1. Memasang gear besar ke chasis

Waktu Siklus = 4,8 detik Performance Rating  Subjektif Tabel 4.41 Performance Rating Subjektif Operasi Kerja 28

No

Faktor

Kelas

Lambang

1.

Skill

Good

C2

+0,03

2.

Effort

Good

C2

+0,02

3.

Kondisi Kerja

Good

C

+0,02

4.

Konsistensi

Average

D

0,00

Total

+0,07

Sehingga performance rating subjektif p1 = 1 + 0,07 = 1,07  Objektif Tabel 4.42 Performance Rating Objektif Operasi Kerja 28

No 1. 2. 3. 4. 5. 6.

Keadaan Anggota terpakai

badan Pergelangan tangan dan jari Tanpa pedal atau Pedal kaki bawah kaki Kedua tangan saling Penggunaan tangan bantu atau bergantian Kondisi mata dengan Cukup dekat tangan Dengan sedikit Peralatan kontrol 0,45 menggunakan Berat beban tangan

Lambang

Penyesuaian (%)

B

1

F

0

H

0

J

2

O

1

B-1

2

Total

6 Sehingga performance rating objektif p2 = 1 + 0,06 = 1,06 Jadi, performance rating : p = p1 x p2 = 1,07 x 1,06 = 1,1342  Waktu Normal Waktu normal = waktu siklus x performance rating 04,8 x 1,1342 = 5,4442 detik  Waktu Baku

100%

Wb

= Wn x 100% − 𝑎𝑙𝑙𝑜𝑤𝑎𝑛𝑐𝑒 100%

= 5,4442 x 100% −13 % = 6,2577 detik 2. Memasang roda belakang kanan ke as roda

Waktu Siklus = 5,67 Performance Rating  Subjektif Tabel 4.63 Performance Rating Subjektif Operasi Kerja 30

No

Faktor

Kelas

Lambang

1.

Skill

Good

C2

+0,03

2.

Effort

Good

C1

+0,05

3.

Kondisi Kerja

Good

C

+0,02

4.

Konsistensi

Average

D

0,00

Total

+0,08

Sehingga performance rating subjektif p1 = 1 + 0,10 = 1,10  Objektif Tabel 4.64 Performance Rating Objektif Operasi Kerja 30

No 1. 2. 3. 4. 5. 6. Total

Keadaan Anggota terpakai

badan Pergelangan tangan dan jari Tanpa pedal atau Pedal kaki bawah kaki Kedua tangan saling Penggunaan tangan bantu atau bergantian Koordinasi mata Cukup dekat dengan tangan Dengan sedikit Peralatan kontrol 0,45 menggunakan Berat beban tangan

Lambang

Penyesuaian (%)

B

1

F H J

0 0 2

O

1

B-1

2

6 Sehingga performance rating objektif p2 = 1 + 0,06 = 1,06 Jadi, performance rating : p = p1 x p2 = 1,10 x 1,06 = 1,166  Waktu Normal

Waktu normal = waktu siklus x performance rating = 5,67 x 1,166 = 6,6112 detik

 Waktu Baku 100%

Wb

= Wn x 100% − 𝑎𝑙𝑙𝑜𝑤𝑎𝑛𝑐𝑒 100%

= 6,6112 x 100% −13 % = 7,5991 detik 3. Memasang as roda belakang kanan assy ke chasis assy

Waktu Siklus = 6,93 Performance Rating  Subjektif Tabel 4.43 Performance Rating Subjektif Operasi Kerja 29

No

Faktor

Kelas

Lambang

1.

Skill

Good

C2

+0,03

2.

Effort

Good

C2

+0,02

3.

Kondisi Kerja

Good

C

+0,02

4.

Konsistensi

Average

D

0,00

Total

+0,07

Sehingga performance rating subjektif p1 = 1 + 0,07 = 1,07  Objektif Tabel 4.44 Performance Rating Objektif Operasi Kerja 29

No 1. 2. 3. 4. 5.

