BADER AL MULLA & BROS. CO. W.L.L. VARIATION SUMMARY PROJECT: AL BASSAM OFFICE TOWER AT TECOM DISCIPLINE: ELECTRICAL Submitted Variatio S.No. Description Value By n Ref. BMB (AED)
Agreed Value (AED)
BMB OH&P(10% TotalCost Corresponden ) (AED) ce
TEC Correspondence
Status
1
V-EL-01
149,176.00
0.00
BMB/TEC/PJ/232TEC/P289/WHB/1565-09
on discussion with consultant
2
V-EL-02 GSM DU Cable Containment 136,255.00
0.00
BMB/TEC/PJ/232TEC/P289/WHB/1565-09
on discussion with consultant
3
V-EL-03 External Lighting (Facade)
###
BMB/TEC/PJ/408
GSM Cable Laying
4
V-EL-04
Structured Cabling
5
V-EL-05
6
159,622.00 130,522.72 13,052.27
Accepted
TEC/P289/WHB/2235BMB/TEC/PJ/301 09, on discussion with , consultant TEC/P289/WHB/2393BMB/TEC/PJ/364 09 TEC/P289/WHB/239209, BMB/TEC/PJ/358 Accepted TEC/P289/WHB/246809 TEC/P289/WHB/2392-
563,385.00
0.00
Fire Alarm
233,788.07 159,090.90 15,909.09
###
V-EL-06
Central Battery System
530,263.00 381,044.54 38,104.45
###
7
V-EL-08
LV Switch Gear
132,828.17
8
V-EL-09
Additional Power Supply as per Du comments
41,748.00
41,946.36
4,194.64
46,141.00 BMB/TEC/PJ/369
Accepted
9
V-EL-10
Garbage Chute
25,011.00
23,593.64
2,359.36
25,953.00 BMB/TEC/PJ/409
Accepted
34,352.73
3,435.27
37,788.00 BMB/TEC/PJ/441
Accepted
BMB/TEC/PJ/334
BMB/TEC/PJ/539
09, TEC/P289/WHB/246809
Accepted on discussion with consultant
10
V-EL-11 Civil Defence Control Panel
39,298.00
11
V-EL-13
Containment for Intelligent Metering System
22,994.00
0.00
BMB/TEC/PJ/456 , BMB/TEC/PJ/514
on discussion with consultant
12
V-EL-14
Additional light points for ground floor
34,130.00
0.00
BMB/TEC/PJ/544
on discussion with consultant
13
V-EL-15
Cable tray Containment CCTV
2,086.00
0.00
BMB/TEC/PJ/540
on discussion with consultant
Remarks
14
V-EL-16
Electrical Provisions in Podium Toilets
24,675.00
0.00
TOTAL
###
###
BMB/TEC/PJ/542
on discussion with consultant
BADER AL MULLA & BROS. CO. W.L.L. VARIATION SUMMARY PROJECT: AL BASSAM OFFICE TOWER AT TECOM DISCIPLINE: HVAC S.No.
Variation Ref.
Description
Submitted Value By BMB (AED)
Agreed Value (AED)
BMB OH&P(10 TotalCost Corresponde %) (AED) nce
TEC Correspondence
Status
1
V-HVAC-01 Rise pipe configuration 103,400.00
On discussion with BMB/TEC/PJ/400TEC/P289/CHN/2577-09 consultant
2
V-HVAC-02
Valves across PHE
92,950.00
BMB/TEC/PJ/322
On discussion with consultant
3
V-HVAC-03
Additional Diffusers & Grills
15,530.24
BMB/TEC/PJ/537
On discussion with consultant
211,880.24
Remarks
BADER AL MULLA & BROS. CO. W.L.L. VARIATION SUMMARY PROJECT: AL BASSAM OFFICE TOWER AT TECOM DISCIPLINE: PLUMBING Submitted Agreed Variation S.No. Description Value By Value Ref. BMB (AED) (AED) 1
V-P-01
Extra requirement of water supply pipes
234,238.87
234,238.87
###
BMB OH&P(10 TotalCos Corresponden %) t (AED) ce 19,067.27
###
###
TEC Correspondence
BMB/TEC/PJ/267 , TEC/P289/CHN/1723-09 BMB/TEC/PJ/133
Status
Accepted
Remarks
BADER AL MULLA & BROS. CO. W.L.L. VARIATION SUMMARY PROJECT: AL BASSAM OFFICE TOWER AT TECOM DISCIPLINE: FIREFIGHTING OH&P(10% )
Total Cost (AED)
BMB Correspondence
133,125.00 104,500.00
10,450.00
###
BMB/TEC/PJ/331, BMB/TEC/PJ/307, BMB/TEC/PJ/160
2
V-FF-02 Fire Fighting Accessories 727,210.00 373,870.90
37,387.09
###
BMB/TEC/PJ/353
3
V-FF-03
FM 200 System
28,930.00
###
BMB/TEC/PJ/323
4
V-FF-04
Pre Action System
79,375.00
69,850.00
6,985.00
76,835.00
BMB/TEC/PJ/363
5
V-FF-05
Diesel Engine Exhaust Piping, Insulation & Cladding
45,702.88
952.72
95.27
1,047.99
BMB/TEC/PJ/333
6
V-FF-07
Additional Firefighting Works
14,090.91
###
S.No.
Variatio n Ref.
Description
1
V-FF-01
Fire Pump
Submitted Value By BMB (AED)
Agreed Value (AED)
328,750.00 289,300.00
541,973.00 140,909.09
###
###
TEC Correspondence TEC/P289/WHB/239209, TEC/P289/WHB/204409 TEC/P289/WHB/239209, TEC/P289/WHB/246809 TEC/P289/WHB/239209, TEC/P289/WHB/246809
Status
Accepted
Accepted
Accepted
Accepted TEC/P289/WHB/239209, TEC/P289/CHN/258809
BMB/TEC/PJ/360 TEC/P289/WHB/2392-09
on discussion with consultant Accepted
Remarks
BADER AL MULLA & BROS. CO. W.L.L. VARIATION SUMMARY PROJECT: AL BASSAM OFFICE TOWER AT TECOM DISCIPLINE: DRAINAGE S.No.
Variation Ref.
Description
Submitted Value By BMB (AED)
Agreed Value (AED)
OH&P(10 %)
952.72
95.27
1,047.99
BMB/TEC/PJ/305
Total Cost BMB TEC Correspondence (AED) Correspondence TEC/P289/WHB/239209, TEC/P289/KHA/158609 TEC/P289/WHB/239209, TEC/P289/WHB/204509 TEC/P289/WHB/239209, TEC/P289/WHB/204309
Status
1
V-DR-05Rain Water Outlet - Roof Floor 1,100.00
2
V-DR-06
4,162.50
3,146.36
314.64
3,461.00
BMB/TEC/PJ/304
3
V-DR-07Manhole Cover - Ground Floor 3,407.50
2,989.09
298.91
3,287.99
BMB/TEC/PJ/306
4
V-DR-08
Floor Drain Cover Swimming Pool
1,050.00
1,168.18
116.82
1,285.00
BMB/TEC/PJ/302
TEC/P289/WHB/239209
Accepted
5
V-DR-09
Additional Rain Water Outlet - 23rd Floor
1,948.00
1,800.00
180.00
1,980.00
BMB/TEC/PJ/303
TEC/P289/WHB/239209
Accepted
Car Park Gulley
.
11,668.00 10,056.34
Accepted
Accepted
Accepted
Remarks