0.00 241,940.00 31,350.00 Harga per satuan pekerjaan dibulatkan

273,290.00 273,290.00

Jumlah Harga Satuan

Bahan (Rp)

Upah (Rp)

Total (Rp)

65,250.00 77,000.00 9,100.00 17,500.00 18,720.00 7,800.00

160,000.00 65,975.00 0.00 0.00 195,370.00 225,975.00 Harga per satuan pekerjaan dibulatkan

421,345.00 421,345.00

I.6.-4#7

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 112,500.00 134,750.00 16,900.00 5,000.00 30,420.00 11,700.00

160,000.00 65,975.00 0.00 0.00 311,270.00 225,975.00 Harga per satuan pekerjaan dibulatkan

537,245.00 537,245.00

I.6.-5#7

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 120,000.00 12,250.00

5,400.00 11,700.00 0.00 0.00 132,250.00 17,100.00 Harga per satuan pekerjaan dibulatkan

149,350.00 149,350.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 180,000.00 18,375.00

5,400.00 11,700.00 0.00 0.00 198,375.00 17,100.00 Harga per satuan pekerjaan dibulatkan

215,475.00 215,475.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 31,500.00 3,215.63

4,050.00 8,775.00 0.00 0.00 34,715.63 12,825.00 Harga per satuan pekerjaan dibulatkan

47,540.63 47,540.00

I.6.-7#7

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 45,000.00 4,593.75

4,050.00 8,775.00 0.00 0.00 49,593.75 12,825.00 Harga per satuan pekerjaan dibulatkan

62,418.75 62,418.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 75,000.00 7,656.25

4,050.00 8,775.00 0.00 0.00 82,656.25 12,825.00 Harga per satuan pekerjaan dibulatkan

95,481.25 95,481.00

J.6.

HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM 1 Memasang 1 m' kusen pintu/jendela aluminium Uraian

Satuan

Bahan : Profil Aluminium Skrup Fixer Sealant Pipa hollow aluminium (1 x 3) cm Paku skrup 1" Tenaga Kerja : Pekerja Tukang Besi Kepala Tukang Mandor

Indeks

m' bh tube btg bh

1.1000 2.0000 0.0600 1.1000 4.0000

oh oh oh oh

0.0430 0.0430 0.0043 0.0021 0.0924

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 119,000.00 600.00 24,200.00 0.00 400.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan 2 Memasang 1 m2 pintu aluminium strip lebar 8 cm Uraian

Satuan

Bahan : Profil Aluminium Aluminium Strip Tenaga Kerja : Pekerja Tukang Besi Kepala Tukang Mandor

Indeks

m' m'

4.4000 14.6000

oh oh oh oh

0.0850 0.0850 0.0085 0.0042 0.1827

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 119,000.00 0.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan 3 Memasang 1 m2 pintu kaca rangka aluminium Uraian

Satuan

Bahan : Pintu Aluminium Profil Kaca Kaca 5 mm Sealant Tenaga Kerja : Pekerja Tukang Besi Kepala Tukang Mandor

Indeks

m' m' m2 tube

4.4000 4.5000 1.1000 0.2700

oh oh oh oh

0.0850 0.0850 0.0080 0.0040 0.1820

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 119,000.00 5,500.00 100,900.00 24,200.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan 4 Memasang 1 m2 jendela kaca rangka aluminium Uraian Bahan : Jendela Aluminium Profil Kaca Kaca 5 mm Sealant

Satuan m' m' m2 tube

Indeks 4.4000 4.5000 1.1000 0.2700

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 119,000.00 5,500.00 100,900.00 24,200.00

Tenaga Kerja : Pekerja Tukang Besi Kepala Tukang Mandor

oh oh oh oh

0.0850 0.0850 0.0080 0.0040 0.1820

50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan 5 Memasang 1 m' talang datar/jurai seng bjls 28 lebar 90 cm Uraian Bahan : Seng Plat Paku Papan Kayu III Tenaga Kerja : Pekerja Tukang Besi Kepala Tukang Mandor

Satuan

Indeks

m' kg m3

1.0500 0.0150 0.0190

oh oh oh oh

0.2000 0.4000 0.0250 0.0100 0.6350

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 40,000.00 17,000.00 2,500,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

J.6.-1#3

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 130,900.00 1,200.00 1,452.00 0.00 1,600.00

2,150.00 2,795.00 0.00 0.00 135,152.00 4,945.00 Harga per satuan pekerjaan dibulatkan

140,097.00 140,097.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 523,600.00 0.00

4,250.00 5,525.00 0.00 0.00 523,600.00 9,775.00 Harga per satuan pekerjaan dibulatkan

533,375.00 533,375.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 523,600.00 24,750.00 110,990.00 6,534.00

4,250.00 5,525.00 0.00 0.00 665,874.00 9,775.00 Harga per satuan pekerjaan dibulatkan

675,649.00 675,649.00 J.6.-3#3

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 523,600.00 24,750.00 110,990.00 6,534.00

4,250.00 5,525.00 0.00 0.00 665,874.00 9,775.00 Harga per satuan pekerjaan dibulatkan

675,649.00 675,649.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 42,000.00 255.00 47,500.00

10,000.00 26,000.00 0.00 0.00 89,755.00 36,000.00 Harga per satuan pekerjaan dibulatkan

125,755.00 125,755.00

K.6.

HARGA SATUAN PEKERJAAN PENGUNCI DAN KACA 5. Memasang 1 buah engsel pintu Uraian Bahan : Engsel Pintu Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Indeks

bh

1.0000

oh oh oh oh

0.0150 0.1250 0.0130 0.0075 0.1605

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 16,450.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan 6. Memasang 1 buah engsel jendela Uraian Bahan : Engsel Jendela Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Indeks

bh

1.0000

oh oh oh oh

0.0100 0.1000 0.0100 0.0005 0.1205

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 7,500.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan 9. Memasang 1 buah kait angin Uraian Bahan : Kait Angin Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Indeks

bh

1.0000

oh oh oh oh

0.0100 0.1000 0.0100 0.0005 0.1205

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 15,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan 11. Memasang 1 buah kunci selot Uraian Bahan : Kunci Selot Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Indeks

bh

1.0000

oh oh oh oh

0.0200 0.5000 0.0500 0.0010 0.5710

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 120,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan 15.a. Memasang 1 buah grendel Uraian

Satuan

Indeks

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp)

Bahan : Grendel Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

bh

1.0000

oh oh oh oh

0.0069 0.1000 0.0100 0.0002 0.1171

27,500.00 50,000.00 65,000.00 70,000.00 75,000.00

Harga per satuan pekerjaan 16. Memasang 1 m2 kaca tebal 3 mm Uraian Bahan : Kaca 3 mm Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Indeks

m2

1.1000

oh oh oh oh

0.1600 0.1600 0.0160 0.0080 0.3440

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 89,900.00 50,000.00 65,000.00 70,000.00 75,000.00

Harga per satuan pekerjaan

17. Memasang 1 m2 kaca tebal 5 mm Uraian Bahan : Kaca 5 mm Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Indeks

m2

1.1000

oh oh oh oh

0.1600 0.1600 0.0160 0.0080 0.3440

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 100,900.00 50,000.00 65,000.00 70,000.00 75,000.00

Harga per satuan pekerjaan 17.a. Memasang 1 m2 kaca rayband tebal 5 mm Uraian Bahan : Kaca Rayband 5 mm Tenaga Kerja : Pekerja Tukang Kayu Kepala Tukang Mandor

Satuan

Indeks

m2

1.1000

oh oh oh oh

0.1600 0.1600 0.0160 0.0080 0.3440

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 119,900.00 50,000.00 65,000.00 70,000.00 75,000.00

Harga per satuan pekerjaan

K.6.-1#3

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 16,450.00

750.00 8,125.00 0.00 0.00 16,450.00 8,875.00 Harga per satuan pekerjaan dibulatkan

25,325.00 25,325.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 7,500.00

500.00 6,500.00 0.00 0.00 7,500.00 7,000.00 Harga per satuan pekerjaan dibulatkan

14,500.00 14,500.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 15,000.00

500.00 6,500.00 0.00 0.00 15,000.00 7,000.00 Harga per satuan pekerjaan dibulatkan

22,000.00 22,000.00 K.6.-2#3

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 120,000.00

1,000.00 32,500.00 0.00 0.00 120,000.00 33,500.00 Harga per satuan pekerjaan dibulatkan

153,500.00 153,500.00 K.6.-3#3

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp)

27,500.00

345.00 6,500.00 700.00 15.00 27,500.00 7,560.00 Harga per satuan pekerjaan dibulatkan

35,060.00 35,060.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 98,890.00

8,000.00 10,400.00 1,120.00 600.00 98,890.00 20,120.00 Harga per satuan pekerjaan dibulatkan

119,010.00 119,010.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 110,990.00

8,000.00 10,400.00 1,120.00 600.00 110,990.00 20,120.00 Harga per satuan pekerjaan dibulatkan

131,110.00 131,110.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 131,890.00

8,000.00 10,400.00 1,120.00 600.00 131,890.00 20,120.00 Harga per satuan pekerjaan dibulatkan

152,010.00 152,010.00

L.6.

HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING

1 Memasang per 1 m2 lantai keramik ukuran (40 x 40) cm Uraian Bahan : Ubin Keramik PC Pasir Pasang Semen Warna Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Indeks

m2 kg m3 kg

1.0500 8.1900 0.0450 1.6200

oh oh oh oh

0.7000 0.3500 0.0350 0.0350 1.1200

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 70,000.00 1,750.00 130,000.00 13,600.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

2 Memasang per 1 m2 lantai keramik ukuran (30 x 30) cm Uraian Bahan : Ubin Keramik PC Pasir Pasang Semen Warna Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Indeks

m2 kg m3 kg

1.0500 10.0000 0.0450 1.5000

oh oh oh oh

0.7000 0.3500 0.0350 0.0350 1.1200

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 60,000.00 1,750.00 130,000.00 13,600.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan 3 Memasang per 1 m2 lantai keramik ukuran (20 x 20) cm Uraian Bahan : Ubin Keramik PC Pasir Pasang Semen Warna Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Indeks

m2 kg m3 kg

1.0500 10.4000 0.0450 1.6200

oh oh oh oh

0.7000 0.3500 0.0350 0.0350 1.1200

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 55,000.00 1,750.00 130,000.00 13,600.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

L.6.-1#3

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 73,500.00 14,332.50 5,850.00 22,032.00

35,000.00 22,750.00 0.00 0.00 115,714.50 57,750.00 Harga per satuan pekerjaan dibulatkan

173,464.50 173,464.00

L.6.-2#3

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 63,000.00 17,500.00 5,850.00 20,400.00

35,000.00 22,750.00 0.00 0.00 106,750.00 57,750.00 Harga per satuan pekerjaan dibulatkan

164,500.00 164,500.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 57,750.00 18,200.00 5,850.00 22,032.00

35,000.00 22,750.00 0.00 0.00 103,832.00 57,750.00 Harga per satuan pekerjaan dibulatkan

161,582.00 161,582.00

M.6.

HARGA SATUAN PEKERJAAN PENGECATAN 1 Mengecat 1 m2 bidang kayu baru (1 lapis plamir dan cat dasar, 2 lapis cat penutup) Uraian Bahan : Cat Meni Plamir Cat Dasar Cat Penutup (2 kali) Tenaga Kerja : Pekerja Tukang Cat Kepala Tukang Mandor

Satuan

Indeks

kg kg kg kg

0.2000 0.1500 0.1700 0.2600

oh oh oh oh

0.0700 0.0090 0.0060 0.0025 0.0875

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 40,000.00 25,000.00 70,000.00 70,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

2 Mengecat 1 m2 bidang tembok baru (1 lapis plamir dan cat dasar, 2 lapis cat penutup) Uraian Bahan : Plamir Cat Dasar Cat Penutup (2 kali) Tenaga Kerja : Pekerja Tukang Cat Kepala Tukang Mandor

Satuan

Indeks

kg kg kg

0.1000 0.1000 0.2600

oh oh oh oh

0.0200 0.0630 0.0063 0.0025 0.0918

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 18,800.00 20,000.00 20,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaan

M.6.-1#2

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 8,000.00 3,750.00 11,900.00 18,200.00

3,500.00 585.00 0.00 0.00 41,850.00 4,085.00 Harga per satuan pekerjaan dibulatkan

45,935.00 45,935.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 1,880.00 2,000.00 5,200.00

1,000.00 4,095.00 0.00 0.00 9,080.00 5,095.00 Harga per satuan pekerjaan dibulatkan

14,175.00 14,175.00

HARGA SATUAN PEKERJAAN LAIN-LAIN

1 Memasang 1 m2 paving blok abu-abu persegi Uraian Bahan : Paving Blok Abu-abu persegi Pasir Pasang Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Indeks

m2 m3

1.0000 0.0800

oh oh oh oh

0.2000 0.1000 0.0100 0.0200 0.3300

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 47,000.00 130,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaa 2 Memasang 1 m2 paving blok abu-abu persegi K-300 Uraian Bahan : Paving Blok abu-abu persegi K-300 Pasir Pasang Sewa Alat Pemadatan Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Indeks

m2 m3 m2

1.0000 0.0800 0.0600

oh oh oh oh

0.2000 0.1000 0.0100 0.0200 0.3300

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 65,000.00 130,000.00 2,500.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaa

3 Memasang 1 m2 atap polycarbonate rangka stainless steel Uraian Bahan : Polycarbonate + Rangka Tenaga Kerja : Pekerja Tukang Besi Kepala Tukang Mandor

Satuan

Indeks

m2

1.0000

oh oh oh oh

0.7000 0.3500 0.0350 0.0700 1.1550

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 715,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaa

4 Memasang 1 m2 pagar besi Uraian Bahan : Pagar Besi PC Pasir Pasang Tenaga Kerja : Pekerja

Satuan

Indeks

m2 kg m3

1.0000 25.0000 0.0500

oh

0.3056

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 517,000.00 1,750.00 130,000.00 50,000.00

Tukang Batu Kepala Tukang Mandor

oh oh oh

0.3056 0.0306 0.0031 0.6449

65,000.00 0.00 0.00

Harga per satuan pekerjaa 5 Memasang 1 m2 pintu pagar besi Uraian Bahan : Pintu Pagar Besi PC Pasir Pasang Tenaga Kerja : Pekerja Tukang Batu Kepala Tukang Mandor

Satuan

Indeks

m2 kg m3

1.0000 2.0000 0.0040

oh oh oh oh

0.2578 0.2578 0.0258 0.0026 0.5440

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 550,000.00 1,750.00 130,000.00 50,000.00 65,000.00 0.00 0.00

Harga per satuan pekerjaa

6 Memasang 1 m2 rangka atap baja ringan mutu tinggi model pelana/perisai sederhana sudut kemiringan 30 o bentang Uraian Bahan : Profil C 75.100 Profil C 75.75 Reng Screw Dynabolt Plat Bracing Tenaga Kerja : Ongkos Pasang

Satuan

Indeks

m' m' m' bh bh m'

3.6800 4.3700 5.9700 25.0000 0.5000 0.4000

m2

0.9000

Harga Satuan Harga Satuan Bahan (Rp) Upah (Rp) 34,375.00 26,125.00 16,500.00 500.00 1,700.00 7,500.00 25,000.00

Harga per satuan pekerjaa

Ls.-1#5

Ls.-2#5

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 47,000.00 10,400.00 10,000.00 6,500.00 0.00 0.00 57,400.00 16,500.00 Harga per satuan pekerjaan dibulatkan

73,900.00 73,900.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 65,000.00 10,400.00 150.00 10,000.00 6,500.00 0.00 0.00 75,550.00 16,500.00 Harga per satuan pekerjaan dibulatkan

92,050.00 92,050.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 715,000.00 35,000.00 22,750.00 0.00 0.00 715,000.00 57,750.00 Harga per satuan pekerjaan dibulatkan

772,750.00 772,750.00

Ls.-4#5

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 517,000.00 43,750.00 6,500.00 15,280.00

19,864.00 0.00 0.00 567,250.00 35,144.00 Harga per satuan pekerjaan dibulatkan

602,394.00 602,394.00

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 550,000.00 3,500.00 520.00 12,890.00 16,757.00 0.00 0.00 554,020.00 29,647.00 Harga per satuan pekerjaan dibulatkan

udut kemiringan 30 o bentang > 16 m'.

583,667.00 583,667.00

Ls.-5#5

Jumlah Harga Satuan Bahan (Rp) Upah (Rp) Total (Rp) 126,500.00 114,166.25 98,505.00 12,500.00 850.00 3,000.00 22,500.00 355,521.25 22,500.00 Harga per satuan pekerjaan dibulatkan

378,021.25 378,021.00

41600

201600

HARGA SATUAN PEKERJAAN BINA MARGA

Ls. Pasang plat grill, per 1 m2 Besi siku L 40.40.3 mm m1 Besi plat 20.3 mm m1 Ongkos las ttk

4.0000 38.0000 80.0000

15,000.00 12,000.00

60,000.00 456,000.00 2,096.00

516,000.00 Harga Per Satuan Pekerjaan Dibulatk

167,680.00 167,680.00 Per Satuan Pekerjaan Dibulatkan

BMg-1#4

683,680.00 683,680.00

ANALISA BIAYA PERALATAN

PROPINSI

:

JAWA TIMUR

JENIS ALAT

:

Wheel Loader

HARGA

:

Rp.

