RAMINGSFORMULIER
JULI 2000
POST
OMSCHRIJVING
VUL IN IN CEL G5 : 1, 2 OF 3 :
BESTEK 1150 ……………………………… ONDERDEEL ………………… HOEVEEL-
EEN
EENHEIDS
HEID
HEID
PRIJS
BEDRAG
SUBTOTAAL
1
DEFENITIEFASE =1, ONTWERPFASE = 2, VOORBEREIDINGSFASE = 3
1.
OPRUIMWERKZAAMHEDEN
1.100
VERWIJDEREN BOMEN
st
125.00
0.00
1.200
VERWIJDEREN BEGROEIING
are
450.00
0.00
1.300
VERWIJDEREN WEGMEUBILAIR
gld
1.00
0.00
1.400
VERWIJDEREN AFRASTERING
m1
1.50
0.00
1.500
FREZEN GEWAS
are
3.00
0.00
1.600
MAAIEN GEWAS
are
7.00
0.00
1.700
ONTZODEN EN OPSCHONEN SLOOT
m1
3.00
0.00
1.800
VERWIJDEREN HEK
st
75.00
0.00
2.
GRONDWERKEN
2.100
ZAND VERDICHTEN
m3
0.65
0.00
2.200
GROND ONTGRAVEN
m3
1.20
0.00
2.300
GROND VERVOEREN
m3
1.00
0.00
2.400
GROND AFVOEREN
m3
7.50
0.00
2.500
GROND VERWERKEN
m3
1.25
0.00
2.600
GROND VERWERKEN IN DEPOT
m3
0.60
0.00
2.650
GROND ONTGRAVEN UIT DEPOT
m3
1.20
0.00
2.700
ZAND LEVEREN
m3
15.00
0.00
2.800
ZAND LEVEREN
m3
40.00
0.00
2.900
GROND LEVEREN
m3
20.00
0.00
2.910
PLAKZODEN
m2
8.00
0.00
2.920
STAPELZODEN
m2
25.00
0.00
3.
LEIDINGWERKEN
3.100
GROND ONTGRAVEN TBV SLEUF
m3
5.10
0.00
3.200
AANV. SLEUF UITKOMENDE GROND
m3
7.25
0.00
3.300
VERWIJDEREN BETONBUIS TOT 600MM
m1
15.00
0.00
3.310
VERWIJDEREN PVC BUIS
m1
15.00
0.00
3.320
VERWIJDEREN KOLK INCL VERVOER
st
30.00
0.00
3.330
VERWIJDEREN BETONPUT INCL VERVOER
st
80.00
0.00
3.400
BETONPUT AANBRENGEN EXCL. PUTRAND INW. ROND 0,80M
st
1100.00
0.00
3.410
POLYESTERPUT AANBRENGEN EXCL. PUTRAND
st
850.00
0.00
3.420
AANBRENGEN PUTRAND MET DEKSEL
st
480.00
0.00
3.430
OP HOOGTE STELLEN PUTRAND IN STEEN EN HOOGW. MORTEL
st
175.00
0.00
3.440
RWS KOLK
st
500.00
0.00
3.450
TROTTOIRKOLK
st
350.00
0.00
3.460
STRAATKOLK
st
300.00
0.00
3.470
ERFSCHEIDINGSPUTJE AANBRENGEN
st
250.00
0.00
3.500
PVC 125
m1
16.00
0.00
3.510
PVC 160
m1
30.00
0.00
3.520
PVC 200
m1
36.00
0.00
3.530
PVC 315
m1
87.00
0.00
3.530
PVC 400
m1
155.00
0.00
3.535
UITLEGGER DWA PVC 125 INKL. KEILINL BOCHTST. 8M BUIS
st
250.00
0.00
3.536
AAN- AFKOPPELEN VUILWATERAFVOER INCL MATERIAAL
st
200.00
0.00
3.540
GEW. BETONBUIS 0.30
m1
125.00
0.00
3.550
ONGEW. BETONBUIS 0.30
m1
55.00
0.00
3.560
GEW. BETONBUIS 0.50
m1
220.00
0.00
3.570
ONGEW. BETONBUIS 0.50
m1
135.00
0.00
3.580
GEW. BETONBUIS 0.70
m1
350.00
0.00
3.590
ONGEW. BETONBUIS 0.70
m1
245.00
0.00
3.600
PVC HULPST. 125
st
15.00
0.00
3.605
PVC HULPST. 160
st
45.00
0.00
3.610
PVC HULPST. 200
st
58.00
0.00
3.620
PVC HULPST. 315
st
65.00
0.00
3.625
PVC HULPST. 400
st
80.00
0.00
3.630
ROOSTERGOOT
m1
40.00
0.00
3.700
METSELPUT
st
2500.00
0.00
3.800
BRONBEMALING
m
30.00
0.00
3.810
OPEN BEMALING
dag
50.00
0.00
4
VERHARDINGEN
4.1
OPBREKEN KLINKERS
m2
2.00
0.00
4.110
OPBREKEN BETONSTEEN
m2
1.60
0.00
4.115
OPBREKEN DUBBELKLINKER
m2
2.00
0.00
4.120
OPBREKEN ASFALT
m2
10.00
0.00
0
metselzand= F33 brekerzand = F40,-/m3
0
0
>3 dik ca 22 cm
4.130
OPBREKEN ASFALT BREDER ALS 1,50M
m2
5.00
0.00
4.140
OPBREKEN TEGELS PALLETS / VERVOER
m2
8.50
0.00
4.145
OPBREKEN BETONVERHARDIND BREDER 1,50M
m2
3.50
0.00
4.150
OPBREKEN GRASBETONTEGELS
m2
10.00
0.00
4.160
OPBREKEN BETONBANDEN
m1
5.00
0.00
4.200
KLINKERS ONTDOEN GROND
m2
1.80
0.00
4.300
ZAGEN BEST. VERHARDING
m1
15.00
0.00
4.310
OPBREKEN GEW. BETONSTROKEN BREED 0.30M
m1
10.00
0.00
4.320
OPBREKEN FUNDERING DIK 0,25M ( HO-SLAKKEN)
m2
6.00
0.00
4.330
FREZEN 0-3
m2
7.00
0.00
4.340
FREZEN 3-3
m2
11.50
0.00
4.350
FREZEN 6-6
m2
15.00
0.00
4.360
FREZEN AANSLUITING
m2
14.50
0.00
4.400
AFWERKEN ZANDBED
m2
1.25
0.00
4.500
AANBRENGEN MENGGRANULAAT
m2
10.20
0.00
4.510
AANBRENGEN GAB
ton
100.00
0.00
4.520
AANBRENGEN STAB
ton
105.00
0.00
4.530
AANBRENGEN OAB
ton
110.00
0.00
4.540
AANBRENGEN DAB
ton
115.00
0.00
4.550
AANBRENGEN SMA
ton
120.00
0.00
4.560
ASFALTEMULSIE
m2
0.30
0.00
4.600
BETON VOOR FIETSPAD 15CM
m2