Keadaan Anggota terpakai

badan Pergelangan tangan dan jari Tanpa pedal atau Pedal kaki bawah kaki Kedua tangan saling Penggunaan tangan bantu atau bergantian Koordinasi mata Cukup dekat dengan tangan Dengan sedikit Peralatan kontrol

Lambang

Penyesuaian (%)

B

1

F H J O

0 0 2 1

6.

0,45 menggunakan B-1 tangan

Berat beban

Total

2 6

Sehingga performance rating objektif p2 = 1 + 0,06 = 1,06 Jadi, performance rating : p = p1 x p2 = 1,07 x 1,06 = 1,1342  Waktu Normal Waktu normal = waktu siklus x performance rating = 6,93 x 1,1342 = 7,86 detik  Waktu Baku 100%

Wb

= Wn x 100% − 𝑎𝑙𝑙𝑜𝑤𝑎𝑛𝑐𝑒 100%

= 7,86 x 100% − 13% = 9,0345 detik 4. Memasang roda belakang kiri ke as roda belakang kanan assy pada chasis assy

Waktu Siklus = 6,00 Performance Rating  Subjektif Tabel 4.63 Performance Rating Subjektif Operasi Kerja 30

No

Faktor

Kelas

Lambang

1.

Skill

Good

C2

+0,03

2.

Effort

Good

C1

+0,05

3.

Kondisi Kerja

Good

C

+0,02

4.

Konsistensi

Average

D

0,00

Total

+0,08

Sehingga performance rating subjektif p1 = 1 + 0,10 = 1,10  Objektif Tabel 4.64 Performance Rating Objektif Operasi Kerja 30

No 1.

Keadaan Anggota terpakai

badan Pergelangan dan jari

tangan

Lambang

Penyesuaian (%)

B

1

2.

Pedal kaki

3.

Penggunaan tangan

4.

Koordinasi dengan tangan

5.

Peralatan

6.

Berat beban

Total

Tanpa pedal atau F bawah kaki Kedua tangan saling H bantu atau bergantian

mata

Cukup dekat

0 0 2

J

Dengan sedikit O kontrol 0,45 menggunakan B-1 tangan

1 2

6 Sehingga performance rating objektif p2 = 1 + 0,06 = 1,06 Jadi, performance rating : p = p1 x p2 = 1,10 x 1,06 = 1,166  Waktu Normal Waktu normal = waktu siklus x performance rating = 6,00 x 1,166 = 6,996 detik

 Waktu Baku 100%

Wb

= Wn x 100% − 𝑎𝑙𝑙𝑜𝑤𝑎𝑛𝑐𝑒 100%

= 6,966 x 100% −13 % = 8,0414 detik 5. Memasang baut pada roller bagian kiri depan

Waktu Siklus = 7,73 detik Performance Rating  Subjektif Tabel 4.41 Performance Rating Subjektif Operasi Kerja 28

No

Faktor

Kelas

Lambang

1.

Skill

Good

C2

+0,03

2.

Effort

Good

C2

+0,02

3.

Kondisi Kerja

Good

C

+0,02

4.

Konsistensi

Average

D

0,00

Total

+0,07

Sehingga performance rating subjektif p1 = 1 + 0,07 = 1,07  Objektif Tabel 4.42 Performance Rating Objektif Operasi Kerja 28

No

Keadaan Anggota terpakai

badan Pergelangan tangan dan jari Tanpa pedal atau Pedal kaki bawah kaki Kedua tangan saling Penggunaan tangan bantu atau bergantian Kondisi mata dengan Cukup dekat tangan Dapat ditangani Peralatan dengan mudah 0,45 menggunakan Berat beban tangan

1. 2. 3. 4. 5. 6.