UMUR KERJA

:

8 tahun

A.

KOTA

:

KEDIRI

1,003,000,000.00 =

12.000 jam

BIAYA PEMILIKAN (OWNERSHIP COSTS) : (Rp./jam) 1.

Depresiasi : 90 % x Alat x (CRF) x

1 Jam/Tahun

=

0,90 x 1.003.000.000 x 0,20483 1,500.00

2.

Lain-lain

:

Asuransi 3% th + PPn 10%

=

3,30 %

x

Harga Jam/Tahun

=

0,033

x

1,003,000,000.00 1,500.00

Sub Total B.

BIAYA OPERASI (OPERATION COSTS) : (Rp./jam) Kebutuhan bahan bakar dan pelumas tiap HP :

Harga

Diesel

=

0.160

/liter/HP/jam.

Bensin

=

0.170

/liter/HP/jam.

Pelumas

=

0.006

/liter/HP/jam.

: Solar/Minyak

Diesel

= Rp.

Bensin

= Rp.

Pelumas

= Rp.

Bahan Bakar Diesel

=

0.160

x

115

Bahan Bakar Bensin

=

0.170

x

115

Pelumas

=

0.006

x

115

Perbaikan dan Spareparts

=

0.800

x

( 80% x depresiasi )

Rp.

Sub Total

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT : A + B

Rp.

145,332.69

+

Rp.

ANALISA BIAYA PERALATAN

PROPINSI

:

JAWA TIMUR

JENIS ALAT

:

Wheel Roller Steel 6 - 8 ton

HARGA

:

Rp.

UMUR KERJA

:

10 tahun

A.

KOTA

319,000,000.00 =

15.000 jam

BIAYA PEMILIKAN (OWNERSHIP COSTS) : (Rp./jam) 1.

Depresiasi : 90 % x Alat x (CRF) x

1 Jam/Tahun

=

0,90 x 319.000.000 x 0,18062 1,500.00

:

KEDIRI

2.

Lain-lain

:

Asuransi 3% th + PPn 10%

=

3,30 %

x

Harga Jam/Tahun

=

0,033

x

319,000,000.00 1,500.00

Sub Total B.

BIAYA OPERASI (OPERATION COSTS) : (Rp./jam) Kebutuhan bahan bakar dan pelumas tiap HP :

Harga

Diesel

=

0.160

/liter/HP/jam.

Bensin

=

0.170

/liter/HP/jam.

Pelumas

=

0.006

/liter/HP/jam.

: Solar/Minyak

Diesel

= Rp.

Bensin

= Rp.

Pelumas

= Rp.

Bahan Bakar Diesel

=

0.160

x

37

Bahan Bakar Bensin

=

0.170

x

37

Pelumas

=

0.006

x

37

Perbaikan dan Spareparts

=

0.800

x

Rp.

+

Rp.

( 80% x depresiasi ) Sub Total

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT : A + B

Rp.

41,588.67

ANALISA BIAYA PERALATAN

PROPINSI

:

JAWA TIMUR

JENIS ALAT

:

Tandem Roller 6-8 ton

HARGA

:

Rp.

UMUR KERJA

:

10 tahun

A.

KOTA

:

KEDIRI

605,000,000.00 =

15.000 jam

BIAYA PEMILIKAN (OWNERSHIP COSTS) : (Rp./jam) 1.

Depresiasi : 90 % x Alat x (CRF) x

1 Jam/Tahun

=

0,90 x 605.000.000 x 0,18062 1,500.00

2.

Lain-lain

:

Asuransi 3% th + PPn 10%

=

3,30 %

x

Harga Jam/Tahun

=

0,033

x

605,000,000.00 1,500.00

Sub Total B.

BIAYA OPERASI (OPERATION COSTS) : (Rp./jam) Kebutuhan bahan bakar dan pelumas tiap HP :

Harga

Diesel

=

0.160

/liter/HP/jam.

Bensin

=

0.170

/liter/HP/jam.

Pelumas

=

0.006

/liter/HP/jam.

: Solar/Minyak

Diesel

= Rp.

Bensin

= Rp.

Pelumas

= Rp.

Bahan Bakar Diesel

=

0.160

x

40

Bahan Bakar Bensin

=

0.170

x

40

Pelumas

=

0.006

x

40

Perbaikan dan Spareparts

=

0.800

x

Rp.

+

Rp.

( 80% x depresiasi ) Sub Total

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT : A + B

Rp.

78,875.06

ANALISA BIAYA PERALATAN

PROPINSI

:

JAWA TIMUR

KOTA

JENIS ALAT

:

Pneumatic Tire Roller 8-15 ton

HARGA

:

Rp.

UMUR KERJA

:

10 tahun =

330,500,000.00 15.000 jam

:

KEDIRI

A.

BIAYA PEMILIKAN (OWNERSHIP COSTS) : (Rp./jam) 1.

Depresiasi : 90 % x Alat x (CRF) x

1 Jam/Tahun

=

0,90 x 330.500.000 x 0,18062 1,500.00

2.

Lain-lain

:

Asuransi 3% th + PPn 10%

=

3,30 %

x

Harga Jam/Tahun

=

0,033

x

330,500,000.00 1,500.00

Sub Total B.

BIAYA OPERASI (OPERATION COSTS) : (Rp./jam) Kebutuhan bahan bakar dan pelumas tiap HP :

Harga

Diesel

=

0.160

/liter/HP/jam.

Bensin

=

0.170

/liter/HP/jam.

Pelumas

=

0.006

/liter/HP/jam.

: Solar/Minyak

Diesel

= Rp.

Bensin

= Rp.

Pelumas

= Rp.

Bahan Bakar Diesel

=

0.160

x

95

Bahan Bakar Bensin

=

0.170

x

95

Pelumas

=

0.006

x

95

Perbaikan dan Spareparts

=

0.800

x

Rp.

+

Rp.

( 80% x depresiasi ) Sub Total

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT : A + B

Rp.

43,087.95

ANALISA BIAYA PERALATAN

PROPINSI

:

JAWA TIMUR

JENIS ALAT

:

Vibrator Roller

HARGA

:

Rp.

UMUR KERJA

:

10 tahun =

A.

KOTA

:

KEDIRI

876,500,000.00 15.000 jam

BIAYA PEMILIKAN (OWNERSHIP COSTS) : (Rp./jam) 1.

Depresiasi : 90 % x Alat x (CRF) x

1 Jam/Tahun

=

0,90 x 876.500.000 x 0,20483 1,500.00

2.

Lain-lain

:

Asuransi 3% th + PPn 10%

=

3,30 %

x

Harga Jam/Tahun

=

0,033

x

876,500,000.00 1,500.00

Sub Total B.

BIAYA OPERASI (OPERATION COSTS) : (Rp./jam)

Kebutuhan bahan bakar dan pelumas tiap HP :

Harga

Diesel

=

0.160

/liter/HP/jam.

Bensin

=

0.170

/liter/HP/jam.

Pelumas

=

0.006

/liter/HP/jam.

: Solar/Minyak

Diesel

= Rp.

Bensin

= Rp.

Pelumas

= Rp.

Bahan Bakar Diesel

=

0.078

x

109

Bahan Bakar Bensin

=

0.102

x

109

Pelumas

=

0.004

x

109

Perbaikan dan Spareparts

=

0.800

x

Rp.

( 80% x depresiasi ) Sub Total

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT : A + B

Rp.

114,271.06

+

Rp.

ANALISA BIAYA PERALATAN

PROPINSI

:

JAWA TIMUR

JENIS ALAT

:

Asphalt Sprayer 1.000 ltr

HARGA

:

Rp.

UMUR KERJA

:

6 tahun

A.

KOTA

:

KEDIRI

23,000,000.00 =

7.200 jam

BIAYA PEMILIKAN (OWNERSHIP COSTS) : (Rp./jam) 1.

Depresiasi : 90 % x Alat x (CRF) x

1 Jam/Tahun

=

0,90 x 23.000.000 x 0,24668 1,200.00

2.

Lain-lain

:

Asuransi 3% th + PPn 10%

=

3,30 %

x

Harga Jam/Tahun

=

0,033

x

23,000,000.00 1,200.00

Sub Total B.

BIAYA OPERASI (OPERATION COSTS) : (Rp./jam) Kebutuhan bahan bakar dan pelumas tiap HP :

Harga

Diesel

=

0.160

/liter/HP/jam.

Bensin

=

0.170

/liter/HP/jam.

Pelumas

=

0.006

/liter/HP/jam.

: Solar/Minyak

Diesel

= Rp.

Bensin

= Rp.

Pelumas

= Rp.