35.00
0.00
4.610
BETON VOOR INRIT 20CM
m2
45.00
0.00
4.620
BETON VOOR BUSHALTE 25CM
m2
50.00
0.00
4.630
TEXTUUR BUSHALTE
m2
0.75
0.00
4.640
TEXTUUR FIETSPAD
m2
0.30
0.00
4.650
VOEGEN BUSHALTE
m1
35.00
0.00
4.660
VOEGEN FIETSPAD
m1
110.00
0.00
4.670
SCHIJNVOEGEN FIETSPAD
m1
8.00
0.00
4.700
PASMAKEN BETONBANDEN
st
9.00
0.00
4.710
PROFIELSLIJPEN BBANDEN
st
12.00
0.00
4.800
BETONBANDEN 13/15 X 25
m1
28.00
0.00
4.810
BETONBANDEN 18/20 X 25
m1
32.00
0.00
4.820
LIJMBANDEN 11/22 X 13
m1
35.00
0.00
4.830
BETONBANDEN 11/22 X 16
m1
32.00
0.00
4.840
BETONBANDEN 11/22 X 25
m1
35.00
0.00
4.850
BETONBANDEN 6/12 X 20
m1
33.00
0.00
4.860
BETONBANDEN 6/15
m1
10.00
0.00
4.870
BETONBANDEN 10/20
m1
17.00
0.00
4.880
BETON VOOR BETONBANDEN
m1
9.00
0.00
4.890
BETONSTEEN KEIFORMAAT
m2
38.00
0.00
4.895
BETONSTEEN DUBBELFORMAAT 20 X 20
m2
40.00
0.00
4.900
KLINKERS DIK
m2
70.00
0.00
4.910
KLINKERS WAAL
m2
84.00
0.00
4.920
TEGEL 30/30/4.5
m2
30.00
0.00
4.930
TEGEL 30/30/8
m2
40.00
0.00
4.940
TEGEL 20/20/8
m2
36.00
0.00
4.950
HERSTRATEN BETONSTEEN
m2
12.50
0.00
4.955
HERSTRATEN BETONSTEEN DUBBELFORMAAT 20 X 20
m2
15.00
0.00
4.960
HERSTRATEN KLINKERS DIK
m2
20.00
0.00
4.970
HERSTRATEN TEGELS 30/4.5
m2
12.50
0.00
4.980
NOKT. TEGEL OP SPECIE
m2
22.00
0.00
4.990
NOKT. TEGEL OP FUND.
m2
22.00
0.00
4.991
GOOTTEGEL 15/30 X 8
m1
15.00
0.00
4.992
GOOTTEGEL 30/30/8
m1
25.00
0.00
4.993
MOLGOOT BETONSTEEN ,6M
m1
55.00
0.00
4.994
BETONGOOT 12/40/100
m1
45.00
0.00
4.995
GRASB. TEGEL 40/60
m2
35.00
0.00
4.996
GRASB. TEGEL 40/60
m1
20.00
0.00
4.997
NOODWEG
gld
1.00
0.00
4.998
ROOSTERGOOT MET ROOSTER INKL. AANBRENGEN
m1
250.00
0.00
7
GROENVOORZIENINGEN
7.100
ZAAIEN BERM
are
20.00
0.00
7.110
ZAAIEN TALUD
are
30.00
0.00
7.120
MAAIEN BERM
are
7.00
0.00
7.130
MAAIEN TALUD
are
8.00
0.00
7.200
AFRASTERING NW
m1
6.00
0.00
7.210
AFRASTERING VERPLAATSEN
m1
3.00
0.00
7.220
DRAAIHEK PLAATSEN
1000.00
0.00
7.230
SLOOT OPSCHONEN
m1
2.00
0.00
7.240
HERSTELLEN UITSPOELING
m2
15.00
0.00
TYPE 0
bocht=40 bocht=45 bocht=44 bocht=48
>3
>3 >3
0
st
0 8
VERKKEERSVOORZIENINGEN / DIREKTIEBEH. / MARKERING
8.100
COORDINATIE SCHOUW VERK.
gld
1.00
0.00
8.110
VRI + BORDENSET
dag
185.00
0.00
8.120
TBS WERKNEMER
uur
50.00
0.00
8.130
TBS HYDR. GRAAFMACHINE
uur
90.00
0.00
8.140
TBS VRACHTAUTO
uur
90.00
0.00
8.150
TBS KOMPRESSOR/SHAMER
uur
90.00
0.00
8.160
GEG VERSTREKKING AANNEME
gld
1.00
0.00
8.170
UITVOERING KW PLAN
gld
1.00
0.00
8.180
V & G PLAN
gld
1.00
0.00
8.190
KEET +OPSL. LOODS+ INSTR.
week
1300.00
0.00 0.00
8.200 8.210
GETROKKEN 0.10 VERF
km
850.00
0.00
8.220
GETROKKEN 0.10 THERM.
km
3500.00
0.00
8.230
GETROKKEN 0.15 VERF
km
1200.00
0.00
8.240
GETROKKEN 0.15 THERM
km
5000.00
0.00
8.250
1-1 0.10 VERF
km
8.260
1-1 0 .10 THERM
km
8.270
1-1 0.15 VERF
km
8.280
1-1 0.15 THERM
km
8.290
3-1 0.10 VERF
km
8.300
3-1 0.10 THERM
km
8.310
9-3 0.10 VERF
km
8.320
9-3 0.10 THERM
km
8.330
1-3 0.10 VERF
km
8.340
1-3 0.10 THERM
km
8.350
3-9 0.10 VERF
km
8.360
3-9 0.10 THERM
km
8.370
FIGURATIE VERF
m2
8.380
FIGURATIE THERM
m2
75.00
0.00
8.390
VLAKKEN/ BANDEN VERF
m2
15.00
0.00
8.400
STRALEN MARKERING
m2
25.00
0.00
9
BIJDRAGEN 0.2%
9.1
INRICHTEN WERKTERREIN
9.11
AKW KOSTEN 18.6%
9.12
STELPOST
0.00 2200.00
0.00 0.00
3300.00
0.00 0.00
2800.00
0.00 0.00
2800.00
0.00 0.00
2100.00
0.00 0.00
2000.00
0.00 0.00
0
A B C
0.00 gld
1.00
gld
1.00
0.00 0.00 0.00
SUB-TOTAAL POST 1 t/m POST 9
0
DEFENITIEFASE + 30%
0
ONTWERPFASE + 20%
0
VOORBEREIDINGSFASE + 10%
0 BTW
0 ==============
0 TOTAAL ========== ==============
RAMINGSFORMULIER
JULI 2000
POST
BESTEK 1150 ……………………………… ONDERDEEL …………………
OMSCHRIJVING
VUL IN ONDER SUB-TOTAAL 1, 2 OF 3 : DEFENITIEFASE = 1,
HOEVEEL-
EEN
EENHEIDS
HEID
HEID
PRIJS
ONTWERPFASE = 2,
BEDRAG
SUBTOTAAL
3
VOORBEREIDINGSFASE = 3
1.
