''CONSTRUCTION OF PARTIALLY ACCESS CONTROLLED FOUR LANE ELEVATED HIGHWAY BETWEEN SAMRALA CHO LUDHIANA MUNICIPAL LIMIT (DESIGN CHAINAGE KM 12+951) OF NH-95 (SECTION PASSING THROUGH LUDHIANA CIT MODE UNDER NHDP PHASE IV''
PROJECT
GECPL-SPSCPL-JV
Request for Inspection
Sr No.
RFI
Structure /Highway
Location
Activity
Details
1
JV/EL/NH-95/STR/1187
Structure
P182-P183
Segment Casting
S2-LDH-2750mm
2
JV/EL/NH-95/STR/1188
Structure
P-64
Piling
Layout, Leveling,Boring,Cage Lowering, Concreting
4
JV/EL/NH-95/STR/1189
Structure
RA1 to RP4
Hand Railing Bottom
Layout, leveling, Reinforcement, shuttering & Concreting
5
JV/EL/NH-95/STR/1190
Structure
Cheema Chowk
RE Wall Panel Casting
FB-3,FC-2,FD-3,PL-4,TA-1,TC-1, Corner Panel-1
6
JV/EL/NH-95/HW/188
Highway
Ch. 1+390 to 1+360
Drain Raft (LHS)
Layout, leveling, Reinforcement, shuttering & Concreting
7
JV/EL/NH-95/HW/189
Highway
Ch. 1+430 to 1+410
Drain Wall (LHS)
Layout, leveling, Reinforcement, shuttering & Concreting
Detail 7 days 7 days 7 days 7 days 7 days 7 days 28 days 28 days 28 days 28 days 28 days 28 days
Grade M60 M50 M40 M35 M25 M15 M15 M25 M30 M45 M50 M60
GECPL
SPSCPL
Sr No. Activity 1 Cube Test
2 2
6
1
15
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Grading (No's) Moisture Content (No's) Silt Content (No's) Elongation Flakiness Slump (No's) Trial impact Sand 10mm 20mm All in Flyash Combine Admixture Cement Cube 28days Cement OPC 53 Physical Test Steel Sampling CBR Calibration CTM Celebration Test Glue Trial
1
3 1
As per TM 1 1 1 1
1 1 1 1 1
1
ETWEEN SAMRALA CHOWK (DESIGN CHAINAGE KM 0+000) TO HROUGH LUDHIANA CITY) IN THE STATE OF PUNJAB ON EPC ' Date
28.02.2019
Raised By
Inspection Date
Inspection Time
Vinod Sharma
01.03.2019
01.00 PM
Sandeep
01.03.2019
08AM to 08PM
Nathi Ram
01.03.2019
03.00 PM
Rounak
01.03.2019
05.00 PM
Himanshu
01.03.2019
05.00 PM
Himanshu
01.03.2019
06.00 PM
Remarks