Bahan Bakar Diesel

=

0.160

x

25

Bahan Bakar Bensin

=

0.170

x

25

Pelumas

=

0.006

x

25

Perbaikan dan Spareparts

=

0.800

x

Rp.

+

Rp.

( 80% x depresiasi ) Sub Total

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT : A + B

Rp.

4,887.73

ANALISA BIAYA PERALATAN

PROPINSI

:

JAWA TIMUR

KOTA

JENIS ALAT

:

Asphalt Mixing Plant 30 ton

HARGA

:

Rp.

1,575,000,000.00

UMUR KERJA

:

1 tahun

=

:

KEDIRI

1.200 jam

BIAYA PASTI PER JAM KERJA 1.

Nilai sisa

=

2.

Faktor angsuran Modal

=

i( 1 + i )A

i = 13% 3.

Biaya Pasti Per Jam

(1+i) -1 A

=

= A

{ (B-C)D + (0,20C) } W

{ ( Rp. 1.575.000.000 - Rp. 157.500.000 ) x 0,199 + 0,20 x (Rp. 157.500.000 ) } 1200

BIAYA OPERASI PER JAM KERJA 1.

Spare Part dan Ban

=

( 12,5 s/d 17,5 ) B 100 W

=

15 x Rp. 100

2.

Work Shop

=

1,575,000,000.00 x 1.200

( 6,25 s/d 8,75 ) B 100 W

=

7,5 x Rp.

1,575,000,000.00

100 x 1.200 3.

Bahan Bakar dan Pelumas 12% s/d 15% HP x Harga Bahan bakar 0,0035 s/d 0,0060 x HP x harga Pelumas + Solar untuk Pembakaran

4.

5.

(

0.1300

x

150

x Rp.

13,750.00

(

0.0040

x

150

x Rp.

36,300.00

(

17.0000

x

30

x Rp.

13,750.00

Operator dan Driver

= Rp.

65,000.00

x

Pembantu Operator

= Rp.

45,000.00

x

Biaya Langsung

F+G+H+J+K

=

BIAYA OPERASI TOTAL PER JAM = TC = E-T = Rp.

261,318.75

+

Rp.

ANALISA BIAYA PERALATAN

PROPINSI

:

JAWA TIMUR

JENIS ALAT

:

Asphalt Finisher

HARGA

:

Rp.

UMUR KERJA

:

7 tahun

A.

KOTA

:

KEDIRI

534,500,000.00 =

8.400 jam

BIAYA PEMILIKAN (OWNERSHIP COSTS) : (Rp./jam) 1.

Depresiasi : 90 % x Alat x (CRF) x

1 Jam/Tahun

=

0,90 x 534.500.000 x 0,2226 1,200.00

2.

Lain-lain

:

Asuransi 3% th + PPn 10%

=

3,30 %

x

Harga Jam/Tahun

=

0,033

x

534,500,000.00 1,200.00

Sub Total B.

BIAYA OPERASI (OPERATION COSTS) : (Rp./jam) Kebutuhan bahan bakar dan pelumas tiap HP :

Harga

Diesel

=

0.160

/liter/HP/jam.

Bensin

=

0.170

/liter/HP/jam.

Pelumas

=

0.006

/liter/HP/jam.

: Solar/Minyak

Diesel

= Rp.

Bensin

= Rp.

Pelumas

= Rp.

Bahan Bakar Diesel

=

0.160

x

30

Bahan Bakar Bensin

=

0.170

x

30

Pelumas

=

0.006

x

30

Perbaikan dan Spareparts

=

0.800

x

Rp.

( 80% x depresiasi ) Sub Total

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT : A + B

Rp.

103,933.53

+

Rp.

ANALISA BIAYA PERALATAN

PROPINSI

:

JAWA TIMUR

JENIS ALAT

:

Water Tank Truck

HARGA

:

Rp.

UMUR KERJA

:

6 tahun

A.

KOTA

275,000,000.00 =

9.000 jam

BIAYA PEMILIKAN (OWNERSHIP COSTS) : (Rp./jam) 1.

Depresiasi : 90 % x Alat x (CRF) x

1

:

KEDIRI

Jam/Tahun =

0,90 x 275.000.000 x 0,20483 1,500.00

2.

Lain-lain

:

Asuransi 3% th + PPn 10%

=

3,30 %

x

Harga Jam/Tahun

=

0,033

x

275,000,000.00 1,500.00

Sub Total B.

BIAYA OPERASI (OPERATION COSTS) : (Rp./jam) Kebutuhan bahan bakar dan pelumas tiap HP :

Harga

Diesel

=

0.160

/liter/HP/jam.

Bensin

=

0.170

/liter/HP/jam.

Pelumas

=

0.006

/liter/HP/jam.

: Solar/Minyak

Diesel

= Rp.

Bensin

= Rp.

Pelumas

= Rp.

Bahan Bakar Diesel

=

0.078

x

115

Bahan Bakar Bensin

=

0.102

x

115

Pelumas

=

0.004

x

115

Perbaikan dan Spareparts

=

0.800

x

Rp.

( 80% x depresiasi ) Sub Total

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT : A + B

Rp.

46,752.20

+

Rp.

ANALISA BIAYA PERALATAN

PROPINSI

:

JAWA TIMUR

JENIS ALAT

:

Dump Truck 5 ton

HARGA

:

Rp.

UMUR KERJA

:

6 tahun

A.

KOTA

:

KEDIRI

116,000,000.00 9.000 jam

BIAYA PEMILIKAN (OWNERSHIP COSTS) : (Rp./jam) 1.

Depresiasi : 90 % x Alat x (CRF) x

1 Jam/Tahun

=

0,90 x 116.000.000 x 0,20483 1,500.00

2.

Lain-lain

:

Asuransi 3% th + PPn 10%

=

3,30 %

x

Harga Jam/Tahun

=

0,033

x

116,000,000.00 1,500.00

Sub Total B.

BIAYA OPERASI (OPERATION COSTS) : (Rp./jam) Kebutuhan bahan bakar dan pelumas tiap HP : Diesel

=

0.160

/liter/HP/jam.

Bensin

=

0.170

/liter/HP/jam.

Pelumas

=

0.006

/liter/HP/jam.

Harga

: Solar/Minyak

Diesel

= Rp.

Bensin

= Rp.

Pelumas

= Rp.

Bahan Bakar Diesel

=

0.160

x

145

Bahan Bakar Bensin

=

0.170

x

145

Pelumas

=

0.006

x

145

Perbaikan dan Spareparts

=

0.800

x

Rp.

+

Rp.

( 80% x depresiasi ) Sub Total

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT : A + B

Rp.

19,720.93

ANALISA BIAYA PERALATAN

PROPINSI

:

JAWA TIMUR

KOTA

:

KEDIRI

JENIS ALAT

:

Compressor Air 210 m3

HARGA

:

Rp.

UMUR KERJA

:

8 tahun

A.

141,500,000.00 =

6.000 jam

BIAYA PEMILIKAN (OWNERSHIP COSTS) : (Rp./jam) 1.

Depresiasi : 90 % x Alat x (CRF) x

1 Jam/Tahun

=

0,90 x 141.500.000 x 0,20483 750.00

2.

Lain-lain

:

Asuransi 3% th + PPn 10%

=

3,30 %

x

Harga Jam/Tahun

=

0,033

x

141,500,000.00 750.00

Sub Total B.

BIAYA OPERASI (OPERATION COSTS) : (Rp./jam) Kebutuhan bahan bakar dan pelumas tiap HP :

Harga

Diesel

=

0.160

/liter/HP/jam.

Bensin

=

0.170

/liter/HP/jam.

Pelumas

=

0.006

/liter/HP/jam.

: Solar/Minyak

Diesel

= Rp.

Bensin

= Rp.

Pelumas

= Rp.

Bahan Bakar Diesel

=

0.160

x

35

Bahan Bakar Bensin

=

0.170

x

35

Pelumas

=

0.006

x

35

Perbaikan dan Spareparts

=

0.800

x

Rp.

+

Rp.

( 80% x depresiasi ) Sub Total

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT : A + B

Rp.

41,006.13

KODE E.052

TENAGA

=

FAKTOR ( CRF )

=

115 HP 0.20483

= Rp.

123,266.69

= Rp.

22,066.00

= Rp.

145,332.69

Harga

13,750.00 /liter 0.00 /liter 36,300.00 /liter x Rp.

13,750.00 = Rp.

253,000.00

x Rp.

0.00 = Rp.

0.00

x Rp.

36,300.00 = Rp.

25,047.00

= Rp.

98,613.36

123,266.69

376,660.36 Dibulatkan

= Rp.

376,660.36

= Rp.

521,993.05 /jam

= Rp.

521,993.00 /jam

KODE E.080

TENAGA

=

FAKTOR ( CRF )

=

= Rp.

37 HP 0.18062

34,570.67

Harga

= Rp.