OPRUIMWERKZAAMHEDEN
1.100
VERWIJDEREN BOMEN
st
125.00
0.00
1.200
VERWIJDEREN BEGROEIING
are
450.00
0.00
1.300
VERWIJDEREN WEGMEUBILAIR
gld
1.00
0.00
1.400
VERWIJDEREN AFRASTERING
m1
1.50
0.00
1.500
FREZEN GEWAS
are
3.00
0.00
1.600
MAAIEN GEWAS
are
7.00
0.00
1.700
ONTZODEN EN OPSCHONEN SLOOT
m1
3.00
0.00
1.800
VERWIJDEREN HEK
st
75.00
0.00
2.
GRONDWERKEN
2.100
ZAND VERDICHTEN
m3
0.65
0.00
2.200
GROND ONTGRAVEN
m3
1.20
0.00
2.300
GROND VERVOEREN
m3
1.00
0.00
2.400
GROND AFVOEREN
m3
7.50
0.00
2.500
GROND VERWERKEN
m3
1.25
0.00
2.600
GROND VERWERKEN IN DEPOT
m3
0.60
0.00
2.650
GROND ONTGRAVEN UIT DEPOT
m3
1.20
0.00
2.700
ZAND LEVEREN
m3
15.00
0.00
2.800
ZAND LEVEREN
m3
40.00
0.00
2.900
GROND LEVEREN
m3
20.00
0.00
2.910
PLAKZODEN
m2
8.00
0.00
2.920
STAPELZODEN
m2
25.00
0.00
3.
LEIDINGWERKEN
3.100
GROND ONTGRAVEN TBV SLEUF
m3
5.10
0.00
3.200
AANV. SLEUF UITKOMENDE GROND
m3
7.25
0.00
3.300
VERWIJDEREN BETONBUIS TOT 600MM
m1
15.00
0.00
3.310
VERWIJDEREN PVC BUIS
m1
15.00
0.00
3.320
VERWIJDEREN KOLK INCL VERVOER
st
30.00
0.00
3.330
VERWIJDEREN BETONPUT INCL VERVOER
st
80.00
0.00
3.400
BETONPUT AANBRENGEN EXCL. PUTRAND INW. ROND 0,80M
st
1100.00
0.00
3.410
POLYESTERPUT AANBRENGEN EXCL. PUTRAND
st
850.00
0.00
3.420
AANBRENGEN PUTRAND MET DEKSEL
st
480.00
0.00
3.430
OP HOOGTE STELLEN PUTRAND IN STEEN EN HOOGW. MORTEL
st
175.00
0.00
3.440
RWS KOLK
st
500.00
0.00
3.450
TROTTOIRKOLK
st
350.00
0.00
3.460
STRAATKOLK
st
300.00
0.00
3.470
ERFSCHEIDINGSPUTJE AANBRENGEN
st
250.00
0.00
3.500
PVC 125
m1
16.00
0.00
3.510
PVC 160
m1
30.00
0.00
3.520
PVC 200
m1
36.00
0.00
3.530
PVC 315
m1
87.00
0.00
3.530
PVC 400
m1
155.00
0.00
3.535
UITLEGGER DWA PVC 125 INKL. KEILINL BOCHTST. 8M BUIS
st
250.00
0.00
3.536
AAN- AFKOPPELEN VUILWATERAFVOER INCL MATERIAAL
st
200.00
0.00
3.540
GEW. BETONBUIS 0.30
m1
125.00
0.00
3.550
ONGEW. BETONBUIS 0.30
m1
55.00
0.00
3.560
GEW. BETONBUIS 0.50
m1
220.00
0.00
3.570
ONGEW. BETONBUIS 0.50
m1
135.00
0.00
3.580
GEW. BETONBUIS 0.70
m1
350.00
0.00
3.590
ONGEW. BETONBUIS 0.70
m1
245.00
0.00
3.600
PVC HULPST. 125
st
15.00
0.00
3.605
PVC HULPST. 160
st
45.00
0.00
3.610
PVC HULPST. 200
st
58.00
0.00
3.620
PVC HULPST. 315
st
65.00
0.00
3.625
PVC HULPST. 400
st
80.00
0.00
3.630
ROOSTERGOOT
m1
40.00
0.00
3.700
METSELPUT
st
2500.00
0.00
3.800
BRONBEMALING
m
30.00
0.00
3.810
OPEN BEMALING
dag
50.00
0.00
4
VERHARDINGEN
4.1
OPBREKEN KLINKERS
m2
2.00
0.00
4.110
OPBREKEN BETONSTEEN
m2
1.60
0.00
4.115
OPBREKEN DUBBELKLINKER
m2
2.00
0.00
4.120
OPBREKEN ASFALT
m2
10.00
0.00
0
metselzand= F33 brekerzand = F40,-/m3
0
0
>3 dik ca 22 cm
4.130
OPBREKEN ASFALT BREDER ALS 1,50M
m2
5.00
0.00
4.140
OPBREKEN TEGELS PALLETS / VERVOER
m2
8.50
0.00
4.145
OPBREKEN BETONVERHARDIND BREDER 1,50M
m2
3.50
0.00
4.150
OPBREKEN GRASBETONTEGELS
m2
10.00
0.00
4.160
OPBREKEN BETONBANDEN
m1
5.00
0.00
4.200
KLINKERS ONTDOEN GROND
m2
1.80
0.00
4.300
ZAGEN BEST. VERHARDING
m1
15.00
0.00
4.310
OPBREKEN GEW. BETONSTROKEN BREED 0.30M
m1
10.00
0.00
4.320
OPBREKEN FUNDERING DIK 0,25M ( HO-SLAKKEN)
m2
6.00
0.00
4.330
FREZEN 0-3
m2
7.00
0.00
4.340
FREZEN 3-3
m2
11.50
0.00
4.350
FREZEN 6-6
m2
15.00
0.00
4.360
FREZEN AANSLUITING
m2
14.50
0.00
4.400
AFWERKEN ZANDBED
m2
1.25
0.00
4.500
AANBRENGEN MENGGRANULAAT
m2
10.20
0.00
4.510
AANBRENGEN GAB
ton
100.00
0.00
4.520
AANBRENGEN STAB
ton
105.00
0.00
4.530
AANBRENGEN OAB
ton
110.00
0.00
4.540
AANBRENGEN DAB
ton
115.00
0.00
4.550
AANBRENGEN SMA
ton
120.00
0.00
4.560
ASFALTEMULSIE
m2
0.30
0.00
4.600
BETON VOOR FIETSPAD 15CM
m2
35.00
0.00
4.610
BETON VOOR INRIT 20CM
m2
45.00
0.00
4.620
BETON VOOR BUSHALTE 25CM
m2
50.00
0.00
4.630
TEXTUUR BUSHALTE
