Segun Contratos

  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Segun Contratos as PDF for free.

More details

  • Words: 175
  • Pages: 1
JUFERMOBEL S.L. RESUMEN DE OPERACIONES: MASTER MATCH S.L. OBRA: CORTIJO GRANDE (LOS BARRIOS) PARTIDA 1.- MONTAJE COCINAS.TOTAL CANTIDAD CONTRATO:

34,799.28 €

1ª Certificacion Fra. 2008027 (23/04/08)

6959.86

2ª Certificacion Fra. 2008034 (26/05/08)

6959.86

3ª Certificacion Fra. 2008049 (07/07/08)

20879.56

TOTAL FACTURADO

34799.28

COBROS: C/Fra. 2008027 Trasnferencia bancaria (23/4/08)

-6959.86

C/Fra. 2008027 Transferencia bancaria (26/5/08)

-6959.86

C/Cta. Fra. 2008049 Transferencia bancaria (28/8/08)

-20000

Diferencia a Favor Jufermobel (Facturado-Cobrado)

879.56

PARTIDA 2.- INSTALACION FONTANERIA TOTAL CANTIDAD CONTRATO:

5,985.60

Fra. 20080050 (07/07/08) (No Cobrada)

5,985.60

Diferencia a Favor Jufermobel

5,985.60

DIFERENCIA NO COBRADA SEGÚN CONTRATOS DE JUFERMOBEL DIFERENCIA PARTIDA 1 + DIFERENCIA PARTIDA 2

6865.16

OTROS TRABAJOS Y SUMINISTROS.Fra. 2008051 (07/07/08) Nota: Suministro y colocacion encimeras y grifos

2,570.78

Fra. 2008058 (02/08/08) Nota: Suministro material electrico, para fontaneria y suministro tableros aglomerado y sellamiento

2,405.18

Fra. 2008059 (02/08/08) Nota: Mano Obra empleada en otros trabajos que no tienen que ver con lo contratado

6,291.91

TOTAL PENDIENTE COBRO OTROS TRABAJOS DIFERENCIA PENDIENTE COBRO A FAVOR DE JUFERMOBEL: PARTIDA 1 + PARTIDA 2 + OTROS TRABAJOS Y SUMINISTROS

11,267.87

18,133.03

Related Documents

Segun Contratos
October 2019 27
Contratos
November 2019 55
Contratos
November 2019 52
Contratos
May 2020 27
Contratos Electronicos
June 2020 12