7,018.00

= Rp.

41,588.67

13,750.00 /liter /liter 36,300.00 /liter x Rp.

13,750.00 = Rp.

81,400.00

x Rp.

0.00 = Rp.

0.00

x Rp.

36,300.00 = Rp.

8,058.60

= Rp.

27,656.53

= Rp.

117,115.13

= Rp.

158,703.80 /jam

= Rp.

158,703.00 /jam

34,570.67

117,115.13 Dibulatkan

KODE E.081

TENAGA

=

FAKTOR ( CRF )

=

40 HP 0.18062

= Rp.

65,565.06

= Rp.

13,310.00

= Rp.

78,875.06

Harga

13,750.00 /liter 0.00 /liter 36,300.00 /liter

x Rp.

13,750.00 = Rp.

88,000.00

x Rp.

0.00 = Rp.

0.00

x Rp.

36,300.00 = Rp.

8,712.00

= Rp.

52,452.05

= Rp.

149,164.05

= Rp.

228,039.11 /jam

= Rp.

228,039.00 /jam

65,565.06

149,164.05 Dibulatkan

KODE E.084

TENAGA

=

FAKTOR ( CRF )

=

95 HP 0.18062

= Rp.

35,816.95

= Rp.

7,271.00

= Rp.

43,087.95

Harga

13,750.00 /liter 0.00 /liter 36,300.00 /liter x Rp.

13,750.00 = Rp.

209,000.00

x Rp.

0.00 = Rp.

0.00

x Rp.

36,300.00 = Rp.

20,691.00

= Rp.

28,653.56

= Rp.

258,344.56

= Rp.

301,432.50 /jam

= Rp.

301,432.00 /jam

35,816.95

258,344.56 Dibulatkan

KODE E.087

TENAGA

=

FAKTOR ( CRF )

=

109 HP 0.18062

= Rp.

94,988.06

= Rp.

19,283.00

= Rp.

114,271.06

Harga

13,750.00 /liter 0.00 /liter 36,300.00 /liter x Rp.

13,750.00 = Rp.

116,453.11

x Rp.

0.00 = Rp.

0.00

x Rp.

36,300.00 = Rp.

14,244.12

= Rp.

75,990.45

= Rp.

206,687.68

= Rp.

320,958.74 /jam

= Rp.

320,958.00 /jam

94,988.06

206,687.68 Dibulatkan

KODE E.153

TENAGA

=

25 HP

FAKTOR ( CRF )

=

0.24668

= Rp.

4,255.23

= Rp.

632.50

= Rp.

4,887.73

Harga

13,750.00 /liter 0.00 /liter 36,300.00 /liter x Rp.

13,750.00 = Rp.

55,000.00

x Rp.

0.00 = Rp.

0.00

x Rp.

36,300.00 = Rp.

5,445.00

= Rp.

3,404.18

= Rp.

63,849.18

= Rp.

68,736.91 /jam

4,255.23

63,849.18

Dibulatkan

= Rp.

68,736.00 /jam

KODE E.155

TENAGA

=

150 HP (B)

= Rp. 157,500,000.00 ( C ) 0.607

= Rp.

0.199 ( D )

= Rp.

261,318.75 ( E )

3.046

= Rp.

196,875.00 ( F )

= Rp.

98,437.50 ( G )

)

= Rp.

268,125.00

)

= Rp.

21,780.00

)

= Rp.

7,012,500.00

= Rp.

7,302,405.00 ( H )

1/8

= Rp.

8,125.00 ( J )

1/8

= Rp.

5,625.00 ( K )

F = Rp.

196,875.00

G = Rp.

98,437.50

H = Rp.

7,302,405.00

J = Rp.

8,125.00

K = Rp.

5,625.00

= Rp.

7,611,467.50 ( T )

7,611,467.50

= Rp.

7,872,786.25

Dibulatkan

= Rp.

7,872,786.00

KODE E.157

TENAGA

=

FAKTOR ( CRF )

=

30 HP 0.2226

= Rp.

89,234.78

= Rp.

14,698.75

= Rp.

103,933.53

Harga

13,750.00 /liter 0.00 /liter 36,300.00 /liter x Rp.

13,750.00 = Rp.

66,000.00

x Rp.

0.00 = Rp.

0.00

x Rp.

36,300.00 = Rp.

6,534.00

= Rp.

71,387.82

89,234.78

143,921.82 Dibulatkan

= Rp.

143,921.82

= Rp.

247,855.35 /jam

= Rp.

247,855.00 /jam

KODE E.182

TENAGA

=

FAKTOR ( CRF )

=

115 HP 0.24668

= Rp.

40,702.20

= Rp.

6,050.00

= Rp.

46,752.20

Harga

13,750.00 /liter 0.00 /liter 36,300.00 /liter x Rp.

13,750.00 = Rp.

122,863.38

x Rp.

0.00 = Rp.

0.00

x Rp.

36,300.00 = Rp.

15,028.20

= Rp.

32,561.76

= Rp.

170,453.34

= Rp.

217,205.54 /jam

= Rp.

217,205.00 /jam

40,702.20

170,453.34 Dibulatkan

KODE E.212

TENAGA

=

FAKTOR ( CRF )

=

145 HP 0.24668

= Rp.

17,168.93

= Rp.

2,552.00

= Rp.

19,720.93

Harga

13,750.00 /liter 0.00 /liter 36,300.00 /liter x Rp.

13,750.00 = Rp.

319,000.00

x Rp.

0.00 = Rp.

0.00

x Rp.

36,300.00 = Rp.

31,581.00

= Rp.

13,735.14

= Rp.

364,316.14

= Rp.

384,037.07 /jam

= Rp.

384,037.00 /jam

17,168.93

364,316.14 Dibulatkan

KODE E.301

TENAGA

=

FAKTOR ( CRF )

=

35 HP 0.20483

= Rp.

34,780.13

= Rp.

6,226.00

= Rp.

41,006.13

Harga

13,750.00 /liter 0.00 /liter 36,300.00 /liter x Rp.

13,750.00 = Rp.

77,000.00

x Rp.

0.00 = Rp.

0.00

x Rp.

36,300.00 = Rp.

7,623.00

= Rp.

27,824.11

= Rp.

112,447.11

= Rp.

153,453.24 /jam

= Rp.

153,453.00 /jam

34,780.13

112,447.11 Dibulatkan

ANALI SA

HAR GA

SAT UAN

LAPIS TIPIS ASPAL PASIR (LATASIR) PRODUKSI DAN SUPLAI (MENGGUNAKAN ALAT) PROPINSI

KODE

JAWA TIMUR

(

)

KOTA

KODE DISIAPKAN OLEH :

KEDIRI

(

)

PROSES :

ANGGAPAN :

1.

Semua material dikirim pemasok

1. LATASIR dibuat di AMP produksi 100 ton/hari

2.

Loader menjaga bin tetap penuh

2. Aspal dipanaskan lebih dahulu agar aspal sudah siap saat dimulai

3.

Produksi AMP 100 ton/hari

3. Biaya produksi termasuk pengangkutan s/d 10 km dari AMP

4.

Dump Truck dimuati dan ditutupi

4. Produksi dimuat kedalam dumptruck 5 ton dan dikirim ke tempat pekerjaan

terpal untuk mempertahankan suhu

5. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

Dump Truck membongkar langsung

6. Spek B.M. No. 12/PT/B/1983 dan revisi Spesifikasi Umum Maret 1989 - Buku 3

5.

kedalam mesin penghampar aspal

PEKER JA

VOL.

HARI

KODE

TOTAL VOL.

Upah

BIAYA

Hari-Orang

Rp./hari/orang

(Rp.)

P

Mandor

1

1

L061

1

75,000.00

75,000.00

E

Operator Terampil

3

1

L081

3

65,000.00

195,000.00

K

Pembantu Operator

3

1

L083

3

45,000.00

135,000.00

E

Sopir

4

1

L091

4

65,000.00

260,000.00

R

Pembantu Sopir

4

1

L099

4

45,000.00

180,000.00

J

Buruh Tak Terampil

6

1

L101

6

50,000.00

300,000.00

A

Buruh Terampil

3

1

L106

3

50,000.00

150,000.00

Satuan

KODE

MAT E R IAL

Total

HARGA SAT.

BIAYA

Volume

(Rp.)

(Rp.)

M Pasir ayak untuk beton

m3

M041

45.00

130,000.00

5,850,000.00

A

Aspal curah

kg

M061A

10,000.00

11,200.00

112,000,000.00

T

Semen

50 kg

M080A

98.00

2,187.50

214,375.00

E

Kapur

m3

M081

6.00

440,000.00

2,640,000.00

R

Alat bantu (set @ 3 alat)

set

M170

0.06

1,295,000.00

77,700.00

I

Batu pecah mesin 0,5/1 cm

m

M026

1.50

253,000.00

379,500.00

3

A L P E RALATAN

Jumlah

Hari

Alat

Kerja

KODE

Jam

HARGA

BIAYA

Kerja

(Rp.)