m2
0.75
0.00
4.640
TEXTUUR FIETSPAD
m2
0.30
0.00
4.650
VOEGEN BUSHALTE
m1
35.00
0.00
4.660
VOEGEN FIETSPAD
m1
110.00
0.00
4.670
SCHIJNVOEGEN FIETSPAD
m1
8.00
0.00
4.700
PASMAKEN BETONBANDEN
st
9.00
0.00
4.710
PROFIELSLIJPEN BBANDEN
st
12.00
0.00
4.800
BETONBANDEN 13/15 X 25
m1
28.00
0.00
4.810
BETONBANDEN 18/20 X 25
m1
32.00
0.00
4.820
LIJMBANDEN 11/22 X 13
m1
35.00
0.00
4.830
BETONBANDEN 11/22 X 16
m1
32.00
0.00
4.840
BETONBANDEN 11/22 X 25
m1
35.00
0.00
4.850
BETONBANDEN 6/12 X 20
m1
33.00
0.00
4.860
BETONBANDEN 6/15
m1
10.00
0.00
4.870
BETONBANDEN 10/20
m1
17.00
0.00
4.880
BETON VOOR BETONBANDEN
m1
9.00
0.00
4.890
BETONSTEEN KEIFORMAAT
m2
38.00
0.00
4.895
BETONSTEEN DUBBELFORMAAT 20 X 20
m2
40.00
0.00
4.900
KLINKERS DIK
m2
70.00
0.00
4.910
KLINKERS WAAL
m2
84.00
0.00
4.920
TEGEL 30/30/4.5
m2
30.00
0.00
4.930
TEGEL 30/30/8
m2
40.00
0.00
4.940
TEGEL 20/20/8
m2
36.00
0.00
4.950
HERSTRATEN BETONSTEEN
m2
12.50
0.00
4.955
HERSTRATEN BETONSTEEN DUBBELFORMAAT 20 X 20
m2
15.00
0.00
4.960
HERSTRATEN KLINKERS DIK
m2
20.00
0.00
4.970
HERSTRATEN TEGELS 30/4.5
m2
12.50
0.00
4.980
NOKT. TEGEL OP SPECIE
m2
22.00
0.00
4.990
NOKT. TEGEL OP FUND.
m2
22.00
0.00
4.991
GOOTTEGEL 15/30 X 8
m1
15.00
0.00
4.992
GOOTTEGEL 30/30/8
m1
25.00
0.00
4.993
MOLGOOT BETONSTEEN ,6M
m1
55.00
0.00
4.994
BETONGOOT 12/40/100
m1
45.00
0.00
4.995
GRASB. TEGEL 40/60
m2
35.00
0.00
4.996
GRASB. TEGEL 40/60
m1
20.00
0.00
4.997
NOODWEG
gld
1.00
0.00
4.998
ROOSTERGOOT MET ROOSTER INKL. AANBRENGEN
m1
250.00
0.00
7
GROENVOORZIENINGEN
7.100
ZAAIEN BERM
are
20.00
0.00
7.110
ZAAIEN TALUD
are
30.00
0.00
7.120
MAAIEN BERM
are
7.00
0.00
7.130
MAAIEN TALUD
are
8.00
0.00
7.200
AFRASTERING NW
m1
6.00
0.00
7.210
AFRASTERING VERPLAATSEN
m1
3.00
0.00
7.220
DRAAIHEK PLAATSEN
1000.00
0.00
7.230
SLOOT OPSCHONEN
m1
2.00
0.00
7.240
HERSTELLEN UITSPOELING
m2
15.00
0.00
TYPE 0
bocht=40 bocht=45 bocht=44 bocht=48
>3
>3 >3
0
st
0 8
VERKKEERSVOORZIENINGEN / DIREKTIEBEH. / MARKERING
8.100
COORDINATIE SCHOUW VERK.
gld
1.00
0.00
8.110
VRI + BORDENSET
dag
185.00
0.00
8.120
TBS WERKNEMER
uur
50.00
0.00
8.130
TBS HYDR. GRAAFMACHINE
uur
90.00
0.00
8.140
TBS VRACHTAUTO
uur
90.00
0.00
8.150
TBS KOMPRESSOR/SHAMER
uur
90.00
0.00
8.160
GEG VERSTREKKING AANNEME
gld
1.00
0.00
8.170
UITVOERING KW PLAN
gld
1.00
0.00
8.180
V & G PLAN
gld
1.00
0.00
8.190
KEET +OPSL. LOODS+ INSTR.
week
1300.00
0.00 0.00
8.200 8.210
GETROKKEN 0.10 VERF
km
850.00
0.00
8.220
GETROKKEN 0.10 THERM.
km
3500.00
0.00
8.230
GETROKKEN 0.15 VERF
km
1200.00
0.00
8.240
GETROKKEN 0.15 THERM
km
5000.00
0.00
8.250
1-1 0.10 VERF
km
8.260
1-1 0 .10 THERM
km
8.270
1-1 0.15 VERF
km
8.280
1-1 0.15 THERM
km
8.290
3-1 0.10 VERF
km
8.300
3-1 0.10 THERM
km
8.310
9-3 0.10 VERF
km
8.320
9-3 0.10 THERM
km
8.330
1-3 0.10 VERF
km
8.340
1-3 0.10 THERM
km
8.350
3-9 0.10 VERF
km
8.360
3-9 0.10 THERM
km
8.370
FIGURATIE VERF
m2
8.380
FIGURATIE THERM
m2
75.00
0.00
8.390
VLAKKEN/ BANDEN VERF
m2
15.00
0.00
8.400
STRALEN MARKERING
m2
25.00
0.00
9
BIJDRAGEN 0.2%
9.1
INRICHTEN WERKTERREIN
9.11
AKW KOSTEN 18.6%
9.12
STELPOST
0.00 2200.00
0.00 0.00
3300.00
0.00 0.00
2800.00
0.00 0.00
2800.00
0.00 0.00
2100.00
0.00 0.00
2000.00
0.00 0.00
0
A B C
0.00 gld
1.00
gld
1.00
0.00 0.00 0.00
SUB-TOTAAL POST 1 t/m POST 9
0
DEFENITIEFASE + 30%
0
ONTWERPFASE + 20%
0
VOORBEREIDINGSFASE + 10%
0 BTW
0 ==============
0 TOTAAL ========== ==============
RAMINGSFORMULIER
JULI 2000
POST
BESTEK 1150 ……………………………… ONDERDEEL …………………
OMSCHRIJVING
VUL IN ONDER SUB-TOTAAL 1, 2 OF 3 : DEFENITIEFASE = 1,
HOEVEEL-
EEN
EENHEIDS
HEID
HEID
PRIJS
ONTWERPFASE = 2,
BEDRAG
SUBTOTAAL
3
VOORBEREIDINGSFASE = 3
1.
