Rfi Gecpl-spscpl (jv) 11.03.2019.xlsx

  • Uploaded by: alok
  • 0
  • 0
  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Rfi Gecpl-spscpl (jv) 11.03.2019.xlsx as PDF for free.

More details

  • Words: 305
  • Pages: 4
''CONSTRUCTION OF PARTIALLY ACCESS CONTROLLED FOUR LANE ELEVATED HIGHWAY BETWEEN SAMRALA CHO LUDHIANA MUNICIPAL LIMIT (DESIGN CHAINAGE KM 12+951) OF NH-95 (SECTION PASSING THROUGH LUDHIANA CIT MODE UNDER NHDP PHASE IV''

PROJECT

GECPL-SPSCPL-JV

Request for Inspection

Sr No.

RFI

Structure /Highway

Location

Activity

Details

1 2

JV/EL/NH-95/STR/1231 JV/EL/NH-95/STR/1232

Structure Structure

P176-P177 Cheema Chowk

Segment Casting RE Wall Panel Casting

S4-LDH-3000mmm BTD-1,BTC-1

3

JV/EL/NH-95/STR/1233

Structure

Cheema Chowk

Hand Railing Bottom & Footpath kerb

Hand Railing Bottom & Footpath kerb( RP8-RP12)

3

JV/EL/NH-95/HW/205

Highway

Ch. 1+295 to 1+282

Drain Wall - LHS

Layout, leveling, Reinforcement, shuttering & Concreting

4

JV/EL/NH-95/HW/206

Highway

Ch. 1+240 to 1+260

Drain Slab - LHS

Layout, leveling, Reinforcement, shuttering & Concreting

GECPL 1

SPSCPL 3 3

Sr No. Activity 1 Cube Test

2 3

Detail 7 days 7 days 7 days 7 days 7 days 7 days 28 days 28 days 28 days 28 days 28 days 28 days 28 days Grading (No's) Moisture Content (No's)

Grade M60 M50 M45 M35 M25 M15 M15 M25 M30 M35 M40 M45 M50

3 3

3 3 12

1

3

4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

Silt Content (No's) Elongation Flakiness Slump (No's) Trial impact Sand 10mm 20mm All in Flyash Combine Admixture Cement Cube 28days Cement OPC 53 Physical Test Steel Sampling CBR Calibration CTM Celebration Test OGL Soil Sampling , MDD, CBR, Omc

1

1

As Per TM

1 1 1

1 1 1 1 1

1

1

1 1

Cheema Chowk

ETWEEN SAMRALA CHOWK (DESIGN CHAINAGE KM 0+000) TO HROUGH LUDHIANA CITY) IN THE STATE OF PUNJAB ON EPC ' Date

10.03.2019

Raised By

Inspection Date

Inspection Time

Vinod Sharma Rounak

11.03.2019 11.03.2019

07.00 PM 05.00 PM

Nathi Ram

11.03.2019

11.00 PM

Himanshu

11.03.2019

04.00 PM

Himanshu

11.03.2019

05.00 PM

Remarks

Related Documents

Rfi
November 2019 24
Rfi-11.04.2019
October 2019 33
Jv Volleyball
June 2020 20
Rfi Ncp
November 2019 30

More Documents from ""