(Rp.)

P

Wheel Loader 115 HP

1

1

E052

5.00

521,993.00

2,609,965.00

E

Mesin Penyampur Aspal 30 t/j

1

1

E155

5.00

7,872,786.00

39,363,930.00

R

Dump Truck 5 ton/145 HP

4

1

E212

24.00

384,037.00

9,216,888.00

A L A T A N JUMLAH (Rp.) Volume

100

Satuan

ton

Harga Satuan

1,736,473.58

Dibulatkan

1,736,473.00

ANALI SA

HAR GA

SAT UAN

LAPIS TIPIS ASPAL BETON (LATASTON) PRODUKSI DAN SUPLAI (MENGGUNAKAN ALAT) PROPINSI

KODE

JAWA TIMUR

(

)

KOTA

KODE DISIAPKAN OLEH :

KEDIRI

(

)

PROSES :

ANGGAPAN :

1.

Semua material dikirim pemasok

1. HRS dibuat di AMP produksi 100 ton/hari

2.

Loader menjaga bin tetap penuh

2. Agregat pecah tersaring disuplai termurah

3.

Produksi AMP 100 ton/hari

3. Aspal dipanaskan lebih dahulu agar aspal sudah siap saat dimulai

4.

Dump Truck dimuati dan ditutupi

4. Produksi dimuat kedalam dumptruck 5 ton dan dikirim ke penghampar aspal

terpal untuk mempertahankan suhu

5. Biaya produksi termasuk pengangkutan sejauh 10 km dari AMP

Dump Truck membongkar langsung

6. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

kedalam mesin penghampar aspal

7. Spek B.M. No. 12/PT/B/1983 (tabel 3.3)dan revisi Spesifikasi Umum Maret 1989 - Buku 3

5.

PEKER JA

VOL.

HARI

KODE

TOTAL VOL.

Upah

BIAYA

Hari-Orang

Rp./hari/orang

(Rp.)

P

Mandor

1

1

L061

1

75,000.00

75,000.00

E

Operator Terampil

3

1

L081

3

65,000.00

195,000.00

K

Pembantu Operator

3

1

L083

3

45,000.00

135,000.00

E

Sopir

4

1

L091

4

65,000.00

260,000.00

R

Pembantu Sopir

4

1

L099

4

45,000.00

180,000.00

J

Buruh Tak Terampil

6

1

L101

6

50,000.00

300,000.00

A

Buruh Terampil

3

1

L106

3

50,000.00

150,000.00

Satuan

KODE

MAT E R IAL

Total

HARGA SAT.

BIAYA

Volume

(Rp.)

(Rp.)

M Pasir ayak untuk beton

m3

M041

31.00

130,000.00

4,030,000.00

A

Aspal curah

kg

M061A

7,300.00

11,200.00

81,760,000.00

T

Semen

50 kg

M080A

90.00

2,187.50

196,875.00

E

Kapur

m3

M081

1.00

440,000.00

440,000.00

R

Alat bantu (set @ 3 alat)

set

M170

0.06

1,295,000.00

77,700.00

I

Batu pecah mesin 0,5/1 cm

m3

M026

22.50

253,000.00

5,692,500.00

Jumlah

Hari

KODE

Alat

Kerja

A L P E RALATAN

P

Wheel Loader 115 HP

1

1

E052

E

Mesin Penyampur Aspal 30 t/j

1

1

R

Dump Truck 5 ton/145 HP

4

1

A L A T A

Jam

HARGA

BIAYA

Kerja

(Rp.)

(Rp.)

5.00

521,993.00

2,609,965.00

E155

5.00

7,872,786.00

39,363,930.00

E212

24.00

384,037.00

9,216,888.00

N JUMLAH (Rp.) Volume

100

Satuan

ton

ANALI SA

HAR GA

Harga Satuan

1,446,828.58

Dibulatkan

1,446,828.00

SAT UAN

ASPAL BETON (LASTON) PRODUKSI DAN SUPLAI (MENGGUNAKAN ALAT) PROPINSI

KODE

JAWA TIMUR

(

)

KOTA

KODE DISIAPKAN OLEH :

KEDIRI

(

)

PROSES :

ANGGAPAN :

1.

Semua material dikirim pemasok

1. HRS dibuat di AMP produksi 100 ton/hari

2.

Loader menjaga bin tetap penuh

2. Agregat pecah tersaring disuplai termurah

3.

Produksi AMP 100 ton/hari

3. Aspal dipanaskan lebih dahulu agar aspal sudah siap saat dimulai

4.

Dump Truck dimuati dan ditutupi

4. Produksi dimuat kedalam dumptruck 5 ton dan dikirim ke penghampar aspal

terpal untuk mempertahankan suhu

5. Biaya produksi termasuk pengangkutan sejauh 10 km dari AMP

Dump Truck membongkar langsung

6. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

kedalam mesin penghampar aspal

7. Spek B.M. No. 13/PT/B/1983 (Mix v)dan revisi Spesifikasi Umum Maret 1989 - Buku 3

5.

PEKER JA

VOL.

HARI

KODE

TOTAL VOL.

Upah

BIAYA

Hari-Orang

Rp./hari/orang

(Rp.)

P

Mandor

1

1

L061

1

75,000.00

75,000.00

E

Operator Terampil

3

1

L081

3

65,000.00

195,000.00

K

Pembantu Operator

3

1

L083

3

45,000.00

135,000.00

E

Sopir

4

1

L091

4

65,000.00

260,000.00

R

Pembantu Sopir

4

1

L099

4

45,000.00

180,000.00

J

Buruh Tak Terampil

6

1

L101

6

50,000.00

300,000.00

A

Buruh Terampil

3

1

L106

3

50,000.00

150,000.00

Satuan

KODE

Total

HARGA SAT.

BIAYA

Volume

(Rp.)

(Rp.)

MAT E R IAL

M Pasir ayak untuk beton

m3

M041

27.00

130,000.00

3,510,000.00

A

Aspal curah

kg

M061A

7,000.00

11,200.00

78,400,000.00

T

Semen

50 kg

M080A

100.00

2,187.50

218,750.00

E

Alat bantu (set @ 3 alat)

set

M170

0.06

1,295,000.00

77,700.00

R

Batu pecah mesin 0,5/1 cm

m3

M026

27.50

253,000.00

6,957,500.00

Hari

KODE

I A L P E RALATAN

Jumlah

Jam

HARGA

BIAYA

Alat

Kerja

Kerja

(Rp.)

(Rp.)

P

Wheel Loader 115 HP

1

1

E052

5.00

521,993.00

2,609,965.00

E

Mesin Penyampur Aspal 30 t/j

1

1

E155

5.00

7,872,786.00

39,363,930.00

R

Dump Truck 5 ton/145 HP

4

1

E212

24.00

384,037.00

9,216,888.00

A L A T A N JUMLAH (Rp.) Volume

100

Satuan

ton

ANALI SA

HAR GA

Harga Satuan

1,416,497.33

Dibulatkan

1,416,497.00

SAT UAN

LAPIS PONDASI BAWAH KLAS A AGREGAT PECAH TERSARING ( MENGGUNAKAN ALAT ) PROPINSI : JAWA TIMUR

KODE

KOTA :

)

KEDIRI

(

KODE DISIAPKAN OLEH : (

)

PROSES :

ANGGAPAN :

1.

Agregat pecah tersaring ditimbun

1. Menggunakan peralatan berat (150 m2/hari)

disepanjang jalan oleh pemasok

2. Material ditimbun sepanjang jalan oleh pemasok

Grader membentuk ulang

3. Dikirim batu quarry/kerikil sungai pecah tersaring yang termurah

permukaan lama jalan

4. Dihampar dan dipadatkan sampai tebal padat 15 cm

Grader menghampar agregat

5. Dihampar dan dipadatkan 1.000 m2/hari

jalan disiram air dengan truk air

6. Koefisien pemadatan = 1,2

Pemadatan dengan mesin gilas

7. Gradasi bahan lapis pondasi bawah klas A semua harus melalui saringan 75 mm

2. 3. 4.

6-8 ton sampai 100% MDD

PEKER JA

sesuai rev. Spek. Umum B.M. Maret 1989 - Buku 3

VOL.

HARI

KODE

TOTAL VOL.

Upah

BIAYA

Hari-Orang

Rp./hari/orang

(Rp.)