OPRUIMWERKZAAMHEDEN
1.100
VERWIJDEREN BOMEN
st
125.00
0.00
1.200
VERWIJDEREN BEGROEIING
are
450.00
0.00
1.300
VERWIJDEREN WEGMEUBILAIR
gld
1.00
0.00
1.400
VERWIJDEREN AFRASTERING
m1
1.50
0.00
1.500
FREZEN GEWAS
are
3.00
0.00
1.600
MAAIEN GEWAS
are
7.00
0.00
1.700
ONTZODEN EN OPSCHONEN SLOOT
m1
3.00
0.00
1.800
VERWIJDEREN HEK
st
75.00
0.00
2.
GRONDWERKEN
2.100
ZAND VERDICHTEN
m3
0.65
0.00
2.200
GROND ONTGRAVEN
m3
1.20
0.00
2.300
GROND VERVOEREN
m3
1.00
0.00
2.400
GROND AFVOEREN
m3
7.50
0.00
2.500
GROND VERWERKEN
m3
1.25
0.00
2.600
GROND VERWERKEN IN DEPOT
m3
0.60
0.00
2.650
GROND ONTGRAVEN UIT DEPOT
m3
1.20
0.00
2.700
ZAND LEVEREN
m3
15.00
0.00
2.800
ZAND LEVEREN
m3
40.00
0.00
2.900
GROND LEVEREN
m3
20.00
0.00
2.910
PLAKZODEN
m2
8.00
0.00
2.920
STAPELZODEN
m2
25.00
0.00
3.
LEIDINGWERKEN
3.100
GROND ONTGRAVEN TBV SLEUF
m3
5.10
0.00
3.200
AANV. SLEUF UITKOMENDE GROND
m3
7.25
0.00
3.300
VERWIJDEREN BETONBUIS TOT 600MM
m1
15.00
0.00
3.310
VERWIJDEREN PVC BUIS
m1
15.00
0.00
3.320
VERWIJDEREN KOLK INCL VERVOER
st
30.00
0.00
3.330
VERWIJDEREN BETONPUT INCL VERVOER
st
80.00
0.00
3.400
BETONPUT AANBRENGEN EXCL. PUTRAND INW. ROND 0,80M
st
1100.00
0.00
3.410
POLYESTERPUT AANBRENGEN EXCL. PUTRAND
st
850.00
0.00
3.420
AANBRENGEN PUTRAND MET DEKSEL
st
480.00
0.00
3.430
OP HOOGTE STELLEN PUTRAND IN STEEN EN HOOGW. MORTEL
st
175.00
0.00
3.440
RWS KOLK
st
500.00
0.00
3.450
TROTTOIRKOLK
st
350.00
0.00
3.460
STRAATKOLK
st
300.00
0.00
3.470
ERFSCHEIDINGSPUTJE AANBRENGEN
st
250.00
0.00
3.500
PVC 125
m1
16.00
0.00
3.510
PVC 160
m1
30.00
0.00
3.520
PVC 200
m1
36.00
0.00
3.530
PVC 315
m1
87.00
0.00
3.530
PVC 400
m1
155.00
0.00
3.535
UITLEGGER DWA PVC 125 INKL. KEILINL BOCHTST. 8M BUIS
st
250.00
0.00
3.536
AAN- AFKOPPELEN VUILWATERAFVOER INCL MATERIAAL
st
200.00
0.00
3.540
GEW. BETONBUIS 0.30
m1
125.00
0.00
3.550
ONGEW. BETONBUIS 0.30
m1
55.00
0.00
3.560
GEW. BETONBUIS 0.50
m1
220.00
0.00
3.570
ONGEW. BETONBUIS 0.50
m1
135.00
0.00
3.580
GEW. BETONBUIS 0.70
m1
350.00
0.00
3.590
ONGEW. BETONBUIS 0.70
m1
245.00
0.00
3.600
PVC HULPST. 125
st
15.00
0.00
3.605
PVC HULPST. 160
st
45.00
0.00
3.610
PVC HULPST. 200
st
58.00
0.00
3.620
PVC HULPST. 315
st
65.00
0.00
3.625
PVC HULPST. 400
st
80.00
0.00
3.630
ROOSTERGOOT
m1
40.00
0.00
3.700
METSELPUT
st
2500.00
0.00
3.800
BRONBEMALING
m
30.00
0.00
3.810
OPEN BEMALING
dag
50.00
0.00
4
VERHARDINGEN
4.1
OPBREKEN KLINKERS
m2
2.00
0.00
4.110
OPBREKEN BETONSTEEN
m2
1.60
0.00
4.115
OPBREKEN DUBBELKLINKER
m2
2.00
0.00
4.120
OPBREKEN ASFALT
m2
10.00
0.00
0
metselzand= F33 brekerzand = F40,-/m3
0
0
>3 dik ca 22 cm
4.130
OPBREKEN ASFALT BREDER ALS 1,50M
m2
5.00
0.00
4.140
OPBREKEN TEGELS PALLETS / VERVOER
m2
8.50
0.00
4.145
OPBREKEN BETONVERHARDIND BREDER 1,50M
m2
3.50
0.00
4.150
OPBREKEN GRASBETONTEGELS
m2
10.00
0.00
4.160
OPBREKEN BETONBANDEN
m1
5.00
0.00
4.200
KLINKERS ONTDOEN GROND
m2
1.80
0.00
4.300
ZAGEN BEST. VERHARDING
m1
15.00
0.00
4.310
OPBREKEN GEW. BETONSTROKEN BREED 0.30M
m1
10.00
0.00
4.320
OPBREKEN FUNDERING DIK 0,25M ( HO-SLAKKEN)
m2
6.00
0.00
4.330
FREZEN 0-3
m2
7.00
0.00
4.340
FREZEN 3-3
m2
11.50
0.00
4.350
FREZEN 6-6
m2
15.00
0.00
4.360
FREZEN AANSLUITING
m2
14.50
0.00
4.400
AFWERKEN ZANDBED
m2
1.25
0.00
4.500
AANBRENGEN MENGGRANULAAT
m2
10.20
0.00
4.510
AANBRENGEN GAB
ton
100.00
0.00
4.520
AANBRENGEN STAB
ton
105.00
0.00
4.530
AANBRENGEN OAB
ton
110.00
0.00
4.540
AANBRENGEN DAB
ton
115.00
0.00
4.550
AANBRENGEN SMA
ton
120.00
0.00
4.560
ASFALTEMULSIE
m2
0.30
0.00
4.600
BETON VOOR FIETSPAD 15CM
m2
35.00
0.00
4.610
BETON VOOR INRIT 20CM
m2
45.00
0.00
4.620
BETON VOOR BUSHALTE 25CM
m2
50.00
0.00
4.630
TEXTUUR BUSHALTE