Lambang

Penyesuaian (%)

B

1

F

0

H

0

J

2

N

0

B-1

2

Total

5 Sehingga performance rating objektif p2 = 1 + 0,05 = 1,05 Jadi, performance rating : p = p1 x p2 = 1,07 x 1,05 = 1,1235  Waktu Normal Waktu normal = waktu siklus x performance rating = 7,73 x 1,1235 = 8,6847 detik  Waktu Baku Wb

100%

= Wn x 100% − 𝑎𝑙𝑙𝑜𝑤𝑎𝑛𝑐𝑒 100%

= 8,6847 x 100% −13 % = 9,9824 detik 6. Membaut roller depan kiri assy ke chasis assy

Waktu Siklus = 12,14 Performance Rating  Subjektif

Tabel 4.43 Performance Rating Subjektif Operasi Kerja 29

No

Faktor

Kelas

Lambang

1.

Skill

Good

C2

+0,03

2.

Effort

Good

C2

+0,02

3.

Kondisi Kerja

Good

C

+0,02

4.

Konsistensi

Average

D

0,00

Total

+0,07

Sehingga performance rating subjektif p1 = 1 + 0,07 = 1,07  Objektif Tabel 4.44 Performance Rating Objektif Operasi Kerja 29

No 1. 2. 3. 4. 5. 6.

Keadaan Anggota terpakai

badan Pergelangan tangan dan jari Tanpa pedal atau Pedal kaki bawah kaki Kedua tangan saling Penggunaan tangan bantu atau bergantian Koordinasi mata Cukup dekat dengan tangan Perlu kontrol dan Peralatan penekanan 0,45 menggunakan Berat beban tangan

Lambang

Penyesuaian (%)

B

1

F H J

0 0 2

P

2

B-1

2

Total

7 Sehingga performance rating objektif p2 = 1 + 0,07 = 1,07 Jadi, performance rating : p = p1 x p2 = 1,07 x 1,07 = 1,1449  Waktu Normal Waktu normal = waktu siklus x performance rating = 12,14 x 1,1449 = 13,8991 detik  Waktu Baku Wb

100%

= Wn x 100% − 𝑎𝑙𝑙𝑜𝑤𝑎𝑛𝑐𝑒 100%

= 13,8991 x 100% − 13%

= 15,976 detik 7. Memasang baut pada roller kanan bagian depan

Waktu Siklus = 5,4 detik Performance Rating  Subjektif Tabel 4.41 Performance Rating Subjektif Operasi Kerja 28

No

Faktor

Kelas

Lambang

1.

Skill

Good

C2

+0,03

2.

Effort

Good

C2

+0,02

3.

Kondisi Kerja

Good

C

+0,02

4.

Konsistensi

Average

D

0,00

Total

+0,07

Sehingga performance rating subjektif p1 = 1 + 0,07 = 1,07  Objektif Tabel 4.42 Performance Rating Objektif Operasi Kerja 28

No 1. 2. 3. 4. 5. 6.

Keadaan Anggota terpakai

badan Pergelangan tangan dan jari Tanpa pedal atau Pedal kaki bawah kaki Kedua tangan saling Penggunaan tangan bantu atau bergantian Kondisi mata dengan Cukup dekat tangan Dapat ditangani Peralatan dengan mudah 0,45 menggunakan Berat beban tangan

Lambang

Penyesuaian (%)

B

1

F

0

H

0

J

2

N

0

B-1

2

Total

5 Sehingga performance rating objektif p2 = 1 + 0,05 = 1,05 Jadi, performance rating : p = p1 x p2 = 1,07 x 1,05 = 1,1235  Waktu Normal Waktu normal = waktu siklus x performance rating = 5,4 x 1,1235

= 6,0669 detik  Waktu Baku Wb

100%

= Wn x 100% − 𝑎𝑙𝑙𝑜𝑤𝑎𝑛𝑐𝑒 100%

= 6,0669 x 100% −13 % = 6,9734 detik

Related Documents

Waktu Baku 1-7.docx
June 2020 8
Baku
April 2020 22
Baku
July 2020 15
Baku
May 2020 10
Kata Baku Tidak Baku
October 2019 33
Bahan Baku
June 2020 14

More Documents from ""

Bab I.docx
June 2020 7
Mutu.docx
June 2020 12
Waktu Baku 1-7.docx
June 2020 8
April 2020 29