P

Mandor

1

1

L061

1

75,000.00

75,000.00

E

Operator Terampil

2

1

L081

2

65,000.00

130,000.00

K

Pembantu Operator

2

1

L083

2

45,000.00

90,000.00

E

Sopir

1

1

L091

1

65,000.00

65,000.00

R

Pembantu sopir

1

1

L099

1

45,000.00

45,000.00

J

Buruh Tak Terampil

6

1

L101

6

50,000.00

300,000.00

Satuan

KODE

A

MAT E R IAL

Total

HARGA SAT.

BIAYA

Volume

(Rp.)

(Rp.)

M Batu quarry

m3

M010

129.00

A

Pasir urug

m

3

M040

T

Alat bantu (set @ 3 alat)

set

M170

Jumlah

Hari

KODE

Alat

Kerja

148,500.00

19,156,500.00

51.00

65,000.00

3,315,000.00

0.06

705,000.00

42,300.00

E R I A L P E RALATAN

Jam

HARGA

BIAYA

Kerja

(Rp.)

(Rp.) 775,000.00

P

Motor grader 100 HP

1

1

E010

5.00

155,000.00

E

Roller steel wheel 6-8 ton

1

1

E080

5.00

158,703.00

793,515.00

R

Truk tangki air 115 HP

1

1

E182

5.00

217,205.00

1,086,025.00

A L A T A N JUMLAH (Rp.) Volume

150

Satuan

m3

ANALI SA

HAR GA

Harga Satuan

172,488.93

Dibulatkan

172,488.00

SAT UAN

LAPIS PONDASI ATAS KLAS A AGREGAT PECAH TERSARING ( MENGGUNAKAN ALAT ) PROPINSI : JAWA TIMUR

(

KODE

KOTA :

)

KEDIRI

KODE DISIAPKAN OLEH : (

PROSES :

ANGGAPAN :

1.

Agregat pecah tersaring ditimbun

1. Menggunakan peralatan berat (150 m2/hari)

)

disepanjang jalan oleh pemasok

2. Material ditimbun sepanjang jalan oleh pemasok

2.

Grader menghampar agregat

3. Dikirim batu quarry/kerikil sungai pecah tersaring yang termurah

3.

Jalan disiram air dengan truk air

4. Dihampar dan dipadatkan sampai tebal padat 10 cm

4.

Pemadatan dengan mesin gilas

5. Dihampar dan dipadatkan 1.000 m2/hari

6-8 ton

6. Gradasi agregat lapis pondasi atas klas A semua harus melalui saringan 37,5 mm sesuai rev. Spek. Umum B.M. Maret 1989 - Buku 3

PEKER JA

VOL.

HARI

KODE

TOTAL VOL.

Upah

BIAYA

Hari-Orang

Rp./hari/orang

(Rp.)

P

Mandor

1

1

L061

1

75,000.00

75,000.00

E

Operator Terampil

2

1

L081

2

65,000.00

130,000.00

K

Pembantu Operator

2

1

L083

2

45,000.00

90,000.00 65,000.00

E

Sopir

1

1

L091

1

65,000.00

R

Pembantu sopir

1

1

L099

1

45,000.00

45,000.00

J

Buruh Tak Terampil

6

1

L101

6

50,000.00

300,000.00

Satuan

KODE

A

MAT E R IAL

Total

HARGA SAT.

BIAYA

Volume

(Rp.)

(Rp.)

M Batu quarry

m3

M010

177.00

148,500.00

26,284,500.00

A

Pasir urug

m3

M040

19.00

65,000.00

1,235,000.00

T

Alat bantu (set @ 3 alat)

set

M170

0.06

705,000.00

42,300.00

Jumlah

Hari

KODE

Alat

Kerja

E R I A L P E RALATAN

Jam

HARGA

BIAYA

Kerja

(Rp.)

(Rp.) 775,000.00

P

Motor grader 100 HP

1

1

E010

5.00

155,000.00

E

Roller steel wheel 6-8 ton

1

1

E080

5.00

158,703.00

793,515.00

R

Truk tangki air 115 HP

1

1

E182

5.00

217,205.00

1,086,025.00

A L A T A N JUMLAH (Rp.) Volume

150

Satuan

m3

ANALI SA

HAR GA

Harga Satuan

206,142.27

Dibulatkan

206,142.00

SAT UAN

LAPIS PENETRASI 50 MM LAPEN (MENGGUNAKAN BURUH) PROPINSI : JAWA TIMUR

( PEKER JA

KODE

KOTA :

)

KEDIRI VOL.

KODE DISIAPKAN OLEH : ( HARI

KODE

)

TOTAL VOL.

Upah

BIAYA

Hari-Orang

Rp./hari/orang

(Rp.)

P

Mandor

2

3

L061

6

75,000.00

450,000.00

E

Operator Terampil

2

3

L081

6

65,000.00

390,000.00

K

Sopir

1

3

L.091

3

65,000.00

195,000.00

E

Buruh terampil

2

3

L.106

6

50,000.00

300,000.00

R

Buruh tak terampil

66

3

L.101

Satuan

KODE

198

50,000.00

9,900,000.00

J A

MAT E R IAL

Total

HARGA SAT.

BIAYA

Volume

(Rp.)

(Rp.)

M Batu pecah 3/5 cm

m3

M.023

56.00

209,200.00

11,715,200.00

A

Batu pecah 2/3 cm

m3

M.024

31.00

250,000.00

7,750,000.00

T

Batu pecah 1/2 cm

m3

M.025

15.50

244,800.00

3,794,400.00

E

Pasir ayak beton

m3

M.041

3.50

130,000.00

455,000.00

R

Aspal kemas

kg

M.061

6,270.00

12,300.00

77,121,000.00

I

Minyak bakar

ltr

M.065

450.00

12,700.00

5,715,000.00

A

Alat bantu

set

M.170

0.06

11,235,000.00

674,100.00

Jumlah

Hari

KODE

Alat

Kerja

L P E RALATAN

Jam

HARGA

BIAYA

Kerja

(Rp.)

(Rp.)

P

Mesin gilas 3 roda

1

3

E.080

15.00

158,703.00

2,380,545.00

E

Mesin penyemprot aspal

1

3

E.153

15.00

68,736.00

1,031,040.00

R

Truck bak terbuka

1

3

E.212

15.00

384,037.00

5,760,555.00

A L A T A N JUMLAH (Rp.) Volume

1,400

Satuan

m2

ANALI SA

HAR GA

Harga Satuan

91,165.60

Dibulatkan

91,165.00

SAT UAN

PENGHAMPARAN LAPIS TIPIS ASPAL PASIR 20 mm ( MENGGUNAKAN ALAT )

PROPINSI

KODE

JAWA TIMUR

(

)

KOTA

KODE DISIAPKAN OLEH :

KEDIRI

(

)

PROSES :

ANGGAPAN :

1.

sebelum dilapis tack/pengikat

1. Menggunakan alat berat 1.750 m2/hari

prermukaan aspal lama dibersihkan

2. Pasir aspal dikirim kelokasi pekerjaan oleh pemasok dari AMP

lebih daulu dengan compressor

3. BJ padat 1,9 ton/m

pengisian material sampai bin

4. Tebal padat rata-rata 2 cm

dari spreader oleh pemasok

5. Lapis tack/pengikat aspal cutback dihampar @0,5 l/m2

Material dihampar dengan

6. Sesuai spesifikasi B.M.No.02/PT/B/1983

2. 3.

spreader dan dipadatkan dengan mesin gilas roda baja dan mesin gilas pneumatic roda karet PEKER JA

VOL.

HARI

KODE

TOTAL VOL.

Upah

BIAYA

Hari-Orang

Rp./hari/orang

3

P

Mandor

1

1

L061

1

75,000.00

75,000.00

E

Operator Terampil

4

1

L081

4

65,000.00

260,000.00

K

Pembantu Operator

4

1

L083

4

45,000.00

180,000.00

E

Buruh Tak Terampil

6

1

L101

6

50,000.00

300,000.00

R

Buruh Terampil

2

1

L106

2

50,000.00

100,000.00

Satuan

KODE

J A

MAT E R IAL

Total

HARGA SAT.

BIAYA

Volume

(Rp.)

(Rp.)

M Campuran panas LATASIR

ton

K.020

66.00

1,736,473.00

114,607,218.00

A

Aspal

kg

M061

700.00

11,200.00

7,840,000.00

T

Minyak bakar

ltr

M065

175.00

12,700.00

2,222,500.00

E

Alat bantu (set @ 3 alat)

set

M170

0.06

915,000.00

54,900.00

Jumlah

Hari

KODE

Alat

Kerja

R I A L P E RALATAN

Jam

HARGA

BIAYA

Kerja

(Rp.)

(Rp.)