m2
0.75
0.00
4.640
TEXTUUR FIETSPAD
m2
0.30
0.00
4.650
VOEGEN BUSHALTE
m1
35.00
0.00
4.660
VOEGEN FIETSPAD
m1
110.00
0.00
4.670
SCHIJNVOEGEN FIETSPAD
m1
8.00
0.00
4.700
PASMAKEN BETONBANDEN
st
9.00
0.00
4.710
PROFIELSLIJPEN BBANDEN
st
12.00
0.00
4.800
BETONBANDEN 13/15 X 25
m1
28.00
0.00
4.810
BETONBANDEN 18/20 X 25
m1
32.00
0.00
4.820
LIJMBANDEN 11/22 X 13
m1
35.00
0.00
4.830
BETONBANDEN 11/22 X 16
m1
32.00
0.00
4.840
BETONBANDEN 11/22 X 25
m1
35.00
0.00
4.850
BETONBANDEN 6/12 X 20
m1
33.00
0.00
4.860
BETONBANDEN 6/15
m1
10.00
0.00
4.870
BETONBANDEN 10/20
m1
17.00
0.00
4.880
BETON VOOR BETONBANDEN
m1
9.00
0.00
4.890
BETONSTEEN KEIFORMAAT
m2
38.00
0.00
4.895
BETONSTEEN DUBBELFORMAAT 20 X 20
m2
40.00
0.00
4.900
KLINKERS DIK
m2
70.00
0.00
4.910
KLINKERS WAAL
m2
84.00
0.00
4.920
TEGEL 30/30/4.5
m2
30.00
0.00
4.930
TEGEL 30/30/8
m2
40.00
0.00
4.940
TEGEL 20/20/8
m2
36.00
0.00
4.950
HERSTRATEN BETONSTEEN
m2
12.50
0.00
4.955
HERSTRATEN BETONSTEEN DUBBELFORMAAT 20 X 20
m2
15.00
0.00
4.960
HERSTRATEN KLINKERS DIK
m2
20.00
0.00
4.970
HERSTRATEN TEGELS 30/4.5
m2
12.50
0.00
4.980
NOKT. TEGEL OP SPECIE
m2
22.00
0.00
4.990
NOKT. TEGEL OP FUND.
m2
22.00
0.00
4.991
GOOTTEGEL 15/30 X 8
m1
15.00
0.00
4.992
GOOTTEGEL 30/30/8
m1
25.00
0.00
4.993
MOLGOOT BETONSTEEN ,6M
m1
55.00
0.00
4.994
BETONGOOT 12/40/100
m1
45.00
0.00
4.995
GRASB. TEGEL 40/60
m2
35.00
0.00
4.996
GRASB. TEGEL 40/60
m1
20.00
0.00
4.997
NOODWEG
gld
1.00
0.00
4.998
ROOSTERGOOT MET ROOSTER INKL. AANBRENGEN
m1
250.00
0.00
7
GROENVOORZIENINGEN
7.100
ZAAIEN BERM
are
20.00
0.00
7.110
ZAAIEN TALUD
are
30.00
0.00
7.120
MAAIEN BERM
are
7.00
0.00
7.130
MAAIEN TALUD
are
8.00
0.00
7.200
AFRASTERING NW
m1
6.00
0.00
7.210
AFRASTERING VERPLAATSEN
m1
3.00
0.00
7.220
DRAAIHEK PLAATSEN
1000.00
0.00
7.230
SLOOT OPSCHONEN
m1
2.00
0.00
7.240
HERSTELLEN UITSPOELING
m2
15.00
0.00
TYPE 0
bocht=40 bocht=45 bocht=44 bocht=48
>3
>3 >3
0
st
0 8
VERKKEERSVOORZIENINGEN / DIREKTIEBEH. / MARKERING
8.100
COORDINATIE SCHOUW VERK.
gld
1.00
0.00
8.110
VRI + BORDENSET
dag
185.00
0.00
8.120
TBS WERKNEMER
uur
50.00
0.00
8.130
TBS HYDR. GRAAFMACHINE
uur
90.00
0.00
8.140
TBS VRACHTAUTO
uur
90.00
0.00
8.150
TBS KOMPRESSOR/SHAMER
uur
90.00
0.00
8.160
GEG VERSTREKKING AANNEME
gld
1.00
0.00
8.170
UITVOERING KW PLAN
gld
1.00
0.00
8.180
V & G PLAN
gld
1.00
0.00
8.190
KEET +OPSL. LOODS+ INSTR.
week
1300.00
0.00 0.00
8.200 8.210
GETROKKEN 0.10 VERF
km
850.00
0.00
8.220
GETROKKEN 0.10 THERM.
km
3500.00
0.00
8.230
GETROKKEN 0.15 VERF
km
1200.00
0.00
8.240
GETROKKEN 0.15 THERM
km
5000.00
0.00
8.250
1-1 0.10 VERF
km
8.260
1-1 0 .10 THERM
km
8.270
1-1 0.15 VERF
km
8.280
1-1 0.15 THERM
km
8.290
3-1 0.10 VERF
km
8.300
3-1 0.10 THERM
km
8.310
9-3 0.10 VERF
km
8.320
9-3 0.10 THERM
km
8.330
1-3 0.10 VERF
km
8.340
1-3 0.10 THERM
km
8.350
3-9 0.10 VERF
km
8.360
3-9 0.10 THERM
km
8.370
FIGURATIE VERF
m2
8.380
FIGURATIE THERM
m2
75.00
0.00
8.390
VLAKKEN/ BANDEN VERF
m2
15.00
0.00
8.400
STRALEN MARKERING
m2
25.00
0.00
9
BIJDRAGEN 0.2%
9.1
INRICHTEN WERKTERREIN
9.11
AKW KOSTEN 18.6%
9.12
STELPOST
0.00 2200.00
0.00 0.00
3300.00
0.00 0.00
2800.00
0.00 0.00
2800.00
0.00 0.00
2100.00
0.00 0.00
2000.00
0.00 0.00
0
A B C
0.00 gld
1.00
gld
1.00
0.00 0.00 0.00
SUB-TOTAAL POST 1 t/m POST 9
0
DEFENITIEFASE + 30%
0
ONTWERPFASE + 20%
0
VOORBEREIDINGSFASE + 10%
0 BTW
0 ==============
0 TOTAAL ========== ==============
RAMINGSFORMULIER
JULI 2000
POST
OMSCHRIJVING
VUL IN IN CEL G5 : 1, 2 OF 3 :
DEFENITIEFASE = 1,
ONTWERPFASE = 2,
BESTEK 1150 ……………………………… ONDERDEEL ………………… HOEVEEL-
EEN
EENHEIDS
HEID
HEID
PRIJS
BEDRAG
SUBTOTAAL
3
VOORBEREIDINGSFASE = 3
1.
