BADER AL MULLA & BROS. CO. W.L.L. VARIATION SUMMARY PROJECT: AL BASSAM OFFICE TOWER AT TECOM DISCIPLINE: ELECTRICAL Submitted Variatio S.No. Description Value By n Ref. BMB (AED)

Agreed Value (AED)

BMB OH&P(10% TotalCost Corresponden ) (AED) ce

TEC Correspondence

Status

1

V-EL-01

149,176.00

0.00

BMB/TEC/PJ/232TEC/P289/WHB/1565-09

on discussion with consultant

2

V-EL-02 GSM DU Cable Containment 136,255.00

0.00

BMB/TEC/PJ/232TEC/P289/WHB/1565-09

on discussion with consultant

3

V-EL-03 External Lighting (Facade)

###

BMB/TEC/PJ/408

GSM Cable Laying

4

V-EL-04

Structured Cabling

5

V-EL-05

6

159,622.00 130,522.72 13,052.27

Accepted

TEC/P289/WHB/2235BMB/TEC/PJ/301 09, on discussion with , consultant TEC/P289/WHB/2393BMB/TEC/PJ/364 09 TEC/P289/WHB/239209, BMB/TEC/PJ/358 Accepted TEC/P289/WHB/246809 TEC/P289/WHB/2392-

563,385.00

0.00

Fire Alarm

233,788.07 159,090.90 15,909.09

###

V-EL-06

Central Battery System

530,263.00 381,044.54 38,104.45

###

7

V-EL-08

LV Switch Gear

132,828.17

8

V-EL-09

Additional Power Supply as per Du comments

41,748.00

41,946.36

4,194.64

46,141.00 BMB/TEC/PJ/369

Accepted

9

V-EL-10

Garbage Chute

25,011.00

23,593.64

2,359.36

25,953.00 BMB/TEC/PJ/409

Accepted

34,352.73

3,435.27

37,788.00 BMB/TEC/PJ/441

Accepted

BMB/TEC/PJ/334

BMB/TEC/PJ/539

09, TEC/P289/WHB/246809

Accepted on discussion with consultant

10

V-EL-11 Civil Defence Control Panel

39,298.00

11

V-EL-13

Containment for Intelligent Metering System

22,994.00

0.00

BMB/TEC/PJ/456 , BMB/TEC/PJ/514

on discussion with consultant

12

V-EL-14

Additional light points for ground floor

34,130.00

0.00

BMB/TEC/PJ/544

on discussion with consultant

13

V-EL-15

Cable tray Containment CCTV

2,086.00

0.00

BMB/TEC/PJ/540

on discussion with consultant

Remarks

14

V-EL-16

Electrical Provisions in Podium Toilets

24,675.00

0.00

TOTAL

###

###

BMB/TEC/PJ/542

on discussion with consultant

BADER AL MULLA & BROS. CO. W.L.L. VARIATION SUMMARY PROJECT: AL BASSAM OFFICE TOWER AT TECOM DISCIPLINE: HVAC S.No.

Variation Ref.

Description

Submitted Value By BMB (AED)

Agreed Value (AED)

BMB OH&P(10 TotalCost Corresponde %) (AED) nce

TEC Correspondence

Status

1

V-HVAC-01 Rise pipe configuration 103,400.00

On discussion with BMB/TEC/PJ/400TEC/P289/CHN/2577-09 consultant

2

V-HVAC-02

Valves across PHE

92,950.00

BMB/TEC/PJ/322

On discussion with consultant

3

V-HVAC-03

Additional Diffusers & Grills

15,530.24

BMB/TEC/PJ/537

On discussion with consultant

211,880.24

Remarks

BADER AL MULLA & BROS. CO. W.L.L. VARIATION SUMMARY PROJECT: AL BASSAM OFFICE TOWER AT TECOM DISCIPLINE: PLUMBING Submitted Agreed Variation S.No. Description Value By Value Ref. BMB (AED) (AED) 1

V-P-01

Extra requirement of water supply pipes

234,238.87

234,238.87

###

BMB OH&P(10 TotalCos Corresponden %) t (AED) ce 19,067.27

###

###

TEC Correspondence

BMB/TEC/PJ/267 , TEC/P289/CHN/1723-09 BMB/TEC/PJ/133

Status

Accepted

Remarks

BADER AL MULLA & BROS. CO. W.L.L. VARIATION SUMMARY PROJECT: AL BASSAM OFFICE TOWER AT TECOM DISCIPLINE: FIREFIGHTING OH&P(10% )

Total Cost (AED)

BMB Correspondence

133,125.00 104,500.00

10,450.00

###

BMB/TEC/PJ/331, BMB/TEC/PJ/307, BMB/TEC/PJ/160

2

V-FF-02 Fire Fighting Accessories 727,210.00 373,870.90

37,387.09

###

BMB/TEC/PJ/353

3

V-FF-03

FM 200 System

28,930.00

###

BMB/TEC/PJ/323

4

V-FF-04

Pre Action System

79,375.00

69,850.00

6,985.00

76,835.00

BMB/TEC/PJ/363

5

V-FF-05

Diesel Engine Exhaust Piping, Insulation & Cladding

45,702.88

952.72

95.27

1,047.99

BMB/TEC/PJ/333

6

V-FF-07

Additional Firefighting Works

14,090.91

###

S.No.

Variatio n Ref.

Description

1

V-FF-01

Fire Pump

Submitted Value By BMB (AED)

Agreed Value (AED)

328,750.00 289,300.00

541,973.00 140,909.09

###

###

TEC Correspondence TEC/P289/WHB/239209, TEC/P289/WHB/204409 TEC/P289/WHB/239209, TEC/P289/WHB/246809 TEC/P289/WHB/239209, TEC/P289/WHB/246809

Status

Accepted

Accepted

Accepted

Accepted TEC/P289/WHB/239209, TEC/P289/CHN/258809

BMB/TEC/PJ/360 TEC/P289/WHB/2392-09

on discussion with consultant Accepted

Remarks

BADER AL MULLA & BROS. CO. W.L.L. VARIATION SUMMARY PROJECT: AL BASSAM OFFICE TOWER AT TECOM DISCIPLINE: DRAINAGE S.No.

Variation Ref.

Description

Submitted Value By BMB (AED)

Agreed Value (AED)

OH&P(10 %)

952.72

95.27

1,047.99

BMB/TEC/PJ/305

Total Cost BMB TEC Correspondence (AED) Correspondence TEC/P289/WHB/239209, TEC/P289/KHA/158609 TEC/P289/WHB/239209, TEC/P289/WHB/204509 TEC/P289/WHB/239209, TEC/P289/WHB/204309

Status

1

V-DR-05Rain Water Outlet - Roof Floor 1,100.00

2

V-DR-06

4,162.50

3,146.36

314.64

3,461.00

BMB/TEC/PJ/304

3

V-DR-07Manhole Cover - Ground Floor 3,407.50

2,989.09

298.91

3,287.99

BMB/TEC/PJ/306

4

V-DR-08

Floor Drain Cover Swimming Pool

1,050.00

1,168.18

116.82

1,285.00

BMB/TEC/PJ/302

TEC/P289/WHB/239209

Accepted

5

V-DR-09

Additional Rain Water Outlet - 23rd Floor

1,948.00

1,800.00

180.00

1,980.00

BMB/TEC/PJ/303

TEC/P289/WHB/239209

Accepted

Car Park Gulley

.

11,668.00 10,056.34

Accepted

Accepted

Accepted

Remarks