Usc Extended Undercrossing

  • Uploaded by: Citizens' Campaign to Fix the Expo Rail Line, a project of United Community Associations, Inc.
  • 0
  • 0
  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Usc Extended Undercrossing as PDF for free.

More details

  • Words: 230
  • Pages: 6
tDMetro Mid City/Exposition Light Rail Transit Project Preliminary Engineering Team

Letter of Transmittal DATE:

0998

October 19, 2005 Mr. Mike Bohlke

TO:

Board of Supervisors Office County Hall of Administration, 500 West Temple Los Angeles, CA 90012

Room 866

PROJECT:

Mid City/Exposition Light Rail Transit Project - Contract No. E0016 Project no. 046105843

COPIES TO:

Dianne Curzon, Joel Sand"Derg,-RiCkThorpe, Rachel Vandenberg Project files 201, 270

TRANSMITTED VIA HAND DELIVERY

WE ARE SENDING YOU Qty

Date Description



ATTACHED

o

UNDER SEPARATE COVER

Cost USC Comparison Grade Separation of Expo Exhibits Project Alternatives

22

.

o •

For approval For your use

REMARKS:

o o

As Requested For review and comment

These exhibits are provided to you at the direction of Joel Sandberg of the Los Angeles County Metropolitan Transportation Authority (Metro).

707 Wilshire Boulevard, Suite 3300 Los Angeles, CA 90017 213.922.9500 213.922.9559

P:\S843\200

SIGNED

Tel Fax

Correspondence\201

CHRONOLOGICAL

LOTs\Lot#900

thru #999\LOT#0998

Trans MBohlkel0.18-0S.doc

Exposition Light Rail Transit Project Cost Comparison of Project Alternatives

• Flower Street with Grade Separation is $19.3 million more than the Hill Street Couplet • The additional $19.3 million for Flower Street is included in the adopted budget, but only if the anticipated $10 million contribution by use is included • Inclusion of the extended covered tunnel to the west side of Trousdale requested by use would require an additional $37.9 million paid entirely by use

Related Documents

Usc Extended Undercrossing
November 2019 7
Usc
November 2019 8
Extended
November 2019 22
Usc Presentation
June 2020 3

More Documents from "VIBHAV"