OPRUIMWERKZAAMHEDEN
1.100
VERWIJDEREN BOMEN
st
125.00
0.00
1.200
VERWIJDEREN BEGROEIING
are
450.00
0.00
1.300
VERWIJDEREN WEGMEUBILAIR
gld
1.00
0.00
1.400
VERWIJDEREN AFRASTERING
m1
1.50
0.00
1.500
FREZEN GEWAS
are
3.00
0.00
1.600
MAAIEN GEWAS
are
7.00
0.00
1.700
ONTZODEN EN OPSCHONEN SLOOT
m1
3.00
0.00
1.800
VERWIJDEREN HEK
st
75.00
0.00
2.
GRONDWERKEN
2.100
ZAND VERDICHTEN
m3
0.65
0.00
2.200
GROND ONTGRAVEN
m3
1.20
0.00
2.300
GROND VERVOEREN
m3
1.00
0.00
2.400
GROND AFVOEREN
m3
7.50
0.00
2.500
GROND VERWERKEN
m3
1.25
0.00
2.600
GROND VERWERKEN IN DEPOT
m3
0.60
0.00
2.650
GROND ONTGRAVEN UIT DEPOT
m3
1.20
0.00
2.700
ZAND LEVEREN
m3
15.00
0.00
2.800
ZAND LEVEREN
m3
40.00
0.00
2.900
GROND LEVEREN
m3
20.00
0.00
2.910
PLAKZODEN
m2
8.00
0.00
2.920
STAPELZODEN
m2
25.00
0.00
3.
LEIDINGWERKEN
3.100
GROND ONTGRAVEN TBV SLEUF
m3
5.10
0.00
3.200
AANV. SLEUF UITKOMENDE GROND
m3
7.25
0.00
3.300
VERWIJDEREN BETONBUIS TOT 600MM
m1
15.00
0.00
3.310
VERWIJDEREN PVC BUIS
m1
15.00
0.00
3.320
VERWIJDEREN KOLK INCL VERVOER
st
30.00
0.00
3.330
VERWIJDEREN BETONPUT INCL VERVOER
st
80.00
0.00
3.400
BETONPUT AANBRENGEN EXCL. PUTRAND INW. ROND 0,80M
st
1100.00
0.00
3.410
POLYESTERPUT AANBRENGEN EXCL. PUTRAND
st
850.00
0.00
3.420
AANBRENGEN PUTRAND MET DEKSEL
st
480.00
0.00
3.430
OP HOOGTE STELLEN PUTRAND IN STEEN EN HOOGW. MORTEL
st
175.00
0.00
3.440
RWS KOLK
st
500.00
0.00
3.450
TROTTOIRKOLK
st
350.00
0.00
3.460
STRAATKOLK
st
300.00
0.00
3.470
ERFSCHEIDINGSPUTJE AANBRENGEN
st
250.00
0.00
3.500
PVC 125
m1
16.00
0.00
3.510
PVC 160
m1
30.00
0.00
3.520
PVC 200
m1
36.00
0.00
3.530
PVC 315
m1
87.00
0.00
3.530
PVC 400
m1
155.00
0.00
3.535
UITLEGGER DWA PVC 125 INKL. KEILINL BOCHTST. 8M BUIS
st
250.00
0.00
3.536
AAN- AFKOPPELEN VUILWATERAFVOER INCL MATERIAAL
st
200.00
0.00
3.540
GEW. BETONBUIS 0.30
m1
125.00
0.00
3.550
ONGEW. BETONBUIS 0.30
m1
55.00
0.00
3.560
GEW. BETONBUIS 0.50
m1
220.00
0.00
3.570
ONGEW. BETONBUIS 0.50
m1
135.00
0.00
3.580
GEW. BETONBUIS 0.70
m1
350.00
0.00
3.590
ONGEW. BETONBUIS 0.70
m1
245.00
0.00
3.600
PVC HULPST. 125
st
15.00
0.00
3.605
PVC HULPST. 160
st
45.00
0.00
3.610
PVC HULPST. 200
st
58.00
0.00
3.620
PVC HULPST. 315
st
65.00
0.00
3.625
PVC HULPST. 400
st
80.00
0.00
3.630
ROOSTERGOOT
m1
40.00
0.00
3.700
METSELPUT
st
2500.00
0.00
3.800
BRONBEMALING
m
30.00
0.00
3.810
OPEN BEMALING
dag
50.00
0.00
4
VERHARDINGEN
4.1
OPBREKEN KLINKERS
m2
2.00
0.00
4.110
OPBREKEN BETONSTEEN
m2
1.60
0.00
4.115
OPBREKEN DUBBELKLINKER
m2
2.00
0.00
4.120
OPBREKEN ASFALT
m2
10.00
0.00
0
metselzand= F33 brekerzand = F40,-/m3
0
0
>3 dik ca 22 cm
4.130
OPBREKEN ASFALT BREDER ALS 1,50M
m2
5.00
0.00
4.140
OPBREKEN TEGELS PALLETS / VERVOER
m2
8.50
0.00
4.145
OPBREKEN BETONVERHARDIND BREDER 1,50M
m2
3.50
0.00
4.150
OPBREKEN GRASBETONTEGELS
m2
10.00
0.00
4.160
OPBREKEN BETONBANDEN
m1
5.00
0.00
4.200
KLINKERS ONTDOEN GROND
m2
1.80
0.00
4.300
ZAGEN BEST. VERHARDING
m1
15.00
0.00
4.310
OPBREKEN GEW. BETONSTROKEN BREED 0.30M
m1
10.00
0.00
4.320
OPBREKEN FUNDERING DIK 0,25M ( HO-SLAKKEN)
m2
6.00
0.00
4.330
FREZEN 0-3
m2
7.00
0.00
4.340
FREZEN 3-3
m2
11.50
0.00
4.350
FREZEN 6-6
m2
15.00
0.00
4.360
FREZEN AANSLUITING
m2
14.50
0.00
4.400
AFWERKEN ZANDBED
m2
1.25
0.00
4.500
AANBRENGEN MENGGRANULAAT
m2
10.20
0.00
4.510
AANBRENGEN GAB
ton
100.00
0.00
4.520
AANBRENGEN STAB
ton
105.00
0.00
4.530
AANBRENGEN OAB
ton
110.00
0.00
4.540
AANBRENGEN DAB
ton
115.00
0.00
4.550
AANBRENGEN SMA
ton
120.00
0.00
4.560
ASFALTEMULSIE
m2
0.30
0.00
4.600
BETON VOOR FIETSPAD 15CM