P

Tandem Roller 6-8 ton

1

1

E081

5.00

228,039.00

1,140,195.00

E

Pneumatic tire roller 8-15 ton

1

1

E084

5.00

301,432.00

1,507,160.00

R

Asphalt sprayer 1.000 lt

1

1

E153

5.00

68,736.00

343,680.00

A

Asphalt finisher

1

1

E157

5.00

247,855.00

1,239,275.00

L

Compressor air 210 m3/jam

1

1

E301

4.00

153,453.00

613,812.00

A T A N JUMLAH (Rp.) Volume

1750

Satuan

m2

Harga Satuan

74,562.14

Dibulatkan

74,562.00

ANALI SA

HAR GA

SAT UAN

PENGHAMPARAN LAPIS TIPIS ASPAL BETON (LATASTON) ( MENGGUNAKAN ALAT ) PROPINSI

KODE

JAWA TIMUR

(

)

KOTA

KODE DISIAPKAN OLEH :

KEDIRI

(

)

PROSES :

ANGGAPAN :

1.

pengisian material sampai bin

1. Menggunakan peralatan berat 1.500 m2/hari

dari spreader oleh pemasok

2. HRS (LATASTON) dikirim sampai ke lokasi oleh pemasok dari AMP

Material dihampar dengan

3. Tebal padat rata-rata 3 cm

spreader dan dipadatkan dengan

4. BJ Lataston 2,2 ton/m3

mesin gilas roda baja dan mesin

5. Spek B.M.No.12/PT/8/1983 (tabel3,3) & rev. Spek Umum Maret 1989 - Buku 3

2.

gilas pneumatic roda karet 3.

Hamparan lapis tck/pengikat aspal cutback @ 0,5 l/m2

PEKER JA

VOL.

HARI

KODE

TOTAL VOL.

Upah

BIAYA

Hari-Orang

Rp./hari/orang

(Rp.)

P

Mandor

1

1

L061

1

75,000.00

75,000.00

E

Operator Terampil

4

1

L081

4

65,000.00

260,000.00

K

Pembantu Operator

4

1

L083

4

45,000.00

180,000.00

E

Buruh Tak Terampil

12

1

L101

12

50,000.00

600,000.00

R

Buruh Terampil

8

1

L106

8

50,000.00

400,000.00

Satuan

KODE

J A

MAT E R IAL

Total

HARGA SAT.

BIAYA

Volume

(Rp.)

(Rp.)

M HRS (LATASTON)

ton

K.035

100.00

1,446,828.00

144,682,800.00

A

Aspal

kg

M061

600.00

11,200.00

6,720,000.00

T

Minyak bakar

ltr

M065

150.00

12,700.00

1,905,000.00

E

Alat bantu (set @ 3 alat)

set

M170

0.06

1,515,000.00

90,900.00

Jumlah

Hari

KODE

Alat

Kerja

R I A L P E RALATAN

Jam

HARGA

BIAYA

Kerja

(Rp.)

(Rp.)

P

Tandem Roller 6-8 ton

1

1

E081

5.00

228,039.00

1,140,195.00

E

Pneumatic tire roller 8-15 ton

1

1

E084

5.00

301,432.00

1,507,160.00

R

Asphalt sprayer 1.000 lt

1

1

E153

5.00

68,736.00

343,680.00

A

Asphalt finisher

1

1

E157

5.00

247,855.00

1,239,275.00

L

Compressor air 210 m3/jam

1

1

E301

4.00

153,453.00

613,812.00

A T A N JUMLAH (Rp.) Volume

1500

Satuan

m2

Harga Satuan

106,505.21

Dibulatkan

ANALI SA

HAR GA

106,505.00

SAT UAN

PENGHAMPARAN LAPIS PERMUKAAN ASPAL BETON (LASTON) ( MENGGUNAKAN ALAT ) PROPINSI

KODE

JAWA TIMUR

(

)

KOTA

KODE DISIAPKAN OLEH :

KEDIRI

(

)

PROSES :

ANGGAPAN :

1.

pengisian material sampai bin

1. Menggunakan peralatan berat

dari spreader oleh pemasok

2. Hotmix aspal beton dikirim sampai ke spreader oleh pemasok dari AMP

Material dihampar dengan

3. Berat Jenis padat 2,25 t/m3 tebal 5 cm

spreader dan dipadatkan dengan

4. Dihamparkan dan dipadatkan 900 m2/hari

mesin gilas roda baja dan mesin

5. Lapis tack/pengikat aspal cutback dihampar @ 0,5 l/m2

gilas pneumatic roda karet

6. Spek B.M.No.13/PT/B/1983 (Mix v) & rev. Spek Umum maret 1989 - Buku 3

2.

PEKER JA

VOL.

HARI

KODE

TOTAL VOL.

Upah

BIAYA

Hari-Orang

Rp./hari/orang

(Rp.)

P

Mandor

1

1

L061

1

75,000.00

75,000.00

E

Operator Terampil

5

1

L081

5

65,000.00

325,000.00

K

Pembantu Operator

5

1

L083

5

45,000.00

225,000.00

E

Buruh Tak Terampil

15

1

L101

15

50,000.00

750,000.00

R

Buruh Terampil

10

1

L106

10

50,000.00

500,000.00

Satuan

KODE

Total

HARGA SAT.

BIAYA

Volume

(Rp.)

(Rp.)

J A

MAT E R IAL

M Aspal beton (LASTON)

ton

K.040

100.00

1,416,497.00

A

Pasir ayak untuk beton

m3

M041

0.90

130,000.00

141,649,700.00 117,000.00

T

Aspal

kg

M061

360.00

11,200.00

4,032,000.00

E

Minyak bakar

ltr

M065

90.00

12,700.00

1,143,000.00

R

Alat bantu (set @ 3 alat)

set

M170

0.06

1,875,000.00

112,500.00

Jumlah

Hari

KODE

Alat

Kerja

I A L P E RALATAN

Jam

HARGA

BIAYA

Kerja

(Rp.)

(Rp.)

P

Roller steel wheel 6-8 ton

1

1

E080

5.00

158,703.00

793,515.00

E

Tandem Roller 6-8 ton

1

1

E081

5.00

228,039.00

1,140,195.00

R

Pneumatic tire roller 8-15 ton

1

1

E084

5.00

301,432.00

1,507,160.00

A

Asphalt sprayer 1.000 lt

1

1

E153

5.00

68,736.00

343,680.00

L

Asphalt finisher

A

Compressor air 210 m /jam 3

1

1

E157

5.00

247,855.00

1,239,275.00

1

1

E301

4.00

153,453.00

613,812.00

T A N JUMLAH (Rp.) Volume

900

Satuan

m2

Harga Satuan

171,740.93

Dibulatkan

171,740.00

KODE K.020 TANGGAL :

SUB JUMLAH (Rp.)

1,295,000.00 SUB JUMLAH (Rp.)

121,161,575.00 SUB JUMLAH (Rp.)

51,190,783.00 173,647,358.00 per ton per ton

KODE K.035 TANGGAL :

m Maret 1989 - Buku 3

SUB JUMLAH (Rp.)

1,295,000.00 SUB JUMLAH (Rp.)

92,197,075.00 SUB JUMLAH (Rp.)

51,190,783.00 144,682,858.00 per ton per ton

KODE K.040 TANGGAL :

SUB JUMLAH (Rp.)

1,295,000.00 SUB JUMLAH (Rp.)

89,163,950.00 SUB JUMLAH

(Rp.)

51,190,783.00 141,649,733.00 per ton per ton

KODE K.510 TANGGAL :

SUB JUMLAH (Rp.)

705,000.00 SUB JUMLAH (Rp.)

22,513,800.00 SUB JUMLAH (Rp.)

2,654,540.00 25,873,340.00 per m3 per m3

KODE K.520 TANGGAL :

SUB JUMLAH (Rp.)

705,000.00 SUB JUMLAH (Rp.)

27,561,800.00 SUB JUMLAH (Rp.)

2,654,540.00 30,921,340.00 per m3 per m3

KODE K.618 TANGGAL : SUB JUMLAH (Rp.)

11,235,000.00 SUB JUMLAH (Rp.)

107,224,700.00 SUB JUMLAH (Rp.)

9,172,140.00 127,631,840.00 per m2 per m2

KODE K.621

TANGGAL :

SUB JUMLAH (Rp.)

915,000.00 SUB JUMLAH (Rp.)

124,724,618.00 SUB JUMLAH (Rp.)

4,844,122.00 130,483,740.00 per m2 per m2

KODE K.636 TANGGAL :

SUB JUMLAH (Rp.)

1,515,000.00 SUB JUMLAH (Rp.)

153,398,700.00 SUB JUMLAH (Rp.)

4,844,122.00 159,757,822.00 per m2

per m2

KODE K.641 TANGGAL :

SUB JUMLAH (Rp.)

1,875,000.00 SUB JUMLAH (Rp.)

147,054,200.00 SUB JUMLAH (Rp.)

5,637,637.00 154,566,837.00 per m2 per m2