Contract:

Four laning of Chikhali - Tarsod(Packagc-llA) section of

Client:

NHAI

Concessionaire:

Chikhali Tarsod Highways Pvt. Ltd.

Engineer:

Aarvee Associates Welspun Enterprises Ltd.

Contractor:

Sl. No. Deptt.

Submitted By

RFI no.

1

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 3997

2

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 3998

3

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 3999

4

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4000

5

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4001

6

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4002 Approved By

Sl. No. Deptt.

Submitted By

RFI no.

7

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4003

8

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4004

9

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4005

10

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4006

11

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4007

12

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4008

13

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4009

14

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4010

15

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4011

16

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4012

Approved By

Sl. No. Deptt.

Submitted By

RFI no.

17

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4013

18

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4014

19

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4015

20

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4016

21

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4017

22

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4018

23

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4019

24

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4020

25

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4021

26

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4022

Approved By

Sl. No. Deptt.

Submitted By

RFI no.

27

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4023

28

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4024

29

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4025

30

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4026

31

HWY

WEL/NH-06/PKG-II-A/Sec-I/HW - 4027

Approved By

ur laning of Chikhali - Tarsod(Packagc-llA) section of NH-6 from km. 360.000 to Km. 422.700 in the State of Maharashtra on Hybrid Annuity pattern und

HAI

ikhali Tarsod Highways Pvt. Ltd.

rvee Associates elspun Enterprises Ltd. RFI Summary (11.04.2019)