m2
35.00
0.00
4.610
BETON VOOR INRIT 20CM
m2
45.00
0.00
4.620
BETON VOOR BUSHALTE 25CM
m2
50.00
0.00
4.630
TEXTUUR BUSHALTE
m2
0.75
0.00
4.640
TEXTUUR FIETSPAD
m2
0.30
0.00
4.650
VOEGEN BUSHALTE
m1
35.00
0.00
4.660
VOEGEN FIETSPAD
m1
110.00
0.00
4.670
SCHIJNVOEGEN FIETSPAD
m1
8.00
0.00
4.700
PASMAKEN BETONBANDEN
st
9.00
0.00
4.710
PROFIELSLIJPEN BBANDEN
st
12.00
0.00
4.800
BETONBANDEN 13/15 X 25
m1
28.00
0.00
4.810
BETONBANDEN 18/20 X 25
m1
32.00
0.00
4.820
LIJMBANDEN 11/22 X 13
m1
35.00
0.00
4.830
BETONBANDEN 11/22 X 16
m1
32.00
0.00
4.840
BETONBANDEN 11/22 X 25
m1
35.00
0.00
4.850
BETONBANDEN 6/12 X 20
m1
33.00
0.00
4.860
BETONBANDEN 6/15
m1
10.00
0.00
4.870
BETONBANDEN 10/20
m1
17.00
0.00
4.880
BETON VOOR BETONBANDEN
m1
9.00
0.00
4.890
BETONSTEEN KEIFORMAAT
m2
38.00
0.00
4.895
BETONSTEEN DUBBELFORMAAT 20 X 20
m2
40.00
0.00
4.900
KLINKERS DIK
m2
70.00
0.00
4.910
KLINKERS WAAL
m2
84.00
0.00
4.920
TEGEL 30/30/4.5
m2
30.00
0.00
4.930
TEGEL 30/30/8
m2
40.00
0.00
4.940
TEGEL 20/20/8
m2
36.00
0.00
4.950
HERSTRATEN BETONSTEEN
m2
12.50
0.00
4.955
HERSTRATEN BETONSTEEN DUBBELFORMAAT 20 X 20
m2
15.00
0.00
4.960
HERSTRATEN KLINKERS DIK
m2
20.00
0.00
4.970
HERSTRATEN TEGELS 30/4.5
m2
12.50
0.00
4.980
NOKT. TEGEL OP SPECIE
m2
22.00
0.00
4.990
NOKT. TEGEL OP FUND.
m2
22.00
0.00
4.991
GOOTTEGEL 15/30 X 8
m1
15.00
0.00
4.992
GOOTTEGEL 30/30/8
m1
25.00
0.00
4.993
MOLGOOT BETONSTEEN ,6M
m1
55.00
0.00
4.994
BETONGOOT 12/40/100
m1
45.00
0.00
4.995
GRASB. TEGEL 40/60
m2
35.00
0.00
4.996
GRASB. TEGEL 40/60
m1
20.00
0.00
4.997
NOODWEG
gld
1.00
0.00
4.998
ROOSTERGOOT MET ROOSTER INKL. AANBRENGEN
m1
250.00
0.00
7
GROENVOORZIENINGEN
7.100
ZAAIEN BERM
are
20.00
0.00
7.110
ZAAIEN TALUD
are
30.00
0.00
7.120
MAAIEN BERM
are
7.00
0.00
7.130
MAAIEN TALUD
are
8.00
0.00
7.200
AFRASTERING NW
m1
6.00
0.00
7.210
AFRASTERING VERPLAATSEN
m1
3.00
0.00
7.220
DRAAIHEK PLAATSEN
1000.00
0.00
7.230
SLOOT OPSCHONEN
m1
2.00
0.00
7.240
HERSTELLEN UITSPOELING
m2
15.00
0.00
TYPE 0
bocht=40 bocht=45 bocht=44 bocht=48
>3
>3 >3
0
st
0 8
VERKKEERSVOORZIENINGEN / DIREKTIEBEH. / MARKERING
8.100
COORDINATIE SCHOUW VERK.
gld
1.00
0.00
8.110
VRI + BORDENSET
dag
185.00
0.00
8.120
TBS WERKNEMER
uur
50.00
0.00
8.130
TBS HYDR. GRAAFMACHINE
uur
90.00
0.00
8.140
TBS VRACHTAUTO
uur
90.00
0.00
8.150
TBS KOMPRESSOR/SHAMER
uur
90.00
0.00
8.160
GEG VERSTREKKING AANNEME
gld
1.00
0.00
8.170
UITVOERING KW PLAN
gld
1.00
0.00
8.180
V & G PLAN
gld
1.00
0.00
8.190
KEET +OPSL. LOODS+ INSTR.
week
1300.00
0.00 0.00
8.200 8.210
GETROKKEN 0.10 VERF
km
850.00
0.00
8.220
GETROKKEN 0.10 THERM.
km
3500.00
0.00
8.230
GETROKKEN 0.15 VERF
km
1200.00
0.00
8.240
GETROKKEN 0.15 THERM
km
5000.00
0.00
8.250
1-1 0.10 VERF
km
8.260
1-1 0 .10 THERM
km
8.270
1-1 0.15 VERF
km
8.280
1-1 0.15 THERM
km
8.290
3-1 0.10 VERF
km
8.300
3-1 0.10 THERM
km
8.310
9-3 0.10 VERF
km
8.320
9-3 0.10 THERM
km
8.330
1-3 0.10 VERF
km
8.340
1-3 0.10 THERM
km
8.350
3-9 0.10 VERF
km
8.360
3-9 0.10 THERM
km
8.370
FIGURATIE VERF
m2
8.380
FIGURATIE THERM
m2
75.00
0.00
8.390
VLAKKEN/ BANDEN VERF
m2
15.00
0.00
8.400
STRALEN MARKERING
m2
25.00
0.00
9
BIJDRAGEN 0.2%
9.1
INRICHTEN WERKTERREIN
9.11
AKW KOSTEN 18.6%
9.12
STELPOST
0.00 2200.00
0.00 0.00
3300.00
0.00 0.00
2800.00
0.00 0.00
2800.00
0.00 0.00
2100.00
0.00 0.00
2000.00
0.00 0.00
0
A B C
0.00 gld
1.00
gld
1.00
0.00 0.00 0.00
SUB-TOTAAL POST 1 t/m POST 9
0
DEFENITIEFASE + 30%
0
ONTWERPFASE + 20%
0
VOORBEREIDINGSFASE + 10%
0 BTW
0 ==============
0 TOTAAL ========== ==============