''CONSTRUCTION OF PARTIALLY ACCESS CONTROLLED FOUR LANE ELEVATED HIGHWAY BETWEEN SAMRALA CHO LUDHIANA MUNICIPAL LIMIT (DESIGN CHAINAGE KM 12+951) OF NH-95 (SECTION PASSING THROUGH LUDHIANA CIT MODE UNDER NHDP PHASE IV''
PROJECT
GECPL-SPSCPL-JV
Request for Inspection
Sr No.
RFI
Structure /Highway
Location
Activity
Details
1 2
JV/EL/NH-95/STR/1231 JV/EL/NH-95/STR/1232
Structure Structure
P176-P177 Cheema Chowk
Segment Casting RE Wall Panel Casting
S4-LDH-3000mmm BTD-1,BTC-1
3
JV/EL/NH-95/STR/1233
Structure
Cheema Chowk
Hand Railing Bottom & Footpath kerb
Hand Railing Bottom & Footpath kerb( RP8-RP12)
3
JV/EL/NH-95/HW/205
Highway
Ch. 1+295 to 1+282
Drain Wall - LHS
Layout, leveling, Reinforcement, shuttering & Concreting
4
JV/EL/NH-95/HW/206
Highway
Ch. 1+240 to 1+260
Drain Slab - LHS
Layout, leveling, Reinforcement, shuttering & Concreting
GECPL 1
SPSCPL 3 3
Sr No. Activity 1 Cube Test
2 3
Detail 7 days 7 days 7 days 7 days 7 days 7 days 28 days 28 days 28 days 28 days 28 days 28 days 28 days Grading (No's) Moisture Content (No's)
Grade M60 M50 M45 M35 M25 M15 M15 M25 M30 M35 M40 M45 M50
3 3
3 3 12
1
3
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Silt Content (No's) Elongation Flakiness Slump (No's) Trial impact Sand 10mm 20mm All in Flyash Combine Admixture Cement Cube 28days Cement OPC 53 Physical Test Steel Sampling CBR Calibration CTM Celebration Test OGL Soil Sampling , MDD, CBR, Omc
1
1
As Per TM
1 1 1
1 1 1 1 1
1
1
1 1
Cheema Chowk
ETWEEN SAMRALA CHOWK (DESIGN CHAINAGE KM 0+000) TO HROUGH LUDHIANA CITY) IN THE STATE OF PUNJAB ON EPC ' Date
10.03.2019
Raised By
Inspection Date
Inspection Time
Vinod Sharma Rounak
11.03.2019 11.03.2019
07.00 PM 05.00 PM
Nathi Ram
11.03.2019
11.00 PM
Himanshu
11.03.2019
04.00 PM
Himanshu
11.03.2019
05.00 PM
Remarks