Submitted By

Activity

From

To

Side

FDD Checking of Embankment 12th layer MCW

371+060

371+180

RHS

FDD Checking of Embankment 6th layer S/R

370+510

370+580

RHS

Level & FDD Checking of Embankemnt Top layer S/R

370+900

371+000

LHS

Level & FDD Checking of Subgrade Top layer MCW

378+840

378+880

LHS

FDD Checking of Embankment 2nd layer MCW

381+940

382+100

LHS

FDD Checking of Embankment 1st layer S/R & MCW

382+100

382+180

LHS Approved By

Activity

From

To

Side

Checking of DBM Top layer Core Cutting

389+950

390+200

RHS

Laying of Filter Media 8th Layer Behind Wall OF MNRB Towards Chikhali Side

374+253

RHS

Laying of Filter Media 8th Layer Behind Wall OF MNRB Towards Tarsod Side

374+253

RHS

Laying of Filter Medi 9th Layer Behind Wall OF MNRB Towards Chikhali Side

374+253

RHS

Laying of Filter Media 9th Layer Behind Wall OF MNRB Towards Tarsod Side

374+253

RHS

Laying of Filter Media 10th Layer Behind Wall OF MNRB Towards Chikhali Side

374+253

RHS

Laying of Filter Media 10th Layer Behind Wall OF MNRB Towards Tarsod Side

374+253

RHS

Laying of WMM Top Layer MCW

387+900

387+940

LHS

Laying of Prime Coat MCW

388+200

388+230

RHS

Level & FDD Checking of Subgrade Top layer MCW

361+860

361+920

RHS

Submitted By

Approved By

Activity

From

To

Side

Level & FDD Checking of Subgrade Top layer MCW

362+400

362+600

RHS

FDD Checking of Embankment 1st layer MCW

361+260

361+380

RHS

Applying of Track Coat & Laying of DBM Top Layer MCW

387+900

387+940

BHS

Applying of Track Coat & Laying of DBM Top Layer MCW

389+600

389+700

BHS

Applying of Track Coat & Laying of DBM Top Layer MCW

388+805

388+835

LHS

Applying of Track Coat & Laying of DBM Top Layer MCW

388+820

388+855

RHS

Applying of Track Coat & Laying of DBM Top Layer MCW

388+200

388+230

RHS

Applying of Track Coat & Laying of DBM Top Layer MCW

388+180

388+230

LHS

Applying of Track Coat & Laying of DBM Top Layer MCW

389+940

390+200

LHS

Laying of Filter Media 8th Layer Behind Wall OF BC Towards Tarsod Side

375+961

Submitted By

RHS

Approved By

Submitted By

Activity

From

To

Side

FDD Checking of Subgrade 1st layer MCW

375+980

376+200

RHS

FDD Checking of Embankment 1st layer MCW

382+350

382+460

LHS

Laying of Kerb MCW

387+900

387+940

BHS

Laying of Kerb MCW

388+200

388+230

RHS

Laying of Kerb MCW

388+190

388+230

LHS

Approved By

e of Maharashtra on Hybrid Annuity pattern under NHDP Phase IV

Submitted By

Date of Submission

Date of inspection

Time of inspection

10-Apr-19

11-Apr-19

12:00PM

10-Apr-19

11-Apr-19

2:00PM

10-Apr-19

11-Apr-19

2:30PM

10-Apr-19

11-Apr-19

11:00AM

10-Apr-19

11-Apr-19

3:00PM

10-Apr-19

11-Apr-19

4:30PM

Remarks

Approved By

Submitted By

Date of Submission

Date of inspection

Time of inspection

10-Apr-19

11-Apr-19

10:00AM

10-Apr-19

11-Apr-19

9:00AM

10-Apr-19

11-Apr-19

10:00AM

10-Apr-19

11-Apr-19

3:15PM

10-Apr-19

11-Apr-19

9:00AM

10-Apr-19

11-Apr-19

12:10PM

10-Apr-19

11-Apr-19

11:00AM

10-Apr-19

11-Apr-19

3:00PM

10-Apr-19

11-Apr-19

4;00PM

10-Apr-19

11-Apr-19

11:00AM

Remarks

Approved By

Submitted By

Date of Submission

Date of inspection

Time of inspection

10-Apr-19

11-Apr-19

2:00PM

10-Apr-19

11-Apr-19

12:00PM

10-Apr-19

11-Apr-19

10:00AM

10-Apr-19

11-Apr-19

11:00AM

10-Apr-19

11-Apr-19

12:00PM

10-Apr-19

11-Apr-19

2:00PM

10-Apr-19

11-Apr-19

3:00PM

10-Apr-19

11-Apr-19

4:00PM

10-Apr-19

11-Apr-19

5:00PM

10-Apr-19

11-Apr-19

12:00PM

Remarks

Approved By

Submitted By

Date of Submission

Date of inspection

Time of inspection

10-Apr-19

11-Apr-19

3:30PM

10-Apr-19

11-Apr-19

12:30PM

10-Apr-19

11-Apr-19

2:00PM

10-Apr-19

11-Apr-19

2:30PM

10-Apr-19

11-Apr-19

11:00AM

Remarks

Approved By

Contract:

Four laning of Chikhali - Tarsod(Packagc-llA) section of NH-6 from km. 360.000 to Km. 4

Client: Concessionaire: Engineer: Contractor:

NHAI Chikhali Tarsod Highways Pvt. Ltd. Aarvee Associates Welspun Enterprises Ltd.

RFI Summary (11.04.201 Sl. No.

Str

RFI no.

Activity

1

VUP

WEL/NH-6/PKG-II-A/Sec-I/STR-1725

Checking of Reinforcement of Raft A1 For VUP

2

VUP

WEL/NH-6/PKG-II-A/Sec-I/STR-1726

Checking of Shuttering & Pouring of Raft A1 For VUP

3

VUP

WEL/NH-6/PKG-II-A/Sec-I/STR-1727

Checking of Reinforcement of Raft A2 For VUP

4

VUP

WEL/NH-6/PKG-II-A/Sec-I/STR-1728

Checking of Shuttering & Pouring of Raft A2 For VUP

5

BC

WEL/NH-6/PKG-II-A/Sec-I/STR-1729

Removing of PCC Grade M-15 of Pier P1 MJRB

6

BC

WEL/NH-6/PKG-II-A/Sec-I/STR-1730

Checking of shuttering & pouring of PCC Grade M-35 for Pier P1 of MJRB for closing of NCR No.-06

km. 360.000 to Km. 422.700 in the State of Maharashtra on Hybrid Annuity pattern under NHDP Phase IV

mmary (11.04.2019) Side

Date of Submition

Date of inspection

Time of inspection

367+377

RHS

10-Apr-19

11-Apr-19

3:30PM

367+377

RHS

10-Apr-19

11-Apr-19

4:30PM

367+377

RHS

10-Apr-19

11-Apr-19

11:00AM

367+377

RHS

10-Apr-19

11-Apr-19

12:00PM

360+649

RHS

10-Apr-19

11-Apr-19

2:00PM

360+649

RHS

10-Apr-19

11-Apr-19

3:00PM

Chainage

Remarks

Contract:

Four laning of Chikhali - Tarsod(Packagc-llA) section of NH-6 from km. 360.000 to Km.

Client:

NHAI

Concessionaire:

Chikhali Tarsod Highways Pvt. Ltd.

Engineer:

Aarvee Associates

Contractor:

Welspun Enterprises Ltd. RFI Summary (11.04.2019)

Sl. No. Deptt. 1

Submitted By

QC

RFI no.

Activity

From

WEL/NH-06/PKG-II-A/Sec-I/LAB-394

Laboratory Testing

394+400

Approved By

n of NH-6 from km. 360.000 to Km. 422.700 in the State of Maharashtra on Hybrid Annuity pattern under NHDP Phase IV

mmary (11.04.2019) To

Side RHS

Submitted By

Date of Date of Submition inspection 10-Apr-19

11-Apr-19

Time of inspection

Remarks

8:40AM

Approved By

Contract:

Four laning of Chikhali - Tarsod(Packagc-llA) section of NH-6 from km. 360.000 to K

Client: Concessionaire: Engineer: Contractor:

NHAI Chikhali Tarsod Highways Pvt. Ltd. Aarvee Associates Welspun Enterprises Ltd.

RFI Summary (11.04.2019 Sl. No. Deptt. 1

SURVEY

Submiited by

RFI no.

Activity

WEL/NH-06/PKG-II-A/Sec-I/SUR - 70

Checking of TBM Flying GPS 370 TO GPS 374

Appoved by

. 360.000 to Km. 422.700 in the State of Maharashtra on Hybrid Annuity pattern under NHDP Phase IV

11.04.2019) From

To

Side

Date of Submition

Date of inspection

Time of inspection

370+000

374+000

BHS

10-Apr-19

11-Apr-19

10:30AM

Submiited by

Remarks

Appoved by